HomeMy WebLinkAboutB12-0193 FINAL REPORT OF SPECIAL INSPECTIONSrowN of vaILJ
Department of Community Development
75 South Frontage Road
Vail, CO 81657
Tel: 970.479.2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of $110 will be charged upon reissuance of the permit.
Application /Permit #(s) information applies
to: Attention: Q Revisions
Q Response to Correction Letter
B12 -0193 Building Department 0_attached copy of correction letter
�� Q Deferred Submittal
ooL4 9 Other Special Inspections Reports
Project Street Address:
302 Hanson Ranch Road 403
(Number) (Street) (Suite #)
Building /Complex Name: Mill Creek Court Building
Applicant Information
(architect, contractor, owner /owner's rep)
Contact Name: George Shaeffer Construction Co.
Address: PO Box 373
City Vail State: CO Zip: 81658
Contact Name: Jon Stevenson
Contact Phone: 970- 331 -4538
Contact E -Mail: jons @gsconco.com
I hereby acknowledge that I have read this application, filled out
in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according
to the town's zoning and subdivision codes, design review ap-
proved, Internalieg Buildin nd Residential Codes and other
ordinance t owlR*"ap�.--
Representative Signature
For Office Use Only:
Fee Paid:
Received From:
Cash
CC: Visa / MC Last 4 CC #
Authorization #
Check #
exp. date:
Description of Transmittal/ List of Changes, Items Attached:
- Final Report of Special Inspections
-- Letter from MJ Mueller- Completion of Project
(use additional sheet if necessary)
Building Permits:
Revised ADDITIONAL Valuations (Labor & Materials)
(DO NOT include original valuation)
Building: $ 0
Plumbing: $ 0
Electrical: $ 0
Mechanical: $ 0
Total: $ 0
Date Received:
NOV 15 2012
TOWN OF VAIL
rI.
1E
TOWN OF VAIL
FINAL REPORT OF SPECIAL INSPECTIONS
Project: �u \\ i?e_s��eNCt R�m�ge L Permit Number: 2 ! i ��
Project Location: 3pZ �t��,t5o11 �RMCA RD. yti1� -C 40
Owner ±V r cv\6�4 S Bu t�l
Address 11 6Wyyy PAr k City: Lakedtn UK Zip: W 2 SZ
Design Professional In Charge: T hA MyA V (012-,c
Address: }
City: Vet , State: Co Zip: 'W05-lb Phone:. '//`
Fax: gi�'411c -Zro 37 E -mail: TAuP- LlPV R WOVA, 4W�41C_V1e4
To the best of my information, knowledge, and belief, the special inspections and/or testing required for
this project, have been completed in accordance with the contract documents.
Interim reports submitted prior to this Final Report of Special Inspections form a basis for, and are to be
considered an integral part of this final report. Any discrepancies that were noted in all interim reports
have been corrected.
Prepared by:
�obEe-r PoLLoc 1L
Q Type or Print Name
Signature
- 17F-
Date
-12-
• 4L® �
Preparer's Seal and Signature Required
U54
WESTERN STATES
INSPECTION CO.
CLIENT CESARE.INC.
13131 BELLAIRE DRIVE
THORNTON, CO 80241
INSPECTION REPORT 303- 957 -8436
PROJECT /JOB# MILL CREEK COURT BLDG_
DATE 10 -26 -12
HOURS OF SHIFT 6:00 AM TO 12:00 PM
MILEAGE TO 100 MILEAGE FROM 100
INSPECTOR ROBERT H. POLLOCK
ASSISTANT N/A
PER DIEM YES NO X
REMARKS:
PAGE 1 OF 3
CLIENT PO # 12.112
CODE AWS D 1 .1 / AWS D 1.3 / AISC
SPECIFICATION PROJECT SPECS./ ASTM
DAY OF WEEK FRIDAY
TOTAL HOURS TODAY (6)
TOTAL MILEAGE 200
CLIENT REP. ADAM SEARS
REPORT #
BULL RESIDENCE REMODEL
MILL CREEK COURT BLDG. - UNIT 403
VAIL, CO.
1) TRAVEL TO PROJECT SITE, AS REQUESTED.
2) REVIEW PROJECT SPECIFICATIONS & DRAWINGS AVAILABLE AT PROJECT SITE.
3) CONDUCT THE REQUIRED "STRUCTURAL STEEL & WELDING" SPECIAL INSPECTIONS FOR SHOP AND /OR
FIELD APPLICATIONS.
4) CONDUCT SPECIAL INSPECTION OF HIGH STRENGTH BOLTING (ASTM A325 OR A490), AS REQUIRED.
5) SEE ATTACHED 'ERECTION INSPECTION REPORT' FOR DETAILS.
����T
�G
AWS CWI # 10090331 - (CERTIFIED WELDING INSPECTOR)
[CC SPECIAL INSPECTOR #878521 - S 1 & S2 - (STRUCTURAL STEEL & BOLTING)
SIGNATURE ROBERT POLLOCK • Q
ICC SPECIAL INSPECTOR
WESTERN STATES
INSPECTION CO.
STRUCTURAL STEEL
ERECTION INSPECTION REPORT
CLIENT CESARE, INC.
PROJECT/JOB-it MILL CREEK COURT BLDG.
DATE 10 -26 -12
HOURS OF SHIFT PG. 1 PM TO PG. 1 PM
MILEAGE TO PG. 1 --MILEAGE FROM PG. 1
INSPECTOR ROBERT POLLOCK
ASSISTANT N/A
PER DIEM YES NO X
13131 BELLAIRE DRIVE
THORNTON, CO 80241
303- 957 -8436
PAGE 2 OF -3
CLIENT PO # 12.112
CODE AWS D 1.1 / AWS D 1.3 / AISC
SPECIFICATION PROJECT SPECS. / ASTM
DAY OF WEEK FRIDAY
TOTAL HOURS TODAY PG. 1
TOTAL MILEAGE PG. 1
CLIENT REP. ADAM SEARS
REPORT #
ITEM
DESCRIPTION /REMARKS
DISPOSITION
ACCEPTED
REJECTED
O.D. Lisr
YES / NO
BULL RESIDENCE - UNITS 403
1
REVIEW WELDER QUALIFICATION TEST RECORDS PROVIDED BY
X
ERECTION CONTRACTOR. (HIGH COUNTRY CUSTOM)
2
CONDUCT VISUAL INSPECTION OF COMPLETED FIELD WELDING
AT THE FOLLOWING:
[A] SPLICE PLATES ON C 10 X 30 LEDGERS
X
[B] 4" X 4" ANGLES / CHANNEL LEDGERS
X
[C] 1/2" BASE PLATES / 1011 X 2" TUBE STEEL MEMBERS
X
[D] W8 X 21 BM. CUP ANGLES / 1011 X 2" TUBE STEEL
X
[E] 8" X 2" TUBE STEEL / 8" X 6" TUBE STEEL AT DOORS
X
[F] 10" X 2" TUBE STEEL COLUMNS / W8 X 21 HEADER BMS.
X
3
IT SHALL BE NOTED, ALL REQUIRED EPDXY ANCHORS HAVE BEEN
X
INSTALLED, UTILIZING POWER FASTENERS ADHESIVE.
(AC 100+ GOLD)
4
CERTIFICATE OF COMPLIANCE IS ATTACHED.
X
v
v
-AWS CWI # 10090331 - (CERTIFIED WELDING INSPECTOR)
QJ
•-ICC SPECIAL INSPECTOR # 878521 - S 1 & S2)-
(STRUCTURAL STEEL & BOLTING)
x,.10
SIGNATURE ROBERT POLLOCK 9
(ICC SPECIAL INSPECTOR)
w5l/
WESTERN STATES
INSPECTION CO.
CERTIFICATE OF COMPLIANCE
DATE: OCTOBER 26, 2012
CLIENT: CESARE, INC. (1 2.1 1 2)
PROJECT: BULL RESIDENCE REMODEL (MILL CREEK COURT BLDG.)
INSPECTION: STRUCTURAL STEEL WELDING & BOLTING
3 oF-3
13131 BELLAIRE DR.
THORNTON, CO
80241
303- 929 -5750
THIS IS TO C- E.RTIFY THAT WESTERN STATES INSPECTION (WSI), TO THE BEST OF MY
KNOWLEDGE HAS COMPLIED WITH THE REQUIREMENTS OF THE PURCHASE AGREEMENT /ORDER
TO PROVICq,E THE REQUIRED INSPECTION OF STRUCTURAL STEEL WELDING AND BOLTING. THE
PROJECT REFERENCED ABOVE SHALL BE CONSIDERED IN COMPLIANCE WITH ALL APPLICABLE
GOVERNING CODES, STANDARDS, SPECIFICATIONS AND WORKMANSHIP PROVISIONS, AS WELL AS
THE CONTRACT DOCUMENTS.
WESTERN STATES INSPECTION CO.
ROBERT POLLOCK
VICE - PRESIDENT / QUALITY ASSURANCE DIRECTOR
dv� 3�
EGG
the mj mueller co., inc.
8 November 2012
Mr. Sidney Schultz
GPSLARCHITECTS, PC
0.53 South Frontage Road West
Suite 230
Vail, Colorado 81657
Subject: REMODEL TO UNIT 403
Mill Creek Court Building
Vail, Colorado
At the request of the general contractor, this report is being prepared to confirm that this office
has been directly involved in the project mentioned above. Any and all questions have been
addressed regarding this project, field visitations were made as requested, and revisions were
made to the structural plans, details and specifications as required for any changes or
revisions. See structural plans, details and specifications dated 2,May 2012 and revised 24
July 2012 and 27 August 2012. Completion of the project as specified on the structural plans,
details and specifications will complete the intent of the structural plans.
Thank -you for the opportunity to provide professional engineering services for this project.
President
, INC.
cc: Mr. Dennis Thompson- GEORGE SHAEFFER CONSTRUCTION COMPANY
civil architectural and structural engineering • p.o. box 2747 vail, colorado 81 658 476 -2627 476 -2637 (FAX)