HomeMy WebLinkAboutB12-0035 SPECIAL INSPECTION PACKETJob Name:_ Job Address:_ Permit No.:_WWN~ SPECIAL INSPECTION AND TESTING AGREEMENT (To applicants of projects requiring Special Inspection or Testing per Section 1701 of the IBe) The owner or his/her representative,on the advice of the design professional in responsible charge,shall complete,seal,sign and submit a copy of the Special Inspection Agreement and Structural Tests Scheduled to the Town of Vail for review and approval.Signatures are required on both pages; photocopied or faxed signatures are acceptable. The owner and his/her general contractor,where applicable,shall also acknowledge the following conditions applicable to Special Inspection Testing: Print Name 1'(0 .(7- Date 1.Contractor is responsible for proper notification to the Inspection or Testing agency for items Iisted.(Page 1)(IBC 1704) 2.Only the testing laboratory should take samples and transport them to their laboratory. 3.Copies of all laboratory reports and inspections are to be sent directly to the Town of Vail by the Testing agency on a weekly basis. 4.Inspection agency to submit names and qualifications of on-site special inspectors to the Town of Vail for review and approval.(Page 2) 5.The special inspector is responsible to immediately notify the Town of Vail Building Official in writing of any concerns and/or problems encountered. 6.It is the responsibility of the contractor to review the Town of Vail approved plans for additional inspection or testing requirements that may be noted.A pre-construction conference at the job site is recommended to review special inspection procedures. 7.The special inspector shall use only the Town of Vail approved drawings. 8.All special inspection field reports must be left on site for review by the Town of Vail staff prior to required inspections or re-inspections. BEFORE OCCUPANCY WILL BE GRANTED:The special inspection agency shall submit a signed and sealed statement that all items requiring testing and inspection were fulfin~d and reported.Those items not tested and/or inspected shall be noted in this statement A copy of the statement shall be maintained at the job site for the Building Inspector's review prior to final inspection. ACknOWled~t: OWner:-l\~ Signature Special Inspection '"R~\>~ Agency:~ Project ='I"\"'b&Arch/Eng:~~ Signature Contractor )~~ /Signature -3- TOWN ~SPECIAL INSPECTION AND TESTING SCHEDULEL\.-~1704) Project Name:~\)b\lt k:jXJ1=:-~\)1 H Owner's Name:7b~. Testing Inspection Signature Agency:~~'Y~~ Testing Inspection Signature PrintName Date Hereby certifies that the Testing/Inspection Agency named above has been engaged to perform structural tests and inspections during construction as checked below,to satisfy all applicable portions of the Building Code. Permit #13 ~12 r Of)3") i6~(/(~klS~l{'(0'(1- PrintName Date 5-'2..1-Ie.· Prior to final inspection,the Inspection Agency shall submit a statement that all items of designated work performed were reported.Any items checked but not tested or inspected will be noted and explained.Whenever any designated Items on the list are ready for sampling,testing,or inspection,it shall be the responsibility of the contractor to give timely notice to the Inspection agency so that the required services may be performed. REINFORc;lNG STEEL: ~Tensile &Bend,one set per heat per __tons Inspection of Placement Inspection of Welding Epoxy MASONRY: __Prelim.Acceptance Tests (Masonry Units,Wan Prisms) __Subsequ~nt Tests (Mortar,Grout,Field Wall Prisms) __Inspection of Placement and Grouting CONCRETE SHOTCRETE GROUT AND MORTAR', Concrete Shot Grout Mortar Aggregatetests for design Suitability of aggregates X X Mix Designs iTestPanel Batch Plant Inspection CementGrab Sample )()t'Inspect Placing\:)j ><.CompressionTests >-X Cast Specimens >c 'X Pick-upSamples Shrinkage Bars Yield Check X Air Check DryUnitWeight PRECAST CONCRETE: Reinforcing Tests Inspection of Reinforcing Placement Tendon Tests Inspection of Tendon Placement Inspection of Concrete Placement Inspection of Concrete Batchlng Inspection of Panel Attachment &Inserts Compression Tests Inspection of Stressingrrransfer PILING,CAISSONS.CAPS,TIES: __Inspection of Reinforcing Placement __Inspection of Concrete Placement __Inspection of Concrete Batching SpeCify other tests,inspections or special instructions required. UNDERPINNING: Temporary/Permanent Inspection of Steel FabricationInspectionofReinforcing&Forms Inspection of Concrete Placement Inspection of Tiebacks SOIL NAILS: Temporary ShoringPermanentWall STRUCTURAL STEEL: Sample &Test (List specific members below)=z::Shop Identification &Welding Inspection Shop Ultrasonic InspectionShopRadiographyiFieldWeldingInspectionFieldBoltinaInspectionFieldUltrasonicInspectionFieldRadiographyMetalDeckWeldingInspection F~PROOFING:Inspection &Placement SOILS:!Acceptance TestsMoisture-Density Determination Field Density Drilled Piers Deep Foundation STRUCTURAL WOOD:Inspection of Fabrication Inspection of Truss Joint Fabrication Sample &Test Components Inspection of Glu lam Fabrication SMOKE CONTROL: SPECIAL CASES: SPECIAl INSPECTION: Seismic Resistance_.0_W~dRequirements .•..\. -4-