HomeMy WebLinkAboutVAIL VILLAGE FILING 2 LOT D2 2003-2007 REMODELS LEGAL/r.'rf Yl\ 7 r-swb
1."+ D / 6,+Da
c6*.siw oEl,EuFtf r
Design Review Board
ACTIOI{ FORIr'l
Department of Community Development
75 South Frontage Road. Vail, Colorado 81657
tef: 970.479,2139 fax.970.479.2+52
web: www.vailgov.com
Project Name: US Bank BuiHing Shtcco DRB Number: DR8070412
Project DescripUon:
Final review of a minor alteration - replace broken siding with stucco to matdt the rest of the
building.
Participants:
OWNER VAIL CUNIC INC
181W MEADOW DR
VAIL
co 81657
o8lL6{2OO7
APPUCANT VAIL VALLEY MEDICAL CENTER
181WEST MEADOW DR SUITE 1OO
VAIL
co 81657
License: 107-4
O8l t6l2OO7 Phone: 970-476-2451
ProjectAddress: 108 S FRONTAGE RDWESTVAIL Location:
108 S. Frontage Road (Weststar Bank Buil
Legal Descripffon: Lot: D-2 Block: Subdivision: VNB BUILDING
Parcel ilumber: 2101{64-0800-1
Comments:
MoUon By:
Second By:
Vote:
Conditions:
BOARD/STAFF ACTION
Action: STAFFAPR
Date of APProvalz O9 | LO|2O07
Cond: 8
(Pl-AN)l No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond:0
(P|-AN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
@nd:201
DRB approval shall not become valid for 20 days following the date of approval'
@nd;202
Apprwal of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permlt is issued and consFuction is @mmenced
and is diligently pursued toward completion.
Cond: CON0009318
The applicant shall install the stucco facade to terminate at an inside comer of
the building.
Planner: Bill Gibson DRB Fee Paid: $250.00
*m Department of Community Development
75 Sou$ Frontage Road, Vail, Colorado 8159
tel: 970.479.2128 tax: 970.479.2452
web: www\rdilgor'aom
Description of the
Location of the Proposal: Loe-Blrxll: t'Lfo SuMivision: VIV B
physicaf Addrcss: lOk < Fu ^laile Ut - Gs< Qrwtl fulovd\
(Contact Eagle Co. Assessor at 970-328-86'10 for parcel no.)
Minor Exterior Alterations
Application for Design Review
General Informaton:
All projects requiring dedgn rwierl must rec€ive apprcval prior to submitting a- building permit application. _Please
r*ir t6 g're su'Uminal requiremenE for the partiorlar approral that is reguested. An application for Design Raniew
cannot Ue accepted untii all required informaton is re&ived by the Communlty Development Department. The
project may also need to be re,riewed by the Town Council and/or the Planning and Envimnmental Commission.
b"lign t"irlo" approyal lapses unt€ss a building permit irs issued and construction commenes within
one year of the apprcval.
Parcel No.:
-vNN
o
\\t
.SZoning:
Name(s) of Owner(s):
"i)'l?oood:'
Owner(s) Signature(s):
NameorApprica*z Vth'L VhUe^J /14A;u( Clt -
Mailing Address:
Phone:
Fax:
For an addition where square footage is added tt?ntT6ldellmf
ommercjal building (includes 250 additions & interior conversions).
$250 For minor changes to buiEings and site improvements, sch as'
re-roofing, painting, window additions, landscaping, fences and
retaining walls, etc.
For minor dtanges to buildings and site improvements, sudl as,
re'roofing, painting, window additions, landscaping, fences and
retaining walls, etc.
$20 For revisions to plans already approved by Planning Staff or $e
Design Review Board.
No Fee
Type of Review and Fee:
tr Signs
O C,oneptial Review
D New Constructiontr Mdfion
y' MinorAftention
(mutti-family/commercial)
E Minor AlteraUon
(single.family/d u plo<)
B Changes to Approved Plans
tr separation Request
Plus $1.00 per square foot of total sign area.
For @nstruction of a new building or
$s0
No Fee
$6s0
$300
$20
n*'=D
TOWN OF VAIL
\/ tl t"t( . (a rt
{t
J
?
r-r,
I
,,,
\ r,l 'r'tr'
,.,.'.\',\'
\' ',- !
\\, :
't)\li+\
\;,\E\
OOa'rt.iIW OETEIOPTG I
Design Review Board
ACTION FO,RM
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel:970.479.2139 fax:970-479.?452
web: www.vailgo%com
Prorect Name: US BANK-VAIL CLINIC
Prorect Descrlption:
Partlcipants:
OWNER VAIL CUNIC INC
181W MEADOW DR
VAIL
co 81657
APPUCAI.IT THE SIGN GALLERY
DRB Number; DR8060546
tu0Ll2006
i2|OI|ZO06 Phone; (970) 24L'6400
REPLACE WESTAR BANK SIGN WITH US BANK SIGN
ProJect Address:
Legal Description:
Parcel Number:
Comments:
Motion By:
Second By:
Vote:
Conditions:
1048 INDEPENDENT A-109
GMND JUNCTION
coLoRADO 81505
Ucense: 878-8
108 S FRONTAGE RD WESTVAIL Location: VAIL CUNIC BUILDING
LoB D-2 Block: Subdivision: VNB BUILDING
2101-064-0800-1
BOARD/STAFF ACTION
Action: STAFFAPR
Date of Approval: 1405/2006
Cond:8
(PLAN): No changes to these plans may be made without the written @nsent of Town of
Vail staff and/or the appropriate review committee(s).
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond: 202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and conslfudion is commenced
and is diligently pursued toward completion.
Cond: 113
All dwelopment applications submitted to the Town after the effective date of
Ordinance 26, Series 2006 shall be subject to the pending employee housing
regulations in whatever form they are finally,adopted; provided, however, that if
the Town fails to adopt the pending employee housing regulations by April L5, 2007,
this Ordinance shall not apply to such development applications.
Planner: Bill Gibson DRB Fee Paid: $56.00
'rf
I
I
Sign Application for Design Review
General Information:
All projects requiring design review must re@ive approval prior to submitting a building permit application. ?lease
refdr t6 tne submittat requirements for the particular approval that is requested. An application for Design Revieur
cannot be accepted untii all required information is received by the Community Development Department.. The
project may also need to Ue reviewed by the Town Council and/or the Planning and Environmental Commission.
b"iign t"irie* approval lapses unless a building permit is issued and construction commences within
one year of the aPProval.
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2139 fax: 970'479.2452
web: www.vailgov.com
Ar....l K
Location ofthe ProPosal: Lot:
physical Address: \ 08 S- t-RoNTA6e R-D .
parcelNo.: r.t0t06'100001 (contactEagleCo.AssessoratgT0-328-8640forparcelno.)
Zoning: CorolneR.c rEe
Name(s) of Owner(s):
vN
CL)o
6-o
C)
.l(c
Mailing lddress: 18 61 [rAe c'-d o.,i Vcit co gt6st
Phone:
Owner(s) Signature(s):
Name of Applicant:Sferu 6ALLc aNc.
Mailing Address:rNPE END€Nf *AIO
E-mail Address:
- 6+00
co
Type of Review and Fee:
{ sisnt
E Conceptual Review
tr New Construction
D Addition
E Minor Alteration
(m ulti-family/commercial)
tr Minor Altention
(single-family/duPlex)
tr Changes to Approved Plans
O SeparaUon Request
retaining walls, etc'
$20 For revisions to Plans
Design Review Board'
No Fee
$50 Plus $1.00 per square foot oftotal sign area.
No Fee
$650 For construction of a new building or demo/rebuild'
iioo For an addition where square footage is added to any residential or
commercial building (includes 250 additions & interior conversions)'
$250 For minor changes to buildings and site improvements' such as,
reroofing, painting, window additions, landscaping, fences and
retaining walls, etc.
$20 For minor changes to buildings and site improvements, such as,
reroofing, painting, window additions, landscaping, fences and
already approv'd.'5y Planning Staff or the
SIGN APPUCATION
SUBMITTAL REQUIREMENTS
General Informatlon
This application is for any sign that is located within the Town of Vail. Specific requirements are available
from the Department of Community Development.
I. SUBMITTAL REQUIREMENTS
A. Name of Business:
B. Building name and physical address;
C. Written approval from condominium association, landlord, and joint owner, if applicable.
D. Type of sign (check all that apply):
trFreestanding Sign
FWallSign
QHanging / Projecting Sign
QDisplay Box
trDaily Special Board
QJoint Directory Sign
trSubdivision Entrance Sign
tr Building Identification
tr Mural
tr Window Sign
tr Sign Program
tr Gas Filled/Fiber Optic
D Temporary Sign
Qother Fpcr- cttcf.r66 IN ExasTr.N6 saGN
atrN'
E.
F.
G.
H,
I.
L
K.
L.
Number of signs proposed:
Sign message:US ?,ANK
Sign and lettering dimensions for each proposed sign (attach a colored scaled schematic
drawing @1/a" = t'):
Length of business frontage:
Height of sign(s) from grade:
la6t
e(/
Sign Location (atbch a site plan and an elevation dnwing or a photograph clearly
indicaUng the proposed location of sign(s)):
Materials and colors of sign (attach samples):
lighting plan:
Indicate type, location and number of fixtures.
Include height above grade, lumens output, luminous.area.
Attach a cut sheet for each proposed fixture.
Drawings showing how and where the sign or awning will attach to the buiHing and how
the awning will be constructed.
The Administrator and/or DRB may require the submission of addiUonal plans, drawings)
specificauons, samples and other materials (including a model) if deemed necessary to
determine whether a p$ect will comply with Design Guidelines or if the intent of the
proposal is not clearly indicated.
Number of signs existine: I
Sign
tr
o
o
F:\cdev\FoRMS\Permits\Planning\DRB\sign_application_l2-05-2005.d0c Page 3 of 4 LAosl200s
.l
'l
NOTES TO ALL APPLICANTS
Time Reouirements
The Design Review Board meeb on the 1st and 3rd Wednesdays of each month. A complete application
form and all accompanying material must be accepted by the Community Development Depanment prior
to application deadlines. A schedule of DRB meetings and associated application deadlines may be found
on the World Wide Web at www,vailoov.com.
Review Criteria
The proposal will be reviewed for compliance with the Design Guidelines as set forth in Tide 12 (Zoning
Regulations) and Title 14 (Development Standards) of the Town of Vail Municipal Code.
Desion Review Board Meetino Reouirements
For new construction and additions, the applicant must stake and tap€ the prcject site to indicate
property lines, proposed buildings and building corners, All trees to be removed must be taped. The
applicant must ensure that staking done during the winter is not buried by snow. All site tapings and
staking must be completed prior to the day of the DRB meeting,
The applicant, or their represenbative, shall be present at the Design Review Board Hearing. Applicants
who fail to appear before the Design Review Board on their scheduled meeting date and who have not
asked in advance that discussion on their item be postponed, will have their items removed from the DRB
agenda until such time as the item has been republished.
If the DRB approves the application wlth conditions or modifications, all conditions of approval must be
resolved prior to the issuance of a building permit.
Staff Approval
The Administrator (a member of the planning shfD may review and approve Design Review applications,
approve with certain modifications, deny the application, or refer the application to the Design Review
Board for a decision. All staff approvals are reviewed by the Design Review Board and any staff decision
is subject to final approval by the DRB.
F:\cdev\FoRMs\Permib\Planning\DRB\si9n-apdication-12-05-2005.doc Page 4 of4 tA05P005
sl
LANDLOR,D APPROVAL
a
GN DESICN IIOCUMENTS
To:Cyotble Crrftcy, vlcc PrgidcDt
U-\. .Bralt C.orpontc Rcrl Ertrtc
2tll0 Errt llrc iirrcct
MlnnorpilirrMN 55106
YdlCllolc,Lrc
P.O. Box 40.000
Vell. CO lll56tl
U*S. BrnL $lgn Colvcrslou
Lllilord Approvel
Froo:
Prvjcers
Rcr
I hsvc rcvioricd tte rnrctrd rllD dodtn aocuDcrtt !!4
fi hlvc hltlrlal ach prgc hdlcrdlt ny rEprcvd of tic tk! dt|bD doc'uacsrr $
ruboltrcd. In lddldon,
I hcreby givr notico to thr tlgn perolftl4 rotborlry tbrt I trpDrcyo tfic rhr d.rltn
doctmcntr lr lrbolrtcrl
I ruthotlzc thc rlgl wador rndcr olrrct pttb US. lhrcorp to ldc tpplicrtioa for
rtd tccnrc tlc dccc.r!ry lanrit(r), rlrrovc rhc crttiD8 rijnr, Inatlll thc ttrre
tpProvcd rlSdr eod rqttir rrry rcruttilg visiblc wrll drmrgc
I I I htvc nedc ootrtlonr orr thc rllu dcriln rlgrunrcng irrdierriuj ulr c6ccrar. Pl.tlc
tddrru ttc|G coaclr$ lDd suDult rcvbcd dtn dc3tg! .locurrc!$ for lry rcvler rld
lpprovll
I I I brvc rnochcd r lcn:r. wlth rddlrloml hforrmtlol lor your comirlcntloo"
9t?'d
? l0/e00 'd
E6EEIESSAbb:0r
E6ZaES50r! ( XUI )
bEO96LbALG rdSOS3I J.I-]I3UJ :J{.rYr 3uro J J 95 :Sl 9@e- l6-n0.l
u6!g l[ 0E:et ([0I)900e-90-40]l
EIbank
t.
Location: 946-01
Site Plan
ro
n S. Frontage Rd. /nxP
, -- ------
\l
Bank Building
ACTION
CODES
R = REPLACE
x. fiEMovE
C ' Cu$TOM
L = LEAVE
il. t{Ew
ffi
INOICATES
SIGN
€
IIIDICATES
PHOTOS
Wbank Location:
Sign No.
946-01
Illuu intt t ctl Cultinct.6
01
Existing Sign
Description:
Height:
width:
Depth:
Letter Height:
Overall Height
above grade:
Face Material:
Wall Material:
Available
H€ight:
Available
width:
0'
N/A"
N/A''
Illurninated: Ycs Doubl€ Facc:i\o
0"
N/A"
Sign Text:
Comments:
Sign Type:
Action:
Description:
Ground Heigh t:
Height:
widrh:
Max Sq Ft:
Min Sq Ft:
Ilumination:
Wall Repai r:
C'ustorn 4t.lutt'
Relluce
RcItIttL'cttttrtt Ftt t r'
Roure tl-Out ck Bucked Up
Xrl
I Bt)
l)( (. oE 2l-()(t | |
Ret .. ()0-|)(.).0i ,Y.\'
;;----v-
25'.0"
Rccommendaiion
Conrmenls:
GM
oul
cDoo-oEc,
(tz
F
at,xul
trlllJo5
Hf;X€Pfo-5
oG ittiii,
Fi-f i I
8a
tl
?
=rii
dstt
9zE'd
t0/800'd
CEeg€EAFb t or
E5ZeE560t0 ( XUJ )
,bffi6LEAL6 t dIICEEI l'r-lrlul f,tfniuoJl 9E3sl glEa-IB -(u{
u6!5 lll 0E rzt (N0[)900a-90-|10N
Efl
o
LtJaoILoE(L
oz
Fa
=ltJ
a6t€ilbl5t!aql
*i
ci(t,
(o
tl
oE'=
IE
Io)lo
xq
.9q
to
oo,o
,E
* iiiE iei9i-!e{!.F;?qiiig:
4,\
iiEliii
i€gii'
t ..:\
ci(/,
aoF
aoI
ro
ot
o
tl
:\f
ql
-l()q
z
lrJ
=[!
OI
o-
lrJ
E,
]Uo
tr
o
]UYo
m
oU
o
uJFfot
o
uJ
CNo(Lo
E,(L
o)Nco
-o
.9ooc
(U
=o
c)
(Y)
{h
oo
3
ci
o*zo
tti
olll
U'o(Lo(E
(L
oz
Fa
=uJ
J\r*l
=
=e)vi,
CErflCl-
H=HPEI
-
=ET
CEG'lr
[ "zr
EIr*l
-CErflUi,lfl
CE
N
Fo
E=fr
6
z
s
;
t
o
llJ(t,oo-oE(L
(5z
F
U'
=uJ
E=EFII
$
Fo
.n v,
=r=F=E=
aE
8
z9
zo
frtIz
I
N
reG
o
UJao(LoE
o-
oz
Fa
=lrJ
FzJ rrJ >l
BgEHI TP=1*l r6Y!+zl ti
FqE=l d-66=l q
6
H\
ciq
\t
a
6
z
=
.t;-
li
rii
o
UJao(LoE(L
(5z
FU'x
lrJ
uJ(5
, at 7a
a=E>il PH-82
.e,U 3r g EB=H:61 V;cEid6+l
=Ho-<E62l toE
=l Htroz*
f--""-l
@
Fo
(\l
C5
=I
-EEE
EErrl
=ethvi,
--C5
IE
2I
Bz0o
'Iz
uiiI
r.i
o
oE!lo
z
u;
?a
f =t
-!l
z
Pn= a
Ug=
f,E=ac
"l ,l .!_:J
!iG,
ot
EDa!
Eo
tt-
v,
d
z
J(L
TUl-a
z.^
oo
olsf
6
oris{(!ro!
B
.i
a(
o
z
E
lktl rt t6From: Elisabeth ReedTo: Mark HrubyDate: 11l14l200,O 3:30:41 PMSubjec{: Re: FW: Vail US Bank Signage
:
Per my brief conveftation wtthW earlier, there are several options that we have for the
changes. The sign you are proposing for the front (north) of the business looks fine in that it is of the
appropriate sign and the colors are not as bright as the traditional US Bank logo (1 1 -5-2, 1 1-5-3
addresses colors). As for the parking signs, they may be up to 1 square fool in size and may not contain
any advertising (unlike those which WestStar had erected - see sections 11-7-2 and 11-7-7\). Therefore,
the sign may read something like "Bank Parking Only''or "Reserved parking for bank customers'or
something similar (again, 11-7-2 or 11-7-71.
Additionally, a'Privale parking, unauthorized vehicles will be towed by the property owner" and "US Bank
customer parking only'' signs do not need to exist for the same parking space. Please choose one or the
other...again, if you choose the latter, please do not include advertising, but rather use general terms.
As for the lobby hours sign, this is acceptable as long as it is no larger than 1.5 square feet per public
entrance (l think there is only one public entrance that exists there, but can't be sure - SEction 11-6-3-a-5).
The only information allowed on this sign, which we call a "Business Operations Sign" is:
1. Affiliations
2. Hours of operation
3. Credit Cards and accepted forms of payment.
Again, the'lisitor Parking Only''sign needs to contain no advertising. I have included a link to the sign
regulations, which are entitled TITLE 11: SIGN REGULATIONS, and which we have posted on our
website, so that you can match all this jargon up to actual code sections (in parentheses, above) if you'd
like.
htto :/Aflww.sterlinqcodifi ers.com/COA/ail/
I would really encourage a comprehensive look to the signage, particularly the parking signage.
Aesthetical continuity will be required at the time that you submit a final application for review of all these
signs.
Please call with any questions!
Good luck.
Elisabeth E. Reed
Planner ll, Town of Vail
75 S. Frontage Road
Vail, CO 81657
970.479.2454 olc
970.479.2452tax
>>> 'Mark Hruby'' <mark.hruby@mcsign.com> 1 1/10/06 10:1 7 AM >>>
Elizabeth,
Can you let me know if you would be able to approve this sign?
<<946-01 VAIL COl.pdf>>
Thanks,
Mark Hruby
Project Manager, MC Sign Company
office 440-209'6200
fax44O-2094278
mark.hrubv@mcsion.com
> --Original Messag+--
> From:
> Sent:
Mark Hruby
Friday, November 10, 2006 9:30 AM
> To: PAUL. R. MENNER (E-mail)
> Subject Vail US Bank
> Paul,
> | have talked to the city and they will not approve the color of blue but they said they would see about the
red, I am send this to them now, hope to hear something soon. She has mentioned that the code has
changed and nor they only allow 6 Sq ft of copy, I have changed that and makes it look like a postage
stamp. I left the tag line off the make the US Bank as big as possible.
> Thanks,
> Mark Hruby
> Project Managor, MC Sign Company
> office 440-2094200
>lax440-209-6278
> mart.hrubv@mcsion.com
> > <<946{1 VAIL, CO.pdf>>
t
o
lrJoo
o-oG
o-
oz
CI'xl|I
\
\N'
\-
l\.q
.\\
S$
\
6:;rct;l
{gE644
lf'
oB'=
I
E
Io)()
xq
.g)q
ro
o
O)o
!
isE;
titEtlts 2 ^@f=:--=:4//ehV) |
ll ( /,F,/
|
@ll r? /F:=a J '/l/eL--,J/
iiEiii,
II
it
!!
oNcoo
.9Eotr
(U
J!t
(o
ct
+
EEHI
PRI
€
o
a;
2
f;
c
t
E
o
'?
ciE
zoE
a;
I
GG
ot!aoo-oE
o-
oz
F
@x
lrJ
H=HHII
T?I
IEI
f-- ,,zt
-
.l
Ec)lr
EIrr|
=EEIu,EIE
N
Fo
o
reG
o
UJao
o-oE
o-
(tz
qxut
H=HsEl
fier
EF=
s
.IE
C$
tE*93
f-- "" -l
@
Fo
o
*U,
v =d
E
-92h zl9 !2
qE=
dcEH=EEdg=
EIE
q
t!
q
zI
o-
UJFa
PX
o
aa
z
E
o;
o
IIJaoo-oEo.
oz
ox
IIJ
6:;t!tiI,ll
E
c;3n
(o
tl
op
=:N
Io)bxq
.e)q
ro
oo,o
tl
19
@
i!Fiii'
tllt!ill
oN
o
-o
.9!toc(lt
:'o
c)
(!)
{t
FIzl
uJl
EIolrl
o-l
uJlEl
llJlol
f,l
o
UJYoc)ur<vr6
Xou
Pffo-5
oE
I
29
o
F
tr]i2;
t
F
o
.iE
o
z
tl
reG
o
uJaoo.oEo.
oz
oxut
FzJUJ>I
f;3EHI TR=: jl ro Y I'i: zl ui
-EqE=l B-66=l 6
-a
H\
c,U)\t
F
2o
6
E]tzt
jI;
rere
oulaoo.oE
o-
oz
FoxlJl
B=HsEl
vitlr
=Tr|
=b
=Ict44
-I
CJ
-EIEI
=
ou
A{9
TEtri
G*9!
+
Fo
o
F2o
5
6
'izt
I
E
/ofDL
Raub l-f
Design Review Board Va;z-/i/t7-rta 2-
TOI44Vffi
Project Name:
Project Description:
Participants:
Project Address:
Legal DescripUon:
Parcel Number:
Comments:
OWNER VAIL CUNIC INC
181 W MEADOW DR
VAIL
co 81657
License:
APPLICANT VAIL CUNIC INC
1B1W MEADOW DR
ACTION FORM
Departrnent of Community Development
75 South Frontage Road, Vail, Colorado 81657
telt 970.479.2139 fax: 970.479.2452
web: www.ci.vail,co.us
DRB Number: DRB040630
Satellite installation on south side of roof at Weststar Bank Building
L212812004 Phone:
L2l28l20M Phone:
VAIL
co 816s7
License:
l0SSFRONTAGERDWESTVAIL Location: SUITE300
LoE D-2 Block Snbdivision: VNB BUILDING
210106408001
see conditions
Motion By:
Second By:
Vote:
Conditions:
BOARD/STAFF ACTION
Action: STAFFAPR
Date of Approval: L213012004
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond:0
(PI-AN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond: 202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is diligently pursued toward completion.
Cond: CON0006858
The applicant shall re-paint the white stucco retaining wall to the east side of the
,t
building priorto final inspection bythe planning departrnentor byJune 30, 2005,
whichever occurs sooner
Entry: L213012004 By: ee Action: AP
Oond: CON0006859
The applicant shall paint the a\posed silver conduit on the nofth side of $re
building and the small silver vents on the south wall of the building to match the
siding on which the equipment exists. This work shall occur prior to final
inspection by the planning departrnent or by June 30, 2005, whichaner occurs sooner
Entry: 1213012004 By: ee Action: AP
Planner: Elisabeth Eckel DRB Fee Paid: $25O.OO
.R, . "
U
Minor Exterior Alterations
Application for Design Review
Department of Communiby Develcpment t,
75 South Frontage Road, Vail, Colorado 81657
tel: 97 0.47 9.2L39 fax: 97 0.479.2452
web: www.vailgov.com
General Information:
All projerts requiring design review must receive approval prior to subhitting a building permit application. pleasi
refer to.the submittal requiremenls for the particular approval that is requested. An application ior Design R.eview
cannot be accepted until all required information is received by the Community Development Department. The
oroject may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission.
Location ofthe Proposal: Lot:
Physical Address: -I-LD_-S. 6.'-. C-o Bno-s
Parcel No.: - lt o t Okt(O-?OU I (Contaci Eagte Co. Assessor at 970-328.8640 for parcet no.)
Zoning: .> m
Name(s) of Owner(s):
Mailing Address: - i0
4/€
Mailing Address:
E-mail Address:170 -'t7? -1tbb
o*"*Crl r,n*,*<rl: :-----*rlilUfr
Name orApp rrrun , .,,8+,^o ft"'D*nt n t- &* hrfu-t/l*Z*lfil'1""
,toftq-f/t " tzz 6")ru/,'4lonp^
Phone:
liax:
Type of Review and Fee:
tJ Signs
[1 Conceptual R,eview
D New Construction
C Addition
dy'Minor Alteration
(multi-familv/commerciali
-
E Minor Alteration
(single-family/d uplex)
tr Changes to Approved Plans
tr Separation Request
PhrS $1.00 pe:' square tbct of tota! sign area.(qn
No Fee
$6s0
$300
(? qn
For construction of a new building or demo/rebuild.
For an addition where square foctage is added to any residential or
commercial building (inclucies 250 additions & interior conversions),
For minor changes to buiidings and site improvements, such as,
reroofing, painting, window additions, landscaping, fences and
retaining walls, etc.
$20 For minor changes to buildings arrd site iirprovements, such as,
reroofing, pairr ng, windon additions, lanc.lscaping, fences and
retainir'tg w€lls, el.c.
$20 For revisiohs to plans already approved by Planning Staff or the
Design Review Board.
No Fee
Page 1of i2104128104
MINOR EXTERIOR ALTE RATIONS
TO BUILDING AND SITE IMPROVEMENTS
SUBMITTAL REQUIREMENTS
,
General Information: !' '
This application is required for proposals involving minor exterior alterations and/or site
improvements. Proposals to add landscaping do not require DRB approval g4lgss they involve
the addition of patios, water features, grading, or the addition of retaining walls.
I. SUPMITTAL REOUIREMENTS**
O All pages of Application are completetr Checklist is completed and signedO Stamped Topographic Survey*, if applicabletr Site and Grading Plan*, if applicableD Landscape Plan*, if applicabletr Architectunl Elevations*, if applicable0 Exterior color and material samples and specifications.Q Architectural Floor Plans*, if applicabletr Lighting Plan* and Cut-sheet(s) for proposed fixtures, if applicabletr Title report, including Schedules A & B to verify ownership and easements*E Photos of the existing site and adjacent structures, where applicable.0 Written approval ftom a condominium association, landlord, and joint owner, if
applicabletr Site-specific Geological Hazard Repo( if applicable*
O The Administrator and/or DRB may require the submission of additional plans,
drawings, specifications, samples and other materials (including a model) if deemed
necessary to determine whether a project will comply with Design Guidelines or if the
intent ofthe proposal is not dearly indicated.
Please submit lhree (3) copies of the mote als noted with an asterisk (x).
**For interior conversions with no exterior chanoes, the submittal requirements include a
complete set of existing and proposed floor plans, a title report, and written approval from a
condominium association, landlord, and joint owner, if applicable.
I have read and the above listed !requirements:
Project Name:
Contractor Signature
Date Signed
JOINT PROPERTY OWNER
WRITTEN APPROVAT LETTER
(
I, (print name) . a joint owner of profurty located at (address/legal
aescriprionl LAIST5i-*- Aa,-11
provide this letter as written approval of the plans dated which have been
submitted to the Town of Vail Community Development Department for the proposed improvements to be
completed at the address noted above. I undersbnd that the proposed improvemenG include:
I further understand that minor modifications may be made to the plans over the course of the re\riew process to
ensure compliance with the Town's applicable codes and regulaUons.
(Signature)(Date)
Page 2 of ltl07lt6l04
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
{"^i;,HTTA?E
R'AD r-" \ 4'
s7o-47g-2r38 ?-'-+"--b-{ L'\ b
--N.,..^\U.f\...,. {\!NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES d
ADD/ALT COMM BUILD PERMT Permit # 806-0007
project #
Job Address: 108 S FRONTAGE RD WEST VAIL Status . . . : ISSUED
Location.......: WESTAR BANK FIRST FLOOR REMODEL Applied .. . : Olllllz}M
ParcelNo....: 210106408001 Issued...: 02l2Ol2N7
?RSoO-Oo\\ ExPires""': 04/l5l20n'
owNER VArrr CLTNIC rNC jL/L1,/20O6
181 W MEJADOW DR
VATI,co aL657
APPLTCANT ,JACKSON BUILDING COMPAI\TY, LL1l/LL/2006 phone: (970) 331-G900
PO BOX 6625
VAIL
corroRADo 81658
Li-cense : 844 -B
CoNTRAcToR .IAeKsoN BUILDING coMpANy, r.,L}L/LL/2006 phone: (970) 331-G800
PO BOX 6625
VAII,
coLoRiADo 81558
License: 844 -B
Desciption:
WESTAR BANK-TENANT IMPROVEMENTS-RELOCATE DOOR. ADD OFFICE
Occupancy: B
Ty,peConstruction: V-B
Valuation: $20,500.00 Revision Valuation: ?? Totat Sq Ft Added:
***,*:****:**:**:*'l**,*
Building--- > $335.25 Restuarant Plan Review--> $0.00 Total Calculated Fees-> $1,545.16
Pfan Check-- > 5277 -9L Recreation Fee-------- > S0 . 00 Additional Fees------ > $0 - 00
Investigation- > $0.00 TOTAL FEES------------- > 91,s45-15 Total Permit Fee------- > S1,545.15
Will Call----> $3.00 Payments---------- > $1,s46.16
BALANCE DUE---..-> SO, OO
Approvals:
Item: 05100 BUIIJDING DEPARTMENI
01-/23/2006 cairrnion Action: CR corrections
requried plan review co[unents sent to applicant and
architect.
O8/L!/2OO6 cgunion Action: CR second check
review comment sent
F: \cdev\cHRrs\PERMrr. CoMMENTS\BoG - 0o 0?\BoG- 0007secondcheck. Doc
L0/:-3/2006 cAunion Action: AP approved revised
plans
OI/3O/2OO7 cgunion Action: AP approved revised
plans
Item: 05400 PLANNING DEPARTMENI
0L/12/2006 warren Action: AP This permit has no
planning implications. The construetion is only for the
reconf ignrration of existing office space.
09/11-/2006 Warren Action: Ap The revisions
submitted on September 8, 2006, are approved.
LO/O6/2OO6 warren Actj.on: Ap The planning
departmetn has approved the revisions recieved on Octobers, 2006
OL/25/2oo7 warren Act,ion: Ap TLre revisions
dated recieved on ilanuary 22, 2OO7, are approved. Thisrevision dramatically reduced the work being conducted.Item: 05500 FIRE DEPARTMEMr
L0/09/2006 mcgee
Item: 05500 PUBIJIC WORKS
09/L4/2006 gc
plan.
09/1,4/2006 gc
Action: AP
Action: COND Provide a staging
Action: AP
See the Conditions section of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and $tate that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and suMivision codes, design
review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FIOR INSPECTION SIIALL BE MADE T\trENTY-FOLIR HOURS IN ADVANCE BY IELEPIIONE AT 4792149 OR AT OUR OITICE FROM 8:fi)
*:f *** ** ************* ** ** ** ** tf :i!t****{.!t**********:t{.t **,f *r(*,t(**1.:f *,f ***1.*r{.***{.*1.*{.{r{.,f{.*i.**:*rt *{.**:t{.'f rt *1r{.!t ***,f *
CONDITIONS OF APPROVAL
Permit#: 80640ffi a.sof02-2L2D7 Sraurs: ISSLJED
:|.**{.'}*'***|.****:******'t*:*{t*t.'({t'f*!t***:*{t'|t'|.****:**!*'|.,t****{.{t'|.,&*,F*,F*******:8:F!t.{t*************
Permit Type: ADD/ALT COMM BLIILD PERMT Applied: 0lllll2ffi6
Applicant JACKSON BLJILDING COMPANY, LLC Issued:
02t20t2w7
(970) 331-6800 To Expire: 04lL5nn7
Job Address: 108 S FRONTAGE RD WEST VAIL
Location: WFSTAR BANK FIRST FLOOR REMODEL
Parcel No: 21010e08001
Description:
WESTAR BANK-TENANT IMPROVEMENTS-REI.,OCATE DOOR. ADD OFFICE
{.,* *r* '****:**********:**'********'******,********{c{.***Conditions. *t r({.*{.l.***'}d(,}'l.d(!*****t!*r.******{.:****'*!t,*r*'t!***!**!***
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORKCAN BESTARTED.
EnWt VZlUzlzW7 By: DRhoades Action: COND
Required to contact Vail Fire prior to any demolition
work.
Submit shop drawings for sprinkler and alarm
systems.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 14
(BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: 40
(BLDG): (MFR/COMM) FIRE ALARM REQLJIRED PER NFPA 72.
tl
\(=-ooc7 ,,
VAIL B LDING PERMIT
Separate Permits are required electrical, plumbing, mechanical, etc.!
75 S. Frontage Rd.
Vail, Colorado 81657***All Revision submittals must include the Ficld Set of approved plans. No further inspections *-"-'
Will be preformed until the revisions are aDproved. ***
,s,k$,gs=,,,-""I3tftr-
T0m{0f l/i{lt
CONTRACTOR INFORMATION
General Contractor:
5.r.kt'.*- D'it-oLr. l.
Town of Vail Reo. No.:fiqf-E Contact and Phone #'s:
Enr*
ATTENTION: JOE, JR, CHARLTE, CREG(CHRjP
Contractor Signature:
COMPLETE EVALUATIONS FOR BUILDING PERMIT Labor & Materials
OTHER:$REVISED AMOUNT: S Lf6O ELECTRICAL: $
PLUMBING:$REVISED TOTAL: $MECHANICAL: $
For Parcel # Contact Assessors Office at 970-328-8640 or visit
Z lo\ o tyo ot
Job Name: trr"l p lar (orwzkv-- [LL-,V*"Job Address:I
Subdivision:Filing:
REASON FOR REVISIONS:I r gco-farr(g,.,'*-+l
WorkClass: New() Addition( ) Remodel ( ) Repair( ) Demo( ) Other( )
Does an EHU exist at this location: Yes ( ) No ( )WorkType: lnterior( ) Exterior( ) Both( )
Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family ( ) Commercial ( ) Restaurant ( ) Other( )
No. of Accommodation Units in this building:No. of Existing Dwelling Units in this building:
No/Tvpe of Fireplaces Existinc: Gas GasLoqs( ) Wood/Pellet( ) WoodBurni
: Gas Aopliances ( ) Gas Loss ( ) Wood/Pellet ( ) Wood Burning (NOT ALLOWED
FOR OFFICE USE ONLY
Flcdev\FORMS\Permits\Building\building-revision-1 1 -23-2005.doc Page 1 of 2 12t812005
*m
A
'M.#,LI*"0""S"f;.*,#,;"d#ff"
Depaftment of Community Development
Project Name:
Project Address:
/ This Cheklist must fu completed before a Buildina Permit aPolication is
accepEd.
a All pages of application is complete
o Has DRB approval obtained (if required) Provide a copy of approval form
o Condominium Association letter of approval attached if project is a Multi-Family complex
o Complete site plan submitted (4)
I Public Way Permit application included if applicable (refer to Public Work checklist)
o Staging pl'an (a) included (refer to Public WorK checklist) No dumoster,oarkino or material
storaoe allowed on roadways and shoulders without written approval
o Asbestos test and results submitted if demolition is occurring
o Architect stamp and signature (All Commercial and Multi family)
o Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and
Commercial)
o Window and door schedule
o Full structural plans, including design criteria (ie.loads)
D Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
o Soils Report must be submitted prior to footing inspection
o Fire resistive assemblies specified and penetrations indicated
o Smoke detectors shown on plans
o Types and quantity of fireplaces shown
I have read and und6rstand the above listed submittal rcquirements:
Applicant's Signature:
Date of submittal:
Received By:
Flcdev\FORMS\Permits\Building\building-revision-1 1 -232005.doc Page 2 of 2 12t812005
TOWN.OF VA1L oppnnrr'arNT oF CoMMUNITY DEVELOPMENT
75 S. FRONTAGEROAD
VAIL, CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT COMM BUILD PERMT Permit # 806-0007
Project #
Job Address: 108 S FRONTAGE RD WEST VAIL Status . . . : ISSUED
Location.......: WESTAR BANK FIRST FLOOR REMODEL Applied .. . : 0111112006
ParcelNo....: 21010e!08001 Issued...: l0ll7/2W
Expires.....: 04/15/2007
owNER VAIIr CIJINIC INC OL/LI/2006
181 W MEADOW DR
VAIIJco aL6s7
APPLICAIIT \'ACKSON BUILDING eoMpAlry, LL}!/tL/2006 phone: (970) 331-5800
PO BOX 5525
VAII.,
cor.oRADo 81658
License: 844 -B
CONIRACTOR 'JACKSON BUILDING COMPANY, T.I'0!/LL/2O06 Phone: (970) 331-5800
PO BOX 6525
VAIIJ
COITORADO 81658
License: 844-B
Desciption:
WESTAR BANK-TENANT IMPROVEMENTS-RELOCATE CORRIDOR. ADD
OFFICE
Occupancy: B
Type Construction: V-B
Valuation: $18,000.00 Revision Valuation: ?? Add Sq Ft:
,t*'*****'*********:****'a*'l*,11.****+*it
Building---> $293.25 Resnnrant Plan Review- > $0.00 Total Calculated Fees- > $1,366.86
PIan Check--> S190.51 Recreation Fee-------- ) S0.oo Additional Fees----- > S0.00
Investigation- > $0.00 TOTAL FEE$----------- > S1,355.85 Toal Permit Fee-----> $1,355.86
WiU Call---> 93.00 Payments----------- > S1,365.85
BALANCE DUE-----> So. oo
Approvals:
IIEM: O5]-OO BUII,DING DEPARTMENT
0T/23/2006 cgunion Action: CR corrections
requried plan review cotnrnent s sent t.o applicant and
architect.
08/LL/2O05 cgrrnion Action: CR second check
review comment sent
r : \ cdev\ cgnrs \ PERMTT . CoMMENTS \B o 6 - o o o 7 \B o 6 - o o o ? secondcheck . Doc
t0/L3/2O06 carrnion Action: AP approved revised
plans
Iten: 05400 PLANNING DEPART'IIIENT
OL/L2/2O06 Warren Action: AP This permit has no
planning inplications. The construction is only for the
recoifiguration of
09/tL/2006 Warren
subnitted on Septemlcer 8,
Lo/06/2006 warren
existing office space.
Action3 AP The revisions
2006, are approved.Action: AP The planning
the revisions recieved on Octoberdepartmetn has approved
5. 2005
ItEM: O55OO FIRE DEPARTIT{ENT
Lo/09/2oo5 mcgee
Item! 05500 PITBLIC WORKS
09/14/2006 gc
plan.
09/L4/2oo6 gc
Action: AP
Action: COND Provide a staging
Action: AP
*t*****1*l*1***'t*
See the Conditions section of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in firll the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and zuMivision codes, desigr
review approved, International Building and Residential Codes and other ordinances ofthe Town applicable thereto.
REQI,]ESTS T1OR INSPtsCIION SIIAII BE MADE TWENTY-FIOI,JR HOTJRS IN ADV TELEPHONE AT 47$'2149 OR AT OftR OIIICE FR.OM t:ll)
AM.4 PM.
{.*'|**,r*'F!t:F*******,t**t********,f*'t*'t*:|.***!t*,F*******{.:|t'*:t:t.'fi.,**1i{.*{.*{.**'|.'|.'|.{.*:t*:t*********
CONDITIONS OF APPROVAL
Permit #: 806-0007 as of 10-17-2006 Status: ISSUED
,|t:f*:t*:8'*:t'*:t*:t'*:8**,t*!*:t'*:|t{t:t,*:&,t:&***,t*{.***:f*:t:t:t:t*******!**:|.:|.:**!********,**,|.*:|!f*
Permit Type: ADD/ALT COMM BUILD PERMT Applied: 01/11/2006
Applicanr JACKSON BLJILDING COMPANY, LLC Iszued:
rOtr7/20f,6
(970) 331-6800 To Expirer U/l52W7
Job Address: 108 S FRONTAGE RD WEST VAIL
Location: WESTAR BANK FIRST FITOOR REMODEL
Parcel No: 210106108001
Description:
WESTAR BANK.TENANT IMPROVEMENTS-REIOCATE CORRIDOR. ADD
OFFICE
*,**,*{!*,.,!:*,.{.{.:|.*!*'!***|.,kl.**'|.*{.*'}*'.*'t***!*|',****,!****Conditions.i.*:l.*******{.***,|.************
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQI.IIRED BEFORE ANY
WORK CAN BE STARTED.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQLIIRED TO CHECK FOR CODE
COMPLIANCE.
Cord: 14
(BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond:40
(BLDG): (MFR/COMM) FIRE ALARM REQUIRED PER NFPA 72.
05-03-2007
Requested Insp€ct Dat6:
Inspection Area:
Site Address:
Fridav, Mav 04. 2007cG -'
,I(l8 S FRONTAGE RD WEST VAL
WESTAR BANK FIRST FLOOR REMODEL
Entered
r\#171
,^'f )
^,,qY
: GCD Action: NO NOTIFIED
AMOUNT OF SHEETROCK, NO SCREW INSPECTION REQUIR
A/P/D Information
Activitv: 806-0007 Tvoe: A-COMMConslTyp6: Occupahby:Orrier: VAIL CLINIC INC
Applicant: JACKSON BUILDING COMPANY, LLC
Sub Tvoe: ACOMUse: V-B
JACKSON BUILDING COMPANY. LLC
WESTAR BANK.TENANT IMPI
ROUTED TO PLAN RACK 8.1.
Status: ISSUED
Insp Area: CG
Phone: (970) 331€800
Phone: (970) 3316800
DROPPED OFF BY RYAN. ROUTED TO CHRIS. -
. CGUNION) TO CHRIS GUNION, WARREN CAMPBELL,
ED FIELD SET - CGUNION
Contractor:
Description:
Cominent:
Comment:
Comment:
Comment:
Comment:
Comment:
Comment:
Comment:
Comment:
Comment:
Comment:
Reouested Insoection(s)
Item: 90 BLDG-Final
Requestor: JACKSON BUILDING COMPANY. LLC
Inspection Historv
Item: 10
Item: 20Item: 30
FOR WALL AND DO
Item
Item
Item:
Item:
Item:
Item:
Item:
Item:
Item:
Reeuestedrrimei
tn?8i
Commelts: '!St lqSr-Sommes Venture CO. , will call 331-6800Assiqned To: JMONDRAGON- Action: Time Exp:
50
60
70
906an
532
538
539
540
REPT131 Run Id: 6644
TOWN OF VAIL
75 S.FRONTAGEROAD
VAIL, CO 81657
970-479-2138
Occupancy: B
TlpeConstruction: II-B
Type Occupancy: ??
Valuation: $8,200.00
Fir€place Informstion: Restricted:
Builditrg---> $L6? .25 Restuaranl Plan Review- >
Plan Check--> S108.?1 DRB Fec-.--------- >
DEPARTMENT OF COMMUNITY DEVELOPMENT
b- 2.
%)>-b uo!-D .,,^A
NorE: rHIS PERMIT MUsr BE posTED oN JoBSITE er nYr1fi)X'*A
\J-r-sb \---^-Et-,1t\t-. b,'\
ADD/ALT COMM BI.IILD PERMT PErMit #: BO5-0194
Job Address: 108 S FRONTAGE RD WEST VAIL Status . . . : ISSUED
Location.......: VAIL VALLEY EAR NOSE AND THROAT Applied . . : 07ll8l2ffi5
ParcelNo....: 210106108001 Issued...: O8lt6l2ffi5
Project No . : ? RSOS -6bG Expires . . .: UllzlzW
owNER vArIJ crJrNrc rNe 07/tg/2oos
181 W MEADOW DR
VAII-,
co 81557
APPIJICANI iI.L. VIELE CONSTRUCTION 07/t8/2005 phonet 970-476-3082
1000 S Frontag'e Road W, #202VaiI
co 81557
License: 1.88-A
CONTRACTOR it.Ir. VIEIJE CONSTRIICTTON 07 /L8/2005 Phone: 97O-476-30A2
1000 S Frontage Road W, #202Vail
co 81557
License:188-A
Desciption:
VAIL VALLEY EAR NOSE AND THROAT OFFICE TENNANT IMPROVEMENT:
STJITE 3IO
InYestigstion- >
lViU Call---->
$0 , 00 R€creation Fee--------- >
$3.00 Clean-up Deposit------ >
Add Sq Fr 0
# of Gas Appliances: 0 # ofGas togs: 0 # of Wood Pellet: 0
FEE SI'MMARY rr*a***il+t'lrr*tr.*'r:t't*'rlr*r.'**t**,rtt+l,irrr.'*t**t'r***:***:r**'t'r*'t't'r
$0.00 Total Calculat€d Fees- > 8214.96
So.oo Additional Fe.es------ > $0.00
$0. oo Total Permit Fee----- > $2?8.96
$o . 0o Payments----*----- > s2?8 . 96
TOTAL FEES----------- > S2?8. e6 BALANCE DUE-------->$0. 00
Approvals:
IICM: O51OO BUILDING DEPARTI,TET{T
08/08/2005 cgunion Action: AP
Item: 05400 PLATiINING DEPART!,IENT
O7/29/2OO5 warren Action: AP
ITCM: 05600 FIRE DEPARTITIEI{T
Item: 05500 PITBLIC WORKS
o7/L9/2oos gc Action: AP
r*t*tta**+it ti.r+l
See page 2 of this Document for any conditions that may apply to this permit.
DECIARATIONS
I hcrby acknwlodge tbar I bave read lhis rylication, filled out in full the infomration required, corpleted aei accurab plot
pl8n, ald state that all tbe.infurmatim as rcquirod is corrcct. I agr€e to conply with tbc inforrration and plot plan, to comply
with all Town ordinam,md strtc lavr, md to build this strucutre according to tbe torrns zoning and subdiviskn codes, dcsign
review apprcved, I&rnatimrl Buildiqg snd Rcsidedial Codes and o[tcr ordinances of tbe Town applicable thorsto.
FROMS:(X)AM-,tRBQTJBSf,S FON, INSBECNON SIALL BB MADB TWENTY-FIOI,|R IIOT'RS IN
PM.
PAGE 2***********+****r.**'i*******:i*:tt*'l{.**l**'f***,|'t|t't't'}*'*{.'**{!|{.**'f**|.13*'t's'f*,|gl|.l*'t{tt*,}'t*'|t|'l*{.'}|**|*******
CONDITIONS OF APPROVAL
Permit #: BO5{194 as of 08-1G2005 Satus: ISSUED
'}'t'}'f:l'f|:|'}l'**|''}'t!t't*'td.*:|'i*lt**********,g**'r******{.****'t*'f'}*|t**|.!i*'t*{.*****t***|*******|{.**!t't'*'t|}'f*****
PermitType: ADD/ALTCOMMBUILDPERMT Applied: AtnSDns
Applicant J.L. VIELE CONSTRUCTION Issued: 08fl6t}WsnM76-3082 To Expire: An2tzW
Job Addrcss: 108 S FRONTAGE RD WEST VAIL
Location: VAIL VALLEY EAR NOSE AND THROAT
ParcelNo: 2l0l0Ct0800l
Description:
VAIL VALLEY EAR NOSE AND THROAT OFFICE TENNANT IMPROVEMENT:
SIIITE 310
Corditions:
Cord:1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQTJIRED BEFORE ANY
WORK CAN BE STARTED.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQLIIRED TO CHECK FOR CODE
COMPLIANCE.
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIG
Project #:Qtrqao&
Building Perm
PPLIC
ing, mech
q
rvwN\Fyi
75 S. Frontage Rd.
Vail, Colorado 81657
re requ
qoNTRACTOR TNFORMATTON
COMPLETE VALUATIONS FOR BUILDI
For Parcel # Contact E e Cou Assessors Office at 970-328-8640 or visit www.e
I ****+***************t*****************FO R OFFICE USE O N LY*******r**************n*************!*
General Contractor:
-l-. I | <-t<.- V\/\- > f'l \,LC
s: cuil 17/-5lb 7
Email address: =:
NG PERMIT Labor & Materials
BUILDING: g 7, M ELECTRICAL:$ i ,.]LOO OTHER: g
PLUMBING: $MECHANICAL: $rornl:$ 8,j0d
a\ot 06
loruame: ValV"ll"v F- N*" )Job Address: Sfrc 3-O
Legal Description Block:Filing:S u bd ivision:
Owners Name:tr..C^
WorkClass: New( ) ryg,tt""(_l Remodet J2e Repair( ) Demo( ) other( )
Work Type: Interior pQ Exterior ( ) Both ( )Does an EHU exist at this location: yes ( ) No ( )
Typeof Bldg.: Single{amiry ( ) Two-famiry ( ) Murti-famiryX cor;"r"i.( ) R"rtuuranr ( ) olher( )
No. of Existing Dwelling Units in this building:No. of Accommodation Units in this buildino: /r"\J
No/Type of Fireplac pliances (o) Qas Logs (p) wood/peltet (d ) wood Burn
!o/Tvpe=9f lilepla Gar Logs (o) wood/Pelet (6) wood Burninq (Nor ALLOWEDDoes a Fire Alarm Exist: Yesl-l--No oes a Fire Sprinkler System Exist yes
FlusersuSuther\newBLDGpERM.DOC
07t28t2004
R20s-49
EEM Consulting, lnc.
Evmmr Enwrnel lleuamn Cosrtno, hc
Algrw . LBP. Coeusl||o . Tur|o
CONSTRUCTION SPECIF'IC
ASBESTOS INSPECTION REPORT
AT
VAIL VALLEY ENT
108 SOUTH F'RONTAGE ROAI)
VAIL, COLORADO
FOR
J. L. Viele Construction ,Inc.
100 South Frontage Rd. Way, Suite #202
Vail Colorado 81657
July 5,2005
(3dl) 67$18s1 . FAX (3@) 6791@0
Ct50 El Pind Ody€ . Evollreen, CO 8O4$]
t EEM Consulting, Inc.
t I E**aa* Erumremr- lleuaepn Corcrrnr, hc
Aracsos . LBP . Coarrno . Taeno
July 5, 2005
Mr. TonyFaulhaber
J. L. Viele Construction, Inc.
1000 South Frontage Rd. Way, Suite 202
Vail, CO 81657
REFERENCE: Inspection for asbestos containing materials Vail Valley ENT 108 South
Frontage Road, Vail CO
Dear Mr. Faulhaber,
EEM Consulting Inc., is pleased to provide this report for the above referenced site. The
inspection is provided in association with the planned renovation.
Thank you for the opportunity to provide our environmental consulting services. Please call if
you have any questions.
Sincerely,
William C. Oleskevich Robert L. Ragan
President/Operations Manager Industrial Hygienist
EEM Consulting, lnc. EEM Consulting, Inc
(3Gl) 67$1851 . FA( (308) 67$1&0
3950 El Pi d Drive . Eve€reeo. CO EO4{19
TABLE OF CONTENTS
SECTION I.OI EXECUTIVE SI.JMMARY
SECTION I.O2 DATE OF INSPECTION
SECTION I.O3 LOCATION OF INSPECTION
SECTION I.O4 EEMCONSULTINGINC.REPRESENTATIVE
SECTIONI.O5 CLIENTREPRESENTATIVECONTACTED
SECTION I.06 PREVIOUS INSPECTIONS AND EXCLUSION STATEMENTS
SECTIONI.OT SAMPLINGRATIONAL/INVESTIGATIONMETI{ODOLOGY
SECTION I.O8 INACCESSIBLE AREAS
ATTACHMENTS
ATTACHMENT#1
BI.JLK SAMPLE ANALYSIS TABLE. AND LABORATORY ANALYSIS R€PORT
ATTACHMENT#2
EPA AND STATE OF COLORADO INSPECTOR ACCREDITATION
(3@) 67$1851 . FN( (38) 6'f$1Eei0
gl50 El Pin l Drivo . Ewrllcc.t CO 801{19
ASBESTOS INSPECTION REPORT
Vail Valley ENT 108 South Frontago Road, Vail CO
I.O1 EXECUTIVESUMMARY:
The construction specific survey for asbestos containing materials (ACM) on interior walls
scheduled for demolition was conducted in general accordance with the guidelines of the
Asbestos Hazard Emergency Response Act AHERA 40 CFR Part 763 and the Occupational
Safety and Health Administrafion (OSHA) 29 CFR 1926.1101. A visual and tactile
inspection of suspect ACM was performed. A minimum of three bulk samples were
collected randomly of the suspect ACM. The Environmental Protection Agency (EPA) and
the Colorado departrnent of Public Health and Environment (CDPHE) recognize material that
contains greater than one- percent asbestos to be ACM.
Laboratory analysis in this survey detected no ACM in the materials sampled:
Reference Attachment #l for The Bulk Sample Table and Laboratory Analysis Report.
I.O2 DATESOFINSPECTION:
July 2, 2005
I.O3 LOCATION OF INSPECTION:
Vail Valley ENT 108 South Frontage Road, Vail CO
I.O4 EEM CONST'LTING, INC. REPRESENTATIVE:
U.S. Environmental Protection Agency (EPA) and State of Colorado accredited inspector:
Mr. Robert L Ragan
Signature
Reference Attachment #2 for EPA and Sate Inspector Accreditation.
1.05 CLIENTREPRESENTATIVES CONTACTED:
Mr. Tony Faulhaber, J. L. Viele Construction, Inc., Vail Colorado 81657
I.06 EXCLUSIONSTATEMENTS:
EEM Consulting, Inc., warrants that the findings contained herein have been with the
level of care and skill exercised by experienced and knowledgeable environmental
consultant who is licensed or otherwise trained to perform asbestos inspections pursuant
to the scope of work required on this project.
The asbestos inspection included inspection of accessible materials. EEM Consulting,
Inc. did not dismantle any part of the structure to survey inaccessible areas. For the
purpose of this wanant, inaccessible is defined as eas of the building that could not be
tested (sampled) without destruction of the structure or a portion of the structure. ln the
event that access to a portion of the building was not obtained (which otherwise would
have been tested), such limitations are specifically identified in Section 1.08.
r.O7 SAMPLING RATIONALiINVESTIGATION METHODOLOGY:
Sample locations were selected in a random manner. A minimum of, three samples were
collected of each homogeneous material identified as suspect ACM in accordance with
AHERA 40 CFR 763 sampling protocol.
The following suspect building materials were sampled for asbestos content.
. Interior gypsum wallboard system (mud joint /tape) compound wall structure
Sanples collected by EEM Consulting Inc. were analped at the following AIHA and
NVLAP acer€ditod laboratory:
r Reservoirs Environmcntal, Inc., 2059 Bryant Stneet, Denver, Colorado and
analpcd by Polarized Light Microscopy (PLM) in compliance with USEPA
guidelines @PA/600/R-93 I | | 6).
l.Ot INACCESSIBLEARDAS:
Reasonable efforts were made to looate and inspect ooncealed areas in apcordancc with
40 CFR 763. Only the areas and the materials listed were inspected as part of this
inspection.
ATTACHMENT #1
BULK SAMPLE ANALYSIS TABLE
LABORATORY ANALYSIS REPORTS
.E
e
o0
'6
=Ip
2tah a,
=a
EZiJ
E8E4
F<rq tl
aF431
'E
E-e
tr>g<
.42
r;!taz
l,F
E
^o" = rr:
FgE
>,= <
E=go=.SgEH.= .:: g =*6 lJ t:
Cl .9€ ot€>='Eb0a)'E.=F=.CEEr!.!tE
tl Ir. o. u
E
Z 't1*a)a, =.
:deJO0.9@ EE3 E
=!l^c,|. 4
E! Efrs€6F F"oi;
tl
?tr
;itrY4.9 E
== r/'= F:'= .Y XiJ !r rE
.o i.=rv,E;.E b
u] 'c z
Fi=E ood
c av
,9 5e
= a) c,F"; 3.=oc,h-a4
h 9i o.r
E *.9
b€ r
'? .! =3,EZ
fi tl
Eo?v>6^u<4,t 29e€
->a =6?a Y9.^AA;- Eooe o
E
o0
o0
U)
oo
r;,i
<9
.S
qEg zzz
"E<?gEEs zzz
.sE
gs z
e.F.96
cL6'5>
AE€E'
&E
FO
s
q
!)
ca
FZf
=.E IG'=t:
=/a
t
Eaz
a)
Ea(A
C.l a.l
===n/'\n
FFFzzz
Xra?i3
sEt
-t) tlzds9E-r<rju (a
=HEEE;l7ra>o
6u)>ri
a
a!
ATTACHMENT #2
EPA AI\D STATE OF COLORADO ASBESTOS
INSPECTOR ACCREDITATION
STATE OF COLORADO
CERN'FICATION*
Colorrdo Dopred of hbtic lhehb
rdEovinrnmt
AhFollrdoCdwdDlvid@
Ihir ccdiE$rhd
ftrtfic*for No: !lf!
hrs mc thorrqdr@ of 25-7-t0?, C.R.!B. md Alr Qdity Co@l
ep".itrirooR{uldion No. t, PttB,.rnd Lbtbycatifcd b'yth.
*rc ofColrrdo in thc blloulrg &ciplirr:
I@Plrocrd
' fh t?-a *?t tI a.rr*r {. trrfl I&{';t*--
{h-..-!L*G,
tl
Page 1 ot 2
2059 Bryant St. Denver, CO 8021 1
(303) 96+1986 Fax (303) 4774275 Toll Free (866) RESI-ENV
July 5, 2005 leboratoryCode: RES
Subcontract Numben NA
laboratory Report: RES 117453.1
Project Descrlption: R:n5-.d9
Vall Valley Ent
Bob Ragan
EEM Consulting, Inc.
3350 El Pinal Drive
Evergreen CO 80439
Dear Customer.
Reservoirs Environmental, Inc. is an analytical laboratory accredited for the analysis of lndustrial Hygiene
and Environmental matrices by the National Voluntary Laboratory Accreditation Program (NVLAP), Lab
Code # 101896 and the American lndustrial Hygiene Association (AlFlA), Lab lD 101533 - Accreditation
Certificate #4E0. This laboratory is cunently proficient in both Proficiency Testing and PAT programs
respec,tively.
Reservoirs Environmental, Inc. has analyzed the following samples for asbestos content as per your
request. The analysis has been completed in general accordance with the appropriate methodology as
stated in the attached analysis table. The results have been submitted to your office.
RES 1t7453-t is the job number assigned to this study. This report is considered highly confidential
and the sole property of the customer. Reservoirs Environmental, Inc. will not discuss any part of this study
with personnel other than those of the client. The results described in this report only apply to the samples
analyzed. This report must not be used to claim endorsement of products or analytical results by NVLAP or
any agency of the U.S. Govemment. This report shall not be reproduced except in full, without written
approval ftom Reservoirs Environmental, Inc. Samples will be disposed of afrer sixty days unless longer
storage is requested. lf you have any questions about this report, please feel free to call 30$964-1986.
Sincerely,
President
Analyst(s):
Paul D. LoScalzo Wenlong Liu
Paul F. Knappe Rich Wegrzyn
Michael Scales
I tit P
^/tt--
Jeanne Spencer Orr
l_t .EilSe!
s
F
ol
o
(\l
o
CDoo
t<lo
IA
U'
=
.>o
o
=
15so
c
eF
tl
s-o
o
=
SEezeFIJJ*9- F;
6EF
=JE ltl>8-3 -
=EE ?:frfr 6xri.q
=a=656 .0>>F zu' IAEtrJ ot*
o(,
ITJo
FzuloE
Blo.
doI
z
YJ
=o
.Jo.
uIJo
f,
(,g-
L
-g E pg
PE-!HE H
E fi Hiifii
o
'5
llJ
d>
8SE-
9ei
ztrItlodzl
ot E*gFH; 5 EJ
€ " cg#f; F
frEEE*€E*troooo<Fo
;F8
J<>Lrl
;o:()
€
ccc'6 '6 '6
CL CL CLI lr Ill ll'c uit (l'lc c,}E E>: F }E
sF s'g* Fggs'3E E8t E33E
OO OO3 OOOO
55 55E 5555
<o <to <cooo
Frr)NoFo)
=llj
ro (olf) |4I(\t (\lo6NI\o) o)
==IIJ UJ
oof1
--
==oo
a
RESERVOIRS EiIVIROI{UENTAL INC.
togt Ltd 6t. O.ne!. OO Silf l RES ,r*,
fftst $b.
O*o!r't{-(na. a{'trs
lec llatL .lc. tn r: rn hord.'t b a rgdr tt?.a- Ssnd€ rra !r fretfr..t (ln , ,um.{ t&mhry ha.s r',||*rftqdd |pGlld qr tr d|{r d (rC(lfv. f.ffar{..sniod |o l$.rab.y !/oaurr yc, rr{| b rdle<r a caaorr a'|'
tx . tts: srhr.{.t: b .6Fr
_'.E _l|dtr
_ahtrStr _tah. _t{*ttafr
tnr*a,r, !|orin u F ra ra*..I,
aarct __-._ ra.|f _ rott^r
q- lca F.a:.g
Pt, $ut F( Utr..!sr. |l'tcdJ|c kr!..
l€t. .r.. q-r.' S..ii{rta
A I En _ , ,.. r|alr _ trcSr I
P-( Sd Od, t1... lq,t
(Aalra € t Fal i'.ot.d r!.r odr l
lGra ll|art ir*! wtt
^ lita- __..__, aa.tr, l{:FAl
Orr{r9 Frd.l9a..
So+.ry _
tnc^t tElrr(xt
El -" to^ ,.trr o9r^
l_J IE{ ,r<n^ ttvd.. t.@ 6{).
Er
tr
r:t
a--t-
,-- taAn,r,!]|l _Lit- ,- ta &ri
I ttlclfl,lili ro.r _ rao{
_ Itlclffal tor -.toq"l$l- fiEQlrlNGO ts ftc|Al Alsra a.. ,E ri r tfrt
SFCId hr-tdion
cld.5fllllrt
!
2
a
a
I
,.
I
t
t!
rl
t1
la
tl
rat& .
ara
r,tq.{'-i6rrrPrG
e.adqri$G.t lt:
flI
)71255/
:
-arta!irt 66, trc.rid I
a.atctrt-rCrF rttdrFraaadlrrffi'a{fil}irritraaat .wtor dsr.c&.|lrr raafrtrarr.cu-ta,('.Fg
{[aa. rr!|Efici r$ t a||il.a ro...aroa -ayrrar.rdat. o Frcir! c csar r!r..Ee- &
700
tdflrr
JVE -r- 4&^S - N t
FF lE{ trrr 4.. F}l.rt.lFi trls: rcaEg('rvf'ttiI!}
Ofa.l t.c5l,|$ac t- ngrg5fc{ rt t 6.r.ry Dyt.''i'|.,
!l
:
cdiLei ..d|gdcrant i|rt|?o.r rqr
O"l"
TOWN OF VAIL FIRE DEPARTMENT
75 S. FRONTAGEROAD
VAIL, CO 81657
970-479-2135
OWNER VATIJ CIJINIC INC
181 W MEJADOW DR
VAII-,
co 8L657
APPLICA}IT COMMERCIAIJ SPECIALISTS OF
WESTERN COIJORJADO, IJLC
P.O. BOX 1572
SIIi/ERTHORNE
co 80498
L,icense! 151-S
CONTRACTOR COI{MERCIA! SPECI,AIISTS OF
WESTERN COTJORADO, LLC
P.O. BOX 1572
SIIJ/ERTIIORNB
co 80498
Licerxse: 161-S
VAIL FIRE DEPARTMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ALARM PERMIT Permit #:A05-0056
1Jo/-at/(: APPROVED: O8lO2l2OO5
Job Address: 108 S FRONTAGE RD WEST VAIL
[,ocation.....: VAIL VALLEY EAR NOSE AND THROAT
ParcelNo...: 21010@{08001
hoject No t prj oeo*c
Status . . .
Applied. .
Issued .
Expires .
08/02/200s
08/02/2oos Phone: 970-513-7100
o8/02/2OO5 Phone: 970-513-7100
Desciption: FIRE ALARM TENANT FINISH
Valuation: $8,635.00
*:r,r**'*'t{r***,r,r**,r**,r***ara,|t**ra*rt,tt*,t *ar*t*tt{t+td!*t*'a*ri.ftattttt{t*,t FEE suMMARy
Electricrl----- >
DRB Fee----- >
Investigstion--- >
Will Call------- >
TOTAL FEE$- >
90.00
$0.00
s0 .00
53 .00
s558 .81
$s58. S1
$0.00
$ss8 ,81
$558.81
$0. 00
Total Calculated Fe€s- >
Additional Fees------>
Total Permit F€€----- >
Patments--------- >
BAI.ANCE DUE----- >
Approvals:
IIEN: O55OO FIRE DEPARTITIEIiIT
08/08/2oo5 mmcgee Action: AP
CONDITIONS OF APPROVAL
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state tlnt all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structrrre according to the towns zoning and subdivision codes, design
reviely approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY.FOUR HOURS IN ADVANCE BY TELEPHONE AT 479.2135 FROM E:flI AM - 5 PM.
SIGNATURE OF OR CONTRACTOR FOR HIMSELF AND OWNEI
ApplrcAnoN wrr Nor BE AccEprED rF rNconPLErE * ii".l1l()9go.16
^-.
I Ploiectl
a?t.trl Building,Permil*.lcrsrcac61\\ r'nr f;lf,Trl-l,ro rn",*,,"*,-*H{/l ,on * o, uo,' ,,*, o**rn ,r*",, orr.,"o'o*
' 'r' 'r ' "-v' I Gommercial & Residentlal Fire Alarm shop drawings are r"quared at time qf 75 S.
informatlon.
n.CI.f
FireAtarm:S fb3S.OO
*:k *:.**:t:t*:tt*:l:l*:H*tf **t***t!.**t**t**t*FOR OFFICE USE ONLYi.*rlrl*+*t**l* jttf **t***:l:tt:lf *!t*i**!t**t
Conliad and Phone #s:Fire Alarm Contracior:Town dVal Reg. t{o.:
COTPLETE VALUATIONS FOR ALARIT PERttllT (Labor & lf,aterials)
Assessors Office at 970-32E-EUO or visit for Parcei
Parcel# ptolOoqObCfft
Job Name: S[eo A rr^r.{c^^ftl.,sTl JobAddr€ss: \OS S. F.-.\o*'Pd.
Legd Descriprion | .ot [ *, ] tn,r,g' ll"uoo,","'on, UNL B\Xq
GrnersName$nr\Ctrnnr llAddress:\httr).\lco,l^^..Dr.\h\ llPh"*' v
Ensineer: -Sh*,,,"* Uta \"Urrll Address: ?ts Eov I cfl] Fnwn ll
Phone: q$4ot\:
Detailed Location of work: (i.e., [6r, ultit #, p$9. #]
..SilpnA rnn^ *lo,..{in s
Detailed descriotion of no*:-'L;r
c,\or.,^- \€r"rar^r - Spp sr n'cr of.-ssrh 0r, n]ri-,
WorkGlass: New( ) Addition( ) R€rnodel( ) R€pair( ) Rotrcfit( ) Otnrtlfi 1
TypeofBldg.: Sindefamily( ) Tno.famty( ) tilrili-family( ) Conmerckl$ Restauiant( ) Otrer( )
No. of Existing Drelling UnitB in thb building: ll No. d Acmmmodation unils in this bullding:
Does a Fire Alarm Exist Yes $) No ( ) ll Does a Fire Sprinkler System Exist: yes (\P No ( )
Wail\data\cdev\FORf\lS\PERMIT$ALRMPERM.DOC
lDq l1
-''58
y
TOWN OF VAIL
75 S. FRONTACEROAD
VAIL. CO 81657
nG479-2t38
OWNER VAIL CLINIC INC
181 W MEADOW DR
VAII,co 816s7
APPI-,ICANT D. P. EIJECTRIC
P.O. BOX 711
EDWARDS
co 8L632
License:119-E
CONTRACTOR D.P. EIJECTRIC' P.O. BOX 7L1
EDWARDS
co 8t632
License: 119-E
Electrical-:--->
DRB Fee----- >
lnvestigation-- >
wilt cdl------>
TOTAL FEES->
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ELECTRICAL PERMIT Permit #:
Job Address: 108 S FRONTAGE RD WEST VAIL
Location.....: VAIL VALLEY EAR NOSE AND THROAT
ParcelNo...: 21010e08001
Project No : -Vl.sot-o SoG
Status. .
Applied.
Issued.
Expires .
08/2s/200s
08/25/2oos Phone z 970-925-4L4o
08/25/2OO5 Phone: 97O-926-4L4O
E05-0189-Bo s -o tq c(
.: ISSUED
. : 0812512005
. : 0812612005.: 02122120M
Desciption: SMALL REMODEL, RELOCATE OUTLETS AND ADD SWITCHING
Valuation: $1,000.m Square feet: 900
'lXr**tr,l'|*rt:***:****'|*,1******,***:*'***'i*'l*'t:t*'i{i**'*'t*,a***'t*'}'l*,*'.*:r*{.'t't++t+ FEE SUMMARY
ss? . s0
s0. 00
90. 00
93.00
$60. s0
Total Calculated Fees- >
Additional Fees------- >
Total Permit Fe€---- >
Payments-------:*- >
BALANCE DUE-----... >
$50.50
90-00
s60.50
s60. s0
so. 00
Approvals:
Item: 05000 ELECTRfCAI-, DEPARTMENr
08/2s/2O0s srrAHN
0B/25/2005 SIIAHN
ItsEM: 05600 FIRE DBPARTMENT
Action: AP
Action: AP
CONDITIONS OF APPROVAL
Cond: 12
.!?.P.-9;J-;..*1Il?."-I."T:.t..t.:I.T.o..lH.-*I.*IP*u-I*"*?.-T9-.*".Y.f.{-J-91..9.o3-T--:-9y."*I*ifR;*.**"*,+r**,,**:r,,*:},i,,:.{,:r:r{.1.+*+,,
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in futl the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to cornply with the information and plot plan, to comply
with all Town ordinances and state laws, and to buitd this structure accordhg to the towns zoning and suMivision codes, design
review approved, lntemational Building and Residential Codes and other ordinances ofthe Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN
PM.
ANCE BY TELE?HONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4
AppLrcAroN wrLL Nor BE AccEprED rF rNcoMpLEr;3$ lir-ru_a s - o3d 6
, il'J,19? 5:#,T #::E:il'f.v q 8r
97 047 I -2'l 49 (lnspections)
mtrywv,ilL
75 S. Frontage Rd.
Vail, Colorado 81657
COMPLETE SQ. FEET FOR NEW BUILDS and VALUATIONS FOR ALL OTHERS (Labor & Materials)
Contact Parcel #
******tt********************************FOR OFFICE USE ONLY********************************'r****
CONTRACTOR INFORMATION
Electrical Contractor:
Dave Peterson Electric
Contact and Phone
OF SQ FT lN STRUCTURE: 900Sq.Ft VALUATION: $ 1000
Assessors Office at 970-328-8610 or visit www.eaole-countv.com for
tarcel # 210106408001
lob Name: Vail Valley Ear Nose and Throat lob Address: 108 S.Frontage RD #310
-egal Description lfot: lplock: lfiling:iubdivision:
)wners Name:yfy46 Address:,og z'-..(\lsct'(frQz r?c) ll Phone:
ingineer: None ll Address:Phone:
)etailed description of work: Small remodel, relocate outlets and add switching
ffork Class: New( ) Addition ( ) Remodel (X) Repair ( ) Temp Power( ) Other ( )
ffork Type: Interior (X) Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No ( X)
fype of Bldg.: Single-family ( ) Duplex ( ) Multi-family ( X) Commercial ( ) Restaurant ( ) Other ( )
,,1o. of Existing Dwelling Units in this building:{o. of Accommodation Units in this building:
s this permit for a hot tub: Yes ( ) No ( X)
)oes a Fire Alarm Exist: Yes ( X ) No (Does a Fire Sprinkler System Exist: Yes ( X) No (
\Wail\data\cdev\FORMS\PERMITS\ELECPERM.DOC inO/t'0712412002
'o o
0&292005 hspestion Request Reportlng Page 18
4:08 om Vail, CO- Cler Oi -
Requested Insp.ect Date: Tu-esday, August 30, 2005
Insoecuon Area: CG
SIE Addressr t08 S FRONTAGE RD Y1EST VAIL
VAILVALLEY EAR NOSE AND THROAT
AJFID lnformaton
Aclvl$ ffi194 - Tlpe: A4OMM Sub Type: ACOM Stalus: lSguEDCotrlTypi: Occupehty: Use: tt-B tnspAre.: CG
Omier: VAILCUMCD.ILApplhlnt J.L. VIELE CONSTRUCTION Phone: 97S47$3Ofl2
cohbactor: J.L.vlELEcoNsTRUcnol,l Phone: 97G47S308:l
DASqIPUON: VAIL VAIIEY EAR NOSE AND THROAT OFFICE TENNANT IIYIPROVEMENT: SU]TE 3IO
Comm€nt PLil{S APPROVED BY BUILDING DEPARTMENT A8 05. PERMIT ISSUAI.ICE IS PENDING VFES
APPRo\/AL. CGT'MON
Comm€nt ROUTED TO THE PLAN RACK. BILL Gln,JsuTr{ER n_r,Reouestedlnspecdqrfsl I I /
tbm:
Reqnslor:
Commnts:
^*nHIl:Tlme Erp:
30 BlDG#ramlnq
J.L. VIELE CONSTRUCTION
rclnspocl
coAvtsi Entersd By: DGOTDEN K
lnspec{on }llsbrY.
lbm:
lbm;ft m:
Itsm:
nam:
tt6m:
Item:
It€m:
lbm:
tbm:
Item:
Item:
Item:
llem:
10 BLDGFootngs/Stoel
20 BLDC'-FourxFtorVSb.l
3D ELDBFramlng
50 B[DGlmdaFn
60 BLDGsheetocft Nall70 BLDCFMISc.
90 BIOGFIEI
53[! BLDC-Temp.C/O
5!12 P1I&TEMP.CiO
533 PLAN.TEMP.CYO
537 PLilNftltAL C/O
538 RRE.RML CiO
539 PttrFtNALC/O
540 ELDGFlnal €YO
REPT131 Run Id: 3568
t
1$3lf* ""ryinF:F,iftr*s *0"'
R.q|t.hd lntp.ctDrb: !g*lry, l{ovqnbcrfi , AX}s- l|r|!.dtlonA|| : CbSlbltlrtt.|: to8 s FRO{IITAGE m |EST vA|L, VALVAIJEYEART{C}SEAM)T}IROAT
AeEh&lDrf,e!
AafYttr
ColATvri:ftii.r:
ADDt ilC{it.cbcDrfrbion:lSlbr:Co|lrl|il
lbm: 1Olbm: 20]bm: 3O
ilc+r9a *.*Ie
ITRCNTOFRCE
Srt|: lssuEDhTAri: CO
4*ryvrcs 7 D(.
*'lB: ilfl
R.ou.dd lrt!.oildt(rl
lbm: 0 BtlroflrdR.fl*c JI.VlEllCOllSTRlJCTlOt{Al|ti|.dTo: miDRA@ll- AEilot!: TlncExp:
hrrre0e[,lEErr
bm: ?O g.fil*.
l5n: $ EIFffiIhm: d[ fl.ff]Tltp.C/olbm: till PWtElitC/Olbm: G}3 Ptll+tEllF.C/Ofm: 637 PL l+FiltlALC/Obm: 6i! ARE+lt{ LCJOrm: Sl9 PUTRN LC/ohm: 6'O ELDG.firlC/O
bTCOp.rF[. fbnft.l.
} D€PARTTIENTAE/(5.
RACK gLL OI8SOT.I, FIRE ANO R'BLIC TrcRKS. PIICED IN SLOT D2 .
Rcqt.lr.tdTlmo: Otl:@t- Plbm: 171{,88E|snd* DOOTDEN K
%!ol^#4 te
REAO.
Acdon: APAPPROT/ED
S AlDe|md.tlonO 4DqqlllFCrt|i _"rpporrd-Acilon: TT.I DEMED(n,:}i,IE InCrcbc JRilonn||t ALtRllRot GllROlxtH MIT ll*lPEcTED. Sr.IrR 9lpBI_olEED \rlA PIFN€ (I0l$r)Comilrt€roryS htrctor JRl,A.ilon: APAPPROT/ED
REPlTl31 Run Id: 3E53
o
ReqtasH Insp€ct Dab:
lmpedon Arca:'Slb Address:
intFc{on R€qucqt
o
Sub Tyr: ACOM
A/P,D lttrsrmrtlon
Vuedne8dly, Auguet 24, 2d)5
'08
S FRONTAGE RO ITEST VAIL
VI/ESTSTAR BANK,STEADTAI.I HAVNqNS CLIT{IC
Cornmnt3: sm,lce*tffii Ta
lbm: ItF El-EC{lsc.Ro$Frbr: D.P. ELECTRIC
A/R
Tlme Exp:
Requeeted Tlmc:' Plrnn:
EnLred B!4 DGOTDEN K
Irrso€c0on Hlsbrv
llam: 110 ELEC-Terp.Porcrlhm: l2O ELEC-Fo4th FADsot€d'
OTEAU(F lrEpeclor: SF|AI*.|Crinr|tlbm: l3P EtECCgndunlbm: l.O ELEC-frbc.
ttem: 19, EtEC+lml
Acdon: APAPPROVED
Phone: 97$92t6-410
tsst EDco
-or- celg!4.6:30Af,'
REPT131 Run Id; 3551
''f
292005 Insp*tion Request R Page 31
4:08
Requested lnspect Date: Tuesclay, Ausust30, 2005' . lnspition Area: SHsiteAddress:lil.nt[fr?]{rT*lPotFit*XTh*oot
ArPrD lntorm.don
Aclhdtv: E0$fl 89 Tvoe: BELEC Sub TvDe: ACOIrl Status: ISSUEDCons!Typ,5: occupahty: g's€. tnspArca: sH
Orvnar: VAIL CLINIC ll'JC
Apdlcant: D.P. ELECTR]C Phone: 970"92S41t|()
Cohlractor: D-P.ELECTRIC . Phone: 970-926-4140
D€scrlpllon: SIIALL REIIIODEL, RELOCATE OLfi/ETS At'lD ADD 3\UTCllll',lG
/1 F/nop? SA*L g/sa/ry-
Reouested tnsoecgon(sl fTl / -
Item: f 20 ELEC-Roush Recuested Tlme: 10:00 Aif
Regues0of: D.P.ELECTRIG Ptone: 97o-92$414c} -or- call 90&
Asslgnod To: EGLATZLE Entered By: DGOLDEN K- Actlon: Time Exp:
\ OFF/ce f,)
A ,7tt b Sau,J-.-/ol.
zoo3, e,)fea
k*si^ e R
tus/r*r/
Z Sr^',1= /*.5
,E4C A
h*,.,e
Pe tt- T tcc
4l oc c,z | *^t c- 7
lnsoecdon Hlstorv
lt3m: 1'10 ELEC-Temp. Pow€r
Item: 12O ELEC-Roush
ttem: 130 E LEc-Cordulttbm: 14) ELEC-Mlsc.
tlem: 1*) ELEC-Rnal
REPT131 Run Id: 3568
o
R.S|. bd In p.c{I}rb: Thureday. S.pbflib.roi, 2@5' hrocdtlon Anrr SH
Sltr Addrl8r; tot S FRO{IITAGE RO YEST VAIL
YAIL VALIfY EAR MISE AT{D THROAT
Afp&&orqeE
Arftfir HXfOI&t lbr: ]E[EC SubTyD.: ACOI,CondTyra: AcrE itly [Fr:Osii.c V ILCUIICNCADDbrt D"P.EI"ECIRE Phom: 9l0*S4lloCdtrOc O.P.EIECTRIC Fhom: 9ilr€a6-410D.*dp!on: 8mA,L REKD€L, R€LOC TE OTJILEIE AI|oADo SWTCIf,I,|(;
Rcomcbd lmocc{ogt's}
Sdfih.pArr.:tSmEDstl
_ lbm: 1e Eltee$hR.sMf: DP.EITCTRILAdffilTo: EGl.lllZtl
";ffiMfu-:
Rrqucccd Tlmr: l0:t0 Ail' PfEm: 9l0ffi1l4Errelrl* Eot^fN K
Efi}TIN OCCIf,AT.ICY SENSOR IN TTG OTF|CEE.
7- c,/- e ooX-
bnrrc&ottrtd
hats
ll0 ELEGT.IID.Fou.l
l2O ELEC{ordrGllillb hD.cbn glnHN AcUon' AI'GRA|IPRO{ED€ORRECIIONRE@Coil||rl! PER 2oGIIECC, PROVIDE 2 SWrclGs oR Ar.l OCCI.FAIICY SEtlgOR N fiE OFFrcES.tsiELEC.Cotd{fbn: t{ EtEo.ft.lLm tgt ELEC.FIn I
REPT131 Run Id: 35'll
!(l5 !'t't- J J'trcur Jct:--=E5t -I
ss1s2005
I!.r!ec$e[.H!Elsq.
Reouested lnsoect Date:' Inspecton Area:
Slb Adciress:
Frldov, Seotember 'l €, 2C05sH -'
'08
S FRONTAGE RD WEST VAIL
VAIL I'ALLEY EAR NOSE AND THROAT
Sub Tvo
Us
ACO[t
Tiine Exp:
lttor E'
Item: 110 ELEC-Temp: PorverItem: ,|20 ELEORpush
@:X)/05 hsnccOUilolOS hslcclor:
Cosunont PERaooa
09O1r05 S*p.clor;Cofiiathfrt :. '\p{Tl|IFfL;tbm: 130 ELEC€ondn
nrm: lao EfEC"Ullc.tb||r: l0
TOWN OFVAIL
75 S.FRONTAGEROAD
VAIL, CO EI657
970-479-2138
Job Address:
Location.......:
Parcel No.,..:
Occupancy:
Type Construction:
Type Occupancy:
Valuation:
Fireplace Information: Reshicted:
ADD/ALT COMM BUILD PERMT
IO8 S FRONTAGE RD WEST VAIL
WEST STARBANK
210106408001
Permit #: 804-0321
Phone:
Phone:
Phone : 97 0-47 6-3082
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TMES
1,0/21,/2004
ADMIN CENTER
B/M
tr l-HR Type II l-Hour
??
$s8,000.00
# ofGas Appliances: 0
Add SqFt 0
# ofGas l-ogs: 0
Building---->
Plan Check-->
lnvestigation->
willcdl---->
S699.?5 R€stuarant Plan R€view-->
5454.84 DRBF€€----------------->
50.00 Recr€ationFee---------->
$3 . 00 Clean-up Deposit----->S0,00 Payments---------'->
s0.00
50.00
s0.00
Total Calculatod Fees-->
Atditional Fees------>
Tolal Permit F6----->
90. 00
TOTAL FEES----------> 51,15?.59 BAI-ANCE DUE-------> S0 ' 00
Approvals:
Item; 05100 BUILDING DEPARTMENT
L1,/1O/2004 jrm Action: AP
Item: 05400 PIJANNING DEPARTMENT
LI/02/2004 MRG Action: AP
Itern: 05500 FIRE DEPARfMENT
Item: 05500 PUBLIC WORKS
hojectNo.t PrJo4-oful
OWNER VAIL 108 LTD
C/O WESTSTAR BANK
PO BOX 1210
GYPSU}4co 81637
License:
CONTRACTOR iI.L. VIELE CONSTRUCTION 1.0/2T/2004
I"OOO S FRONTAGE RD W, #202
VAIL, CO
81657License: 188-A
APPLICANT iT.L. VIELE CONSTRUCTTON LO/21/2004
1OOO S FRONTAGE RD W, +202
VAIL CO
81657
L,i-cense:
Desciption:
WEST STAR BANK RENOVATIONS-ADD MGHT DEPOSIT BOX. ADD
SEPERATION WALL. UPGRADE LIGHTING IN LOBBY.
FEE SUMMARY a'tr'tr*'r'trta**!a***ttrr'rr't*t*'tl*,r*t'r:ra*ra**:.a.*t..rr'lr**'.rt'tr***
Lo\-bt-Y'.\i&z,{
\t"-tsHi'3e-'.\'r-
ISSUED
10/2t/2004
tt/lt/2004
05/r0/200s
# of Wood Pelld: 0
See page 2 of this Docrunent for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, complcted m accruate plotplaq
and state tbat all the information as required is correct I agree to comply with the information and plot plao" to oomply with all
Toum ordinances and stat€ laws, aadto build this structure according to the towns zoning md subdivision codes, dxign rwicw
appove4 Uniform Building Code and othcr ordinances of the Town applicable thereto.
REQI,JESTS FOR INSPECIION SHAI,[, BE MADE TWENTT.FOUR ITOT.JR{I IN OFFtrCt FROM 8:00 AM -4 PM.
CONTRACTOR FOR HIIISELF A}.TD OS'NER
sTl I -
PAGE2**:i*f +'t*f,'lt*at'l*i!t+*f t'tt*'t
'|.
ta*ata***+*a*l.l*t'ta'l*t't f t*t*'tt***'l*'i:tt:i*'t*tt*|ta'ltit!ti'ltlf *tl|l**'t'|l*'i f **ta'tat't
CONDMONS OFAPPROVAL
Permit#: B0+0321 asofll-ll-2O04 Status: ISSUED***'lt**t'tf +'l*ttttttt*'ta***af 'tf ttt***'l**t*'t***'trt**trt*'t*'t***t'tf ****t't'**,lr*t******ti*****l.tta*ta*t*'ta*r.+'lt**f t*
Permit Typc ADD/ALT COMM BUILD PERMT Arplied: l0l2ln}04
Applicmt J.L.VIELECONSTRUCTION Is$Fd: lllll/20o497M76-3082 To Expirc: 05/10/2005
Job Address: 108 S FRONTAGE RD WEST VAIL
Location: WESTSTARBANK
ParcelNo: 210106108001
Description:
WEST STAR BA}IK REI{OVATIONS.ADD MGHT DEPOSIT BOX, ADD
SEPERATION WALL, UPGRADE UCHTING IN LOBBY.
Conditions:
Cond:1
(FIRE); FIREDEPARTMENT APPROVAL IS REQI]IRED BEFOREANY
WORK CAN BE STARTED.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQIJIRED TO CHECKFOR CODE
COMPLIANCE.
II
oY3?APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR
LDI
;-trt<,t
IJJ/WIOF
75 S. Frontage Rd.
Vail, Colorado 81657
TION
, mechanical, etc,!
Project #:
CONTRACTOR INFORMATION
BUILDING: $ELECTRICAL: $
PLUMBING: $MECHANICAL: $
COMPLETE VALUATI S FOR BUILDING PERMIT Labor & Materials
For Parcel # Contact Assessors Office at 970-328-8640 or visit
******************!e*****************FOR OFFICE USE O N LY*********rr*************t************
FrPtrFlltl-Fl
Accept,
Plannel
ocT 2 1 2;04
TOV.@@fiD@EV.
Z\o\ o?q, of oo\
JobAddress: l(ft S lawJob Name: ut@6hr &nU, furnffitttt
Subdivision:Filing:
WorkClass: New( ) Addition( ) Remodel (X) Repair( ) Demo( f Other( )
Does an EHU exist at this location: Yes ( ) No ( )Work Type: Interior (1) Exterior ( ) Both ( )
Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family ( ) Commercial (i0 Restaurant ( ) Other( )
No. of Accommodation Units in this building:No. of Existing Dwelling Units in this building:
Noffvoe of Fireplaces Existinq: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Bq4!
No/Tvoe of Fireolaces Proposed: Gas Apoliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burning (NOT ALIOWED
Does a Fire Sprinkler System Exist: Yes (X
WailWata\cdev\FORMS\PERMITS\BLDGPERM. DOC
y*rurt'r.L
tl
I0fth,m
Questions? Call the Building Team at 479-2325
Department of Community Development
Project Name:
Project Address:
This Chddist must be omoleted before a Buildina Permit appliation is
arcptd.
All pages of application is complete
Has DRB approval obtained (if required) Provide a copy of approval form
Condominium Association letter of approval attached if project is a Multi-Family complex
Complete site plan submitted
Public Way Permit application included if applicable (refer to Public Works checklist)
Staging plan included (refer to Public Work checklist) No dumoster,oarkino or material storaoe
allowed on roadwavs and shoulderc without written aooroval
Asbestos test and results submitted if demolition is occurring
Architect stamp and signature (All Commercial and Multi family)
Full floor plans including building sections and elevations(S sets of plans for MultFFamily and
Commercial Buildings)
Window and door schedule
Full structural plans, including design criteria (i.e,loads)
Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
Soils Report must be submitted prior to footing inspection
Fire resistive assemblies specified and penetrations indicated
Smoke detectors shown on plans
Types and quantity of fireplaces shown
D
D
D
B
a
a
D
o
tr
o
o
o
o
o
B
Applicant's Signature:
Date of submittal:
\VaiMatalcdevFORMS\PERMITS\BLDGPERM.DOC
Received By:
0/,t02t2003
t'
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works)
review and approval, a Planning Department review or Health Department review, and a review
by the Building Department, the estimated time for a total review will take as long as three (3)
weeks.
All commercial (large or small) and all multi-fami[ permits will have to follow the above
mentioned maximum requirements, Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for.
Agreed to by:
Project Name;
tDate: Le / -- lhl
F :everyone/forms/bldperm3
-t
HOW DIDWE RATE WITH YOU?
Toum ofVail Survey
Community Dwelopment Departnent Russell Fonest Director,
(970)17€-213s
Check all that applies.
1. Which Deparfnent(s) did you contact?
Building _ Environmental _ Housing_ Admin
Planning DRB _ PEC
--2. Was your initial conhct with our staff immediate_ slow
no one available
lf you were required to wait, how long was it before you were
helped?_
Was your project reviewed on a limely basis? Yes / No
lf no, why not?-
Was this your first time to file a DRB app_ PEC app
Bldg Permit_ t',|/A
Please rate the performance of tre sffperson who assisted you:5432lName:
(knowledge; responsiveness, availability)
Overall efiectiveness of he Front Service Counter. 5 4 3 2
What is the best time of day for you b use fre Front Service
Counter?
9. Any commenb you have which would allow us to better serve you
nextlime?
Thank you for taking fhe time to complete this survey, We are
commited b improving our service.
l,r.'. '' .1 :,
1
1t.
8.
WHEN A *PUBLIC WAY PERMIT" IS REQUIRED
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESNONS REGARDING THE NEED FOR A
"PUBUC WAY PERMIT'':
tr Is this a new residence?
o Does demolition work being
public property?
pefformed require the use of the Right-of-Way, easements or
No-{-
No-+-
o
o
tr
0 Is any drainage work being done that affects the Right-of-Way, easements, or public property?YES_ NO_x__
D
o
Is a "Revocable Right-of-Way Permit" required?Nox-
Is the Right-of-Way, easements or public property to be used for staging, parking or fencing?YES- NO X
If answer is NO, is a parking, staging or fencing plan required by Public Works?YES_ NO_x__
If you answered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Work at 479-2198.
I HAVE READ AND ANSWERED ALL THE ABOVE QUESNONS.
-T t- . /,.t-c'-
Job or Project Name:
Dat€ Signed:
Is any utility work needed? YES NO_*K_
Is the driveway being repaved?No-l(-
Is a different access needed to the site other than the existing driveway? YES_ NO_tr_
te/z-1/e4 t------.---.--.-{-
ontractor Signature
F:/everyone/forms/bldpenn4
Company Name
APPLICATION
FOR TOWN OF VAIL
PUBLIC WAY PERMIT 19
PW*:T T'T T ! T
Parcer#:If l[-IlI-Il-ItI ffi
Brds.Permit#:EnI-IIII Tornvo f/
1.Job Namo Street Address nnn-n (llunknowncal
LJ LJ L_J | | 479-2138 exl.o)
2.Excavating Contractor Name Maillng Address TOV Conlraclor's LicEn66 Numb6f REOUIREO
()
zipCity Phone #
4.
Slart Date
Work is tor (circl€ on€)
Cornpletion Dale
Waler Sewer Gas Electric Telephone CATV
(P€rmit Expiration Date)
Landscaping Temp. Site Access
Other
Trench-width
(min.4')
Bond Amount $
6. ALL MATEBIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED.
7.Rubber out-riggers are required on
Asphalt surfaces underneath the
A signature below indicates a
signatures are obtained, permittee
necessary Town of Vail signatures.
BE ON THE JOBSITE BEFORE THE
working on asphalt.
at all times.
utilily locations and approvals. Once all utility company
application through the Public Works office lo obtain the
up to one week to process.
Depth
Total SF $
TotalLF $
Permit Fee Total Permit Fee $
Public Service Company (1
U.S. West (1-800-922-1987)
TCI Cablevision of the Rockies (1-800'922-1987)
Eagle River Water & Sanitation District (970'476-7480, ext. '114)
Holy Cross Electric Company (1'800-922'1987)
Town of Vail Electricians (970-479-21581
Town of Vail lrrigation (970-479-2158)
Town of Vail Public Works Construction Inspector (970'479'2198)
9. THERE WILL BE NO TOTAL STREET CLOSURESI A construction traftic control plan must be approved by the
Public Works Department Prior to issuance of the permit.
10. All excavation must be done by hand within 18" of utilities - (senate Bill 172).
11. pennittee must contact Public Works Dopartment at 479-2198 24 hourc prior to commencing ot work. Failure to notify
the Town will result in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town
charging the contractor a reinspection tee.
12. I certify that I have read all chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility
company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required.
Contractor's Signature of Agreement Prlnt name cleaJly Date ol Signature
White - Public Works
Yellow - Contractor
ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC coNTRoL PLAN
show streets with names, buildings, and location of cuts. usE DASH LINES FOR CUT.
How it relates to Building Permits:
Fill out the attached check list with the Building Permit Application.
If yes was answered to any of the questions then a "Public way" permit is required. you
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc,). This
plan will expire on November lst and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Work's office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to peform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
F NOTE: The above prooess is for work in a public way ONLy. public Way
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
I have read and understand the above.
F :/everyone/forms/bldperm5
"f
rumv0F
pRAINAGE ANp CULVERT INSPECTTONS ARE REQUTREp By PUBLIC WORKS!
Please read and check off each of the items below:
o The Town of Vail Building Department has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
u The Town of Vail Public Works Department will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culverts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Depaftment for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at479-2198 to request an inspection from
the Public Works Depaftment. Allow a minimum of 24 hour notice.
o Also, the Town of Vail Public Works Department will be approving all final drainage
and culveft installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Ceftificate of Occuoancy issuance.
Agreed to by:
Project Name:
Date Signed:
F:/everyone/forms/bldperm6
TVWNOF
Please read and check off each of the items below,
(Copies of complete text are available upon request)
CODE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED
o Unlawful deposits; Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any
other debris or material upon any street, sidewalk, alley or public place, or any portion thereof.
o Notice; Abatement: The Director of Public Works may notify and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public Works. In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified.
D Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 14-1 of this code.
o Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section t-4-t of
this Code. (1997 Code: Ordinance 5 (1979).
CODES 7-3A-1 AND 7-3A.3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
D No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) g 1)
o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Atticle, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) 5 3: Ord. 28(1981) 5 1)
I have read and will comply with the above code provisions:
Position or Relationship to Project:
.t
Date Sis.ned: lo lz-t I e<L
---------------]=
F:/€veryone/forms,&ldpernlT
Vait 2004
Vail Village and Lionshead Village Construction Hours
Information Handout
Problem Statement
The Vail Village and Lionshead Village are invaluable assets to the community. Thousands of people
come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer.
The community and merchants rely upon our guest to generate revenue. Our summer/winter guests
expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the community and on our
guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village and
Lionshead Village Construction Hours Handout.
It would be inesponsible for the Town of Vail, the the Merchants. to not
actively participate to minim2e the impaet of
New for 2004-2006 will be the Vail Village
!illage areas.
utility related improvements, streetsca
All Construction projects and/or Scott
Bluhm Town of Vail Streetscape
Givens
The following givens are intended to constructlon
in the Villages:
o The public's health, safety and at all
. Adequate pedestrian, load
be maintained.
The hours of Outside Construction Activity shall be as follows:
- April 15 -June 18 & SeptemberT - November 19,7 a.m. until 7 p.m., seven daysaweek.
June 18 thru September 10, work must end by 4:00 p.m. on Fridays.
November 13 - April 1 5, 2005 work allowed within daylight hours only.
- Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m.
to 8:30 a.m. on Bridge Street.
- Special Construction delivery permits must be requested in advance, from Public Works in
conjunction with Code Enforcement at Checkpoint Charlie.
- No construction activity shall occur on Saturday or Sunday between June 19 and
September 5.
all
-3418 for
TOWN OF VAIL FIRE DEPARTMENT
75 S.FRONTAGEROAD
VAIL, CO 81657
970-4.79-2135
Job Address:
Location.....:
Parcel No...:
VAIL FIRE DEPARTMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ALARM PERMIT
108 S FRONTAGE RD WEST VAIL
Permit #:A05-0051B.+ 4r^t
210106408m1 fus'lzr&ap
ISSI.JED
08tut2w5
08/08/2005
02tMt2w
OITNER
APPIJICAITT
Electrical----- >
DRB Fee------ >. Investigrtion- - >
Will Call----- >
TOTAL FEES- >
Approvals:
Ttem: 05600 FIRE DEPARTMENT
08/08/2oos mmcgee
08/02/2oos
OF 08/02/2005 Phone: 9?0-513-7100
08/02/2OO5 Phone: 970-513-7100CONTRACTOR
Desciption: FIRE ALARM TO TENANT FINISH
Valuation: $10.070.00
*,.r* *'hhl ***'tratr **rt,t
$0. 00
$0. 00
$0.00
93.00
9612 .53
$612.63
$0. 00
$512.63
$512 .53
$0. o0
Total Crlculated Fees- >
Additiooal Fees--:-- >
Total Permit Fee---- >
PaynEnts--------- >
BALANCE DUE----- >
Action: AP
Project No , ?q ort e+31
VAIIJ CIJI}IIC INC
1.81 VI MEADOW DR
VAIIJco 81657
COMMERCIAIJ SPEEIAIJISTS
T{SSTERN COIORADO, I,IJC
P.O. BOX 1572
SIIJIERTI{ORNE
co 80498
License: 161- S
COWER,EIAIJ SPECIAT,'ISTS
WESTERN COIJORJADO, IJIJC
P.O. BOX 1572
SIIJ\IERTHORIIE
co 80498
L,icenge:151-S
CONDITIONS OF APPROVAL
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct, I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and zuMivision codes, design
review approved, International Building and Residential Codes and other ordinances ofthe Town appticable thereto.
R"EQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AI 179-2135 rROM 8:00 AM - 5 PM.
OR CONTRACTOR FOR HIMSELF AND OWNET
?acy.oV3?
APPLICATION WILL NOT BE ACCEPTED IF INCOTPLETE OR
application submittal and must include infurmaEon llsted on the Vail, Golorado
of this form. Application will not be accepted without this
Frontage Rd.81657 2^
COTPLETE VALUATIONS FOR ALARtt PERltllT (Labor & taterials)
FireAlarm: $ tO.01O.
for Parcel #
***i!f,***t*:t**:t:t***:t:t**:i:t::*:l*tt*r:t:r*:.*:tiFOR OFFICE USE ONLY***:lt*l:t*:l:l*!F*****:t:t:t*:t**:*!f,*t ********
Contact and Phone #s:Fire Alarm Contracloc Toum ofVal Reg. No.:
Contd.ct Assessors Ofrcr at 970-32E-EU0 or visit
Parcel# r|dt g\O\Ot t0BOOt
Job Name: Nc*sk " 8..- r k^o"r Job Address: tcA s Tron\.,qa [4.
LesarD€scription I r-o,' I ero*, ll rr'r,s, ll suoai"irlon'{t}5 bu,\,{r..
orners t'tame: {.r 0\r*i r ll Address:t*.,1 r , ) $400.1t.,, Dv \L,; 'tll Pnone: )
Ensine€r:slma., h f-o vDlL ll
Address: gt Bs r I D?) F,isr^r I enone: QtTt q 0Br
Detailed Location of lyork: (i.e., floor, uhit #, bldg. #)
\rjesl.c.l.,- ?,.^" t f y",- r
D€tailed description of worft:
Sr-o .. \c',.u."^ k "to,,rl &..\-,-\-
S€e Scoge.. oL .rso'rk-On d Ycrrr\^t \
WorkClass: Now( ) Additim( ) Rernodel ( ) Repair( ) Retro{t( I Oil't"t1$knan {
Typeof Bldg.: Singlefamily( ) Trrcfamly( ) irtJttfamily( ) Commercial\! Restaurant( ) Other( )
No. of Existing D^,elling Unils in this buiHing: ll l.lo. of Acomrnodation units in this building:
Does a Fire Alarm Exist: vesr$) No ( ) ll Does a Fire sprinkler System Exist: Yes (// No ( )
\WailUab\cd€v\FORMS\PERi/ITS1ALRMPERM I)OC
TD\L/J
TOWNOFVAIL
75 S.FRONTAGEROAD
vArL, co 81657
970-479-2138
Job Address:
Location.....:
Parcel No...:
OVINER
CONTRACTOR
APPLICANT
ELECTRICAL PERMIT
108 S FRONTAGE RD WEST VAIL
WEST STARBANK
210106408001
Permit #:
Status. .
Applied.
Iszued.
Expires .
Phone:
DEPARTMENT OF COMMI]NITY DEVELOPMENT
NOTE: TTIIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TMES
E04-0268
8,4 - obl
.: ISSIIED
. : ll/16/2004
. : ll/17/2004
.: 05/16/2005ProjectNo , pi"4 _b+37
VAII-, 108 LTD
C/O WESTSTAR BANK ADMIN
PO BOX L210
GYPSI]Mco 81637
I-,icense:
D.P. ELECTRIC
P. O. BOX 711_
EDWARDS, CO
8].632
LLcense: .tl.v --E;D.P. ELECTRIC
P. O. BOX 7l_1
EDWARDS, CO
81632
I-,icense: 11-9-E
Desciption: INSTALLNEW LIGHTFD(TURES, REARRANGE
Valuation: $20.000.00
FEE SUMMARY
Electrical----->
DRB Fee-.----->
lnvestigation-->
Will Call----->
TOTAL FEES->
Approvals:
Iten: 05000 ELECTRICAL DEPARTMENT
1,L/t5/2004 Js
IEem: 05600 FIRE DEPARTMBilI
Action: AP
CONDITIONS OF APPROVAL
Cond:1-2
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required completed an accurate plot plan,
and state that all the infomration as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and suMivision codes, design review
approved, Uniform Building Code and other ordinances of the T9ryn applicable thereto'
rr /15 /2004
CET{TER
L1,/L6/2004 Phone: 97 0-925-4t40
LI/L6 /2004 Phone:. 970-926-4t40
s360.00
s0.00
s0.00
$3.00
$353.00
$363.00
s0.00
s363.00
s363.00
s0 .00
Total Calculated Fees->
Additional Fees------>
Total Pfinit Fee----->
Payments----------->
BALANCE DUE--_.>
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY.FOIJ'R HOURS IN OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSI
Project #:
Building Permit #:
Electrical Permit #:
97fJ-479-21
CONTRACTOR INFORMATION
b8
75 S. Frontage Rd.
Vail, Colorado 81657
Electrical Contractor:
Drt bgE E tr'?*9 y' E ue"mrc. E//4.
Town of Vail Req. No.:
//q-p,-
Contact and Phone #'s:
%6 /Uo
E-Mail Address:nloe/eetfr lni /. net
/Cohtractor Sionatft\ ' ,'rt 4-rtYnf _.,
COMPLETE SQ. FEET FOR NEW BUILDS and VALUATIONS FOR ALt OTHERS (tabor & Materials)
AMOUNT OF SQ FT IN STRUCTURE:ELECTRICAL VALUATION: $
Contact Assessors Office at 97O-328-864O or visit for Parcel #
Parcel #klo t 0a10fi00
Job Name:wEsrsThIL Bht)l Job Address:rox s pnoLnta€ R.otujatEtf
Legal Description Lot:Blockr Filing:Subdivision:
owners Nutu'.J,+lI ioK Lfo nadress:fg 1e/0 C/pjan,U Phone:
Engineer: pt Address: pt_Phone:
Detailed description of work: tr pg f t C C U e d Lfe kl FAy ra4l^€5, Bg Vpp/,{4 E
WorkClass: New( ) Addition( ) Remodel !4 Repair( ) TempPower( ) Other( )
Work Type: Interior ( f{ Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No F)
Type of Bldg.: Single-family ( ) Duplex ( ) Multi-family ( ) Commercial ('!.1 Restaurant ( ) fther( )
No. of Existing Dwelling Units in this building: s No. of Accommodation Units in this building: F\
Is this permit for a hot tub: Yes ( ) ruoK )
Does a Fire Alarm Exist: Yes N) No ( )Does a Fire Sprinkler System Exist: Yes ( ) No 6Q
"';- \_ ,
'.
- fi''#?*,+ fti {$JS:Si * * i * * * * * * *
i,t t.l \r
TOV-C0trti.rlf;.U'
(./ ,i,
. i i? t-r;t// j
i.J1 - tv
* * * * * * * * * * FOR OFFICE USE ONLy* * 13 * *x ** * * * **,t *\.* ** ** * * x **4* * x * t x *
Date Received:
DRB Fees!Accepted By:
Planner Siqn-off:
,1vu-
07/26/2002IiVAiI\dAtA\CdCV\FORMS\PERM ITS\ELECPERM. DOC
tr
0
Overhead services are not allowed in the Town of Vail.
Underground services have to be in conduit (PVC) from the transformer to the electric meter, main disconnect
switch and to the first electrical distribution circuit breaker oanel.
The main disconnect switch shall be located next to the meter on the exterior wall of the structure easilv
accessible.
All underground conduits are required to be inspected before back-fillinq the trench.
In multi-family dwelling units, no electrical wiring or feeder cables shall pais from one unit to another. Common
walls and spaces are accepted.
NM Cable (Romex) is not allowed in commercial buildings or structures exceeding three (3) stories.
No use of aluminum wire smaller than size #8 will be permitted with the Town of Vail.
TOWN OF VAIL ELECTRICAL PERMIT GUIDELINES
All installations of exterior hot tubs or spa's require a DRB approval from planning. This application will
not be accepted without a copy of the DRB approval form attached (if applicable).
If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over
30" above grade/ you must also obtain a building permit.
If this permit is for installation of an exterior hot tub or spa on any existing deck or elevated platform,
a structural engineer must review the existing condition and verify that it will support the added
concentrated load. Please provide a copy of the structural engineers wet stamped letter or drawing
with this application.
If this is a remodel in a multi-family building with a homeowners association, a letter of permission
from the association is required.
o
D
l
f
: If this permit is for a commercial space, two (2) sets of stamped drawings are required.
I have nd the above.
,l ./li, /1 ,l/I; /. | - i !
rgna Date Signed
If you have any questions regarding the above information or have additional questions,
pfease contact the Town of Vail Electrical Inspector at970-479-2L47. The inspector can be
reached on Tuesday, Thursday and Friday mornings between the hours of 8am and gam. You
may also leave a voice mail and the inspector will call you back.
rea(a "Gy
01-04-2005 Inspertion Request Reporting Page 12
4:13 prn Vall, CO'- Clty Oi -
Requested Inspect Date: Thursdsy, January 05,2008
Inspec0on Area: JRM
Slte Address: t08 S FRONTAGE RD VIEST VAIL
WEST STAR BANK
A/PrD tnfiormrflon
Actlvttv:
Cons! Typ6:
Or'vnor:
Appllca nt:
Conhactor:
Desc pflon:
Comment:
Requested lnspecuon{sl
Item:
R€questor:
Comrn€nts:
Asshned To:- Actlon:
Comm€nt:
BO4-{)321 Typa: A-COMM
occupahiry:
VAIL I(}8 LTD
ACOM[ 1-HR
o/-c{-
Requested Tlme: 02:00 Pm- Phone: 471-W7
Entered By: DGOLDEN
StBtus: ISSUED
Insp Ar€a: JRM
J.L. VIELE COI.fSTRUCTION Ptron€: 970-47&3082
J.L. VIELE CONSTRUCTION
I/I/EST STAR BANK RENOVATIONS.ADD NIGHT DEPOSIT BOX. ADO SEPERATION WALL. IJPGMD€
LEFMNG IN LOBBY.
ROUTED TO JR. MATT GENNETT AND FIRE - JSUTHER
90 BLDG-Flnal
J.L. VIELE CONSTRUCTION
$llcall471-5467
JMONDRAGON
ao+Si3
ErbPi.ozssnrrope
r.r
-2 Iq/''"^Y'
lnsoecuon Hlstorv
ttem: 30 BLDGFramino - ADDrov€d *
11i 15'(X -lnspoctor: JRM '
Comm€rd:
Item: 50 BLDc-lnsul€tlon -- Approved *
11;15'(X lnsp€ctor: JRM'
Commoni:
Item: 60 BlDc-Sheelrock Nail " Approved -11jl5O4 Inspector: JRM
Comnr€nt:
It€m: 90 BLDG-Rnal
1 1i01/05 Inspector: JRM Action: DN DENIED
Comment: PERMITS FO4-0034 BO5-0013 EO4-0268 STILL OPEN
Item: 532 PW-TEMP. C'o
It€m: 533 PLAN-TEMP. C/O
It€m: 537 PIANRNAL C/O
liem: 538 FIRE-FIi.IAI C/O
Item: 539 PW-FIML CYO
Item: 21 PLAN-ILC Foundallon Plsn
Itam: 22 P|-AN-|LC Sll€ Plan
Acllon: AP APPROVED
Action: AP APFROVEO
Actlon: APAPPROVEO
REPT131 Run Id: 4085
v-
Ttr07Zm5-- tnspection RequsrtReponTng G
4:11 prn Vail, CO - Cttlr Of
Requested Inspect Date: Thursday, Septem ber 08. 2005
Insoedticn Ares: Cv
SIte Address: 108 S FRCNTAGE RO WEST VAIL
.,A'EST lTAtr BANK
A,1t/D lntormatioi:
Acttvftv: E0$012C TvD€. E-ELEC Sub. Tvoe:
Const Typ6: Occupahty: t'Jsa.
Ovin€r: VAIL lOA LTD
Appllcant: D.P. ELECTRIC Phone:
Cohkactror: D.P. ELECTRIC Phc'ne.
Duscrlpllon: UPGRADE LIGHTING lN LOBBY AIJD i.llcl-{T DEPC iITC,qY
ACOM Slalus: ISSUED
Insp Area: CG
97S926-41.O
970.926-41,{{}
Requested Insoection(si
Item: 190 ElEc.final
Requestor: D.P.ELECIRIC
A:rignec!.To: 9FI{HN
L"LLY Af7ru"'-f
Requested Tlme:' Phone:
5
,Enta! ed By:
W ll"#/
1r[,t
01:30 PM
97O-E26-41& -or- 904-
0335
DGOLDEN K
Trne Erp.
Item: 110
Item: 120
fl€m: l3O
rl6m. 14)
.' ( r /'[!t
tt|
lnssc=ctlon Hist:rv
llem: 19O ELEC-Ftnal
ELEC-Temp. PowerELEC-Roush '- Approved "
0&'01/05 Insg€clor: shahir' Action: APAPPROVED
Comtn€nt t3mp prfi spgrowd
0&'0905 Insrbatot: ' aq Aiition: APFR APPROVED
Comrnorlt: ne* receptaclE onry -r€nlove alt nonmted caties in pl€nnuim c€lllr€
ELEc-Conduit
€tEC-Mrsc.
ffit25t06 lns0eclor: SHAHN Acrpn. A},CH APPROVED,CORRECTIONREQD
Comn.ni: ibTE.GFI WILL BE REOIJIRED AT COFFEE $-IANON AT FINAL INSPECTION.
REPLACE
'{O}I
RATEO TY.T,IRAPS WTH PLENUM RATED W.Y}RAPS.
SI,PPORT RECESSED CAN F'XTLIRES FFIOII' STRI,CTI,RE PER I,IEC 3fi).11
REPT131 Run Id: 3593
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGEROAD
'AIL,
co 81657 ?-,o.-\p Lo*\ ,970-479-2138 U.;t g.f(...1- 7.-:'-
NorE: THIS pERMIT MUsr BE posrED oN JoBsrrE AT ALL TrMES t3"-:vo.^--E'*[
ADD/ALT COMM BUILD PERMT PCrMit #: BO5-0073
Job Address: 108 S FRONTAGE RD WEST VAIL Status...: APPROVED
Location.......: WESTSTAR BANMTEADMAN HAWKINS CLINIC Applied . .: Ml27l2N5
ParcelNo....: 210106408001
04/2'1. /2005
ProjectNo. : ? (56-0lcfo
OV{INER VAII, CLINIC INC
181 W MEADOW DR
VATL
co a1557
coNrRAcToR,J.L. VIEIJE CONSTRUCTION 05/23/2OO5 phone t 970-476-3082
1000 S Frontage Road W, #202Vail
co 8t_55?
License: 188-A
APPTJICAI{m K. C . COMPANy 04 / 27 / 2005 phone : 949 -L502
P.O. Box 341
Avon
co 81520
I-,icense: 455-B
Desciption:
TENANT FINISH-OLD BANK OFFICES INTO NEW DOCTORS
OFFICES/CLINIC
Occupancy: B
TypeConstruction: II-A
Type Occupancy: ?2
Valuation: $250,000.00 Add Sq Ft: 0
Fireplace Information: Restricted: # of Gas Appliances: 0 # of Gas Logs: 0 # of Wood Pellet: 0
+ + *'* lr*,* * +rt,lr:t:irr +* +
Building--- > S1 , 833 - ?5 Restuarint Plan Review- > $o . oo Total Calculated Fees-- > $3 , 028. 69
Plan Check--> Sr,191.94 DRB Fe€--------------------- > 50.00 Additional Fees-.----- > $0.00
Investigation- > $O - OO Recreation Fee--------> $0. OO Total Permit Fee-----> $3,028.59
Will Call---> $3.00 Clean-up Deposit------> $o. oo Payments----*----- > 93,028.59
TOTAL FEES-------------> S3,028.6e BALANCE DUE---------> 50.00
Approvals:
ILem: 05100 BUII-,DING DEPARTMENT
06/2L/2OO5 trRM Action: AP
Item: 05400 PLANNING DEPARTMENI
o5/Lt/2o05 Warren Action: AP The conversion of
the space into rnedical offices did not have any impact on
the parking requirment for the building as the space was
previously bank offices which has the same parking
generation requi rement .
IIEM: O55OO FIRE DEPARTMENI
Item: 05500 PITBI-,IC WORKS
o4/29/2oo5 gc Action: AP
PAGE 2
* * * * ** ** **:F***:t* * ** **** *****:t*,f *****1.*1.************:t******+*:t:F:t!F:*'t,t!N(,f ******+:t *!t +*+:t+*:t;t*:t *,r * i. * * * *:F:t:F !* !t !t *
CONDITIONS OF APPROVAL
Permit #: B05-0073 as of 06-21-2005 Status: APPROVED
'F*****!t***********,t*******!t!t****,t(****:t'*!t****:********!t*****+***************!*!t,*{r,t *********,t *,t **{<*******:t **
Permit Type: ADD/ALT COMM BLIILD PERMT Applied: Mt27t2Ws
Applicant: K.C. COMPANY Issued:949-1502 To Expire:
Job Address: 108 S FRONTAGE RD WEST VAIL
Incation: WESTSTAR BANMTEADMAN HAWKINS CLINIC
ParcelNo: 210106408001
Description:
TENANT FINISH-OLD BANK OFFICES INTO NEW DOCTORS
OFFICESiCLINIC
Conditions:
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQTJIRED BEFORE ANY
WORK CAN BE STARTED.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
See page 2 of this Doqunent for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurare plot
plan, and state that all the information as required is correct. I agree to comply with the information and ptot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and suMivision codes, design
review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN
PM.
VANCE BY TELEPHO OFFICE FROM 8:00 AM - 4
CTOR FOR HIMSELF AND OWNEF
o
WILL
?KJ6d-u40
APPLICATION NOT BE ACCEPTED IF INCOMPLETE OR UNSI
Project #:
75
TOWNOFII
75 S. Frontage
Vail, Colo I
(lnspectio
PLICATION
lumbi , mechanical. etc.!
CTOR INFORMATION
co LETE VALUATIONS FOR BUILDING
nefal Contract Contact and Phone #'s:
o,/gf7^($,,'l'i
Email address:
ontractor Signature:
PERMIT Labor & Materials
BUtLptNG:$ //o&tvoO ELECTRTCAL:S p.$Ooo orHER:$ L&2p0060
PLUMBTNG:$ /O/ oOo MECHANICAL:S /QpOO rorAL:$ 7.6-onao.aD
Far Parcel # Contact Eaqle Cn@ct Eaqle Gou Assessors Office at 970-328-8640 or visit www
Parcel #?l6t cl4o 3oo/
-r^,. A...{-^^^. W<f f-a'v- FWz;Z-ZZ&-
i"hY"I:"" 6*€El ,r+/ F.-rL. R*.1
Legal Description Lot:Block:Filing:subdivision: l/1/B
;Yf ^TYLW,lfAddress:Phone:
/v cn[ecv,ueslgngf: t 1. ,t- ur,trle/ | -&r e hr t-4c*+Address:
Engineer:Address:Phone:
Detailed f,escription of vrgrfi !u nn@
Doc-tt-'-? -d/<4>^q ,/ e //n,'c
WorkClass: New() Addirion( ) RemodetJ){ Repair( ) Demo( ) Orher( )
WorkType: tnreriory'$ ert"-iofi-Gotn;Does an EHU exist at this location: yes ( ) No ( )
-
Typeof Bldg.: Single-family ( ) TwoJamiry ( ) Murti-famiry ( ) commerciarA Restauranr ( ) other( )
No. of Exisling Dwelling Units in this building: O No. of Accommodation Units in this buildino:
No/Typeof Firepla ( )wood/pelet( )woodBurninq ( ) -&
lo/Tvp?of Fjleplaf ) wood/Peltet ( ) wood Burnins (Nor ALLOWED)
Does a Fire Sprinkler System Exist: yes ffi No (Does a Fire Alarm Exist:Yesft--tloll
( ***********'***t**********************FO R OFFICE USE O N Ly**************************************
Questions? Call the Building T
o
eam at 479-2128
Buildinq Permit Subm ittal Checklist
)
Department of Community Development
Project Name:Hre
Project Address:
This Checklist must be completed before a Buildina Permit application is
accepted.
All pages of application is complete
Has DRB approval obtained (if required) Provide a copy of approval form
Condominium Association letter of approval attached if project is a Multi-Family complex
Plan Check Fee required at submittal for projects valued over $25000.00 (See attached Construction
Fee Schedule for calculations)
Complete site plan submitted
Public Way Permit application included if applicable (refer to Public Works checklist)
Staging plan included (refer to Public Works checklist) No dumpster,parkinq or material storaqe
o Full floor plans including building sections and elevations(4 sets of plans for SFR and Duplex, 5 sets
of plans for Multi-Family and Commercial Buildings)
l Window and door schedule
o Full structural plans, including design criteria (i.e.loads)
o Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
o Soils Report must be submitted prior to footing inspection
! Fire resistive assemblies specified and penetrations indicated
o Smoke detectors shown on plans
o Types and quantity of fireplaces shown
I have read and understand the abqle listg! s,ybmittal requirements:
Applicant's Signature:
Date of submittaL
| -.4,
tt
o
o
4).-J
a
o
o
I0lt'Ar0F 1,,,1/l
7/6 --\sbestos test and results submitted if demolition is occurring t
-t Architect stamp and signalure (All Commercial and Multi family)
F:\Users\JSulner\newBLDG PERM. DOC
Received Bpd
7-tp-or
07128t2004
tl
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works)
review and approval, a Planning Department review or Health Department review, and a
review by the Building Depaftment, the estimated time for a total review will take as long
as three (3) weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser
amount of time. However, if residential or smaller projects impact the various above
mentioned departments with regard to necessary review, these projects may take five
(5) weeks to review and approve.
Every attempt will be made by this department to expedite this permit as soon as
possible.
I, the undersigned, understand the plan check procedure and time frame. I also
understand that if the permit is not picked up by the expiration date, that I must still pay
the plan check fee and that if I fail to do so it may affect future permits that I apply for.
Agreed to by:
Project Name:
Date: L7- L04
F:\Users\JSutheAnewBLDGPERM.DOC 07 t2812004
ll
PUBLE WOR.KS AND THE PUBLE WAY PERM T PROCESS
Florv it relates to Buildine Permits:
Fill out the atbched check list with the Buildino Permit Application.
If yes was answered to any of the questions Bren a 'Public Way" permit is required. You
can pick up an applicab'on at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verifi7 (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locaE.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locatjons of all traffic control
devices (signs, cones, etc.) and tre work zone, (area of construction, sbging, etc.). This
plan will expire on November 1st and will need to be resubmitted for considemtion for
approval frrough he winter. Be aware trat your resubmission for winter may be denied
depending on he location of construction.
Sketrh of work being peformed must be submitted indicating dlmensions (lengh, widft
and depfr of work). This may be drawn on the traffic control plan or a site plan for the pb.
Submit completed application to the Public Work's office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates bke place in
the morning, but may require up to 48 hours to perform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be conbcted as to the status and any requiremenb that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Departnent will be notified, allowing the
"Building Permit" to be released. Please do not confuse the 'Public Way Permit" with a
"Buildinq Permit".
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an aubmatic renewal.
.-/q- ?p-o\' Date Signed
rstand the above.
WHEN A "PUBLE WAY PERMIT" XS REQUIRED
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING OUESTIONS REGARD]NG THE NEED FOR A
"PUBLIC WAY PERMII":
o
o
o
o
o
q Is any drainage worl$einq done that affecE the Right-of-Way, easemenG, or public property?YES -NO tr "
lsa'RevocableRight-of-WayPermit"required? YES NO ,/
Is the Right-of-Way, eagemenb or public property to be used for sbging, parking or fencing?
YES NO V
If answer is.NO, is p+lLrking, sbging or fencing plan required by Public Works?YES_ NO f ,/
If you answered YES to any of these questions, a 'Public Way Permit" must be obhined.
"Public Way Permit" applications may be obbined at the Public Workt office or at Community
Development (a sample is atbched). If you have any questions please call Leonard Sandoval in Public
Works at 479-2198.
ALL THE ABOVE OUESTIONS,
eJt (o s,' ^ ck
'l^h
^r D r^ia.i Nl>rno'
FlUsers\JSuther\newBLDGPERM. OOC
F. /a\,aF,^ha /f^rmc /hl.l^6164
Is this a new residence?YES
Does demolition work being performed require thqg;e of the Right-of-Way, easemenE or
nr rhli. nrnnerh/? YES NO ,i-
G any utility work needed? YES- NO *
Are frere any improvements being done to the driveway ? YES Not
Is a differentaccess needed to the site otrer than the existinc drivewav? YES NO D(
NO
Company Name
07 t28/2044
tl
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS!
Please read and check off ench of thc items belorv:
The Town of Vail Building Department has d'eveloped the following procedures to ensure that new
construction sites have adequately established proper drainage from building sites along and
adjacent to Town of Vail roads or streets.
The Town of Vail Public Works Department will be required to inspect and approve drainage
adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at
access points from the road or street onto the construction site. Such approval must be obtained
prior to any requests for inspection by the Town of Vail Building Department for footings,
temporary electrical or any other inspection. Please call Leonard Sandoval at 479-2198 to request
an inspection from the Public Works Department. Allow a minimum of 24 hour notice.
Also, the Town of Vail Public Works Department will be approving all final drainage and culveft
installation with resulting road patching as necessary. Such approval must be obtained prior to any
Final Certificate of Occupancy issuance.
Agreed to by:
Project Name:
Date Signed:4. ?-t> or
F:\Users\JSutheAnewBLDGPERM.DOC 07 t28t2004
MATERtrAL STORAGE AND CONSTRUCTION PARKING
Please read and check off each of the items below,
(Copies of complete text are available upon request)
CODE s-2-10: DEPOSIIS ON PUBLE WAYS PROHIBITED
B Unlawful deposits: Subject to subsection C hereof, it is unlawful for any person to litter, track or
deposit or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dift, snow, ice, or any
ofier debris or material upon any streef sidewalk, alley or public place, or any portion thereof.
o Notice; Abatement: The Director of Public Works may notry and require any person who violates or
causes anofier to violate the provision of subsection A hereof, or who has in he Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dirt, snow, ice or any offrer debris or material within twenty four (24) hours after receipt of said notice
by fre Director of Public Work. In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notifled.
o Sumrnons and Penalty: As an alternative to the nobce for removal provided in subsection B above,
any person who violates or causes another to violate fie same, may be issued a summons to appear
before tre Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 14-1 of this code.
o Notice and Penalty: It is unlaMul for any person to fail or refuse to comply with the notice of the
Director of Public WorK as provided in subsection B hereof, and any such person shall, in addition to
paymentof the expense of removal incurred by U-re Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 6 (1979).
CODES 7-3A-L AND 7-3A-3: PARKII'{G OBSTRUCTING TRAFFE & IMPOUNDMENT AUTHORZED
o No pe6on shall park any vehicle upon a sfeet or at any oher place within tl-ris Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
sbeet or highway maintenance. (Ord. 2(1968) $ 1)
o Whenever any police officer finds a vehicle attended or unattended, standing upon any poftion of a
sbeet or upon any place within tris Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under trre conditions prescribed by Colorado Revised Sbtutes sectjon 42-4-1102, as
amended, the officer shall require tfre vehicle to be removed or cause it to be removed and placed in
storage in fre nearest garage or odrer place of safety designated or mainbined by trtis Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of fte vehicle in
addition to a ten dollar ($10) impoundmentcharge. (Ord. 2(1968) $ 3:Ord. 28(1981) 5 1)
t.
I have read and rvill conlply rvith the above code provisions:
Position or Relationship to Project:
F)Ri B egiUsrdh e r\n ewB LDG P E R M. Doc
6L
47t28!2004
1000 Sotrth lironrege l{oecl \\tsr. Suire lt)2
Vail. (irlored<, li 1657
Ii'le 97().476.1082
l:.rx 970.,176.14l-l
wrvlvrr icltconstrLrcriorr.corn
May20,2005
Town Of Vail
Department of Community Development
75 S. Frontage Road
Vail- CO 81657
RE: Building Permit B05 - 0073
Gentlemen:
This letter shall serve as notice that J. L. Viele Construction is the General Contractor
for the Steadman-Hawkins Clinic in the Weststar Bank Building at 108 S. Frontage
Road West.
$ncerely,
l
Tony Faulhaber
Project Manager
#,-ll;1,J',J,';'J',#;l'"*il- ilJ',i, ;,1'#J;;ffi'o T-248 P.002/002 F-391
T.Iil l-Szrtu File
5flr/05
To*aon tt M$y C$CrrIi
Thb k E infnn you fr6 Cd.tl COrotnrsrio,q Rkfi Gplce tc 6t lfilr t. eoorrsEt1a.of rscfi os t3SEtur flrurfhr Clioc rurodcl 6 Wsflfr Efit tof S trufqencf Wa.
TtnUl,o\
RiEhC4lr
&.Wahh
Environmental Scientists and
an ecology and environment company
November 12,2003
Mr. Scott Fricke
Buchanan Yonushervski Group, LLC
825 Logan Street
Denver, Colorado 80203
Bo5- 007?
rCIwn of Vail
RE: Pre-renovationAsbestoslnspection
288 Bridge Street, Vail, Colorado
. WALSH Projecr #5657-010
INTRODUCTION
Buchanan Yonushewski Gloup, LLC ccntracted Walsh Environmental Scientists and Engineers,
LLC (WALSH) to conduct a pre-renovation asbestos inspection at 288 Bridge Street in Vail,
Colorado. The building is a l-story structure previously occupying a coffee shop and bar. The
building exterior is constructed of plaster and brick. The building interior is primarily dryrvall
and wood frame construction. The scope of thc inspection consisted ofareas of the building that
may be impacted by the renovation activities. The scope of the inspection consisted of materials
in areas identified on site as being likely impacted during the renovation. The areas inspected
included the building interior and the front (rvest side) of the building around the rvindou,s. Due
to time constraints, the report is provided in summary format.
Suspect materials, or homogeneous areas, sampled during this inspection include the follorving:
. Carpet Adhesive. Spray-on Acoustical Ceiling Material
' Drywall and Dry',vall Mud. Plaster. Caulking. Floor Tiles. Lay-in Ceiling Panc-ls
' Baseboard Adhesive. Paneling Adhesive. Drywall Texturing Material
WAL.SFI collected 37 sarnples of suspect uraterials lrcrnr the building. 'I'he inspection ancl
analytrcal resLrlts identitiecl no nraterirls in the bLrildings that rvere conflrmed to contaln greatel.
than 196 asbestos.
4888 Pearl East Circle . Suite 108 . Boulder, Colorado . 80301-2475 . Phone (303) 443-3282 . FA){ (303) 443-0367
I
Nlr. Scon Fricke. BLrchanarr Youush ki Crou|. LLC
November 12,2003, Ptrge 2
288 Bridge Street, Vail, Colorado Asbestos ltrsDccriorl
METHODOLOCY
Asbestos inspection activities were perforned by an Asbestos Hazard Emer)gency Response Act
(AHERA) accredited and State of Colorado certifled inspector.
A homogeneous area (material) is defined as an area containing a material that appears similar
throughout with regard to color, texture, and date of application. Each homogeneous material is
classitjed into one of three available types ofhomogeneous material descriptions.
' Surlacing lVlaterial ref'ers to a wide range of trorvel or spray-applied materials typically used
for acoustical or fireproofing purposes. Examples include spray-applied fireproofing and
acoustical texture ceilings.
' Thermal System Insulation (TSI) refers to insulation that is applied to heating or
mechanical system components. Examples include pipe, tank and boiler insulation.
' Miscellaneous lVlaterials refers to all other materials that do not fall into one of the above
categories. Examples include floor tile, adhesives, and ceiling tiles.
Once the type of homogeneous material w'as determined it was then classified as friable or not.
The Environmental Protection Agency (EPA) distinguishes betrveen friable and non-friable forms
of Asbestos-Containing Building Materials (ACBM). Friable materials can be crumbled or
reduced to powder by hand pressure, whereas non-friable materials cannot
The EPA and Colorado Department of Public Flealth and Environment (CDPHE) have identified
2 categories of non-friable nnterial. CDPHE and EPA define Category I non-friable naterials
as asbestos containing packing, gaskets, resilient floor covering, and asphalt roofing products
containing more than 1olo asbestos and Cotegory II non-/riable materials as any material,
excluding category I non-friable ACM, containing more than l% asbestos that, rvhen dry, cannot
be crumbled, pulverized, or reduced to powder by hand pressure.
The following Br.rlk Sampling Strategy satisfies CDPHE requirements for sampling for friable
and non-friable materials, and rvas used to determine the number of samoles to be collected.
* One sanrple rvas collected for linritcd qualltity, replacenerrt or patch (salientf nraG.ials
WALSFI collected bulk samples of the homogenous natcrials rn a random ancl representative
manner, as determined by the inspector. Samples rvere collected by takrng a cornposite core
san.rple that included all layers vvithin the suspect material. Samples tiom soft lriable materials
were obtained by removing a small portion using rvetting techniques. All samples r,vere placed in
sealed, labeled oontainers, and the sample descriptions and locations rvere recorded.
Table 1 Bulk Sampting Strategy
Units
Minimum
Number of
SamDles
Friable Surfacing less than 1000
1000 to 5000
more than 5000
SF
SF
SF
J
7
Non-friable Surfacing SF J
Friable and Non-friable Thermal Svstem
Insulation
LF/SF/EA 3
Friable and Non-friable Miscellaneous
Materials
LF/SF/EA 1
IMr. Scott Fricke, Buchlrun YorrushcEki Grouo- LLC
Novernbcr 12. 1003. Pree J
288 Bridge Strecr, Vail. Colorado Asbestos InspecrioD
The bulk samples ,ffere submitted for progressive analysis to DCM Science Laboratory, Inc.. an
NVLAP accredited laboratory. Analysis of the bulk samples was perlormed using Polarizetl
Light Microscopy (PLM) using procedures dcveloped by N{cCrone Research lnstitute and in
compliance with the guidelines established by the Environmental Protection Agency (EPA-
600/M4-82-020, Dec. 1982) to determine asbestos type and content. The pLM samples are
reported as percent asbestos by rveight. Percent asbestos for separate layers and total for the
sample are delineated in the laboratory report. Unused portions of samples are archived for six
months unless the client requests special handling.
FINDINGS
WALSH performed the inspection and sampling on Monday, November 10,2003. A total of 37
samples r.vere collected from the building and analyzed. EpA and oSHA define asbestos
containing material as material containing more than lu% asbestos, or materials that are assumed
to contain asbestos. The inspection and analytical results identified no materials in the buildings
that were confirmed to contain greater than loZ asbestos-
The table below summarizes the sampling and analytical results for the suspect materials.
Homogeneous Material
Description
Associated
Sample
Number(s)
Functional
Space
(Location)
Description
, . Arialytical
Result
(Percent and
Type of
Asbestos)
Tan, Pliable, baseboard adhesive
(BBA-01)
Miscellaneous
Non-friable
Cateqory ll
01
Storage Room
(East side of
buildinq)
No asbestos
detected
White, brittle, baseboard
adhesive (BBA-02)
Miscellaneous
Non-friable
Cateqory ll
01 Bathroom No asbeslos
detected
Yellow, brittle carpet adhesive
Miscellaneous
Non-friable
Category ll
01 Bar room (West
side of buildino)
No asbestos
detected
02 Middle room No asbestos
detected
Composite drywall, tape & mud
with gray paper (CDW-01 )
Miscellaneous
Non-friable
Category ll
01 Mechanical room No asbestos
detected
vz Bar room (West
side of buildinq)
No asbestos
detected
UJ Middle room No asbestos
detected
Composite drywall, tape & muo
with tan paper (CDW-02)
Miscellaneous
Non-friable
Cateqorv ll
01 Mechanical room No asbestos
detected
Composite drywall, tape & mud
painted black (CDW-03)
Miscellaneous
NonJriable
Cateqory ll
01-02 Bar room (West
side of building)
No asbestos
detected
White, pliable, exterior window
frame adhesive (CK-o1)
Miscellaneous
NonJriable
Cateqorv ll
0l West side
extenor
No asbestos
detected
White, powdery, drywall lexturing
material (DS-01 )
Surfacing
Friable
0'1
Bar room (West
side of buildino)
No asbestos
detected
02-03
Storage room
(east side of
buildinq)
No asbestos
detected
Mr. scon Fricke, no.unon YonurnQi Group, LLC
November 12, 2003, Page 4
288 Bridge Street, Vail, Colorado Asbestos lnsDection
5/8" "fire resistant" unfinished
drywall (DW-01)
Miscellaneous
NonJriable
Cateqorv ll
01
Storage room
(east side of
bulldinq)
No asbestos
detected
12"x12" lan floor tile with cream &
black markings, and yellow mastic
(Frc-o1)
Miscellaneous
Non-friable
Category |
01
Storage room
(east side of
buildinq)
No asbestos
detected
02 Middle room No asbeslos
detected
12"x'12" gray tloor tile with black &
white specks, and yellow mastic
(Frc-02)
Miscellaneous
Non-friable
Cateqorv I
01 Middle room No asbestos
detected
2'x4', gypsum, lay-in panels with
white vinyl cover (LlP-01 )
Miscellaneous
Friable
01 Middle room No asbestos
detected
02-03
Storage room
(east side of
buildinq)
No asbestos
detected
2'x4' lay-in panels, painted brown
with random, raised pattern (LlP-
02)
Miscellaneous
Friable 01-02 Bar room (Wesl
side of building)
No asbestos
detected
Dark brown, pliable, wall panel
adhesive (MA-o1)
Miscellaneous
Non-friable
Category ll
01
Storage room
(east side of
buildinq)
No asbeslos
detected
02-03 Middle room No asbestos
detected
Gray plaster over concrete witn
white skin-coat (PL-o1)
Surfacing
Non-friable
Category ll
01 Mechanical room No asbestos
detecled
02
Storage room
(east side of
buildinq)
No asbestos
detected
03 Bar room (West
side of buildinq)
No asbestos
detected
Gray, granular plaster on metal
lath with white skin-coat (PL-02)
Surfacing
Non-friable
Category ll
01-02 Middle room No asbestos
detected
03
Storage room
(east side of
buildinq)
No asbestos
detected
White, spray-on acoustical ceiling
material (SOA-01)
Surfacing
Friable
01-02 Bar room (West
side of buildinq)
No Asbestos
Detected
n?Middle room No Asbestos
Detected
04-05
Storage room
(east side of
buildinq)
No Asbestos
Detected
IMr. Scon Fricke, Buchanan YonusheE3ki Grouo. LLC
November 12, 2003, Page 5
288 Bridge Street, Vail, Colorado Asbesros Inspection
RECOMMENDATIONS
i
In the event materials not identified in this inspection are discovered during renovation activities,
WALSH recommends an accredited and certified asbestos building inspector sample the
materials and have them analyzed for asbestos content. Under renovation, any activity that
directly impacts or disturbs asbestos-containing material must cpmply with requirements set forth
in the Code of Federal Regulations, OSHA Construction Industry Standard for Asbestos
1926.1101, and Colorado Department of Public Health and Environment (CDPHE) Regulation 8.
TIMITATIONS
WALSH performed services in a manner consistent with the level of care and expertise exercised
by members of the asbestos inspection and assessment profession. WALSH does not imply or
guarantee that every potential asbestos-containing material on or in the building has been
identified or sampled. Historically, asbestos has been added as a component to over 3,000
materials and products produced in the United States. The inspection included the building
interior and the front (west side) of the building around the windows. The inspection did not
include areas above the drywall ceiling, the roof or the other exterior sides of the building. The
scope of the inspection consisted of materials, in areas identified by the client, as being likely
impacted during the renovation. The inspection was intended to identiff those materials that
were reasonably suspect and that were most likely to contain asbestos in quantities subject to
regulation, based on existing industry and regulatory standards.
If you have any questions or comments regarding this report, please contact us at (303) M3-3282.
Sincerelv
WALSH ENVIRONMENTAL SCIENTISTS AIYD ENGINEERS, LLCln il .-W\^-- dlgltuJ
Chris Gerow,
Asbestos lnspector
Attachments
Barry Monroe (Shaw Construction)
WALSH file
Cc
i^rtv
A\\:alsh
Enuiron-"nrul S
ATTACHMENT #1
LABORATORY RESULTS
qe<ttts qq qq qq eq
Eis -E :55 E5
qqq qqq*tt 8c8 eq qq q€t qqo8 tt tt tt
833 33:e3 F3 FE 3E
l'l'l'
.t
hI
EsFSEENIi4'EE\,OLEig g g
&ddttrYli
==<?'t!.1E5 tgEI FII';Y
lo lotz t2tlIItl
a aaz22
tlIF IA17 12tltltl
222 222
t^
12
I
zz 2z 2zz
$$$S* S:t *S *Sqq qq qq qe-s*s8 aqaq qYl:e t
*
d
H
td
E?
t!
FI
,d
ljIncEiez)E9!alJF=F';AFIHEvzzE'i;.tseE
EE
EF<x*Yrd I:FE E6 E {o'l -"l ee ?Qo ==? - t? FE EEE- iEl B El E," 3: t*t Etlu xEx f;G >GEt. t,E - ;e ?i E!: lEE EEEF EEg E EE 'i 3E :bF EF'" iXF F EF 3F EF 3E{ ica .tcd { {c .ac {c {c
5E E IE 3 5 E:!i3!i:i
T
EEEE
HE
ZE
=8
3?
EEEF
EF
n|{
IHEP1!
t
td
zuJ:-
d*> EriI CaiE EF
2
F -3itr 2EF FIE
fiEg
tsr
3
H
4H
z
L
FxE
!i
!a Pl
;3
EEE
9ciZ
gEE
EAz
qrt
g
2
E{
e,It
ztrEI15?rF i''!
EE-EQ9
Oia.
F{eaaJ:--<sE5aszArl
3sa
I::zE
l-tc
b
rdx
FE.
EEEgf;$
riiEr$
EFFfi'gEEaEEE'E E
EEE E
t
qqq qqe Qqqtts r8g 388 c€cc <t.5clgddd ddd
aqc eq6 oQc qqqq qqqg.s g.* g.E gd.* g"i
:33 3g:acra €<t o<! 606d g.r deg"r dd.i
lE
I
la
lz
I
la lol= l'lltltl
???!?rtEEFSrie e F Ri:i I : i
le tc lcttlttl
22222 zzz zz7 2z7z 222
s
d
s*s s** ssaqqQ eqq Qq<?..s-s4..55 f{fTIdE${{.{.4:5
F'z
a-3F, i-F=i I
EEE EEEE 5:3F 4<du I
Qae:HiE
,tt
B
^ EHI tlnE F$Eg JEE- tf;EF9Z'z
=lEEE
tt ldE&
OO(a{C I P p?
EEEE EEiED0{E{:il'.i{-{
E*E*EeEEEEFlFE;:F
{ .i <cd <dd {dd .ddaC
EEE 3 i E3i::i:
gP
TF
EE
.D2E
F.IE:<
E8
EEEE
3P
EE
EE-8
EEH'<E
s
I
z
q
AEe
ei
A
L
E
E
titdE
3x
EE$6;U
-Hf;
HEEEAt
lrl
!t
x
>=gs-
eEE9{E
===zE!4:iiP'E
,tE
:-FY H ;i .. E
EEg E HleiEE o
dEe Er gEifEg
Ef<g iar tPg'lEtEgE; E3 igEEEE EHiEE E
ETd '
E-r g
I
Eti
H
Q
,t!lET
7,
2B{I
g
2I
15?4F l':
EF=
E;E
F{efrECla-<L
EH3?r:t$E
FzH
6
E
gd Qq3t qe
Ei5a5
o6c c€€ coggt Ed€ g€
qqtt qqtt 9qtt dC€i caat cc.3 .G6dd8 scc E*
qq dd qq o<t!! ccc rc.! € o6d€. id. id-: €i
la lo12 lztlIIlt'
tre ezzz
5s8Fq€FSEEEqEEEE33t!tidd rt6at<t
le ln lal= l" l=ttltll
zzz ,i22 2,Z2
lol2
I
ln lol= l"tl
zz 2z zz
ss9q..ts* sss sss sasq= q=? q<tq q.iq-3 nRR '':g .geasci9n8ss
tl g'
$ect:HEEEABHl.EE4e
4e
U
F
dI
.D
etrDI
2-lOHi?
I'i .aY&,tIld2rli9e
E3
o(9FF729(,aa4Etti-)Egi Exd H HiEi iEI EE E
':E ':E
EE IF'F FEF HE H
tgt tE' tf t.{dd {ict {d .i
E€E€€666ii!!
7
4
6tt{Et
=ez
':EEFF
B6'
.ddd
c
tsEZBcrr i in9 I 5;tb 3 <x3 Et E-xfi 2e ,t|iI CA r;AFrd rd Et ri 6rqF FF l-FEtr trT EEI-t '' ''.ld {d {d
EE5Ti5
?
0t5ca
g9
TFEF
EE
EEI
2EnEiaF
EE
"9Et
6FEE', 'EE!
EP
Eg
*Ezo
6
E
EtaIa
TJS
3E
EEE6At
FEHz3t
FE
td
ia
B
>E
FE.
sBsg*E
iirESg
tr
2
c
3:$H u ..E
EEg I Hled;E g
;Eie;gEEEEEE
$:E E E
EIE '
EF6
2
p
5A
q
d!lB
tsrz
zllI
?.A
z.JEI15?rft- Fl
FE-
E;E
F'i UGtc
=<flECa
:IP**E4
zI
dgdgd6QCCI Cc' €€CSggg dg ggd
qqt8
I
qq qqqq qqtSFr 8e
qqq qe<tatcc rto€
ec 9& qqqE qd
tt- c€gF cF qcg qqqoF€ c€€
ln
l"
la
l=
lc
l=
le
I'
le
77 22 Z2Z2 z2 zzz zz2
s
H
HEFa
I
d
ts,
U
6E
EE?>
z)E9ttrF=FiIIE136uzz
E€E
{{ {E S{{$ {E S{$ {E{-s rF c',q$ sF .IF -gg
I
e
tlFv)
FIA
ll:
zZt<9F
tit tl lil
EtB
.{dd
a
?
I
n
E6
c _rnF9!rdF
dEf;Fen|:>l-riEl=E6t
.idd
Ii
FJ
L
.'!d
FF-,l
=z
F>
FH69
.{d
Y
i
Itt
z
EI
t
.A
agc d atsEE E EIgJ E J;F
Es fu EEEs
=z 22 tsctszFF Ff FE'T.{d {d {idd
.n !q.??q::i
?.?tEE5>E:*:.1€ro€
Y.f
=)F9AEP
EF
EE
EEE
"iFl
EEEE
EEE
3?
EF
z,
=8
I
Hera>€Fra
-tl
E o.'H=
XTa6
trt
flj
C'2
x
Ij
:(z
EE*
2
L
E
B
H
!-<?Ata
EEEU;E
gEF
x32
FTEF
'ta
ts
1EsE-
eeeSEH
===zEaii:9tt
tl
zRc-$
He$ E tircpp
gFigilEFgFE
EiEH
B
q
.t&EJ2
zcq
I
2H0r3i<+FtlEE
=t!=E;Ed(aFEI'
EiIIE
=<lrJECaqrrJi3RaeE
E
&
FzH
rr
U
)
EEE EEE EE
eq
EEE EEE EE
qqtt
383 333 33 <t eq
la
l"
I
I
z
t^t^t^
lE lz lEttll'l'l'
s*8 SHC d
l"
I
222AOA AAA 60zzz 222 zz
ass *ss
.iCd iidd 55 S9g d
s
T'
FTE
t4
E
FI
F
tiIJI
1CEFJ;JE9rttrF=FI
dlE-rH6vzzFT,:,EGE
qrEllcldl|
ltt(tt(l{dd4tsFFEEsta&tFhhE9eees
EAA-H! E8 EE E U U E E
FEFFEEEEF:33F3
Fr:, Fl P:'Fr l| y Fl Fl 9t F: td tdEEEEEEEEEEEEEEF6rEEFt6ttttEt.aco {dd .{d < .id i { {
3 I 3 EE EE3i!iIii!:
9!!
6EE
o1 qq
eo6
Yi.l
Ese!!qst=tEE{EE658tt
&&4C&iGJT.tlF
e?
EF
4E
EF
EHEE
AP
EF
EE
!x
iEE
P€g
s
rd
z
fi'
.H
Fd
Eg
2
E
f;
g
Nrl El
=-<
EEEdfE
EHE
Flj
-,a
n'
-EFs-
+EEHf;$
!i=E3H
-,FF":$H a E
3gnEeEEEEEEiE'85 EgErd EFgE
=-E g
3f
EE
(J
d4
FIz
z.E€
o
FzH
se=
=qF ! .r
EE-
=(J46hE
E{e
Er4!.-<dECa
?8RBCE
I
B
o
Enviromul
(prge I of 2_)
Colsdo t0301 I (303) 443.32E44ttt Pcd EdCirdc, Suilo lot O
ANALYSIS REQUEST end CHAIN OF CUSTODY
DESCRIPTION:(lt*ltde wfunelor ab snplet)CIJENT IIAMPLE ITUMBERS:
r. 104-BBA0l{l
PROGSET: L\E US&
SAMPIIS SIJBMITTED BY: Wrbh Erylrorucrtrl Sticrtlrts rrd Erylrccrq LLC.
!.,ABORATORY SIJEIII|TTED TO: Pacc Analtica DCII{ )Rcsrrwm (other)
$fYOlCE T(} (f dffzcil)
IIATE OF SAMPLE COLLECTION: I l/l0f2m3
PRoJECT / CLIENT Veil / 2E6 Bridgc Strcct
PnqrEcT #
CONTACT: Ctrir Gcmw
pHoNE (303) 443-3212 FAX (303) {43.0357
PAGER @scrmnbd l3/|q 944Al4e
ANALYTICAL INSTNUCTIONS:(circlc rqutd senlce:)
SEM (ot Er)ASBESTOS BTJLK ANALYSIS :
(twt@ FCMT4OOA PCMORM (otlrr)
(speclfy neul)
NR(nehn) wKtERfug/I)
(ttcrM)
sOlL(e6veEhr) wPEFdf)
AA Fbrnc AA Fumaco TC'LP
DUST (%vctsh, C:IIIF O6vcW)
METAI,S A}{ALYSIII:
$1pc of anph / lw rcpttd)
2honRUSH 6 hours
Fl\X(tu rnnbet)
(ottpr)l|.|r.Irdr& crt D|Gl.d 6dr ., Cralodt d.| nral lrf natarr
Slsndlrd 6 months (tpcib loryer tu6bn)R.tufn Srsrplc' b Clicof?
2. 102-BBAO2{I
3. 100-cA0l{l
4. l0l{A0l-02
5. l034Dw0l4l
6. 100€Dw0142
7. t0l{Dw0l-03
t. l03,cDw@-01
1004Dw0341
!0. 100€Dw03{2\ll.'' xw{Kol4l
r2. 100-Ds0l-01
13. lu-Ds0l42
14. 104-Ds0l43
15. lB-Dw0l-01
16. lg-FTcol-01
r7. t0l-FTc0142
18. 104-FTC02-0!
le. lol.LPol{l
m. 104-LIP0I{2
/a) TRANSFEROFCUSTODYTO: (tuelhn)OFCUSTODYFRO.M: (tuu/tb,,c)
ANALYSIS REQUEST and CHAIN OF CUSTODY
PR(XECT/ CLIENTT Vdl / 2Et Brldgc Stret DATE OF SAIIIPLE COLLBCTIoN: lf/fU0:t
Qtr lude w lane fo dr wnplel PR(rcSf,T: LABUSE:
5
CLID,NT SAf,TPLE NT'MIEISI:
zr 104-LIP0I-03
DESCruPTION:
100-LIP02.0l
t00-LIP02{2
104-MA0l{l
l0l.MAol-02
l0l-t{Aot-03
103-Pu)l-0r
100-PL01.02
104-PL0l{3
x2.
23,
24.
u.
76.
n.
2t.
29.
30.
31.
32,
JJ.
34.
35.
36.
l0l-PL024l
l0l-PL02-02
t04-PL02.03
loGsoAot-01 l0
100-soA0l.02 l0
r0t-soA01-03 l0
104-soA0l44 l0
ro+soAol45 l0
EnvironrEnEl Scicntish and Engine€rs, LLC
. ATTACHMENT #2
CONSULTANT CERTI FICATIONS
ASBESTOS
CERTIFICATION *
STATE OF COLORADO
Colorado Department of Public Health
and Environment
Air Pollution Control Division
This certifies that
Chris Gerow
Certification No. 9198
has met the requirements of 25-7-507, C.R.S. and Air
Quality Control Commission Regulation No.8, part B,
and is hereby certified by the state of Colorado in the
following discipline:
i
fnspector/Management Planner*
Expires: 0510112004
* This certiticate is valid only with the possessiott
the discipline speciJied above.
Issued: 05/01/2003
of current AHERA certilication in
z
fr'll
AIzl<l
Fll
.lFIzl
IJ.]I
>lrrllHI(?l
<lzl<l
>l-\|
-rlxll-r Iirl
ErlAI
aalzl
tr
a
;)
O
lrl
v)lr'l
E.
14
J
zz
14fTr
t
Fr'rrr)
()
c)
c)
C)
U)
rn()
C)o
(n
an
l-.
fr: ? Ei=$ E 9EU: n il
8EX E I
!_aE t 35Eo !4 F:
G Er L,,' XR\J
h{
$u $$) 0oS
F.$ $
w
a o€
{) u: raa)=6!
; EF(e E93'; XIE\U.e P<
F
()!
o0
a
ON
La
v)t-
(.)
l-
c) !/.E si
cn an
i6(,
,*X
,- F-o(|)
C<rr
EXr.(
o.=
2C)
P7l
l-1 Lr.-()
,Fr =c)'o(/r o.jl9>
,-! o.
Fr.i
f T l
<A
q)
(t)!
o
U)
9-
PE
FF
c<
>l
<l
'la-tl
9l sr\l^lot <l*l +l
cil
->l
=fl.\tI
-..1 ool
<A
E
z
()
T-()
q1
(|<
;
()
{.)a
."1\l
't I'')l\\lhql
\j,l\N
oo
t EEM Consulting, tnc.
t I E *""-" ElvncrrL llrrec*nr Cogr,nro, lrc
Arrcgro . LBP . Cogmntc . Tmrnr
AT OFFICE GOPY
ts05zurl
CONSTRUCTION SPECIFIC
ASBESTOS INSPECTION REPORT
Town of Vail
WESTSTAR BANK - B,^=LbrK6'
108 SOUTH FRONTAGE ROAI)
VAIL, COLORADO
FOR
J. L. Viele Construction,Inc.
100 South Frontage Rd. West, Suite #202
Vail Colorado 81657
Sre,cbvtftt t . Fl'f,og;rXrs Cul51a4-
Bos - oo" >
May 11,2005
(303) 67$1851 . FAX (300) 679l8eo
3350 El Pind Drive . Evergreen, CO 8O4$t
R205-30
t EEM Consulting, Inc.
t l E*E*Iurcmncolrgf,rrr, bc
Argt[ r llP o Coclrnc . Turln
May I1,2005
Mr. TonyFaulhaber
J. L. Viele Construction, Inc.
1000 South Frontage Rd. West, Suit€ 202
Vail, CO 81657
REFER.ENCE: Inspection for asbestos containing materials WestStar Banh 108 South
Frontage Road, Vail CO 81657
Dear Mr. Faulhaber,
EEM Consulting trnc., is pleased to provide this report for the above referenced site. The
inspection is provided in association with the planned renovation.
Thank you for the opportunity to provide our environmental consulting services. Please call if
you have any questions.
Sincerely,
William C. Oleskevich Robert L. Ragan
President/Operations Manager Industrial Hygienist
EEM Consuhing Inc. EEM Consulting, Inc
(8(B) 6,S185l . FA( (3qr) 6-t$1840
33SOAPimlDirr. Everyeon, CO 80ltl9
TABLE OX'CONTENTS
SECTION 1.OI E)GCUTTVE SUMMARY
SECTION I.O2 DATE OF INSPECTION
SECTION I.O3 LOCATIONOF INSPECTION
SECTIONI.O4 EEMCONSTJLTINGINC.REPRESENTATTVE
SECTIONI.Os CLIENTREPRESENTATIVECONTACTED
SECTION I.06 PREVIOUS INSPECTIONS AND EXCLUSION STATEMENTS
SECTIONI.OT SAMPLINGRATIONAL/I}WESTIGATIONMETHODOIOGY
SECTION I.O8 INACCESSIBLEAREAS
ATTACIIMENTS
ATTACHMENT#I
BULK SAMPLE ANALYSB TABLE. AND IABORATORYANALYSIS REPORT
ATTACHMENT#2
EPA AND STATE OF COLORADO INSPECTOR ACCREDITATION
(96) 67$1851 . FN( (3q!) 6't$1&10
&5O El Pind t)riw . Ew€rc.G CO 80499
ASBESTOS INSPECTION REPORT
Weststar Bank 108 South Frontage Road, Vail CO
I.OI EXECUTIVESIIMMARY:
The construction specific survey for asbestos containing materials (ACIO was conducted in
rooms designated for renovation by J.R. Viele Construction. The Survey was performed in
general accordance with the guidelines of the Asbestos Hazard Emergency Response Act
AHERA 40 CFR Paft 763 and the Occupational Safety and Health Administration (OSHA)
29 CFR 1926.1101. A visual and tactile inspection of suspect ACM was performed. A
minimum of three bulk samples were collected randomly of each suspect ACM. The
Environmental Protection Agency (EPA) and the Colorado departrrent of Public Health and
Environment (CDPHE) recognize material that contains greater than ono- p€rcent asbestos to
b€ACM.
Laboratora enalysis in this survey detected no ACM in the materials samplod.
Reference Attachment #l for The Bulk Sample Table and Laboratory Analysis Report.
I.O2 DATESOF'INSPECTION:
May 10,2005
1.03 LOCATIONOX'INSPECTION:
Weststar Bank, 108 South Frontage Road, Vail CO 81657
1.04 EEM CONST]LTING, INC. REPRESENTATIYE:
U.S. Environmental Protection Agency (EPA) and State of Colorado accredited inspector:
Mr. William C. Oleskevich Mr. Robert L Ragan
Signature Signature
Reference Attachment #2 for EPA and Sate lnspector Accreditation.
r.O5 CLIENTREPRESENTATIVES CONTACTED:
Mr. Tony Faulhaber, J. L. Viele Construction, Inc., Vail Colorado 81657
I.06 EXCLUSIONSTATEMENTS:
EEM Consulting, lnc., warrants that the findings contained herein have been with the
level of care and skill exercised by experienced and knowledgeable environmental
consultant who is licensed or otherwise trained to perform asbestos inspections pursuant
to the scope ofwork required on this project.
The asbestos inspection included inspection of accessible materials. EEM Consulting
Inc. did not dismantle any part of the structure to survey inaccessible areas. For the
purpos€ ofthis wanant, inaccessible is defined as af,eas ofthe building that could not be
tested (sampled) without destruction of the structure or a portion of the structure. In the
event that access to a portion of the building was not obtained (which otherwise would
have been tested), such limitations are specifically identified in Section 1.08.
I.O7 SAMPLING RATIONAL/INVESTIGATION METHODOLOGY:
Sample locations were selected in a random manner. A minimum of, three samples were
collected of each homogeneous material identified as suspect ACM in accordance with
AHERA 40 CFR 763 sampling protocol.
The following suspect building materials were sampled for asbestos content.
r Ceiling Tile, suspended 2'x4' white
r DrywalU mud-joint & tape with surface textureo Vinyl sheet flooring / adhesive, gray
Samples collected by EEM Consulting, Inc. were analped at the following AIHA and
NVLAP acqedited laboratory:
r Resenoirs Environmental, Inc., 2059 Bryant Street, Denver, Colorado and
analped by Polarized Light Microscopy (PLM) in compliance with USEPA
guidelines (EPA/600/R-93/I I 6).
I.O8 INACCESSIBLEAREAS:
Reasonable efforts were made to locate and inspect concealed areas in accordance with
40 CFR 763. Ottly the areas and the materials listed were inspected as part of this
inspection.
oo
ATTACHMENT #1
BULK SAMPLE ANALYSIS TABLE
LABORATORY ANALYSIS REPORTS
E
oo
'q
ba
2=0?cx
=1E,IEZ
aiD >?3E4
F<F
tl
U)F<34
!)
E-e22
tr.s<o=.zz
tlE,
r;'ig<'?z
EI
?'B>
v)xor 6G I
EHEE
o >1(
:P F 5 F?F U 9 H.Ett= = I !|)
?:st ? S
EfiS* 1r= o0 (|) '.- .=
= 9= FA
ho;l.* : :i;ei;(j
I rl
o'5d -Ezo=
==v:= EEsu.;e-v,i F.s
kv.E;.E b(|)- t
,9'F z\:g dto6es>'E
E OO(!
vco
c Gtv
,P 5S
E?#a-a4h,io,E,Z=
E 1.9
9E FE,EZ
lltl
6:><29^o<7(rrt tr- Z
\cFa
E
F.E
_8" €g>F*A.=;€
d o rtt
€€-g
.B-e ft troo lt bo
F6F
->= =6?a YlL ^ at)oDE ioo9 @
fi
oa
<o
<9
|a
N
rt1
q)
G
*S
qEE
zzzZzz
Et<c?
EEEg zzzzzz
E-
.s'E
EE
2&z2Izz&z
EEc!cE=
8E€E'
EgF€
ooo
Qe)()t=='=='=xxxEEEEgg+++€€€xxx(u(ul|)e.'hA"33F.i.i.iEEE
trtrtr'?'?'?sss77=
FFFo0b000===!=EF''ar ar -l.x;<XliA;i
o
atlt
oE
E
E
N e.l:lt :lt :tt :lt
|l)o=oiu=(,9Rlol)ct
EE'rrEE&eA(t--cl(l|6lctrd
YYYY
il il Fl Fl
c
E,z
I
Et
ch
3 rar \o
(\.l ..){{{qqHF- t-- FYVYnSncqq
F
I
cl
rihtear EiEo=6tr
AO
-EqEO
xg-z zt),../ Eco-Oot
-Orqszx<
6a
?A6)
K
.E
e
oI)
.E
a
O
2-0d.,J
Ez
E2
(t) >E8
Fl
ll
(t)F43<
.E
t)
E-e
(>g<
o=.zz
="r-i3r.a2
'J
T!
E<'5>
=_axo ;oE PE E'*;.: e= eLA> 9
oE:i os E 6 gr?
d ii ., >'-5E E E 6
?:at i EEi€:sc! --^ ., .: EE q,;-E E
#EfE5
JC=zo=
==v.= EE
E d.iC*voXe
TOE;.E b9=E
u) '= z
s>'EE oDd
tr cv
,eE9
5h; -8.=o a.tE<h9ord, z:E? <.=
s€€LLA
tl
Q3=^o<7,t.2
9€€
E
F.=99
bo i:92Hloa.\ .=
--' €
lq Oa'
€€-g
6EEI epY^ !2 Y^FE tr
EAF
.. tL t tlE>?f aa= i
EX EaE t
<= el 9g I
u)
N
tt
a)
6t
.S
qEi zzzzz
it<€?
gsHg zz22z
E-st
gE
44**^.tzzzzz
"EEEEEE>
AE€E'
EgFC
gg
xxoo
€€q)()
'= '=.:a .:1 F !! !€
=:EEEE;.= .= .=
==F'666>r>r(DrDa)ona66
tlo
C
q
.9ctE
a
E E F = H
==EgE#S.EFiE;
EE?Egg E;D 5
t
-z
a)
Et
E
E
iiot-r-ii'-tYOC)
==7tzn??433g9' >
F
EQ
rits/a
3.Eattr
6q)-LtrtrosH
=o63oo-aoriO
1u2
=9,EE:<
qt
oI
oo
oo
ATTACHMENT #2
EPA AI\D STATE OF COLORADO ASBESTOS
INSPECTOR ACCREDITATION
oo
- -- -t
coLoRADo DEeARTTENT orlrlc HEALTH & ENvrRoNirENT, RlATtoN cotttrnoL Drvrsrox
: PEESS F'Rf,IY
hCD tll CE FeGf tt'rlsa OH..tl.|rd. { p.tvfou. tonr.)
GREEIf GOPY: eage 2-(FACturv aEG,SIF ttT'S F LECOPY)
X.RAY IIACHI NE CERTI FICATION EVALU ATION REPORT
RcD se-r rOr,*. cERTrFrcATroN E'ALUATT.*,ne"r,on,
1. QUALIFIED INSPECTOR:
A. Soc{lon l: Provide complete, legible information on the Certilicetion Evaluation (CE) Report. Complete a separate RCD 59-1 torm for each
madline gvaluated. Area t0ed 'REGISTMNr should retl€ct name of legal owner. A conlact, other than the legal owner, should be entered in j
lhe 'Contact Person' informaiion box. The registralion number is tracked/assigned lo the facility. lf lhere are facility items of noncompliance,
cornplet€ a Fadlity Certification Evaluatlon torm (RCD 5920.B. Socllon ll(ll: lf UNSAFE FOR HUMAN USE- check box and print Unsafe for Human Use label number in spac€ provided.
Secdon llfl)(Af): lf machino is in noncompliance, complete this seclion as appropriate. The Ql shall dte he RH number conssponding lo the
sp€clllc rooulatory rsguirement that has not b€en safisfied. lf an item of noncompliance is con€cted at the time of inspection, initial hs
approprlate space(s). Ch6ck t|e appropriale circlo(s), next lo 2.A-F, if this violalion is a rapeal from the last inspsction. It her€ are r€maining ibms
\ of noncompliance, inform the registrant that thelr /€sponsibllities includ€: 1) completing Section lll(2): 2l conecting any ltems of Molaton as.' iodlcated In S€ction ll rvihin hirty (30) days; 3, obtaining verification of repair fiom service company Sscuon lll(3); 4) notifylng the Ql to obtain CE
lab€l and Ol's signature in Seclion lV(2); and 5) fillng the CE with the Department within lhirty (30) days of CE impodio.r dato a3 Indicatsd Ut-
Seclion l. (As a s6rvice, th€ Ol may mail the CE to the Department to assure compllance with Departmont notification polici€s and t€gulations.)
Socllon ll{3): Us6 this space for misc. general intormation; it does not have to be noncomplhnce related infomalion. Print Inbnnation regarding
labeb issu€d as PAST DUE LABEL(S) hore.
C. glgg]grugg! lf macfiino is dotermined to be in noncompliance, immediately notjfy he Registrant, or R€gistranfs agpnt, print narn€ and litle in
Section ll(4), sign/data the CE in Sgction ll(5). Atter machin€ is ropaired and is in complianc€, sign in Section lV(2). Note: lf machin€ is in
compliance during initial evaluation, Ql signature is required only in Section lV(2).D. glEg!glB94$g! lf lhe machine b Inilially in compliance the registrant do€s not have to sign the CE. The Ql should co.ndoto th€ CE
proces3 by atfuing lhe label and signing in Section lV(2). lf the machine was not in compllance hav6 thg r€gistrant sign Section lll(2).E. Slonlturca/Tlar I Soonsor: Not6 that a Tier I Sponsor musl revlew a Tier ll's machine Certitication Evaluafon and must sign n€xt lo lh6 Tior ll
slgnature.F. All Ccimc.tlon Ey.luatlon Reportrs (CE) yvhlch aro requlrod to bo mallod to tho Departmont, mu.t bo mallod wlthln th]!c (3) drya on
flndlng r machlne In noncompliance tnd wlthln thrro 13) davs of rnalnlno compllanco.
2. FACILITY REGISTRANT:
A. .glg!!@! Review the Certlficadon Evaluation (CE) Reporl thoroughly. Section I ls compl€ted by the Qualifi€d Insp€ctor (Ql) during he
evaluaton,B. 9@l!g!! Read and und6retiand any items of non@mpliance noted on th€ CE report in S€ction ll (l,2A-F). Sign, date. and provide your titl6 in
S€cton f lf(2). Revievv RH 2.6, pages 2-11 E 2-12, Colorado Ru/es and Regu/€fions furtaining to Radiation &ntrot, b defne Fadlity R€glsfant
RoEporulblllUes.C. Soc{lon lll: lbms of noncompllance must b€ r€pairod or the machlne placed in storage. Afl€r ths machine me€ts compliance, the bllolvlng
should occut: lh€ seMce r€palr person signs and dales the CE in Sec'don lll(3); thg Registrant notlf,es a Ql to obtain a CE machlnE labeli lhe Ql
cornpfotos tf|3 lnbmational box€s: New Label Num'€.r and Expintion Dato, and signs Section lv(z). Ql will mail the whlb copy (pag|3 1) to |he
O€partnent withln thlrty (30) days of iGp€ction date (OR WITHIN THREE (3) DAYS OF ATTAINING COMPLIANCE). Tho Ol wlll mall $€ gr€en
copy (paF 2) to the r€gbtrant.D. Place yo.rr copy (Gre€n oopy - Pags 2) of this C€rtfication Evaluaton Report, and all other perfnent sgMce r€porB, in a frlo and rotaln for at l€ast
. thr3e (3) yeets. Th€s€ doorm€nls must bg made readily avallablo for the Dopartments r€view upon request Pl€ase not€ he 6oord r€t€nton
requlrem€nb ot RH 2.6.3 and RH 6.3.1.1.12 of the R€gulalions.
3. SERVICES and SERVICE REPAIR:
A, Perto.m appropriate ad,$fn€nts, ssrvio6, or installalion as nscessary b rne€t r€Oulatory rsqulr6m6nb.B. lf cornplotlon of he s€rrico wor* will be delayed, pleass inform the regbtrant of the expect€d completion date. lf unable to porbfin lho cornplianc.
soMc6 work, doase Infonn lh€ ragistanl so oher anang6m6nb can b€ made to meet the thirty (30) day rgulalion. A ssMcs t€palr l€pod of lhe
3€Mc€ npon !g!!I accompany thls CE Report showing all conected ltsms, !E!gg!!g.'l!g@Lgg:EllC. Upon cofird.ton of compllanca 3eM€, slgn thls form, Seclion lll(3), lo cedry that all ltems of noncomdlanco havo b€en cort€clod and thal
eervice rvork was In aocordanos wlth the Regulatlons. The Camry Copy - Sorvlcs Repatr (pag€ 3), 3trould be retalnod In lho s6Mco conpanf3
r€cordg,
lf there are qusstions regarding this form, please contiact the X-Ray Certification Program at (303) 692-3075.
Address all conespondence to:
Colorado Department of Publlc Health & Envlronment
(page 1).
(page 2)-
(page 3)-
hage 4)-
(page 5)-
)
4300 Gherry Greek Drive South {HMWMD-RM)
Denver, CO 80246-1530
Distribution:
White
Green
Canary
Pink
Goldenrod
Colorado Department of Public Health & Environment copy I See 1(f) of above instruclions ]
Registranfs fi1e copy
Service/Service Repair copy
Colorado Department of Public Health & Environment copy I See 1(f) of above instructions I
Qualified Inspector copy
J :\DOCSXRA\AFORMS\59- 1 lnst.trm 0?i2812003
Charlie Davis - Re:Star Bank
From:
To:
Date:
Subject:
Mike,
Charlie Davis
Mike McGee
0912812005 8:06:32 AM
Re: West Star Bank
Thanks for the info. lf you like, l'll attach lhese permits to the projects as you described. Let me know.
Regarding the descriptions, these depict what is written on the applications for each permit. The applicant
has described the work activity and our staff input it into the computer. I believe some lraining for our
applicants is due. This can be handled by asking more questions at the front counter. I will follo,rr-up on
this.
Based on your additional information, it appears that all alarm and sprinkler work must be completed prior
to occupanry for the Steadman office and the responsibility to complete this work sits squarely on the
WMC group. We will honor the request and not approve occupancy until these issues and work is
completed. Once compleled, will we get some type of confirmation from Vail Fire?
Chadie Davis
Chief Building Official
Town of Vail
>>> Mike McGee0912812005 7:02:35 AM >>>
Thanks for the list of permits.
Upon revieq it is very dfficult to tell what's what. The description entered into Perm its Plus are basically
nondescript. Befter descriptions would be helpful here as it would on most every permit.
The fire alarm work shows two permits pulled by Vail Clinic 454019 4l15lOS $15K and 405-0051 8/2/05
$10,700). The first permit appears to be for the panel replacement and common element. The second
permit, judging by the date, appears to be for the tenant spaces per the agreement with Stan Anderson
a.k.a. WMC.
Steadman Hawkins work would be under the second permit (4054051).
The third permit, A054056 is for the Ear, Nose and Throat.
Most all of the fire alarm work is about done.
WMC has not selected a monitoring company yet so the phone lines are not hooked up. The fire
sprinkler system is not yet monilored.
I called western States yesterday and told them we have a request for a final this weekend. They pulled
the permit in July, 2004. That should have been more than enough time to finish.
Steadman is contenting the fire alarm work is all "retrofit" and therefore they do not need to comply before
opening. I disagree.
Tony Falhaver reportedly told Steadman to call us direct. I do not believe it is the role of the GC to have
the lessee request inspections. Viele should be taking care of that.
I intend to discuss this with Tony at Viele today.
I also intend to call Wester States (sprinkler contractor) and find out why they are not done and what is
left.
I liks^,ise, intend to call WMC and urge them to make a decision as to where the sptem will be
monitored.
That decision should not take 5 months to make.
I am willing to uork with them to an extent. That means they need to work too!
We should ncte they intend to put patients into the building sirarting Monday. The nature d their business
predudes self resane for many of their clients.
The fire ahrm must be t00% and the fire sprinkler should be on.
GC:Buildlng_Dlvision ; Joseph Suther
TOWNOFUAIL
Vail Fire & Emergency Semices 42 West Meadow Drive
August 4, 2005
Darryl Flores
Direcnr of Facilities
Vail Vallq Medical Center
181 llest Meadow Drive
Vail, Colorado 81657
Re: Fire Protection Pbn, June 2E,2005
Dear Mn Flores;
Vail, Colorado 81657 970479-2250
I rcceived your email 8/3/05 on the Fire Protection Plan for VaiI Vallq Medical Centen The Fire Protection PIan is dtted
June 28, 2005 and is apparently the resulb ol our meeting on May 19, 2005. I appreciate your efiore nothg the 11 PM timc stamp.
As noted in the proposal" VI4MC has a Simplex fire alarm control panel, Modcl 2100, cunently tied into another Simplu
fire alarm contol panel, Model 4100. In discassions with Simplex several yearc ago and confirmed again today, the Model 2100
control panel has not been manufactarcdtor at least ten yealro now. ParB are no longer available. Accofiing to the conversation
with Simple this dtte, the interconnection is not AL Uste{ is not recogniud by the manufocfirer, and is thereforc, not in
compliance with minimam codc requiremen&.
In that this issue is not new and given we have been binging this issue up over and over for yearc, n'e are of the opinion
the Modcl 2100 panel must be replace4 discorde4 removed, or otherwise taken out of the moniartng and contol loop. The
*hting 4100 series panel has salltcient capaciE andfeaturcs to absorb aA the circuits on the 2100 paneL Field devices that are
less than 8 - l0 years old and can he shown to be within manufacture's sensitivity senings, can be connec'ted to the 4100 panel via a
monitor modale. No change in wiring is required
To extend sn existing non-compliant condition any longer would be a detrimental to the pstients and stafr. The codes only
allow an *isting non-compliant condition ,o exist so long as it does not pose a hazard to ,he occupants. In this case, the existing
non-compliant condition daes pose a haurd.
lle strongly suggest lvl/MC seek additional eryertise regarding oprtons to addrcss the 2100 panel Adfuessable modules on
existing circaits may be an acceptable option if the detection devices are operable. A full panel upgrade or replacement may be
approprfute for undcr the scope of the Phase II redcvelopment
As yoa suggesteQ fafrre capital plans are subject to Board approval but firc protection upgad.es should be anticipatedfor
each projecl Be advised incremental actions may lead to unanticipated expenses if the technical aspects (notifrcation cbcuit loah,
wiring issues, Toning, porxr requirements, etc.) are not considercd as part of each upgradc,
The $Fiscal Year' plans submitted shoald be held h abeyance until morc rcsearch has been completed It is noterwrthy
the zpnes not protected by the 1100 panel reside on every level ucept the frstfloor, cover most of the fire qfinkler system, the
kitchen where fires are most likely occur, and the elevator, an essential element in patient relocation during a fire.
I am generully pleased with the proposal as it relates to the West Star Banh It should be noted oJfices not undq rcmodel
will eventually be rcquircd to retoftt as a condition of approvol Incomplete coverage is not to the benefrt of the owners or
occupants, especially given the associtted costs when compared to the risk benefit analysis
WMC Fire Protection Plan
Pagc 2
In shotg ttc 2100 pancl iw mN be sd&essed. A three year dension on the requirem.rt ta rqlroG ot nt rur$e a non-
llstedfue al$n panel Is not agrowd
Tlcptopsolforflre lYedfu, hnk is apptoved.
Plcrs fu rwt hedlab b coiltuol ts ilyou wish b discass this ndter hr more MaiI or nqube furthq o&a,nar W. ane
most tt fuu$ b rcstw therc isracc, Thanh youfor yow effor* to dtb. Sigtiltcot t progess hes bun ma&,
SUceruty,
MichutMciice
IrNlCftW/FtuaMarchel
&: JolnGullc$FircChtcf
Mtho Vaughoa Ftw Prchtun Ofucr
Chadb DoYis, Chicf kWng Ofultl
MEMORANDUM
TO: Mike Magee - Vail Fire Department
FROM: Darryl Flores, Director of Facilities - Vail Valley Medical Center
RE: Fire Protection Plan
DATE: June 28,2005
**********************************'1.'f*'i************'t****'t*'t!t*:i*,i*******'l**'t*
The following is WMC's long term plan for retrofitting the fire detection system. I have not
yet received the information you were going to provide for WMC regarding incomplete
TCO'S at the West Star bank building. I've contacted the Town of Vail and was informed
they did not have any record of outstanding TCO's for 108 S. Frontage Road.
Vail Valley Medical Center Fire Protection Plan for converting existing zones monitored by
the 2100 panel to 4100 addressable monitoring system:
o Vail Valley Medical Center will continue to honor its agreement with Vail Fire
Department to continuously upgrade remaining zones currently monitored by the 2100
panel. Current zones on system will be converted to existing 4100 addressable
monitoring system, at the time of renovation, improvement of deparfrnental spacg
change of use or other significant alteration requiring a building permit from the Town
of Vail.
r Future capital plans for upgrade of all fre systems within the organization will be
subject for Board approval on an annual basis.
r WMC is cunently under design for Phase II construction which will include the
demolition ofthe 1964, 1976, buildings.
o WMC is currently upgrading Howard Head Sports Medicine fre protection system
located on the first floor physical therapy area. @ermit #21212)
Memorandum - Jul1.' 20. 20{'15
Page 2 oli -i
Listed is a future plan for conversion of current zones not monitored by the 2100 panel:
o F'iscal 2006 Capitat Budget - Basement Level
1. basement water flow switches
2. basement tarnper switches
3. basement kitchen manual station
4. basement kitchen auto devices
5. basement electrical room auto devises
6. basement S.F.-l duct detector
7. basement S.F.-2 duct detector
8. basement elevator room S.F.-3 shaft fan override switch
9. basement kitchen hood svstem
o Fiscal Year2007r. 2nd floor tamp;:l'ffl3"tget
- Patient care unit
2. PCU /ICU water flow
3. 2"d floorPCU flow switches
4. 2'd floor manual stations
5. 2fr floorN room auto devices
6. 2"d floor corridor auto devises
7. 2"d floor/PCU's rooms auto
r Fiscal Year 2008 Capital Budget - 3d floor 86 buildingl. 3d floor west main O.R. corridor auto devises
2. 3d floor west main O.R. auto devises
3. 3d floor Steadman Hawkins corridor
4. 3td floor south corridor & room auto
5. 3td floor west manual station
6. 3d floor S.F,-4 duct detector
7. 3d floor S.F.-5 duct Detector
8. 3'd floor west water flow
9. 3'd floor west tamper devices
10. 3'd floor sf 4 & 5 override switches
West Star Bank Fire protection
Memorandum - .lulv 20. 2005
Page -'1 ol3
WMC is in the process of installing a fire sprinkler system and a new fue detection systom
throughout WSB Facility as recommended by VFD. As agreed with Vail Fire Departrnent, all
tenant improvement requiring a building permit will also require the addition of fire detection
throughout their space.
Areas to be frtted out for install2005:. All conmon areas in the facilityo Parking structure detectiono Howard Head P.T. Space #304
. Sprint office #210o Vail Land Titleo West Star Bank
o Steadman Hawkins Offices l't floor
West Star Elevator Upgrade:
2005t2006l. Install Phase II recall
2. Access to mechanical room via parking structure
2007t2008l. Remove wood panels from building asi recommended by Vail Fire. Replace with
stucco to match existing conditions on building.
From: Mike McGeeTo: BsildlngDivision; Fire_lnspectorsDate: 05/19t200511:08:42AMSubJecfi West Star Bank 405-0019
tr. Plans are approred as noled
2. Panel and rlser should be confirmed with respec* to capadty to handle enlire building.
3. Plans shov trrto units labeled 210. Resolve conflict.
4. Heat detedors In garagg, debcfion in elevalor, and HVAC are required.
5. Compliance with Letter of Agreemenl between VFES and WMC is required.
6. Fumish lbt of exlstlng tennanb. Some require debc-tion lo comply with TCO.
ceurc.tmGDcomcasl.net; John Gulick
From: Mike McGeeTo: Charlie Davis; Wanen CampbellDate: 61111i2W512:18:21PMSubJec{: West Star Bank Permits
ll appears we need to put their plans on hold.
Stan Anderson wents Chief Gulick at a meeting on 5/19. He reportedly doesn't think the flre alarm
requirements ar6 Yair',
Perhapo we need to look at the previorJs conditions under which we released the permlts for the preMqrs
forr proJec{s as utell. Theh conditions of approval stipulated conneding to lhe neur firE alarm systern.
BuildhgDMsion; Fire_lnspectors; John Gulick
E!er!re!et"'t .We'!s,s-t3! a--- -O_
From: Mike McGeeTo: Charlie DavisDate: 0912812005 7:02:39AMSubject: West Star Bank
Thanks for the list of permits.
Upon review, it is very difficult to tell what's what. The description entered into Permits Plus are basically
nondescript. Better descriptions would be helpful here as it would on most every permit.
The fire alarm work shows two permits pulled by Vail Clinic ,454019 4115105 $15K and 405-0051 8/205
$10,700). The first permit appears to be for the panel replacement and common element. The second
permit, judging by the date, appears to be for the tenant spaces per the agreement with Stan Anderson
a.k.a. WMC.
Steadman Hawkins work would be under the second permit (A054051).
The third permit, ,4054056 is for the Ear, Nose and Throat.
Most all of the fire alarm work is about done.
WMC has not selected a monitoring company yet so the phone lines are not hooked up. The fire
sprinkler system is not yet monitored.
I called western States yesterday and told them we have a request for a final this weekend. They pulled
the permit in July, 2004. That should have been more than enough time to finish.
Steadman is contenting the fire alarm work is all "retrofit" and lherefore they do not need to comply before
opening. I disagree.
Tony Falhaver reportedly told Steadman to call us direct. I do not believe it is the role of the GC to have
the lessee request inspections. Viele should be taking care of that.
I intend to discuss this with Tony at Viele today.
I also intend to call Wester States (sprinkler contractor) and find out why they are not done and what is
left.
I likewlse, intend to call WMC and urge them to make a decision as to where the system will be
monitored.
That decision should not take 5 months to make.
I am willing to work with them to an extent. That means they need to work too!
We should note they intend to put patients into the building starting Monday. The nature of their business
precludes self rescue for many of their clients.
The fire alarm must be 100% and the fire sprinkler should be on.
riee !--,l
CG:Fire_lnspectors; John Gulick; Joseph Suther; Russ Forrest
o
EVELOPMENTTOWN OF VAIL
75 S. FRONTAGEROAD
VAIL, CO 81657
97U479-2t38
OWNER VATL CI,INIC INC
181 W MEJADOW DR
VAII-,co 81657
APPLICANT D. P. EIJECTRTC
P.O. BOX 711
EDWARDS
co 8L632
I-,icense: 119-E
CONTRACTOR D. P. EIJECTRIC
P.O. BOX 711
EDWARDS
eo 4L632
I-,icense ! 119-E
Ele.rical---- >
DRB Fe€-------- >
Investigation-- >
Will Call-------- >
TOTAL FEES.. >
06/28/zoos JS
ftem: 05600 FIRE DEPARl'l'tENf
06/28/2OO5 Phone: 9?O-926-4L4O
06/28/20os Phone z 97o-926-4L40
ARTMENT OF COMMUNITY D
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ELECTRICAL PERMIT Permit #: E05-0119
f o€aa73
Job Address: 108 S FRONTAGE RD WEST VAIL Status . . . : ISSUED
[ocation.....: WESTSTAR BANMTEADMAN HAWKINS CLINIC Applied . . | 0612812005
Parcel No...: 210106408001 Issued. . : 0f,l28l2D5
ProjectNo : ?rj Of-otcfo Expires. .: l2/25/2W5
06/28/21os
Desciption: TENANT FINISH-OLD BANK OFFICES INTO NEW DOCTORS
OFFICES/CLINIC
Valuation: $28,0m.00 Square feet: 5700
** * r*rt,* 'l*rt**'l:h**,1'*
$611.80
90. 0o
$0.00
$3 .00
$514 .80
$614.80
$0. oo
s514.80
$514 . S0
90 .00
Total Calculated Fe€s- >
Additional Fees---- >
Total Permit Fee----- >
Payments-:------ >
BALANCE DUE--.-- >
Approvals:
Item: 06000 BL,ECTRICAI-, DEPARTMENT
Action: AP
CONDITIONS OF APPROVAL
Cond: 12
(BLDG.): FIEL,D INSPECTIONS ARE REQUIRED TO CIiECK FOR CODE COMPL,IANCE.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in fi.rll the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, Intemational Building and Residential Codes and other ordinances of the Town applicable thereto.
149 OR AT OUR OFFICE FROM 8:00 AM - 4REeUESTS FoR rNspEcTroN srrALL BE MADE TwENTy-ForJR HoyttrIN ADVANCE BYPM. /Ih/*;
AppLrcArroN uil. no, BE AccEprED rF rNcoMpLErt un*
Project #:
Building Permit #:
Electrical Permit #:
97 O - 47 9 - 2749 (Inspections)
.oftl
TVWNOFV/IL
75 S. Frontage Rd.
Vail, Colorado 81657
JUN Z
IVED
? .JC5
CONTRACTOR INFORMATION
COMPLETE SQ. FEET FOR NEW BUILDS and VALUATIONS FOR ALL OTHERS (Labor & Materials)
Electrical Contractor:
.Qavz ?etergtllor*c rowl,ofvaipes. no.:Contact and Phone #
Dauo qu Lilt{o
'ek (so,1e\<.LV( tc-tv|c-\ LorA
AMOUNTOF SQ FT IN STRUCTURE: SVO O ELECTRICAL VALUATION : $oQo
Contact Assessorc Office at 970-328-864O or visit for Parcel #
Parcef # ZlolobqASrct
rob Name: S4ead.an {a^dCrrr s Ciini c JobAddress: lo6 s.Pronbg4R\
Legal Description Lot:Block:Filing:Subdivision:
owners name:{at lCtirrt -rrnc ll Address: igt d" MflDoaJ DR ll Phone:
Engineer:Address:Phone:
De!4iled description gf work: -f<yen* fi'rrrSh Otd baht(o€€rcL-s rn4o v44t',') Doc(ocg
o$,,c e5/ cltdit c
WorkClass: New( ) Addition( ) nemoAei?$ Repair( ) TempPower( ) Other( )
Work Type: Interiorl!, ) Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No (\)
Typeof Bldg.: Single-family( ) Duplex( ) Multi-family( ) Commerciai\p4 *.O.rtant( ) Other( )
No. of Existing Dwelling Units in this building: 6 No. of Accommodation Units in this building:
Is this permit for a hot tub: Yes ( ) No (X )
Does a Fire Alarm Exist: Yes fil No ( )Does a Fire Sprinkler System Exist: Yesff) No ( )
Ltq
*******'!f<*********************r!****t ***FOR OFFICE USE ONLY******************,t*****r.************
Other Feesl Date Received:
DRB Fees:AcceDt€d Bv:
Planner Sion-off:}d^
\WAiI\dAtA\CdEV\FORMS\PERM ITS\E LECPERM. DOC 07 r26t2002
TOWN OF VAIL
75 S.FRONTAGEROAD
VAIL, CO 81657
nu479-2t38
f**r""*r oF coMMU*rr" orurr?"r*,
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MECHANICAL PERMIT PCrMit #: MO5-OI8O
3P ) "co-?3
Job Address: 108 S FRONTAGE RD WEST VAIL Status . . . : ISSUED
l,ocation.....: WESTSTAR BANMTEADMAN HAWKINS CLINIC Applied . . t 081@12005
Parcel No...: 210106f08001 Issued. . : 0811112005
Project No : -p Rr CF ,o rqb Expires . .: 02107120M
owNER vArt elrNre rlrc og/ogl2oos
181 W MEADOW DR
VAII,co 81657
APPIJICANT 2 H Mechanical , I-,IJC OB/O9/2005 phone: (9'70l. 778-4560
555 S. Westgate Drive
Grand ilunct ion
Colorado 81505
L,icense:307-U
CONTRACTOR 2 H Mecharical , LLC 08/09/2005 phone: (970) 7'78-4560
566 S. Westgate Drive
Grand dlunction
Colorado 81505
I-,icense: 307-M
Desciption: HVAC REMODEL FOR TENANT FIMSH-OLD BANK OFFICES INTO NEW
DOCTORS OFFICESiCLINIC
Valuation: $25,m0.00
Fircplace Infonmtion: Restricted: Y # of Gas Appliances: 0 # ofcas lrgs: 0 #of Wood Pellel 0
**t*tt++it+t$tirl.*rr'*+{rtr'r*+1t*r*,1.:l
Mechanical-,- > 9500.00 Restuarant Plan Review- >
PlanCheck--> 3125.00 DRB Fee----------------- >
S0 .00 Total Calculated Fees-- > 5628 . 00
S0. oo Additional Fees------ >s0. 00
Investigation- >
will cdl----->s3.00 s528.00
*a|+**iai*+l.||i|*+'|tlF.**t*|.|**'||'ll.,hltt*.*.+l.*t|||liti|l|l.ll|++it*ti*t**l.t***ilt**+t|'i
ITem: O51OO BUII,DING DEPARTII{ENT
o8/o9/2oos Js Action: AP
ITEn: 05600 FIRE DEPARTI{ENT
CONDITION OF APPROVAL
Cond: 12
(BL,DG.): FIEL,,D INSPECTIONS ARE REQUIRED TO CIIECK FOR CODE COMPLIAIiICE'
Cond: 22
(BL,DG.): COMBUSTIONArR IS REQUfRED PER CHAPTER 7 OF TIIE 2003 IMCAIID SECTION
304 OF THE 2OO3 IFGC AS MODIFIED BY TOWN OF VAII,.
Cond r 23
(BL,DG.): BOIILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND
CI{APTER 10 OF THE 2OO3 IMC.
Cond: 25
(BLDG.): GAS APPLIAIICES SHALL, BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC'
Cond: 29
(BL,DG. ) : ACCESS TO MECIIANICAIT EQUIPMEMI MUST COMPIJY WITH CIIAPTER 3 OF THE 2003
IMC A}ID CIIAPTER 3 OF THE 2OO3 IFGC..
$0.00 TOTAL FEES-+ $628.00 Total Permit Fee-.----- > $628.00
Cond: 31
(BLDG.) : BOILERS SIIA],L
IJISTTD FOR MOIII{TING ON
Cond: 32
(BLDG.): PERMIT,PIJAIiIS AND CODE ANAIJYSIS MUST BE POSTED fN MECIIAIIfCAIT ROOM PRIOR
TO A}I INSPECTION REQIIEST.
Cond: 30
(BLDG. ) : BOIL,ER ROOMS SHALL BE EQUIPPPED WITH A FI'OOR DRAIN OR OTHER APPROVED
MEAITS FOR DISPOSING OF IJIQUID WASTE pER SECTTON 1004.6.
DECLARATIONS
I hereby acknowledge that I have read this application, fitled out in full the information required, corpleted an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with dl Town ordinances and state laws, and to build this structure according to the towns zoning and suMivision codes, design
review approved, Intemational Building and Residential Codes and other ordinances ofthe Town applicable thereto.
REQITESTS FOR INSPECTION SHALL BE MA"DE TWENTY-FOUR HOLJRS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OttR OFFICE FROM 8:fi) AM - 4
PM.
BE MOI'NTED ON FLOORS OF NONCOMBUSTTBI.,E CONST. I'NIJESS
COMBUSTIBIJE FI.'OORING.
SIGNATURE OF OWNER O CTOR FOR HIMSELF AND OWNEF
fl
TOmIWUilL
75 S. Frontage Rd.
Vall, Colorado 81657
APPUCATIoN,I. no, BE AccEPTED IF INcoMPLETEQ.
TOV Project #:u{b
Building Permit #:
Mechanical Permit #:
97 O- 47 9 -2L49 (Inspections)
Permit will not be aocepted without the following:
Provlde Medranical Room layout drawn to scale to include:
I
tl
/"f
a,';qPo
41
CONTRACTOR INFORMATION
Mechanlcal Contnctor:
Ia * /l/ten har, io o-
Town of Vall Reg. No.:47 rn I Pf Tf nZi;]lill*
o'"
n14? 5 =*tE-Mall Address: phJOJhme,.1. ?,-/)rn Fax#: 9lolo - egq - hD54
'Ppi inature:'Ct-r-
MECI-IANICAL: $
ConAct AwpOfuat or visit forPatel #
Job Name\l ^ -l - {
ftc
Work0ass: New() Addition() AltentionS$ Repair() Other()
Does an EHU exist at this locauon: Yes ( ) No ( )BollerLocation: Interior( ) Exterlor( ) Other( )
Restaurant ( ) other ( )Typeof Bldg: Single-family( ) Duplo<( ) Multi-family( ) Commercial
No. of Acmmmodation Units in this building:No, of ExisUng Dwelllng Unlts in this bullding:
Nofiype of Fireplaes Proposed: Gas Applhnces ( ) Gas LoSs ( ) Wmd/Pellet ( ) Wood Buming (NOT ATIOWED)
Is this a to an EPA Phase II dedce? Yes ( ) No
F:\cdcv\BUtLDING\APPUCATICN SWECH PERM2m5.DOC 06082005
t**r"r*r oF coMMr.JN,r" oru"t""*,
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PLI.JMBING PERMIT
OWNER VAII, CIJINIC INC
18], W MEJADOW DR
VAII,
co 8L557
APPLICANT 2lI Mechanical L,LC
555 S. Westgate Drive
Grrnd ilunction
Colorado 815o5
Licenge: 329-P
CONTRACTOR 2H Mechanical IJIre
555 S. Westgate Drive
Grand 'Junct ion
Colorado 81505
I-,icense t 329-P
o8/09/20os Phone: (970) 778-4s60
08/09/200s Phone: (970) 778-4560
Desciption: PLUMBING REMODEL FOR TENANT FINISH-OLD BANK OFFICES INTO
NEW DOCTORS OFFICES/CLINIC
Valuation: $16,4O7.m
Fireolace Informrtion: Restrict€d: 22 # of Gas AppliarEes: ??# ofGu Logs: ?? # of Wood Pdleu ??
't*'**'**'*'*'at*,ht*,t*,t|.**'t'l**'|,ta't*t{.'}a*'},t't'**,a***t***'t*'*'}*t *l***:a*r*l,t*'t+i+ FEE suMMARy*t+r'*1+l+|.*l**lr'l{.t*{.i.*i'|.l{l**tlt*il*t{.t {.'tl.*lt*{.**'l***i.'i'|{rt'|.tt
Job Address: 108 S FRONTAGE RD WEST VAIL Status . . . : ISSUED
Iocation.....: WESTSTAR BANMTEADMAN HAWKINS CLINIC Applied . . : 08/09/2005
Parcel No...: 210106108001 Issued . . : 08llll200l5
Project No : ?Irs 6 j,6 r.tcJ Expires . .: O2/07/2M
o8/09/2oo5
$255.00 RcstDrant Plan Rcview->
S63.7s DRB Fee--------------- >
$0 . o0 ToTAL FEES----------->
s3. oo
TOWN OF VAIL
75 S. FRONTAGEROAD
VAIL, CO 81657
970479-2138
Plumbing-- >
Plan Check-- >
Investigation- >
wil cdl--- >
S0.00 Toal Calculated Fees-- >
So. oo Additiotul Fees----- >
$321. ?5 Total Pcrmit Fee---- >
s321.75
90. 00
9321. ?5
$0. 00BAI.ANCE DUE..-..-_ >
Item: 05100 BUILDING DEPARTI{EIi|II
o8/09/2OO5 JS Action: AP
Item: 05600 FIRE DEPARI'IuEMr
CONDITION OF APPROVAL
Cond: 12
(BL,DG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in firll the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and stat€ laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, Internationat Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS F()R INSPECTION SHALL BE MADE TWENTY-FOLJR HOTTRS rN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OJFICQ
ry7M
8:00 eU - +PM U*"/a'u*'
Permit #: P05-0108'tsos cor 3
APPLICATION
o
WILL
rcvNw
75 S. Frontage Rd.
Vail, Golorado 816
NOT BE ACCEPTED IF INCOMPLETE OR os{rrdProject #:
Building
Plumbing Permit #:
970-479-2119
CONTRACTOR INFORMATION
Town of Vail Reg. No.:Phone #'s: 'f 70-
IION FOR PLUMBING PERMIT (labor & Materials)
PLUMBING; $
Asressorc Offie at 97O-328-864O or visit
Job Name: 5l,,r,-t*^,,,,0
WorkClass: New() Xaaiti'on1 1 Alteration${ Repair( ) Other( )
Type of Bldg.: Singlefamily ( ) Duplex ( ) MultFfamily ( ) Commercial V) Restaurant ( ) O$er( )
No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building:
a conversion from a to an EPA Phase II device? Yes ( ) No
****************************r*********iFOR OFFICE USE ONLY****************************l********
'Fees:s_Yedt ,, ',
F€eg: '.' : : 'i
bL\1Y
\WAiI\dAIg\CdCV\FORMS\PERMITSVLMBPERM. DOC
RECDAUG-5ZOO5
o7n6D@2
,-\-,ffiJ ''!
f$/*) ' t
'sr'
Tfl'iltffvff y'
HOW DID WE RATE VUITH YOU? A
Town ofVail Survey
Community Development Departnent Russell Fonest Director,
(970)179.2139
Check allthat applies.
1. Which 0eparfnent$) did you conbct?
Building _ Environmenhl_ Housing_ Adnin
Planning DRB _ PEC
2. Was your initial contact with our Saff immediate_ slow or :
nooneavdlable . !? '' :' :
3. lf you were required to wait how long was lt before you were
helped?_
4. Was yar project rcviaved on a limely basis? Yes / No
lf no, why not?
5. Was this your first lime b fle a DRB app_ PEC app_
Bldg Permit N/A
6. Please rate fte performance of he stafiperson who assisted you:
54321Name:
(knorvled gq responsiveness, availabilig)
7. Overall effecliveness oitre FrontService Counter. 5 4 3 2 1
8. Whatis tre bestlime of day fur you b use fie FrontServiceCounter? _
:
9. Any comments you have which would allow us to beter serve you
netttinp?
Thank you br taking the lime to compleb his survey. We are
commihd b Lrproving ourservice
ThuErby, S.94.[5sr 29, 20tti t:58:561tr a- O
t*o'-
o\Bo
2H Xoch.nicd LLC 865 298 8054 Prgr 2 ot t
q wf,s
RTIFIED TEST. ADJUST. AND
BALANCE REPORT
SEPTEMBER 28, 2OO5
STEADMAN HAWKINS CLINIC
WESTSTAR BANK BUILDING
VAIL, COLORADO
9,150'
LUNOELL ARCHTTECTS + ASSOCTATES P.C.
AEC ARCHTTECTURAL ENGINEERTNG CONS , "$
2.H MECHANICAL
PROJECT:
ADDRESS:
ALTITUDE:
ARCHITECT:
ENGINEER:
HVAC CONTRACTOR:
NEBBCoNTRACToR: GERTIFIED BALANCE lNC. OF GOLORADO
ADDRESS: 924?z6 ROAD
GRAND JUNCTION, COLORAEO
970-245-'1157 / 970-25A-3259
2H edrlnicd Ll-C 866 298 6054Thutsd&. S6.bt|5cr 29. 2005 9:58:58 Al. XIIT P.q.2 ot 8
t
Thursday, Septefl$er 29, 2005 9:50:56 Am Dl 2H ilechanical LLC 866 298 6054
STEADMAN HAWKINS CL]N]C
Prgs 3 oa 8
CERTIF ICAT JN
NE,Fele
PROJECTi
ADDRESS:
THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF THE SYSTEMS PERFORTUANCE AND
WAS OBTAINEO IN ACCORDANCE WITH NEBB STANDARD PROCEDURES. ANY VARIANGES FROM
DESIGN OUANTITIES WHICH EXCEED NEBB TOLEMNCES ARE NOTED THROUGHOUT THIS REPORT,
THE AIR AND. OR WATER SYSTEMS HAVE BEEN TESTED AND BALANCED ANO FINIAL ADJUSTMENTS
I-AVE BEEN MAOE IN ACCORDANCE WITH NEBB "PROCEOURAL STANDARTS FOR TESTING.
ADJUSTING.BALANCING OF ENVIRONMENTAL SYSTEMS'AND PROJECT SPECIFICATIONS. THE
REPORT IS BASED ON BUILDING, SPACEAND EQUIPMENT CONDITION ON DATES TESTED.
suBMrrrEDAr.rDcERrlFrED *, M/fu*
NEBBcoNrRAcroR CERTIFIED BALANCE lNC. OF
TAB SUPERVISOR Clinton P. Gorman
REG.NO. 2823
0ATE 8g/28/05
Thu6day. S€otg||b€r 29. 2005 9:58:t6 lI DT 2t{ echlnical L|JC E66 29E 505/+Paqa3dE
Thursd.t, SepLnS.r 29, 2005 9:58:56 A IDT
'F'
Fd &i 1ffiru-E
PROJECT:
2H ilecftrnic.l LLC 866 29E 6054
STEADHAN HAWKTNS CLTNIC
PrgE4dl
?
DATES OF
usE
GAIJBRATIOII
DATESAI'PLEi\TION
A}'TEK TAC}TOMETER,/CBT,/CO 60 RPM READTNGS 9/28/Os e/t/05
SHIMPO STROBOSCOBE/ CAI/CO 59 RPM READTNGS 9/2/05
FI,UKE 336 CBI/CO voI,T/ AHP READINGS 9/28/05 8 / 3a/0s
FLUKE MO. 52 THERH/CBI/CO 09 TEMP.READTNGS e /2s /os 8/31/03
DIGITAI THERI,I. TAYLOR 9841 TEMP. READINGS 9/28/Os 9/79/Os
DNYBR 485 DIDGITAT HYGROMETER AIR/HUUIDITY READINGS 9/28 los 9/6/O5
RAYTEK 5T6 TEMP. RSADTNGS 9/28/Os 9/01/0 5* *
AIR DATA MUI,TIUETERI CB]/CO 5?AIR FLOiW READINGS 9/28/05 4lOL/As
SHORTRIDGE FLOW HOOD,/M9130 AIR FLOI{ READINGS 9/28/05 910t1o5**
PITOT TUBE 18I'PRES. READINGS N,/A
PITOT TUBE 24"PRES. READINGS N,/A
PI1OT TUBE 36"FRES. MADINGS N/A
HYDRO DATA METER HDM 3OO/* IT05069 WATER PRES. READINGS s/2s/05
TEST GAGE, O-30 I,BS,/CBT/CO 21-2 WATER PRES, READINGS 9/t/05**
TEST GAGE, 0-60 r,Bs./CBr /cA?14 IIATER PRES. READINGS 9/r/o5*"
TES? GAGE, 0-200 LBs/cBrlCo 2L5 NATER PRES. READINGS 9/!/O5++
TEST GAGE, -30+60 LBs,/ cBr,/co 205 tsATER PRES. READINGS 9/t / 05*'
HYDRO DATA METER/CBT./CO 2]-].
'{ATER
PRES. READINGS 9/7/05**
PROJECT ATITUOE: 0, 1s0 n d|€cksd b calbrrbd m€Ar
CFM TRANS, FACTOR O.80
REIIIiARKS: AIR ELoII READINGS ilITH SHORTRIDGE INSTRWENTS ARE CORRBCTED
fOR TEMPERATURE AND ALTI?UDE.
Pagel6l
ThuEdrv. S.Dbn$or 29. 2005 g:5E:56 Altl DT 2H
'.ecftanical
LLC E65 29E 605i1 Pao.4 ot E
2H L.chrnic.l LLC 860 298 60Thursd.y, S.pLr*..2t! m05 9;58158 Al DT o Prga 5 of 0
ts,ItsffiE
I
H"zu r1::il.r.. i -
PlorSdt
pno.teqy: srE4DMAry HAwKrNs crrrNlc
FOLLOWING WAS NOTED WHILE COMPLETING THE TEST AND BAIA'iICE ON
PROJECT. ALSO SEE INDMDI'AL REPORTS FOR ADDITIOI{AL COUMENTS.
fhe existing thermostats are in very poo,r condition. ?he
Control- Contractor is going to repl-ace or repair as necessary.
when this is done it LriII be necessaly to adjust the boxcontrollels to match the hlgh and low pressures, noted in thereport and written otl or near the VAV box.
Thur3d.v. SeobrSar 2e 2005 t:54:55 Ata fDT 2H €cft.nicrl LIC 866 29E 6O5/t
nega1c'1
ThuEday, S.@.r 2t, mls 9:58:58 AI DT' I F;I
ru#i, lffih$L
2H [cchanicd lJ-C 866 ztE 6031 Plg 6ot8
PROJECT
SYSTEM
STEADMAN HAWKINS CLINIC
VARIABLE ATR BOX SYSTEMS
FinalPrel.Desrgn
CFM
OutletF
Served #CFM CFM CFM
EXISTING VAV #7
EXAM 105 I lr 2408 150 208 L44 96%
X_RAY 2 2t08 300 r2a 294 90%
EXA},I 1O3 3 B 2408 150 287 L4T y*
EXAM 102 1 B 2408 150 90 t-4t_grt%
TOTALS 750 705 120 96n
VAV CONTROLLER PRESSU RES HIGH .54 LOW .11
EXISTING VAV *B
CORRTDOR 5 A 2406 100 105 102 rEt(
EXAM / CAST 6 B 2408 200 1,29 209 1(F%
EXAI.{ / CAST I B 2408 200 104 20r 101%
OFFICE 108 I B 2408 200 139 220 lrota
TOTATS 700 477 732 1o$lt
VAV CONTROI,LER PRESSURES HlGH .39 LOW .08
EXISTING VAV #9
RECEPTTON 9 B 2408 200 310 L92 96pl|
RECEPTION to B 2408 200 286 214 107'96
NURSES 11 B 2408 150 329 148 gFr
TOTALS 550 925 554 101%
VAV CONTROILER PRESSURES HIGH .25 LOlf .05
EXISTING FP VAV #10
TE,LEPHONE EQUIPMENT t2 B 2408 100 175 97 9796
oFFrcE 111 t3 B 2408 150 1-80 136 91%
TOTALS 250 355 233 gt96
250 3s5 233 9:t96
VAV CONTROLLER PRESSURES HTGH - f,f,LOW .20
REMARKS:
TEST DATE:
FILE MME:
teb hood'l
ThuBdrv. S.ob||$et 29. 20OS 9:58:56 Al| [Df
9/28/05
SHCSJ GORMAN
hgcld2
2H [echanicel LLC E6E 29t 6054
READINC'S BY: c.
P.E6ot8
t
ThuFdry, S.fft|ttt r 29, -05 9:56:56 AI xDT,I
;,,4ffi ltr#frH
2H k|||fcd U-C 866 2e8 0054
STEADMAN HN.WKINS CLINTC
'P.f.7oat
PROJECT
EXISTING FAN
PANISONIC
CETTING CEILTNG CEILING
DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE
REil|ARK$:fiX]STING FANS
CLEANED.
COULP PRODUCE ADDITIONAL AIRFLOW ]P
TEST DATE:
FILE MME:
tabe83
9/28/05
sHcS.I READ|NGS BY: c-GORMAN
PeEelofl
PaoeTdEThrrsdrv. Saobrfi€t 29. 2005 9:56:56 AX f,DT ztl trocftEnical Ll-C 866 29E 6054
T
Thlrsdrt, S€@ f.r 29, 2005 t:51:56 Af, ffitf O ZH r.c anicel LLC E65 29S 60\ O
lf-il:
$&
6
&y
/;F s----- / f"-t.--t/ __\{_
L
I
t,fJ
2H M€chanicd LLC 886 2S8 805,f Paoe I ol 8
-01-&l-2fh6
Inrpecfion Request Reporting Page 14
4:13 pm Vall_ CO- Clry CF
Requested tnspect D.te: Thursday, January 05,2006' Insoition Area: JRM
SIte Addr$s: I 08 S FRONTAGE RD VI,EST VAIL
WESTSTAR BANK'STEADIIIAN HAYI'I(NS CUNIC
ArPrD lntlonnaiqr
Acthrltu 80$0073 Twa:
Const Tyrr6: Occupaity:
olvrhr: VAIL CLli.llC ll.lC
Conb8ctor: J.L. VIELE CONSTRUCTIoN
ApDllcant
Nc-rlptbn:
hlolb€:llolh.:
A4OMM Sub
Phone: 970'47&3t!82
Phon€: 94S)-'15O2
INTO NEW DOCTORS OFFICESi/CLINIC
Stat6: ISSUED
lrr3pAr€.: ..[1M
AND COLUi'NS REOI'IRED TO BE FIRE PR@FED.
Comment ROUIED TO JR. I,VARREN. FIRE AND PUBLIC IAIORKS - JSUTHER
Reauected lnsoecf on(sl
Item: 540 BLDG-Flnal Crc
R.quclior:
Cofli]mr s:
Assbned To:- Acfion:
lnsoacton Hlstorv
tbm: 10
Itcm: 20
ll€m: g)
llem: 70
Item: 90
AZ)/-o5'da
Requested rrme: ?iit€&T Vti. *:T'1'l-TL x,q
erg, 1'@ Ent'redBv: DGoLD'EN K- (\
tl€m: 50
Itcm: 60
Actbn: CR CORRECTIOf.I REOUIRED
: AND NEED TO BE REINSPECTED. PROVID USTEDlS INCOi'IPLETE ANO NEED TO BE
I PROO{CTUSED.
IS REOD. EXPOSE ilrcT TO INSPECT SEruNG OF JOINTS, 1 PIICE
3.RElrcVE ALL IJI.fRATED COMBUSI1BIES FROM PLENI M.
OK TO I,I,AI\|() IJI'ALLS.
COLUMNS ARE RRE PROOFED EXECPT 1 TO BE IJI.'RAPPED.
BLDelnsuhtlonBlDesh..tock lJall - Apo.ov€d -
0AlA/05 Insp€ctor: JRM " Actlon: APAPPROVED
Comntcnt SHEETROCK APPROVED0tv2g05 lnsD€ctor: GCD Acffon: Pl PARTIiAL INSPECTIO{'I
COMMENT LEAD LINEO SHEETROCK IN X.RAY ROOM EXECPT CONTROL WALL.
Gt/OGilXi lmpectot: JRll Acdon: AP APPROVED
Comrmnt sta.bock FOR X RAY APPROVED
BLDC-Mlsc.
0712710fi lnsD.cto.: JRM Actlon: llo IPTIFIED
comTnent COfuRTSEY INSrcT.. PRIMARY STEEL AND COLUMNS MUST BE RRE PROOFED
BLDGFh!I
OS/3OO5 Insp€ctot: GCD Actton: CR cORRECTlOf.l REOUIRED
Comment OK FOR
REPT131 Run Id: 40E5
-*'*iHlHSHffs: 5flff , sepbnbersl' 2005
Slb Arftlret|: 108 S FROITITAGE RD |IGST VA|L
YI'ESTSTAR BANISSTEADilAN HATTI(|NS CUI{IC
'*1H: fii*$rtp: lgSluEDlrpAnr: JRll
VAIL CLlt{C l}.lC
J.L. VIELE COf ,lS'tRlJCllOil Phom: 9?O47$3ffi1K.C.CONPANY Fhom: 94915(}2
TEMNT FNISHOLD BANK OfFlCEg INTO tEW DOCTORS oFFlCEs/cLlMC
ASBESTOS T"ETIER IN FILE . .NMNDRAGON
COh|IRACKIR }.|CTI|FIED tIG PRMARY STEEL AnD COLUT/triFt REOITRED IO EE FIRE FROC,FED -
G,DEt{Crllft,(,tEo TO JR, WARREN, FIRE AM) PIJBTIC I,VORKS . JSUT}GR
R€ouc.bdfn$Gdodst 07-g -Olbn: e0 BLDGflnd ReoueahdTlme: 08:00AtRedretbt: Jt.VlELECOnSTRl,rCnOil ^ '- Plrm: il71€r168 t(Redretbt: Jt.VlELECOnSTRl,rCnOil ^ .- Plrm: il71€r168*nHHi rrcf\tmAcor.rc /l *oo, 25 Enr.tdBr oGorDEN K
q \:u R"qJ%S- 34,,t^ry(z+Y)
@ C,0r4^Lur,-,lta- ,*U ;."!. frr;
Rtf*,/
Ar;r^,6o
' Ac0on: CRCORRECIIONREOT IRED
IS I}ICOMPLETE AT{D NEED TOBE REhTS,PECTED. FRqflDUSTED
PRODICTT'SED.
T.TSPECToN lS RE@. EXPOSE DlJcTTct NSPECT SEAtll.lO OF xxills, I PI-ACE
ArPlItInlbnn|[dr
- idbty: ils{xr?:}Cor*Tvri:Oriirr:
Conbrcbr
llr.o.G{dr HlEbrY
*tr ACOI/|M
?tbm: 1O BtDGFoo[nil/$.1bn: 2O BLDGfornfrntSbcllbmi t'G46/6
Conmer*
5t Bllrc-h3nhlbn
lhm: 70 BlDeilbc.
lbmi
lbm:
lNm:
l5m:
lbm:
lbm:
Connrft
m2116 lmordc .frlt A.ilon: l,lOt{OItFIED
conumd: cclRIsEY tNsPcr. PRtitARY slEEt Ato cotunns rflrsT BE FIRE PRooFED
SIt H-DGTrme.C/Osin PUSTEIp.-Crct
6i}3 Ft.|l+'TErp.c/o
REPT131 ( TCo o n\y
0S232005 Inspectlon Request Reporting Page 7
4:12 prn valt, Co'- Clty Oi -
Requested lnspect Date: tlgnCay, 9eptember 16, 20C5
Inspecuon Area: C-
Slte Address: 108 s FRC}ITAGE RD WEST VAIL
WE:TSTAR BAIIK/STEADMAN HAIII'KINS CLINIC
A/FJD lnfiormafion
Insoec0on Historv
It6m: 19t)
Actlvlty: EC$0119 _ Typ:. E-ELEC SubTlFe: ACOt"l SFtus: I_S_SUEDConslType: O;cupaiicy: lJie: Insp fuea: CGO,vrhr: VAIL CLINIC lNu
ADgncant D.P.ELECTRIC Phon€: 970-926-4140
Cohhactor: D.P.ELECTRIC Phone: 370-9:5-.{140 . I
Descrlptfon: TENAIIT RNISH.OLD BAt'lK CFflCFS !:,TC lrlsli/ DaCTC!:t ?rACE:AltltC \ I I - 1l ,Descrlptlon: TENAIIT RNISH.OLD BAI'IK CFqCFS !:,TC lrlsli/ DaCTC!:t ?rACE:z;tllC \
Requested lnsoecdcn(sl rt (t aru 4 >GxY
TILQ!'*!Er ftf1t a/u{/ il LUlb*
Item: 190 ELEC-Flnal Requested_Tlme: qg:_dqAM
_ R€quespr: B.I.,ELECTRIC/PaIIy ' Phone. 97A-926414
Asslgfrgd.To: SFI,AHN Ent6,€d Ey: FRONT K
Adlbn; _ Tirrrc [rp.
ilt r-o F,r L (Z- f nv-L
-' ht-nnKs
e- e rllo'f
Fu,ftx
F"-j
LlLw;T ftut*
Item: 110
ttem:120
Item: 131
ll€m: 14t)
ELEC-Temp. Powe;ELEC-Ror.Sh * Ap;ir.eC "
07;22105 lnsD€ctor: Sl-l,AFlN
Comrnont
ELEC-CondunELEC'Mlsc. ",trpproved "
0&26,05 lnspector: shahn
Comment CONTRACTOR NOTREADY
@.|01/05 lnspeclor: eo
_q.o!nrFn! tnro metas, twro paenls
ELEC-Firtal
/rc,l;ol: AP APPROVED
Action. I'lR NOT READY FOR INSPECTION
Actlon: APAPPROVED
REPTl31 Run Id: 3655
R.Cn fbd krrp.ctt).b: Th-uEdry, S.pbnrb.rot, AX)s- llr! cc'$oo Arur: CcS|[ Addr.$: IO8 S FROITTAGE RD IGST VAIL, IGSTSTAF BAIII(STEADflAI{ HAIU(FIS CIJI{IC
ArF[tlnfrmdon
A.ilulr E6{Xfg llpc: BELEC St5nmo: ACOIICorflTyfi: Occurircy: (ir:
O*ii.c VA|LCLIMCII.IC
ADD0c.nt O.P. EI,ECTRn Pfion : 9ilL9a8.l1.OC.iibrcbc O-P, EIECIRIC Phon: 970'916-4141
D|rcrlgtloo: TEMIIT FIHSH,OLD gAm( OFFICE$ INTO l€W DOCTORS OFFICES/CL|MC
Rcqrtd lnrorc;0cnfrl
ffi!: ltlStEOl|ltpAr||: CC
tbm: lrl{} El.ECS.c.
Coiln|nt
Requ.cEd Tlmc: lo:(x) Afl- Phorx: 97t,fiF41toErb|ldBf OOOTDEII KTh.
READY
,4/
/lff 7 7)<.-e-e dt ({-4/* 7'a'/-2c2o\-
'n
r-.t!$nrslb!.fltshn
ll0 ELEG'T]IIp.Foilrlm EL€C-Roqgh -ApilosOIruIfiE fllD.cbr: SllAflNCoilnut||m: lO ELEC€oniltlhfiu l.O E[€C-$*.
Acdon: APAPPRWED
Acdon: f,lR NOTREADY FOR ll{EPEeTK,f'l
[anu
06,2r8,tF f,iD.Cb.: rh.fhCocmrnt CCI{TRACTOR}.IOTREADYlCt ELEC-FLrl
/n.{*o
?**"1^
REPT131 Run 3574
Reque.Ed Insp.ct Drb: Thullday, S€pEmbcr 20, 2005- Insg.dlbnAn : CG
Slb Ad.lrcrr: 108 S FROffTAGE RO IGST VA|L
IIESTSTAR BAI{K'STEAIilAI{ HAWI$TIS CUNIC
ArPlIt lnlbrm.0o||
Acfvily: lfilGfi&l nDe: <rCH SnbTvoe: AOOII $iltr: lgStEDCon{Tni: Ocser,i*:f CFr: InapAm: COO*iirn V ILCLIMC]i|C
ADD[c.nt 2HM.chnlc.l,tlc Phon : {970)778#0Coilrcbc zHhll|nlc.l,tlc Phom: t970)77&466oD.|crlpioo: IMC REllOtrL FOR TEMNT FlMSll-OLD BADff OfTTES |NIO I.GYV DOCrcRS OrFFlCESrcLtrc
Br$ffilltEreledrl
tbm: 390 fECH#lnd
R.q|.n|br: Tony-VLL
Coflln flts: PM,'wilcr[4716468Ar[rpd-To: ODEI.ICKLA .afAc0otr:
lgllcb'lEtsq
tbm: 2q)
3to
315
&lo
ET'
340
3Et
lbm:lbm:
lhm:
lbm:
lbm:
lbm:
fir.ICE P.e"e-
leeemnC-In D.cb,f: .Rt '- Actbn: APAPPROVED
Dt ET ltlSPECTlOftl AFFROT ED
R.qu..bd Tho: 0l:00 t- Plpm: (970)Ze45dt
Efindry DOCTLDEN K
REPTl31 Run Id: 36E2
I
4:12pm veil, A8:e'fiISf"rtrns
Requ.sbd lntp.ot9.b: {gndry, S.pbmbcr26, 2005- In D.ddon Anr: CG
Slb Atldro$: loE S FROI,IIAGE RD UEST VAIL
YESTSTAR MNK'STEADTAN HAUS(|!{S CUI{E
A|F,D lnfottndlon
Rao||.cbd ln|o.cfloilsl
tbn: 2e0 PLEfln.l
subT6: Acoil Sldr|:lmpAl||:rsrgrED@
FOIR TEMNT RNISI'}OLD BTNK
Rrqt$c 2Hllrclrdcalll€yDonwCofiirilil$ ltb iltL ilrf / Sbdmn FbwlrlArdgnld-To: .ffirl€RAOON
Arilon: _
/ '\)-r 'l
fno.c0onHktorY l^ I0''bm: Zl0 ftMeRouCflD.W.V. "ADgrcrr.d"B'16tr lmD.cbr: JRl|EICIF lmD.Sr: fiM Acdon: APAPPROVED - yr . /cofniaft F Fn L AFFfibvAr ALL ExcEpiFd'-Mbp-siix AiEA cor.nln cnoN ARafuippnor/Eoz
rhm: xD **"ouorlfflrARrEsr \d\ "
nAY
!bm: 240 Plll9GrsPhlru \ lr Y \Itrm: 2G0 PLfiEfooul.fifin \r ,/ | nll|rm:260PtlBMbc. . Iv , rv t/lbm; z$PttFF|nrl ( /' lzxt ,rl
['[$.',"tt *
,' P n1t" (nf'ut/ . ,li n, [,
\ "\tv.. /\t (If
REP l
,/ru^firJ
TOWN OF VAIL
75 S.FRONTAGEROAD
VAIL. CO 81657
970-479-2138
Valuation: $3.000.00
Fircplace Information: Restricted: # ofGas Appliances: 0
DEPARTMENT OF COMMUNIry DEVELOPMENT
1,..o{ 4, l.oo.,-!t'{a Lt\-b
Ua-^( O',t(..?- /'9
U.,^\ $.}.t'(jB.^+t{-
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES S.^ilr,a ZoS
ADD/ALTCOMMBUILDPERMT Permit #: 804-0012
Job Address: 108 S FRONTAGE RD WEST VAIL Status . . . : ISSUED
Location.......: 108 S FRONTAGE ROAD WEST,3RD FLOOR Applied. . : 0211712004
ParcelNo....: 210106408001 Issued...: 03/01/2004
ProjectNo.: NA Expires...: 08128/2004
omrER vAIIr 108 LTD O2/L7/2OO4 phone:
C,/O WESTSTAR BANK ADMTN CEMTER
PO BOX L210
GYPSI,M
co 81637
I-,icense:
CONrRACTOR HCBECK, LTD. O2/L7/2OO4 Phone: 303-455-955
ATTN: iIAIIES LEWIS
1807 Ross Avenue, Suite 500
DAII,AS, TX 752OL
I-,icense: 119-A
APPIJICAI\TT HCBECK, LlD. 02/1,7/2004 phone:303-455-965
ATTN: iIAMES ITEWIS
1807 Ross Avenue, Suit.e 500
DALLAS, TX 752OL
License: 119-A
Desciption:
STEADMAN HAWKINS WALL REPLACEMENT
Occupancy: B
Type Construction: II l-hr Type II l-Hour
Type Occupancy: 2?
S83 ,25 Restuarant Plan R6Yiew->
$54.11 DRBFee----------->
$0. 00 Recreation Fee-------->
93. oo Clean-up Deposit------>
TOTAL FEES------->
Add Sq Ft 0
# of Gas hgs: 0
S0.00 Total Calculated Fees->
$0 . 00 Additional Fees----->
$0.00 Total Permit Fee----->
90.00 Pa)Tnents----'---->
$140 - 35 BALANCE DUE---->
d of wood Pellec 0
:t l'l't l *rt* 't a,l t:lf a,l 't
Building--->
Plan Check-->
lnvestigation->
Will Call--->
$140.35
$0. 00
$140.36
$14 0 .35
$0.00
a**a+t *,t t +,1+ t a:* t *
Approvals:Item: 05L00 BUIL,DING DEPARTMEMI
02/26/2004 cdavis Action: AP
ftem: 05400 PLANNING DEPARTI{ENI
Item: 05500 FIRE DEPARTMENT
Item: 05500 PIIBIJIC WORKS
**art t,l t *:|:t * 'l a rt 'l aa'lI**'|'l |.*a*t +a* aa | 't:l:l it t 't '| 'l *taa'li
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this sfucture according to the towns zoning and suMivision codes, design review
approved, Uniform Building Code and other ordinances ofthe Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENry-FOUR HOURS IN AT 4?9-2149 OR AT OUR OFFICE FROM E:00 AM - 4 PM.
SIGNATUREOFO OR CONTRACTOR FOR HIMSELF AND OWNET
YB
PAGE 2
'|'*'|*'|'}'t:t'|****'|t,tt'i*'t**'t*******|.*:}*t**'}|t'}f'r**!t**,t*{t|*'}**'}****:t*'t**'t:}*******|.*****!}*'t**'f**'tf*
CONDMONS OF APPROVAL
Permit #: B04-0012 as of 03-01-2004 Status: ISSUED
:lt 'f *,t t * * *ti 't* * rt rt l. tt *'t N * * * rt ** rt *:t t * * rf !t * * * rl 'f * rt * *!t *'t* t rt *rt,l t!t* t *,t |t,t *{. * f,* ** * | * ** * + * *** f * **,} t | *t {,I,t,t*** * t {. *:t*** * * *
PermitType: ADD/ALTCOMMBUILDPERMT Applied: 021nn004
Applicant HCBECK, LTD. Issued: 03/0112004303-466-966 To Expire: 08n8/2004
Job Address: 108 S FRONTAGE RD WEST VAIL
Location: 108 S FRONTACE ROAD WEST. 3RD FLOOR
ParcelNo: 210106408001
Description:
STEADMAN TIAWKINS WALL REPLACEMENT
Conditions:
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORKCANBE STARTED.
Cond: 12
@LDG.): FIELD INSPECTIONS ARE REQUIREDTO cHEcK FORCODE
COMPLIANCE.
I
.a
At.o I Ch',"l'n-ll
REC E IVE O
ItlrWTINVI:
75 S. Frontage Rd.
Vail, Colorado 81657
CONTRACTOR INFORMATION
re Ja'n: (<,,ts
Qru"?
COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor & Materials
BUILDING: $ Jox>ELECTRICAL:$OTHER: $
PLUMBING:$MECHANICAL:$TOTAL:$
For Parcel # Contact Assessors Office at 970-328-8640 or visitffizlota(AOBG)l
Job Name:-Z;;i';:^^
l,/o.,s <r u< lt) F L,- 7& D l"<.ctn e+, r Job Address:*i&*Z'r.c,,tntL fuc,J L) 3-J {bu,z-
Legal Description I Lot: ll Block: ll Filing:*oo,v'"'on' i ilB Tr^, ld, ^WcgsF'--U,x-Address: bB < Frc,,,r.s& rr"J Lc)Phone'.4r, ZIrrZ
ArchitecvA#ppr:oo?F;ttor, t,,,, &t,.Jku^{,,1,1t : tmrt Wff.at,u qbGE
Engineer: lzc*<---Address:Phone:
1-'.t | . tl
14 rriqct rutal' of LJq ll
Work Class: New ( ) Addition ( ) Remodel fi) Repair ( ) Dgtgl_l_ lthgl l
Work Type: Interior [) Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No ( )
Type of Bldg.: Single-family ( ) Twofamily ( ) Urttit"tity ( ) Cottercial fi Restaurant ( ) Orher ( )
No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building:
No/Typeof FireplacesExisting. GasAppliances( ) GasLogs( ) Wood/Pellet( ) WoodBurning( )
Noffvpe of Fireplaces plepes,ed: Gas Appliances ( ) Gas Logs ( ) Wood/Pellet ( ) Wood Burnin9 (NOT ALLOWED)
Does a Fire Alarm Exist: Yes ( ) No (DoeffiSFnn-kler system Exist: Yes ( ) No (
*ss*+*******ttt*t*************r*f,a**FoR OFFICE USE O N LY*"*r****t***t*******ir***t***!Bt*t***t*
\\Vai IUatabdev\FORMS\PERMITS\BLDGPERM.DOC o7t26t2002
tl
Department of Community Development
Project Name: 6*aoJ,^on fr/o,par ^, IzU q / I Ez//ort - "-t
ProjectAddreca, b ta S (*^*f P'roJ LJ )llo,l
m
T0l{tr0tl/lttL7
Questions? Call the Building Team at 479-2325
This Chslclist must be amoleted before a Buildina Permit aoplication isarcpd.
All pages of applicaUon is complete
Has DRB approval obtained (if required) Provide a copy of approval form
Condominium Association letter of approval attached if project is a MultFFamily complo<
Complete site plan submitted
Public Way Permit application included if applicable (refer to Public WorK checklist)
Staging plan included (refer to Public Works checklist) No dumoster,oarkino or material storaoe
allowed on roadwavs and shoulderc without written aooroval
Asbestos test and results submitted if demolltion is occurring
Architect stamp and signature (All Commercial and Multi family)
Full floor plans including building sections and elevations(s sets of plans for MultFFamily and
C-ommercial Buildi ngs)
Window and door schedule
Full structural plans, including design criteria (i.e.loads)
Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
Soils Report must be submitted prior to footing inspection
Fire resistive assemblies specified and penetrations indicated
Smoke detectors shown on plans
Types and quantity of fireplaces shown
tr
o
tr
o
o
o
o
a
o
u
o
o
tr
o
o
Applicanfs Signature:
Date of subminat z/ ll/4
\VailUata\cdev\FORMSWERMITS\BLDGPERM.DOC
Received By:
041o2r2003
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Depaftment Approval, Engineer's (Public Works)
review and approval, a Planning Department review or Health Depaftment review, and a review
by the Building Depaftment, the estimated time for a total review will take as long as three (3)
weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller pQects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this depaftment to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame, I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for.
Agreed to by:
-Pr
Urc_e_1nc.lcSo.J
Project Name:St*,J ^*^ k,-o,us l,&/l Etf/.&-t--zait
o^r", zy'l/a(
L.,^(-
Signatdre
F : everyone/forms/bldperm3
l
fi\N{)nwawW
HOW DIDWE RATE WITH YOU?
Town of Vail Survey
Community Development Departnent Russell Fones! Director,
(970) 47s.213e
Gheck all that applies.
1. Which Departnent(s) did you contac0
Building _ Environmental_ Housing Admin --
Planning , DRB_pEC
no one available ?
3. lf you were required to wail how long was it before you were
helped?
4. Was your project reviewed on a limely basis? Yes / No
lf no, why no0
5, Was this yourfirsttime to file a DRB +p_ PEC app itrldn Darrvrl+ li.lrrt i .r 'i.r'Bldg Permit_ N/A
6. Please rate the performance of ttre shffperson who assisted you:54321Name:
(knorledgq responsiveness, availabilig)
7. Overallefiectiveness of he Front Service Counter. 5 4 3 2 1
8. What is the best fme of day for you to use the Front Service
Counter?
9. Any commenb you have which would allow us to beter serve you
nextlime?
Thank you for taking the time to complete this survey. We are
committed b improving our seMce.
WHEN A *PUBLIC WAY PERMIT" IS REQUIRED
PLEASE READAND CHECK OFF EACH OFTHE FOLLOWING QUESNONS REGARDING THE NEED FORA
"PUBLIC WAY PERMIT":
D Is this a new residence?YES NO
o Does demolition work being peformed require the use of the Right-of-Way, easements or
tr
o
o
public propefi?
Is any utility work needed?
Is the driveway being repaved?
YES NO
NO
YES
Is a different access needed to the site other than the existing driveway? YES_ NO
Is any drainage work being done that affects the Right-of-Way, easemenG, or public property?
o
o
Is a "Revocable Right-of-Way Permit" required?
Is the Right-of-Way, easements or public property to be used for staging, parking or fencing?YES NO
If answer is NO, is a parking, staging or fencing plan required by Public Works?YES NO
If you ans,wered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-2L98.
I HAVE READ AND ANSWERED ALL THE ABOVE QUESNONS.
Contractor Signature
Job or Project Name:
Date Signed:
F:/everyone/forms/bldperm4
Company Name
APPLICATION
FOR TOWN OF VAIL
PUBLIC WAY PERMIT 19
PW*:TT TTTTParcer#:Irln-IIx-II-IIf ffiBrds.permit#,EnI-IIII Tor{4vmtt
Job Namo Street Addrsss
Maillng Address
n n n-[-l (tfunknowncall
L_l r._J LJ | | 479-2138 ext. 0
TOV Contraclor's Liconse Numbor REQUIRED
()
Excavaling Conlractor Name
City Phon6 #
Start Date Complotlon Date (Psrmit Explfation Date)
Work is for lckcte onel Water Sewer Gas Electric Telephone CATV Landscaping Temp. Site Access
Other
4.
Trench-width
(min.4')
Bond Amount $
ALL MATERIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED.
7.
8.
Rubber out-riggers are required on
Asphalt surfaces underneath the
A signature below indicates a
signatures are obtained, permittee
necessary Town of Vail signatures.
BE ON THE JOBSITE BEFORE THE
working on asphalt.
at all times.
utility locations and approvals. Once all utility company
application through the Public Works office to obtain the
up to one week to process.
Depth
Total SF $
Total LF $
Permit Fee Total Permit Fee $
Public Service Company (1
U.S. West (1-800-922-1987)
Pubfic Service Natural Gas Group (1-800-922-1987')
TGI Cablevision ol the Rockies (1-800-922-1987)
Eagle River Water & Sanitation District (970-476-7480, 6xt. 11 4)
Holy Cross Electric Company (1-800-922-1987)
Town of Vail Electricians (970-479-2158)
Town of Vail lrrigation (970-479-2158)
Town of Vail Public Works Construction Inspeclor (970-479-2198)
9. THERE WILL BE NO TOTAL STREET CLOSURESI A conslruction tralfic control plan must be approved by the
Public Works Department prior to issuance of the permit.
All excavation must be done bv hand within 18" of utilities - (Senate Bill 172)'
Permittee must contact Public Works Department el 479.2198 24 hours pl'ior to commencing of work. Failure to notify
ttre town will result in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town
charging the contractor a reinspection fee.
I certify that I have read all chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility
company agreements, signed by me, and will abide by ihe same, and that all utilities have been notilied as required.
10.
11.
12.
Cor ractor's Signature ot Agreemenl
ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN
Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT.
Pdnt nams clearly Date of Signature
White - Public Works
Yellow - Contractor
PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
How it relates to Building Permits:
Fill out the atlached check list with the Building Permit Apolication.
If yes was answered to any of the questions then a "Public Way" permit is required. You
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verifo (locate) respective
utiliiles prior to signing application, Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffc control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November lst and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Work's office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to perform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Depaftment will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
NOTE: The above process is for work in a public way ONLY. Public Way
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
I have read and understand the above.
Signature
F:/everyone/forms/bldperm5
Date Signed
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS!
Please read and check off each of the items below:
o The Town of Vail Building Department has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
u The Town of Vail Public Works Department will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culverts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at479-2198 to request an inspection from
the Public Works Department. Allow a minimum of 24 hour notice,
o Also, the Town of Vail Public Works Department will be approving all final drainage
and culvet installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Ceftificate of Occupancv issuance.
Agreed to by:
Print Name
Project Name:
Date Signed:
F:/everyone/forms/bldperm6
Signature
Please read and check off each of the items below.
(Copies of complete te)ft are available upon request)
CODE 5-2-10: DEPOSTTS ON PUBTIC WAYS PROHIBITED
Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or ctruse to be littered, tracked or deposited, sand, gravel, rock, mud, dirt, snow, ice, or any
other debris or material upon any street, sidewalk, alley or public place, or any portion thereof.
Notice; Abatement: The Director of Public Works may notify and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public WorK. In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified.
Summons and Penaltyi As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 14-1 of this code.
Notice and Penalty: It is unlavvful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 6 (1979).
CODES 7-3A-1 AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
o No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) $ 1)
o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or ciruse it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipalify, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) g 3: Ord. 28(1981) 5 1)
I have read and will comply with the above code provisions:
Print Name
Position or Relationship to Project:
Date Signed:
F:/everyone/forms/bldpemrT
Signature
TOil'NM
Vail 2003
Vail Village and Lionshead Village Construction Hours
Information Handout
Problem Statement
Vail Village and Lionshead Village are invaluable assets to the community. Thousands of
people come to Vail each year to sightsee, recreate, shop and to enjoy everything the
Vail Valley has to offer. The community and merchants rely upon our guest to generate
revenue. Our summer/winter guests expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the
community and on our guest as possible, the Town of Vail finds it imperative to create
and implement the Vail Village and Lionshead Village Construction Hours Handout.
It would be irresponsible for the Town of Vail, the Construction Contractors and the
Merchants, to not actively participate to minimize the impact of construction in the Vail
and Lionshead Village areas.
Givens
The following givens are intended to provide the basic foundation by which construction
will be completed in the Villages:
r The public's health, safety and welfare shall be honored at all times.
. Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and
circulation shall be maintained.
. Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
r All construction deliveries, equipment, tools and materials entering the Vail Village
and Pedestrian areas must go through Check Point Charlie. All Lionshead
construction activity must go to the Vail Police Department for a parking permit. Do
not use delivery zones for construction parking, refer to approved staging plan or
make other anangements for parking.
. The hours of Outside Construction Activity shall be as follows:
- April 15 - June 20 & September 8 - November 14,7 a.m. until 7 p.m., seven days
a week. June 20-September 5. work must end by 4:00 p.m. on Fridavs.
November 14 - April 15,2004 work allowed within daylight hours only.
- Deliveries shall be restricted tothe hours ol 7 a.m. to 11:30 a.m. on Gore Creek
Drive and 7 a.m. to 8:30 a.m. on Bridge Street.
- Special delivery permits must be requested in advance, from Public Works in
conjunction with Code Enforcement at Checkpoint Charlie.
- No construction activity shall occur on Saturday or Sunday between June
21 & September 7.
No outside construction activity shall occur on the following dates:
Friday, February 14, Saturday, February15, Sunday, February 16, and Monday,
February 17. (President's Weekend)
Saturday, May 24, Sunday, May 25 and Monday, May 26 (Memorial Davl
Friday, July 11, Saturday, July 12 and Sunday, July 13. (Vail Arts Festival)
Thursday, July 3, Friday, July 4, Saturday, July 5 and Sunday, July 6.
(lndependence Dav)
Saturday, August 30, Sunday, August 31, and Monday, September l.
(Labor Dav Weekendl.
' ^ Friday, Septembet 12, Saturday, September 13, Sunday, September 14 in
(Lionshead) and then on Saturday, September 20 and Sunday, September 21.
(Vail Village) - (October Fest)
Thursday, November 27, {Thanksqivinq Dav) Friday, November 28, Saturday,
November 29 and Sunday, November 30.
Thursday, December 25, Friday, December 26, Saturday, December 27, Sunday,
December 28. (Christmas Dav Holidayl
Monday, December 29, Tuesday, December 30, Wednesday December 31,
Thursday January 1. lNew Year 2004) Friday January 2, Saturday January 3 and
Sunday January 4, 2004. No Work allowed the entire week of the
Christmas/New Year Holiday.
The Town of Vail Noise Ordinance has been waived by the Town Manager from 7a.m.
- 7p.m.for construction activities from April 15 through June 20, and from September
8 through November 14. The Noise Ordinance shall be in effect and strictly regulated
from June 20 through September 5 and November 15, 2003 to April 15, 2004
All construction sites will be required to obtain an Approved Construction-Staqinq
Plan from the Town of Vail Public Works Department in conjunction with Code
Enforcement. (The approved staging/parking plan is required to be on-site at all
times).
The Town of Vail reserves the right to amend the Vail Village and Lionshead Village
Construction Hours regulations at anytime should abuses or problems arise.
The Three-Strike Rule will be enforced. Step 1. (Written warning), Step 2.
(Written warning), Step 3. (Construction site will be Red Tagged until all
violations are resolved).
The following expectations are established to insure the success of the Vail Village and
Lionshead Mllage Construction Hours Plan:
r Full and complete cooperation and understanding from all parties involved in the
construction activity in regards to this plan.
. Strict adherence and compliance with the requirements outlined in the construction
plan.
. Respect and consideration for the affected interests and parties.
lf you have any questions, Please contact the Town of Vail Public Works Department
(Construction lnspector) or the Vail Police Department (Code Enforcement Officer)
970479-2198 970-476-7603
ll
TOWNOFVUI,
Vail 2003 Staging / Parking Plan Information
fhe Staqinq / Parkin ls a very important step in the building process. Striking a balance
between safe public access and giving construction projects room to build is becoming increasingly
challenging, for us tq meet all the needs of those who will be impacted by construction projects. The factls,
there is less room to build in the Town of Vail.
Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of Way is a Privilege,
not a given right. We take into account when we review and approve staging / parking plans, impacts on
neighborhoods, tourism, business and the traveling public along with your right to build.
The General Contractor is responsible for all subcontractors and all construction activitv relatina to the
buildinq proiect. The staging plan will be enforced according to the Approved Set of Building and Staging
Plans. You are required to keep a copy of the Approved Staging Plan on site.
Two staging /parking plans are required, a summer and winter. Summer staging plans expire on November 1,
and winter staging plans expire on April 15. (Note: There is no on street parkinq in the winter season and all
materials, equipment. etc must be 10' off the edoe of asphalt).
Enforcement of all staging / parking plan is as follows.
A) Staging / Parking Plans to scale required.
B) Once the plan is approved, they will be held to complete compliance.
C) We will use a 3 step and you're out, process.
Step One- Verbal and written warnings as to the staging plan violation, then have contractor sign and date
field memo warning.
Step Two- Police Department issue tickets and tows or public works writes second written warning to all
violators who have been notified under step one and who are still in violation of the approved Staging / Parking
Plan. The Town of Vail Chief Building Official will call the contractor and notify them, the next time any
violation happens, the building department will red tag the construction site for 48 hours.
Step Three- lf still in violation after step two, a 48 hour Red Tag will be issued to the project site.
lf you have any Questions, Please contact the Town of Vail Construction Inspector at 970-479-2198
WailUatabdev\FORMS\PERMITS\BLDGPERM.DOC 03/04/2003
llrr
Requirements for an Acceptabte Staqinq Plan
It is preferred that and Approved Site Plan is used to draw a staging plan, but a hand drawn plan may be used
as long as it is dawn to scale and is neat and legible.
1.) The Staging Plan must show the following:
(a) Show all parking that is required for the job site. (lncluding construction equipment).
(b) Show the location of all materialthat will be staged on site.
(c) Show the location of all dumpsters and port-o-john that are to be on site.
(d) lf a fence is required, then show the location of the fence and describe the material used for the fence.
(e) lf trees and / or vegetation is required to be protected, then show how this will be done.
(f) lf this staging plan is for a Demo Permit, then show staging for dump trucks and all related equipment. lf
the Town of Vail Right of Way area is needed for staging, then a Traffic Control Plan is required in
conjunction with the staging plan.
(g) Please provide and show an Erosion Control Plan.
(h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in the Winter Staging Plan.
2.) lf work needs to occur in the right of way, then add a Traffic Control Plan to the staging plan showing the
following:
(a) The work zone (area that is to be performed)
(b) Traffic Control Devices (warning, signs, cones, flaggers, etc.)
(c) Distances that all devices will be set up from the work zone. Also show all dimensions of work being
performed in the right of way. All traffic control plans must conform to the MUTCD manual.(Manual of
Uniform Traffic Control Devices)
3.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and Community Development
Department. Once the staging plan is approved, it will be registered with the departments listed above and
enforced.
4.) The Village and Lionshead area have outside construction restrictions, please become
familiar with the Vail 2003, Vail Village and Lionshead Construction Hours handout.
\\VAiIbAIA\CdEV\FORMS\PERM ITS\BtDGPERM.DOC 03/04/2003
Parcel Detail Page I of3
,-' ,. n'' u
I
"- ite t',1+sl .'-.u.'r, ,,.,nr*..tj sEARcH IEAGLE C6ilUNTY
Elcctcd ofhci:ls *'I rrnt tCounty servicr3 Visitors "
Eagle County Assessor /Treasurer
Parcel Detail Informatlon
Assesso r/T rca srrr.t i Picpliy ;c;-t r-r- ir I A:::ri:-ilrr 5t,l)'-:ct l.;'i!-r-t I A!5c:;:itr Salcs Se.liillr
iesi: iii-rl,l,r; -rJ -3:te, sl,:s | 3x IntcrnatloF
:-|!]-:.\..-i!]l'...-|.-..-',|i.'.:.,'
Community r
Tax Ar€a Accoont llumb€r Parcal umb€t Hlll l-gvy
sc103 Rfft8690 21010em8001 rt6.566
Owner tlame and Addrsss
VAIL 1O8 LTD
C/O WESTSTAR BAI{K ADMII{ CENTER
FO BOX 1210
GYPSUM, CO 81637
L€gE! D€scriptlon
SUB:VNB BUILDING DESC: (METES &
BOUNDS) BK-O214 PG-OsO7 WD 01-0969
BK-O246 PG-O708 SWD 0+-22-76
BK-0246 PG-0709 QCD (X-27-76
BK-0384 PG-0O38 QCD 04-27-84
BK-0384 PG-0057 WD (X-24-&{ BK-0384
PG-0058 WD 04-24-84 Bl(-o38ir PG-m59
wD (x-24-84 BK-(Xa9 PG-O983 PTD
08-25-88 BK-O519 PG-0815 r,4,AP
12-15-89 BK-0650 PG-0845 SWD
09-14-94 BK-O650 PG-O846 SWD
09-14-94 BK-0650 PG-O847 SWD
09-16-94.
http ://www. eagle{ounty.com/futurnJassessor/Parcel. asp?AccountNumber--R008690 2tr7t2004
IIJSIJ'Jt_3t KrrN Id: I-'1IT
03-12-200/'
7:M am
fnspectlon Request Reportlng Page 12ialL cq- Tol,utloE_-
ArPrD lnbrmauon
A.trrfts gl+(xx2
ConsrTyi:Oilr.r: VAL I(DLTDApplhrnt }ICBECX, LTD.
Requested ln3pect Date:
Inspec0on Arer:
Slte Address:
TYD.: A.COirM
Occugoirby:
Frldav. March 12.20McD ''
IO8 S FRONTAGE RDWEST VAIL
108 S FRONTAGE ROAD YUEST. 3RD FLOOR
SLh|s: ISSUEDkrplts: CD
Phonq: 3)}48&965
Reouested Tlme: 08:lD Al,' Phone: 977-1045
Entsr€dBy: DGOLDEN K
Tlme Exp:
lbm: 30 B|-Dc+flnkrg " Agprov€d "Ogql(X h$ech{: cCDllcm: 50 BlDc'-lr|3ulrdoft -ActIoN: APAPPROVED
Acdon: APAPPROVED
lbm:
tbm:
tl€m:
ll€m:
llsm:
lbm:
ll6m:
It€m:
Itdn:
lbm:
21
22
i 90 BLDG+lnrl: HCBECK.LTD.
nts: Sullc 302.304
To: CDAMS
(Rrt/60
60 BLoG'sheetocttlrll
03/04/04 lrB.clor:
70 ALDer-Mbc.q, BLDC'-Fhal
53a PW-TEMP.C'O
533 P|-^IT'-TEMP.C/O
537 P|-AI{-RNALC/O
53{l FIRE-Rl.lA,l- CJO
539 PW-F|MLCyO
Pl-Al$lLC Furndallon Pbn
Pl-Al$]LC Stte Plan
" Appro\rs(l "
fftrrrl3
towubr vau, DEpARTMENT oF coMMUNrry DEVELopMENT
75 S.FRONTAGEROAD
vAIL,cc 81657 vJ A,"t-t-'vt {kt\-bg7o-47s-2t38 \o-^\ O . t((..ar- 2*A
NoTE: THrs
'ERMIT
MUST BE posrED oN J.BSITE AT ALL TIMES \),'-eo.^JfRs^'.\.
ADDiALTMFBUILDPERMIT permit #: 803-0365 S-.*-,.h_ ?tO
Job Address.: 108 S FRONTAGE RD WEST VAIL Status.....: ISSUED
Location......: Suite #210 Applied...: t2/12/2003
Parcel No....: 210106408001 Issued ...: 1211912003
ProjectNo...: p{1TO 3-gt(f j Expires...: 0611612004
owNER VAIIJ 108 IJm L2/L2/2003 phone:
C/O WESTSTAR BANK ADMIN CENTER
PO BOX 1"2L0
GYPSUM CO 8L637
I-,i-cense :
coNTRAeToR BrLL JoSEPH & AssocIATEs INc12/L2/20o3 Phone:
P.O. BOX 4509
EJAGLE, CO
81631
License : 572-9
APPLTCANT BrLL iTOSEPH & ASSOCTATES INC12 /L2/20O3 phone z 970-328-0436
P.O. BOX 4509
EAGIJE, CO
81531
License:
Desciption:
Tenant Improvement- Demo of interior walls, new
doors,cabinets, wet bar,mosc elechical paint and finish
Occupancy: B
Type Construction: II l-HR Type II 1-Hour
Type Occupancy: 22
Valuation: $124,000.00
Fireplace lnformstion: R€st cted: Y # ofGas Appliances: 0
Building--> $1,128.15 RestuarantPlanReview->
Plan check__> s733.30 DRB Fee---->
Add Sq Ft: 0
# ofcas Logs: 0 # of Wood Pellet: 0
FEE SUMMARY
$0. o0 Total Calculated Fees-> S1,854.45
lnvestigetion->
will ca
->
$0. 00 Recrealion Fe€--....-.->
$3.00 Clean-uPDePnsit->
$0. 00 Additional Fe€s---_>$7s.00
$0. OO Total Permit Fee----> $1,939.45
S0.00 Pa]'ments.-.--> S1,939.45
$0.00TOTAL FEES-> S1,864.4s BALANCE DUE-->
Approvals:Item: 05L00 BUII-,DING DEPARTMENT
L2/1,2/20o3 JRM Action: Ap
Item: 05400 PLAIiINING DEPARTMEMI
Item: 05500 FIRE DEPARTMEIII
Item: 05500 PITBLIC WORKS
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge thal I have read this application, filled out in full the information required, completed an acourate plot plan,
and state thal all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, Uniform Building Code and other ordinances ofthe Town applicable thereto.
REQI,JESTS FOR INSPECTION SHALL BE MADE TWENTY.FOUR HOIJRS IN ADVANCE BY AT 479-2149 OR AT OLJR OFFICE FROM 8:00 AM - 4 PM.
OWNER OR CONTRACTOR FOR HIMSELF AND OWNET
PAGE 2
'}{t**:t**'}{t,t{':t*:|.*i'fl!t*:f!t*:|'*'}****'i,t{t**!t*:i,}:l!t*!i*t'|t{.{'{.*!t**:|t:t'}'t*****i*
CONDITIONS OF APPROVAL
Permit#: 803-0365 asofl2-19-2003 Status: ISSUED
***+'|.*'8:}'l!t**:|t*'}*t*'|*'i**'i'|.***t't**!t'}:*'}'|t:t*:i'i't.!*'t'|.t****'t*:*ltt*'t****!ft}!i+
Permit Type: ADDiALT MF BUILD PERMIT Applied: 12/12/2003
Applicant BILL JOSEPH & ASSOCIATES INC. Issued: t2ll9l}003970-328-0436 ToExpire: 06/1612004
Job Address: 108 S FRONTAGE RD WESTVAIL
Location: Suite#210
ParcelNo: 210106408001
Description:
Tenant Improvement- Demo of interior walls, new
doors,cabinets, wet bar,mosc electrical paint and finish
Conditions:
Cond: 12
@LDG.): FIELD INSPECTIONS ARE REQUIRED TO CI{ECK FoR coDE
COMPLIANCE.
Cond: 14
@LDG.): ALLPENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO
BE SEALED WITI{ AN APPROVED FIRE MATENAL.
Cond: 16
@LDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND
EVERY STORY AS PER SEC,3IO.9.I OF TTIE 1997 UBC.
Cond: I
@IRE): FIRE DEPARTMENT APPROVAL IS REQI.NRED BEFORE ANY
WORKCANBE STARTED.
4 nfilz
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UN
T?trTIOFUi,IL
75 S. Frontage Rd.
Vail, Colorado 81657
ll
qt3
Building Permit #:
CONTRACTOR INFO
General Contractor:
Rill Jos*u +AJsac, tie.Town of Vail Reg. No.:
972-a
Contact and Phone #'s:
6,71 JosepH 7a(-o?3/
ALUATIONS FOR BUILDING PERMIT (Labor & Materials
BUILDING: $ l2'l,0Do. Oe ELECTRICAL: $OTHER: $
PLUMBING: $MECHANICAL: $rorAl:$ lrLl . Kf,b,6b,
6r r")# C;ontact Assessorc Office at 970-328-864O or visit
r will not be accepted without parcel number) 2lOl OaY OFe I
Job Name: ESRE? TE,-4f A640.4f.ral4,^t JobAddress: l0? Eo' et'rr"tQtt@' bt€'E-
Sutli? z,to Y*t'l'
LegalDescription ll Lotr ll Blockr ll Filing:Subdivision:
Owners Name: yarl 15g U?Address:Phone:
Architect/Desig n r, 61tfrfil rrd.,,Address"rr* to. F<.FTrr6r aa ,;,ssii Phon"t fle 'trr?
Engineer: m4. ll Address:Phone:
Detailed description of work:
TX - Pdo Oeiarctba u+tl7 tvCb, zruot. etdort.JfU&l. ,A&c. eal pt'ir, 6Lill
WorkClass: New( ) Addition( ) Remodel ffi Repair( ) Demo( ) Other( )
Work Type: Interior (!l Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No (rfl
TypeofSldg.: Single-tamily ( ) Two-family ( ) Multi-family ( ) Commercial (;d Restaurant ( ) fther( )
No. of Existing Dwelling Units in this building: pD-.4-No. of Accommodation Units in this building: *t--tL
No/TyoeofFireolacesExistino: GasAooliances( )GasLoqs( )Wood/Pellet( )WoodBurninq( ) pceC
No/Tvoe of Fireolaces Prooosed: Gas Apoliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burning (NOT ALLOWED) rz
Does a Fire Alarm Exist: Yes ( ) No (X)Does a Fire Sprinkler System Exist: Yes ( ) No (X?
of Construction:
************************************J,*FOR OFFICE USE ONLY**************************************
Page 1 ot 2
Reservoi rs Envi ronmental lnc.
2059 Bryant St. Denver, CO 80211
(303)964-1986 Fax(3O3)4774275 Tdl Fre€ (866)RESI-ENV
D€cember 8. 2003 RES
NA
RES t00t03-l
W. Star Bank Bldg Sult 2'
Vall, CO 81657
Jane Adams
Adams Environmental Arch itecture, P.C.
3535 Silwr Plume Court
Boulder CO 80305-7212
Dear Customer,
Reservoirs Environmental, Inc. is an analytical laboratory accredited for the analysis of Industrial Hygiene
and Environmental matrices by the National Voluntary Laboratory Accreditation Program (NVLAP), Lab
Code # 101896 and the American Industrial Hygiene Association (AIHA), Lab lD 10153:t - Accreditration
Certificate 11480. This laboratory is currently proficient in both Proficiency Testing and PAT programs
respec{ively.
Reservoirs Environmental, lnc. has analyzed the following samples for asbestos content as p€r your
request. The analysis has been completed in general accordance with the appropriate methodology as
stated in the attached analysis table. The resulb have been submitted to your ofiice.
RES 100103-l is the job number assigned to this study. This report is considered highly confidential
sole propefi of the customer. Reservoirs Environmental, Inc. will not discuss any part of this study with
personnel other than those of the client. The results descdbed in lhis report only apply to the samples
analyzed. This report must not be used to claim endorsement of products or analytical results by NVI-AP or
any agency of the U.S. Govemment. Samples will be disposed of ater sixty days unless longer storage is
requested. lf you have any questions about this report, please feel fr€e to contact m€ at 30$964-1986.
Sincerely,
Jeanne Spencer On
President
Laboratory Coda:
Subcontrec{ Number:
Laboratory Roport:
ProJcct D.3ctlpdon:
o,",r"rr"r,- *?AQ s u4fitrr'
Paul D. LoScalzo Wenlong Liu
Paul F. Knappe Rich Wegzyn
It!l.ri.!t r<
,. td '-
EEEs
=F|J-A
Eoo
o o ooo .oooo ooott lO O<DO OOO) OCDO
u$#
E'o
o o ooo roooo ooo(o ro o)
ET.9o>ts
clqr
E{,E-
EIE
E
a
sIoo
e
ffir
€Eao o-?
EggF
o-8
J<>uiE
!o ro <) ooro ooo
-F)tO rO C) d) cr) (D(a{
'6 '6o.o
oo:cb,br=E'E i >E 'E
rl, >. 9 9>
= .e E 5 5E e 5g € gEF FgE ;Eg
e € ;ge $EfiE ;geg E .E.ls ege.l eIe5 = 5F=
=5=F
5FE
<coo <rooo <6(J
ooo<>
o5
EteZio
t\Nost@
=uJ
]-@o)O(o@(ot\1\ l\ I\ l\oooorfttst666@
uJ uJ uJ uJ
EF!
(a
C'ro
N
c;
N
rO
C)
c'ctaqetctc)ctorolA(trocroccN(\|GI (\I
F Fddctct
F tF !FN(\|G|G|+.,irt+clocrct
6l
o
N
oo!oL 3at
ii
tl,
*{p
6
c
tl
eF
()
=<8.^
EEgllJ*i
= rr
=E^>OE€
EYX
=E: =:irE6 ntg E9 =e€g v
=a=o56 !q
>-F Z?t' Il!FtDduroE3
o(,
ulc,
i<-lll
C'
E,u,o.
aot
z
IJD
!0-Jr
ulJo
F
q
4
E3(,g
EC
EN<o
- :l:g,;
Es eE s
E9EE}€ }Efi{:gE.i
;88:F3iEHEtStdxt
tq
E>tss
6vsri5tzF
llIAdZl-
ot Es
b E.>tth0,
" EHEE 2.68.. .:
E EEE.*E I
= o o Fr-:?E-ggsagE
PsssfieFE
,*,\" I RESEFVOI RS ENVIFONMENTAL SERVICES.
zog9 Brysnr Sr.. Denvcr co eo21 r
Pnmt,(lA3l Sa l9a0 F rr (30itt an"a2ts ttA rs; t.r|&nEst fNv t711.!!t8t
tNc.
RESI Job t:
orJe Oa t€:
Due Time;
I(LS 19$: 03
PAGtRI olJcALL Ptg.' rNntbr€rrltsDl. !l Lrt, Atlr.lrut Pr{trrti pLM/l€lr gr92l !? pcw .t lr $s.ao90l^F Ei }touRs t sE otrry}
Pra9Alt ls,Glfld|fr P.c,' Chrilet!,
I I !'1' ICP
-
H.lJ _nCFa!
| | Oun tol.t R€lrrirbt
,ra* fb' srE'r ,eri.{t Lo.,q ,sper p.,.'! c.rjrn
I I fEM - O,!rr S!.n{urat
l_J rrr. cr
-
LicnJ SCAAE
F.nt- 3o|r Dur. V/9c TCIF
lEil Dfi*lq WErl! /V.''r
cjru 9. \t3s!d \'ftt€.
l*.r!, _ RCRA E
fl **-'
IAIIPTES AUB TTTEO EY: :
elu,a, P.C
TNVotC- Tor (aF O,FFEF€flr
i/o.r!.Fv, ^scrnrEnyrrI'nmlntltArcnl|trd*rar 353! Sllwr PIUII. C1
Eoulder, CO E0305.7tt2 ---
9!I!!___{rn!_L44gn!_'-- fr,o.," lol-liarOZa ' _-
rrr, 3bl..tsr.tsll p"!r*
P|!ielr rn+o. P O r. W a
!Itil9rdq!!r!!r!!!ciron Tl=
le€3 aggly tof aiar hou.s and hotidays lot alt E utyris typos. Sanrpt€E fflt be andlyzed rtunno normal labofabry haors untessl'r€flged and s9eciliod on lhe chdn ol cu3lody Turnaround B sublecl to labolatory volun|{, yau \irll bc notiliod d detayB are
LABORATORY ttFS: W{rtayr: Zrm - 7pm
2 t{drr R|J3H l_,/F{ hour , t-S ftordryr
_ I H.i,r nulll _-E-hOg? _ $5 rtffdrf!
ANALYNCAL METHOOAtR l--l *rr;rmr rrooB qsHA
E tar. AF€q^ rar{:r ra{u rso
LAEOAATOftV HOURS: l{rcldry;: 8rm - SDnl
_ sP€Olr RUSH _. tDrr __ too.!
-
SPEqllnUSH I D.y
Nl}nc. F€OUn€O |c 9FiC,.1! !1us.t AA
Special hd'ucllonr:
I
5
,ii
?
I
t0
l1
t3
II
.r lrfl J', 1,i,l.Ir \__rllr :!*.nir'i! rtr'r
i".,.,',;.r 1'..,.;,:'" "1:l: l'l | ',,,
!rr'r' rI I'|t'!'!n.
, '12-@a-2A3 4:48PM P. I
t
5$It
t$t
\"
,i
1
-gg'EgE$ E,"=
C g5 f;iE€ EE;=aEie*:E EgF
EigFEgEgEiE
ft3€;EeF E:e
E EEffCEfu FgE: EEE g FE=F E F€Ir
s;E€cfEEEEE
EEEgiFEEgEE'
FFEiEFFFgFiiggF
E
s
i^S
at
E
B
l:d
(Il
==TE
=;( c;*+s
E',E.e;E EF
EEB g
EHE;EEEE
=s
s,
EE gE
F q i'4FP E^PS3 H9
.Ee F.'aEi rtg:z g c6<-) E+(:9 9F
EE EE
F
<-u€-
F? E.E
=; sE
s€ *Eb;P€}SE8
(-)
FL !4'l ui
EEErH63+
=HEESE5=E;E=
Sb,EE
c
-9
tv
g
E
Eal
5F
EcttC3B
a
atal
E
Eo
!.
EE
EI
Ear
llat6
c)
coNo
+
o2
E;
=l-
=<t
p
+lf
ol
Nl
HI5l0lo
2t:
fl+
$l*o
*at
,$ G*
filu\*F$$
a..a\
\Lt!-.=-a'^**w.
-J Q- ?-.;\ 5.^rc6v,
5tl\ot
cn
E
o-5t3trFq,*E"
c) $'
.t
oz
7
Hor\u
68c\z
F6y<
Eluino
t-P
I
tu
N-4
ltrHz9
^t-DAiiiz>
f;b9
6ilp
A
uJI
rtl
F=
sHr
btx
E Fi$gl
$Fs
+$K
$iR
g?d
qMt
9P,,i
PHE
E;F
PR?
nkfA
tuIo
ET7 -..Jt'o
UOE., q'-h<il
ir8\J- JFOIIL
-E, -\ aAotjt s'.7--'t-
"34_--?
lu
)u-r
F9
;<rL
ut
tu
t",l
n
i
7
.
TOWN OF VAIL DEPARTMENT OF COMMTJNITY DEVELOPMENT
75 S.FRONTAGEROAD
VAIL, CO 81657
970-479-2t38
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ELECTRICAL PERMIT Permit #: 803-0279
jo 34Y"t
Job Address: 108 S FRONTAGE RD WEST VAIL Status . . . : ISSUED
Location.....: Suite #210 Applied . . : 1213012003
ParcelNo...: 210106408001 Issued. . : 0111212004
Project No : tfSO 3-6>(6 9 Expires . .: 07110/2004
owNER VAIIr 108 IJID L2/3O/2OO3 phone:
C,/O WESTSTAR BAIIK ADMIN CENTER
PO BOX 1210
GYPSUM CO 8l_537
I_,icense:
COI{rRACTOR Current El-ectric Co., IJLC |2/3O/2OO3 phone: 970-328-L7LL
P.O. Box 7355
Avon, CO
824 Chambers Ave, Unit 88
Eagle, CO 81620
L,,icense: 315-E
APPLICA.!flI Current Electric Co., LLC L2/30/2OO3 Phonez 97O-328-L7LL
P. O. Box 73 55
Avon, CO
824 Chambers Ave, Unit, BB
Eagle, CO 81620
License: 315-E
Desciption: ELECTRICAL DEMO OF EXSTING OFFICE NEW LIGHTING,SUB PANEL
AND OUTLETS
Valuation: S8,000.00
FEE SUMMARY
Total Calculated Fces-> $1,17 . 00El€€i'ic8l-------> S144. oo
DRB Fee-->
Investigation-->
Will Call--->
s0.00
$0. 00
$3.00
Additionsl Fees----->s0.00
Total Permit Fee----> S147 . 00
Payment5-_--.--1 9147 - 00
BALANCE DUE--*-.>s0.00TOTALFEES-> 5!.47.00
Approvals:ftem: 06000 EI-,ECTRICAL, DEPARTMENT
L2/30/2OO3 DF Action: AP
Item: 05600 FIRE DEPARTMEMI
tt+ ++f t +tt ttr t t+ *
CONDITIONS OF APPROVALCond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
' and stite that dl the infonnation as requircd is conect I agree to comply with the information and plot plaq to oomply wi0r all
Toun ordinances and stab laws, and to build this sfiucture according to the towns zoning and subdivision codes, design review
approved Uniform Building Code and other ordinances ofthe Town applicable thereto.
RBQI,JESTS FOR INSPEC"TION STIALL BE MADE TWENTY-FOIJR HOTJRS IN ADVA}.ICE AT 479-2149 OR AT OL,R OFFICE FROltf 8:$ AM - 4 PM.
ACCEPTED IF INCOMPTETE OR
Building Permit #:
Electrical Permit #:
97 O - 47 9 -2149 ( Inspections)
mvu
75 S. FronTase Rd.
Vail, Colorado 81
COMPTETE SQ. FEET FOR NEW BUILDS and VALUATIONS FOR ALL OTHERS (Labor & Materials)
.6q83
Electrical C.ontractor:C;i;,xf -fle,l'; - (Town ofVail Reg. No.:Contact and Phone #'s:
E-Maif Address: fn1_+-
AMOUNIT OF SQ FT IN STRUCTURE:ELECTRICAL VALUATION: $
Contact Assessorc Otrrce at 97O-328-8640 or visit for Parcel #
Parcel # AlO106lOtOOt
robName: 6SReY o{ltL{JobAddress: )og s FcoJ*.--g< Rd.
v)efDa- Ja-. r 5u, te- a lo
Legal Description ll Lot: ll Block: ll riting:Subdivision:
owners trtame: y'4.1 I0r ttp ll AdffBg' raro 6{e<rr4- ao ll Phone:
Engineer:Address:Phone:
Detailed description of work:
.lll''.tll P tJ Lt ,t lLtt *4 , 1Jtu
plz.-41: c"_l
-t\^,,^-d
D e..vto t:1lOc..J
Ar"-A.- aut*let5
d f e-*: s t iJ a+€: <<_
WorkClass: New() Addition( ) Remodelp{ Repair( ) TempPower( ) Other( )
Work Type: Interiofp() Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) tlo ff)
Type of Bldg.: Single-family ( ) Duplex ( ) Multi-family ( ) Commercial X Restaurant ( ) fther ( )
No. of Existing Dwelling Units in this building: @ No. of Accommodation Units in this building:
Is this permit for a hot tub: Yes ( ) No (X)
Does a Fire Alarm Exist: Yes ( ) No ( )Does a Fire Sprinkler System Exist: Yes ( ) No (
********************************r.******FOR OFFICE USE ONLY*****rr***************
Other Fees:Date Received:
DRB Fees:AcceDted Bv:
Planner Sion-ofr:
,......ffiM..
('u
\WAiMAiA\CdEV\FORM S\PERMITS\ELECPERM. DOC 0'7 /26t2002
TOWN OF VAIL DEPARTMENT OF COMMI.INITY DEVELOPMENT
75 S.FRONTAGEROAD
VAIL, CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MECHANICALPERMIT Permit #: M04-0001
363-Oscs-
Job Address: 108 S FRONTAGE RD WEST VAIL Status . . . : ISSUED
Location.....: Suite #210 Applied . . : 0110612004
ParcelNo...: 210106408001 Issued. . : 0110712004
ProjectNo : -?trD3d t(6 3 Expires . .: 07105D004
owNER VAII_, 108 I_,TD 01/06/2004 phone:
C/O WESTSTAR BANK ADMIN CNflIER
PO BOX 1210
GYPSITM CO 81537
License:
CONIRACTOR CLIMATE CONTROL CO OF GWS 01,/06/2004 Phone: 970-94s-2326
P O BOX 1042
GLENWOOD SPRINGS, CO
8'J,602
License: L29-M
APPLICAIIT CI-,IMATE COIiITROL CO OF GWS OL/06/2004 Phone: 970-945-2326
P O BOX 1042
GIJENWOOD SPRINGS, CO
815 02
IJicense: 129-M
Desciption: replace s/a and r/a registers
Valuation: $2,500.00
Fireplace lnformation: Restricted: Y # ofGas Appliances: 0 # ofGas Logs: 0 # of Wood Pellet: 0
$0.00 Total Calculated Fees-->
$0 . oo Additional Fees--->
S?8.00 Total Permit Fee----->
Pa)'ments---------->
BALANCE DUE-->
't|+l*t*tlllt|l|ltlt|l+lltl||+''|t|.ti|tt|i|i'||+|il'*l*l**|l.tit|lt**l|||t|l}|t***|*l**Item: 05100 BUILDING DEPARTMEN|
OL/O6/2O04 df Action: AP
Item: 05600 FIRE DEPARTMENT
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CIIECK FOR CODE COMPLIANCE.
Cond:22
(BLDG.): COMBUSTIONAIR IS REQUIRED PER SEC. 701 OF TIIE 1997 UMC, OR SECTION
701 0F THE 1997 rMC.
Cond:23
(BLDG.): INSTAJ,LATION MUST CONFORM TO MANUFACTITRES INSTRUCTIONS AlrD TO CI{APTER
10 OF TTIE 1997 I]MC, CHAPTER 10 OF THE ].997 IMC.
Cond: 25
Mechanical->
Plan Check---->
lnvestigation->
Will Call---->
s78.00
s0. 00
s78.00
$7S.00
$0.oo
$50. 00 Restuarsnl Plan Review->
$15. 00 DRB F€e.------->
$0.00 TOTALFEES-------->
$3.00
(BL,DG.): GAS APPLfANCES SHAITL BE VENTED ACCORDING TO CI{APTER I AIiID SI{AIrL
TERMINATE AS SPECTFIED IN SEC.8O5 OF THE 199? I'MC, OR CHAPTER 8 OF THE 1.997 IMC.
Cond: 29
(BI-,DG.): ACCESS TO HEATING EQUIPMEIilI MUST COMPIJY WrTH CHAPTER 3 A].ID SEC.1O17 OF
THE 1997 IIMC AND CHAPTER 3 OF THE 1997 IMC.
Cond: 31
(BI-'DG.): BOILERS SHAIJIJ BE MOIINfED ON FLOORS OF NONCOMBUSTIBLE CONST. ITNIJESS
I-,ISTED FOR MOI]NTING ON COMBUSTIBIJE FIJOORING.
Cond: 32
(BI-,DG.): PERMIT,PLANS AND CODE ANAITYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR
TO A}I INSPECTION REQTTEST.
Cond: 30
(BLDG. ) : DRAINAGE OF MECIIAIIICA! ROOMS CONTAINIIIG HEjATING OR HOT-WATER SUPPLY
BOII,ERS SIIAJ-,I., BE EQUIPPED WITH A FIJOOR DRAIN PER SEC. IO22 OF THE 1997 UMC, OR
:::::-T.]''-:-.-;:-''o-:'.]j:..''-:i-]-.lT-l;.-.--**t*t:l|*'.l.*|*'*|'l|||l*'*,t|*t++++*+:}*'|'*:ll|:*****||*
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, Uniform Building Code and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY.FOUR HOURS IN ADVANCE BY 49 OR AT OUR OFFICE 8:00AM-4PM.
TURE OF OWNEROR CO CTOR FOR HIMSELF AND OWNEF
TOVT{WYAIL
75 S. Frontage Rd.
Vail, Colorado 81657
IF INCOMPLETE OR UN
Building Peimit #:
Mechanical Permit #:
97 O- 47 9-2149 (InsPections)
Permit will not be accepted without the following:
include:
CONTRACTOR INFORMATION
Provide d to
Mechanical Contractor:
Ct,^A-c Conoe.-. Can.PArl
Town of Vail Reg. No.:
I7q-A
Contact and Phone #'s: . .4*EYo (E;lszsa-
E-Mail Address:
COMPLETE VALUATION FOR MECHANICAT PERMIT Labor & Materials
Conbct Awrc offie at 970-328-8640 or visit
Parcer# 2/O/244A 44/
rob Namet /.2 AE y aoor--//t%o8 106 166r"u; -D a*r 5 r4 P r6'4'++(-Zu *Ei
Scut€.2.1a VA/a.c'
uegat oescripuon I loe fl ero"ri ll rirhs,Subdivision:
Owners Name: Elg E€ y Address:Phone: ,,vr/ft
Engineer:Address:Phone:
Detailed description of work: '; t .a I /'r?aPzAz.€ s,/* / E/r+ Pa-'asz'sA<
WorkClass: New( ) Addition( ) AlterationI Repair( ) Other( )
BoilerLocation: Interior( ) Exterior( ) Other( )Does an EHU exist at this location: Yes ( ) No ( )
TypeofBtdg:Single.family( ) Duplex( ) MultFfamily( ) CommercialP4.Restaurant( )Other( )
No. of Existing Dwelling Units in this building:
No/Tyoe of Fireplaces Existing: Cas@-
Noffype of Fireplaces rropos"O' Cas lpptiatt.es 1 I e"t f"g< I Wood/Pellet ( ) Wood Burning (NOT ALLOWED)
n EPA Phase II device? Yes ( ) No ( ) -.'-
*********** ********* ****FOR OFFICE USE ONLY*****
for Patcel #
**************ffo3
\WAiI\dAIA\CdEV\FORMSWERMITSU\4ECHPERM.DOC
07t2612002
TOWN OF VAIL DEPARTMENTOF COMMTiNITY DEVELOPMENT
75 S.FRONTAGEROAD
vArL, co 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PLUMBING PERMIT Permit #: P04-0001
'K 3o 3G;
Job Address: 108 S FRONTAGE RD WEST VAIL Status . . . : ISSUED
Location.....: Suite #210 Applied . . : 0I/0612004
Parcel No...: 210106408001 Issued . . : 0110612004
ProjectNo: ?g-q33-Or{(i Expires..: 07104/2004
OWNER VAIL 108 IJTD 0!/06/2004 phone:
C/O WESTSTAR BA}IK ADMIN CENTER
PO BOX 1210
GYPSITM CO 41637
I-,icense:
coNrRAcToR PROFESSTONAIJ PLITMBTNG SERVTCo1/o6/2004 phone: 970-328-1545
P.O. BOX 3891
EAGI,E, CO
81531
License: 119-P
APPLICANT PROFESSIONAL PLTMBING SERVICoI/o6/2004 Phone z 97O-328-1545
P.O. BOX 3891
EAGLE, CO
81631
I-,icense:119-P
Desciption: add bar sink
Valuation: $2,500.00
FireDlace Information: Restricted: ??
Plumbing-->
Plan Check-->
Investigation->
Will Call--->
# ofGas Appliances: ??
$45.00 Restuarant Plan Review->
$11.25 DRBF€e----------->
$o. oo TOTAL FEES--->
$3.00
So. oo Total Calculated Fees-->
50.00 AdditionalFees------->
# of Gas Loss: '!'! # of Wood Pellet: ??
$s9.25
$ss. 0o
$59 .25 Total Permit Fee---> 5114 .25
Payments------------> $114 . 25
*t!t***)t*.:l*1ltt***1***:li*.**.*t**|:l**'}'|l'lt*+.+|ltt*.**'}i't*i*******+.
BAI,ANCE DUE..--.-_>$0.00
Item: O510O BUIIJDING DEPARll'tElIt
0l/06/2004 dn Action: AP
Item: 05500 FIRE DEPARTMEIfT
CONDINON OF APPROVALCond:12
(BLDG.): FIEI-,D INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPI-,IANCE.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full fhe information required, completed an accurate plot plan,
and state that all the information as required is correct. I agee to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, Uniform Building Code and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY.FOUR HOURS IN
OWNEROR
OFFICE FROM 8:00 AM - 4 PM.
CTOR FORHIMSELF AND OWNEF
APPLICATION WILL NOT BE ACCEPTED IF II{COMPT"ETE OR UN
Building Permit # :-BlE3uiliis
Plumbing Permit #:
97 o -47 9 -2L49 (Inspecdons)
COMPTETE VALUATION FOR. PLUMBING PERMIT (labor & Materials)
W-Tha-6tJ83
\\t€
32-8^r3{S
Aslgc ,rc Office at 97O-328-8640 or visit
Parcel #
Jo! A{drqgs*to? s GaovTAce AD l^r&Sl- VO? LTD
4o. tlr 6 C-'rPsr)
description of work:
WorkClass: New() Addition( ) Altentionp() Repair( ) Other( )
Typeof Bldg.: Single-family( ) Duplo<( ) MultFfamily( ) Commercial OQ Restaurant( ) O$er( )
No. of AcoommodaUon Units in this building:No. of Existing Dwelling Units in this building:
Islhis- @nversion from a wood burning fireplace to an EPA Phase II device? Yes ( ) No
********************t******************FOR OFFICE USE ONLY********.**********l******l*t*t******
ffiCD JAll ;i 2003
\Wail\dataMcv\FORMS\PERMITS\PLMBPERM. DOC 0726t2002
fi.I;v'rr5t KUN ICl: I''Ig
Page 11
Reouested lnsoect Date: Frldav. March 12.2004' lnspifron Area: JRM
SITEAddress:
'08
S FRONTAGE RD WEST VAIL
Suibifl210
ArPrD Inlbrm.[on
Acthdty: E[}}G!65
CondTna:
oifln r: VALi(ELTD
Tvpe: AMF
Occupoifty:
Stri$:
Insp Aro.:
Sub Typr:
IJse:
AtrtF
lt {+tR
ISSTJED.nm
ADDIcail BILL JOSEPtI & ASSOCIATES ll.lc. Phone: 970,32&04i!6
COIilN.NT ASBESTOS TETTER IN Fil-E, NOI'|€ DETECTED. CD,'VISCoflfli.nt ROUTEDTOfiI|FOR REVEW - OFLORES
Requested Tlme: 08:00 At' Phon€: 9()+2480
Ent r.d By: OGOI"OEN Kuvry>-
idn:
lldn:
lbm:
lbm:
226 FIRE DEPT. M'TIFICANON
S) BLDGFrtmIm "ADDrcr,Bd-
Ot/t6/Otl -lnapccb.: C'cD'dt BtDGShc*,od(Ndl -ADorovad"
01/2tYO4 ln3Dcctoc GCD -'
ql BLDGFIn€I
Acilbn' AP APPROI/ED
Acfon: APAPPRO\rED
I
I
90 BLIIG-Flnal
B[.1JOSEPTI &
rcau€d€d CD w,l
II,!;l? I I5J-aun r(tt t-rl'u
03-12-2004 --trnspect1q,|l neqnAa-ffiorttng7:0{-en_ - vAtL. co;Toyyrt0F -Page 19
A/FrCt Informat*rn
Artlvlty: PO*tXX)l
Const Tlrpo:
Owner: VALIoBLTD
Reguested Inspect Date: Frlday, March 12,2004
lnspec0on Area: lrm
SlteAddress: 't08 S FRONTAGE RD WEST VA|L
Suite rQl0
Typ€. &PLMB
Occuparrcy:
Sldu3: ISSUED
Insp &€.: Jm
Requested Tlme: 08:00 Aff' Phone: 9fl4'&|€o
Enter€d By: DGOLDEN K
S ua-lrc AIoT
- StoPS-,-' u+;l€cL
Appil@nt PROFEgSlOhlAL PLt tr,tBti.tc sERvtcE - ptrofi€: 97tr3?&15r*5
ueseomsogronrsr--\ hOpe*luP
ll call g)42480
Tlme Exp:
-ed CD
T/.JsltrL€{ 6/U 6dctogJf?,fL_
t o\lSn41tdL4
LcovtE Cry?ltp :
--<- Pu"na hr+<t< gp,rter+ 6(L @d aAtc<q
,,*ffira+r W/couyryl
llem: 2{O PtM&Un<broroundt.m: 22O Pl-MlRouotVD.W.v.oloTa{ hr!D.ci(
Cdnm€nts:llrm: zlx) PLMSRouoh rurt€ro1o7/o{ tmo€c
t'owrvtrvnrr.
75 S.FRONTAGEROAD
vArL, co 8t657
970-479-2138
DEPARTMENT OF COMMUNIry DEVELOPMENTIL' \i,4-.*b ["f -s
c$;r u,&Z^ Aq
NOTE: THIS PERMIT MUST BE POSTED oN JOBSITE AT ALL TIMES \!."jt-_r,.-
ADD/ALTCOMMBUILDPERMT Permit #: 803-0181
Job Address: 108 S FRONTAGE RD WEST VAIL Status . . . : ISSUED
Location.......: 108 S FRONTAGE RD UNIT # 203 Applied . . : 07115/2003
ParcelNo....: 210106408001 Issued...: 08104/2003
ProjectNo. : Expires...: 0l/31/2Q04
owNER vArrr 108 IJTD 07/Ls/2oo3 phone:
c/o WESTSTAR BANK ADMIN CEISTER
PO BOX 1210
GYPSUM CO 81537
Lricense:
CONTRACTOR Graham Reid Construction, anOT /L5/2OO3 phone:
P.O. Box 1424
vail, co
81558
License: 646-B
APPITICAI{:r Graham Reid Construction, InOT /L5/2oo3 Phone: 97O-949-51a6
P.O. Box L424
Vail , CO
8165I
Lricense:
Desciption:
GUT EXISTING WALLS,CEILING AND INSTALL NEW WALLS AND CEILINC
Occupancy: B
Type Construction: II l-HR Type II l-Hour
Type Occupancy: ?'!
Valuation: 5140.000.00 Add Sq Ft: 0
Fireplace Information:Restrict€d: # ofGas Appliances: 0 # ofcas Logs: 0 # of wmd Pellei: 0
|'l|tl|+.'}:t't*.|.|t||'lt||t*|.*tl..'l.t''|.l+''+.+..+|tt*.|.|'|'*.|*l|.||||FEEsUMMARY**l...|'*|*:tt*'..'+|..l.|'|*.{.|'.
Building-> 9L,2L1 .15 Restusrsnt Phn Review-> go.oo Total Calculaled FeeF> S2,o!2.29
PIan Check-> $791.54 DRB Fee------------> $0.00 Additional Fees--'---> SO. 00
Inv€stigation-> $O . OO Res€ation F€€-> $0 . OO Total Permit F€€-> 12 ,0L2 .29
Will Call--> 93.00 Clean-up Deposit--> $0.00 Paym€nts----> l2'oL2-29
TOTAL FEES-----> 62 , oLz .29 BALANCE DUE---> S0 . 00
1 t*at all *ttt+'t,t,l'|
Approvals:I€em: O510O BUII-,DIIIG DEPARII{EIII
o8/04/2oo3 cdawis Action: AP
Item: 05400 PIJANNING DEPARTMENT
Item: 05600 FIRE DEPARllldENr
Item: 05500 PITBLIC WORKS
rrttttttall*ra*rt
See page 2 of this Document for any conditions that may apply to this permit.
ra
PAGE2
'}t|'tt'tt*!t|'l***t*|,t:t**|t:t*tt'}|*l*i'tt*i't|:t't+*'}lt't|t:|**'t,tt|t{t*'i'}{t't'}'t'}**'}'|'t*'}!t:t'}*'}'i******|*******
CONDITIONS OF APPROVAL
Permit #: 803-0181 as of 08-04-2003 Status: ISSUED
'|*'}*f*******|t'}'}'}*'}*'|tt*|***'|t'}{t**'}t'}i''}'}*'}****:t't*'t,}+!f*{t't,}'t*'r**l{t*{.'}:t,}**********
PermitType: ADD/ALTCOMMBUILDPERMT Applied: 07115/2003
Applicant Graham Reid Construction, Inc. Issued: 08104/2003970-949-5186 To Expire: 0l/3ln004
Job Address: 108 S FRONTAGE RD WEST VAIL
Location: 108 S FRONTAGE RD UNIT # 203
Parcel No: 21010640E001
Description:
GUT EXISTING WALLS.CEILING AND INSTALLNEW WALLS AND CEILING
Conditions:
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORKCAN BE STARTED.
Cond: 12
@LDG.): FIELD INSPECTIONS ARE REQURED TO CHECK FOR CODE
COMPLIANCE.
-fl, ov!tl
AppLrcArloN wfLL Nor BE AccEprED rF tNcoMpLErrr"?!"ifrWng_ O#fp
Buildino Permit#:
oLo.Xr+.gigffi fr .-'di{ffi }
mm{uFutn
75 S. Frontage Rd.
Vail, Golorado 81657
PLETE VALUATIONS FOR ILDING PERMIT
BUILDING: $ELECTRTCAL:S 29, dAO OTHER: $
PLUMBING:$MECHANICAL:$
For Parcel # Contact Assessors Office at 970-328-8640 or visit
Ltol 06+ 0g cD I
Jkrtq^reT JobAddress:,Og 5p flox|w4r. KO=hJdr
tirYt-iS vc€ft
WorkClass: New() Addition( ) Remodel /-Repair( ) Demo( ) Other( )
Work Type: lnterior tl- E)derior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No
Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family ( ) Commercial ([ Restaurant ( ) Other ( )
No. of Accommodation Units in this building:No. of Existing Dwelling Units in this building:
: Gas Aooliances ( ) Gas Loos ( ) Wood/Pellet ( ) Wood Burni
Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq (NOT ALLOWED
Yes( ) No
****rF***********ffi**"*FOR OFFICE USE ONLy*****s***s**t****************
ACCeOteO t'V:
off:
07126t2002\VailWata\cdev\FORMS\PERMITS\BLDGPERM.DOC