HomeMy WebLinkAboutVAIL VILLAGE FILING 1 BLOCK 5B LOT C AND D COVERED BRIDGE BUILDING BUILDING PERMITS LEGAL\:ffi*."^,ffi;,ff,m*
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ELECTRICAL PERMIT
Job Address: 227 BRIDGE ST VAIL
Location.....:Sharpshoolers at the Covered Bridge Bldg
Va,l U;l (rl-
llr R r,'LLgg
TOVfII OFVAIL
75 S.FRONTAGEROAD
VAIL, CO 81657
970-479-2t38
ParcelNo...: 210108267003
ProjectNo,'?fCsot-cxsaZ
OWNER COVERED BRIDGE INC
701 SE 5TH AVE 204
DEI-, RAY BE,ACH FI.,
33 483
I-,icense:
COMTRACTOR RIVER ELEETRIC
P.O.BOX 8407
BRECKENRIDGE, CO
80424
License:302-E
APPI,IEANT RIVER ELECTRIC
P.O.BOX 8407
BRECKENRTDGE. CO
80424
Licenee:302-E
Perrnit #: Eol-001I
Status...: ISSUED
Applied. . : 0l/18/2001
Issued. . : Oll3l/2001
Expires. .: 0713012001
01./te/2oo1- Phone:
oL/L8/2o0t Phone: 97o-453-748o
0t/t8/200! Phone: 970-453-7480
Desciption: Wire fresh air intake fans
Valuation: $250.00
'lt''}t*''|'|**.|.:t.,t.''}.'t.''.t|'.lt|t|t.||.|.''1''|l'''.'''''.t.t:ttt.tt'FEEsLrMMARY'.||.|....'.|..''Elec{rical----> S42. oo Tolal Calculal€d Fees-> i45.00
DRB Fee-----> So.oo Additional Fees------> 90'00
Investigation-> So . oo Toial Permit Fee-> S45 ' 00
Will Call > 93 . oo Payments--> 945 ' oo
TOTALFEES-> S4s. Oo RAr 'AllcE DL[E-*> s0'00
tttaili*r*t*rtlllii
Approvals:ItEm: 06000 ELECTRICAI, DEPARTMBflI
Ot/t8/2}0t KWARREhI Action: AP OVER TIIE COITMIER
CONDITIONS OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CIIECK FOR CODE COMPL,IAIICE.
tatiiltt**alii*tIt
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in frrll the information required" completed an accuate plot plan, and
state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town
ordinances and state [aws, and to build t]ris sfiucfure according to the towns zoning and subdivision codes, design review approved,
Uniform Building Code and other ordinances of the Town applicable thereto.
REQI'ESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVAIICE BY TELEPHONE AT 4?9-213t OR AT OllR OFFICE FROM 8:00 AM - 5 PM.
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNE
a-AppLrcATroNla no, BE AccEprED rF TNcoMpLETG un'
Project #:
Building
Electrical Permit #:
97 O-47 9 - 2149 (Inspections)
TOWN OF VAIL ELECTRICAL PERMIT APPLICATION
| 0L)
TVWT',|0vyln
75 S. Frontase Rd.Vail, Colora-do 81657
Contad Aswsorc Office at 970-328-864O or visit for Parcel #
Parcel # (Required if no bldg. permit # is provided above) zbt. 082.1o1,
sft'?i4,s
Detailed descriotion of work:
l,tJtRr TZdo frl^Js
WorkClass: New() Addition( ) Remodel ( ) Repair( ) TempPower( ) Other( )
WorkType: Interior( ) Exterior( ) Both( )Does an EHU exist at this location: Yes ( ) No ( )
Type of Bldg.: Single-famiv ( ) Duplex ( ) Multi-family ( ) Commercial ( ) Restaurant ( ) Other( )
No. of Existing Dwelling Units in this building:No. of Accommodation Units in this buildinq:
Is this it for a hot tub: Yes
Does a Fire Alarm Exist: Yes ( ) No ( )Does a Fire Sprinkler System Exist: Yes ( ) No
COMPTETE SQ. FEET FOR NEW BUILDS and VALUATIONS FOR ALL OTIIERS (Labor & Materials)
AMOUNT OF SQ FT IN STRUCTURE:ELECTRICALVALUATIoN: 5 ( /iO' OO
CONTRACTOR IN FORMATION
Electrical Contractor:
AtJnp-tzJ<{A/c-, )du
Town of Vail Reg. No.:
3D7-L
Contact and Phone #'s:970-/t-z-748o
ContractorSignature: [ / -42 Jrm DO4\05
*:r***********,t**r.*.l9{******rr**,r*,t**,f ****FOR OFFICE USE ONLY***************)r*t(*****,t*************
F:/everyone/forms/elecperm
ry
.*"1 vfr'oo,
Y'tfn^'
'' \9
TOWNOFVAIL
75 S.FRONTAGEROAD
vArL, co 81657
970479-2138
Job Address:
Location.....:
Parcel No...:
Project No :
09/06/2000JRMttem: 05600 FIRE DEPARTMENT
09/05l2000 'lRM
Status . .
Applied.
Issued.
Expires .
.: ISSUED
. : 0910612000
. : 09/0612000
.: 03105/2001
ACTION: APPR APPROVED
Action: APPR N/A
CONDITION OF APPROVAL
Cond:12
FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPI,IANCE'
Condt 22
CoMBUSTION ATR IS REQUIRED PER SEC. 701 OF THE 1997 UMC, OR SECTION 701 OF rHE
1997 rMC.
Cond: 23
INSTAI,LATION MUST CONFORM TO MANUFACTURES INSTRUCTIONS AND TO CHAPTER 10 OF THE
1997 UMC. CHAPTER 10 OF THE 1997 IMC.
Cond: 25
cAS APPLIANCES SHALI-, BE VENTED ACCORDING TO CHAPTER 8 AND SHALI-, TERMINATE AS
SPECIFIED IN SEC.8O5 OF THE 1997 t]MC, OR CHAPTER 8 OF THE 1997 IMC.
Cond:29
AccEsSToHEATINGEQUIPMENTMUSTcoMPI-,YWITHCIIAPTER3ANDSEc'1017oFTHE1997
UMC AND CHAPTER 3 OF THE 1997 IMC.
Cond:31
onptrnreur oF coMMLlMTy DEVELopMt
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MECHANICAL PERMIT
227 BRIDGE ST VAIL
227 BRIDGE ST (sharpshooter's)
210108267003
Pennit #:M00-0100
APPI-,ICANT SHARP SHOOTER SPECTRUM IMAGIOg,/06/2000 Phone: 970-668-3499
P.O. BOX 4200
FRISCO, CO
80443License: 237 -M Afso is CONTRACTOR
coNTRAcroR slIARP sHoorER SPECTRUM rMAGrog/06/2000 Phone: 970-658-3499
P.O. BOX 4200
FRTSCO, CO
80443
I-,icense: 237-l"l Also is Applicant
OWNER COVER-ED BRIDGE INC 09/06/2000 Phone:
701 SE 6TH AVE 204
DEI, RAY BEACH FL
33483
I-,icense:
Desciption: INSTALL ADDITIONAL VENTILATION
Valuation: S I,050.00
FireDlace lnfonmtion: Resficted: Y # ofGas Applianc€s: 0 # ofcss Lgs: 0 # of Wood Pellec 0
;;;;;;;f;;;';i.;;l.i***i*i*i*******+,|,}.}}}tttt+,|*,}.},}**'**t++**a**:||FEESUMMARY'..iil*i|****''**
Mechanicat...>$40.00R€stuarantPlaoReYiew_>$0.0oTotalcr|$|atedFees-->$53.00
Plan Check--> $10.00 DRB Fee----------------> $0'00 Additioml Fe€s------> $0'00
Irvestigttion-> $0.00 ToTAL FEES--------------> $53.00 Toral Permit Fee------> $53'00
Will Call---> $3.00 Paynenls-------------> $53 ' 00
BALANCE DUE---------> $o ' oo
****tttN*****+++lt******+tl'*****'|.***t*****************l'l|*++*****i*i*i{
]Iem: O51OO BUII,DING DEPARTMENT
Borr.,ERS,s'Ar-,r-, BE MouNrED ot to*, oF N.N..MBUSTTBLE ao"rr.Q"Ess LrsrED FoR
MOUNTING ON COMBUSTIBLE FT-,OORING.
Cond:32
PERMIT,PLANS AND CODE ANAI-,YSIS MUST BE
INSPECTION REQUEST.
Cond: 30
POSTED IN MECHANICAI, ROOM PRIOR TO AN
DRAINAGE OF MECHANICAL ROOMS CONTAINING HEATING OR HOT-WATER SUPPLY BOIL,ERS
sHAIrL, BE EQUTPPED WrrH A FLOOR DRAIN pER sEc. 7022 oF THE 1997 ttMC, OR SECTTON
-1-9-9-1';f..'9.T'.If."..'.1.?-?J--Illc-;-*****i+*********.r
DECLARATIONS
I hereby acknowledge that I have read this applicatioq filled out in ftll the information required" completed an accurate plot platL and
state that all the information as roquired is conect. I agree to comply with the infonnation and plot plalt' to conrply with all Town
ordinances and state laws, and to build this stRrcture according to the towns zoning and subdivision codes, design rwiew approved'
Uniform Building Code and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOIJR HOTJRS IN ADVANCE 4?9-2 I 3 8 oR AT oUR OFFICE FROM E :00 AM - 5 PM.
SIGNATTJRE OF OWNER OR CONTRACTOR FOR HIMSETX AND OWNER
b
O O + bL,^r"Jl-"
lait (rlta5e flAoto Lab f6,_,:;#nf
ye-tila,tronr +rcooti,5 * d.," **n,
,g:#tffi-#F$,arylii-
gle trntun
fXlnaur- i-ity'r,su
E COPY
l{to' Of OD
prtoPoseo
CHnv$e 5
O Yr,nKe ulr,Doc.,
'lP o\er A6l < lat Loc(er foo'
@ Stti< clenrAu'e
[5c7rrrr^/ Elhartl oo,t
n^.o sP&./(ler htAo
rv 0,5,?nL 6pprc,
@ Ret^r'5 DocT Pron
VEiltt trnl PrevhB ers
ffi @fu sz+ll /^/t t^/ FR^, s
c '' Pnr j ptor^n slRrJluhL
h
mr:. .44eh,\6f,f 5
md cc::;r -:::iont
thc orsc:ion of
'f. any violrtiofl oa
F:,;"{&Reve&r .4vo f,ebcn?q
'd,othcr c:r '61ft04hA AIY Co^Dllro'\, f f
Locl(rr
Rooh^
rS"DvcT
fRoFosC
:p
ElL-( rs3
/r**'?'t
ffiggl {r'o.idoor or rtt oir_--c e-ii cirer E pttruming !ogtrc lffiyor6b
codc.or othcr ordinanccs or oc Jriidirdorne tssucrtcc-of r permit brrd oo ptu,
oor [icvcnr rhc building oficil tom 6Acnc:.:::r c:.;J plans. spcciticaicrr aad ortcaope!: : bei:; c:.:ic J on Ocrculocr wtcnal: ., Jia:.l:cc,r cf riis jurisdicrion.
Q = tufw [,uo(l(
l€ l'= &'
75 S. Frontage Rd.
Vail, Colorado 81657
lppucerron il.. *o, BE AccEprED tF tncotrlPLETrl unarunro
Pruject #:
Building Permit #:
Mechanical Permit #:
97 O- 47 9 - 2149 (I nc pec{f ons )
Permit will not be accepted without the following:
Prpvide Mechanical Room layout drawn to scal€ to inctude: I lO
"" ttrlHei,Hts""JlH::':ffir.oca'on - Afr-
H.i#i#*.lffi:'*t*'Hoo'
v
Conbct Asseslgolr dfice at 970-328'8640 orvist
@ permrt ! ts!rcudd abre) 2tot --
Job Name S1.{nRPSttocrzet- ptaolo LA$
Vev-{il R'lrov t Cooliv5
:oU oOOro* C ov 4l.Eo 6Rio'rc f3orloi"?
i"rio'"iitr'Vnr vlle'ic ZZa 6r,"0 Jf
Subdivision:Legal Description ll t-ou ll Block: ll Filing:
owng6|gmg;o BRtoqe wL.ffi,'*?"t - seA i nrt o€f\\#ehone:g6t-?+j-llgg
Engineer:Addressl Phone:
of work:S?e DRAlvr-j qll-r',Q rr--i. \-h=^--
WorkClass: New() Addition( ) Alteration(t/) Repait( l-lthgl-)
BoilerLocation: Iirterior( ) Exterior( ) Other( )
Typeof BHg: single.family( ) Duplo(( ) Mulu-family( ) Comm€rdal M) Restaurant( ) otter( )
'!
flo. of lcconrmoOation Units in thls building: \
No/Tvoe of Fireolaces Existinq:
e ll device? Yes ( ) No ( )
l
forPatel #
(^./
Mechanhal Contractor: SAn Rp Shool e f
lUillrnvrr pgeher ittecr1r,wt
Town of Vail ReS,Ng.:
2i l -ll4
Comact and Phone #'s: w(llrc Ptlcrer
11o-Gee'3qq1 x 3tl
,!..
**rt *{r**:t **r.*l.***l.*{.t {.**FoR OFFICE
F: / cYeryonc/fr omr/ mcchpcrm
SHARPSHOOTER SPECTRUM IMAGING
VENTILATION OF VAIL VILI,AGE LAB
LAB AREA----15ft.x l-1ft. x8ft. = 155 sq. ft 1320 cu. ft
DIGITAL AREA--11f t.x 11f t. x8f t. = l-21- sq. ft. 968 cu. f t.
VENTTLATED AREA - 286 S;. fr. 2288 cw. ft.
American Society of Heating,Refrigeration and Air Conditioning
Engineers, recommendations for ventil-ation of photographic
processing operations calls for 3.75 room changesper hour.62-1-979
Exist.i-ng exhaust fan rated aE l-80 cfm derated 15? for 25 f t. of
5 inch duct =150 cfm.Existing air intake fan rated 153 cfm ,derated 1-5? for 25 fL. of
5 inch duct =l-30 cfm. The difference in the vo]ume of intake and
exhaust creates a slight negative air pressure in the rooms
insuring adjoining rooms are not effected by lab air.
2288 cu. ft. divided by 143 cfm = one room change per 16 minutes
or 3.75 room changes per hour. Meeting the A.S.H.R.A.E.
recommendation.
However we have found that the work space is still to hot
especially when the weaEher is mild and altshough our chemicaf
tanks are all covered, the odor is still a problem.
We are planning to upgrade the ventilation system with the
addition of in-line fans of 270 cfm on both fresh ai-r intake
and exhaust ducts. Derating these fans 15? for 25 ft. of 6 inch
duct brings them to 230 cfm.Increasing the total cfm to 350.
This 1eve1 of air flow will result in better than 9 room
changes per hour, more than doubling our current venting of the
rooms.
2/24/oo
vi.c.P.
0L/Lt/OO 10:43 8201 1079
Pogc I of I
ROYAL SOVEREIGN
100 Wcrt Shcfficld Avcnuc
Englcwood, NJ 0763 1-4809 U.S.A.
568
O
@ oo1/oo1
Wilia Pikfrrr
Shorp$ootrr Spcdnn lmoging
Jrftcy Poull PHONE:
DAIE AFill4,20(n
Pf{OlrE- l970l6683a99.d.31|FAX (9701 66&56r I
fzor1568.0830 (EoOl 397-10,25
l2orl56&107e
pftoulCrrar,oupcom
Dincror ol Modrrttng
Yorr Fox of Aprt 8th
FA)C
r.oril
RE
S$ISAQE:
DccMr. Pithcr
RcgodlB yorr docripion ond tliogron of thr mr,tlrod you wi$ to rrc to vut lho cxhoort from
ycn nodrl ARP€30 Ponoblc Air C,ondilioncr, l\n run thfu by our bchniool rbff ond thry do nol
s.. ony coron wlry tlir sould not b. rob.
fhcy t ll me lhir <ir condition.r normdt runr ot 4.3 onrpr luith fi. rlddond rxhoud horo,
providrd wilh trc urltl. lt thc horc b o:andcd, thd my irrror b 1.6 - 1.7 onpr
lf firrc ir conccrn obout lhr rxhourl ho* bci4 *rrm to thc louch, tfrot moy be orrrcorm by
wogtng ltwilh rqnc bnn of irailolloo.
lf wc oon bc d furthor rnico, phcrc lct or lnow.
Rerpcdfully, f\.-<++=s
CON FI DENTIAT FACSIM ILE
THIS DOCUIAENT
'' "*
|s ADDIESSS AND AIA
CONTAIN IhFOIMANON THAT IS T*|V|IEGEq, CONFIDe.TTIAL AI{D EXEilPT FNOI OI'C|o(ruM UNTR
A??IICAIIE IAW. F THE NEADCN, Of ilIS
'TESSAG€
IS NOT IHE INIB{D€D IECI?GI.If, OT TH€ EM?IOYEE OR
AGENT NESFOISIILC TOR DRIVEIINGIHE MESSAGETOTHE INITNDED RECIPIB.II. YOI' AIE HREIY I{ONHED,
IHATANT DlSSEltll{AnON, Dlsltillullof.+ Ot COmNG Of rHF COT^ilUNEAnON ls Sm|cnY PRq{i|lE.
IF YOt' HAVE RECEI'ED DI6 COAAIIUNCANON N ERNOR. NEASE NONPY fiC SE{DET |^IMEDOATEIV
AT l0|l0l 39/.1025. t}|^r{( vqr.ROY rSOVEIETGNCOflP.
,Jeff Paul-l-
Royal Sovereign
hle own a Roam Air model- ARP 830 air conditioner and we are
using it to cool- our photo lab here j-n Vail Coforado.
We were unable to insta]l it to specs. as per the instruction
manual because the room we are cooling does not have a window
or even an outside wall. However what we have done to vent the
hot, air from the heat exchanger seems to work and we
believe to be safe. The Fire-Marshal- in Vail would like to
have your OK on the venEing and clearances of the ducL work
and t,he installation of the uniE. His concern is because
the heat exchanger duct is warm to the touch.
The unit is installed on the floor about 1 ft. from the waLl
The warm air duct is 4 inch diameter round sheet metal duct
and runs about 10 ft. surface mounted to drywall Lhen juncLi-ons
into 5 inch diameter round sheet metaL duct near the ceiling.
This 6 inch duct will run approx. 20 fE. to a 27O cfm exhaust
fan then approx, 3 ft. to an outside vent. On the other end of
the 6 inch duct is 180 cfm exhaust fan approx 6 ft. before the
junction with the 4 j-nch venE.
Included with this description is a drawing to clarify the
lnstaLlation we wish you to o.k. in writing
Thanks for your he1p.
W1IIie Pltcher
Sharpshooter Spectrum Imaging
Phone; 970-668-3499 ext. 3l-l-
Fax; 970-558-55L1
: HCV8JI,{ UO,{
JUOdSU TUNTd
oooz/ot /t0
SSDIONNI TTIS .ISSdIC ON
o=- INSTALLATION INSTRUCTIONS
-
FR SERIES FANS
: ,MPoBrANr:
-
BEAD iHESE IilSINUCIIOTIS COMPLE\ELY BEFOEE NSTALLIIiG FAII AND SAVE fHEsE INSTNUCI'ONS FON FUruNE NEFENE CE.
t- ; I ltems Included: One FR fan, one mounling bracket, mounling hardware for lan and bracketFantEtrn i:il,J3',,11'^H1lli,',li:;1l]]|,:'']l,ffilJillfl,',':'j'if,illl;llfl'ilil1]*illlliif,i;.1.tiil,e,ilXififTf, m'un,i,,s cramps
Additional llems Needed: Ducl w0rk, duct tape or m0untimg clarnps, duct lerminalion device (r0ol cap, louvered shutler, etc.)
To0ls Required: Electric drill, drill bits, regular screwdriver, phillips scrswdriver, razor knife, keyhole saw (oplional)
INSTRUCTIONS POUR TINSTALLATION
VENTILATEURS DE SERIE FR.-------
-
€LtBEcEstNsTnUcT'o|ts^l!c0MPLETAvA|tT0.'Nsf^LLEnLEvEtlfturEUnEfLEEc0llsEBvEnP0UnnEFEnEilcEFUTUBE
-
Les pi ces comprennenl: un venrilaleur FR, un support pour le m0ntage, la quimaillerie ndcessaire p0ur installer le ventilateur et le support.E- Les ensembles rdguliers comprennent Cgalemenl: Une grille, un collet de montage/registre anti-reloulement, et des allaches pour
l'installation de conduits.
Les ensembles deluxe comprennenl €galement: Deux grilles, les collets de montage/regislre anti-refoulemenl, un adapteur en "Y", ainsique
les attaches pour l'installation de conduits.
Articles additionnels requisr Conduits, ruban p0ur conduils ou attaches, accessoires pour boucher le conduit (bouchon d'exlrdmit6,
volet auvents, etc.)
0utils requis:Perceuse 6lectrique, m ches pour perceuse, t0urne-vis rdgulier, t0urne-vis PHILLIPS, c0uteau utilitaire, sciedd6couper (lacultalive).
Fantech
-..-----.----...
INSTRUCCIONES DE INSTALAGION
VENTILADORES DE LA SERIE FR
-
LEArODASLASINSIAUCCIOIIESAIITEEDEINSTALABELVENNI,,,DON. GUANOEETIN'IBUCNVOPANAUSAfrLOCOMONEFENENC'AE- EII EL FUTUBO.
----
l_.+--:- Piezas incluidas: Un ventilad0r FR, un soporte de montaie, elementos para el montaje del ventilador y el soporte,
FantgCh LostQurpros normales tambi6n incluyen: Reiilla con combinaci6n de colladn de montaie/registro de conllaliro, abmzaderas para montaie en
Los equipos de lujo tambi6n incluyen: Dos reiillas con combinacidn de collarin de monlaje/registro de contratiro, unidn en "Y", abrazaderas
para montaie en conduclos.
Elemenlos adicionales necesarios: Conductos, cinta para conductos 0 abrazaderas de montaie, disposilivo lerminal para elconducto (cdpula
de techo, lumbrera de persiana, etcetera),
Henamientas requeridas: Taladro el6ctric0, mechas para laladr0, destornillador plan0, destornillador de estrias, navaia, sierra caladora (optativo).
fAnllrxG
FANTEcH'|Nc.pIoduclsaredesiqnedandmanutactU'edtoprovidere|irb|ep€1lormanc€,bUt|heyarenot0Uamnteedtobe100%lree0mde|e0l
expetience occaslonal la
AVEFIISSEMEIIT
de ddlaillance, moins qu'll n'avoue 6tre pfet e accept€r le risque de telte perte oU telle btessure.
AOYEilEXCIA
Los Droductos fANTECH, lNC., han sido disefad
de lallas, o estar dispuesto a aceptar el riesoo de dichas pdrdidas 0 lesiones.
IilSTAtLINq MOUIITIIIG ERACIGT AND FA}I
Slep 1.
Wtrfin selecting fan mounting lgcation, the following criteria should be considered: a) type 0l application; b) service accessibility;
and cl mountina to minimize noise qenerated by fan operution"';1 1,;;jffiffi;d;o il;iiiliili,hn ruir uiimounteo a minimum of 12 feet from lhe dryer outlet. lf the lan is mounted closer lhan"'
if,",i idio*ru.i'di i'z'iitii, it wn Aevetop enough pressure to pull lint through the dry6r filter.causing prcmalure fan failute Jhe
best location for the fan to be rnounted, in any application, is as close as possible l0 the terminati0n 0l the duct work. llnponanl
lfoiice, io preuint tne possibility ot tiie hazarOt vihen usind a booster lan ih conjunclion with a gas fired dryer, booster lan air flow
must not exceed the dryer fan capacity,
b) Fan location should allow sufficient access lor service.
c) Mountinq the tan as far as poislUiJiiom the exhaust point will minimize fan operating noise frorn being transmitted back-'
iiiiou'dft iltd Jucl wort<. tt itre'tan is to be used as a boost6r for moving lhe air betwden lwo rooms, a cenlral poinl along the duct
ijjli"dr Jpri"i.r. l;;;t.irdifi; iuit *o* i,iicommended for all bithroom exhaust applications) will also resull in quieler
oDeration.
Step 2.
lljtg-lhe *ooO screws prgvided, attach the mounting bracket (NB or MB) to a support beam at the selected location. Fan mounting
can U1 iiany poinf atonl tne OuciinO in iny ingte, h"owever, virtical morinting is recommended.to reduce condensalion buildup in
itie rln. tf i td,izontat initatlation ii neceJidry iid'conOeniaiion buildup may lose a problem., either wrap insulation around the fan
or Oritt a y.t nob in the b61ont of the housini (along with an NPT inseit and drain tubing) allowing condensation to drain.
Slep 3.
Ritictr lan to ttre mounting bracket with the sheet metal screws provided. Wiring box should be pos-itioned Ior easy access. Eracket is
pioviOeO witn rubber vibiation isolition grommets to prevent the transmission of sound through the structure. Be careful not to
5ir-riiilrr-tr'i. ndi. sj':e itrouiO neiitin not"to strip the plistic housing. Screws are sell tapping and do not requke pilot holes. However,
pilot h-oles (no larger than 3i62") are recommended.
Slep 4.
Corinect duct wort< to inlet and oullet 0f lan using CB clamps or duct tape. When using insulated duct, it is recommended lhat the
i.;;; ti;yt;;t; il ciimpi'O br tiped tolhe inlet a;d oullet a'nd that lhe vlpor banier suirounding the insulation be duct taped l0 the
fan housing.
NoTE: Steps 2 & 3 nal be rcYe6cd.
r{sTAl-Acdil DEt s0PoRlE 0E tlol{I JE Y Et VEllTlLADoB
PAS0 t.
Tenoa en cuenta los siouientes laclores al seleccionar el punto para el nlontaje
det;entifador: a) tipo de apliucidn: b) accesibilidad para el setvicio: c) nonlate
oue ninimiee ei riirlo
^enendo
pol el luncionamienlo del venlilador'
al Sielventilador se usa como reforzadol en operaciones de secado, deberd
monlarse a una dislancia minima de 3'7 m (12 pies) de la salida de la
secadota Si monta elvenliladol a menos de 3.7 m (12 pies)' la presion
oenerada ouede ser suliciente para que la pelusa atraviese ellilll0 d€la
iecadora v ocasione fallas Drematutas delvenliladol La melor ubicaci0n
deiventitddor, sin importa;el tipo de aplicacion. es l0 mes ce'ca posibl€
del extremo def conduclo. Avis' lnpodanle: Pan evita( el esgo de
incendi| al usar un ventilador rclorzad con una secadora de gas' el
lluiT de aire delventlladot relorzador no debe exceder la capacidad del
venlila(lor de la secadon.
b) El punto de m0ntaje delvenlilad0r debe permith el acceso para el servicio
c) Si monta elvenlilador lo mds leios posible del punlo de salida minimizari
la kansmision del Itrido oDeralivo del ventilador por l0s co'rduclos Sl
usard el ventilador como relorzador para mOver aire enlte dos
habilac'ones, la ubicaci0n 6plinra puede ser un punto inlermedjo a l0
lar00 del conducto. El luncionanlienlo tambidn seld mds silencioso si
em-olea conduclos aislad0s (recomendad0s para lodas las aplicaci0nes
de ;xtracci6n en baRos).
Paso 2.
Uieioi torniltos para madera enkegados con el pfoduclo y sujele el soporle de
montaie (NB 0 MB) a una viga de soporle en el lugar s€leccionado para Ia
instalaci6n PuedeIn0ntarelventiladolencualquierpuntoal0larg0delc0n0tlclo
v a cualouiet ,n0ulo; sin elnbalg0. recomendarnos el m0ntaie verlical para que
ie acumule menos condensaci6n en elventilador' Sies necesaria una Instaracon
horizontal v la acumulac;dn de agua condensada Pudiera ser un problema,
envuelva eiveniilador con malerial aislante o perlore un agujeto de 6 4 nlm
{%')enlaDarleinletiordelarmazdnyaoregueunc0necl0r NPTyunamanguera
de drenald para Dermitir la salida delcondensado
Paso 3.
Suiete el venlilador al sopOrle de m0nlaie usando los lornillos para llelal
enireoados con el oroducto. [.lbique la caia de alamblado en un lugar de ladl
acces"o. El s0o0rle incluye arandelas de goma que aislan las vibraclOnes para
evitar la transmisl6n de sonido p0r la estructura. Tenga cuidado de n0 aptelar
con demasiada fuerza. Asimism0, no desprenda la envoltura de plastico. Los
l0rnillos s0n autorl0scantes y no Iequieren agLrielos pil0l0: n0 obstanle'
recomendamos usar aguieros piloto (no mayores que 2,4 mm (%r').
Paso 4.
Conecle l0s conductos a la entradayla salida delvenlilador, usando abrazaderas
CB o cinta oara conductos. Si em'plea c0nducl0s aislados, es rec0mendable
suietar o adherir el nucleo de vi'riio a la entrada y la salida y usar cinta para
cohductos para unir elalmaz6n delventiladol a la pelicula impermeable que
rodea al aislanle.ll0l[ Pnetle lnvedh cl odcn de l's pasos 2 y 3.
IIISIAIIATIOII OU SUPPORT DE
'IIOIITAGE
ET OU VEI{TITATEUR
itane 1.
Pour choisir I'emplacement du ventilateul, considCrer les points suivants: a,
le type d applicalio : b) I accessibine pou I entetien: c) un endroit qui
minimisen les Dossibililqs de ntnnsnission du bruil.
a) Pour aoir comme aopoint d une sdcheuse, le \'enlilaleur DolT €tte installd' au moins t2 oleds de la sorlie de la sdch€use. Si le ventilaleur est installd
moins des douze pieds recommand6s, il produira sulfisamment de
pr€ssi0n pouraspirerla charpieitravers le liltre d€ la sdcheuse, causant
d€s dommages permanents au ventilateur. 0uel que soit lllsaqe pl€vu,
le meilleur endroil d installer pour ventilateur estaussi pr I que possible
de la fin du sysl me de conduits. /| 3 lMPo4fAttf: Alin d'6viler tout
danger d'incendie lors de I'utilisation d'un ventilateur d'appoint avec
une sicheuse gaz, le ddbit du ventilaleur d app1int ne doil pas exceder
la capacitd du ventilateur de la s'cheuse.
b) Lemplacement du ventilateur devtait permetlre l'accessibilil6 pour
lenhetien.
c) En installant le ventilateul aussiloin que possibledu pointd ovacualion,' on minimisera le retransmission du bruit par les conduits. Si le ventilateur
est utilis6 Dour acctoitre la circulation d'air enlre deux pieces, il est
recommand€ d installel le ventilaleur le plus possible au centle de la
ligne, p0ur un renaement 0ptimal. Des conduits isol6s (Iecommandes
poursystdmes d €vacuati0n dans une salle de bainslpeuvent €galement
ameliorer le niveau sonore.
Elane 2
A l';ide des vis a bois lournies,lixer le supporl de montaoe (NB ou MB) sur la
0oulre t'endroit voulu. Le ventilaleut peut €tre instal16 n'importe quel point le
ionq du conduit el n importe quel angle: cependanl, le montage verlical est
recommand6 afin de riduire I accunrulalion de condensalion dans le venlilaleur'
Si une installation horizontale s'avlre ndcessail€ et que I'accumulalion de
condensati0n pourrait p0ser un probleme, elltourel le venlilateur de matdliel
isolant ou enc6re, perlorel un trou de y." dans le dessous du boitier et installel
tuyau de drain quipermettra la condensalion de s'6couler.
ftape 3
Altacher le venlilaleur au suppott de m0ntage avec les vis m€lal foutnles La
boite des lils dleclriques devrail €tre olacoe de faeon y faciliter Iaccds. Le
suDDort com0orte des rondelles en ca0utchouc pour isoler c0nhe les vibrali0ns
el ii propagalion du bruit. Prendre soin de ne pas trop les serrer. De plus,
0rendre soin de ne 0as ecrasef le boili€r en plaslique. Les vis n exigenl pas de
perforations-guides. Cependant, d€s perlorations'guides (pas plus grandes
que 3lp') sont recommandoes.
Etaoe c
Fixer les conduits l'enlr6e et la sortie sur le venlilatsur au m0yen de attaches
CB 0u de ruban pour conduits. Avec des conduils isolds il est recommande
que le noyau inldrieur en vinyle soit raltach6 I'entree et la sortie au moyen
d allaches ou de ruban et oue le c0uoe-vap eur entourant l isolant soit rattach6e
au boitier du ventilateur au moyen de ruban pour conduits.
N?fE: Les ehpes 2 & 3 peuw et| inverldes.
Mount Bracket (NB)
Fixer le supporl de monlage
Monte el soporte
Mount Fan
Attach et le ve ntil ateru
Monte el ventilador
Mount Bracket (MB)
Fixet le suppolt de ntontage
Monte el sopofte
Mount Fan
Attachet le venlilateu r
Monte el ventilador
IttsrAtt-nc HG SUppLy/rxHAUST GO
Please note: When i*ms are ourchased-!1!! elau-st^klt,.the gritt nounling coltar may include a collar/backdnft damper combinatiitn. tt so, ignore steps s a a:'insiiiaiion tor the combination is the same asinstallation for the co ar alone.
Slep 1.
select the grill mountin0 00inl within-the.area lo be.venlilated. To ease installation, localions of framingbeams within the wails oi ioisrs supp.rring gr;. c'Jliii Jirjuli o"e ionsioereo. coilar is provided with aperforated hanging strap foi attachmdnt dire-ctly to a beim orloiri"rr tiru lorrri0n 0l the qrilt does n0t allov,0rrecr afiachment, a cross_membef mounteo t6 ine trimini:iiJrij lu ,*0.
Slap 2.
Place the mountino collar in the selected location and trace a circle 0nt0 the surface. From the interiorside 0f rhe r00m, cur rhr.uoh th.e. sufface. p-idrsi' ,-ote:-r."oilll,o ,.rr* a smo'ther finish wherl
filountins
through a sheerroc,-k or rite rype ceiiin;;'iiii iririiirinillo thar a fazor knife be used to make
Slep 3.
From within the attic or crawl soace, place the.mounting collar into the hole until the edge of the collar isflush wirh the interior wail or ci,iring iuirace. Atdch iiiii, tli"in, ii,iil,rrr beam wirh rhe 2"w'od screwsprovided. Attach duct work. ptexi-note: tr !ea't;;;i;i;i ,;;;;;;i;; tEisht or the cvtar, attow surricienrspace between lhe collar and the beam .to atlacn tne tiici'ioii.-itsi,'*ne, atttcning flex ducttothe colar/damper c^mbination and an immcdiate etoow is niiiiii.'";;;;;;,, ffiat the etbow is instated with a"sofl'bend to allow damper blades to opente propeily. '
Slep 4.
open the grill dellectors tor maximum.air flow. snap the grill into the mounting collar. Grill should bepushed tightt)/ into prace ror an airrighi.rir -1tiJu6d Jriilr,orjrri'riirro sr.rrrry .rock.rhe orilr inro orace
$T#lf,,Tlf,i:il$jormed rnrheiorrar d'iirci'iiow'#;;rili'l rdi;;;ftd';il'n;;ruli';i#"=
lAlhen cleaning' lhe ouler linish Dortion ot the gritt shoutd remain locked into the coltat and wiped dwwn.t ne nner deflectors can be conptelety renoied.- -- -
utsrALLATtol{ DE tA cRtLt E o.AltttEilrATtoH ou o,tulcunnot nc
N0TE: Lotsque des anictes sonl achetfis clmme ensenble pour lCvacuation, te c\ltet de nnntage de la gtille peul inclweune conbinaison coltet de nontaoeheoistrc-an-ti+toutmteni'siii esiii'6i."ii'iitr orr roo,pre des itapes s et 6: L.instagatiopour ta conbinaison est identique t'fista ation pour le co et siiiii;l '* *" '
Etaps 1
s€leclionner le lieu d installalion de lt .Ill:^9Y-:rj.9:-l'espace e.6he venritd. pour tacititer t insta ation, on devraft tenircomple de I emplacement des colomba0ei-dansres murs ou encori dei soriuei iupponant le plafond. Le colletest accom'aond0 un0 c0urioie pertol6e D0ur l'inslallilion, directemenr aux corom[iies oi ,"rir"roriu.r. si lemplacement de ta grilre-nepermet pas une fixation directe, on doit utiliser une traverse aialh;;ffi;il;;
ElaD' 2
Placer le collet de montage au lieu choisi et-tacer un,cercle sur la surface. De I intdrieur de la pi ce. ddcouper ra surface.veurrrez noler qu'atin d assurel un tini Dlus unitors oe |iniiiiiitron oi.'i'ir prir"rtli * gypse 0u en luites itest recommand€o ulfiser un couteau e gypse.
Elapo 3
De l int€lteur de lentre-loit 0u de l esDacc.Iesheinl. placer.le-collet de montage dans | 0uvenure jusqu, ce que le rebord du
lli*1iii,::1',i.Eri!1/,'.,#"1n:;.rXry;;trv!;rn*;:i,;:,xn;rbl#uiztiiii',}{,*"i#ffitlJsl;:}entre E cottet el la poutre atin d v lixer te coiduit
.o-e
ptus, niiqi:6iiiiii,i'ii'iiitun n*,uu laconbina*on coret/rcoistret:,:: f;l:i:l::!'n'nt est requts assurez'vous ,ire t''rsie-i;ii iii^lu ii'tiiii a pr,rrnri, ,u, tameles du re,isire de
€taoo 4
'uvrir
les ddfrecteurs de ra
'rite
pour un maximum.de circ.utation d,air Fixer ra grirre dans re coret de monta'e. La orrreo€vrarelre Dlen poussde en Dlace Dour un aiustem.ent trermeli[ui - triairiii..siu, r, grirre d,ivenl tixer celle-cien Dlaie 0eraqon s€curilaire par-dessus ta boidure_enrb.uree nnre,ilui c.u'iorrei. L? iiiiiJ"piur rnrinrunant che ajusree pour obtenir tenol d a'r desi16 (plus ouvert=plus d ak: plus ferm6=nroins d.airi.
hgl'r:,!1,':iy,:!,7,'i!:l!#,::l::i:ili,ii::Xde,ta,gnh doit demeuie bien rentemte dans te coret et tre essuyce Les
IilsrAtActdI DE tA BEJttt-A DEtUt[81{r ctOil/Err stoil Hc
lii:i,xT:::!';i:::,;l::i:fliit!';x,#iJ:;i:2:I;T:|tflf:!:,,;i,If,[:#xi:,Jittxif::f:;:ctuirunacon]binaci,nPaso 1.
Seleccione elpunlo de m0nlaie de la reiilla.de
ljiiii..:i*:.i;l'i1T0'E|co||arinirictUyeuntirantsf;aif;i|;drec|amentea
Prso 2.
:'"#f :f ?lli'li,l,' Jli:llf :? f,'.',11',",:iTf i.{:f 1i#J#Il','JJ
Paso 3.
s0p0neusando|osdostorni||os0arimaderade,5,1cm(2';quesepi6iioiiii"ninco*,r,eri.'o,iiillvoij.5iijiid"i'wo,1eucedela'au[ade|col|a|in'deh
'J:#f:'lf:,:l!,f :;!:f;'i;:t:':{J:t::l!;';::;1,[t:^iiT:;1:ei,ri:it:l:iZi6:Att"",ii;ii,]!i|;'ioi,,;nconuinaciai aiio-ria,
Paso 4.
ii# ?1i13;'il'='f lfJ llLl'j Jl :?l',:f':'#.Tg
Dunnle la limpieza' la porci,n de acabado exlerior de ta reiilla debe pemenecer tirme en er colarrn y tinpiarse con un pairo. puede desmontar las pe*ianas internas.
Q
Mount Collar
Collet de montage
Monte el collarfn
Side View Gri E Co ar
Vue latdrale g lle et coltet
Vista lateral de la reiilla y et coltattn
TIIST,ALLIIIG IACKDRAFT DAMPEB
Ceilirtg
lllustration 1 .
Sle0 5.
iei,iria rountins localion. When using a single exhaust point, lhe damper should be installed direclly to-lhe
ilffi:i;d(;;;]rustrition rl. ra1n-er riirg miitipie eitrauit points, the dimper can be located at the'wve','tee'
il;itr;i;;;d; 6;;lrrijstiitio,izl. iitieiiriiol.ooiti'c,n.loampeiscan-be mounted al each exhaustvent poinl. Based
ori[, irir. .f thi iir irow, ttre oimp-ei-stroritd dmounted in a.180" radius above a horizonlal axis..Mounting lhe
oi,iibriiii in inudtteo poririon ray'iirue-ni tr'e utaciiiiiim ctosing complelely. Preferred installati0n is vertical
(illuitration 1 is a vertical inslallation).
Slop 6.-tiioiant:
1amperc must always be instalted so that the ait llow direction wilt open the bu.ltefily b.lades' Il the'iiiiiii;ii niiiliiidbe,tiien tnieiniiliiiit p6ini iid netbn, the.btades witt op.en toward the .fan. lJ lhe damper
i. i.itilrb-,i u-ei*ddn the tan and rfre Jiiltriigi poini, ttre utades witt open awav lrotn tlre fan. lnsert.lhe damper
;i;ii;;;.]ils;irne ieiected rocltio-n nd-oirpei witl eisily fit inside wire helix type {lexible duclins Secure
iii'i".g ctiii iiri.mrjiinolor cucirajie. wtrdn in'iratting the damper into rigid t1'pe ducting' Fc clamps or duct
tape should be used.
Flerlble Duct lnstallallon Hlnts
W-tren uiing ttexiUte type duct work, duct should be slretched as tight and slraight as possible- failure to do so
iouio reiuti in o,amaiib toss ot sysieri pe,iorranCi. ntso, insulated-duct work is recomrnended for wherever the
ffii";;;;;rh;ildr' unirdnoitii,-ne?$icei. raiiuir io use insulation could resull in excessive condensation
uririrui-riifrl*ii'e ii,*. rreriule oriiis-for,'1i n,i .oineiteoio ini iin witn cB gpe worm clamps or duct tape. All
ionne[tons stroutd be as airtight as possible to maximize system performance
INSIATTAIIOII DU REGTSIRT POUR A .RETOUTEIIEIIT
ftapr 5
Choisir l,emplacement. Lorsqu'on utilise un seul polnt d'6vacuati0n, le reoistre doit Ake install6 directement au tuyau de sodie (voir
iilirrtirtion't t. Dans le cas ife points O'euacraii[n multiptes, le registre-peut €tre place e I'adapt€ur 0n Y en T.0u ax,boitier {voir
fiifurtr.tion Zi Sion le d6ske, des registies petlvent 6tre ptac6s ctrique pbint de ventilali0n de sortie' Selon le plan de la circulati0n
d'air, le reqistre devlait 0lre ptac6 dans un iiyon de 1800 au-dessus d;un ixe hothonlal Linstallation du regislre en p0silion inversde
oouir.if r'n p cher les lameiles Oe termer compi tement. Une installation e la verticale est pr6f€rable (l'illustrati6n 1 montre [ne
installation verticale).
€tape o
lnponant: Les rcgistrcs doivent touiours llte instalt|s de lagon ce que la .direction du counnt d ait tera ouvrir les lamelles en papillon'
iiii iiiiti it iturc enre le poit du t;yau de sorlie a li ventilanut,les lanelles ouviront en dircction du ventilaleur si 18 tesistre
est inslall6 entre le ventitateuret te point oJJdcnaioe, tes tamettes s'ouvriront du cdl6 inv€rse du venlilateur. lns€rer le registre dans le
ConOuit ftnOroit sefeCtionn6. llsera lacile d'itrtroOuiie fe ttglstte Oans Un conduit llexibl€' Le maintenir en place au moyen de allaches
oe t,,pe cir ou fc - encore de ruban pouicJnJuits. Lorsqu'on installe le registre dans du c0nduit de type rigide, il convient d'utiliser
des attaches FC ou du ruban pour condurls
Gonseils Dour I'installation de conduits flexibles
l,ors do l,o lsat0n de coldnlts ll6ribles, les conduits devraient clre 6tir6s autant que p0ssible. Autrement, le syst me poulrait
ionrtionnri Urauroup moins bien. De plus, des conduits is0l6s sont recommandes l0rsque le cgnduit passe dans des espaces n0n-
c0nditionnds. Sans isolant, it pourratl se pr;duire une accumulati0n excessive de condensation dans le conduit. Le conduit flexible doit
etre rattach€ au ventilateu, au moyen oe iattaches de type CB, oU encoIe de ruban pour conduits T0Us les raccords doivent 6tre aussi
he;mdliques que possible alin de maximiser la perlormance du sysldme'
IIISIATAGIoII DEt BEGISTRO DE COIITRAIIRO
PASo 5.
briii.ion, et tugar pla et montaie. Si hay un soto punto de extraccidn, conecte el regislro direclamente alaguiero de salida (vdase Fig'
ii -si
,rprru "iii.i puntos de extraccio'n]pueoe iotocai eiregisrto-en la."Y", la "T' o el colector (v6ase rig 2) Sl lo desea' puede
montar reqistros adicionales en caUa uno de los aouiero Oe satida. El.regislro se monta en un radio de 180" sobre el eie horizontal'
usandg comg reterencia el pfano o. ftuio Otf iitt.iitontri. drt registio en posicidn invertida puede impedir el ciene total de las
p.i.ir.o L, *.ptforma di instalar etiegistro €s en posici6n vertical (la ligura 1 es una inslalaci6n vedical).
PASo 6.
lnpoftante: Los regislros sienpre deDen instalarse de nanen que la direcci,n (le tlui| del aie abra las persianas Las percianas se
abidn hacia et ventilalor si irsata et,ejiiiiiiitri i iuiro le nmay el ventitador Las persianas se abren aleiendosedel ventilador
si inslala el regislro enf,, .f urntlrrOor y'rt punio O, Ot'rr'.tgr. Introduic-a el regisho en la posicidn que sel€ccion6^en el conducl0 El
iugi.lro.rlr iin p1ollemas en conduitos'liexibles de tipo helicoidal. Sujele el regisho con abrazaderas CB o FC 0 con cinta para
co"nduclos. Deberi usar abrazaderas FC o cinta para conductos al inslalar el r€0islfo en conduclos rigidos
Sngsnncles pan It tnsteltcldn en conduclos ltarlbles
iiitiriiironouo* rr.xiutes, cstos oeteian eitiooe y.norrezao, al mdximo. si no lo hace, es posible que el rendimiento del sistema
oi*i*v, rn forma considerable. Ademds se recomienda el uso de c6nductos aislados si los c6nductos pasan por zonas n0
acondicionadas. El no emplear aistarnirnto purOe grnU", la acumulaCidn excesiva de c0ndensado en el interior del Conducto Los
c0nductos lexibles d€ben conectarse al ve;lihdoi usando abrazaderas de gusano tipo CB o cinla para conductos. Asimism0 las
conexionesdebensel|om,shefmdticasposib|eparamaximizareIrendimientodeIsis|ema.
A
RSK Dampert'>,4
,/\__//-,4ii,hi:l
,trr#il Gollector Box
Exhaast Ai.
lllustration 2.
II
+:= | €q
€= | FE Reoishe RsK
i 3 | ,E ==
Resistro RsK
../
-
Plal0nd Co et de ori e sitencieuse (HG)
clelo laso cuello d;la reiilla sil€nciadora
lllustratio? 1
Figura l.
lllustration 2
Figura 2.
II Reqislre RsK
I Registlo RsK
Joint en 'Y l+'
-Y'\ f::::->(\(\ , Drtection du
A--/--E''n'on'
oireccion dt
flqio del aire
Boile de conlfole
0irecllon d!
collranl d air
Il0ireccion de
nuio delaire
Regislre RSX
Reoislro RSK
EUCTRrcAL G0iillECT|0rl o
lo lheD0 l!01 CqIINECT PoWER SUPPLY untlllan ls conplelly lnslalled. Make ilrc eleclrical service
is locked ln "0FF" poslllon.
1 . All units are suitable for use with solid-staie soeed control.
2. This unit has rotaling parts and salety precautions should be exercised during inslallation, operalion and
lan
a. Use this unit only in lhe manner intended by the manufacturer. lf you have questions, contacl the
laclory.
b. Before servicing or cleaning, swilch power ofl at service paneland lock service panel to prevent fan
lrom being swilched on accidentally.
c. Installalion work and electrical wiring must be done by qualified person(s) in accordance with all
applicable codes and standards, including lire-rated c0nstruclion.
d. The combustion airllow needed for sale operation of fuel burning equipment may be allecled by lhis
unit's operati0n. Foll0w the healing equipment manutacturer's guidelines and safely standards such
as those published by the National Fire Protection Association (NFPA), the American Society of Heating,
Refrigeration, and Air Conditioning Engineers (ASHRAE) and the local code authorities.
e. When cutting or drilling inlo wall or ceiling, do not damage eleclrical wires 0r other hidden utilities.
f, Ducted fans musl always be venled t0 lhe outdoors.
g. Install fan al least five leet above the lloor.
h. Acceptable for use over a balhtub or shower when installed in a GFCI protected branch circuil.
i. NEVER place a swilch where il can be reached lrom a lub or shower.5. WARNltlGl Check vollage at the fan to see il it coffesponds to the molor nameplate.
GUARDS MUST 8E INSIALIED WHEI{ FAN lS WITHt}r REACH 0F pERSor{}tEr 0R WlrHtt't SEVEIT (7} FEET
OF WORI(ING TEVET OR WHEI{ DEEMED ADVI$ABTE FOR SATEIY.
Step 1.
Remove the screws securing lhe terminal box cover plate located 0n the side ot lhe fan. All fan motor conneclions
are prewired t0 an eleclrical lerminal strip. A %'romex type cable restraint connector will be needed to secure
the wiring through the knockout provided on lhe side of the lerminal box.
Slop 2.
Ering incoming electrical service through the romex connector and the fan knockout. Be sure to place the
conneclor nut over lhe wirin0 coming into the terminal box. There are two open ports on lhe terminal slrip.
Using a small regular screwdriver, tighten the neuhal (white) wire of the inboming supply under the open
terminal slrip p0rt labelled "N". Tighten the line (black) wire of the incoming supply under the open terminal strip
port labelled "1". Since the tan motor is isolated within a plaslic housing, groundinq is not necessary.
Step 3.
Secure ths romex c0nneclor. Secure lhe incoming supply with lhe romex conneclor. Replace the fan lerminal
boxcover. Allfan motorand capacilof conneclions (no capacitor on FR100 & FR125)have been pre-wired lrom
lhe factory. No additional fan wiring is necessary.
TROUETESHOOIING
It tan tails to operate, please check the tollowing:
1 . Consllt wiring diagrams (page four of these instructions) to assure proper connection.2 Check motor lead wiring. capacitor leads and incoming supply leads lo assure delinite contacl.3. It possible, use a metei to test tor continuity across the tah motor leads. In order to do this, the capacilor
musl be disconnecled (do nol test the capacitor - it will nol meter continuity). lf motor leads show continuity,
consult lactory f0r a replacement capacitor.
MAilTEilAilCE lltSTRUCIl0ltS
1. Since lan bearings are sealed and provided with an internal lubricating material, no additional lubricalion is
necessary.
2. When using in a dryer boosting application, DlSG0llllECT PoWEB SUPPLY and check impeller periodically
for any lint buildup.No olher mainlenance is necessary.
WIRING DIAGRAMS
Models FRl00, FR1251llet Withottt Motot Speed Co totv
Romex Wiring Top View
maintenance.
Other
With otot Speed Conlrollel
l.lnt (81..*l . Black /6;\
ttsv suopty . Btack (iidi6rJ
flarnal(wiftel \-./
Models
W hod Mdu Spced Contrclter
Standard Wiring Top View
With Molot Spced Contro et
MULTIPLE LOCAIIOII SWITCHING WIRING DIAGRAM
O ttut (b) YEAR
'ARRANTYTHIS WARRAIfIY SUPERSEDES AI.T PRIOR WARBAINTS
FOB TACIORY REIUBII YOU MUST:
1) Have a Return Materials Authofization (RMA) number lhls number may be oblained by
callin0 FANTECH, lNC. al l.800-747-1762. Please have Bill 0f Sale avallabl€
2) The RMA numb€r must be clearly disphyed on he outside ol tlrc carton, or delivery will b€ relused
3) All product being leturned must b€ shipped prepaid and be accompanied with a copy 0l lhe
Eillof Sale.
4) Product will be replacedrepaired and shipped back t0 buyer. l'10 credits will be issued.
DURI G TflE FIRST THIRTY (30} OAYS:
FANIECH, lNC. will r€place any product which has a tactoly delect In wofkmanship or malerial
Producl may be r€tulned to either the poinl ot purchase or the fANTECH faclory, logether !,vith
Eill ol Sale,lor an immediate replacement.
0UBtllc IHE tlnSf THRTE l3l YEARS (srcludlng lhs atoYt 30 day Dorlod):
FANTECH, Inc. willr€place any productwhich has a laclory delect in workmanship 0r material.
Pr0ducl musl be lelulned to the FANIECH fact0ry, looether with Eill 0l Sale and identified with
an RMA ntlmber.
DURlitG YEARS FoUF (4) and FlvE l5):
FANTECH. lNC. will reDaiI or replace any product which has r laclory def€ct in workmanship 0r
material. Product must be returned t0 the lantech FACT0RY together with a Bill ol Sale and
ldentilied wilh an RMA number.
IHT FOTLOWIIIG WABRAIIIES OO ilOI APPLY:
Damages hom shipping. €ither concealed or visible. Claim must be liled wilh lh€ carrier'
Damages resultin0lr0m impr0per wiring 0r installali0n
Darnales caused
-by
acts 0l natule, or resulling lr0m improper c0nsumer procDdurcs such as:
lmporpel Maint€nance.
Misuse, abttse, abn0rmal use. or accident, or
Incorrect electrical vollage 0t curtent
Femoval 0r alteratali0nmade 0n lhe FANIECH labelcontr0l number or dale 0l manu'aclure'
Any otherwaoanty, expressed, written 0r imptied, and to any consequentialor incidenlal damaoes'
losi of property, ievenues,0r prolit,0r cosls ol removal' installation or Ieinstallation, tor any
breach ol warfanly.
WABRAITY YAI.IDATIOil:
lhe end user must keep a copy ol the Eill 0f Sale to verily purchase date
GARA nE DE Glllo (51Al{s
Celle garantie annulle toule garanlie prdalable.
POUF OES RIIOURS A TUSIIIE I[ TAUT:
1) Avoir un numdro d aulorisalion de reloul de matdri€l (ARM). 0n oblient ce nunldro en
a0oelant FANTECH lNc. au 1'800-747-1762. Pri re d avoh I'acte de venle en main
2) Le numero AR[, doit 6lre clairemenl Indiqud suf lextdrieur de la boite; sinon la livraison
sera relus€e.
3) Tout produit retournc doit €ke exp6di6 port pay6 et olre accompagn6 d'une copig de
lacls de venle.
4) Le produit sera remplac€/rdpard et rtexp6di6l acheteul. Aucun cr6dit fle s€Ia emis
OURAIIT tES PREMIERS IIEI,ITE (30}JOURS:
FANTECH lNC. remplacera lout produit qui comporte un ddfaut de fabrication au niveau de la
main d oeuvre ou des materiaux. Le produit, accompagn6 de l'acte d0 vente, peut €he felourn6
soit au point de venle ou l'usine FANTECH pouI rcmplacement immedial
DURAI,II LE TB0ls (3lPREMlf,ES AtlltEES laxcl0anlla pdrlode dt g,louts m€nli0nndecl-des$s),
FANTECH remplrcera lout ploduit qui comporte un doleul de labrication au niveau de la main
d oeuvfeou des matdriaux. Le produjt, accompaqnd de lacte de venl€ et identili6 au moyen d on
num610 ARM. d0it 6lI€ retoulnd I'usine FANTECH.
DURAII LA OUATRI E (1] Er t^ Cllloul t{E (5} Allll[E,
FANTECH lNC. r6parera ou rcmplacera toul produit qui comporte un d6faut de fabrication au
niv€au de la main d'oeuvre 0u des mat6riaux. Le produit, accompagnd de I'act€ de vente et
idenlili6 au moyen dirn num6ro ARM, doil 6tr€ retournd l usire FANTECH
TA GABAIIIIE I{E S'IPPLIOUE PAS CE OUI SUII:
oes dommages prov€nant de I'expddilion, qu'ils soienl visibles ou cachds Un€ telle raclamalion
doil otre laile aupr s du lransporteur.
Des dommages r6sullanl d'un ddlaut de raccordement 0u d installation.
oes dommages provenanl de causes naturelles, ou rosultant d'actlons inappr0pri6es de la part
du consommateur telles que'
Mawais enlretien;
Mauvais usage, abus, usage an0rmal 0u accident: 0u
Voltage 0u couranl 6leclrique lncorrect.
Lenl vement du numdro de conlr6le ou de la dat€ de labrication sur l'6tiquette FANTECH' ou sa
modilicalion.
l0ute autre gara0lie, expresse, 6cIite 0u tacite, et toul d0mmage c0nsdquent ou incident, perte
de propri6t6, rev€nus, ou prollt. ou co0ls relios au ddmant lement, e l'installation ou a la
rdinstallation, pour lout bris de oarantie.
vAUoAr|0[ DC LA GARII{TIE
futilisateur linal doit c0nserver une copie de l'acte de vente alin de conlirmer l'informalion
quant i I'achal.
cAnAilrlA PoB clflco (5) Af,os
Erta garanlla r!smplazr a todas la3 gatantlaS antetlotas:
loi nioursros plnl otvoLven ut pnooucro A tA rArRlcA soil:
1) Tensr un nimero d€ Aul0rizaci6n d€ Devoluci6n de Malerial (RMA, Return Malerials
Authorinlion\. Puede obtener esle n0mero llamando a FANTECH, lNC tel6i0no 941-
351-2947. Por tavor lenga a la mano la laclura
2) El nfmelo RMA debe estar visible en la parle extetior de la caia' pues de lo :onlr:rio se
rechazar, la devoluci6n.
3) Todos los Droduclos dgvueltos deberrn enviarse con el ftete pagado pof anlici : !0 y
ac0mpaiados por una copia de la factura.
4) El oroducto sera reemplazado 0 reparado y devuelto al clienle No se aplicar'n cr't
rl rbs phturnos rnrtNTA (30) DfAs:
FANTECH, lNC., reemplazara cualquier producto c0n detecl0s de fabricacidn 0 de maleriales tl
produclo puede detolverse al lugal d0nde se compr6 o a la l,brica FANTECH, acompanado por
la laclufa. para ser teemplazado de inmediato
tlt Los PRIMERoS TRES 13l A[0s (erclrysndo ?l pert0d0 de 30 dias ya menclonad0]:
IANTECH, lNC., Ieemplazai{ cualquier protlucto c0n det€ct0s de labiicacidn 0 de maleriales El
product0 deberi devolverse a la l6brica FANTECH, acompaRado por la lactura e idenlili'ad0 cDn
el n0mero RMA.
Eu Et cuARro (4) Y oultlro (5) Afios:
feruffCl, tt',1C., ii parara o reemplazar, cualquier producto con delectos de labricaci6n o de
materiales El producto debere devolverse a la feblica FANtEcH, acompaffad0 Dor la lactula e
identilicado con el nim€ro RMA.
t s cABA[TlAs stcutE TEs N0 s0t{ APLIGAILES:
oin* portnuio. taan ocultos o visibles. Toda reclamaci6n deberd p esentafse a la companla
de transporte.
0an0s 0casi0nados por alambrad0 0 inslalaci6n delicientes.
Dai0s ocasionad0s p0r lendmen0s naturales o por plocedimiento!' inadecuad0s d€l clienl€
c0m0:
Mantenimiento incorlecto
Mal uso, abus0, uso anormal, accidentes
V0ltaie 0 c0rrienle el6clrica incoffeclos
Remocidn o altericidn del nfmero de conkol 0 la l€cha de labllcacidn que aparecen en la
etiqu€ta FAt{TECH,
Cu;lquier otra 0aranlia. ya sea expllcita. por escrlto o implicita; daRos incidenles 0 consecuentes:
pdrdiba de bienes, ingrisos o ganancias: costos de remoci6n, instalacidn 0 reinstalacidn p0r
violacidn de la garantia.
vrurDAcrd[ DE tA GARA TIA:
it usuario linal oebe conservar unr copia de la factura para que pueda verificarse la lecha de
LltllllATl0ll 0F wlnnlrw All0 LlaSlllTY
;,'li$f;;ti;i.ii#f;'i,:.,.i.6i"ri'iii1jioiiiii'iiti.ia]lji..iieqdantlaili'ages,sott'eao-ove|imiiation6and.rc|UsJons
l.lttllE 0E u G^nlmlt El0E nEsPollsAtll'llt
i'iiiirri,"i' ,t" ,tii.ioii o"eas o.rmd.i"cts. it se o',rt i6nc qxe (e< lrnilatolsou 64lusions ne vous so,e"l oas lpplicables.
u lrlH0il 0E GAnll|IllY ntsPotlsllltl0r0
en su nombre olres responsabilil
quiz, no se apliqugn en so caso
I
------v
:,
ArFYD Inlbrmruon
Actfhr ffiXxllm
Corut TVn6:
Paicd: 2lOlGa6?0O3
ApDllccnt
Ccilacbr:
Owner:
Dercrlp0m:
lhm:
fhm:
lam:
lhm:lfr:hm:kr:
*."ffi &MECH srblg: Acori
SFURP
S}IARP
SPECTRI*I hTAGI},IG,
SPECTRT.|II IhIAGIMihE
I/ENTILATIOhI
Phon€:
Phonc:
970.€8&3499
s7066&3499
Raorsbd lnrpccton(s I
lbm: 300 ilECHSlnrl
A|slgn€d To:
Actlon:
lnsoacoon Hlsiorv
Tlmo F:xp: ____;
R.qudor: SI{ARPAHOOTERSPECTRI il' htAohgfrytfl.
?O0 UECtfRomh
z/fl, PLHBGI8FIDIm
310 lrECll-fldrh -
320 llEcl.l-Exhord l{00de3S MECI+SuDplyA&340 tlEcl+tiac. '
Sn ltrCtlFtrd
Fcquest€d 'ilme: Ot:(Xl At' hori.: 97D66&34S
Erfied By: LC.AIPBELL K
(OtflonaD(Wonalr(oph)
{Wonolf(ooddnall(ffind)
(Ra$hed)
nLd9A Lt"Y rrtr.ll ,rt f | 1l
tttrt -n r r,/lLtr . ^41'./\V fr,Lf
\nl
Slrtr: FSTIEDlmpAlf: .rRM
REPTl31 Rlrn 42L
oo
TOWN OF'VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
97 0-47 9 -2L38
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE
ADD/ALT COMM BUILD
POSTED ON JOBSITE AT ALI, TIMES
PERMT Permit #: 897-0175
APPLICANT CONSTRUCTION DESIGN ASSOCIATES Phoner 3033937590
5250 LEETSDALE DR, DENVER CO 80222
CONTRACTOR CONSTRUCTION DESIGN ASSOCIATES Phone: 3033937590
5250 LEETSDALE DR, DENVER CO 80222OWNER SERENDIPITY LIMITED
501 W BROADWAY 19TH FL, SAN DIEGO CA 921013598
Description:
INTERIOR REMODEL OF COMM SPACE
Occupancy: 82 B2
Type Construction: II l-HR Type II l-Hour
Type Occupancy:
Valuation: 9 r 800 Add Sq Ft:
Fireotace InforDation: Rest ri cted:fof Gas Appt i ances:#0f 6as Logs:fOf llood/Pa I Let:
****************t************tt*t************************ff FEE SUI'1t'IARY ***********************ff***t*****************f***********
Job Address
Location. . .
Parcel No. .Project No.
227 BRIDGE ST
COVERED BRIDGE BLDG
2101-0 82- 67 -OO2
Status. . .
( Il,tAGApplied. .
Issued...
Expires. .
.00 Totat Catcutated Fces--->.00 Add'itionaL fees--------->
ISSUED
RO6 /24 /ree7
o6 /24 / reeT
12/2t/Lee7
!42.25
-5.30
338.95> 138.95
Bui Ldi ng-----)
PLan check--->
Investigation>
tli l. L CaL L---->
Restuarant P lan Revi ew-->
DRB Fee--------
145.OO
94.25
.00 Recreation Fee---------->
3.00 C Lean-l.Jp Deposi t-------->.00
10o.00
Totat Permit tee-------->
Payments
***************************r***********llll*t*Iff:;;;;;;;;iiii**********lli;ii*******il!*15-ll5;;;;;;i**iiii***********ill***
Item: .05100 BUILDING DEPARTMENT Dept: BUILDING Division:06/24/1997 CHARLIE AcLion: APPR CHARLIE DAVIS
I!e,t;',9!490_PLANNING DEPARTMENT Dept: PLANNING Division:06/24/I99'I CHARLIE ACTiON: APPR N/AI!e,I;',9Iq90 FIRE DEPARTMENT Dept: FIRE Division:
9F/24/!9_9_7_CHARLIE Action: AppR N/AI!e4i',9!5q0_PuqtIc woRKS Depr: pUB woRK Division:06/24/1997 CHARLTE Acrion: AppR N/A
,r**ff******ff**********t***t*lr***********************t*******t*********************************Jc**********************ff**********
See Page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I. hcrcby .acknovtedge that I have read this apptication, fitl,cd out in ful,l. thc information requi rcd, compteted an
P[6n, and etate that atl the information provided as rcqui red is corrsct. I agree to compl,y with the in?ormation
to.compty with att TolJn ordinances and state [a]rs, and to buitd this stfucture according to'the Town's zoning andcodes, design revieu approved/ Uniform BuiLding Code and other ondinances of the Toun
REOUESTS TOR INSPECTIONS SHALL BE I,IADE TIIENTY-FOUR HOURS IN ADVANCE
Send Ctean-Up Deposit To: CoNSTRUCTIoN DESIGN ASSOCIATES
cabte thereto.
OR AT OUR OFFICE IROI'I
lccuratc ptot
and plot pLEn,
subdi vi si on
OR COIITRACTOR T AND OI.'NER
********************************************************************************
CONDITIONSPermit #: 897-0175 ae of 06/25/97 Status: TSSUED
*******************tr************************************************************
Permit Type: ADD/ALT COMM BUILD PERMT Applied: O6/24/L997
Applicant: CoNSTRUCTION DESIGN ASSOCIATES Issued: 06/24/1997
303393?590 To Expire I L2/2L/1997
Job Address:Location: COVERED BRIDGE BLDG (IMAGES OF NATURE)Parcel No: 2101-082-67-002
Description:
INTERIOR REMODEI-, OF COMM SPACE
Conditions:1. FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE
STARTED.2. FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.3. ALI-, WORK PERMITTED IS FOR INTERIOR ONiJY
TOWN OF VAII,
75 S. FRONTAGE ROAD
VAIL, CO 81657
9't0-479-2L38
DRB Fee
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON
EI,ECTRICAI., PERM]T
JOBSITE AT ALL TIMES
Permit #: E97-0131
Status...: ISSUED
IMAGApplied. . : R06/3 0 / 1997
rssued... ! o6/30/1997Expires..: 12/27/1997
Phone: 303-978-1880
Phone:303-978-1880
APPLICANT SERVICE ELECTRTC
PO BOX 621279, LTTTLETON CO 80162
CONTRACTOR SERVICE ELECTRIC
PO BOX 621279, LTTTLETON CO 80162
OWNER SERENDIPITY LIMITED
501 W BROADWAY 19TH FL, SAN DrEGO CA
Description! ELEC FOR INTERTOR REMODEL
Job Address
Location...
Parcel No..Project No.
.m
3.00
53. OO
227 BRIDGE ST
COVERED BRIDGE BLDG (
2101-082-67 -002
PRJg7-0117
921013598
Valuation:1, 000. oo
***************ft******t************ff****i*t************** FEE SU}1iIARy ***r******************************************************
E Iectri cat--->50.00 Totat catcutated Fees--->
Additionat Fees--------->
TotaI Permit Fee-------->
53 .00
.00
53.00
53.00
.00
lnvestigation>
l.l i Lt ca l.l.---->
TOTAL FEES--->. BALANCEDUE------------->
***lr*********************ff***Jri*ff*ffJr*****t******l**********************************************t********t******ff*ff****rrt*****
Item: -06000 ELECTRICAL DEPARTMENT Dept3 BUILDING Division:06/30/L997 CHARLIE Action: APPR FOR ELEC DEPTIt'em:' 05600 FIRE DEPARTMENT Dept: FIRE Division:
****tl**Jr*************************t************************t**f,t*t***************t*t***ff***ff***ff******ff**ttt*****************
COND]TION OF APPROVAL
1. FIELD INSPECTIONS ARE REQUIRED TO CHECK F'OR CODE COMPLIANCE.
***********t*fi**********f,******f*****i****f,i*t*ff**************i*********ft*****H***#**************************************
DECLARAT]ONS
I hereby acknovtedge that I have read this apptication, fitted out in futt the information required, compteted an accurate ptotptan, and state that att the information provided as requi red is correct. t agree to compl,y Hith the information and pl.ot ptan,to comply vith al'|, Tovn ordinances and state [avs, and to buil,d this structure according to the ToHnrs zoning and subdivision
codes, design reviev approved/ Uniforn Buitding code and other ordinances of the Town appticabte thereto.
REouEsTs FoR INSPECTIoNS SHALL 8E IIADE TIIENTY-FOUR HoURS IN ADVANCE BY TELEPI]0NE Af 479-2138 OR AT OUR OFtlcE fRO[ 8:00 AH 5:OO Pl4
TOWN OF VAIL
75 S, FRONTAGE ROAD
VAIL, CO 81657
97 0-47 9-2L38
APPI.,ICANT
CONTRACTOR
OWNER
ADD/ALT COMM BUILD
POSTED ON JOBSITE AT ALL TIMES
PERMT Permit, #: 897-0175
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE
Job Address
Location. . .
Parcel No..Project No.
CONSTRUCTION DESIGN
5250 LEETSDALE DR,
CONSTRUCTION DESIGN
5250 LEETSDALE DR,
SERENDIPITY LIMITED
501 W BROADWAY 19TH
ASSOCIATES
DENVER CO 80222
ASSOCIATES
DENVER CO 80222
FL, SAN DIEGO
Phone: 3033937590
Phone: 3033937590
cA 921013598
227 BRIDGE ST STaTus...: APPROVED
COVERED BRIDGE BLDG (lMAGAppIied. . :RO6/24/I9972101-082-67-002 Issued...: 06/24/799'lExpires..: L2/2L/1997
Description:
INTERIOR REMODEL OF COMM SPACE
Occupancy: B2
Type Construction: II
Type Occupancy:
Valuation:
Firrptace Infoftation: Rest ri cted:
B2
1-HR Type II 1-Hour
9, 900
fot 6as AppI i ances:
Add Sq Ft:
flOf Gas Logs:fof tlood/Pal. Lct:
*|t*****ff***ffi*t**ffiffi*ffi**t***ff*#ffi**t***ff f EE SUllllARY ffi****ffi***Httntffi.rt*rrrlrrrt*****ff**ffi**t*******ffit*
Bui tdi ng-----)
Plan Check--->
Invest i gation>
lli tt cat L---->
Restuarant Ptan Revi ew--)
DRB Fee--------
Total. Cal,cutated Fees--->
AdditionaL Fees-------->
Total Permit Fee-------->
Payments-------
BALANCE DUE----
145. m
91.?5
.00
20.00
.00
100.00
362.?5
362.25
.00
362.25
.00
36?.25
.@ Recreation FcF-------->
3.00 Cl,ean-Up Dcpos i t------->
TOTAL FEES-----**ffi******t*i*ffi***ffitffi**t|*ffi*ffi**t**#*t*iffirttr$*Jrlr*ttr*ffiitr*trrttHrffi*ffi**t**ffi*ffiffi#*i*ff**
Ilemi .05100 BUTLDING DEPARTMENT Dept: BUILDING Division:06/24/1997 CHARLTE A-Eionl- EDFn cHanr,rE DAViSItqm:'.05400_PI,4NNING DEPARTMENT Dept: pLANNING Division:06/24/1997 CHARLIE ec€ion: ApFn H/aItem:'.05600^FIB_E DEPARTMENT _ Depr: FrRE Division:06/24/1997 CHARLIE action: APPR N/AIte$i'.05500_PqEI,Ig WORKS Depr: pUB woRK Division:06/24/1997 CHARLTE action: AppR N/A
********ffi******t*******tt|t*******ffi*****ffiffi*****ffi*ffi**Jrrtffiffi**ffi**r***ffi!t**ffirt***tr****t*ft**t*ffi**ffi*
See Page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I. hereby .acknovtcdge that I havc read.this appLication, fil,ted out in fuLl, the information required, coflplrted an accuratc ptotplan, and state that atl the infofnation provided as required is correct. I agrec to cornpty riith tire information and ptot jrtan,to compty with.l'l' ToHn ordinances -and state [aHs, and to buiLd this structure according iothe Tovn's zoning and suMivisioncodes, d.sign rcvicv approved, Uniforn BuiLding code and other ordinanccs of the tonn afpticabl.e thereto.
REOUESTS FOR INSPECTIONS SHALL BE IIADE TI,IENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROI{ 8:OO AI{ 5:OO PII
Send Ctean-Up Deposit To: CONSTRUCTION DESIGN ASSOCIAT€S SIGNATURE OF OI,INER OR CONTRACTOR FOR HTIISELF AND Oi,'NER
********************************************************************************
CONDITIONSPermit *: 897-01?5 ae of O6/24/97 Staru6: AppROvED********************************************************************************
Permit Type: ADD/ALT COMM BUrLD PERMT Applied: O6/24/L997Applicant: CONSTRUCTION DESIGN ASSOCIATES Issuedi 06/24/L9973033937590 To Expirez |2/ZL/L997
Job Address:Location: COVERED BRIDGE BLDG (IMAGES OF NAfURE)
Parcel- No: 2101-082-67-002
Description:
INTERIOR REMODEL OT COMM SPACE
Conditions:1. FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE
STARTED.2. FrELD TNSPECTTONS ARE REQUTRED TO CHECK FOR CODE COMPLTANCE.3. ALL WORK PERMITTED IS FOR INTERTOR ONLY
Jun-24-97 02:OOl P-()1
t-F_--
COT.ISTRUCTION DESIGN ASSOCIATES
tllilrlHt0it4COP^nffAY r 1292 r 0R,I/E.CQO0&O tl2lS3.15&;€t2 fAI: 3{D-75&dlE9 P GGt J0lSlO75
FACSII{IIE MESSAGE:
FAX T0: Charlie Davis
FRotit:
SUEJECT:
OATE:
IO FAX *
IIINIEER OF
Torn of Vail Buildinq Departnent
Shel ly l{ei ssoan
Inaoes of llature - 227 Bridqe Street
June 24. 1997
v97A-479-2452
PAGES T IilCII'DIIIG TIITS SHEEI
IF J0lJ Do.lr_oJ RECEM Att 0F THE PAGES. PLEASE CALL 303-758-7872
OtR FAx rlt|aER I5j 303. 758-8189
'::";il:r;;:iioi ;ll'r;::;"j:eddil oF vArL coNsrRu.'ronO PERlrr'i
'ARCEL f ?dlol-OB)-67'6od- pERl.lrr AppLrcATr-oN FoRM6-+lt-?7 - o*ez 6fJA/4?(^JfinNC FoR VttecEL idfc
. -APPLTCATION ITI'ST BE FII,IDD OI]:I COMPLETELY OR IT UAY NOT BE ACCEP{IEDI
f****************t************* pERI,IIT fNFORI'tATfoN rr********t*t****************t/./...-ty'l-srrtraitrg [ ]-Plunbing 1'{-Electrical I l-Mechanibal. [rf-other
Job Name:
I Descf
4 rob Addre esz fuf,!# ,t t 'rt*ttt,*'
B1
t
[ ] -New Ir/] -Af tlon I J-Additlonal [ ]-Repair [ ]-other
Nurnber of Dr.relling Units;Nunber of Accommodation Units:
Architect:
Work CI
Address:
Electrica
Address:
Plunbing Contractor:N*
Address:
I
Reg.NO.
Town of Vail Reg. lfO.
Phone Nurnber:
oFFrcE usE *********************i*********
BUTLDING PIAN CHECK FEE:
PEUI,IBING PL.AI{ CHECK TEE:
UECTIANICAI, PIAII CHECK FEE:
RECREATIOI{ FEE:
CI,E.AN-UP DEFOSIT:
TCIEAIJ PERUIT FEES:
Phone Number:
Town of VaiI Re<j.,/_E
Phone Nunber:
Town of Vail
Fhone Nunber:
l{echanical
Address:
contractorz NA
**r********t******************r* FoR
BUILDING PERI'{IT TEE:
PII'MBING PERI'IIT FEE 'UECIIAI{ICAL PERI.IIT FEE8
ELECTRIC}L FEE:
OTHER TYPE OF FEE:
DRB FEE:
BUTI,DING:
SIGNATT'RE:
ZONING:
SIGNATT'RE!
Comments:
: !.,.. ,:,! _,
-. ., ,]..
.'"f. ' i','1sr
:\ i,
). ' ',.' .'?l
26LB'l
naTE n5uLATE Ir'€6t-t sr-iaF'f waLL
Rfl:col -lcTl -18'7'l -
I_l
-[--"-:
ctz
E
=G,
ITJc
oOFN ct,oo(7'
0
uJ
uJl!
tr
=uJ
o-
L.)
@
ol
(o
El
el(u.cBt g
(ttl
GIJ >,< d-q,t6
dlE -,,PiO'r-vtlo d
tzra
t=
I
I
I
I
I
3tH.\\lo
ct)dl
rol
I
uJF
c,I
EFI
==
=z
frFozo
=o
ldl
.a
o
4z6
n
Px
P
oU
o
c
ll'
-tulu,
=i
Got!
oFo
GFzoo
(r
o
G
lrJziod
l! ltlar2;.3EoI lr,FI<F7oYZo<
EgEgg
EgEl;
:OEFE
gEFIE
g";
Es €SEiei
=
*E€E
iEEEg
iiiii
to
no
oIrt)(\l ro(o
O
o
d
oo
oo
-l
rf)
O)$l
tr
EEu,o.ozo
J
5o
x()
uJ!oz
Jo-
J
9
o
r.lJ
uJ
(,z
Io
==o-
J
Iz
o
uJ
=
r.lJ
UJt!zo
F
uJ
llJ
oG
o.D
=g
uJc.2I
af,uI
F
I
uJ
o.?z
uJ
()
x
F
u.l
<t,f
tt
IJJ
LIJlr
E
=t
IJJ4
J
FoF
z
o
@
o
EF()
uJ
qJ
z
=
J
Iz
I()
u,lE
NOllvn']VA
-Eo3-
l!C,OE2.9ctc
b_ cta.
oi
<ifrEzr-
uJ
=>E
-E.n
=urci
=aD$l
zz99i:c9XfF90atoz>89|l<og
hnd>()FOid
zI
k
u-
Eo
uJq
F
o
Ocr)
E
o-
uJG
J
z
E
o
zo
c,
IIJFJ
3
uJz
lltltl
g
z
z
-sn<oo<
=Exrr6o<z
at,F
2,.g=
fi(,}E
u,l
f
E
U)lIzY
iF
zIF
5
oz
attJJ
=F
ul
3
o
-.rl<ltrl
zl
zl
.. >lo
uto
UJul2
E
cE
uJ
o-
zI
tr
o2
Fo
Et
z
Y
(\l
I
co
d.-
c!orl
C\/OO
zo9
=eaoo
=zjfJc)tL tI-
:f*
dHs
l!F
q,
@oazo
Fo-
uJY
ut
c0
oFt
tr
UJ
o-bl>gEXO-irl
H-p
l-tzo
F
=Eluo.t!oEgE3€uB9!La9'58
E dEE FH: =oE 8bI ltuEXO-E Xaaul
€;
IJJ
@oF
rR
\ k-i llE\z/J=
II.-
E
=E.lrlg-
z9F(JfE
6zo()
!D!
';
atItt
\
l,l
l;l
Jsl
itll>
l+tzFio=JII
@'oI
oE
cD
.Jl
ii
=z
.oo-.|
i!
1
Y
c
1ul
=4
P(n
ocn!
!
co
T\
GI(\l
at
uJ
d,
t
LfIJ.n
F
I
sL
n|
6 =ctl
u,/c,
J
=
G
F6
l"-l=fq) co
4 r-{
a
.Teotd
+H
Ss
"t btzd3SP
rc|(")r\lrt
It\(\l
c
!.F
o
c
.F
o
tc|r
IJ
(\,1
(f)
!-l
oz
ti
IIJ
J
tt
z3oF =c,
l!
(,
IIJ](El
J
iqz3oF
g
II
.iz
.;
ut
IE
J
l!oz3oF
ctz
cittE
J
tto
23oF
UJJ
IJJ'F'
G,
uJz
=o
Fou,
EI()E
E
-rO<FEa)
lrJ <ze,ljJ F.nZ-oo
J
()
g,
F
C)u,-'tll
E
?)(
=))
('z
6
=Jo-
?
I
z
iE
i3
gF
oFl*o
=+EFt-o2 oo
J<oasn36
-
EEN
b-o
Sug
sbE
F.9 .rt
€rEC'= €!ssc L x'
or!=5u 3'
-oo=EF:E; I
6 d i.j
E E}ig E 9n
.€ Ft
*E e.r
ii -.C ara= € F
i'E;s?=Eoc o- c
:E s5
Dtl C ()
;EgH
.as5;6s t',ag:;
or= st IrE.c E i
3Eu:o >'i tql=:;
FF*;i
E:e i
cLo - tE(|)./rC
8 FE;
l_
t3
I
lg
6
,l\'
I
(,/)
tl'l!IL
F
L!
J
oF
I
I
I diiul
o'z
O(z-,
6.?lv
@€^c,>E\z)olNI
lg
r6
x
F
Itl
z
u,
I
o
o
-lr'lt
z
6
!!
z
OrJ
z
=
z.
C)
UJ
a!
o
ll.l
NO[vn.lvA
troD
z
<gPz?
aoo
=zde
IJ
| ,^.< 5
aif
=:iru@ur=
E60
h
lrF.O--'tr-tttOd
E<Ztt,<:z
Pc<. :aEoF><
agouJ
dt-br
E-=l
o-- !r_, I> o-lcqu-llEoli url5-.lolo--:lu{:-' I
J:-.q.I
Ul-
3,1d
e'
eI
-c
et
.E
c
Eo
C)
:io
t-trl:5
'--a0
:r-f -=si rrr|
t_io)
0)s.o
v
Lo
3r
ildtlr
ctu,
urt4lz
=EqJ
_t
zo
o
II
I
z
z9q,5?9dXEo:
<2
-o
=2u-
2Z>o
-o-Eo
qto
qJ
z.rlJ|9X
=G
ur=',\a
=
z
tr33coFE9o
YOvz3E|rl5o- (J>c)Fo'
le-\
:.q
X.l
\r1
I
FI
z('
u,l
Gl
-4il
EI
3l
o2
19
u,ll
JI
<lilol
zl;l
F?
oi.o ()
Izr
C'lJ
=
9F
s3)td6
C'
<oC)F
^-- C)
=<iJgu=
JO<l-
c< c)lt<
LIJ F9zo
C)
Fc)
uJt-
(J
\t
r.r- ElE<
>GtOL,
_J
\u\
di
=zl
ol')l
J< (-)o6ll, lJ.l
Ys /q\ 1v-r s 1\qi t:'v
.tr'-;. \r
' -'l t .:,,t"t or 'woVL,1 t"''-
BOYDSON CONSTRUCTION COMPANY INC.
STEVE BOYD o BOX5O5. ValL. CoLoRADO 81657 . 476.3344
II tr :,. Y. .--,/ /'l -Llit , I -r / vvl U
iJ6n 'nt 1i 11 tt i
1'' trr;'! j r rtl ,'\ lzAbf
,("'
\
,/r"'
,t
crt:
)o
lo f.*{ 1n ..t f/ovre;.o re\
2
1?
4c'
-'-
4
=sa
l"
-s
st:
a
?
<t€o
v
.1i
\}1(l
,lF--' -.z =..'r'a./,.2-'e-? .l.J.,
112 a\
€€
F\<-
,\lo/ lt 9"dlq
BOYDSON CONSTRUCTION COMPANY INC.
STEVE BoyD r Box5O5. VA|L. CoLoFADo 81657 .4-76.3344
h \tt ) ,tt -i,r, ,l-r'*,,r
a
.:,/6w,,t 1t tj r, )
y, -o /'6 0r!'r
;7 t c\' tfu"t
"
- -'t
gttLll l'tq ..\
r --' \r '/
0 r nnoVL
/
/+
a\
)o
. ,/nLouill
l-t{^ JVI.-2- tt I- '.\1
'L,:
/t'l
,t1"i\i\t
\
I
ir44 |
4nB.A. v.--\
q$/t
;r0 lJ:,t-(' 7, aa^ -t-
I
5/ o r og-t 0
v
s1.il
I
I
I
.,
€4)- zFo n4
/2 \ce
S,-\ -nE) u+/ s>t&- 4\j- , ,lru a itr 'v .-'l u, L c Yc de "->? .Jo -s >_/7o?
/tF---...
:\
_ar-F \
I'-a^AT
!i
Alol I t gutLa
oo* t- / z s- /8 {o"
r , l.r -)
.-'+- I L,' C--
PERMIT NUMBER OF PROJECT
INSPECTION:MON
INSPECTION
TOWN OF
.-\11 t'7-1
REOUEST
VAIL
AM iPM /''..--,,'
NAME
CALLER *, ()
READY FOR
LOCATION:
TUES G' THUR FRI
BU
trl
trl
alltr'
tr
trl
tr
ILDING:PLUMB!NG:
FOOTINGS / STEEL tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
FOUNDATION / STEEL
FRAMING
ROOF & SHEER tr GAS PIPINGPLYWOOD NAILING
INSULATION O POOL / H. TUB
SHEETROCK NAIL EI
O FINAL tr FINAL
ELE
trl
trF
oc
tr
CTRICAL:MECHANICAL:
TEMP. POWER tr HEATING
ROUGH tr EXHAUST HOODS
CONDUIT O SUPPLY AIR
tr
tr FINAL tr FINAL
APPROVED
)RRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIBED
^1.?''Jb- v ")DATE
' lh. P nbry,v. i
il
PERMIT NUMBER OF PROJECT
DATE
CALLER
READY FOR INSPEGTION:MON TUES
z {let'-' JoB NAME ltt ct
LOCATION:
7\ou ;
INSPECTIONr TOWN OFI luShoy
q,,1-
THUR FRIr
REOUEST
VAIL
(
ct
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING u
tr
tr
tr
n
ROUGH / WATER
- ROOF & SHEEBu ptYwooo NATLING GAS PIPING
tr INSULATION POOL / H. TUB
tr SHEETROCK NAIL
n
tr FINAL tr FINAL ,.
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
{ noucn tr EXHAUST HOODS
tr CONDUIT
n
tr SUPPLY AIR
n
lb*unr-tr FINAL
y'neenoveo .64coRREcrroNS
-
tr DISAPPROVED tr REINSPECTION REQUIRED
INSPECTOR
I
rNs CTION REQUEST
TOWN OF VAIL
-) y't t/
t?/'1.0c- r.
Ffi! ,/ -AM
t
PE
t\ / ,"r -)
/- I t-t t--
)h
INSPECTION:
NAME
CALLER
MON TUES WED PMREADY FOR
LOCATION:
PERMIT NUMBER OF PROJYN
oor. 6 f :. s-/trs' ,o,
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
D FOUNDATION / STEEL
tr FRAMING
r_r ROOF & SHEER" PLYWOOD NAILING tr GAS PIPING
tr INSULATION POOL / H. TUB
SHEETROCK NAIL
O FINAL
tr HEATING
tr ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIB
tr FINAL tr FINAL
tr DISAPPROVED tr REINSPECTION REQUIRED
CORREGTIONS:
,or= /t1-2)-tf rNSpEcroR
a
NS PECTION
TOWN OF
REQUEST
VAIL
JOB NAME
CALLER
READY FOR
LOCATION:
PERMIT NUMB R OF PROJECT
roN:
BUILD!NG:PLUIIBING:
tr UNDEFGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
o
tr
tr
tr
tr
o
Ph
FOOTINGS / STEEL
FOUNDATION / STEEL
FRAMING
ROOF & SHEER
PLYWOOD NAILING tr
tr
o
GAS PIPING
INSULATION
SHEETROCK
POOL / H. TUB
NAIL
FINAL
tr
tr FINAL
Ellcrnrcn-'
tr TEMP. POWER
MECHANICAL:t;
tr HEATING
tr ROUGH B EXHAUST HOODS
tr CONDUIT
rl
tr SUPPLY AIR
o
E E+fiAL O FINAL
'ffiRovED
tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
'? /.., ,f 4'DATE ,"/(t-y' t INSPECTOR
m
I
INSPECTION REQUEST
TOWN OF VAIL
THUR FRI @PM
I
n/'L a-,I NAME
MON
CALLER
TUES @READY FOR
LOCATION:
ECT
INSPECTION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER" PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL
tr FINAL tr FINAL .'
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr FINAL
APPROVED tr DISAPPROVED tr REINSPECTION BEOUIRED
io*r=c'o*o4
oor= 7- z 7 - Ff rNSPEcroR
(\|
€r-{€6
(\I
@
I
@(\l
I(0
uJ
(t)ooazo
Fo-
Lu
!<
luo
oF
F
=E
uJ
o-
lt.p>ooo
I
ulFoz
utts
o
z
(59ze
aoo
=zJc'(L IJ-
J
=H:=;i,ioE;E
t
=tulo-t!oEE2zE<ctf€8E9EA
'e'EE
=>FJI-
= lll i-
E FE: =oE 8b9 \urEXO_E XTEulo-irrE
ulooF
-f
-
F
=Elrlo.zorl-oDEFazo(J
nrn
oz
E
=e.ulo.
;Elis
5;;EE
s-; Ei €
I lllFI<F2rr92o<
Fguf e
EE -o- !sE;eI.9=aPE
EEEEE
:-*E 5co6 0'-E -G;O('|C
ee ?.3 €
t!Jq,l
ah
=I
Gol!
EoFo
cE
ld
IE
Eg
EE
E3
fiH
3q
fiH;flctI
oF
=24>*
;nEE
?- 9- .Y5 = E?9 3=dl<iiEstEsbo(5(Jrz
I
I
I
Iol
=.1ol
r.ultrl
JI
<l>l
l!lol
zl
3lo|FI
oo!I(u
d.
(Ut-oP
<
o0)E
L
E(l,L(U
o(J
ri,i
=zoo-)
ol
uJl
5l
3l
tLlol
slolFI
(U
-szC'o,
o,d,
I!q,
E
=E
=tr
JI
<l>lttlol
zl
3lolFI
I
:l
it
fli
F()
ul
ET()E
F
e.Fz
()
2P9?zE3Fd3
t-E;rul
F;o2 oo
.
t
&DD
oz
t
=E
uJo-
<too
t!
(tlll
IUu-
ts
=t
IJJ
o-
' ,4 ,)l ','4"":! 1'',1 ' '/,
:)\tl,I t44[,^;I
I
l.,
.Ft<to
I
I
I
(t
e.
I
==
zz
.4(u
o
.f,
<U(Jc
G'c
itia
t-t
4,
o1Cz4);i o,
=cis
.5C
g"g
z
h
tluz;o
ut7
oz
o)
BsOo)
stFe\,p
59.
:9 -e'
E.5-ocaepF
EC
o)4.c at\
C.tooNO-oIC6'
eE'FO
cb!€oo
PF
E8oo
EC)6oD
s€-'=9d
6E
oO
El
-E.9q9
oogG
";o.9
asE
--- 0)
EtiE
ebE
eoq,.e; I89trc.= O
E8Ec-o
e:5
;gPG>=c9c'- cL-c
EEE
E E-F:€8
9;Bg=E
0.(5 cL*Ei
oP o-sf;e
E6:EE E
E C.E
EF.E: a.9
-r. C6 0'-c= o
gE=
'6>.9 6E-
-i:Eti8
.3.fe9Eor
eEg
-oG
ero
GJ(Y)
oo
(\,
oo
o
orJ)
aY,rr)
E
=Eul
o-ozo
=
Yoru
C)z
d
J
9
G,FolU
arJ
z6
=)
oz
oqJ
=
u.l
UJltz
tr
UJ
IJJE
o
oo
=g
IJJEz
6
uJ
uJ
z
J
Q
x
F
ut
C"
(t)lll
UJFh
=t
UJd
J
h.q
F
(,2
=
J
o
o
u,l
ul
z
6
=J
=
C)tt
=
NOtrvn'IvA
c:I+
T
I
r+
cI
I
oI
\
C(
I
C
rlrl
t
n
cF
xGo3t!oz
tr
E
uJ
e
u,lz
UJo
=>E
_E.r,
3tu.$
=aOGl
zz99g5F90qroz>-ooozr!<o*
.r- O;oFO
zo
lJ
E
ciar,
IJJo-
F
oc)c)
N
o-
IJJc
zo
Eoo
z
tr
llt
J
=ulz
||tlSrll
= ."2=?
=
E
6gfiF
=88!g H : s,< o o f.rlltl||rl
F?ia
= i rH2 3=d.l:3 iEg;t H5ooorz
zo
F
-tftt)z
gJ
UJ-
ii
0
olu
tr
ooo
=
llJz!
=
(\I
I
co
UJ
F
-=*<!Lx30
JFY
uJ
l.,s
NF,5
rr{j'f,.)
Gl@t
(\l
Iro
'l
\\lu
U)oo.:
zo
Fo.utY
ulo
tr
I
I
uJF
o
oF
E
Glll.L
.lte
\a,
I
ulFo'z
nntr
=:
IElu
o-
l!o
EgE<llf€frE9EEa9
=EE dLEFSo dtr! 3tE oo9 lutE XA-E ;Tau{€=
1!
@oF
---
z
oPz_e
60
=zffJOo- u-
5fii
E
=E,
lrJ
o-zoF()
PFazo
C)
I
=.1ol
uJl
1l
al>l
t!lol
zl3olFI
ol
=.1olrul
5l
<l>l
xt
zl
=lolFI
I
I
3
:l
ult
olzl
cilull
5l
3lt!tol
zl
3lotFI
(U
J.(JoE
od,
II(u'(t3&
Eg
lt
I
I
I
I
I
.lol
=.1olull
5l
<l>l
I.|-|ol
zl
=lolFI
<,z
J
lJ-
(Ud
oLo+,
l,/,
o
Ct)E
6
'o
Eo
o(.,
ui
=z
(Do-)
E
2P
c3
f,F
-a zo
C)
d ir
+8,t-o2xnn
ltlF
o
0EoF
FIz
=
=z
I
I
I
I
I
I
I
I
I
I
I
t4IF
lo
I
I
I
I
I
I
I
to
IE
U'
rlJ
uJIL
F
=c
UJ
o-
lrJlll
CN
=Go
Gol-o
.EFzoo
Go
Gulz3od
|! IIJ6z;=E \.,
fl!FIsF26YZo<
o
o
oE
I
(o\.oeq
(E
c
3oF
q)
€.
o
al,
0,()q
(o
.sa
o
0)E
ooc6
oltoo
or
.EI
5
d!
E
o
=cf
d().
o
o.o
{E!
.9
c
.9
a,oD
a!;oDoo..l
d.E
-:o
o
lt
6
ot
.E
oN
-alt
3oF
q)c
o
o)
Eoo()
(lt
0,
o
.D
.ahE
Plo
o
oc(rt
a
3
E:go-6
'=qr(,,
g8E
s.e 3.: tt c)E9rc., .= (6
EFEc-o
=EF-i 'S =c96'- o. -c
EEE
E EEsooi=o
e;e
U:E
o.6 0-
sEE
(,'!O.
E€eE;i
E E.EO(!:i $E
- -o-.9
+.eC(! 0'-
5 -o-3
gEE
E8;o (!=
;frs9Ear
OEE!oct
-o(!
6
UJult!
E
=t
uJ
TL
FoF
oG
oo
3lll
l4lEz
6tuo
NOIIVN'IVA
zz9oq5
EP o
.aO6b<)z*s.',,
=uJ t:9UFOjtri
z9
F
J
UJ
J
zo
Eo
o
=x
tu
uJ
o()z
tttltltlr.l
FOrL<z!
FqJrE
Ot!do-z
F
Ed2tf<oO2E:<HsaEooo
zI
J
U)z
(!
l,
Cf
r{(3O
oz
E
=t
]U.L
LIF6dlo1zo
F
lllY
ulo
oFt
=0c1!o.I\r
ulF
o
I
llJFoz
z.
o9
=e,to o\l
=z.i
=s$
tr
Gu,
lto4.. uJE9E<o.f€Ea9
:tE ir-
= ru :--
E FEx >(Li 8a
P \tsc;L.j x>(t ; r-.l 'i
!;
UJ(I)
o
/.(^B\' ri[=
\' .// te.,
t-i
ts
=g,
lrl
o-zo
l-(J
DGFazo
C)
tnn
"dg
=83;Hg
a
=J
a.t-
(D
F
J
\
\\\
\
EN
N
u;
z
o5
J
\l
\-t
Nj
rq
=z
gJ
o
Ja
=
I
I
E
\
\-\
l>I =Etr
uJEo
:
o-
\
F()
\$
.\
\{\
S
\E
E
z.
u.l
51
?l>l
ttlol
zl
3lolFI
\
,N\
I
\
3
UJF
=Gtr
o.z
o
UJ(r
J
tl.oz3
F =
tr
ciz
o
UJ
z.3I =E-
z
o
UJ
ar)
a
]Loz
3lI
r.uz3
F
tJJ
T(J
&
<F
IJJ <zE(rzo
J(r<o()F
FSO-\z
13
E('ozI-;o
=<-E)zu-o
<;
=Fa<
Og
2 :-1
::: \J
e)l)
<Oo2
JO
I
nlt I
Jq
N
I
oz
E
=e
uJo-
,4,f)
n
2,7
'/n/L/
r)
t
IJJ
trooo-zo
Fo-
IJJY
uJ
d)
oF
F
=bEorllJ F{
o-
5Rlr'-l6'ilOo.l;<lrl
Hul
2E
Iz
Iolu
=D
ItF
C)
IJJ
tra
L>4
oz
o!
6
fl
t
=s
o-tt
;1{E>.E<al€fre9ELb95EF 1tl-
=ut:-E b=o dfi: >o-; 8b9 iurE XO_t x>t q-o-!E
uJ
@oF
z(,9ze
d)o
=zd9
E
=e
lrJ
o-zoF
C)3EF(nzoo
nttr
-I
-
I
I
l.,
.Ft<to
I
I
I
I
'- .<.r lo!er
I
I
I
IuJlJINI
<l
-J IJ
-t6t- tu-.n t*.
Eli"fi',B; €.E, IH
BHI;E I;
EgiiF]E
iEiiiNHE
rEig!
!EEsgat O'- .= -E:O(DC
g,f;; g €
igii$
NOtrvn]vA
tltl
= ll
3 : . lfl_ _ ., lo{
=
: f lH
YoaEI
9HZ Z r! Olo oo Itr ^ -,!, Z-lI 5 > eaE E O EC
6'?, f1b { ;dTg E-4
H(vOl
zl
.. >lo
uJ
lltujz
U't
E
UJc
z
E
bl
zl
=lolFI
=.1olurl
5l
=l
I
I
I
FI
JI
<lil
el l
I
I
I
I
I
rl
ol
"'l
*lol
fl
at1UI
o
F(Jt!
-)Ld
UIa-
F
oz
,;
ul
J
a
ttoz3o
(\lto(o
I
Or<f
Or
U.Jd.
U)
IrlI
c€
UJ
=z
.D
2?
=Ed3
C)
ot-E. i.,g+Eo2
-.r O<FE()uJ<ztUJF
O
J
EFc)
uJJ
;E;9c l;
EgE;I In
€ EE:3-8 lf
I;;;: ..lF
iFiig $l
gtiei -
g;o65
tE'; iE' i
-- t- Js(! 0'-: - ':v.c; o o a :f
.. d)= o O /':YFEsEE n9P € 5'E /'):Fi;i i*fE:a 1
iE$ii fr
:iE E5,
,,
I
IJl
,: tl'
> G, tl '
- r ,'r -l\i ur 3 rln
=6or'll
-,,
!sZZU-I 9 o!
pa
=FS
F ? fir
s g Eir ar or.
zl
.. >louto
uJ
uJzo
ts
=ltJ
J
zI
tro
,^clr, O
co +,<roOCH.t'J-
o-x<(t,
l)- t^,-{ O)vg
.=gctan,u)!|l'
@o+,!o
(JE
L'
(F
an+)
OJtn
(\J
Lrts
!
o,+)+,
c,J
F
Ee.!.Jc
z,
J
L!
d.oLr-
olrJolrl
IJz,
lt',
z.
=o
-lJaLl-
llj
E
@
c0o-zo
Fo-ulY
ulgl
oF
F
=E- llt-- -o-i:'r!'-llOU, I> .-lo-\21orqo rJt4g-';
2E
u.t
F F. c\l
I
I
JJ6
oz
Jtr
Fo
li
I
It.\t'\t:
$?
\-
.\
\
tt
url
=l<lzl
cololll
ll
'\l
I\l
\l'sl -<l o-
c\l
sl
\l
ul
olct{J>
=o
\^
I
I
I
lo.
I
I
I
)
frq
CTq
J35
l.l
Jfl,
il .l
;l *l I
"l 3)
ilHr
HrI El
ll
l.llzlloltHl
ldi
dflpl
I
I
I
ol
=.1ol
q
<l>lLIol
zl
3lolH
I
I
.lzl
c;l
ql
'l'
=tr
UJz
=o
Fo
UJF
o
G
-rO<FcouJ<ZE
IIJ FaZo
C)
Jt.
5P
E3fiF-,2r
2?
E?
=oafFd6()
i5::F
<3;iF
5g
E,hgY
*Eo2
o
J<o<t !).5HI
><x
z.r9
=e.(Do
=zd8
EBi
=HE
,ri fd><(E
UJ91 t
\/|lEo
Es $E^ -.4!!x Ii-vll! O
-F G
.= tJ-t ;sffE
=> Ul --
€=!F:-r 3 69El urEu-x o-
Eue r
€$E
r3TF**
F
=&
lrJo-zoF()fEFazo(J
DDI
G=
-E'
xXXxx.
!B!
-6*) k ,-, /... (4 '.' /
a
INSPECTION REQUEST
PERMIT NUMBER OF PROJECT VAIL
oora tt'/
INSPECTION:
CALLER
TUES WED THUR FRIREADY FOR
LOCATION:
BUILDING:
tr FOOTINGS
D FOUNDATI
O FRAMING
/ STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr GAS PIPING
-tr POOL / H. TUB _
tr_
r-r _
O FINAL
MECHANICAL:
ON / STEEL
,.-,, ROOF & SHEEB" PLYWOOD NAILING
tr INSULATION
tr SHEETROCK NAIL
tr FINAL
ELECTRIGAL:
tr TEMP. POWER D HEATING
tr ROUGH O EXHAUST HOODS
tr CONDUIT tr SUPPLY AIB
o tr
DFINAL FINAL
,EI APPROVED
CORRECTIONS:
tr DISAPPROVED T] REINSPECTION REOUIRED
DATE INSPECTOR
oz
E
=E
uJ
o-
ooo
olr)
o
o
o
ooo
af,ul
UJt!
E
t
UJc
- Le -b eo-Q
41r Oe +\h-clx
*-
'lJ$
Ng
I
t,
lx
I
I
I
l-,oIFt<(E
IFtvtz
IE
t2,zlo
!
.!
{Ja
o
+Jo
an
o
o
uJF
z
oz
6J
o
.6
ozzo
+JL(U
o!
(o
+,
=oE
o
EoE
.0es, O.';o
E6-oc;EpF
sEor-CO'Eq
ooNCI
-of;cc
;EFo
eb!€oo
PF
E€oo
8o6oD
o-S
=E
Ed
atc
€€.of
-E'ogq9
CLEO.c(!t=
.t 0)t';.!E
.9o(,E
gi
0,.ttr
o
.9
U'
=o
o
o
E .;
rD ti ro
'=90'
g8E
EEg
F8Ec-oc:i
:EPd'i =c96'- cL<
EEE
EEA
--: (t
3eets! i.=- 6
o.(u cLsEio=E
-a 9u'(5C
E6:e: E
E G.6
EFE_ag
s+ C6 0'-5ags*:
E 5'=EE;
9 6a
ii(g:6PE
.3"6 P
P6.arEEE!oo,
-o(E
Oq
(f)o
<\,1
oo
o(\t
oo oo
o
r.ct
vI
orrt(\l
c)
o
r,
Orf!
rOsf(\I
=EE
uJ
z6.J
@
:<
UJ
z
()
tF
uJJ
UJ
z6
E
)
z
uJ
ur
IJJu-zo
F
UJe.()
UIe
ao
=g
luE
z.oaul
F6
o-
IJJ
z
gJ)
x
F
ulo
o
ITJ
lr.lltt,
=Eu,
Jl
Fo
F
(,
z.oJf
@
9tF(,
uJJ
IJJ
oz6
=
c
J
Iz
()
uJ
=
NOTMtVA
*aAo>c
:ig
%
9oE!
ea(J-
fl.l-
i+rEF
EF
(.'tL
=>G
y6\p
zz
tr^6q5EP c)
oo5ba)zE<oqH6t(JFO;ni
ll-lq,l>
lo
l(Jl.Dlial(6
{
c)€o
o!
()
v,
zI
F
J
F
o
c
UJ
ooo
o(o
IJJc
J
z
Eoo
zo
E
IEurF
=uJz
l|llJrll
= "2z_zY*
F,, E $
=sEE8e'oz<ooftlttltttlt
?2!43 -= tH2 3 =d:sE iE3'EeHboo(Jlz
zo
F
J
utz
ul
J
uJ'r
;i
uJJ
UJ
oo3
.Jo
utzx
=
(\l
I
L
llJ
F
FibirPt-..1
CD{)rlrl
i)
)
uJ
Eo
co
r.?
zo
Fo-
uJ
!a
lrJ
dt
ulF
o
oF
E
=t
IIJo
tto
o-oo
I
uJ
z
z
<rPze(Do
=zJO(L rJ-
J
EEi
BHE
=trAltoEE22E<C!l€EB9Trk
'9'EE
=>E dtrE FE; >o-E 8a9 iurE XO_E ;Taul!'-!i
uJooF
---
E
=E,l!
o-z
9F(Jf
E,Fazo(J
t]8n
gIo
'oEt!t
tr4l
!(U!o
oct
LrJ
=z
(Do
-l
tl
tl
+J
4H
Et d
=
JI
<lil
E|
(Uiz(u
(I)d
I!q,E
=d
ctr
z:l
(,|
3lotFI
I
I
I
JoI'E
.F
q)
#
*.'f,+
+
Ht
I
ol
z:l
olull
5l
<l>l
I.L|ol
zl
3lotFI
I
I
I
I
cilzl
sl
:l
<l>l
rLl
el r
oL|F
?
E
E
-.,t o<Ftor!<ZE,
6Zo
C)
J
cF()
UJ)
c
9P
=#d6
E
F
E.Fz
Eht!*&.o2 oo
EEN
oz
ts
=G
UJG
tl
N
c
h
sl
€1
gl
il
0
YI
U
t\
s
\s
U'
uJ
IIJt!
..F
=e.
UJo-
I nrli{l
*iiEil
l'{ J{il
U
I
ItI
llJul
at,
i
|rot!
tEo
Go
G
UJz
=od
|rl'|J
:;Eof lltFI<F
6e(o<
o
oc
g
46o
o.c
o
ct
oEooo
.g:
@
E
o
=c:)
Eo
o
o.o.(,
3
.9
o
c.9
at(D
13
atoEo(J
ttc(!
F
lD
o
o,c
Eo(,(J
.E
E
=()
o
.9t
I
o
Ecq
di.;t(!
o
a!
c(E
oc,o
G
Eq
d
'|-
o
6
ct
oao
(E
c
.9
o
=
'3o.tr
oo
o
o
Eo)6
()
q)
oo
.9
Eo
C'
c)
ao6
E
c)
o
ot5i
=6.ct o
Eo-o9o(!C
6.8
fiC-.9
-6cF(Ei
=o
o'-a9o-=-L::d'(J>(u=cEc:pUfeEoEEOoto6
Eo
J
o
o
(!
E
o
c
o
ot
D
(6o
o
a^
o
o
6
@(,l
E
B
.Y
(E
o
o
c
0
n)
N)
q
rvl
o.I
0\
d
t\
0
\
\I I
ct
a
t1
0
I
\lrl
.I
Q
a
a
q
m
s
b
G
\.
"/
ffi
N
\ie
f9l=
foo
TK
I
rl
I
I
l-
'<r(J
l|!-lrr.
lc'
tZlo
t-J|:
l)s
tHi
led
I9
lg!
=
=Gluo-oz
o
x
UJ
C)z
Jc
aF
ur
at
z
co
=l
o.
Iz
rl,
=
o
ao
=UJ
rlJGz
6gJ
F
UJ
z
lll
o
x
F
u,
3t)
UJ
uJtf-t
=G
UJ.L
J
FoF
(5z
J
J
9E
Fou,
ut
oz
!o
=
J
(,
z
t!
=
\
N
NO|lVn'M
Nl\=>G
eqs
zz99h o- tt'
EA i
29E9lr<og
:g;tri
2o
F
e
F
o-
o
(,
u,a-
$\
\\
lu
t^t:l<zotr
6
:
2otr
uJFrl
^l
;lr!lzl
(,z2=
=3fsoEs9tro>ooz()fttttllttltrl
F
dq3 E9H =dt! F rlr
=-gE9r.Ol|JO0()!2
=o
E
a!
.D
I
I
2
z
tr
=E
o-!
zIF
J
<nz
u,
J
?
F
ITJ.'
utJ
uJ
o
B
UJz-I
$
,-(
\ta
-s
s
all
F
FibIIP
Fl
tr')rlr{rJ-:
z
.r9ze
coo
=zl:)
dP
;Ei
aHg
EEG
IJJ4EoEB9zE<ct]€aB9!Lb9'E .-
=>= u, :-
E FEE =*-c 669 itrtr xa_E ;=aqo-!i
lrJ
@oF
-et
UJFotoo
.-lzo
FrO-
uJY
1!o
oF
F
=EluG
ILo
o-oo
ItrF
o
I
UJFoz
)
F
=Eut
o-zo
l-
C)fEF
CNzo
C)
tratr
oz
=u-
LlJ
=zoo-)
Ec
)
(
I
E
dol
sl
sl
ruol
zl
3l
FI
?l(,l
uJl
5l
?l>l
l'|.tq
fl
tltlItltollzilsllallilI trltollzl
Eil
I
I
I
fl
;l
7lvOl l|JHF
-rO<FEa)
IJJ <ZE
IJJ F(nZo
E!20z.F
=<ZE
JZrro
F
z
()
Iz
7ollr
=
F
GFz
sdr
October 12, 1982
Town of Vail
Building Department
75 South Frontage Road West
Vail, CO. 81657
Attn: Gary Murrain
,----- .- ---==--
C", "."."* tt,at" t,
Dear Gary;
I inspected the gravel base at the entry stair'and it appears
oPen enough to provide adequate drainage to keep frost from forming
below the footings. Also, with the paving sealin$ moisture out of
the a rea to begin with, there should be no problem with frost.
Therefore, I believe the footing depth as constructed will
be acceptable.
Sincerely, A
./)V AJ/ ilIf J.Vc,--?-
Roger T. Landing
Ruoff/Wentworth Architects, AlA, PC
RTL/st
r ill"
Ruotr/\fGntworth
AfChiteCtS ?:r i:ilT'*#ii AIA
William J. Ruofl
Kenneth S. Wentworth
75 soulh tronlage road
vail, colorado 81657
(303) 476-7000 offlce of communlly develoPmenl
March 5, .1984
Ruder-Rei necke Construction
4496 E. Meadow Drive
Vail, Colorado 81657
RE: Covered Bridge Store
Building Permit #1166
Dear 8ob,
After checking our files, we find that you have not requested any
inspections oi the above named permit since November 15' 1982, this
inspection was for sheetrock naiI.
It is important that you contact th'is office immediately. . Your permit
has expjred on this iob, and we feel that you must renew the permit.
Your inrnediate attention within five days from the date of this 'letter
is requested.
Sincerely,
@24";
Gary Mtmajn
Building Inspector
75 3oulh tronlage road
vall, colorsdo 81657
(303) 476-7000 offlce of communllY develoPnenl
'July 3, 1984
Robert Ruder
Ruder-Rejne-cke. Cqns tf qcti on
4496 E. Meadqw'Drile
Vail, Colsrads,81657
RE; Perm.j.t #1166
Covered Bridge Store
Dear Bob,
Enclosed is a copy of the final Desi'gn Review Board inspection
review on the paving and landscaping.
You need to contact me regarding the final building inspection
and the final fire department inspect'ion.
l.le would like to clear this permit out of the files' so may we
hear from you within ten days.
Si ncerely,
Gary ltlfrrain
Building Inspector
GM/rme
CTION
TOWN OF
REOUEST
VAIL
JOB NAME
CALLER
INSPECTION: MON TUES WEDREADY FOR
LOCATION:
THUR (9
BUILDING:
F FOOTTNGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr
tr
tr
tr
tr
tr
tr
UNDERGROUND
ROUGH / D,W,V.
tr FRAMING ROUGH / WATER
tr
tr
tr
tr
ROOF & SHEER
PLYWOOD NAILING GAS PIPING
INSULATION POOL / H. TUB
SHEETFOCK NAIL
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP, POWER
MECHANIGAL:
tr HEATING
tr
tr
ROUGH tr
tr
EXHAUST HOODS
CONDUIT SUPPLY AIR
tr FilwL tr FINAL
D tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
INSPECTOR .DATE
t-.a"'
t
JOB NAME
rN#CTION REOUEST
TOWN OF VAIL
AM PM
) 'l/i | .t,'
DATE
HEADY FOR INSPECTION:
LOCATION: ,: !. t!.
CALLER
TUES WED
BUILDING:
tr FOOTINGS
tr FOUNDATI
tr FRAMING
/ STEEL
ON / STEEL
n ROOF & SHEER- PLYWOOD NAILING
tr INSULATION
tr SHEETROCK NAIL
tr
tr FINAL
PLUMBING:
- tr UNDERGROUND
_ tr ROUGH/D.W.V.
_ tr ROUGH/WATER
tr GAS PIPING
_ tr POOL / H. TUB
_tr
n
_ tr FINAL
MEGHANICAL:
_ tr HEATING
-
_ O EXHAUST HOODS
_ tr SUPPLY AIR
-
ELECTRICAL:
T] TEMP. POWER
AROUGHtr CONDUIT
tr
tr
B
FINAL tr FINAL
--.Fleenoveo
CORRECTIONS:
tr DISAPPROVED I] REINSPECTION REQUIRED
..r'INSPECTOR
,*#"toN neouisr
TOWN OF VAIL
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
t{/oN .
CALLER
TUES WED THUR FRI AM PM
i:.-'
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
B UNDEBGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
r.r ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr
tr
tr
tr
POOL / H. TUB
tr SHEETROCK NAIL
tr
tr FINAL FINAL
ELE
trT
4F
trc
tr-
CTRIGAL:MECHANIGAL:
TEMP. POWER tr HEATING
ROUGH tr EXHAUST HOODS
CONDUIT tr
tr
tr
SUPPLY AIR
tr FINAL FINAL
A APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
1
DATE INSPECTOR
,*#"toN *=ouisr
DATE
INSPECTION:
JOB NAME
MON
CALLER
-' 111$'" K(B THUR FRI PMAMREADY FOR
LOCATION:
PLUMBING:
g' 'roolHcs / srEEL ':;14/ /': tr UNDERGRoUND
tr FOUNDATION / STEEL - trROUGH/D,W.V.
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
tr POOL / H. TUB
ELECTRIGAL:
tr TEMP. POWEH tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT T] SUPPLY AIB
,/tr DISAPPROVED tr REINSPECTION REQUIRED
' coRREcloNS:
,*#"toN
-,: -, TOWN OF:-t.""1-7 (;
REOUEST
VAIL
DATE
READY FOR
LOCATION:
JOB NAME
,/;
., t l_t
CALLER
TUESIN$PECTION:
i'& t
wED Gi FRI \PM
,pkeeaoveo tr DISAPPROVED I}*ETNSPECTION REQUIRED
CORRECTIONS:
/, -.. ', 'a* t.* ,4 , / o{on} ....'t/ i!, ^21;.
BU
trl
trl
Rl
bt
ul
trr
tr
ILDING:PLUMBING:
FOOTINGS / STEEL tr
tr
o
tr
tr
tr
E
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATER
FOUNDATION / STEEL
FRAMING
,R OOF & SHEER GAS PIPINGPLYWOOD NAILING -
INSULATION POOL / H. TUB
SHEETROCK NAIL
tr FINAL tr FINAL
ELECTRICAL:MECHANIGAL:
tr
tr
tr
tr
TEMP. POWER tr HEATING
ROUGH tr
o
tr
tr
EXHAUST HOODS
CONDUIT SUPPLY AIR
,/'/
tr,FIFAL FINAL
DATE INSPECTOR
,"#"toNTOWN OF
REQUEST
VAIL
DATE JOB NAME
MONREADY FOR
LOCATION:
INSPECTION:
CALLER
TUES i
-,,.: -'\
WED,' THUR FRI PM
BUILDING:
tr FOOTINGS / STEEL
PLU[IBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
C] FRAMING
n ROOF & SHEER" PLYWOOD NAILING O GAS PIPING
tr,INSULATION
tr SHEETROCK
tr POOL / H, TUB
tr
tr FINAL
tr
tr
tr FINAL
ELEGTRICAL:
tr TEMP. POWER
ilECHANICAL:
tr HEATING
tr
tr
tr
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr
tr F|ML tr FINAL
tr DISAPPROVED tr REINSPECTION REOUIRED
CORRECTIONS:
DATE /2 I :- -. -
INSPECTOR
INSPECTION REQUEST
,l-tt I i -t -;.'< e.l LDATE
READY FOR
LOCATION:
INSPECTION:TUES / WED,' THUR,/
JOB NAME
MON
CALLER
FRI AM PM
TOWN OF VAIL
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGBOUND
tr ROUGH / D.W.V.
E'IJILIJINIJI;
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
tr FRAMING
- *oor & sHE-R ;-
" PLYWooD NAILING
O INSULATION
-
tr SHEETROCK NAIL
n_
O FINAL
ELECTRICAL:
tr TEMP. POWER
EROUGH ,I \,i ,
TI ROUGH / WATER
tr FOUNDATION / STEEL
tr GAS PIPING
tr POOL / H. TUB
tr
D
tr FINAL
MECHANIGAL:
tr HEATING
O EXHAUST HOODS
tr
tr
tr
CONDUIT tr SUPPLY AIB
FINAL
tr
tr FINAL
,,Vnnenoveo
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
DATE INSPECTOR
INSPECTION REQUEST
TOWN OF VAIL
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
CALLER
MON TUES
BUILDING:PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
FOOTINGS / STEEL
o
il
tr
tr
tr
tr
tr
FOUNDATION / STEEL
FRAMING .r L ,--\ lr 1-
I
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION
SHEETROCK
tr
tr
tr
POOL / H. TUB
NAIL
FINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr
tr
tr
tr
tr
HEATING
tr
n
tr
ROUGH EXHAUST HOODS
CONDUIT SUPPLY AIR
tr FDAL FINAL
VED
CORRECTIONS:
O DISAPPROVED O REINSPECTION REQUIRED
DATE
DATE
READY FOR
LOCATION:
JOB NAME
INSPECTION: MON
CALLER
TUES
a'V,//
BUILDING:
tr FOOTINGS / STEEL
PLUIIBING:
tr FOUNDATION / STEEL
tr
tr
tr
tr
tr
tr
r'l
UNDERGROUND
ROUGH / D.W.V.
tr FRAMING ROUGH / WATER
n ROOF & SHEER" PLYWOOD NAILING GAS PIPING
t-
d rnsulnrroru
b snerrRocr
POOL / H. TUB
NAIL
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
IIEGHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
n,
tr SUPPLY AIR
tr;ffi T] FINAL
tr DISAPPROVED T] REINSPECTION REQUIRED
CORRECTIONS:
zi: ,1"DATE
t1l
- | tr?'INSPECTOR.
CTION REOUEST
TOWN OF VAIL
JOB NAME
INSPECTION:MON TUES WED - (.::t)READY FOB
LOCATION:
"-t-'
/
BUILDING:
tr FOOT]NGS
tr FOUNDATI
tr FRAMING
/ STEEL
PLUIIBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
ON / STEEL
n ROOF & SHEER" PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL/ H. TUB
NAIL tr
trtr
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MECHANIGAL:
tr HEATING
tr EXHAUST HOODS
tr
tr
tr
CONDUIT tr SUPPLY AIR
FINAL
tr
tr FINAL
;fl neenoveo
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
,*#"toN
TOWN OF
neouisr
VAIL
JOB NAME
MON
CALLER
TUES WED THUR ,FRIREADY FOR
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNOERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH / WATER
n ROOF & SHEER" PLYWOOD NAILING tr
tr
tr
n
GAS PIPING
tr /NSULATTON
\SHEETRoCKtr_
POOL / H. TUB
NAIL
tr FINAL tr FINAL
ELECTRIGAL:
tr TEMP. POWER
[IECHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
n
tr SUPPLY AIR
n
o Ko,tr FINAL
ngF+aovED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
././ ? a),,././ - *- /'1--DATE // c' a INSPECTOR
,*#"toN neouisr
JOB NAME
INSPECTION:
CALLER
TUES THUR FRIWeo Atrl , puREADY FOR
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
O UNDERGROUND
tr ROUGH / D.W.V.
T] ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAM|NG
n ROOF & SHEER- PLYWOOD NAILING GAS PIPING
tr INSULATION POOL / H. TUB
tr SHEETROCK NAIL
ETECTRIGAL:
tr TEMP. POWER tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT SUPPLY AIR
APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
REOUEST
VAIL
DATE I" " , JOB NAME ,il i.
CALLER
i'f.,fOru ,, TUESREADY FOR
LOCATION:
INSPECTION:WED THUR FRI AM PM
BUILDING:
O FOOTINGS / STEEL
tr FOUNDATION / STEEL
tr FRAMING
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr INSULATION
-
tr POOL / H. TUB -tr SHEETROCK NAIL tr
-
tr tr--
tr FINAL tr FINAL
ELEGTRIGAL: iIECHANICAL:
tr TEMP. POWER tr HEATING
qROUGH tr EXHAUST HOODS
tr CONDUIT C] SUPPLY AIFI
-
tr INSULATION
-
tr POOL / H. TUB
tr SHEETROCK NAIL
-
tr
trtr
tr FINAL tr FINAL
ELECTRICAL: iIECHANICAL:
tr TEMP. POWER tr HEATING
trtr
tr 199.f^LSLqFn...^ tr cAS PTPTNG- PLYWOOD NAILING
tr FINAL tr FINAL
,;{ eeenoveo
CORREGTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
DATE
,"#"toN REQUEST
VAIL
:l roa NAME
CALLER
TUESINSPECTION:IVI\JIIl WED THUR FRI
TOWN OF
li r"
DATE
READY FOR
LOCATION:
AM
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH / WATER
n ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL
tr tr
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
,tr ROUGH D EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr FINAL tr FINAL
,,EI
APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
JOB NAME
CALLER
READY FOR
LOCATION:
INSPECTION:
/'2-<-\MON //TUES ] WED THUR FRI
tr FOUNDATION / STEEL
tr FRAM]NG
n ROOF & SHEER" PLYWOOD NAILING tr GAS PIPING
tr ]NSULATION
SHEETROCK /.NAtL
tr CONDUIT tr SUPPLY AIR
tr APPROVED
CORREGTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
t ,*#"toN REeuEr,
t-
TOWN OF VAIL
CALLER
TUES FRI PM
I
ol;:e '7 | i--- JoB NAME
READY FOR
LOCATION:
INSPECTION:
BUILDING:
tr FOOTINGS / STEEL
PLUTBIIIG:
tr FOUNDATION / STEEL
tr
tr
tr
tr
tr
tr
n
UNDEFGROUND
ROUGH / D.W.V.
tr FRAMING ROUGH / WATER
n ROOF & SHEER- PLYWOOD NAILING GAS PIPING
tr INSULATION POOL / H. TUB
NAIL
Laal1 t1 v1 -
tr FINAL
ELECTRIGAL:
tr TEMP. POWER
IIEGHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
n
tr FINAL tr FINAL
APPROVED tr DISAPPROVED tr REINSPECTION REQUIREO
CORRECTIONS:
oz
ts
=G,
llJ
o-
n e
U>
tJ.t
uJ
lJ-
L
=
UJ
Y$\hRS\I
col
O'l-l
il
N,-
Ff :<Hlo
I
I
.-a/
.Jtz'tl-&13Elo
EIEtoFro&,2<lF
r5
!!F
o
oF
FIz
=o
zz
@
IJJFoz
z
J
dl
.6
o
=zo
\a
vv
0.(
U
to
O"
0
trz
trld
\
:\;t
hoo(c
@
bq,
:{Eilr
o)
€t,
=::\o
E
=icrf
o)
o-(
o>!
'*:
oo
!
(t
'=
N
o
q.
3'
F
o)
E
oo
G
E
()
at,
.9
=f
o
E
$
g;
3o
o
o
c
=F
(!
't
E
o
(6
oa
E
(d
.F
(!
E
;.c
c
=;
E
o
0)
(o
E
YO'=O
9U
c..2
=LF'=Fo;ocL'-oo(!
-CF()
=p.=>c9'- o.
dE
o(Eotr
cC
_Y-
o-(!
r- aE--E
Eg
E6OE
Oo
6c-cg
-o.(6O
drO
o)iE
E8o6
tF.! tt
>.9-oO9E=-!,cr-o
-o
c!F\F.+o
o\
N
F
=Eurc
z
-J
l
(D
-
lu
oz
IL
-F
UJ)lu
z
(D
J
J
9z
o
IIJ
=
UJ
UJILz
tr
IJJ
uJ
oE
o
=IJJt
UJ
z
6
u.l
F6
o-
uJ
z
UJ
()
x
uI
U)
sulu-
E
=(E
I.IJo-
J
FoF
z
J
=
J
F
UJ.)
uJ
2
==
oz
rlJ
=
F
F{
NO[Vn]VA
Y(r
;!i:<
=Eg&1
NdYH
f,i r'.o-L&<Hg<2*
UE
>E
iu.r3
=(D(\l
zz9oq5
F9 0
aJt Oz>-
<)z
!L<
v=
EY-x
z
tr
l
g
-(I
f
E(,
lu
F
an
fi!,
uJE
z
Eo
z
tr
ll,,FJ
=uJz
ll
LzlzOt,
<Oo{
>fi2i!
xrr5o<z
I
aaz,"r-9z
iI
BEox
I
HI
t"ltoltoltdl
UJl)
CE
Q
UJz
i
F
2
F
5oz
{
L | --.-
=l
:z .1
., >|o_ALaE-+Y";E4
UJ(L
--J
zo
OO
<a
=rll--.f. I Itl---f--Tt#a-fA -ll-wl
7ffi1l=lsl
lglEi;ld)lo. ol
I
H
1
LIJF
U)
d)o-zo
Fo-ulY
lu
d)
t-
t-
=Pl! ch
(I
IJ- Po$iJa'r Hl5trr$'lUurbkzo
L
ut
6:!!EZE<ofo96YB9r,E
cdlr
=ut:E r->Cl rr1 n/rr dtr; >(L:OLE OO
oF,,,
t x>o::'iF
er-t'l-
llJ
oF
E-IE
E
=E
lrJo-zIF(J
EFozoo
I[tr
z
.n9z\(Do
=zJOo- tl
iff(Jo=
=reoiir
-1 -i t!6il=
tstn
F.l
FfH
rlH
(Jz
J
u-
,.l
:t
d
F
\
qa
A\I
s0
\I\
o,
n
U
u;
z
,-)
I
1
ZlrHI E
(nl(4l l{<l ()
EIBI Fl
zto(/)l ()
Ihlool\
thi4laF.ll l/)JI LIJ
...t <
=t =<t <z>
6l
Or\o
I\c|
io-
FlH
a>u
tr
=g
uJ
oo
J
Fo
Hv
1EixF)<
.J)H
Fl
FfH
tr
oz
l!
=
z
3oF
o,lmc'\\o
I\o
F\.il
!
z
llJ
=
z
3
F =e.
.iz
ti
ul
J
z;=g
z
(,
uJ(E
l!
z3
F
=g
oz
o
UJ
E
J
lloz3oF
u.t
IJJF
t
LIJz
=
F(J
uJF
T
c)
E,
-rO<F0a()uJ<zt
.42o
C)
JE,<oC)F
FI
XF-,2^'- ^5! \JJO
2?
E9>(rfFt- zo
<x
:IF7<)a<
d=>H
(r
=-! ffF=o<()srfr=ldnn
^ElrJ OF-l .-H@+J
=<,EdLt clrl H .ECr-Je(5&QZ,< a
J tr- |,Fr r-. CDU-v E
c. .'=oc.ttu-(,l-rr.()O.!!J c,o o+,uJ! oLtJ C-zoo-(JE
at1 .oHE(,]
C5 L l.- Iz r*- ol
I
=L(,lo o) +JlJp cJlJ p t/l|Oo) |u- J C!l
I
=l+:'l
x
1
v,ululIL
E
=
uJ
TL
loIgJthxlzEl('
El=.tt )zl )
=loOl.6llozl =6l€
I
l',
t<to
I
I
I
I
I
I
I
I
I
t
\it\
t
nit
i
iII
I
[-
\
\,
rd
$
F
=tu
z
J5
.D
I
z
o-
F
tuJu,
z
to
=
o-
J
z
LU
=
tullJlr-zo
t!
!!
o
o
3r!
UJ
z(,
ut
F6o
lrl
z
qJ
C)
X
F
UJof
.t^
UT
q
3
UJ
Jsl
vl-l
z
J
IGF
UJJul
ozd
)
o-
z
gJ
=
J
F
q\,1
NO[vn]vA
u,
F
rI
6t i"ll
=g6N:<cll9{3 EbS;; =$e* E$
EH N
z
tr
J
IL
t!
F
t
I
.
1F1
uJ
l:
l<lzlotr
;loltrl<l
rlJIil
z
II
I
v,
=z
o
=o
o
u-
o
tt
3
lll
o
IufJ
2o
F
J
z
otr2..
9zrbd63tr
-,\<l
FI
2l
1---tJ
I
I
zl
.. >lo
ur
uJulz
t-lt I egFii * |t\Eg;sE
o 6? t P
ir"s;g_- c f (D
t= o (a tr
gg;:;
E Ia;E
;f s; g
esH'ei
I
\
.llg lll
ll 5 | I I
FllF:lsl;l'
$
\
\0
\!
- o'--'bn
E "'Jorl
I r]
Hu,bkZo
F
=E
lrJo-
UJ
tr
U)
@o?zo
Fo-
auY
UJ
@
o.F
ts
ut
;fii
urEd><s
t'lDa\-z LEO
E* U:^=
R>< dE-ei tr O
-FC
5fr FF.J- J I-
='? ru :-
54 ! E;ai.:-ru B9IE urEIJ- X d
E.sq r#qi
=ruiE a
lllt^|
D1 +
rYs
:<'\lJ4 |$:s _sl'f,:4sv:F-i
Y ;]I;l
=lzlrDlrl
1\
t1\(}
t\:}-
qi
''l
=(J
I
I
Itl'
I
Itlat
H
d<lJ>SE
ql
3l
tr-tol
=lPI
.(
\
\
5
sl
rl
EI
trl
I
I
sl
FIll
flolFI
'|ll
Jfl1l*l I
d3d
ljJi
: $,1
I
I
I
ol
=.1olu-l
:l
?l>lttl
Zl ,,i
=t 5Ol lrJFIF=tr
J<()<5@
5o*
EIuz
=o
F8\)
6\(ts\
E-:o<Fcot!<zEt!F
o()
JE
6 P\)=<)-FE\G
gFY
sEI-61
6F
F3
E6
fl,+E
Oz
'? \/
NAME OF COMPII}IY:
ADDRESS:, ('(
gnatu
General Contractor A or Construction Management
(Valuation over 91,000,000). .$1ZS.OO gIZ5.00
General Contractor B or Construction Management(Valuation under $1,000,000) 100.00 75.00Plumbing. ....; 75.00 55.00
Mechanical ... 75.00 55.OOElectrical... 75.00 55.00
Special (includes drywal'l , gliss, masonry, concrete, elevator
etc. . .. 75.00 55.00
Elcgvation...
DATE oF BIRTH .,//tr, / AJ-,/qJL
I{ORKMEN'S COMPENSATION -*No l.lo rkrnen ' s Comp .
LIABILI\ .ption #r:
8i:333:333 il tl: ffiffiil: I:i B::;ll.J'irlrn"
Option #2: Combined single limit of 91,000,000.00
Show that you are covered in the State of Colorado
Provide a letter stating you are the sole owner &will not hold the Town liable for any accidents. At
the tjnn you hire someone you will provide us with tdQ.
N0TE: If you are purchasing an electrical or plumbing registration, you must
provide a copy of a Master Registration from the State of Coloradol-
Thank you,
Janei I Turnbul'l
TOV Building Dept.
YnoNr. *: 411 .- 1,9 3 A
CONTRACTOR REGISTRATToN PREQUALIFTCATToN F0RM
Must be received and approved prior to issuance of registrat'ion.**Submit to the Town of Vai'l Building Department.
PLEASE SUBMIT COPY OF AI{Y PERTINENT REGISTRATION I,IITH APPLICATION.
Type of registration beirW.appl
Application made by:
REGISTRATION FEES
Regular Cost Renewal Cost
IT IS IMPERATIVE THAT ALL CONTRACTORS HAVE THE FOLLOWING INSURANCE CERTIFICATES:
By:A Corporation
A Partnership
An Individual
Type and l.lhen
Class of work Completed Name and Address of 0wner
,U/.n
,l,t n Al n t /
pri nci par Off i ce : .tJ J J.,s. {:. /l k' lr. ff.a.:i.d.g * t. . . . . . . .
EXPERIENCE QUESTIONNAIRE (AIA Document Number A-305 79 Edition may beffi
l. How many years has your organization been in business-as acontrapto; under ygur present business name? . .///4.........1./7"/Z€.4{try.
2. How many years experience in the proposed type and size ofconstruction work has your organization had?
3. List the most recent projects your organization has had inconstruction work similar in type and size:
4. List municipalities you have licenses and current status:
l'
| ,.
)
10. tist the major
or corporation own
items of equipment
or will be used in
which your or your
the Town of Vail:
company,
p./p...
11. List below the Contracts which you, or our company, orcorporation were party_to, during the previous ten (10j-years,
that were involved in litigation of any type:
..N.-.O....
L2. The fol'l owing is for all contracts which you, or your company,or corporation were party to.during the prev.ious five (S) years.
A) Percentage of projects completed within schedule.. | ,/\,,'\""lULt""'*
13.
14.
How much of the work wi] I you do directly compared to sub-contractors?
/A a a1o /, ru c f/'/
Banking References-^-.i;"i i;"'7"/onk /ar5 rr"ntgz,ll /a'/€o r/1rf'
//.,4B.& rtk. oy' fis/e /- /o Box 'tt " y'yn "' ( o /lt' t/
Trade References15.
s. /r/;le y'^7o, fi- rJ Ert <--.-, P /ru /
c.
D.
F
5. ilf,ut oth.,^ important projects of sjmilar magnitude has your organization
comPi eted?
Type and
C'l ass of work
l,lhen
Compl eted Name & Address of Owner
6. Have You ever failed to
-.U.4.....If so, where and
compl ete any work awarded to You?
why?
,-/ 7 . Name the Surety .Company, . bondi ng- capaci ty '-andthenameandaddressofthelocalagencyyouexpecttouse:
..N,.:4.
-.. 8. What is the construction and experience of theL'/' """inlioir inaiviauats of your organization and those individuals
[o U" lir".ily invotved iir any pioiect in the Town of Vail.
Individual's
Nante
.{9..-..a...
' Present
Pos i ti on
or Office
Yrs. of Con-
structi on
Experi ence
Magni tude
& Type of
l.lork
In l'lhat
Capac'i ty?
g. Do you hold any valid licenses, i.€. Master Plumber, Architect, Electrical?
N'r)
' t'
i'r .t
'16. Have you ever had a Iicense in our area or any other area
under any name that was:
A) Revoked
B) Denied
C) Suspended
If so, please exp]ain:/0a
l7) If registrant is Corporation or Partnership' p'l ease state
app'l 'i cant rel ati onshi p/posi ti on :
l8) What is your postion in this registration?
A) 0fficer
B) Stockholder
C) Principal
D) Other
'le) sociar security #: . t.(/...7!:i.f.1.{
I walI Street rnsurance, rnc.
225 Wal1 StreetVail, CO. 8I657
{AME ANO
MAILING AOORESS OF INSUREO
Hillis of Snowmass
170 Gore Creek Dr.
Vail, CO. 8f657
Type rnd Locrllon ol Properly
SPECIAL CONDITIONS'OTHER COVERAGES
sN$-Building or Premises
227 Bridge Street
Vai1, CO.81657
P
Ro
P
E
R
T
Y
L
I
A
B
I
L
I
T
Y
Llmils ol
Llmils ol Liabilily
Bodily Injury (Each Person) $
Bodily Injury (Each Accident) $
$
$
,ooo,0o(
$1 ,000,0(
A
U
T
o
M
oI
I
L
E
LJ wORxeRS' COMPENSATION - Statutory Limits (specily states below)L-.J EMPLoYEBS' LIABILITY - Limit
nental Western
Eflective 12 :01 an 8/20 ,19 B7
Expires Ll 12:01 am LJ N olicv,l!lssuance
This bindor is issued to extsnd coverage in the above named
company p€r Bxplring policy #
1,000 r 00
All Risk
Replacement Cost
nuilding
227 Brj-dge Street
Vail, CO. 8I657
Bodily Injury
Property Damage
Scheduled Form IJJ Comprehensivo Form
E Premises/Ooerations
E Products/Completed Operations
LJ Contractual
EJ otn"r (spscity below)
E tteo. Pay. 91,000 -n", 910r000 . p"'
personat tniury deIdt"S exclusiorl"t"''
Bodily Iniury &
Property Damage
Combined
$ r,000,0
n li"oitity n Non-owned n nireo
! co tlislon-Ded u ct ible
LJ Medical Payments
LJ unlnsured Motorist
LJ No Fault (sp€cilyl:
LJ Other (specify):
Property Damag€
Bodily Injury & Property Damage
Combined $
n .*" "o"..
LOAN NUMBEF
NAME ANO AOORESS OF LJ MORTGAGEE I ooo.,nrr"ro
ACORD 75 (l lt74)
oo
5ez L ,/_1€r7',S(2,,b,
1s>{
.1
STATE CO}IPENSATION INSURANCE
950 BROADITAY DENVER, COLoRADO
(3o3) 866-3542
FUND
80203
HILLIS OF SNO!{UASS INC
DBA HILLIS TURS
DESIGNER FURS LTD & I
AFFINITY
176 GORE DR
vArL co 8L657
POLTCY # LO9124 0
RrsK # 050331075
WORKERS COilPENSATION PRE].IIUI'i EKPERIENCE MODIFICATION
THIS ENDORSEI,{ENT SHALL BE ATTACHED TO AND WILL FORIiT A PART OF POLICY * LO9724 O
ISSUED BI STATE COUPENSATION INSURANCE FUND OF DENVER, COLOR,ADO.
IN ACCORDAI{CE WITH T}IE PROVISIONS OF THE POLICY TO IIHICH THIS ENDORSE}IENT IS
ATTACHED, AND AS A RESULT OF TIIE APPLICATION.OF THE EXPERIENCE RATING PLAN
APPROVED BY THE INDUSTRIAT COI{I{ISSION OT' COLORADO, THE PREUIUU' AS }IEI{TIONED
IN ITSU 4 OF TIIE DECLARATIONS (CLASSIFICATIONS OF OPERATIONS), OR IN ANY AUDII
SrATE!.|ENT OR 9UARTERLY AD.IUSTI,IENT STATEUENT FoRI,IING A PART OF SAID PoLICY'
SHALL BE ADJUSTED BY THE EXPERIENCE I{ODIFICATION SET FORTH BELOW, AND PAID IN
ACCORDANCE WITH THE PROVISIONS OF TIIE SAID POLICY.
E:KPERIENCE DEBIT
ETFECTIVE DATE:
PREIiIIUI{ ITODIFICATION
I{ODIFICATION 1.12 -OR-12 Z DEBIT
04 01 8804 01 87 E.KPIRATION DATE:
REVISION Itr*i*
NOTHING HEREIN CONTAIilED SHALL BE HELD TO VARY, WAIVE, ALTER OR EXTEND ANI OF
THF: PROVISIONS OR CONDITIONS OF SAID POLICY EKCEPT AS ABOVE STATED.
IN IIITNESS WHEREOF, THE STATE COI'PENSATION INSURANCE FUND OF COLORADO HAS
CAUSED THIS ENDORSEI{ENT TO BE SIGNED BY ITS UANAGER THIS EIGHTH DAY
oF ocToBER, 1987.
t.'c 05 04 32
REv. 4/84 S4
90152P1 GERRITT J. PON, I.IANAGER
STATE
---l--_^_
STATE COMPENSATION INSURANCE AUTHORITY
950 Broadway, Denver, CO 80203-2779
We've been listening to your concerns and we're ready to talkl
OUR NEW TELEPHONE NUMBER WILL BE
(3O3) 837-4OOO
On April 18, 1988 our new telephone system will be installed and
it willprovide:
Expanded capacity to answer telephone calls
Reduced "on hold" time
Efficient routing to appropriate areas
The State Compensation Insurance Authority has an ongoing
commitment to provide the quality of service you deserve.
STATEOF COLORADO
DIVISION OF FIRE SAFETY
PLAN REGISTRATION FORM
"^"J4/s4-
Contractors Name
MailingAddress _
14congractorRegistrationNt^b., ?4-O44 ,
" //tlttty l4/u,e ilc.uor,rog t Ettre,cnt /ntc-47r' * ?/= qo-ry saFo
zpcode F6ZO
Telephone
Nameof
System Test
Signahrre
Certification No.(Qualified Fire Inspector)
Iurisdiction
Comments
(for additional comments use separate sheet)
Distribution: Original copy goes to Division of Fire Safety upon total completion of form. Copy to local fire deparhnent.
Copy to contractor and copy to building owner upon completion and sign-off.
/,
MEMORANDUI'
ALL CONTRACTORS
TOWN OF VAIL PUBLIC WORKS DEPARTI'ENT J{JL' A I 1994]
TO:
FROM:
DATE:
RE:
MAY 9, 1994
WHEN A "puBuc wAy pERMtr.ts REounf0\f.00[\4lvl, DEV, DffL
Job Name:
Date:
Please answsr
ls this a new residence?
ls demolition work being performed
that requires the uss of the right
of way, easements or public property?
ls any utility work needed?
ls the driveway being repaved?
ls different aocess needed to site
other lhan existing ddveway?
ls any drainage work being done
affecting the right of way, €asem€nts,
or public property?
ls a "Revocable Right CI Way Permit'
required?
A. ls the right of way, easemehts or
public property to be used for staging,
parking or fencing?
B. lf no to 8A, is a parking, staging
or fencing plan required by Community
Development?
/Ll /Nq
ng questionnaire regarding the need for a'Public Way permit":
YES
{:iE|f
tiltF'?t
lflou- answered yes to any otthese questions, a "Public Way Permit' must be obtained.
"Public Way Permit' applications may be obtained at the Public Work's office or at
Community Development. lf you have any questions please callCharlie Davis, the Town
of Vail Construction Inspector, at 479-2159.
NO
1)
2l
Ycst-
r{o
/r/t
tJo
ilo
ilo
N"
3)
4l
s)
6)
7\)
8),-/
tt t- --,/
read and answered allthe above questions.
PUBUC WAY PERMIT PROCESS
How it relates to Building permit:
1)Fill out the our check list provided with a buitdino oermit aoolication.
lf yes was answered t9 any of the above questions then a "public way permit" isrequired. You can pick up an application at either community oeverJpment,located at 75 s. Frontage Road or Firutic works, located at 1309 vail varrev orlve.
Notice sign ofls for uritity. companies. All utilities must lield verity (locate)
lespggtiye utilities pdor to signing apptication. some utirity comfanies require upto a 48 hour notice to schedule i toiafe).
A construction tratficcontror pran must _be prepared on a separate sheet of paper.This plan will show rocations of ail tratfic dontror devices (signs, cones, etc.) andthe work zone, (area of construstion, staging, etc.)
Sketch ol work being perlormed must be submitted indicating dimensions (length,wjdth & deprh of *jto. Thdiliil&n on rhe rraffic &nrrorpran or a sireplan for the job.
Submit co-mpleted application to the Public Work's office for review. lf required,locates wil be schedured for the Town of vair Erearici;"; ft k"afuion crew. Thelocates are take prace in the moming, but may require up to 4g hours to perform.
The Pubtic work's construction Inspectorwill review the apptication and approveor disapprovs the permil you wiil be conraaed as to the tiituii^o anv criingeithat may be needed. Most permits are released within 48 hours of being received,but please allow up lo one week to process.
As soon as p-ermitis proces-sig,
3 copy wiil be laxed to community Deveropmentallowing th.e,'Building permit" to be rileased. please do not confuse the "publicway Permit'with a'BuiHing permit" to do work on a prolea iite'itserr.
Note:
'The above process is for work In a rlght_ol_way only.
.Publlc Way permlt's are valld onlv unill November 15th.
*A new Publlc Way permit ls requlred each year.
2',)
3)
4)
s)
6)
7)
lhtcD.lut g rsrt
TOT{N OF VAIIJ CONSTRUCITON
PERMIT APPLICATION FORMDATE:__
Address:
PERUIT
'f
, APPLICATIoN I.lUsT BE FILL,ED oUT CoI{PLETELY oR IT }fAY NoT BE AccEpTED
It* ** ******** * * ** ** ************ PERMIT TNFORUATTON ** **** ************ ** * * **** ***
tl (t€p.f.az,ntxtczl, ,-",rrtutnn t l-ptunbing [ ]-Electrical [ ]-Mechanical ,lt-k-r"''."'
rob Name: Oue eep Ee.,p# 6r,a,,,grob Addre "=, 'zz1 ?a,t41 (k ,
Legal Description: Lot_ Block_ Ftling susprvrsroN,r. rt/ n '=.. n i^-lonners Name: 4sr/A6rfftaril<rz< Address: E, /Qnfrg ut- pt..7/l) 50 /,
Architect:
General Des
pr..+lb- ll4'l
EBrp6t 60,a,
\-oWork Class: IX-New [ ]-Alteration [ ]-Additlonal [ ]-Repair [ ]-other
durber
and Type of Fireplaces: cas
{*********
* ************ * ***** *****fz'e< 574d<'re
OTHER: | 3O,zoo
Number of Dwelllng Units z 7
BUU.,DING:
PLTIMBING: $
Ir * * * * * * *** **** * *tl!r !r ******* **llJenerai conEracEor:
rtrCfntCal: SMEcHANrcAtrl@_ToTAL: $.
CONTRA TOR TNFORT.IATION
Address:
Plunbing
Address:
Appliances
VALUATIONS
Nunber of Acconnodation Units:
Gas Logs_ Wood/Pellet
* ** ******** ** ************** * *****
Electrical Contractor:
Address:
* * * * ** * * * * * * * * * * * * * * *** *** *
Town of Vail Reg. NO._
Phone Number:
Town of Vail Reg. NO.
Phone Number:
Town of Vail Reg. NO.
Phone Nurnber:
Contractor:
lllechanical. Contractor:
Address:
******************************** roR
BUILDTNG PERMIT FEE:
PLT,MBING PERI'IIT FEE:
I'IECHANICAIJ PERMIT FEE:
ELECTRTCAL FEE:
OTHER TYPE OF FEE:
DRB FEE:
Town of Vail Reg. Iq.e:::Phone Number: - q4cI' flTl
oFFrcE usE ************************ **** ***
BUILDTNG PI,AN CHECK FE8:
PLUMBING PIAN CHECK FEE:
!'IECHANICAI, PIAN CHECK FEE:
RECREATION F8E:
CLEAN-UP DEPOSIT:
TOTAIJ PERMIT FEES:
BUILDING:
SIGNATT'RE;
ZONING3
SIGNATTIRE:
CLE/AI T'P I}EPOSIT NEN'ilD !O3
lnwn |lfll
75 toulh Irontrge roed
urll, color.do 81657
(303) 479-2L38 or 479-2L39 ottlcc of communlty dcyrlopmc$t
BUILDING PERi.IIT ISSUANCE TIME FRAI,IE
If this pe"Tit requi.res a Town of Vail Fire Department Approval,Engineer's (.pyb]ic works) reyiew and approvai,' i iiiniini'blpartment
11l]:I_gl^+lealth Departmiint review, and'a review uv lr,e duiihing'-uepartment' the estinated time for a total review may take as l5ngas three weeks..
ll] .9ry:"Sial ('large or sma'il) and all multi-family permits willnave to foll0w the above mentioned maximum requiremlnls. Residential
119-.:Tl1l projects-shoutd take a lesser amound of time. However, ifresrdential or smaller projects impact the various above mentioned
lgll"lT3q.with regard to necessary review, these projecli'*valso tal(e the three week period.
Every.attempt wil'l be made by this departrnent to expedite th.ispermit as soon as possible. -
I' the undersigned, understand the p'lan check procedure and timeframe.
r
DalE l{ork Sheet wal- turnerl-TnToJfie
Corrnuni ty Development Department.
75 south lrontage road
Y.al, Golorado 81657
(303) 479-21.38 ot 479-2139 ofllce of communlly devclopmcnl
TO:
FROM:
DATE:
SU&TECT:
ALL CONTRACIORS CTJRREMTLYL REGISTERED WITH TITETOWN OF VAIL
TOWN OF VAIL PUBLIC WORKS/COMMINITY DEVEIOPMENT
I.IARCH 16, 1988
CONSTRUCTION PARKING & I'IATERIAL STORAGE
rn sunmary, -ordinance No. 6 states that it is unrawfur for anyperson to litter, !5ack. or deposit any soil, ,J-*, sand, aeUiisor naterial , including trash lunpster3, poriabre toilets ana---workmen vehicres. yFon any streetl siaewairl -;ii;y or pubric
-qr?9" or any portion theieof. rfre iighi:"i-r.v-"n arr Town ofVail streets and.fgags is approxinateiy s it--lff pavement.This ordinance witr be striiliy enforc3d by the rown of VaitPyPlic ttorks Department- perslns found vi6lating trris orairr.nc"wirr-be given a 24 hour written notice t" ""n""" said rnaterial .rn the event rhe person so notified doei-";a-;;;pry witrr-irre---notice within the-24 hour tine sp""iii.a,--trt"-p"tric !{orksDepartment will remove said mateiiat at tr,"- ""p"irse of personnotified. The provisions of this ordinance shall not beapplicable to c6nstruction, naintenance or repair projects ofany street or alley or any utilities in tfre rlght-i_riy.
To review ordinance No- 6 in furl, prease stop by the Town ofY1il Bui+ding Departnent to obtain a copy. rirani< you for yourcooperation on this rnatter.
d and acknow
(i.e. contractor, owner)
luwn
75 3oulh Irmlrgo ro.d
Ytll, cdordo 8161i7
(303) 17$2138
{303) {7$2130
offcc ol communlty developrnenl
NOTTCE TO CONTRACTORS/O!|NER BUTLDERS
Effective June 20, 199L, the Town of vail Building Department hasdeveloped the following procedures to ensure that new constructionsites h-ave adequately established proper drainage frorn buirdingsites along and adjacent to Town of Vail roads or streets.
lbe Town of vair Public works Department wi.ll be reguired toinspect aad approve drainage adjacent to Torrr of Vail roads orstreets and tbe installation of tenporary or peruanent curverts ataccess points fron the road or street on to tle construction site.such approvaL must be obtaj-ned prior to any request for inspectionby the Town of Vail Building Department for footings or temporaryeLectricaf or any other inspection. please call 4't9-2160 torequest an inspection from the public works Depart.ment. Arlow aminimum of 24 hour notice.
A1so, t.he Town of Vail public works Department will be approvingall finar drainage and culvert installation with resulting roaipacchj-ng as necessary. such approval must be obtained prior toFj.nal Certificate of Occupancy issuance.
TOITN OFVAIL
75 South Frontage Road
Vail, Colorado 81657
303-479-2r s8 / 479-21 3e
FAX 303-479-2452
Department of Communiry Developrnent
TXFORMAIIOIf IfBEDED lilllElf APPLIINC FOR A riECllAllICAL PERUIT
I{EAT LOSS CALCULATIONS.
TO SCALE FI.,OOR PLAN OF' MECHANICAL ROOM WITH EQUIPMENT
DRAWN IN TO SCALE, WITH PHYSICAL DIUENSIONS AND BTU
RATINGS OF ALL EQUIPMENT IN }IECTIANICAL ROOM.
sHow srzE AND LocATroN oF coMBusTroN AIR DUCTS, FLUES,
VENT CONNECTORS AND GAS LINES.
NOTE WHETHER ELEVATOR EQUIPMENT WIIL ATSO BE INSTALI,ED IN
MECHANICAL ROOM.
FAILURE IO PROVIDE IHIS IIfFORMAUOI{ I|IL,L DELAY IOUR PERI.IIT.
1.
2.
3.
4.
TOWN OF VAIL
75 S. FRONTAGE ROADvArL, CO 81657
97 0-47 9-2138
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PLUMBING PERMIT Permit #: P96-0197
Job Address
Location...
Parcel No..Proiect No.
Status...: ISSUEDApplied..: LL/2s/Lee6
Issued...: LL/25/1996
Expireq. . : 05/24/1,99?
Phone: 949-0317
Phone l 949-0377
APPLICANT AVALANCHE PLUMBING & HEATING
P.O. BOX 2994, AVON, CO 81620
CONTRACTOR AVALANCHE PLUMBING & HEATING
P.O. BOX 2994, AVON, CO 81620OVINER SERINDIPITY,AUTREY C.
Description: BATHROOM 3RD LEVEL Valuation:2,000.00
**i********ft**********t**rrl*********************ff******** tE€ SUf'ltlARY ***#ff**********t*t************t*ff**********************
Ptumbi n9----->
Ptan check-->
Invest i gat ion>
Uitt catt---->
50.@
7 .50
.00
3.00
Restuarant Ptan Review-->.00 TotaL cal.cutated fees--->40.50
.00
40.50
Payments-------
Additionat t.es--------->
Total Pernit Fee-------->
40.50
Dept: BUILDING Divislon:
Dept: FIRE Division:
*****************************tt***************************i********t********i*****t*tt**************l***************t t*********
CONDITION OF APPROVAL
**ffiff*ffit'tJr||l**t*ff***ffi***ff******************tt***********Jrt!t***rt**f*********ff*ff*tffi*fr**tffi*trtrffi*ff*ffi**)H
DECLARATIONS
I hercby acknorrledgc that I have rrad this apptication, fitted out in ful,t the inforration requi red, compl,eted an accurate plotptrn, and statc that att thc inlormtion provided as requi rcd is correct. t agrca to coiply vith the information and plot pl,an,to corPLy Hith att Tovn ordinances lnd state lavs, and to buiLd this structure according to the Toun's zoning and subdivision
codes, design review approved, uniforn Euitding Code and other ordinances of th. Town appLicabl,e thereto.
REOUESTS FOR INSPECTIOI{S SHALL BE IIAOE INENTY-FOUR HOURS IN ADVANCE
IIe.m: -O51OO BUILDING DEPARTMENTLL/25/I996 DAlr Action: APPRItbm:' 05600 FIRE DEPARTMENTLL/25/7996 DA\I Action: APPR
2101-0I2- 67 -001
TOWN OF VAIL
75 S. FRONTAGE ROAD
vArL, co 81657
97 0-479-2138
Description: BATHROOM 3RD LEVEL
***************t********ff ft ********ft it***ff****t*t*ft*t** FEE SUl ,tARy
NOTE: TH]S PERMIT MUST BE POSTED ON
PLUMBING PERMIT
Job Address: 227 BRIDGE ST
Location... : COVERED BRIDGE BLDING
Parcel No.. : 2101-082-67-001Project No.:
APPLICANT AVALANCHE PLUMBING & HEATING
P.O. BOX 2994t AVON, CO 81620
CONTRACTOR AVALANCHE PLUMBING & HEATING
P.O. BOX 2994, AVON, CO 81620
OWNER SERINDIPITY,AUTREY C.
DEPARTMENT OF COMMUNITY DEVELOPMENT
JOBSITE
Permlt
ALL TIMES
P9 6-019 7
Status...: ISSUED
Applied..: tL/25/lee6
Issued. . .: LI/25/t996
Expires..: 0s/24/t997
Phone t 949-O3L7
Phonez 949-03L7
2, 000. 00
AT
+.
Ptumbing----->
Ptan check--->
Invest i gation>
!i tL catl.--->
30.00
7.50
.00
3.00
Restuarant Ptan Revielr-->
TOTAL FEES-----
Valuation:
.00 Total Catcutated fees--->
40.50 AdditionaL Fees--------->
TotaI Permit Fce-------->
Payments-------
().50
.00
40.50
40.50
Dept: BUILDING Division:
Dept: FIRE Division:
ITem: 051OO BUILDING DEPARTMENTLL/25/7996 DAN Action: APPRITbm:, 056OO FIRE DEPARTMENTLI/25/1996 DAN Action: APPR
**********ff*************************t***tr**********i-H*********************************#************t***************ffi****
CONDITION OF APPROVAL
**ffirt*:*t!trr*nttt***t*tt*********tlrl**i**ffitt*t******tl***ffffi***ft**i*****ft******ff*ff*t***ff***ffift*ftffi*ff*****ffiff**
DECLARATIONS
I hereby acknor[edge that I havc read this.pplication, fil,ted out in ful,l, the infornation required, conptetcd 6n accurate ptot
ptan, and state that atl the intormation provided as requircd is corrlct. I agrce to compty uith the infornation and ptot ptan,to compty sith atl, ToHn ordinancls rnd state [aws, and to buitd this structure according tothe Tovn's zoning and subdivision
codes, design revieu approved, Unilorm BuiLding code and othep ordinances of the Torm appl.icabte thercto.
REOUESTS FOR II{SPECTIONS SHALL BE I,IADE T!'E}ITY-TOUR HOURS IN ADVANCE BY TELEPHOI{E
a.
^2":':3:.^ :?":i,,eounEy-Asae""f r*-t". Off at-!70;329-8640 for Parcet /i.- TOWN OF VAfL CONSTRUCTfO-F
fpARcEL tt:. f.l A t- 6g't -L1 _oo I pERlrrT AppLrcATroN FoRl.t
lv DATE:-
BUILDINGs nt.ECtRlCAt: $
^ PIrruBrNGz Woo r,rEcgd;iAii i--v
,I* * * * * * *. * * * * * * * * * * * * * * * * * ** colflIRAgtOR INFORMATION7 Eeneral Contractor:
rll-^--
PER},IIT #
APPLICATfoN I{UST BE FU.LED ouf Co}iPLETELY oR IT I'IAY NoT BE AccEpTED
:*:i:-':l;:::ii: i:r*.-ll*
* * * * * *
pt}TJrftt",y'l -Hurlins l-Electrical t J-Mechanibal
,(r., Address:
Legal fiescription: Lot Block_ Filirg susDrvrsroN,
owners Name: S&lSn,t ,gddress: a:o ne Jg. l;'F pn. 4lb-aVat
f*""
and Tlpe of Fireplaces: Gas Appliances
/f* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * vALUATToNs
Gas Logs_ Woodrzpellet
Architect:Address:Ph.
ceneral Description:
work class: fl-New [ ]-Atteration g l-Actditional [ 1-nepair [ ]-other
Number of Dr,relling UnLts; I Number of Acconmodation Units:
***** * ******* ** * *****************
OTHER:
TOTAL3
*******************,********
Town of Vail Reg. NO.
Phone Number:
Town of Vail
Phone Nurnber:
Reg. NO.
Address:
Electrical
Address:
Contractor:
. Plunbing C^ontractor :Address:
MechanicaL Contractor:
Address:
* **** ******** **** ****** *** ****** FORBUTLDING PER}IIII FEE:
PLI'MBING PERMIT FEE:
}fECHANTCAIJ PERI.IIT FEE :
ELECTRTCAL F8E:
OTHER TYPE OF FEE:
DRB FEE:
[ ]-other
L^.-)"-f e i
Town of Vail Reg. NO.Lft-JA'-b
Phone Nurnber: =at-rl4 l-
Town of Vail Reg. NO.
Phone Number:
oFFrcE usE *** ********* *** ****************
BUILDING PI,AN CITECK FEE:
PLIJI.TBING PLAN CHECK FEE:}IECHANICAL PI.AN CHECK FEE:
RECREATION FEE:
CI.EAN-UP DEPOSIT:
TOTAL PERI.TIT FEEss
BUILDING:
STGNATURE:
ZONINGs
STGNATI'RE:
CLBAII IIP I'EPOSIT REFI'ITD r1):
75 roulh lronliga rold
vril, colorrdo 81557
(303) 479-21.38 ot 479-2139
TO:
EROM:
DATE:
SUBJECT:
olllcc of communlty devcloFmont
ALL CONTR.ACTORS CT'RRENTLYL REGISTERED tfITH THETOWN OF VAIL
TOWN OF VAIL PUBLIC WORKS/COMMUNITY DEVEI.,oPllElcr
MARCH 16, 1988
CONSTRUqTTON PARKTNG & I,IATERIAI STORAGE
rn suDnary, ordinance No. 6 states that it is unrawfur for anyperson to titter, track or deposit ;t:;il]-"o"r., sand, debrisor naterial , incr.uding trash bunpsters, portabre toilets andworkmen vehictes.upon any streetl siaewairl-;li;y or publicplace or anv nortiin trr"i"oi. --tI" right-of-hray on arr Town ofVail streeti ina.Ig"g= is approiinately 5 ft. off pavenent.Th's ordinance rill 1..;iri;il;-'enforced by the Town of VailPublic l{orks DeDartment. persins found viirriting this ordinancewill be siven a 24 hour rriii"i"i"ti""-t"-;;;;;"""id nareriar.fn the event the person so notified.does not cornply with thenotice within ttt_ea hour.tG.-=p""ified, trre puiric r{orksDepaltment wirr remove said nateiiar it-it"-"*iEi=e of personnotified. The orovisions-or-trrii-"iai""#; ;frIii nor beapplicable to cinstruction, ,iiri"r,"rrce or repair projects ofany street or alrey or any uti.iities G A"-;iiii-"_r"y.
To revierrr ordinance No. 6 in full, prease stop by the Town of:::i"::iili"g"Tiif*:lt"::-'"iiii" a copv- riani vou ror your
ositi6n/neliEiGiffi (i.e. contractor, owner)
lnttn
75 routh frontlgc ro.d
vtll, colorldo E1657
(3031 479-2L38 or 479-2L39 offlcc of communlty devclopmcnl
BUILDING PERI.IIT ISSUANCE TIME FRAME
If this permi.t requi,res 1 Towl 0f vair Fire Department Approvar,Engineer's (pubr ic l'rorks) review .nJ
-ipb"ouat,'
a ptinnin!'bepartmentrevi ew or Hea'r th Deoartrnint. rev iew, -rn[-i-"i,i"i
Lv'iii""Euii ai ngDepartment, the estirnated time ro"'a-totar ".ri.*i.v"Lil'us rongas three weelts.
All commerc-ial ('large or smal'r) and al'r multi-fami'ry permits wirlhave to follow the ibove mentioneJ-maximum requirements, Residentiarand.small projects shourd take t-le;;er"amount of time. However, ifresidential or smar'rer.projects rmpiii the various above mentioneddepartments with reoard to-necessiii-""ui"", these projects mayalso take the three-weet period.
Every attempt wir'r be made by this department to expedite thispenni't as soon as possible. s^rLs'es e'l
I:-il. undersigned, understand the plan check procedure and timeframe.
Corrnuni ty Devel ooment Department.
TO:
FFOM:
DATE:
RE:
MEMORANDUM
ALL CONTRACTORS
TOWN OF VAIL PUBLIC WORKS DEPARTMENT
MAY g, 1994
WHEN A ,PUBUC WAY PERMIT'IS REQUIRED
Job Name:
Date:
Please answer the following questionnaire regarding lhe need for a "Public Way permit.:
YES
ls this a new residence?
ls demolition work being performed
lhat requires the use of the right
of way, easements or public proper$?
ls any utility work needed?
ls the driveway being repaved?
ls ditferent a@ess needed to site
olher than existing driveway?
ls any drainage work being done
affec.ting the right ol way, easements,
or public prcpefty?
ls a'Revocable Fight Of Way Permit.
required?
A. ls the right of way, easements or
public property to be used for staging,
parking or fencing?
B. lf no to 8A, is a parking, staging
or fencing plan required by Community
Development?
answered all the above questions.
NO
V
K
V
{
X
1)
2)
3)
4)
s)
6)
7',t
8)
!f19u_ a11wet9d yet to any of these questions, a "Public Way Permit" rnust be obtained.?ublic Way Permit' applications may be obtained at the pubtic Work's ofiice or at
C-o.r.nq.tuJtlty Development. lf you have-any questions ptease call Charlie Davis,lhe Town
of Vaif Construction Inspector, at 479-21*.
I have
I
Contracto/s
PUBLIC WORKS PERM]T PROCESS
How it relates to Building Permits:
1) Fill out our check list provided with a buildino oermit aoolication.
lf yes was answered to any of the above questions then a "public Way" is
required. You can pick up an application at either community Development,
located at 75 S. Frontage Road or PublicWorks, located at 1309 VailValley Drive.
2) Notice sign offs for utility companies. All utilities must field verify (locate)
respective utilities prior to signing application. Some utility companies require up
to a 48 hour notice to schedule a locate.
3) A construction traffic controUstaging plan must be prepared on a separate sheet
of paper.An approved site plan may also be used. This plan will show locations
of all traffic control devices(signs, cones, etc..) and the work zone, (area of
Construction, Staging, etc..). This plan will expire on Oct. 1Sth. and will need to
be resubmitted for approval through the winter.
4) Sketch of work being performed must be submitted indicating dimensions (length,
width & depth of work). This may be drawn on the traffic control plan or a iite
plan for the job.
5) Submit completed application to the Public Works's office for review. lf required,
locates will be scheduled for the Town of Vail Electricians and lrrigation crew. The
locates take place in the moming but, may require up to 49 houls to perform.
6) The Public Work's Construction Inspector will review the application and approve
or disapprove the permit. You will be contacted as to the satus and any thai may
needed. Most permits are released *ithin 48 hours of being received, but pleas6
allow up to one week to process.
7) As soon as the permit is processed, a copy will be faxed to community
Development allowing the "Building Permif'to be released. Please do not confuse
the "Public Way Permit" with a "Building Permit" to do work on a project itself.
NOTE:
] Jhgrgboveprocess ts tor work In a publc way onty.' Public Way Permlts are valid onty unilt ttovemUer iSttr.'A new Public way Permit is required each year if work is not complete.
cdlptt.y
TOWNOFVATL
75 South Frontage Road
Vail, Colorado 81657
303-479-2 I 38 / 479-2 I 39
FAX 303-479-2452
Department of Comnuniry Development
IIIFORUATIOf, TEEDED I{lIE|r A"PPLTTf,G FOR A IIECHATTCIL PENUIT
HEAT LOSS CALCULATIONS.
TO SCAIJE FLOOR PLA}I OF MECHANICAL ROOM I{ITH EQUIPMENT
DRAWN IN TO SCALE, WITH PHYSICAL DIMENSIONS AND BTU
RATINGS OF ALL EQUIPMENT IN I'IECHANICAL ROOM.
SHOW SIZE AND LOCATION OF COMBUSTION AIR DUCTS, FLUES,
VENT CONNECTORS AND GAS LINES.
NOTE WHETHER ELEVATOR EQUIPMENT WILL ALSO BE INSTALLED IN
MECHANICAL ROOM.
FAILI'RE IO PROVIDE IIIIS Tf,FORI,tAIIOf, IIILL DEI.AY IOUR PEruIIr.
1.
2.
3.
4.
tnwn
75 touth hontagp rcrd
rdl,cdon&a165/
Fqr) 47$2138
(34) 47$2139
office of communlty developmenl
NOTTCE tO CONTRACTORS/OIINER BUTLDERS
Effective June 20, L991-, the Town of Vail Building Department hasdeveloped the following procedures to ensure that new Lonstructionsites have adequately established proper drainage frorn buirdingsites along and adjacent. to Town of Vail roads or streeLs.
Tbe Town of vail Public ttorks Deparluent will be required toinspect and approve draiaage adjacent to Town of Vail roads orstreets and tbe installation of tenporary or permaneat culverts ataccees points from the road or street on to tle construction site.such approval must be obtained prior to any request for inspect.ionby the Town of vail Building Department for footings or temporaryelectrical or any other inspection. please carr 4'1 9-2160 toreguest an inspection from t.he public works DepartmenL. Arlow aminimum of 24 hour notice.
A]9o, the Town of Vail public Works Department will be approvingall finar drainage and culvert instal-lation with resulting roaipauching as necessary. such approvar must be obtained prior toFj.na1 Certificate of Occupancy issuance.
TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
9't 0-47 9-2738
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON
ADD/ALT COMM BUILD PERMT
JOBSITE AT ALL TIMES
Permit #: 896-0366
Job AddressLocation...
Parce1 No. .Project No.
22? BRIDGE ST
COVERED BRIDGE BLDG
210 t_-0 8 2 -6 7 -0 01
PRJg6-0204
Status. . .
3RD FAppIied..Issued...
Expires. .
I S SUED
Et2 /13 /ree 6
12/te /7ss6
06 /L7 /tee7
APPLICANT C 6( H WOODWORKING phone: 303845?968
PO BOX 3840, AVON, CO, formerly CAIRNS 81620
CONTRACTOR C&HWOODWORKING phone:303845?968
PO BOX 3840, AVON, CO, formerly CAIRNS Bj_620OWNER COVERED BRIDGE BUILDING LTDt EAST WEST PARTNERS ATTN: C, DRAWER 2770, AVON CO 81620
Description:
INSTALL BATH IN OFF]CE,HANG DRYV{ALL CEILING ETC..
B1
Type fI Fire Resistive
Occupancy: B1
Type Construct,ion: II FR
Type Occupancy:
Val-uation i 7 ,
Fi reptace Information: Rest ri cted:
***********ff********************************************** FE€ SUl.ll,lARy ***********ff*********************************************
000
fof Gas App I iances:
Add sq Fr:
fof cas Logs:
.00
20.00
.00
100.00
#Of tlood/PaL l.et:
8ui Ld i ng----->
Ptan Check--->
115 .00
74.75
Restuarant P lan Revi ew-->
DRB FeF-------
Recreation Fee---------->
Ctean-Up Deposit-------->
TotaI Catcutated Fees--->
AdditionaI Fees--------->
TotaI Permit Fee-------->
127 .75
.00
4?7 .75
4?7 .75
lnvestigat ion> 115.00
Ui L l, cat l,----)3.O0 Payments
I!e$i,951q0 BUILDING DEPARTMENT Depr: BUTLDTNG DivisionL2/,13/.L996 CHARLIE Action: NorE pLANs ro cHAhiie-!2'/17'/L996 CHARLTE Acrion: AppR eHARr,rn-oAViS---Ils{ri,gg1q0 PLANNTNG DEpARTMENT Dept: PLANNING DivisionI?/,11/,1226- q!IABI,IE Acrion: llorn pLANs ro MrKE-Fuo[r,rcA-l?/19'/199.Q-cl{ARLIE Action: AppR pER LAUREN-!,i. ----
ItEfn! ,!,9qq0 FIRE DEPARTMENT Dept: FIRE Division!?/73/ls_s_Q^cLrABI,Iq __49!ron: AppR N/A --r-- -
I!e,{'i"9tlq0 puBl-,rc woRKs '. Depr: puB woRK DivisionL2/73/1996 CHARLIE Action: AppR N/A
***********ff*********ff********ff**********lrt****ffi**f***ft******tr***tt********t****t*ff******ff************ff*******#*ff**t**
See Page 2 of this Document for any conditions that may appty to this permit.
DECLARATIONS
I. hereby .acknow ledge that r have read-this apptication, fitl,ed out in ful,t the inforration requi red, completed an accurate ptotpl'an, and state that atl the informati.on provided as required. i.s cofrect. I agree to compty riith tire information ana piot i[an,to.comPty Uith att Tol,n ordinances _and state [aus, and tb uuita this structure according iithe Tovn,s zonint and su6ivisioncodes, design reviev approved, Unifor Buil,ding code and other ordinances of the Toun afpticabLe theret;.
r 47k?138 0R Ar orlR oFFrcEREOUESTS FOR INSPECTIONS SHALL BE IiIADE TIIENTY-FOUR HOURS IN ADVANCE BY
o
NG
COVERED BRIDGE BLDG 3RD FLOOR OFFICE
210L-082-67-001
I
Send Ctean-Up Deposit To: C&H lloODl.rORKI
************************************************************************r.*******
CONDITIONS
Permit #: 896-0366 as of 12/1,9/96 Status: ISSUED***********************************r.r.*******************!k*********tr*************
Permir Type: ADD/ALT COMM BUrLD PERMT Applied, I2/13/t996Applicant:C&HWOODWORKING Issued.L2/19/I9963038457968 To Expiret 06/77/1997
o
SIGNATURE OF OIINER OR CONTRACTOR FOR HI14SELF ANO OI,]NER
Job Address
LocationParcel No
Description
INSTALL BATH IN OFFICE,HANG DRYWALL CEIIJTNG ETC..
Conditions:1. FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE
STARTED.
2. FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.3. A 1HR FIRE RATING MUST BE RETAINED ON THE CEILING LID.A 2 HR F]RE RATING IS REQ'D TO BE MAINTAINED ON ALL MECH.
cHASES/SHAFTS4. THIS SPACE MUST BE USED AS A 81 OCCUPANCY ONLY, IT CAN NOT
BE USED AS AN Rl OCCUPANCY.A TUB OR SHOWER IS NOT TO BE INSTALLED IN THIS SPACE.
THERE CANNOT BE ANY INTERNAL CONNECTION BETWEEN THE RESIDENTIAL CONDOMINIUM AND THE OFFICE CONDOMINIUM.
TOWN OF VAIL
75 S. FRONTAGE ROADvArL, co 81657
97 0-47 9-2138
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
Permit #: 896-0307
Job Address
Location. . .Parcel No..Project No.
I SSUED
F72 /73 / Lee 6
12/Le/rss6
o6/1,7 /Lss7
477 44
ELECTRICAL PERMIT
227 BRIDGE ST Status. . .
COVERED BRIDGE BUILDING 3AppJ-ied. .2101-082-67-001 Issued...PRJ96-0204 Expires..
Phone: 30352
Phonez 3035247744
Valuation:
APPLICANT ELF ENTERPRISES
P O BOX 1100, GYPSUM CO 81637
CONTRACTOR ELF ENTERPRISES
OWNER
Description: ADD CAN LIGHTS TO OFFICE
*************#*******ff********t**************iff*t****** FEE SUl,tlt^Ry
E tectri cat--->50.00
P O BOX 1100, GYPSUM CO 81637
COVERED BRIDGE BUILDING LTDt EAST WEST PARTNERS ATTN: C, DRAWER 2770, AVON CO 81620
1,500.00
DRB Fee
.00
3.00
55. OO
Total Catcutated Fees---> 53.00
Additionat Fees--------->.00
Total Permi t fee--------> 53.00Invest igat i on>
tli tt cat L---->
TOTAL FEES--->BALANCE DUE----
53.00
.oo
**********ffi*******t**t****t******ff****t********ff******************************************************ff***ffi***r******
Dept: BUILDING Division:
ERNST G -
DeDt: FIRE Division:
***'r***********ff**********itr******t**ff**t***ff********ff***************ft*****************ff*fri**t***t*i**********************
CONDITION OF APPROVAL
1. FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPI,IANCE.
***************ff*ff***********ff***ft******************t***********tr*t******i*i*********tff******************ff*******tr*****
DECLARATIONS
I.hereby _acknovtedge that I have read this apptication, fil,l,ed out in futl, the information required, conpteted an accurate ptotpl'an, and state that atl the information provided as required is correct, I sgree to compLy riith the in?ormation and pLot ptan,to comp(y uith al'L Tolrn ordinances and state [aus, and to buitd this structure acconding io'the Town,s zoning and subdivisioncodes, design review approved, Uniform Buil,ding code and other ordinances of the Torn afpticabl.e thereto.
Iten: O6OOO ELECTRICAL DEPARTMENT72/I9/1996 CHARLIE Action: APPR FORItbm:'.05600 FIRE DEPARTMENT72/19/1996 CHARLIE Action: APPR N/A
REQUESTS FOR INSPECTIoNS SHALL BE llADE TIIENTY-FOUR HoURS IN ADVANCE BY TELEPHONE Al 179-2138 oR AT oUR oFFIcE FRol4 8:00 Al,t 5:00 Pt'l
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT75 S. FRONTAGE ROADvArL, co 81657
97 0-47 9-2138
NOTE: TH]S PERMIT MUST BE POSTED ON
APPLICANT
CONTRACTOR
OWNER
ELECTRICAL PERMIT
Job Address: 227 BRIDGE ST
Locati-on... ! COVERED BRIDGEParceI No.. : 2101-082-67-001Project No. I PRJ96-0204
ELF ENTERPRISES
P O BOX 1100, GYPSUM CO 81,637
ELF ENTERPRISES
DRB Fee
Status...: ISSUED
BUTLDTNG 3Applied . ..F12/L3/r996Issued...: 12/19/I996
Expires. . : o6/1,7 /L99'7
JOBSITE AT ALL TIMES
Permit #: 896-0307
Phone t 3035247744
Phone:3035247744
l-,500.00
P O BOX 1100, GYPSUM CO 81637
COVERED BRIDGE BUILDING LTDt EAST WEST PARTNERS ATTN: C, DRAWER 2770, AVON CO 81620
Description: ADD CAN LIGHTS TO OFFICE Valuation:
fEE SUIIHARY
EIectri cat--->50. 00 Total Catcutatcd Fees---) 53.00
Invest i gation>
tli Lt cat l,---->
TOTAL FEES--->
.m
3.00
53.00
Additionat Fees--------->
TotaI Permit Fee-------->
.00
51.00
Payments-------
.00
*ff**ffi***********t****ttt**ffi*ff********ff**ff**********ff***************t***********r*ff******ff*****ff*****ff*lrt**ff*****
Ileryr! ,q6Qq0 ELECTRTCAL DEPARTMENT Depr: BUTLDTNG Division:12/I9/L996 CHARLIE Action: AppR FOR ERNST G ^Item:'.05600,!IRE DEPARTMENT _ , Dept: FIRE Division:12/19/L996 CHARLTE Actionl AppR N/A
******i***********************ff**************i***ff****t*******************************************fi*********************ff*****
CONDITION OF APPROVAI,J
].. F]ELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
************t*************t****************************i************i******************t******ff******ff***ft********************
DECLARATIONS
l. hereby .acknow ledge that I have read.this apptication, fittcd out in ful,t the information required, compteted an accurate ptot
P(an, and state that at( the information prov'ided as requi ned is correct. I agree to compl,y riith the iniormation and ptot ptan,to comPty lrith atl Town ordinances_and state [aws, and to buitd this structure according io-the Townrs zoning and subdjvisioncodes, design review approved, Uniform Buitding code and other ordinances of the Town afpticabl.e thereto.
REOUESTS FOR INSPECTIONS SHALL BE }IADE TIIENTY-FOUR HOURS IN ADVANCE BY TELEPHoNE AT 479-2138 oR AT oUR oFFIcE FRoI'I 8:oo AI.I 5:oO PI'I
ffozs
TOWN OF VAIL
75 S. FRONTAGE ROADvArL, co 81657
97 0-47 9-2t38
JOBS]TE AT ALL TIMES
Permit #: 896-0366
Description:
TNSTAIJIJ BATH IN OFFICE,HANG
Occupancy: B1
Type Construction: II FR
Type Occupancyi
227 BRIDGE ST
COVERED BRIDGE BLDG
21,0L-082-6 7 -001
PRJg 6-02 0 4
DRYWALL CEILING ETC..
B1
Type II Fire Resistive
Job Address
Location. . .
Parcel No..Project No.
Status. .
3RD FAppJ-ied.
Issued..
Expires.
.: APPROVED
. tE12/1,3/1,es6
. r 12/7e/tee6
. : 06/!7 /Lee't
APPLICANT C&HWOODWORKING Phone:
PO BOX 3840, AVON, CO, formerly CAIRNS 81620
CONTRACTOR C&HWOODWORKING Phone:
PO BOX 3840, AVON, CO, formerly CAIRNS 8l-620OWNER COVERED BRIDGE BUILDING LTD
B EAST WEST PARTNERS ATTN: C, DRAWER 2770t AVON CO
3038457968
3038457968
81620
#of Uood/PaL let:
***ffiffi*fr****t*t*******ft************************t**tffi FEE SUttilARY *t**f,f,ffi****t*ffi**t***ffit**t****t****f,i**i*ti****
Valuation:
Fireptace Inforration: Restrictcd:
7, 000
#Of Gas Apptiances:
Add sq Fr:
#0f Gas Logs:
.00
20.00
100.00
Bu i Lding----->
Ptan check--->
lnvest igat ion>
1,, i l, L ca l. l,---->
115.00
74.73
115.00
5.00
Restuarant Ptan Revi eH-->
DRB Fee--------
Recreation Fee---------->
Ctean-Up Deposit-------->
TotaI Catcutated Fees--->
AdditionaI Fees--------->.00 Total Permit Fee-------->
tc7 -75
.00
427 .75
.00Payments-------
********ffi*********r*ffi****r*-*lTlhffff;;*---**i**********1kH*******i*lli5#5;*-*-*;;L****i*1il;li**
Item: .O51OO BUILDING DEPARTMENT Dept: BUILDING Division:L2/.I3/.t996 CHARLTE A-Eiona--Noir pr,ells ro cHAF.r,inI2'/I7'/1,996 CHARLIE Action: AppR CHARLIE DAVISIleqi'.954q0 _!I-,4\NNING DEPARTMENT Dept: PLANNTNG Division:12/.13/7996 CHARLIE Action: NOTE pLANs TO MIKE-FMOLLiCA- - --
12'/19'/1,996 CHARLIE Action: AppR pER LAUREN W.I!e{ri'.glqqo,FIRE DEPARTI4ENT ____ _,_ Depr: FrRE Division:!?1t3/\22Q^cgABlIE Aqtton: AppR N/AI!en:'.05500_PUBLIC WORKS Dept: pUB WORK Division:12/13/1996 CHARLTE ection: AppR N/A
*ff***********ff******rffiffi**t****ffi*****ff*******ffi******i****t*****ffi****ffi**r*******ff***rffir*****ff*ffi*******
See Page 2 of this Document for any conditions that rnay apply to this permit.
DECLARATIONS
I. hereby .acknou ledge that I have read_this appl,ication, fil,ted out in ful,t the information requi red, compl,eted an accurate p[otpl'an, and state that atl the information provided as requi red is correct. I agree to compty viith tire infornation and pt,ot il.an,to.corPty tiith al't Toun ordinances,and state [aws, and to buiLd this structure according to- the Town,s zoning and subdivisibncodes, design reviev apProved, Uniform Buil.ding Code and other ordinances of the Town a[p[icabLe thepeto.
REaUESTS FOR IilSPECTIO}IS SHALL BE iIADE TIIENW-FOUR HOURS IN ADVAIICE BY TELEPHONE AT 179-2138 OR AT oUR OFFTCE FRott 8:m A 5:OO p
tCOr-o l?- l7-76
9: tonu CD
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON
ADD/ALT COMM BUILD PERMT
o
U@DI,IORKING srcNATuRE a,t- oR coNTRAcroR FoR Hu,rsELF AND or.,NER'Send C ldan-Up ocposit To: C&H
********************************************************************************
CONDITIONS
Permit #: 896-0366 as of l2/L9/96 Status: APPROVED********************************************************************************
Permit Type: ADD/ALT coMM BUrLD PERMT Applied: L2/I3/Lgg6Applicant:C&HWOODWORKING Issued:t2/19/L9963038457968 To Expirez O6/17/L997
Job Address:Location: COVERED BRIDGE BLDG 3RD FLOOR OFFICEParcel No: 2101-082-67-001
DescripLion:
INSTALL BATH IN OFFICE,HANG DRYWALL CEILING ETC..
Conditions:
1. FIRE DEPARTMENT APPROVAL 15 REOUIRED BEFORE ANY WORK CAN BE
STARTED.2. FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.3. A 1 HR FIRE RATING MUST BE RETAINED ON THE CEILING LID.A 2 HR FIRE RATING IS REQ'D TO BE MAINTAINED ON ALL MECH.
cHASES/SHAFTS4. THIS SPACE MUST BE USED AS A 81 OCCUPANCY ONLY, IT CAN NOT
BE USED AS AN R1 OCCUPANCY.A TUB OR SHOWER IS NOT TO BE INSTALLED IN THIS SPACE.
THERE CANNOT BE ANY INTERNAI CONNECTION BETWEEN THE RESIDENTIAL CONDOMINIIJM AND THE OFFICE CONDOMINII'M.
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGE ROADvArL, co 81657
97 0-47 9-2L38
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ELECTRICAL PERMIT Permit #: E96-0307
Job Addrese: 227 BRIDGE ST Status...: APPROVED
Location. . . : COVERED BRIDGE BUILDING 3Applied. . zFL2/L3/1996Parcel No.. ! 2107-082-67-001 Issued...: L2/L9/L996Project No.: PRJ96-0204 Expires..: 06/L7/L997
APPLICANT ELF ENTERPRISES Phonez 3035247744
P O BOX 1100, GYPSUM CO 81637
CONTRACTOR ELF ENTERPRISES Phone: 3035247744
P O BOX 1100, GYPSUM CO 81637OWNER COVERED BRIDGE BUILDING LTD* EAST WEST PARTNERS ATTN: C, DRAWER 2770, AVON CO 81620
Description: ADD CAN LIGHTS TO OFFICE Valuation: 1,500.00
'|t*ff***ffffi**|tffi***ffiffi**ff***ffirrt*****t*f*#ff*** FEE SUllllARY ***ffi****#***#*ffi****t*ffiffi*****ffi**#*****ff
Etectrical,---> 50.00 Tota[ Catcu[ated Fees---> 53.m
DRB Fee
Investigation> .m Totat Pernit Fee--------> 53.00[i L L Ca l, t---> 3. m payrnents-------
TOTAL FEES---> 53.00 BALANCE DUE-----
**t*****ff*ff***||**ff********ffi******ffiffiffi******ffffi**ffiffi***ffi*H**********************t*********.i**
rtem: .06000 ELECTRICAL DEPARTMENT Dept: BUILDING Division:T2/L9/L996 CHARLIE AcIion: APPR FOR ERNST G .
I!e$i',qlqq0-EIBE DEPARTMENT Dept: FIRE Divj-sion:12/I9/L996 CHARLTE Action3 AppR N/A
*******ff't*****ff***********ff*#************ff***ff************ff***#ff**trrffi*******ffi***ff*******t*****tr******ff*ff*******
CONDITION OF APPROVAL
T.. FIELD INSPECTIONS ARB REOUIRED TO CHECK FOR CODE COMPLIANCE.
H***ffiffiffiffi*ffi*******ffi*ffi*********ffi********ff*t**t****i***S******rbrrt**rHnffinffiffiffiffitffi*
DECLARATIONS
I. hefeby .acknovtedge that I have read this apptication, fiLted out in ful,l, the information required, conpl.eted an accufate ptot
Ptan, and state that aL[ the infonmation provided as requi red is conrect- t agree to conpLy Hith the infornation and ptot irl,an,to compty vith al'l' Town ordinances and state [avs, and to buiLd this structure according to the Toun's zoning and subdivisioncodes, design reviev approved, Uniform BuiLding code and other ordinances of the Town afpticabl,e thereto.
REQUESTS FOR INSPECTIONS SHALL BE I'IADE TI,ENTY-FOUR HOURS IN ADVANCE BY TELEPHONE Al 179-?138 OR AT OUR OFFICE FROI| E:00 An 5:OO ptl
SIGNATURE OF O}INER OR CONTRACTOR FOR HIIISELF AND OI.'NER
?r
)*ContacE Eagle Count, o"""""ors?frr..( ar 970-328-8640 for parcel /l . TowN or VAIL coNsTRucrro
LPARCEL lt:. 'Llol- OhZ- Lrl*t PERMIT AppLIcATIoN FoRM? DArE.lZ_t3:41_/
, APPLICATIoN UUST BE FILLED OUT COMPLETELY OR IT ttAy NOT BE ACCEPTED
'I****************************tt* PERMIT fNFORMATfON *****************************n.- '{:-Building tf,l-erurnuins (J-nlectricat [ ]-MechanibaL [ ]-other -
o
N PERI'IIT #
Job Narne : f--'r Job Address:
Owners Nane:
Lesal Descripti on, r, BtE.l{ $rrrrn ,uuorurrro*
A,;rre.l Address: [Lxrc,.- F llln.. p,-otl-Vs,'5'1ttb
Architectt il/n Address: pr,.flA_
ceneral Description:
N, tz- lAEffiarurWork Class: [ ]-New I
Number of Exuelling Units: I Number of Accorunodation Units, I
Electrical Contractor
Address: i4
Ptunbing
Address:
Mechanical Contractorl
Address:
********************************
BUTLDING PERMIT FEE:
PLUMBING PERMIT FEE:
MECHANICAIJ PERMIT FEE:
PLT'MBING PI,AN CHECK .FEE:
}'ECHANICAL
ELECTRICAL FEE:
OTHER TYPE OF FEE:
DRB FEE:
Town of Vail Reg. NO."otL
Phone Number: qW sU-@-
Town of VaiL
Phone Number:
Town of Vail Reg.
Phone Number:
*******************************
PI,AN CHECK FEE:
.r-r .s r-r.|'rt i Il\RECREATIoN FEE: lE4
CLEAN-UP DEPOSTIS1
rorAL PERMTT r"sj DEB13-+${+
BUILDfNG: rrr!; i ;: r \
SIGNAIT'RE:
ZONTNG:
SIGNATURE:
FOR OFFTCE USE
BUILDING
ontractor:NO.
c No*waPfuBcf ae4D
Lb 81.fi-D
?o,
Auatl,
CLEAN I'P I}EPOSIT REEIITTD !O:
o
75 3oulh fronlage road
vail, colorado 81657
(3o3, 479-2L.38 ot 479-2L39
TO:
FROM:
DATE:
SUB.TECT:
olflce of communlly developmcnl
ALL CONTRACTORS CI'RRENTLYL REGISTERED WITH THETOWN OF VArL
TOWN OF VAIL PUBLIC WORKS/COMMUNITY DEVELOPMENT
}IARCH 15, L988
CONSTRUCTTON PARKINC & MATERTAL STORAGE
rn summary, ordinance No. 6 states that it is unrawfur for anyperson to litter, track or deposit any t"ir,-t".i, sand, debrisor naterial , including trash lurnpsters, portable toilets andworkrnen vehictes. upon any streetl siaewailc, -;ii;y or pubticpl?g" or any portion theieof. itre right_";;;t-;n arl Town ofVail streets and.Igag. is approximately 5 ft. off pavement.Ttttl ordinance wir.r. be =t.iEiiv--lnforc-ea by the-rown of VailPublic lrorks DeDartment. pers3ns found vi;ratin; this ordinanceyill- be given a 24 hour written i"iiJ"-t"*;;;:*=aid rnareriar.rn the event the person so notified_aoes noi -"rpiy with thenotice wi.thin the 24 hour.tin;-;;;;i;i;,"ii"-i"f,ric worksDepartment wilr renove said nateii"t "t it"-'""i."se of personnotiried. The provisions "r-tni"-"iai"."li! =f,5ii' not beapplicable to c-onstruction, ruirri"t"r,ce or repair projects ofany street or al1ey or any utilities i" it,.-rlgfri___*"y.
To review ordinance No. 6 in full , prease stop by the Town ofYiil_tli+ding Departrnenr to obrain a copy. Thani< you for yourcooperation on this matter.
ositionTneliErrsn-Ifi (i.e. contractor, owner)
75 touth frontage road
vrll, colorado 81657(30t) 479-2L38 ot 479-2L39 otflce of communlty deyolopm€trt
BUILDING PERIiIT ISSUANCE TIME FRAITE
If li,i, peryt!t requires a Town of Vail fiire Department Approvat,Engineer''s. (.Pgb.l ic Uorks) reyiew and approvat,' a ptannin6'b.p..t .ntreview or Heatth Department review, anl'a-"euie; ;i-;i;;"EriioingDepartment' the estimated time for a totar ".ui"n-iluv"tu[.'i, tongas three weeks.
f]l c9mm9rgial (iarge or sma'il) and ail mu]ti-family permits wilrhave to follow the above menti6ned maximum requireminii. 'Residentia.l
and.small projects_shourd take a resser amount or-time.' Hoiever, ifresidential or smal'l er.projects impact the various auoue mentioneadepartments with reoard to necessary review, ,r"i" i""j""ii"ruyalso take the three-weet< periJJ.
Every attempt wi1'r be made by this departnent to expedite thispermi.'t as s.eon as possible. -
I' the
frame.
undersigned, understand the plan check procedure and time
Communi ty Devel opment Departunent.
TO:
FROM:
DATE:
RE:
MEM6RANDUM
ALL CONTRACTORS
TOWN OF VAIL PUBLIC WORKS DEPARTMENT
MAY 9, 1994
WHEN A "PUBLIC WAY PERMIT'tS REOUIRED
Job Name: LaDate: l?: t3 -nv
Please answer the following questionnaire regarding the need lor a "Public Way Permit":
YES
ls this a new residence?
ls demolition work being performed
that requires the use of the right
of way, easements or public propefly?
ls any utility work needed?
ls the driveway being repaved?
ls different access needed lo site
other than existing driveway?
ls any drainage work being done
atfeciing the righl of way, easements,
or public property?
ls a "Bevocable Right CI Way Permit"
required?
8) A. ls the right of way, easemenls or
public property lo be used for staging,
parking or fencing?
B. lf no to 8A, is a parking, staging
or fencing plan required by Community
Development?
ll you answered yes to any of these questions, a 'Public Way Permit' musl be obtained.
'Public Way Permit" applicalions may be obtained at the Public Work's office or at
Cgmmunity Development. lf you have any questions please call Charlie Davis, lhe Town
of Vail Construction Inspec.tor, at 479-2158.
I have read and answered allthe above questions.
Conlraclor's Signatur
NO
7"1)
2l
f,
3)
4)
s)
6)
x
r
f
Job Name
PUBLIC WORKS PERMIT PROCESS
How it relates to Building Permits:
1) Fill out our check list provided with a buildinq permit application.
lf yes was answered to any of the above questions then a "Public Way" is
required. You can pick up an application at either Community Development,
located at 75 S. Frontage Road or Public Works, located at 1309 Vail Valley Drive.
2) Notice sign offs for utility companies. All utilities must field verify (locate)
respective utilities prior to signing application. Some utility companies require up
to a 48 hour notice to schedule a locate.
3) A construction traffic control/staging plan must be prepared on a separate sheet
of paper.An approved site plan may also be used. This plan will show locations
of all traffic control devices(signs, cones, etc..) and the work zone, (area of
Construction, Staging, etc..). This plan will expire on Oct. 1Sth. and will need to
be resubmitted for approval through the winter.
4, Sketch of work being performed must be submitted indicating dimensions (length,
width & depth of work). This may be drawn on the traffic control plan or a site
plan for the job.
5) Submit completed application to the Public Works's otfice for review. lf required,
locates will be scheduled for the Town of Vail Electricians and lrrigation crew. The
locates take place in the morning but, may require up to 48 hours to perform.
6) The Public Work's Construction Inspector will review the application and approve
or disapprove the permit. You will be contacted as to the status and any that may
needed. Most permits are released within 48 hours of being received, but please
allow up to one week to process.
7) As soon as the permit is processed, a copy will be faxed to Community
Development allowing the "Building Permif'to be released. Please do not confuse
the "Public Way Permit" with a "Building Permit" to do work on a project itself.
NOTE:
* The.above-process lsJor work.ln a public way,only.* Public Way Permits are valid only untit November 15th.* A new Public Way Permit is required each year if work is not complete.
cdlF,vay
75 South Frontage Road
Vail, Colorado 81657
303 -479-2 I 3 I / 479-2 I 39
FAX 303-479-2452
1.
2.
De pa rnn e nt of C otnnun i ry D eve lo pm e nt
INFORMATION NEEDED }|HEN APPLTING FOR A UECHAilTGAI, PERMIT
3.
4.
HEAT LOSS CALCULATIONS.
TO SCALE FLOOR PLAN OF MECHANICAL ROOM WITH EQUIPMENT
DRAWN IN TO SCALE, WITH PHYSICAL DIMENSIONS AND BTU
RATINGS OF ALL EQUIPMENT IN MECHANICAL ROOM.
sHow srzE AND I-,oCATION OF COMBUSTTON AIR DUCTS, FLUES,
VENT CONNECTORS AND GAS LINES.
NOTE WHETHER ELEVATOR EQUIPMENT WILL ALSO BE INSTALLED IN
MECHANICAL ROOM.
FAILURE TO PROVIDE THIS INFORMATION I{ILL DEI,AX TOUR PERI,TIT.
o
75 louth lronlage road
vall, colorado 81657
(30it) 4792138
(303) 47e2139
off lce ol communlty developmenl
. NOTICE TO CONTRACTORS/OWNER BUILDERS
Effective .fune 20, 1991, the Town of Vail Building Department has
developed the following procedures to ensure that new ionstructionsites have adequately established proper drainage from buildingsites along and adjacent to Town of Vail- roads or streeLs.
The Town of VaiI Public ltorks Department will be required toinspect and approve drainage adjacent to Town of VaiI roads orstreets and the installation of temporary or permanent culverts ataccess points from the road or street on to ttre construction site.
Such approval- must be obtained prior to any request for inspectionby the Town of Vail Building Department for footings or temporaryelectrical or any other inspection. Please call 479-2L60 torequest an inspection from the Public Works Department. AIIow a
minimum of 24 hour notice.
Also, the Town of Vai] Public Works Department will be approvingall- fj.nal drainage and culvert installatj.on with resulting roadpacching'as necessary. Such approval must. be obtained prior to
Ej.na1 Certificate of Occupancy j.ssuance.
12/16/SO ll:27
I
slR&f, S.D.
SEREI{DIPITY, tTD"
501 West.Broad.ty, 19th Floor
San Diego, Cali{omia 92101
Dsccnrber 16,1996
YI,AFACSIMILE
Mr. Mikc Mullica
llousing hspection Deparbnent
Town ofVail
Vail" Colorado 81657
Rc: Offcc Spoce Condominium
Covered Dridge Building
Deu Mr. Mullica:
I am a duly clcoted officer of serendipity, Ltd. the ownet of the ebove
referenced Condominium. The purpose of ttris lcner is to udvisc yuu thar it is
Serendipity's interest to fiunishthgcondomirium with the necessarv and appropnate
fumfu; arrd equipment so that it can be llsed to host client meetings,.to be e
communicatiOrri clnter ftom whichto send zmd rsssive electrodo and papcr data' and
a cotrfsr€occ and multi media centcr to make audiovisual presentahorts to prospective
iavestors and Clients in various Serendipity projec.ts. Rccntrse ecccss to thc officc
spul4 is irrtcnded to bc scparatc ftom aioeiJto thc adjogins residcnbol.spnoe, wc need
t6 mafe srue frat tftc offiie has all nccessary acoommodadons for lengfly meoftEs
@ ooz; oor
. I2/t8/98 r4t27 O SIR&B S.D,
Mr. Mikc Mullioa
Deceurbbr 16, t996
Pege2
which must include a full bathroonl including shower and tub, toilct and other
fncilities usualty found in a sophisticeted privafe ofrice.
Should you have aIry qucsdons, pless€ call me at (6 19) 3 3E-66 19.
trHt:W
Victor A. Vilaplana
3Dt :DNl\litnfi |ul020t1,lt. I
G oog, ool
t
72/L6/gO 1{:20 E svR&H s.D,
Srrnpplnn, Mtn r,n, RIcrrrER& HAIcT0N tLP
auMrrfD t lA Lrrr l^rrrrLilftt n|ct.|JDn'1ctnoFtlf,1'D{r1'rnn}*..'tl'fr s
ATTONNEYSAT IJW
:tOI'WEsT BROADWAY. NIN&TEE.IITH FLOOR
saN DE$o. cAufoRJ{lA 92r01n5tE
TELI,PHoNE (619) 3386soo
nrcsntrL;?ll) 234'38rs
Zootzool
YY8-30030
$auDieBo Offrcc
IELECOPYNUMBER
(619) 23+3Ets
TARGETED-TIME
DNI/DA}
*T THIS TELECOPY TRANSNdISSION WILL NOT BE MAILED **
DAIE: Lcc€mber 16, 1996
lO: l'fikeMullica FAXNO.(97o) 479-2452
FIRM: Townof VaiI CONF.NO;
IROM: Victor A. VilaPlana, Esquire
RECI:ItsT CONHRMATION VIA PEONE REQUESTED:
FA)( RECTiO'T CONFIRMED BY:
'l'() l'AJ- NUMBER OF PAGES (INCLUDING THIS PAGE):
IF ALLPAGES NOT RECEIVED, PLF.ASE CAIJ, (619)338{s00
NAI\,IE OF SENDER
M[TiSAGE:
TIME STARTED
MESSA€E IS NgT THE ELNGRI NC.THE.ME€CAC.E TO. TIIE
il.=ffi:6';*;riiii loiliiErii-n-eii-irlmi'rLii i-niifur orsiemir.rairirru, orsrRrBrrrrrN oR c.oFvrNG oF rHls ccrtmluNlcArloN ls
u .v.r?r E'lrlrlllc llln
YES xNo
ll;fiHiitrdlffiiil;.'ii-idi-nave neclrvED rlrs coMuunriiiron rn ennon, qqerqe-ryg1tFY us rMMEor^T€LY Bv rEtEPHot{E
^NDnEruix rrrE oiloin,ru uessec'i io riEii rrre iaove ADDREss vlA rHE u.s, e6snl s:avtcE, rH,rNKYou'
75 South Frontage Road
Vail, Colorado 81657
970-479-21 3 V479-21 39
FAX 970-479-2452
COMPANY NAlvlE:
D e p artme nt of C omrnunity Deve lo pment
COMMUNITY DEVELOPMENT
FAX TRANSMITTAI, SHEEI
, t76 - 8S-/rlFAX TELEPIIONE NUIIIBER: c/ I
FROM:
DATE:f)- 17- to TIME:2;u_es_-
n
# oF pAcES tN DOCUMENT(S) (NOT |NCLUDTNC COVER St-IEET)-----a-
RESPONSE REQUf RED'I - /(
SENT BY:
TOWN OF VAIL COMMUNITY DEVELOPMENT FAX #:- (.970) 479-2452
TOWN OF VAIL COMMUNITY DEVELOPMENT TELEPHONE #: (970) 479-2138
SPECIAL COMMENTS AND NOTES:
tp **"tto'utr
I
TOWN OF' VAIL
75 S. FRONTAGE ROAD
VAIL. CO 81657
97 0-47 9-2L38
Job Address. . .
Location
Parcel- No.....Project Number
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON
MECHANICAL PERMIT
JOBSITE AT ALt TIMES
Permit #: M97-0001
22? BRIDGE ST STaIus..
22? BRIDGE ST 3RD FLOOR OFFICEApplied.2101-082-67-001 Issued. .PRJ96-0204 Exoires.
I SSUED
or /02 / LeeT
0r /02 / reeT
o7 /oL/Lee7
*********************************************************** FEE SUI'lllARY ********t t************************************************
l4echani cat---)40.00 Restuarant Plan Revi ew-->
Description:
ADD TWO SPRINKIJER HEADS TO EXISISTING
Fireplace Information: Restricted: Y dof Gas App I i ances:
Ptan Check---> 10.00 DRB
VALLEY WIDE MECH. & ELECTRICAL
P O BOX 5080, AVON CO 81620
VALTEY WIDE MECH. & ELECTRICAL
P O BOX 5080, AVON CO 81620
COVERED BRIDGE BUILDING LTD
E EAST WEST PARTNERS ATTN: C,
.OO TOTAL FEES-----
3.00
Phoner 3039491747
Phone z 3039497747
DRAWER 2770t AVON CO 81620
Valuation: 1, 600. 00
fOf Gas Logs: #0f t,ood/PatLet:
APPLICANT
CONTRACTOR
OWNER
Invest igat i on>
Ui l. L Ca t l,---->
.00 Total catcutated Fees--->.m Addit ional Fees--------->53.00 Total Pernit Fee-------->
PaYments-------
53.00
.00
53.00
53.00
***************r********r**************************************************************illllii-lli;;;;;;;iiiiiii************il3***
Itelni .0s100_BqILDING DEPARTMENT_ Dept: BUTLDTNG Division:0I/02/1997 CHARLIE AeEion:--AFFn x/nIqe{ri'.Q56q0 FIRE DEPARTMENT ' DeDt: FIRE Division:OL/.02/.1.997 CHARLIE Action: NOTE SENT TO rrRr-Dnpt----OL'/O2'/1997 JEFF_A Action: AppR Fire Dept. Approves
CONDITION OF APPROVAL
1. FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
****** * * * * * * *** * *** * ** ** rr* r.* ***** ** * * *** *** * ******* ** t * ** * * * **rr* ** *** * * * * *** * * **
DECLARATIONS
I.hereby -acknowtedge that I have read this app[ication, fitLed out in futt the intormation requi red, conpteted an accuratc ptot
PLan/ and state that atl' the information provided as required is correct. I agree to conpty riith tlre information and pLot itan,to.comPty lrith aLL Town ordinances and state lalrs, and to buiLd this structure according to-the Toyn's zoning and subdjv,isioncodes, design review approved/ uniform Buil,ding code and other ordinances of the Tovn cfpt,icabte thereto.
REOUESTS FOR INSPECTIONS SHALL BE IIADE TIIENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 oR AT oUR oFFIcE FRoI4 8:oO AI'I 5:oo PII
SIGNATURE OF OIII{ER OR CONTRACTOR FOR HII.ISELF A}{D
TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 4L657
97 0-47 9-2r38
Job Address...:Location......:
Parcel No.....:Proiect Number:
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON
MECHANICAL PERMIT
JOBSITE AT ALL TIMES
Permit #: M97-0001
227 BRIDGE ST
227 BRIDGE ST 3RD
2101-0I2- 6 7-0 01
PRJg6-0204
Stat,us. . .
FLOOR OFFICEAppIied..
Issued...
Expires. .
ISSUED
o1/02/ree7
or/02 /tee7
07 /o1/tee7
APPLICANT VALLEY WIDE MECH. & ELECTRICAL I
P O BOX 5080, AVON CO 81620
CONTRACTOR VALLEY WIDE MECH. & ELECTRICAL I
P O BOX 5080, AVON CO 81620OWNER COVERED BRIDGE BUILDING tTDt EAST WEST PARTNERS ATTN: C, DRAWER 2770,
Phone r 3039491747
Phone : 3039 4917 47
Valuation:L, 600 .00
F i rep[ace Information: Restricted: Y #0f cas App t i ances:fof Gas Logs:#Ot Uood/PaL Let:
***********************************i****t****************** FEE SUlll'lARy **********************************************************
l,lechani ca [---)40.00 Restuarant Ptan Revi ew--).00 Totat Catcutated Fees---) 53.00
Description:
ADD TWO SPRINKLER HEADS TO EXISISTING
P(an check---> 10.00 DRB
AVON CO 81620
.00 Additionat Fees--------->55.00 Total Permi t Fee-------->.00 TOTAL fEES-----
3.00
***********************r***r**************r********************************************lllllli-lli;;;;;;;iiiiiii************ill***
i!e4i,91190_EqII,DING DEpARTMENT Depr: BUTLDTNG Division:Ol/02/1997 CHARLIE Action: APPR N./AItem:'.056Q0_EIBE DEPARTMENT ' Depr: FrRE Division:oL/.02/.1997 CHARLTE Acaiont NorE sENr To FrRE'5epi----OL'/O2'/1997 JEFF_A Action: AppR Fire Dept. Approves
CONDITION OF APPROVAIJ
1. FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
********************************************************************************
DECLARATIONS
I. hereby .acknov tedge that I have read.this application, fitl.ed out in ful,t the information required, conp[eted an accurate ptotptan, and state that att the information provided as required is correct. I agree to compLy riith tire information and ptot 'pt,an,
to compty with al'1. Torrn ordinances_and state_taws, and to buil.d this structure accofding to-the Tovn,s zoning and subdivisioncodes, design revie!, approved, tniform Buil,ding code and other ordinances of the Town afpticabte thereto.
REAUESTS FOR INSPEC1IONS SHALL BE IIADE T}IENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AI 479-213E oR AT oUR oFFIcE FRoI4 8:oo A 5:oo PII
UCTOR TOR HII,ISELF AND *-
lnvest igat ion>
l.l i l.L caLL---->
.00
53.00
53. OO
ffi. ."""., o""u""o'" or".' ac 970-3/8-8640 fqr Pareq,! il .-. .TOWN OF VAIL CONSTRUCTTON
.PARCEL II./IOI. OFL- 47. CIO( PERMIT APPLTCATTON FORMl oeri..t-d.4U'_ -?ene-o;o(
APPLTCATION MUST BE FILLED
*****************************
[ ]-Building I 1-rturuling t
Job Name:
Legal Description: Lot
Owners Nane:
Architect:
ceneral Description:
PERI'IIT /I
OUT COMPLETELY OR IT MAY NOT BE ACCEPTED
PERMIT TNFORMATTON * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
l-Electrical 6y';-uectranibal [ ]-other- 7\'
Job Address:
Block_ Filing surorvrsroll,
Address:
Address:
Ph.
l' n". rlfi
awork crass: [ ]-New tf-art"tation t l-Additional [ ]-Repair [ ]-other/\
Nurnberof Dwelllng Units:L Nurnber of Accomrnodation Units: L
-yro.r and Type of Firepraces: cas applianceslL eas rogs 6 wood/perl e\4_
T**************************t
**'****
+.#:groag?
*********************************
BUTLDTNG: + *o - rr,nctnt'6r,: $ -o - orHER: | -D -
.
PLUMBTNG: * -o - MEcHANrcAtrSJTffiT_ ToTAL; W
Jt*************************** CoNTRACTOR TNFORI.IATION ***************************Seneral Contractor: Town of Vail Reg. NO._Address: rrlra;a rrrr*lra> rphone Number:
Electrical Contractor:
Address:Town of Vail Reg. NO.
Phone Number:
Town of Vail Reg. NO.
Phone Nurnber:
Plunbing Contractor:
Address:
Town of Vail Req. nO. n1-?
Phone Nurnber: cl4l- 1741
* ********** ** ******* * ****** ***** FOR OFFTCE USE ** * ***** ** ******** ** ******* * * **
BUfIJDING PERIIUT FEE: BUILDfNG PLAN CHECK FEE:PLUMBING PERMTT FEE: .T
PLUMBING PI,AN cHEcK FgE:MEcrrANrcAL pERMrr rnn: T I,{EcHANrce,L prAN cHEcK FEE:
--
:ffisfl.i$}fIF"i"", --- :#lfi1II"LiHl.;
-
-
DRB FEE:. TOTAIJ PERMIT FEES:
Mechanical Contractor:
VALUATIoN I gutr.ornc:
_l_l STGNATIIRT!
-t_t_t
I zoNrNG:
eomments: /JztA
STGNATIIRE:
TYPE IGROUP
CLEAN UP DEPOSIT REFIIND !O:
96.12,31 15r 15 P, 2FROI'I BFP E
I
o
N(o
o
o
ot-
io
t
ooa
9=
6=EU'.)q-rE
XI
rZ
.-,zfl
sE
-g
2W
:
.e6cE
.r=6326
6E!
> r.1
=
v.
euEoo
b
I
(o
s
trj()
t!tro
--f
FL!Llo-
=o-oi=2.vt<
XFr.J(,
FtdJoF
Ftd \\lJ-\6r-
F
I
F
LdJ
F
Ctr
tE
E EsctE
s E8o GE3 o>9;
<..:,
***END*,N*
O ic,r42.oer5lic-31-96 TUt 2,22 PM
REPT 131 TOt^tN 0F VnIL, COLORADO
AL/3L/97 @6:51 REOUESTS FOR INStrECTION NORK SHEETS FORz L/3I/97
Activity: M97-OO01 L/31 /97 Type: B-MECH
Address z ?P,7 BRIDGE ST
Loeation:'€87 BRIDGE ST 3RD FLOOR OFFICE
Parce I : 31O1-68e47-o'6L Occ r
Description: FIDD TWO SPRINKLER HEADS T0 EXISISTING
Applieant: VALLEY WIDE MECH. & ELECTRICAL I trhoner
Owner: COVERED BRIDGE BUILDING LTD Fhone:Contractor: VALLEY t^rIDE MECH. & ELECTRICAL I Fhone:
trRGE A
AREAI CF
Status: ISSUED Constr: ACOM
Us e.f
3439491747
3Q39491747
Inspect i on Request Inf or.nat i on, . . . .
Requestor: BRI0N/VHLLEY WIDE MECH
Req Tine: O8:OO Connentsr
Itens requested to be Inspected...
OO390 MEtrH-Final
Fhone:39O-3Ci53
Act i on Connent s Tine Exp
History.....
AO?AA MEtrH-Ror-tgh
@@E?5 FI RE-StrRINK,LER ROUGH
@L/04/97 Inspeeto/: JEFF_A
@e39@ MECH-Final
OO538 FIRE-FINAL C/tr
,.<.d.
Actionl AtrtrR rough in approved 1-7-97
Inspect i on
Itemr' Iten:
''.. Ite,r;
Iten:
REPT131 TCtt^,N UF VAIL, COLORADO trAGE 7
AREA: CFAr/3I/97 O6:51 REOUESTS FOR INSF,ECTION [^,ORK SHEETS FORt l/3L/97
tretivity: 896-O366 1/31 /97 'fype: A-COFIM Status: ISSUED Consttt: ACOFI
Address: EE7 BRIDBE ST
Location: COVERED BRIDGE BLDG 3RD FLOOR OFFItrE
Farcelr 3101-OBe-67-OOl Oec: User II FR
Description: INSTALL BATH IN OFFICE'HANB DRYWALL CEILING ETC..
Applicant: C & H I.,OODI^,ORKING
Owner: COVERED BRIDEE BUILDING LTD
Eontractor: C & H I^TUODNORKING
trhone: 3O38457968
Phone:
Phone: 3t2r38457968
Inspeet ion Req r-rest Infor"oation.....
Reqr.1sstr or l brian/C&H t^loodworking Phone: 39@-3rZt53
Req Tiner t38r60 Eonnentsr'trenthouse Office,WILL CALL FLERSE
Itens pequested to be Inspected... Action Cornents
60UtgA BLDG*FinaL
Time Exp
-g-';
.+-*
-F---*Inspection History.....
Itemr O0ta3CI BLDG-Framing. le/ 3L /96 Inspector: DS
Item r AerE5O BLDG-InsuldttbnItem: AAO6O BLDE-Sheetroelr NailItem: AAragO BLD6-FinalIterr OO540 BLDG-Final C/O
nct ion ! trA LJNLL INSPECT REBRD
t'
O MEMORANDUM
ENVIRON}IENTA], COMMISS IONTO:PLANNING AND
FROM: DEPARTMENT OF COMMUNITy DEVELOPMSNT
DATE: October 9, 1980
RE:A condilional use Request for the covered Bridge store to arrowthe conversion of one apartment from Residential to corunerciaL.
t
DESCRIPTION OF PROPOSED USE:
The second fl-oor apartment space is approximately 540 square feet. Theintended use is as a needlepoint shop with access throuth a new entrelerayto be shared with the Covered Bridge Store.
CRITERIA AND FINDINGS:
Upon review of Section l8.60.060theDepartment of Conununity Developmentrecommends Approval of the Conditional Use Permit based upon the iollowingfactors:
Consideration of Factors:
Relationshi and ct of the use of develo t obiectives of the
As is stated in the Application, the precedent for change of use of spaceoriginally designed for long term residentiat in the Coie area has beenset by the clock Tower Building, the Liquor store Building, and the oreHguFe Buirding. The reason for the requested change is tie amount ofnight time noise created by bars and restaurants in ttre irunediate area.We feel that this reason is a J-egitimate one, and that the precedent hasalready really been established.- There will be one long teim residentialapartment that will remain on the second rever of the covered BridgeStore BuiJ-ding.
There should be no effect on these factors.
There shoutd, be no effect on these factors,
Pe rocaceqz rnclucting the scale and bulk of the proposed use in relationto surrounding uses:
-The character of the area will not be changed by this change in use.There are some minor modifications to the exterior of the building whichwill be reviewed by the Design Review Board,. In our review of th6se changes,we feel that they are positive improvements to the building and do conformwith the Vail Village Urban Desigm Considerations.
Such other factors and criteria the Corunission deemse Propos use:
The effegt. gf the \rgg gn light and air, distribution of population,transportatio4 facilities, utiliti acili-
Ef{ect .uPgn. traffic. with_particular reference to congestion, automotiveand pedeslT+?n safelv and cgnvqnience, traffiC flb\lr and corrtrol, access,maneuverability, and removal eas:
The environmental impact report is not required.
licable to
'covered Bridge Store
- LO/9/BO
f TNDINGS AND RECOMI'{${DATIONS :
Department of CommunityPermit be approved based
Development recommends that the Conditionalon the following findings:
The
Use
pf this ordinance.
w-e feel that, unfortunately, the era of long term residentiar units inthe core is coming to an end.. we would like to encourage those unitsstilr existing to remain, but do not feel that we should require themto do so.
The one condition of approvar would be that g2,2go be paid into theParking Fund. This is for the increase in the'Parking Requirement dueto the change of use.
t
uJF
o
Ee.
az
=
zz
0llJ
UJ
lJ-
ts
=
uJ
o-a[!!!t!t
E
IJJ
J
oF
t
E
UJ
o-
=J
E
BU
UJ
z
6qJ
z6
=
o--
oz
I
c)
NOTMTVA
',JuJ
lJ-
I
a
6
z
U'
oatlLlF
=J
UJF
z.
J
o
uJ
zz.
tr^6q5s9 0
oa5d<)zr!<oqlrJta9UFO,-{ oi
z
tr
f)
e.a
IJJ
*z
Eo
zz
S -t 'e.a6 fiEtl,ef ;qESieaat,lrl<OzdozS
F(J
* ,=i reF3z-deE iEH>Ou;Ol|JOOo-z<)
UJ
I
,l
Vt
a)
q
zlz
F
o
=o
(J
Lz
z
=J
uJ3
zo
-
.J
azz9
u.rF
=(uz
3
X<!!-x=o
Jt-=
LU
o€
ol
=
ciz
E
=EulL
Il<r
\
{i*\
oz
F
C)
UJ-)oto-
u,F
o
E
=Elrlo-
Jzozo
F
oz
oII
Tt ftt__Jt__J
J
=T
C)t!
n
('z
co
=f
E_lFl
=lEl
Hl .n(,O
3b53
QUJ
Eb
Co
Eooo
ott
.E
:
E
Eoa,
trF
UJJ
LLo
uJ
F
(,z
=tr
F
J
d
dj
=
;
1I
ca
FIa
J
ul
=z
otu
Ja
=
-o-
tr()=tr
oo
\r,r
t
ril
\\J
ru
3
$t=
tr
(t
IJJ
3
0)z
=Etr
at
a!)
uJE
<l
=
F
G
U)
LU
o
.Ja tr
oo
IJJ
o
o,]
tr
aa
TJJ
o
J
IL
F
E
UJz
=o
ro
UJF
Tot
E
dP x0ao:s*uas
O
)t6P{E?.5Eq
-
F\,ll5-
E2?
s3
d6
ax
:UF
13
=.2
=8
E
l-Eirg:
{-, Z
<ciHfl
=o
zoF()f
E,Fazo()
lnwn
75 soulh frontrge .oad
uall, colorado 81657
(303) 476-7000
John Dobson
?27 Bridge StreetVail, Colorado, 81657
Dear John,
This is a reminder that thefor the Covered Bridge Store
installment is $553.97.
Thank you,
Sincerely,
Jt.lS/rme
offlce of communlty developmcnt
November 21, 1983
second insta'l'lment of the parking fee
expansion is due at this time. The
o
ln*in u
75 south l:'ontage rd.
vail, colorado 81657
(303) 476-7000
UftI
Septenber 22,.1982
John Dobson
227 Bridge Street
Va i'l , Col orado 81 657
Dear Mr. Dobson:
The purpose of this letter is
in the Covered Bridge Store.
as fol I ows :
department of community development
Re: Covered Bridge Store Parking Fee
to assess the parking fee for the retajl expansion
The fee will be $2,.l00. The fee is calculated
Retail expansioit of 600 square feeto requirement of 2 park.ing stalls.
Credit for dwelling unit 618 square feet, uihich requires 1.3 parking stalls.
2 Requirement for new use
- 1.3 Credit for existing use
.7 Balance of parking requiietnent
.7 x.$3,000 = $2,]00 ($g,OOO is the fee for a commercial stall,)
You have the op*ion of paying the entire.f,-. lt ll,is tjme or paying over a
five-year period. If tire-lalter op!].,'is.takeno interest of 101i per annunr
is chirged'on the unpaid balancp 'li you do choose to pay over titrte,'pl ease
s ign the attached pronr: -" -'.v :roLe '
? BEsT
COPY
Covered tiridqe Fee -2- 9/?.2/8't
An outline of your schedule of payments
Your monthly payment is $553.97.
INTEREST
210
I 75. 60
137.77
96.1 5
50. 36
PRINCiPLE
343
378.37
416.20
457.82
503.61
$2,099.97
$ 669.83
apfiears bel ow:
BALANCE
1 ,756.03
1 ,377 .66
961.46
503. 64
.03
.YIrAB
1I
t
3
.t
Sum of princip'le
Sum of interest
S incerel y,
4nL
JIl| SAYRE
Pl anner
JS:br
-4\-/sV''\,------
1,, 2 ,l 00
ln iirs{.,, lltiiirrl.s ti['ler cliri.c, fr-rr valLlir i''.. iv:,'i , I 1,1{,,';l i',: l.', i,'')/ to
of 'vlir:: 'l-or.;ir oI Va jl ; t tlie- 0f l jcc. of i.|,.' i 'l:;,]licc Lri: r ::t ir" : ', il: ip3'l
at Va il CcrloraCo
Iro-.Ihqusand.lne Hunclrpd .-.-, . -Do1 l ars '
vlith interest of terr.pcrcent pcr annurn oir 1.lt{: unpeid lriiltiill.c, 1;ayab'l 0 in yr,'r t"i1'
instal lrnents as fo'l lovti:
O ir, (.,,1r,,.,,i,Opt. 27r.,.^.-.-,. i B?-
tirt iri'l
8u i'l ,.' il i
The first installment
the second installment
the th i rd i nstal I mc''nt
the fourth installnrcnt
vrith the entir.e unpaid
$-ss:.Bz.-.*.
g 553.97
and payable
and payable
--0ctohel:J,--L982-.,
'0ctober I, 1983 ,
of
ul
of
on
on
due
duc
$ 5s3. e7 clue ;rnd payabl c on*0_cto,ber_L.lgg4-_,
of $ 553.97 due and payabl c on_O.d-ober I_'l*98.5_,
pa.ye.bl e on _-___-__-..Qq!o!_e-r I , l_98_6 __.balance due and
-. 't.
IT IS AGRIID that if this note is not paiC r.rhcn due or declared due. hereiinderl ,
the principal and accrued intercsi.thereorr shall draw intcresi: ai the raLe of-
l8 percent per annunl, arrd that failure tti ritrke any Ji.ryrttctlt of principal or jntei''est
wiren clue or any default under any incuriii.iralrce or agrecrnent securing i:his noLe
shall cause th-e vlhole note to become ciuc at oncc? or the interest to bc cotri-rtc(l
as principa'l , at the option o'1" the holrler of the note. Tlte nl;ii<els and endcii-scrs
Irereof sevelally waivc pl'esentucnt i"or p.:r1,iii;nt, prc;tcst, notice on nonl-reyillcnl
and of'protest, and agrcc to any exicnsion cf tinn of p;yrnetrt and partia'l 1r:i'tilt-':tis
before, a! or after rrratur'-tr, and jf this noJ;e oritriercst thei'eon is nol paid
when due,:or suit is brought, agree to pay rril reasonalrle cosis of coj'l cctiott,
incl uding reasonabl e attorney's fees.
JOHN DOBSON
DATI.
a
Pro etject Applicalion
Date
>A
Proiect Name:
tLEtllJtcrProiect Description:
Contact Person and Phone
Owner, Address and Phone:
Architect, Address and Phone:
Legal Description: Lot Block Filing Zone
-
Comments:
Design Review Board
Motion by: i tt+n'-
Date
seconded W, 60 YA
APPROVAL DISAPPROVAL
L/* o
74bva *Est-q,rrJ
Summary:
E statt Approval
hwn n
oo
ral
box 1fl!
vail. colorado 81657
Bo3) 47G5613
oo
department of community development
September 20, 1,982
John Dobson
227 Bridge St.
Vail, Colorado 81657 RE: DRB Submittal of 9-15-82
Dear John:
0n September 15, 1982 the Design Revjew Board approved the Covered
Bridge Store facade revisions. A letter from Vai'l Associates shou'ld
be obtained approving the stair encroachment on their property should
be obtained before a building perm'it. A parking fee will be assessed
when the bu'ilding permit is jssued.
Si ncere'ly,
/1 - /'/L^ /"lfIT
Jim Sayre
Town Planner
JS:df
to- Project Application
August 9, l9S2
Proiect Name:Covered Bridge Store
Project Description:
Contact Person and
l' :r proposed to fill the depress entry at the North half of the building.
p6ene Ruoff/WentworthArchitqEts 476- 30s l
Owner, Address and Phone: John ftobson 227 Bridge Street. Vail. CO 81657 476-5416
Architect, Address and Phone:Ruoff VJentrryorth A rchitects 500 Uionshead lvlall, Vail, CD
lo
Legal Description: Lot C 6 D , Btock 5B Filing Zone
Comments:
Design Review Board
Date
Motion by:
Seconded by:
APPROVAL DISAPPROVAL
4.4^-' , .ntz{^C,'-Jn
-.-.---
Summary:
!
I
Date:
E Statt Approval
Q,,,=?uu,.,.o BTt II]CL STOR!:to
1.
{iN,;
n')z
'i;l:;, d
L'.]o*o)
Arch itcct ura | / L.andscape Consiclerations
ROOFS
The fascia will lrave a vricler trim ancl tlre roof eclEe will be mo<Jifiedto inclucle a built--in gutter to redtrce ice accurnulaticrrig at tlre frontof the building in the winter. g>,A:''D.€,:rf .TE p-x>t* $*?E
The trim on the dormers wilt be replaced with heavier mate lzEwiftS
will be painted to match the facacle trim-noted below. rial and up'9ilnt4
FACADE
l\,lateria ls--T he rnaterials will match the existing rough-sawn texturewith sonre being changed to thicker pieces. Tlre lower 30't of the
facade wiff be iplit-face moss rock veneer. ,> tprl) w;4.*,f'4fu)y1111fi0f
color--The woocl trim cotor will be : Moorwcod sr-6g. v>iu' v;'oo c'2-
Tlre wood siding color will be: Moorwoocl ST-58. t*T 4u2-
Transparency--1'he lineal feet of glazing is increased by fcrur feet.
Winclow--The wirrdows will be clear thermal glazing of tlre sarne helght
as is existing (approxiroately 6'6") .
Doors--The doors will be wood framed with tempered qlass panels. Thev
rrrilf be painted Benjamin l\.loore Color #BT-21. - 3T"1\fr)8"+f T1s.4fwtiHOttrNEe nioag -
,+'r.\-o1-\-/Trim--The trim as noted above will be rough-sawn to matcfr existing. UJ.O1,A)E'- 6Tqen*+ #gf^ *r3.;p J /-2-, n - ,pcar:5BALCONTES tboi.,eut+_ t .
There are existing dormers with small balconies wlrich will remain.
_ DiiSf'rr- 44,(ofrtE[ T3 a#^l'v4+
DECKS E PATIOS
N/A
ACCENT ELEMENTS
There are existing flower 6q195 v'r;1,'1i will remain at the balconyrailirrgs. t-
LANDSCAPE 61-;:ttr -,.t -1,
Ternn,^; -','w paving will be placed over the construction area at ttre front.ll.,: i,rll later be done in brick pavers in the future Town of Vail3pecial llnprovement District tentatively plannecJ f<r r next spring.
The.small area of ground (approximately 4t x 25') acljacent to therrorth of the buildinq wilt be included with the f'own of Vail lanclscapingrthich is being planried as part of tlre special lmprovernent District.
3.
It.
5.
b.
eo of
Stone plantersr will f lar-rl< the entry sla;rs arrcl v.rill fre plarrted vrith flornrers.
7. SERVICE
N/A
t-) (z- \-D too\rj6 2 Oers44_J € s/ \Jl\ EL< 14 tr_
?r-1
(tr 57rytrc ON rq.-44
2 ?*f l,
':1lL, ?Do./X,t
f-t .L-\oa
o)
'COVERED BRIDGE STORE ZONING CHECK
18.24 Zone - Commercial Core I
18.24.030 Permitted Uses - First Floor or Street Level
I - Retail Stores
18.24.040 Permitted Uses - Second Floor
6 - Retail Stores
18.24.090 Lot Area 6 Site Dimensions
5,000 square feet and minimum frontage of 30 feet.
18.24.100 Setbacks
None required.
18.24.120 Height
Sloping roof - 38 feet Actual - 30 feet at Bridge Street
36 feet from Basement
18.24. 150 Site Coverage
80? maximum of total site may be covered by building and
ground level decks.
Allowable - 3,741 square feet Actual - 3,349 square feet
Area of apartment to be removed - 602 square feet.
lName of Project: CovereO OOge Store O
Legal Description: Lot Part B, C, D Block 5-B Filing Vail Village First Filing
Description of Project: lmprove entry conditions at the front of the building.
The following infornration is required for submittal by the applicant to the Design Review
Board before a final approval can be given:
A. BUILDINc MATERIALS Type of Material
Roof
Siding
Other Wall Materials
Fascia
Soffits
Windows
Window Trim
No Change
No Change
Moss Rock Veneer
Wood (to match existing). Moorwood 5T-69.
Wood (to match existing). Moorwood 5T-69.
Doors Wood framed with glass panel (existing). Beniamin
Moore BT-21.
Trash Enclosures N /A
Wood (to match existing). Moorwood clear penetratirrg.
Clear insulated glass.
Wood (to match existing). Moorwood 5T-69
l$rr diameter metal pipe. Color to match trim.
N/A
N/A
N/A
N/A
Door Trim
Hand or Deck Rails
Flues
Flashings
Chimneys
Greenhouses
Other
B. LANDSCAPING
Name of Designer:
Phone :
PLANT MATERIALS
Botanical Name Common Name Quantity Size
TREES N /A
SHRUBS N /A
COVERS
GROUND N /A sauAREQorAcE
SQUARE FOOTAGE
SQUARE FOOTAGE
SOD N/A
SEED TYPE N/ A
TYPE OFIRRIGATION N/A
TYPE OR METHOD N/A
OF EROSION
CONTROL
C. Other Landscape Features (retaining walls, fences, swimming pools, etc.)
Please specify.
Moss Rock planters adiacent to entry stair.
o
l.
2.
5.
3.
4.
THE COVERED BRIDCE STORE
Architectural E Landscape Considerations
ROOFS
The existing gabled roof will be modified to include a built-ingutter to reduce ice accumulation at the front of the buildingin winter. The fascia will have a wider trim at both the roofedge and the face of the existing dormers.
FACADE
To maintain the character of the building since it was built in
1962, we will continue the wood framing and finish at the frontof the building. The only change being the 24" high split-faced
moss rock veneer across the lower front.
The width of glazing has been increased by four lineal feet.
The windows will be ctear thermal glass the same height as is existing(approximately G'6").
ItLarge single pane windows occur in the Village, and provide somecontrast,-so long as they are generally consistent in form with otherwindows.rl
The windowed entrance doors will have a tempered glass panel ina wood frame to add to the transparency of the facade. The woodframe is to be painted Benjamin Moore *-gf-Zt.
The trim around the doors and windows will be rough-sawn to matchexisting.
BALCONIES
There are existing dormers with balconies which will remain.
DECKS E PATIOS
N/A
ACCENT ELEMENTS
The existing flower boxes at the second floor balconies will remain.New planters adjacent to the entry stairs will be planted with ftowers.
LANDSCAPE ELEMENTS
A Special lmprovement District is being planned for the future
which will include brick pavers for Biidle Street and landscapinginthe area at the south end of the bridge.
The area in front of the building wilt be paved temporarity and atemporary stairway will be constructed for access to the tract of landjust rrcrth of the building.
6.
7.SERVICE
N/A
?ro**,u, AND ENViR.Nr,'NTAL ror*trou
August 23, 19Bz
l:30 pm I
l. Approval of minutes of August 9.
2. Request for an exterior alteration and modification approval for the Covered
eriage Store building on'lots C and D, Block 5, Vail Village lst Filing
in oider to fi'11 in ihe northern part of the entry to the Snug store.
Appl icant: John Dobson
3. Request for a conditional use pernit to convert an apartment to retail space
, on'the second floor of the Covered Bridge Building. Applicant: John Dobson
4. Request for an exterior alteration and modjficati.on.approval for Conmercial
Core I for the Hong Kong Cafe to construct an addition on the south side of
the existing bar and restaurant. Applicant: Tom Gilbertson
5. Application for exterior a'lteration and modification 'in Conlnercial Core I
fbi. Cyrano,s Building to enclose two decks and add a third floor condominium.
Appf icant: Bud and Greta Parks.
6. Request for variances for GRFA, setbacks and site coverage in order to construct
an'additjon in an MDI'IF zone district at 4254 East Columbine l'lay.
Appl ,icants: John and Debbie Odum
7, Request for a conditjonal use permit in Commercia'l Core III zone djstrict
to'conduct outside auto emissibn testilrg next to the Safet'tay store at 2'l5l
North Frontage Road West. Applicant: Town of Vail
B. Request for a conditional use permit in accordance with Chapter'18..60 to construc
a bus wash and fuel pump facility ro the east of the ex'isting,bus barn located
. at the Town shops in a PUD zone district. Applicant: Tottn of Vail
Published 'in the Vail Trail August 20, 1982.
MEM|]RANDUM
T0: Planning and Environmental Conmission
FR0i4 I Cornmunity Development Department
DATE: August 18, 1982
SUBJECT: A conditional use request for the Ccrver'ed Bri dge Store to allow
the conversion of one apartment from residential to cornnercial .
Appl icant: John Dobson
DESCRIPTION OF PROPOSED U5E:
The second f'l oor apartment space is approximately 540 square feet. The jntended
use is for the Snug shop.
I. BACKGROUND
The Coverecl Bridge buildjng in 1980 requested a conditional use permit to_.
remove a resjdeniial unit 6n the second f:loor for the needlepoint shr:p. The. Planning Commissjon did not recomnend approval of the conditional use requcst.
It was ippealed to Town Council, and they voLed to overturn the PEC approval .
In 19Bl there was a requesi to remove three lodge rooms at Gasthof GramshamLner.
This vras.denied by the PEC and overturned at Town Councjl.
In 1982 there was a request at the Casino Building to add three residential
units, ancl this was approvecl. In addition, a nevl unit was approved for the
Ore House.
As the PEC can see, there have been units adcied and removed in Vai'l Viliage
over the last two years. As jn the l9B0 Covered Bridge Building and Pepi's
request, the staff supporled the renoval of the unit and lodge r'ooms.
II. CRITIRIA AND FINDINGS:
Upon review of Section .|8.60.060, the Departnrcnt of Comnunity Dcvelopliient
reconlrends approval of the condjtional use pernrit based upon tlre following
factors:
Consideration of Factors :
Relatiorrship and impact of the use on developtnen! lLlec|1Yef-qlthe Town:-
0ver the years there have been residential units removecl to pennit additional
commerciai expansion. Recently as noted in the background section, four
new residential units have been erpproved. The staff considers tirat as iong
Cov Brdg Cortd Usn -2- B/1Li/t,t
as vre contjnue to have the rnjx of rersidential and conrr;rercial willtin Vail Vi11age,
the renroval of sonre residential units l0r cornri,ercial expansinn is desirablc. The
Vajl Vil'lage Urban Design Guide Plan recoiniil'rnds arlditjonal comirr{rrcial expansion,
and the parking fee provid:s for an jnceni-ive to pronrotc coittntercial expansion in
Cornmercjal Core I. Thc staff considcrs that. the proposal js consisLent witlr the
development objectives of the Jown.
III. The effect of the use on liqht anci air, djstribution of popuiation, transportation
TacTfitlesa@
There should be no effect on these factors.
A. Effect on vehicle traffic on Conimercial Core I district:
Possible reduction by not having people coming to unjt.
B. Reduction of vehicular traffic in Comnrercial Core I district:
Possib'l e reduction of traffic.
C. Reduction of nonessential off-street parking:
Possibl e reduct'ion
D. Control of delivery, pickup and service vehic'l es:
The space will be used by the Snug shop, and addjtional deliveries will probao'ly
not be required by this addition.
E. Development of public spaces to be used by pedestrians:
No new spaces developed or proposed by this proposal
F. Continuance of the various coniniercial , resiclential , and public uses in CCI
so as to nraintain the existing character of thri area:
See nunbers I and II.
o
IV.
There should be no effect on these factors.
V. The effect upon the character of the area in which the-plgrugqg_Ae_j!-_t"_o_be located,
InE]uAlng fEE scaTe-ana-butk-oT-En=e-p.I"oFosEa- u'se-in -fe1!116n-to surrouncll!-g__q!91
There should be no change by this proposal.
VI. !!p environmentailqpqct leport collgry-llg the proposed use j
Tm p a;T r e p o rT-T s r eirll r ed-bi-c h a p t e r l-f, 5q-
Not requi red.
VII. Comrnercial Core I Factors AplJicable
_I!e_qtle_cl_$9!_lr"elfi g r./!b_lU!ic4gf- Ie_te1gncg_ lq con3esti on, automoti vjEglEl_en-$TElt-rnd conveui"n."-rfieTiT-. fl*;nA .0rt-ioT-a.c*tC; ,and removal of snow from the street and parl<inq areas:
n
' Coveredo
desir,;n, and
maintain the
Brdg C.Use -3-
l andscape
exi sti ngControl qual ity of construction, architectural
desiqn iri comnr-ercial core 1 djstrict so as to
character of the area;
No change
H. Effects of noise, odor, dust, smoke, and other factors on Lhe 'environment
of commercial core I district.
No change.
RECOMI,IENDATI ON
The comrnunjty Development Department recomntends approval of.the conditional
;;; ;;;;;;i:" [[;;si;;-"i ,il,-r"r' iesidenriar to comrnercial is consistent
with the recent actioi ot itu Town Council, the policy.board of the town
of Vait. The statt loniid;;; i[;i ir'e Uulance oi residential and commercial
does not dramatical'ly change by this proposal '
One condition of aPProval would be:
'1. The app'licant wjll pay the parking fee for the change of use'
Before a vote on the agenda.'item, the PEC shall make the following findings
before grant'i ng a conditional use permlc:
1. That the proposed'l ocation of the use is in accordance with the purposes of
in" aitt"i"t'in whjch the site is located;
2. That the proposed location of the use and the conditions under which it would
be operated o" *iiriii'i"a rifl not bJ O.itint.ntut to the public health' safetv'
.or welfare, or materially iniuriout-io pioperties or improvenrents in the
vj ci ni tY;
3. That the ProPosed use w j 'l 'l
th'is title.
comply with each of the applicab'le provisions of
oo
PLANNING AND ENVIRONMENTAL COMI'IISSION
August 9,1982
2:00 pm Site Visits
3:00 pm l. Approva1 of minutes of July 26,1982'
Z. Request for conditional use permit in order.to construct a termporary winter, time enc'losure over the Lodgb at Vail swirrning pool. Applicant: Lodge
Properties, Inc.
3. Request for conditional use permit 'in order to obtain approva'l for
the sale of birds and marnnls at the Mountain Tropics Pet Shop on lot 3
Block l, Vail Das Schone #3. Applicant: Mountain Tropics Pet Shop:
Catherine G. Street.
4. Request for a variance for a two foot front setback variance on lot 28
block'l , Potato Patch in order to correct a survey emor. Applicant:
Fox, Romrel'l , a Texas partnership.
5. Request for an exterior a'l teration and modification approva'l for the Covered
Bridge Store building on 'lots C and D, B1k 5 B, Vail Village 'lst Fil ing in order
to fill in the northern part of the entry to the Snug store. AtRficant:O"|lll
. 6. Request to amend Sections 18.24.020 (C), 18.24.030 (C), .l8.24.040 (B),
18.24.065 (A) and 18.26.045 (A) of the Vail Municipal Code to change
the process for an outdoor patio in CCI and II to a conditional use perm'it
procedure which can be applied for year-round. Applicant: Town of Vail
7. Request for amendments to the park'ing chapter of the Vail l'lunicipal Cotle
to clarify wording, revise certain parking requirements and to amend the
definition of Floor Area and to include a new parking requirement for
employee housing projects. Applicant: Town of Vail
8. Request for amendments to the municipal code section .l7.40.075 Condominium
Conversion--Lodge and Accommodation Units to clarify working and to reflect
the.original intent of the ordinance. AIso an amendment to section .l8.22.020
Permitted Uses in the Public Accommodation District to nnke it clear that
only units without kitchen facilities ('i.e. acconunodation units) will
be a'llowed in the PA District. Applicant: Town of Vail.
oo
Published in the Vail Trai'l August 6,'1982
MEMORAI.IDUM
T0: Planning and Environmenta'l Ccxmnission
FR0M: Conrnunity Development Department
DATE: August 4, 1982
SUBJECT: Public hearing in consideration of an exterior a'lteration and
modification in Commercia'l Core I.to modify the front exterior
to the Covered Bpidge Building specifical'li the Snug shop located
on Bridge Street
Appf icant: John Dobson
I. PROPOSAL
The pvtposal is to remove the stairs that
spacb in and to add a sma'l I amount of new
for a new entrance which would be a couple
go down to the Snug shop to fill the
floor area, new windows, and to provide
of steps above street level.
II.COMPLIANCE t,'lITH PURPOSE SECTION OF.'I8.24.0I0
The Cormercia'l Core I district is intended to provide sites and maintain the character
oi Vaji Vittage.om*.riiif area, with its mixtirres of lodge and conrnercial establish-
menti and a piedominantly pedesirian environment. The Commercia'l Core I district
ii'int"naeo io-insure iUEqLite tight, air, open space, and.other amenities appropriate
to the permitted types of'buildinls and uses. The district regu'lations in accordance
with thi: Vail Villabe Urban Design Gu'ide Plan and Des'ign.Considerations prescrlDe
Aevetopment standards that are iitended to insure the maintanance and preservation
oi a iighly c'lustered arrangement of buildings fronting on pedestrian ways and
publ.ic Ireinways and to inslre continuation 6f OuitU'ings, sca]e, and architectural
qualities that distingu'ish the Vil1age.
The proposa'l is in comp'liance with the purpose section of the Corunercia'l Core I
zone district.
COMPLIANCE WITH THE URBAN DESIGN GUIDE PLAN
The Urban Design Guide Plan does not specifical'ly deal with enclos'ing floor area
for the Coverei Bridge Building. One bt ttre desired goals of the Urban Desigl
GuiAe plan was to enfiance the iommercial activity that takes p'lace in the Village
and to insure safe and adequate access to stores and shops. The Community Deve'lopment
Oepailment considers thtt the proposal would allow people greater visibility of
th6 conunerc'ial activity and make the entry way nore desiraole into the Snug shop
and the Covered Bridge Store.
III.
fverec Bridge -2- 8/4/82
IV. URBAN DESIGN CONSIDERATIONS
A. Pedestrianization
!!"!ag. street current'ly is a predominant pedestrian way within vai'l vi11age.
This section of Bridge street is essential]y vehicle free and is probably thehighest used pedestrian walk-way within the-Town of vail. As you come acrossthe covered.Bridge, this is the major entry way into the entirb vail villagearea, and the proposed improvements for the snirg shop and the covered Bridge
Store shou'ld allow for easier access into the stores.
B. Vehic'le Penetration
There should be no change by this proposa'l
Streetscape Framework
The streetscape framework wou'ld change somewhat by bringing out the store front
approximately four feet. There would be easier access for people to wa1 k up
and window shop. The steps that are being proposed for remodeiing with the'addition to the,Snug shop wou'ld also be carried over to the coverid Bridge
Store which would improve entry ways into both shops.
Slreet Encl osure
F.
There wou1.d be insignificant change by the small expansion of the Snug shopa)ong Bridge Street by this proposal .
Street Edge
By the new addition, there wou]d stil'l be variations in the bui'lding facadeto maintain visual image along Bridge Street.
Building Height
There would be no change by this proposal.
Vi ews
I.
No change by this proposal
Service and Delivery
No change by this proposal.
Sun/shade
The project would not change the sun/shade on public property.
The.design of the store fronts and steps are the responsib'ility of the DesignReview Board
c.
D.
tr
G.
H.
J.
fvereo Bridge -g- B/4/Bz
V. ZONINGCONSIDERATIONS
The parking fee wou'ld be due at the time of the building permit.
STAFF RECOMMENDATION
The Community Development Department recommends approval of the proposed addition
to Snug and the enhancement of the entryv,,ay into the Covered Bridge Store. l.le consider
that one of the major elements into Vail is the streetscape as you cross the Covered
Bridge and that continual upgrading of this area and enhancement of this area within
the framework of the Urban Design Guide Plan is a positive aspect to Vai'l Village
and the Vail community. The reconrnendation for approval would inc'l ude the following
condi ti ons
1. That the applicant agree to participate in and not remonstrate against
a mini-improvement district if one if formed for this section of Bridge
Street.
2, That the appl'icant agrees to participate in and not remonstrate against
a special improvement district if one is formed for the entire Vail Village area.
3. That the applicant be responsible
the grassy landscaped area by Gorefor the upgrading of this area.
4. That the applicant agrees to allow for ptiblic use of the space and land down
by the Gore Creek area.
for the construction of new steps down to
Creek, and that a landscape plan be submitted
*M
APPLICATION FORM FOR
CONDITIONAL USE PERMIT
I. This procedure is required for any project required to obtain a
Conditional Use Permit.
The application will not be accepted until all information is
subnitted
A. NAIIIE OF APPLICANT D0BSON BROtHERS (A p€rtner
Buttdtng)
ADDRESS 227 Brldse Srreer. v811. @ 81657 PEONE 476-5416
B. NAI.|E OF
ADDRESS
APPLICAIITTS REPRESS{TATM John A. Dobson
PSONE 476-5416
C. AUTHORIZATION
SIGNATURE
ADD co 81657 PITONE 476-5416
LOCATION OF PROPOSAL
ADDRESS 227 Brl Street. Vell. CO 81657
LEGAI DESCRIPTION Lot QtD Block5-B Filing #1+4rF.-il6r-
FEE $50.00 plus an anormt equal to the then current first-class postage
rate for each property owner to be notified hereunder.
A list of the name of oltners of all ProPerty adjacent to the
D.
ulufi
subject property and their addresses,
ITORT'fi: Tonn of Vall trsct land and Gore Creek
pzsolfrll:. Granshemer Butldtng - 231 E. core creek Drlve
EAST: Across Brldge Street -
2,',Ore House Butl.dlng - 288 Brtdge Street
(Ron Rlley)
/ Sllfer Bulldlng - 230 Brldge stre€t
tfEST: Parklng Area - Jolnt ownershlp
a/u
, l,lo "-. f
,. lY ''yv"
sonqlrlonar usef)nnr.E page z !
- JI . Pour (4) copies of the following information:
A. A description of the precise nature of the proPosed use and
its operating characteristics, and measures proposed to make
the use conpatibte with other properties in the vicinity.
B. A site plan showing proposed development of the site, including
A topography, building locations, Parking, ttaffic circulation,
I useable open space, landscaped area, and utilities and drainage
S features.
Hrtr e. Preliminary building plans and eLevations sufficient to indicate
B the di-urensions, general appearance, scale, and j-nterior plan ofall buildings.
D. Any adclitional material necessary for the'review of the application
as determined by the Zoning Adninistrator.
III. Time requirements
llhe Planning and Environrnental Commission meets on the 2nd and 4th
llondays of each month. An application with the necessary accompanying
rnateriaL must be submitted four weeks prior to the date of the
meeting.
DossoN BnorHsns
227 Btldse StreccE9'!5EFF6. vArL. coLoRADo 816s7
Re: Appllcatlon f,or Condttlonal
on page 2
Use Permlt, ln rcsponee to A through D
A: Ttre naturs of the proposed uee ls for rctatl aales space. Ttre propoeed
uscr tfould be Ttre Snug Conpany rtro currently have the adjacent opace.
Thls use of the epace ls oonpattbls nlth the uees of, suctr space ln th€
bulldlng ltaelf, and wlth oth€r propertles ln the vlclnlty.
The uee of thls apace for long tct:n houslng has been rqrdered tm-
prrctlcal because of tho nolse and traf,ftc g3nerated ln the ares by
adJacant rost.uranta, bars, 6tGoe 6nd by the haany use of Brldge
Streot generally, eepectally ln the sv€nlng and the vety early
rcrrrlng. Further, because of parklng a€Etrlsttona and the thttatlong
luposed to assure that ln Core Area I ae llttle vehlqllar accoas ae
poeslble ls pcrnltted, lt ls not posstble for a long tert r3stdent
eo hsva access to the aperuFnt by car.
Because of, the nay ln uttlch the Core Area has developed - as a short
tern houelng, r'rataurant, shgp, and bus tngsg of,flce area - there rs'
nsln onty tr|o lottg tetn restdenttsl apartoents ln the core Area. One
belongs to !lra. Joanne Httl at tho Plazar the oEh€r to Mrs. Chrlsty
Htll at the end of Brtdge Stre€t.
In adJacent butldlnge - the Ore House, tho Sltfer Bulldlng' The Clock
Toner Butldlng, and tho Grarshamr Bulldlngr all {f,loor abv€ stre€t
levelnspace ls used as retall, off,tce, or hotel room apace.
In ttre f,ormr C€rton Butldlng, now bolng c€opletely changedt lt 18 our
undsrstandtng that all rff,loor abov€ street levelrr epace rtll also be
comrclal .
Ttre pmposcd use of, the space ls thc aam currontly tn exlatencs tn
other prop€rtles ln the vlclnttY etldr as euch, conpletely conpattble.
B: A floor plan of, ths flrst floor above etre€t level plan of the Covered
Brldge Bulldtng ls lncluded wlth thls appllcatlon. The change of use
tnvlows only lnterlor changes and wltl ln no rilay ef,fect the €||stertor
of the orlstlng btrlldlng.
C! Not applloable
Da lfe wllL be hrppy Eo supply any addltloml lnfomatlon as datelolncd by
the Zonlng Adulnlstrator.
TIEISTI
l,lill Trout
Scott Edwards
Jim Vie'le
Dan Corcoran
Diana Donovan
Duane Piper
Jim Morgan
PLANNING AND ENVIRONI'liNTAL COMMISSION
August 23, 1982
l:30 pm
STAFF PRESENT
Peter Patten
Dick Ryan
Jim Sayre
Betsy Rosol ack
I9USJ!-EEP.
Bil l l,ljl to
.bi...:
tt
I
8.
l. Approv.al .of mijrules of August 9.
The minutes were corrected to read "Ed Drager" instead sf Bill Ruoff asked to
wait until Scott Edwards was in the room to consider the Lodge pool bubble.
Also corrected were the words Trout used to describe adding other pets to the
Mountain Tropics request. Trout had said "other non vicious pets,"
Donovan moved and Piper seconded to approve the minutes as corrected. Vote
uas 4-0-2 with Viele and Morgan abstaining.
est for a conditional use rmit in accordance with Cha r 18.60 to
us wasn an to the ea st exist
ocat at the n a PUD zone str ct.cant:
itEill Andrews explained the need for expansion. Corcoran noted that the project
was fairly sheltered and not too visible. Andrews added that there would be
some cuts and that they would be reseeded. Morgan wanted to know if there were
any other projects or activities at the bus barn that had not come through for
approval , and Ryan answered that there weren't.
Donovan moved and Vie1e seconded to approve the conditiona'l use permit, The vote
uas 6-0-l in favor with Corcoran abstaining.
an exterior a'l teration and modification a roval f
rto e ent tot
Dick Ryan reminded the board that this had been explained at the last meeting whenit was tabled. He added that he had spoken with several business owners .in ihe
Pas! fgry days, and that they impressed upon him that a safe entry into a shop wasdesirable. -Ryan used the casino building as an example of making steps saferrespecially in the winter. He also added that some reljef was proposeil for the facade
9I t.te covered.Bridge building to enhance it. John Dobson, thb aiplicant, askedthe board if they had any problems with page 2 of the memo, and piier and Donovan
objected to the staff's opinion on street edge. Barry Bakern the nnnager of the
snug shop, explained that the snow plow pushed snow down into his entrance, andalso snow was brought into the recessed itairway by boots. In the surmer, invalidsand chrldren were often carried up and down the stairs
e Covered
ots C an
o
PEC -2- 8/23/82
Dobson showed elevations and perspectives of the proposed remodeled buiiding,
and repeated the rennrks about the snow problem, and added that the awning -
uas a problem with vandalism and blocking visibility. Ryan stated that Jaffllinston of Gage Davis was working on the-problem of-the Covered Bridge width
and thenorth side of the Covered Bridge store building, considering ieconstructionof the bridge and the entry way onto Bridge Street from the bridgei
Comments:
l'lorgan: It would be better to have the steps inside, but this is an improvement.Piper-:r Jhg s!ep9 now are stated to be a problem, but you are not eliminating steps.I feel that the front as is is a strong identification to the Vjllage, even frore
than the Covered Bridge. This is the initial,introduction to the Viliage, moreso than coming out of the parking stnuETiie.
Donovan: I feel the same way I did at the last meeting--the windows are in the
same line, the rock wall wil] meet Pepi's. rock wall. i feel the confusion couldbe addressed with signage. When peop'le wa1k into a landing, they know that thereis obviously more than one level .' If they walk into one l6vel , they may not knowthat there is another level. I feel the itreetedge is not good.on lhe proposal.vie'le: _I'm in general accord with the staff's analysis of the proposa't '. 'It's
in.compliance with the Urban Design Guide Plan and is an improvbmeirt in safety
and access. hjould there be a change in the stairs to the creek? Ryan: TherLwould be temporary steps.
Edwards.. My only objection is construction on Bridge Street. I'like the new planbetter than the existinq.Trout: Are.you changini the f'loor elevatjons in the inner space? Now there arefive steps down. You feel there is danger, but there are five steps up to an ex-terior.landing which doesn't alter the iafety factors. Nany famoui.-uuirainst -
have this type of entrance, but the decision of the entrancb for retail reaionsis not ours to make. I'm concerned about the landscaping of the area by Gore
Creek.
fyqnr It wil'l be done with an overall upgrade of the area, but it won,t be donethis construction season. Trout mentionbd that at the lasi meetjng,-tnere-wii-
discussion about remonstration against a possible improvement distiict for thearea. Dobson answered that it didn't make sense to say o.k. if I don,t know thedetails, but I am sure we can work something out,
Trout stated that he was concerned with the town getting an easement or a rightgf'way for steps leading to the creek. Corcoran ieminaia him that the town iidnot own. the property by the creek. Ryan added that there would be steps to thecreek, but not on the Dobson property, and at present th'ey would be teirporaryunti'l the improvement district was formed. Trbut was conlerned about the coit,
11d Ryan expla_ined that the cost would be shared, plus the Town wou'ld share in'the cost as well.
Dobson felt that morally and politically it was not a good idea to ask someoneto agree to legistation he hasn't seen. "I will agree to participate in the typeof improvements the staff has recommended up to noil.' '
Viele moved and'Edwards seconded to approve the alteration and modificationto the covered Bridge building as per the iiaff memo. viele amended this tosay "without the staff conditions oi approval ." After discussion, the vote was3 in favor., (Edwards, viele, Morgan),'3 against (Donovan, Trout, piper) with -
Corcoran abstaining.
.!R
i
.li.ir3- ..:i:, !!.!. ,
PEC -3- 8/23182
use Dermit to convert an aDartment retail space
vereo br e Burldrn N UODSON
uest for a cond i ti onal
on tne secon oor
(Edwards left)
Dick Ryan reviewed the memo
Vail Village. He added that
units, but there was still a
After more discussion, Viele stated a new motion, that of approval of the alteration
as fer ine statt recommendation and conditions with nunber 3 nodified to read:
3. That the applicant be responsible for the construction of new steps down to
th;-giiisi'tandscaped arei Uy Gore Creek, that the applicant_provide . ...
puUtic aciess to tire landsca-ped area, and that a landscape plan be submitted
for the upgrading of this area.
Edwar:ds seconded the motion, and the vote was 4 in favor and 2 against (Donovan,
and Piper) with Corcoran abstaining. The motion passed.
3.
and gave an update on the conversion of space- in
theie had been a reduction in numbers of employee
mix of residentja'l and conrnercial within the Vi1'lage'
Dobson stated that because of noise, lack of access' etc. th-at the space. was not
fi;J ib; reiiadniiii-ina-iiJtea uuitaings that had fommercial space on the second
fl oor.
Trout and Viele stated that they were in agreenent with the staff. Donovan felt
the use should stay as it was bLcause the iore was dead at nite, and the housing
was needed. Piper-felt that there was no way to know whether or not there was
i need-for employee housing and that a survey should be done to find out.. Morgan
fei'f ttrat it ;holld be usei as employee housing, and that there was a need for this
type of housing in the val1ey wherever it nny be,. and th.at the Urban Design Guide
Plin djd not encourage commercial when it deleted resjdential units.
Dobson stated that the record of the Town Council was never to turn down a. request
iife tnis and he wanted the same consideration. Morgan also disagreed with the
fact that there would be less traffic, stating that there would be more- traffic.
Dobson agreed.
Piper moved and Viele seconded to approve the request for the conditional use
wiitr ttre one condition of approval per the staff memo dated 8/18/82'
itre vote was 3 in favor, 2 hbainst (Donovan and l"lorgan) with Corcoran abstaining.
4. Request for an exterior altqration a!q_@cjI-9gli9!_gEroval for cormercial
Peter Patten showed sections, perspectives and an isometric of the. proposal and
reviewed the memo. Gilbertson'stated that he did not agree with the condition of
partic'ipating in an improvement distr:ict.
Duane Piper, architect for the project, described the addition adding that it
wou'ld g i ve more 'l if e to the p'l a za .
Trout moved and Morgan seconded to approve the exterior alterations per the staff
nnmo dated 8116/82 including the one'iondition. The vote was 3 in favor, none
against, with 3 abstentions-(Piper, Corcoran and Donovan). The motion passed.
C6rcoran reminded Gilbertson'thit he had l0 days in which to appea'l the condjtion
of the approval.
I
-ir{i':
PEC -4- 8123/82
Bill hlilto, the councjl representative, asked the board if they would give.the
Council iorire-direction conlerning the conditions regard.ing. the-improvement.
distrjcts. Corcorin-"epii"O inat this was one item he had planned to bring
up at the ioint meeting on September 2.|.
5. App'tication for exterjoLqEglg!-q!-and ntoltfigg.lj-g!-jn commelgjgl-lplgl
patten asked to have this item tabled until the meeting on september l3 because
tnJ-iisi-lru*iit.i by the applicant of adjacent property owners.to noiify had not
been complete. He aided tnii ttr;s was the last meeting under the rules of the 90
day rev'iew for exterior alterations.
Donovanmoved and Piper seconded to table this item until Septenber.'13 at which
iime if'e ipp'liiant mlst Oe piesent with dll required material' or thjs proiect
*uia U. pirt into the next Lime slot (the November review date)' The vote
was 6-0 in favor of tabling.
6. Request for two varjances: Setback and GBEA !o rnq!9-qdditlong-elll-Dpreygnents".
Patten exp'l ained the memo and showed the plans and el.evations. He added that
theicondominium had twice as much GRFA as was allowed, and that the lots werejniv-ii ie.i wiae (triougfi N9NF required 20' setbacks), adding that the bu'ildings
wer! ionstructed wliile in the courity and that the zoning was added when they were
innexed to the town, and then the pioject was subdivided into very small lots, adding
to the compl.ications.
J'im Manning, architect for the proiect, showed s-ite and floor,plans-and elevations
and stated that the pioperty wai oilnea-Uy 2 fami'lies each w'ith 2 children, needing
one more bedroom, unl tfrut 6ne ch'ild had Down's syndrome.,.requiring more supervjsion'
He added that since iSii; S-ririlar proposals in ihis subdivision had been presented
6 i[;-bd;A, 4 oi wflich'had been deirieb by the staff, and the PEC:had approved
alj except for the Curfman request in 'l 980.
-.Pitten aqreed that 5 had been presented, but that they were.not exactly a'like'
'i'6;ffi;ilt;d iiiii t. iunded tb favor the variance, uirt where did one stop?
nipEr mentioned that in rezoning in.annexation' one reason is to bring some confor-
*i[i anO ionlinuiiv. He found it aitticult to support any addition to GRFA over
that which is a'llowed. 'specific to the airlock, he was in favor of this' since
it was encouraged, Uri tnii ttre stairway would ida to the prob'lem of snow removal.
Donovan agreed with Piper. Vie'le felt that imposing MDMF setbacks was a hardship
because if it were takbn seriously, nothing could be bu'ilt. It seemed unrealistic
to him to look at GRFA restrictio-ni on suc[ a tiny lot. Trout agreed with Viele'
with respect to snow iemoval , as did Corcoran. Corcoran was concerned with a
pdwer tihe that ran'above the dwel'ling and asked the applicant to determine
i.rhether the power company had an easement for the line.
Patten mentioned that the town had received a letter from the secretary of an
orqanization that owned the common areas in favor of the proposal., but hg wqs
sp6aking only for himself, Donovan stated that there were 3 condo assoclatlons
in the group of condominjums.
!
I
.Lb-
PEC -5- 8/23/82
After additiona'l discussion concerning the tota'l GRFA on the site if it were treated
as a norrrn1 "town-housed" project (the total GRFA was not known), the applicant
was asked if he wished to table the item for more study on his part. Patten admitted
that he had no idea what the GRFA would be if treated as a rrtown-house" project
Ueciuse of lack of records. The feasibility of a study of any kind was discussed.
A pol'l of the members revea:led:
Morgan did not feel the setbacks were any problem.
Piper wanted further study, because as it stood now he felt he cou'ld not approve
it.
Donovan approved of the airlock, was opposed to the front setback and the
bedroom setback.
Viele wanted to look at the proiect tota'l with some meaningful nunbers.
Trout agreed with Viele.
Corcoran wanted to 'l ook at the entire project
Piper asked how they cou1d look at the tota'l
own individuit lot. He felt that they should
Manning asked the members how they wou'ld fee'l
the project as a whole.
Morgan said he wou'ld fee] the same way unless
ovei in dRFA.
Donovan stated that she didn't fee't that she
Vie1e fe'lt that he might be willing to change
of the study.
in MDMF and also the building separat'ions
GRFA when each building was on its
deal with the situation as it exists.
if there could not be a studY of
it were found that the units were
cou'ld approve the setback encroachments
his mind depend'ing on the results
Trout was concerned with the total GRFA.
l',lanning requested to tab'l e his request until September .|3. Piper moved-and Viele
Second6d td taOte as per the applicant's request. The vote was 6-0 in favor.
7, Reouest for a conditional use
conduct outside auto emission
The vote was 6-0 in favor.
Patten announced that on September 16,
regu'lations.
The meeting was adiourned at 4:25.
rmit in Conunercia] Core III zone district to
testinq next to the Safewa store.
Patten revjewed the memo. Ruth Cogan, enviromental health officer, explained that
the test would be directly in froni of the store, and that it would not impede
traffic, and that cars could go thru the test in l-l/2 minutes. Donovan moved
and l'forlan seconded to approv6 the request per the staff memo dated 8/17/82.
there would be a study of the subdiv'ision
tF
Pr.c o t)/s/:J't
ilqilgiryL
Dobson
Peter Patten explained the meino and added a cori"ectiorr that oor are.r lvould
be decreased rather than'i ncreased, and thus no par'king fee would be reqriired.Bill Ruoff, architect for the project, shovued site plans and elevations. lle exp'l ainedthat the upper level of the bui1ding would stay as it was, keeping the narrow gabies.
He added that the width of Bridge Street would be increased, anci that there would
be new steps down to the creek to replace the ones being removed.
Donovan felt that there was a certain anrount of mirrorimage in the proposal , and
that some of the street interest was being lost because a very straight line was
created and because of the widening of the road,
Ruoff stated that the Covered Bridge was too narrow to handle the pedestrian trafficin winter and he wou'ld like to see it widened, and that he was nrerely nraking this
end of Bridge Street the same width as the rest of Bridge Street.
Piper stated that he felt the entrance to Snug was a very p'l easing one. Ruoff ansleredthat the entrance was a confusing one for the shopper, and for that reason t,he shop
has never done well. P'iper sa'id that, still jt offered relief in a way that isoften attained only by effort, adding that Pepi's storefront was now too streanlined.
Trout added that a great deal of thought about the stores across the street hao
gone into approval of the building across the street, and he agreed with Piper.
Ruoff countered that the steps to the park as built were non-ccnforming with the currenbuild'ing code and unattractive. l^fhen the members vrere po1 led, they suiU, - -
Piper: I love the existing building, but the materials cou'l d be improved.
Donovan: I can see other solutions to the probieur. There is confusion at the
entrance, can't see the Snug shop s'i gn. One solution would be to put the
sign at right angles to the street.
Edwards: I feel that it is a hole, and I'm in favor of the concept.
Trou.t: My preoccupation is on the north end of the building.....
Corcoran: llave to abstain
Dobson asked to table the item until August 23. Donovan.nroved and Piper
seconded to table the heari ng until August 23. The vote rvas 5-0'in favor of
tabl ing.
6. Request for anendnrents to the municipal code sect'i on 17.40.075 Condonriniunr
eqnverslon::Iodge_qrgXcconrnoA;Tibn tniTs tb-cIariTy r.,,or"d1nq anilTo -ref] qE
the original jntelt of the_ordinance. Appl icant: Tol,,rn of Vail
Corcoran conplimented Larry Eskr,rjth for looking aI the whole ord'i nance rather thansimply reacting to part of it. tskwith explainecl the clraiiges and Patterr ex1,1ained
!g!-! glqg.11i_!!_M._9!jr-s-lgq1g!-l_g1l o 1' a n _e; t e r i c r a I t e ra t i orrjn-forraqqdaT-eorel_}t|a[ily$.-!Lu_&ttleiToFtq_lhZ
tree-i-rica-tIt-Th"-s*s-ifi -art-to&'t-t:(_q_rll@rie_!qis-t_.-7bn
modificii
ppl icant: Johg,
'some of the reasons for thr: chanqes in connection vrith
Eskvrith stated that there v/c1s coicern rrot with thc l.ype
avajlabil ity of rental units to tourjsts.
Donovan moved and Piper seconded to approve the request
17.40.075 per the revised ordinance. 'lhe vote was 5-0
pi c - q.- Ata/R')
t irie sharing convr-:r'sions , elc"of salc, but witir the
for the anrendrnents to Section
in favor.
Rgqug:t for amert{1qnti_!9_!!e_ruUL1n SlgglC1-oljle_Y{il_ l'1u.ql_c-U_ql_!q4,q: to
c !.a!ly--w0igl 'tg-r-te_vr
s9--99l8.: r'_!-g-t:!tls_-I9$li '"sg4@ui!rql0t tloor area. Applicant: Town of Vail
Peter Patten stated that the Town Council sent the parking revisions back to the
PEC on Juiy 20 because the staff wished to change the way floor area was to be
measured. Included is a new definition called "Net Floor Area" to be used in
calculating parking spaces. Trout suggested adding a phrase explaining that thisdefinition was to be used in calcuiating parking only.
Bili |.lilto, speak'ing as a cjtizen, felt that for a single fanrily drvell'ing, 2 parking
spaces were not enough. Trout agreed. Discussion followed as to whether or notto require certain parking spaces be covered. Trout felt that the problem utaswith the outdoor parking and suggested an increase in the nunrber of spaces required.
Patten replied that the numbers used were the result of much study and changes suggeste
by the PEC.
Edwards moved and Piper seconded to approve the changes as presented by the staffwjth the addition of the phrase, "to be used only for calculating parking require-
ments" in the definition of net floor area. The vote was 4-l with Trout against.
The motion passed. Corcoran conrplimenled the staffinbeing flexible on the clefinitionof net floor area after receivinq much feedback.
1 8. 24. 030 I B. 24. 040 I 8. 24. 065
e process Tor an ouloooratio in CCI an II to a conditiona errni L rocedure which cql_.!e apgl_ig{
Tor year-round.ppf icant: Town o
Peter Jamar cxplained that this had been discussed at the July 12 PEC meeting whenthe staff had suggested that outdoor patios could go through Design Review c,nly.At that tinre the PEC mernbers expressed the feeling that they still wanted to have
the ability to review applications for the addition of outdbor patios in CCI and
CCII.
Piper moved and Donovan seconded to approve the staff request for the amendmentsper the memo dated 7/29/82. The vote was 5-0 in favor.
The meeting adjourned at 6:00 pm.
8.
tI'Name o; Project:
' Legal Description:
Description of Project :
The following information is required
Board before a final approval can be
A. BUILDING MATERIALS
Roof
Siding
Other Wall fvlaterials
Fa scia
Soffits
Windows
Window Trim
Doors
Door Trim
Hand or Deck Rails
Flues
Flashings
Chimneys
Trash Enclosures
G reenhouses
Other
Color
C^v0r t r. rn',s €Tnil=
LotF,rTbtc,qJ Block FA FilinswFrg
T'
for submittal by the applicant to the Design Review
given:
Type of Material
B. LANDSCAPING
Name of Designer:
Phone:
PLANT MATERIALS
Botanical Name Common Name Quantity Size
TREES
SHRUBS
!
I GROUND
COVERS
souAo FoorAGE
SQUARE FOOTACEsoD
SEED rYPE l{.A SQUARE FOOTAGE
TYPE OF
IRRIGATION
TYPE OR METHOD
OF EROSION
CONTROL
C. Other Landscape Features (retaining walls, fences, swimming pools, etc.)
Please specify.
o
ONPLANNING AND ENVIRONMENTAL COMMISSI
June .|4, I982
1:15 pm Preliminary review of applications for exterjor alterations and' modifications in Commercial Core I and II. Determined will be whether
each project has a major or minorimpact and the appropriate review
period for each project.
2:00 pm
t. Request for a variance to construct a garage in a red hazard
ava'lanche zone on Lot 21, Vail Meadows Filing #.|.
Appl'icant: Thomas LeRoy
2. Request for rezoning of Lot l, Vail Village 2nd Fi'ling from Residential
primary/Secondary to Specia'l Deve'lopment Djstrict with an underlying
zone of High Density Mu]ti-Family to allow five dwe'l1ing units.
Applicant: Ron J. Byrne
3. Request for a condominium conversion for a 3 unit building on lot 42'
Vai I Vil Iage West Fi1 ing #1. App'licant: Dennis Shimon
4. Request for two s'ide setback variances to allow the construction of
a residence on lot .|2, Vail Village lJest Filing No. 2.
Applicant: Gottfired Angleitner
5. Request for a front setback variance to allow the construction of an
addit'ion on lot ll, Matterhorn Village Filing No. l.
Applicant: James R. W'illiams.
6. Request for a conditional use permit to construct an addition to the
east end of the existing bus barn located at the Town shops'
in a PUD zone district.
Applicant: Town of Vail
7. Request for approval of the general circulation and access plan for
the Arterial Business District.
Applicants: Property owners in the proposed Arterial tsusiness District
Published 'in the Vail Trail June ll, .|982
APPLICATION FORM
OR MODIFICATIONS
D:te
ll.Ur)lication
FOR EXTERIOR ALTERATIONS
tN CoMMERCIAL CORE I tCCl)
l,/'ay 20. I 982
,,.),t
l. This procedure is required for alteration of an existing building which adds
or removes any encto;ed floor area or outdoor patio or replacement of an
existing building shall be subject to review by the Planning and Environment
Commission.
The application will not be accepted until all informatiorr is submitted.
A. NAME OF APPLICANT John Dobson
ADDRESS 227 Bridqe Street Vail. Colorado 81657 PHONEttZ6-Stlt0
ADDRESS 500 Lionshead Mall, Vail. Colorado 81657 PHONE475-3051
c.AUTHORIZATION OF PROPE ER
SIGNATURE Jo
ADDRESS 227 BT Colo 8r6 PHONE 475-s4r6
D. LOCATION OF PROPOSAL
ADDRESS 222 Bridqe Street Vail, Colorado 81657
LEGAL DESCRIPTION Lots C e D, Block 58 Vail Vill4qe First Filinq
E. FEE: Check for $101.20 enclosed.
F. IMPROVEMENT SURVEY: See attached survey by Interrnountain Engineering.
G. LIST OF ADJACENT PROPERTY OWNERS AND ADDRESSES: SCE AttAChEd
B.
0YA''t 'llV(r>q-t
list of six names .
It. SITE PLAN: See attached drawings.
III. PROJECT DESCRIPTION :
It is proposed to fill the depressed entry at the North half of the building
front so that an easier access may be provided. The entry doors to the
various shops will be reorganized for easier identification.
.7 .rY4rL, )B^t"^ tv ah.zlL +bt-1.
tzr;l pa,r\
;r,l'wr,tl.5 '
I/t^*tt\
hra, F,lai- ri^r t*, oLe-qrh\ '
'l
. IV. URBAN DESTGN CONSIDERATION:
A. Pedestrianization
The modifications proposed will widen Bridge Street in front of the
building thereby creating a more inviting entrance to the Village from
the Covered Bridge.
B. Vehicle Penetration
Vehicles are not allowed on this end of Bridge Street. But the added /width that will be created will ease access for T.O.V. maintenance and
emergency vehicles.
C. Streetscape Framework
The basic front and building lines which are so familiar to our guests would ./be maintained. The new work will maintain the same general character as
exists now.
D. Street Enclosure
The eave height of the building will remain unchanged. Therefore, the ,/street enclosure will not be changed.
E. Street Edge
Variations in the building facade maintain visual interest in accordance "/
with street edge requirements.
F. Building Height
Building height will not be changed. y'
G. Views
Views on the north end of Bridge Street will be improved. The work y'
will not affect views in any other directions.
H. Sun Shade Considersations
Shading patterns will be unaffected. ,./
V. ZONING:
Zone - Commerical Core I
18.24.020 B Uses - Basement or Garden Level Existing: Retail Stores
18.24.030 B Uses - First Floor or Street Level Existing: Retail Stores
18.24.040 B Uses - Second Floor Existing: Retail Stores
o
18.24.040 B Uses - Second Floor Existing: Retail Stores
18.21t.090 Lot Area E Site Dimensions I,329 square feet
18.24.100 Setbacks
l8.2tl. 120 Height
18.24. 150 Slte Coverage
t8.24. 170 Landgcaping S Site Development Unchanged
18.24.180 Parking 6 Loading Unchanged from existing.
No Requirements
Allowed: 381Existing: 37.
At Brid'ge Street: 29r6n
80E Allowed : 3, 463. 2 sq . ft.Existing: 3,355.8 sq. ft.Proposed: 3,339,4 sq. ft.
Sp#a )y',/tu-
,i
t.
G. Pepi Gramshammer
231 East C,ore Creek Drive
Vail, Colorado 81657
Slifer 6 Company
230 Bridge Street
Vail, Colorado 81657
Ron Biley
228 Bridge Street
Vail, Colorado 81657
Chuck Rosenquist
1451 Buffer Creek Drive
Vall, Colorado 81657
John McBride
105 Paclfic
Aspen, Colorado 8161 I
Town of Vail
APPL]CATION FORM
oR [toDtFlcATtoNS
DatU Application I'tay 20, 'l!:._:_--
FOR EXTERIOR ALTERATIONS
IN COMMERCIAL CORE I (CCI)
t. This procedure is required for alteration of an existing building which adds
or removes any enclosed floor area or outdoor patio or replacement of an
existing building shall be subiect to review by the Planning and Environment
Commission,
The application will not be accePted until all information is submitted.
A. NAME OF APPLICANT John Dobson
ADDRESS 227 Bridqe Street Va'rl. Colorado 81657 PHONE476-5416
B. NAME OF APPLICANT'S REPRESENTATIVE Ruoff/Wentworth Architects AIA
ADDRESS 500 Lionshead Mall, Vail, Colorado 81657 PHONE476-3051
C. AUTHORIZATION OF PROPE
SIGNATURE
ADDRESS PHONE 426-S4t e
D. LOCATION OF PROPOSAL
ADDRESS 227 Bridqe Street Vail, Colorado 81657
LEGAL DESCRIPTION Lots C t D. Block 58 Vail Villaqe First Filinq
E. FEE: Check for 5101.20 enclosed.
F. IMPROVEMENT SURVEY: See attached survey by Interrnountain Engineering.
G. LIST OF ADJACENT PROPERTY OWNERS AND ADDRESSES: SCC AttAChCd
list of six names.
I l. SITE PLAN : See attached drawings.
III. PROJECT DESCRIPTION:
It is proposed to fill the depressed entry at the North half of the building
front so that an easier access may be provided. The entry doors to the
various shops will be reorganized for easier identification '
v
IV. URBAN DESIGN COI{SIDERATION:
A. Pedestrianization
The modifications proposed will widen Bridge Street in front of the
building thereby creating a more inviting entrance to the Village from
the Covered Bridge.
B. Vehicle Penetration
Vehicles are not allowed on this end of Bridge Street. But the added
width that will be created will ease access for T.O.V. maintenance and
emergency vehicles.
C. Streetscape Framework
The basic front and building lines which are so familiar to our guests would
be maintained. The new work will maintain the same general character as
exists now.
D. Street Enclosure
The eave height of the building will remain unchanged. Therefore, the
street enclosure will not be changed.
E. Street Edge
Variations in the building facade maintain visual interest in accordance
with street edge requirements.
F. Building Height
Building height will not be changed.
G. Views
Views on the north end of Bridge Street will be improved. The workwill not affect views in any other directions.
H. Sun Shade Considersations
Shading patterns will be unaffected.
V. ZONING:
Zone - Commerical Core I
18.24,020 B Uses - Basement or Garden Level Existing: Retail Stores
18.24.030 B Uses - First Floor or Street Level Existing: Retail Stores
18.24.040 B Uses - Second Floor Existing: Retail Stores
18.211.040 B Uses - Second Floor Existing: Retail Stores
18.24.090 lot Area a Site Dimensions {,329 square feet
18.29.100 Setbacks No Requirements
18.24. 120 Height Allowed: 38'
Existing: 37'
At Bridge Street: 2916rl
18.24.150 Site Coverage 808 Allowed: 3,463.2 sq.ft.Existing: 3,355.8 sq. ft., Proposed: 3,339.4 sq. ft.
18.24. 170 Landscaping E Site Development Unchanged
18.24. 180 Parking 6 Loading Unchanged from existing.
t.
G. Pepi Gramshammer
231 East Gore Creek Drive
Vail, Colorado 81657
Slifer 6 Company
230 Bridge Street
Vail, Colorado 81657
Ron R.iley
228 Bridge Street
Vail, Colorado 81657
Chuck Rosenquistl45l Buffer Creek Drive
Vail, :Colorado 8t657
John McBride
105 Paclfic
Aspen, Cobrado 8161 |
Town of Vail
+
Oatej APPiicatiotr
FOR EXTERIOR ALTERATIONS
rf.r COMMERCIAL CORE I (CCl)
i.ay 10, 'l 982
PHONE 420-Sttt 0
APPL]CAT ION FORhI
OR IIIODIFICATIONS
ADDRESS
l. This pr-ocedure is required for alteration of an existing building which adds
or removes any encloied floor area or outdoor patio or replacement of an
existingbui|dingsha|tbesubjecttoreviewbythePlanningandEnvironment
Commission.
Theapp|icationwillnotbeaccepteduntiIallinformationissubmitted.
A. NA[4E OF APPLICANT John Dobson
OF PROP
Dobson
B. NAME OF APPLICANT'S REPRESENTATIVE RUOff/WCNtWOTth ATChitECtS AIA
ADDRESS PHONE 476- 3051
C. AUTHORIZATION
SIGNATURE John
ADDRESS 227 BTi Street Vail Colorado QI657 PHONE 476-s4r6
D. LOCATION OF PROPOSAL
ADDRESS 227 BT
LEGAL DESCRIPTION Lots C
E. FEE: Check for $101. 20 enclosed '
F. IMPROVEMENT SURVEY: see attached survey by Intermountain Engineering'
G.L|sToFADJACENTPRoPERTYowNERSANDADDRESSES:seeattached
l ist of six names.
I l. SITE PLAN : See attached drawings '
tIt. PROJECT DESCRIPTION :
tt is proposed to fill the depressed entry aJ.tfe North half of the building
front so that an easier access may be provided, T.he.ent'y doors to the
various shops will be reorganizecJ for easier identitlcatlon '
IV. URBAN DESIGN CONSTDERATION:
A. pedestrianization
The modifications proposed will widen Bridge Street in front of thebuilding thereby_creating a more inviting e-ntr"n"" to the Village fromthe Covered Bridge.
B. Vehicle penetration
Vehicles are not allowed on this end of Bridge street. But the addedwidth that wilt be created will ease access ro1-r.o.v. maintenance andemergency vehicles.
C. Streetscape Framework
The basic front and building lines which are so familiar to our guests wouldbe maintained. The new *o-*.k *ill maintain 1t" ,"r" general character asexists now.
D. Street Enclosure
The eave height of the building will remain unchanged. Therefore, thestreet enclosure will not be chinged.
E. Street Edge
Variations. in the building facade maintain visuat interest in accordancewith street edge requirements.
F. Building Height
Building height will not be changed.
G. Views
views on the north end of Bridge street wiil be improved. The workwill not affect views in any othel directions.
H. Sun Shade Considersations
Shading patterns wiil be unaffected.
V. ZONING r
Zone - Commerical Core I
18'24'020 B Uses - Basement or Garden Level Existing: Retail Stores
18'24'030 B Uses - First Floor or Street Level Existing: Retail Stores
18.24.040 B Uses - Second Floor Existing: Retail Stores
.a
r 8.24. 040
l8.2rl. 090
18.24. r 00
|8.24.r20
r8.24.150
r 8. 24. 170
| 8.24. 180
Uses - Second Floor
lot Area 6 Site Dimensions
Setbacks
Height
Site Coverage
Landscaping 6 Site Development
Parkiirg 6 Loading
Existing: Retail Stores
4,329 square feet
No Requirements
Allowed: 38'
Existing: 371
At Bridge Street ' 2916rl
808 Allowed: 3,463.2 sq.ft.Existing: 3,355.8 sq. ft.
Proposedl 3,339,4 sq. ft.
Unchanged
Unchanged from existing.
t.
G. Pepi Gramshammer
231 East Gore Creek Drive
Vall, Colorado 81657
Slifer 6 Company
230 Bridge Street
Vail, Colorado 81657
Ron Riley
228 Bridge Street
Vail, Colorado 81657
Chuck Rosenquist
Itt5l Buffer Creek Drlve
Vail, Colorado 81657
John McBride
105 Pacific
Aspen, Colorado 816ll
Town of Vail
o
APPLICATION FORM FOR EXTERIOR
OR MODIFICATIONS IN COMMERCIAL
Date of Application l"lay 20, r J02
ALTERAT IONS
coRE I (CCt)
l' This procedure is required for alteration of an existing building which addsor- removes any enclosed floor area or outdoor patio oi replacemient of aneristing.building shall be subiect to review by the planning and EnvironmentCommission.
The application will not be accepted untit all information is submitted.
A. NAME OF AppLtCANT John Dobson
ADDRESS PHONE 476-s416
ADDRESS 500 Lionshead Mall. Vail, Colorado 81657 pHONE476_3051
C. AUTHORIZATION OF PROPERTY &SIGNATURE John Dobson
ADDRESS 227 Bridge Street Vail, Colorado 81657 gpE 475-5416
D.LOCATION OF PROPOSAL
eqlsrado ale5z
ADDRESS 22
LEGAL DESCRIPTION
E. FEE: Check for gl0l.20 enclosed.
F. IMPROVEMENT SURVEY: See attached survey
C. LIST OF ADJACENT PROPERTY OWNERS ANDlist of six names.
ll. SITE PLAN: See attached drawings.
III. PROJECT DESCRIPTION:
by Intermountain Engineering.
ADDRESSES: See attached
It is proposed to fill the depressed entry at the North half of the buildingfront so that an easier acceis may be piovided. The entry doors to thevarious shops will be reorganized for easier identification.
. IV. UiIBAN DESTGN CONSIDERATION:
A. Pedestrianizatlon
The modifications proposed will widen Bridge Street in front of thebuilding thereby
-
creating a more inviting Jntrance to the Village fromthe Covered Bridge,
B. Vehicle Penetration
Vehicles are not allowed on this end of Bridge Street. But the addedwidth that will be created will ease access for f.O.V. maintenance andemergency vehicles.
C. Streetscape Framework
The basic front and building lines which are so familiar to our guests wouldbe maintained. The new work wilt maintain the same general chiracter asexists now.
D. Street Enclosure
The eave height of the building will remain unchanged. Therefore, thestreet enclosure will not be changed.
E. Street Edge
Variations in the building facade maintain visual interest in accordancewith street edge requirements.
F. Building Height
Building height will not be changed.
G. Views
Views on the north end of Bridge Street will be improved, The workwill not affect views in any other directions.
H. Sun Shade Considersations
Shading patterns will be unaffected.
V. ZONING:
Zone - Commerical Core I
18'24.020 B Uses - Basement or Garden Level Existing: Retail Stores
18.24.030 B Uses - First Floor or Street Level Existing: Retait Stores
18.24.040 B Uses - Second Ftoor Existing: Retail Stores
I
t,'
to \I
18.24.040 B Uses - Second Floor Existing: Retalt Stores
18.24.090 Lot Area E Site Dimensions q,329 square feet
18.24. 10O Setbacks No Requirements
t 8. 24. 120 Height Allowed : 3A,Existing: B7lAt Bridge Street. 2916r'
18.24.150 Site Coverage 80t Allowed: 3,163.2 sq.ft.Existing: 3,35S.9 sq. ft.
. Proposedl 3,339.rt sq. ft.
18.24. 170 Landscaping 6 Site Development Unchanged
18.2{. 180 parking 6 toading Unchanged from existing.
.a ro\b
l.
G. Pepi Gramshammer
231 East Gore Creek Drive
Vail, Colorado 81657
Slifer e Company
230 Bridge Street
Vail, Colorado 81657
Ron Riley
228 Bridge Street
Vail, Colorado 81657
Chuck Rosenquist
l45l Buffer Creek Drive
Vail, Colorado 81557
John McBride
105 Pacific
Aspen, Colorado 8161 1
Town of Vail