HomeMy WebLinkAboutVAIL VILLAGE FILING 1 BLOCK 5C LOT F G H I J K PLAZA LODGE BUILDING PERMITS 1987-2004 LEGAL/ / ,,t ,/'t .///// //ua/z
/-;4i/ / (
B4*/ r=( /o/s iql,IJfuq",44-
,'1'-/ . /galle;.4 E"rr-b //t2-&
/ -eaaQ,
roil\roFVArL
75 S. FRONTAGEROAD
VAIL, CO 81657
970-479-2138
DEPARTMENT OF COMMI.]NIry DEVELOPMENT
!^--ols C-tr t-r i<
3 (V. qc
NorE: THIS pERMIT MUST BE posrED oN JOBSITE AT ALL TIMES U.^-^( U' L(,,,1' \o
\J
ADD/ALTCOMMBUTLDPERMT permit #: 804-0023 l\tlS^ f,tr
Job Address: 291 BRIDGE ST VAIL Status . . . : ISSUED
Location.......: 301 BRIDGE STREET Applied . . : 03109/2004
ParcelNo....: 210108262001 Issued...: 0311012004
ProjectNo. : Expires...: 0910612004
or/irNER pr,AzA LoDGE ASSOCIATES r_,TD O3/O9/2OO4 phone:
ONE TURTLE CREEK VII,I,AGE
3878 OAK LAWN AVE STE #4OO
DAIJIJAS
TX 752L9-4469
License 3
CoNTRACTOR MASTER SEALERS 03/o9/2OO4 phoner
P. O. BOX 4473
VAII-,, CO
8165I
I-,icense z 577 -B
APPLICAITT MASTER SEAT,ERS 03/09/2004 phone: 9'70-476-3975
P. O. BOX 4473
VAIL, CO
8155 8
License:
Desciption:
RE-ROCK SAME FOR SAME ROOF
Occupancy:
Type Construction:
Type Occupancy: ??
Valuation: $87,750.00
Fireplace Information: Rcstricted:
Investigation->
WiU Call--->
# ofCas Appliances: 0
$0.00 RecreationFee-------->
$3.00 Clean-upDeposit------>
Add Sq Ft: 0
# ofGas Logs: 0 4 of Wood Pellet: 0
90.00 Tolal Calculaled Fees--> $1, 504.09
$0.00 Total Permit Fee-----> S1,504-09
$0. 00 Payments-----------> $1, 504 . 09
Building---> $909 . ?5 Restuarant Plan Review->
Plan Check--> 9591.34 DRB l'ee----------->50.00 AdditionalFees----->$o. oo
$0. 00
* *.*,*)id. ** '** + * 'l + *:i + *:1.:f *,ir:* {. *:},t *:f,},r* *,r ir* * * i},s ** ** *
Approvals:rtem: 05100 BUILDING DEPARTMENI
o3/o9/2OO4 DM Actionr AP
ltem: 05400 PLANNING DEPARTMETII|
Item: 05500 FIRE DEPARTMENI
Item: 05500 PIIBIJIC WORKS
TOTAI- FEES------> S1,504 - 0e BALANCE DUE---->
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in fullthe information required, completed an accurate plot plan,
and state that all the informafion as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, uniform Building code and other ordinances ofthe Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY 2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM.
WNER OR CONTRACTOR FOR HIMSELF AND OWNEF
PAGE 2
**,r**'F+*** ** * * ****+ {.
'N.
*** ********* ***:t *,t<:lr*+******+*++++,t ++{.,r+**+ * * *+++**++ ++**+******* * *** * * ***r*********
CONDITIONS OF APPROVAL
Permit #: 804-0023 as of 03-10-2004 Status: ISSUED
**********,!*,t *r< ** **** * ****:t++ 'i * d. * * * *,F * * *:t * * * * * * * + *,t *,i * * * * * t * *,t *t< *,t,F*:i* jt<,F{.,t{<********** ************{.******
Permit Type: ADDiALT COMM BUILD PERMT Applied: 03/0912004
Applicanl MASTER SEALERS Issued: 03/1012004
970-476-3975 To Exoire: 09/0612004
Job Address: 291 BRIDGE ST VAIL
Location: 301 BRIDGE STREET
ParcelNo: 210108262001
Description:
RE-ROCK SAME FOR SAME ROOF
Conditions:
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQU]RED BEFORE ANY
WORK CAN BE STARTED.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQLnRED TO CHECK FOR CODE
COMPLIANCE.
fltp0lon tl
NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED
MWNWVAIL
75 S. Frontage Rd.
Vail, Colorado 81557
CONTRACTOR INFORMATION
.ffzc-acr ;fi .zt.tc:.zany'Z 79a. €2a
COMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials
BUILDING: $ELECTRICAL: $OTHER: $
PLUMBING:$MECHANICAL:$TOTAL:$ FZ Z.fa. € "
For Parcel # Contact Assessors Office at 970-328-8640 or wsff
*************t i*rffi******{*{ek*****FoR OFFICE USE ONLY*******I rt*********!l'.*ir*it***r*t'***
\\Vail\data\cdev\FORMS\PERM ITS\BLDGPERIVI. DOC
7/a,., z(f > 6'DPa <?,/
r.Job Name:'1-.e Z-.lt Za'e€,
WOfk: 4*'. .eeF Jra.- at ,€ea t..*rrt
.*t+ ,/ ---r{rt*'e.*o44a A..4+u{Jri
WorkClass: New() Addition( ) Remodel ( ) Repair( ) Demo( ) Otherld
Does an EHU exist at this location: Yes ( ) No ( )Work Type: Interior ( ) Exterior ( d,/Both ( )
Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family ( ) Commercial (( ) other ( )
No. of Accommodation Units in this building:No. of Existing Dwelling Units in this building:
No/Tvpe of Gas
Gas ADeliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burning (NOT
07 t26t2002
ll
Questions? Call the Building Team at 479-2325
Depaftment of Community Development
7/c-a 2-4
{ This checklist must be ampleted before a Buitdino permit aooliation is
acceoted.
All pages of application is complete
Has DRB approval obtained (if required) provide a copy of approval fonn
condominium Association letter of approval attached if project is a Multi-Family complex
Complete site plan submitted
Public way Permit application included if applicable (refer to public works checklist)
Staging plan included (refer to Public Works checklist) No dumpster.parkino or material storaoe
allowed on roadwavs and shoulders without wriften aooroval
Asbestos test and results submitted if demolition is occurring
Architect stamp and signature (All Commercial and Multi family)
Full floor plans including building sections and elevations(5 sets of plans for MultFFamily and
Commercial Buildings)
Window and door schedule
Full structural plans, including design criteria (i.e,loads)
Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
Soils Repoft must be submitted prior to footing inspection
Fire resistive assemblies specified and penetrations indicated
Smoke detectors shown on plans
a
tr
D
B
a
o
tr
D
D
B
tr
D
D
D
f,l
D
Applicant's
Date of submittal:
ProjectAddress: 7a/ 1fi.a-.tzz3t/ rf
Types and quantity offireplaces shown
\Wail\data\cdev\FORMS\PERMITS\BLDGPERM.DOC
Received By:
04t02t2003
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Depaftment Approval, Engineer's (Public Works)
review and approval, a Planning Department review or Health Department review, and a review
by the Building Department, the estimated time for a total review will take as long as three (3)
weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for.
Agreed to by:.t-774r',ai/l 57,
Project Name:2z ?azz-a
Date: r,/r./-r'
F : everyone/forms/bldperm3
05-26-2004 Inspec{on Request Reportlng5-,3-Z-pm _ '_vAtLco-iroyyx_br _" l
Requested InspecJlrX5; I[i*d"y, May ?7, 1004
SlteAddress: 2Sl BRIDGE ST VAIL
30' BRIDGE STREET
ArPrD Inlbrmafron
Adivlty: B0+ffi3 Tvoe: &COMMConsilTyp6: Occuooidcv:
Orvri€r: PLAZA LODGE ASSOCIATES LTDApplhanl: MASTERSEALERS
Requested lnsDecfi on{sl
Item: 90 BLDG-Flrral
Requestor: IUASTER SE,qLERS
Asslgngcl To: CDAVIS
Aclbn:
9lalus: ]SSUED
In€p Ar€6: DM
Requestred Tlme: 08:00 Ali' Phone: 97t"476-3975
Enl€redBy: LCAMPBELL K
Tlm€ Exp:
wp(
Insp€cdon Historv
ll€m: 10 BlDc'-Fmilnos/Sts€l
fiem: 20 EtDGfouncEtbrvStesl
Item: 30 BlDG+ramlno
Item: 50 BLDCdnsuHEn
Item: 60 BLDC'-Sha€lrock l,tatlIt€m: 70 BLDGMtsc.
Item: 90 8{-Dcr.FlnElll€m: Itito ELDe.Temp. C/Ollem: 532 PW-TEMP.-CyO
llem: 533 PLAN-TEMP.C/O
Item: 537 PLAI*FIML C/Ollgn: 538 FIRE-FIML C/O
frern: 539 PW-FIML C/O
frem: Sdo BLD&Flnal Ci/Obm: 21 PLAI*ILC Fonnrhlhn phn
n€m: 22 PLA'+ILC Slte Pbn
*k; *
Phone: 97&47S39?6
REPT131 Run Id: 1893
TOWN OF VAIL
75 S. FRONTAGE ROADVAIL, CO 8L65?
97 0 -479 -2r38
lu /s
DEPARTMENT OF COMMIINITY DEVELOPMENT
|-/.r
l roa
ON ,JOBSITE AT ALL
Permit #: B9B-0078
SEatus...: ISSUED(PLAZA Applied. . : 04/29/LgglIssued...: os/Os/L998
Erryj_res. . : LL/0L/L998
T'0ViComm. Dev.
L
NOTE: THIS PERMIT MusT BE PosTED
ADD/ALT CoMM BUILD PERIvn
:
TIMES
Job Address:
L,,ocation. . . :Parcel No..:Project No. r
291 BRIDGE ST
29]- BRIDGE STREET
2101- 082 -52 -001
APPLTCAI{| cTLLAN-ARMsrRoNc DESTGN BurLD phone: 970-468-2t05coRPoRATroN, 8471- IURNPTKE DR., sTE . 2oo, wEsrMrNrsrER, co 80030coNrRAcroR cTLLAN-ARMsrRoNc DEsrcN BUrr,D phone: 970-468-zLoscoRPoRATroN, S4TL tItRNPrKE DR., srE. 200, wEsTl4rNrsrER, co 80030OWNER PI,AZA LODGE ASSOCIATES LTDTURTTE CREEK VTLLAGE STE 605, 3B7B OAK I-.AWN AVE, DAr,r,AS TX 75219
r)fean-upr Deposit Refund;:!pproved
;: tllOUllt
.l-.;...sq Ft'i
*Of Gas Logs:
FEE SIIMMARY ****tt*it'r'r'rBuilding--__-> 1,14o'oo Reeluarant plan Rcvie!.--> .o0 Toeal calculated Feea---> 2,584.ooPlan cb€ck---> 741.00 DRB Fee--------- 2oo.o0 Addilional Fees-_-_--___> .oornvesLigaEion> .oo RecreaEion F€e--_--__-__> .oo rotal pe!_.ni! F€e-_-----_> 2,5a4.00will carl'---> 3.oo clean-up Depo6l E - - - - - - - - > soo.oo palr€neB-_______ z,sa+.oo
-""...._,:::l:.illl;;;;;:;;;;.;;.t".".....1:?li;::...._..::Tiil.?yi;;.;;;:;";;:;;......._...";::_..
IE€M: 051-OO^BU_I!PING DEPARTMENT D.gPE; BUILDING DiViSiON:g.t / os / 1998 ^ ClqELiE- -AEEi<jii, EpFn cHARr.,rE DAlr.r.srtem: 0s400 ._q!!$ryJxe
-neFEiiful-ENi" -.:-*-- -' oepc : pr,ANNrNG Division:95 / os / tees ^cEABliE-'-A;Eib;;' EFFn w/artem: 0s600^E_Ing DrnARiMEiii --- ^',.4' DepE,: FIRI Division:0 s / 0s / +2s_C ^
CHASI-,IE-_ AsE _foii; AppR N/Arrem: 05500^pUE1_,19 wonkS---' Dept: pUB WORK Dj.vision:os/Os/L998 CraRLiE "addlon: AppR N,/A
See Page 2 of this Document for anv conditions that mav apply t.o thls permit-
DECLARATIONS
I heleby acknor{ledge that r have read LhlB application, fi1led out in full the inforaaEion requlred, conpleted an accurace ploeplan' snd 6tat6 lhaL all the inEor-nation plovia"a a6 lequired i6 corlecL. r agree to comply vith lhe inforEration and FroE ptan,Eo co$Fly eith arl Toirn ordinance6 and 6t'ate 1aFe, and to build Lhia sErucEure according go che To{n'a zonj.ng and eubdlviBioncodeg, d.sign revier approved, Uniforn Building code a$d other ordinaoced of the T.oi{n applicabl,e chereto.
REQUESTS FOR INSPESIIONS SHALI, BB MADS TI.IEMTY-FOUR HOURS IN A.DVANCE BY
send cI.en-up Depoaic To: GrIrraN-ARMsTRoNs DEsIoN
Descript.ion:
RE-ROOF RE-DECK, INSUI..ATE T]NDERDECK
Occupancy: 82 82Tlpe ConstrucLion: III l-_HRTytrle III 1_Hourlpe Occupancy:
Valuat.ion:1,99 ,572
Fireplace Infolrnet ion; Rest.r:icted: Sof
Add
cae AFpllances:1
f
\'
\
************************************************************:t*******************
CONDITIONSPermit #: B9B-0078 as of Ts/os/g8 SLatus: TSSIIED********************************************************************************
PETMIT.TYPE: ADD/ALT COMM BUILD PERMI APPliCd: O4/2g/Lgg8APPIiCANI: GILI,AN-ARMSTRONG DESIGN BUILD ISAUEd: O5/05/Lgg8970_468_2105 To E>(pire r LL/0L/1"998
Job Address r
LOCAT,iON Z 29L BRIDGE STRXET (PI,AZA LODGE)Parcel Nor 2t_01__082_62_001_
Description:
RE-ROOF RE-DECK, INSUTATE LJNDERDECK
Conditions:
1- FrRE DEPARTMENT APPRoVAL rs REeuTRED BEFoRE ANy woRK cAN BE
STARTED.2. FIELD INSPEqIIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.3. A THERMAL BARRIER WILL BE INSTALLED IN ACCORDANCE TO1991 UBC SEC 1?1-3 (d) TO PROTECT FOAM rNSUr,ATrON.ALL GUARD RAITS MUST COMPLY WrTlT 1-991- I]BC SEC ].71"2
tfork class: [ ]-New [ ]-ALteration [ ]-Addit,ionar ffi-nepaii-l
*ouq * (?^ n 9r.: [-]-other:::7'' ce;tttff a+eA
Number of Dwel-Ling Units:Number of Accomnodation Units:
fnber and Type of Fireplaces: Gas Appliances Gas Logs_ Wood/Pellet
r * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * VALUATIONS * * * * * * * * * * )t * * * * * * * * * * * * * * * * * * * * * *
3UIIJDING: $
?LUMBING: $
O Er,EcrRrcAL: $
MECITANICAL: $--'-----OTHER: $
TorAL : +__f99r_fff=eg_
' Tt'r,r trt
I * * * * * * r' * * * * * * * * * * * * * * * 't * * * * CONTRACTOR INFORMATION * * *,L * * * * * * * * rr * * rr r( * * * * * * * * * *lenerar contractoT:,@d-brp Tovrn of vair Reg. No. /-?/-4\ddress: teq Haiust, ezb,l lW, phor," Nunrler.: 4AL/2i7-
llunbing contractor: _ l)-l0 --' Torl of Vail Reg. No.\ddressr
-....-
_ phone Number:
'techanical Contractor; Town of VaiL Rec. rr^
iOOfeSS: rrt-^*^ r'..*r^^--Phone Nunber:
i * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * FOR OFI'ICE USE * * * * * * * * * rt * * * * * * * * * * * * * * * * t( * * * *
:1::::1:"1 contracror: _ tf,Grg fown of vail Res. No._\CtOfeSS: _ +.1(!h ^no Nrrnl-ror.
i r orr"-""
]UTLDING PERMIT FEE: ..i, BUILDING PI,AN cHEcK FEE:?LUMBING PERMI'I FEE: T . - 'PLWBING PI,AN cHEcK FEE:,IECHANICAL PERMIT nnn: ----
-_
I,IESHANISATT pLAN CHECK FEE:ILECTRICAT, FEE: .REcG;Ti;n "".,
:rrt:,Llr(r-uA! r rrri : * .RECREATION FEE :)THER TYPE OF FEE: "- ' -;1 .--:-- .l- cr.FAN-TrD nFD^aT
)RB FEE:
i,i,,, i " '-' CLEAN-UP DEPOSIT:
, TYPE IGROUP I SQ.TION IBUILDING:_l l_l STGNATURE:t_t_t_t zoNrNG:
-I-I--I-
ISIGNATURE:lomments:
)
CLEAN IIP DEPOSIT REFIIND TO:
75 south lrontage road
vail, colorado 81657
(303) 479-2I.38 or 479-2L39
TO:
FROM:
DATE:
SUBJECT:
Read and acknowledged by:
of llce ol communlly developmenl
ALL CONTRACTORS CURRENTLYL REGISTERED WITH THETOTVN OF VAIL
TowN oF vArL PUBLIC WoRKS/COMMUNITY DEVELOPIIENT
FIARCH L5, 1988
CONSTRUCTION PARKING & MATERTAL STORAGE
rn sununary, ordinance No. 6 states that it is unr.awful for anyperson to litter, track or deposit u;t-=;irl"=I.r., sand, debrisor materiar, including tri.n-Iu.psrers, portable toilets andworkmen vehicles. upon any street, sidewalk, altey or publicplace or anv r:ortion tneie"il--if" right-oi-"uy rn arr Town ofvail streetl ina.roads is approximately 5 ft. Lff pavement.this ordinance wirr re ;;rf:ii;^enforced by the Town of VaiIPubric works Denartnent. --p".=ln= rou.,d viorating this ordinancewill be given a 24 hour r-ia[;;"r-rotice t"-."r;"":said materia].fn the event the person so notified.g?.= not comply with thenotice within the-24 n""i tim"-lpecified, the putric worksDepartment wir-1 rehove said mare;i;i-;a-inJ"I"pl"re or personnotified' The rrrovisions "t tni= ordrnance sharr not beapplicable to c6nstruction, *ii.L"nurce or repair projects ofany street or arrey or any "liiit;;;"i; ;;"';i;;i_._r"r.
To revier+ ordinance No. 6 in furl, p)-ease stop by the Town of:3:i"::ii:i"3"";Hi:'m*"::"";;;i" a copv. rnani< you ror yo,,,
'r'lr'lrl
contractor, owner)
75 south tronlsge road
vall, colorado 81657
(303) 479-2138 or 479-Zt3g of tlce of communlly devolopmerrt
If'this permi.t requj,fe: a Toy/n of Vail [ire Departrnent Approval,Engineer''s (pubr i. H:Ilrl r"vi"* unl'ipi"ouur , a pranning'Departmentrev i ew or. Heat th Department. iev i ew, un['u-.iuiur tv"iiiu"iuii ai ng
Sirt[l[:'*;.ll: ""i'uted time ror'a iotar ;;;i;,-,'.;"iu[e'i, rons
BUILDING PERI.iIT ISSUANCT TII,IE FMI,IE
all multi-family permits wii
ma x imum requ i remen tsfi-T?\iffi
resftre[tTAT or snral ] er projects impact tt;l;iliu;departments r.rith regard' to"necesiaiy'review, tneiealso take the three week perioJ. - "
Every.attempt vri'l r be made by this ,epartnrent to expedite thispet'mit.aS s.oon as possible. -
I, th. undersigned, nnderstand
Trame..
ver, if
above mentioned
projects may
the plan check procedure and time
All commercial
have to follow
(1arge or
the above
smal i ) and
rnentioned
Communi ty Development Departrnent.
TO:
FROM:
DATE:
RE:
MEMORANDiJM
ALL CONTRACTORS
TOWN OF VAIL PUBLIC WORKS
MAY 9, 1994
WHEN A "PUBLIC WAY PERMIT'
DEPARTMENT
IS REQUIRED
Job Name:
Date:
Please
1)
2)
e following questionnaire regarding the need ior a "public way permit';
YES NO
ls this a new residence? Vr
ls demolition work being performed
that requires the use oithe right N
of way, easements or public property?
ls any'utility work needed? X
Yls the driveway being repaved?
ls diflerent access needed to site y
olher than exisling driveway?
ls any drainage work being done
affecling the right ol way, easements, V
e\
4)
s)
6)
or public property?
7) ls a "Revocable Flight Of Way permit'
required?
B) A. ls the right of way, easemenls or
public property to be used for slaging, Yparking or lencing?
I have read and answered allthe above questions.
za La
v
B. lf no lo BA, is a parking, staging
or lencing plan required by Community .
Development?
lf you answered yes to any of these questions, a 'Public Way permit' rnust be obrained."Public Way Permit' applications may be obtained at lhe public Work's oflice or at
C.o.ryr.r1u1tity Development. lf you have any questions please call Charlie Davis, lhe Townof Vail Construction lnspector, at 479-21i8.
DateJob Name Contracto s Signature
06/04/58 XoN 15:14 F X 303 128 L732 Gllla[6 IncotTorated
ffi Co{tw.fro|n
IIATENTAI. SAFf,TY TTATA SIIEf,"T
h|| trt
F'o-lofl rlq,D'|Jr3li! m,r:ttDra, rwftcvor!.lr{0f,.iEraat sEalt-€ar E |lt as tl!,tr: tsltl ?u. agrtlfr{rra
Aoos
HrzrnE|J|GtoHr!frrlfE
FFqfqr
ftsryfiSarAc-crnatrulb
gIE F-
ollll.rr-3
lil{r4
!1lBr3l
6t{rELicry.r|d
IJ|f,!tr
IOllIH
rEsrt TLVilfqr-'0rq[Ph|rrrnqtItrili|f
Err-rerrrF
ilr r'rrc ffif,trE ottt6.l
X'A
rEsrre giAvll?.lr rO=tt
llvrtilrlioxtar; m*FrrrsdrcR
tl
lroufr.lTt r rc.t
hld.||r
ffi!..*----
-firqt. niiltr fr.t: rrrrrfr aanr
. SEGTIOX IV . FIRE AilD HAZARD DATA
lffia A!|il.t lr drrrd u{l Olrfr ff nnttrq ns.|ffit tl
nEAcTlv!:If_ DATAccrrdltErt[lo
Xrrnr
nc0r'rrE{,t}Yd|^rlr||| 3 rb -IE-
lcr tlTarrxr-mis Fo|.t*tl? fn|
ililtoc.|'.
Gffitro*l0lH)
f..|ftrilL
x|a roq,ra rtt#lra|'€a, if rrnooahiir
iu!lmtl
06/04/96 IoN 15:14 FAI 303 428 1-7!2 Glllans Incorporetetl @ ool
' "'f-:f- ?: &' ali E ilL'e'Iff,:ylL'Ii $prc, s lf,x:rr z*s - 2642
pF
- 04
ffi COl;tEaTrlgr{
MATENIAI, SA]DTY TDATA SIItrf,T
' t {.tcz
- l.*
=F-q.D- -rurdr xorq ,;'\gn,fG. rcu JGftlEV ortft,rfltr:ru.m &lr$.srr mrrr llo r:rd. riras ier, riEi+a.
sEcilor vt - HCArfr:ff=j=@ifrffiffi m'J:'*lrFt-ilrmil!'htal '{r ''!:*Er|lr' Ea'rat-
r |l|rN 5 m|D - . .--.H.Tj1?.::tr qc6 r4 rn rrr *| rqj;r,*|r15'fgt-,',i.:-F,ilEffi*,# :rSHt11g'-"{; ;; r r*"r h ril Grk.. cl.rH-IHlEffiE;FffifiEffiH**ltffi#Hs3 trIffi#+ o tl,.dr,r ffi ffiE!fiffi ,ffi. F.lE
: Goilltor tEASuREg
Damage Repair Design Build
AGREEMENT
This AGREEMENT made this 16 day of April, 1998 by and between Pla"a Lodge Association in Vail,
Colorado, hereinafter referred to as "Client"; and Gillan Armshong Corporation, 8471 Turnpike Drive,
Suite 200, Westrninster, CO 80030, a design build contractor, hereinafter refened to as "Giilan
Armskong."
WITNESSETH:
In consideration ofthe mutual covenants and promises herein set forth the parties hereto covenant and
agree as follows:
A. The work of this contract shall be as follows:
Foam Insulation:
o Plastic offthe rest ofthe store and carpetingo Remove ceiling and partial grid to l0 foot perimetero Remove false walls at dressing rooms on the south endo Spray four inch foam and vapor sealant coatingo Replace the ceiling. Replace the walls and paint
Decks above Christv Sports:r Demolition of wood deckingo Demolition of handrails and columns or re-build handrailso Demolition of flashingo Demolition of sidingo Pull three hot tubs with a craner Demolition of roolurg at least at the edgesr Install % inch recovery boardo Install new 60 Mil rubber and EPDM l8 inches up the walls loose laido Install Trex Board (plastic wood decking) with EPDM sliders at the
supportsr Install hot tubs with a crane. Install rebuilt handrailso Install sidingo Re-build three areas at hot tubsr Paint and stain the new materials only. Special needs: Crane; Plumber; Electrician; Access
GTLLAN ARMSTRONG CORIORATO
Plaza Lodgc Deck
Upper Hot Tub: (Crane costs included in removal of hot tubs above
Christy Sport)r Pull offthe hand railsr Pull offthe hot tubr Pull off the surrounding deck and wallsr Re_build the roofing. Re-build the wallsr Re-build the handrailsr Re-build the Parapet cap slope towards the roofr Replace the sidingr Replace the deckingo Replace the hot tubsr Paint and stain new materials only
For the compensation to be paid by client as hereinafter provided, the parties agree that:
I . Gillan Armstrong shall provide all necessary certified drawings, labor, supervision, equipment, tools,
materials and construction debris removal to the Client in accordance with the Preliminary Design
referenced in Gillans Incorporated report dated March 17, 1998 with reference to Roof and Deck
Observations.
2. Gillan Armstrong shall begin the work May 4, 1998. They shall complete the construction phase of
the interior of Christy Sports by May 19 and the deck and hot tub by June 15,1998, assuming weather
and accessibility are good.
3. Gillan Armstrong shall pay all required fees of govemmental bodies having jurisdiction over the
project and all costs for permits and licenses necessary for the performance ofthe work.
4' Gillan Armstrong shall perform the work in a workmanlike manner, to the satisfaction of the Client
and in conformity with the standards and regulations of governmental bodies having authority and the
approved plans and specifications or other construction documents, developed by reference in
paragraph l
5. Gillan Armstrong shall repair and correct to the Client's satisfaction, at Gillan Armstrong's expense,
all defects in workmanship or material arising within two year after completion of the work. A ten-
year manufactures warranty on both labor and material for the deck water proofrng will be obtained.
Acceptance of the work by the client shall not impair these warranty obligations.
6. Gillan Armstrong shall procure and maintain in futl force and effect at all times during the
performance of the work under this Agreement for not less than the following limits of liability, or
required by law, whichever coverage is greater:
a) Workers' Compensation:
(i) State of Colorado:
(ii) Applicable Federal;
Statutory
Statutory
Page 2
' GILLAN enMsrRoNc coRPoRA
Plaza Lodge Decks
(iii) Employe/s Liability: $100,000 each incident
$500,000 disease, policy limit
$100,000 disease, each employee
b) Commercial General Liability (including Premise-Operations; Client's and Gillan
Armstrong's Protective Liability; Conhactual; Personal and Advertising Injury; Products and
Completed Operations; Broad Form Property Damage);
(i) Bodily Injury & Property Damage Combined Single Limits
General Aggregate S2,000,000
Products/Completed Operations Aggregate $2,000,000
Personal and Adve*ising Injury $1,000,000
Fire Damage (any one fire) $50,000
Medical Expense (any one person) $5,000
(iD Products and Completed Operations Insurance shall be maintained for a
minimum period of three years after final payment and Gillan Armstrong shall
continue to provide evidence ofsuch coVerage to the Client on an annual basis during
the aforementioned period.
(iiD Property Damage Liability Insurance shall include coverage for the following
hazards:
tr X(Explosion)
EI C (Collapse)
tr U(Underground)
c) Umbrella Excess Liability Combined Single Limits
Bodily Injury and Property Damage $1,000,000Retention S10.000
d) Automobile Liability
Bodily Injury and Property Damage $1,000,000
Owned, Non-Owned, Hired
(e) Other Insurance:
Coverage Amount
Builders Risk Coverage will be provided by the Client on all contracts for the Contract
Amount.
The $ I ,000 deductible amount will be the responsibility of Gillan Armsbong.
A certificate evidencing such insurance shall be submitted to Client prior to the
commencement of the work. The Certificate shall name the Client as Additional Insured with
respect to this project. The Certificate shall contain a provision that coverages afforded under
the policies will not be canceled, non-renewed or modified until at least 30 days prior written
notice has been given to the Client.
8. Gillan Armstrong shall save and hold harmless the Clienl its officers, employees and agents from and
against all claims relating to or liability resulting from damage to property, injury, death or any
person or persons arising out of or in any way connected with or resulting from the work to be
Page J
CILLAN ARMSTRONG COMORATI
Plaza lodse Decks
performed hereunder including, but not limited to, claims or liabiliry arising out of or in any way
connected with or resulting from the acts, negligence or alleged negligence of Gillan Armshong or its
subcontractors, agents, servants or employees.
9. Gillan Armstrong shall submit monthly applications for payment to the Client for the value of the
work performed and materials furnished or stored on the job site, together with such supporting
documentation as the Client may reques! including, but not limited to, evidence that all claims, bills,
indebtedness, or costs incuned in connection therewith have been paid on a timely basis. Gillan
Armstrong shall, in addition thereto, with each application for paymen! furnish releases or waivers or
all liens for labor or materials from subcontractors, laborers, and suppliers in such form as the Client
may require. Payment shall be made by the Client to Gillan Armshong (or its subcontractor or
suppliers directly if the Client elects) within l5 days after the application for payment is approved. It
is agreed that if payment in firll is not paid when due, Gillan Armstrong may, without waiving any
claim or right against the client, and without liability whatsoever to the client, terminate the
performance of service. Retainers shall be credited on the final invoice. Client may suspend or
terminate Gillan Armstrong's services by written notice. In the event any deiay or suspension by
Client exceeds three months, Gillan Armstrong may require adjustment of the compensation provided
for herein. Gillan Armstrong may suspend or terminate services upon l0 days rwitten notice and file
for collection without presentment for payment, protest, or notice of non-payment and of protest if
Client fails to pay any Gillan Armstrong bill within 30 days after the date of invoicing. In the event
this Agreement is terminated by either party prior to the completion of services, Client will pay Gillan
Armstrong for all services and materials rendered and expenses incurred to the date of termination
plus expenses attributable to termination. If it is necessary to retain an attorney to enforce collection,
the Client will pay all reasonable attorney fees and court costs. Whether or not suit for collection is
filed, the Client will pay a finance charge of 1.75 percent per month on the unpaid balance on
accounts after 30 days, it being expressly understood that the amount ofthe finance charge will be
added each month to the account balance.
10. Compensation for to produce Certified Drawings as needed and related Construction cost shall be:
$203,66s.00
Terms of payment shall be $101,832.50 at the first day on the site, and $101,832.50 within 15 days
after completion of the work. If the final payment is made within the required 15 days, a discount of
$4,073.30 may be deducted from ttre final invoice.
I l. Any deviations from the terms oftbis Agreement involving an extra change or credit must be agreed
to before the change is made and evidenced by the Client's written Change Order.
12. Gillan Armstrong in performing the work hereunder is an independent contractor and reserves the
right to control Gillan Amstrong's employees and representatives, and the Client reserves only the
right of inspection to ascertain that the completed work conforms to the requirements of this
Agreement.
13. Client agrees to the following further terms and conditions:
a) Public Responsibility
Page 4
, GILLAN ARMSTRONG CORPORATI
Plaz: I-odge Decks -
The Client recognizes that both the Client and Gillan Armstrong owe a duty of care to the
public that requires them to conform to applicable codes, standards, regulations and
ordinances, principally to protect public health and safety. Gillan Armstong will do its best
to alert the Client to any matter that requires the Client's immediate action to protect public
health and safety or conform to applicable codes, standards, regulations and ordinances.
Should the Client decide to disregard Gillan Armstrong's recommendations in these respects,
the Client agrees Gillan Armstrong has the right to employ its best judgrnent in deciding
whether or not to notiry public officials or take appropriate action. The Client agrees Gillan
Armstrong should not be held liable in any respect for reporting or failing to report said
conditions. Accordingly, the Client agrees, to the fullest extent permitted by law, to
indemniff and hold Gitlan Armstrong harmless of any claim, liability or cost (including
reasonable attorneys' fees and cost of defense) for injury or loss arising or allegedly arising
from Gillan Armstrong's notifing or failure to notiff public officials.
Ownership of Instruments of Service
All reports, plans, specifications, field data, notes and other documents, including all
documents in electronic media, prepared by Gillan Armstrong as instruments of service shall
remain the property of Gillan Armstrong. The Client may make and retain copies for
information and references in connection with use and occupancy. The Client shall not reuse
or make any modifications to the reports, plans, specifications, field datq notes, electronic
media or other documents prepared by Gillan Armshong as instruments of service, without
the prior written authorization of Gillan Armstrong. The Client agrees, to the fullest extent
permitted by law, to indemnif and hold Gillan Armstrong harmless for any claim, liability or
cost (including reasonable attorneys' fees and defense costs) arising or allegedly arising out
ofany instructions ofservice by the Client or any person or entity that acquires or obtains the
instruments of service from or throush the Client without the written authorization of Gillan
Armstrong.
Verifi cation of Existing Conditions
In as much as the remodeling and/or rehabilitation of an existing structure requires that
certain assumptions be made regarding existing conditions, and because some ofthese
assumptions may not be verifiable without expending additional sums of money or destroying
otherwise adequate or serviceable portions ofthe structure, the Client agrees to bear all costs,
Iosses and expenses, including the cost ofthe Gillan Armstrong's additional services, arising
from the discovery ofconcealed or unknown conditions in the existing sFucture.
Hazardous Materials
It is acknowledged by both parties that Gillan Armshong's scope of services does not include
any services related to asbestos or hazardous or toxic materials. In the event Gillan
Armstrong or any other party encounters asbestos or hazardous or toxic materials on thejob
site, or should it become known in any way that such materials may be preseot at the job site
or adjacent areas that may affect the performance of Gillan Amstrong's services, Gillan
Armstrong may, at its option and without liability for consequential or any other damages,
suspend performance of services on the project until the Client retains appropriate specialists,
consultant(s) or contractor(s) to identifu, abate and/or remove the asbestos or hazardous or
toxic materials, and warant that the job site is in fulI compliance with applicable laws and
regulations.
b)
c)
a)
Page 5
GILLAN ARMSTRONG CORPORAT.
Plaza Lodge Decks V
The Client agrees, not withstanding any other provisions of this Agreement, to the fullest
extent permitted by law, to indemnify and hold harmtess Gillan Armstrong, including
officers, partners, employees, agents and consultants from and against any and all claims,
suits, demands, liabilities, losses, or costs, including reasonable attomeys' fees and defense
costs, resulting or accruing to any and all persons, firms, and other legal entity, caused by,
arising out of, or in any way connected with the detection, presence, handling, removal,
abatement, or disposal ofany asbestos or hazardous or toxic substances, products or materials
that exist on, about or adjacent to the job site, whether liability arises under breach of contract
or waranty' tort, including negligence, strict liability or statutory liability or any other cause
ofaction.
e) ADA Compliance
The Americans with Disabilities Act (ADA) provides that it is a violation of the ADA to
design and construct a facility for first occupancy later than January 26, l993,that does not
meet the accessibility and usability requirements of the ADA except where an entity can
demonstrate that it is structurally impractical to meet such requirements. ADA also requires
the removal of architectural barriers in certain existing facilities where such removal is
readily achievable. The Client acknowledges that the requirements of the ADA will be
subject to various and possibly contradictory interpretations. Gillan Armstrong, therefore,
will use reasonable professional efforts to interpret applicable ADA requirements and other
federal, state, and local laws, rules, codes, ordinances and regulations as they apply to the
project. Such interpretations will be based on what is known about ADA interpretations at
the time the service is rendered. Gillan Armstrong, however, cannot and does not warrant or
guarantee that the Client's project will comply with interpretations of ADA requirements
and/or requirements ofother federal, state, and local laws, rules, codes, ordinances and' regulations as they applyto the project.
D Assignments
Neither party to this Agreement shall transfer, sublet or assign any rights under, or interest in
this Agreement (including but not limited to moneys that are due or moneys that may be due)
without the prior written consent of the other party.
g) Time Bar to Legal Action
All legal actions by either party against the other arising out of or in any way connected with
the services to be performed hereunder shall be barred, and under no circumstances shall any
such claim be initiated by either parry after six years have passed from the date Gillan
Armstrong's services have been completed or terminated.
14. This Agreement in writing constitutes the sole agreement between the parties concerning the subject
matter hereunder and all prior negotiations, representations, understandings or agreements concerning
the subject matter hereunder are hereby canceled.
15. The laws of the state of Colorado will govern the validity of this Agreement, its interpretation and
performance. Any litigation arising in any way from this Agreement shall be brought in the courts of
that state.
Page 6
. r GTLLANARI'rsrRoNccoRPoMnlt
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed the date first
above written.
CONTRACTOR: GILLAN ARMSTRONG CORPORATION
H:\cill|n Arnltong\Plrr. Lodgc\Dcsign Build ASrcGrnatllf
April 16, 1998
rage /
TOWN OF VAIL
Department of Community Development
75 South Frontage Road
Vail, Colorado 81657
970479-21i8
FAX 970-479-2452
: a-
I \-W
r*o
tr
July I.1998
Mr. Parkcr Foy (Peak Properlies)
Fax- (970\476-6747
RE: Plaza Lodge Guardrails
Dcar Parker.
Thank you fol taking thc time this morning to rcview the guardrails at the Plaza Lodge with rnc.
Listcd below at'e issuss attd proposcd rerredies to makc thc balconies above grade morc in
compliance with thc UBC.
| ) All guardrails undcr constluction.
A) Ptovidc morc suppol't fot'thc tcmporary guardrails now installcd, and install rnore snow
fencing along the tcmporary r.ails.
B) Install signs at all points ofacccss notifying propelly owners and gucsts that the balconies
are undcr constrlction and only cmergency access is allowed.
C) Restrict acccss anywherc that does not need to be uscd as emergcncy egrcss (lE. fiom
bcdrooms).
2) All other guardlails.
A) Inspcct and confitm anchoring of the guardrails. A minimurn of a 3/8" x 5" lag bolt should
be uscd to adequatcly anchol mils to the wall. Also confirm what typc of rnaterial is used to
install thc lag bolts into (lE. 2"x 6" lumbcrJ. If your inspection determines inadcquate
anchoring, plcasc t'cstrict acccss to thosc particular balconics in question. Pleasc tbllow the
rccomnrcndations above.
3) As for unit # 7. the tcmporary bracing appears to bc adcquate to secure the guardrail
from falling frorn thc stlucturc but morc necds to be donc to allow occupancy on that balcony.
Plcase kccp the occupants fiom using that balcony until molc is donc to sccul'c the rail. See
abovc.
This should be cnough to gct us through thc busy holiday weckend. Ifyou havc any questions or
conccrns, fecl free to call me at (970) 4lg-2142.
Senior Building
tP **""'o'n'o
TAWN OF VAIL
D epartment of Community Deve lopment
75 South Frontage Road
Vatl, Colorada 81657
970-479-2138
FAX 970-479-2452
TO:
Building Saf*y
6c Inspectiott
Services Divisiott
FAX NUMBER:
PHONE NUMBER:
FROM:
FAX COVER SHEET
coMpANyxmnr: Pt Hr Bet0Nra n+r0 Assac tn+pS
L/76 -67'i7
Charlie Davis, Senior Building Inspector/Plans Examiner
Town of Vail
Community Development Department
Building Safety & Inspection Services Division
75 South Frontage Road
Vail. Colorado 81657
Phone 97 0.47 9.21 42, direct line
FAX910.479.2452
COMIVIENTS, NOTES:
{p ^"n"""o '^'*
\o
REtrTl3l 1
U9 / ll /98 O7:49 REQUES]"S
TOHN OF VAIL, COLORADo
FOR INSFECTIUN IIORK SHEETS FUF: 9/IL/9S
trAGE
AREA: trD
-Activity:
r Address:
Locat i on:
Parce I :
Descri pt i on:
Appl icant:
Owner:
Eontract or:
89S-OO7g 9l Ll/98 Type: fl-Ct}ltlFl StatuE: ISSUED
Oec:
Constr: AtrOll
Use: III 1-HR
891 BRIDGE ST
E91 BRIDIIiE STREET (trLAZA LTIDGE)
2101-6ge-'6e-Ba1
RE-ROOF F]'E-DECK, INSULATE UNDERDEEK
EILLAN-AFII{STRONG DESIGN BUILD trhone:
trLAZH LOIIGE ASSUCIATES LTD Phone:
EILLAN-ARIYISTRONE DESI6N SUILD Fhsne:
970-468-e1fis
979-468-el05
Inspeet ion Request
Requestor: JEFF
Req Tire: OB:OO
Iters requested to
BDOSE BLDG-Final
Inf'ornation.....
I{ARTINEZ
Corrents: trHffRLIE SAID
be Inspected... Aet i on
Fhone: 97O-418-1O3€
TO CALL IN
Cornent s Tile Exg
Inspect i onIter:
It er :It er:IterrIter:
Itea I
fter:
Iter:
Iter:
It er:
It er:Iter:Iter:Iter rIter:
History.....
6A930 BLDG-Fraring
OOO4A ,r * Nat Un File * *
OOO50 BLDG-Insulation
00060 BLD6-Sheetroek Nai I
OOOSO * t Not 1ln File * *
$EgTg BLDE-FIisc.g9/LA/9A Inspector: CD
00690 BLDE-Final
96536 BLDG-Terp. Cltr
SA53I FIRE-TEFIP. C/O
oG53e trhf-TEFltr. Cltr
sG533 trLAN-TEltp- C/O
oO537 PLAN-FINAL CIO
86538 FIRE-FINAL C/O
oos39 ptr-FINAL C/(}
Og54g BLDG-Final C/O
AtrtrR ALL GUflRD RAILS
tl
TOI\rl\T OF VAIL FIRE DEPARTMENT VAIL FIRE DEPARTMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2135
Job Address: 291 BRIDGE ST VAIL Status . . . : ISSUED
Location.....: Applied..: 01,/02/2003
ParcelNo...: 210108262002 Issued. . : 01,/03/2003
Project No : Exples . .: 07 /02/2003
OWNER PITAZA LODGE ASSOCIATES LTD OL/O2/2OO3 PhONC:
ONE TI]RTLE CREEK VTIJIJAGE
3878 OAK IJAI^IN A\rE STE #4OO
DALLAS TX 752L9-4469
I-,icense:
CoNTRACTOR WESTERN FIRE PROTECTION INC. 01/02l2003 phone: 3O3-46'7-a677
]-3551 W. 43RD DRIVE. I]NIT P
GOLDEN, CO
80403
License: 651_ - S
Desciption: upgrade hood system in vendetta's kitchen to be ul 300
standard compliant
Valuation: $900.00
FEE SUMMARY
g0 . 00 Total Calculated Fees--> $28 . 00
go.0o Additional Fees------> gss.00Plan Check-->
Investigation->
Will Call--->
BALANCE DUE_.--->$0.00
Ttem: 05100 BUILD]NG DEPARTMENT
Item: 05600 FIRE DEPARTMENT
oL/o2/2oj3 mvaughan Act.ion: Ap
CONDITION OF APPROVALCond:12
i3."..".."_:.1.:..1_1T3*":::::::'*:5ff*:::::::*"_*::_:::_:::::*:::.:*.::TI:_13*:1;
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an
accurate plot platl and state that all the information as required is correct. I agree to comply with the infonnation and
plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoninE
and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable
thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWTNTY-FOUR IIOTIRS IN ADVANCE BY TELEPHONE AT 479-2135
FROM 8:00 AM - 5 PM.
' ,i,--..\ \.,, \-\., ra ; I
{_)
"\c"4--\-.\j'-
NOTE: THIS PERMIT MUST BE POSTED ON IOBSITE AT ALL TIMES
SPRINKLERPERMT Per:nit #: F03-0001
, r I ,\{. <L L tr_-,c-a.r
Mcchanical--> 920 - 00 Restuarant Plan Revlew->
ss.00
S0 - 00 TOTAL FEES------------> 928 . 00 Total Permit Fee------> $83 . 00
$3-00 Payments----------> $83 .00
Jan O2 O3 O2:26p
12111/zgaz 2L?44
DEc- tEl-o2 ra ' se t
*M
Vail Fire Dept,
3A34679183
Vai I CO
t\FP INC
970 4?9 21?6 p.1
PAGE 05
PAGE A/A
75 $ Fontage-M.
vell, @lorado 8aG57
t D . g?eA ?s2{ s2
DuaHitc Pcrnlt #;-.*-_:.
Sprlnltlcr Psmft #: --.....=--.
iii'ffi- zt Ume oc pe-rnit submitlal and
Pernrft epplHton will not be aceped
Englnee/scirntpof tl.Lc.ET' !-evel I[ (min)
#thp.. equifmentqftsheetsof tnltnfht* . ! ,,, rr-\n[-i. tl'idraulicrnlqrFtions. ,&\*"". A-Sutpdcoloradoflan REf,illrtadmfulm. u
r Plans mrrrt br nrbnriusa w r Re|Etered Fllt P;otEEdon contrrctor.
lmindqGt||ri
and Phone *j= u,nt b=-444-
COTiPLETE VALUAIIOII3 FOR AIsRll PERI'|IT (hbcr & Mateft 15)
Fire sprtnkler: *' |J E b"ffi,-
*r.*im'af rtlr***i*r******itlthtt*.**+*t59f, oFqrcE usE oilLY"".***s*****r*r****$nr.trrt+tr.****.*
#
WaooaL
JoDt{atne: vENDErrA 3 lobAddes: a\4r BRru6g SitReET-
L6gal Dcscription Wn/e \aw*' 4/alry"g tJ/A g,OO*n, N/;
Engtneen n /A *t
^/^
VfmetnA
D€Giled L@uon of vrork ([.efnmr, unft *, bUg;+I-
Fr85df_W& - KtT4,t8'r, ?all €RrlGs 519eff, UNff C-e
Detaited descdpUon otvwrtc, WfitCelifuCnnad n6fa,tEi. -kp,+ce fufu UEwl CtJ Ll NE,E;B rrr rr x uu lrsrzu e Flrax'jg.o evu ttb€ R-
!tr-!cEq: Nr..,( ) Add?6on( ) R€modd( ) Repsir( ) R€trefr( I Ort*1X) OPfiWE"z-
TypedBldg-: Stnglehmityl ) ruo-enUy( ) Mulu{hmily( ) Omrnerdal pO Rertauoot( ) Ottrer( }
No. of bdstiog Drrvelling Unlts in thB buildiB: 1,1/p No- d naomrnodatton Urnb d $is bYrry= nt/e
Doesa Firenbrm ffi- -q t-E F @: tes( ) No$J
f ns hR"akn<t u+frio0 '#L
TOVIN OF VAIL
75 S. FROI{TAGE ROADvArL, co 81657
970-479-2L38
DEPART'I,IENT OF COMMUNlTY
NOTE: THIS PERMIT MUST BE POSTED
ELECTR]CAI-, PERMIT
..Tob AddreSS: 29]- BRIDGE sT
IJOCAI,ION. . .: 291. BRIDGE STREETParcef No. . : ZLOL-082-62-00LProject, No.;
' .).r.-^,\ L) , f\...q,, \ s-i-
L..-,\t,r , t\ , \, rJ {- g\q >-L
DEVETJOPMENT P\c--<.-. \ 't\ '{ -
/ / : ')4w>/ ,,'l/'
ON .TOBSTTE AT ALL T]MES
PermiE #: E9B-0189
t
APPLICAI\ilT H & S ELESTRIC
P. O- BOX 3926, DrrrLoN, co 80435
COMTRACTOR H & S ELECTRIC
P. O. BOX 3926, DILLON, CO 80435OI/,]NER PI,AZA LODGE ASSOCIA,TES LTD
TURTLE CREEK VILI,AGE STE 606, 3B7B
Description: REWIRE HOT TUB
STaTuS...: APPROVED
Applied..: 0B/2a/]-999
Issued. . . : 08/2L/1,999
Elq)ires. . : 02/L7 /1,999
Phone: 970-468-2404
Phone: 970-468-2404
OAK I,AhIN AVE, DALI,AS TX 752L9
500.00Valuation:
FEE SUI4MARY
E;aecEtlcal -->
InweaLigation>
Tot.af Calcufated Fees -->
AddiLional Fees-- -- --- -- >
Total Permit. Fee
Paymente-----------
50 .00
, oo
.00
3,00
5? .00
53 .00
. oo
5l . oo
.00
51 . o0
IlgFj,9Fq80_EIECTRICAL DEpARTMET{T Depr: BUTLDTNG Diwision:98/2L/4998 -JRI_{- Act.ion: AppR APPROVED JRtdrt.em: 0s600_qIRE DEeARTT,{ENT ____ -_-,_ -beipt: FrRE Division:0B/2L/L99e Jwt --AAiiorii AppR N/A
CONDITION OF APPROVAL
DECLARATIONS
r hereby aeknoroledge bhat r have read this applicat.ion, filled outs in fuI1 th€ information required, comprered an accurate protp1an, and state that a1l the information provided ae requi.red is correct. r agree Lo comply with the information and plot plan,to coftply t"ith a1l rown ordinances and sLate laws, and Eo build Lhis Btruccure according to the Town,s zoning and Bubdivisioncodes, degi.gn reviett approwed, unifol_m Building cod€ and ocher ordinances of the Town appttcab-Le lhereto.
REOUESTS FOR INSPECTIONS SHALL BE MADE TWEMTY-FOUR HOURS IN ADVANCE BY TEI,EPHONE AT 4?9-21]S OR AT OUR OFFICE FROM S:OO AM 5:OO PM
SIGNATURE OF OWNER OR COIJTRACTOR FOR HIMSETF AND OWNER
^i::*itff3r'io3"i"v-Assessors
orrice Datg ReCgiVgd
F,i-'.;i";:fr:r':W:',Tsif
' '39H"?; XilLAlU;fi"S3ii*
-irre
eo irtC
-i'Etrr /,__
J APPLrcArroN MUsr BE FTLLED il""*ffi oR rr MAy lror
6r!{:.!ro7t
A*trr'rr************************** PERMTT TNFoRMATJoN * * !r * * * * * * * * * * * *,r * * * * * * * * x * * * )[ ]-Building I J-plurnbing 1\y'_rtectricat I j-Mechani-cal [ ]-otherJob Name:
Lega3. Description: Lot Block Fi'r i n^
owners Name: Pf,ftZ&![ff Address:Iffiftffi,
Architect:Address:
ceneral Description:
r da"puir t r*.n",Number of Dwel-ling' Units:. Nu&ber of Accommodation UnLts:
#::::.::: ::::
of Fireplaces: Gas AppLiances_ Gas Loss_ wood/per_l"..-A**** * * * * rt * *** * * x *** rr * * * * * * * * rt **,/$ - ^ ^ - x x x iB:t x rt * * * vALUATIoNs * * * !t * * * * * * * * * * * * * * * * * * * * * )r * * * * x * *BUILDf Nc: g F.r i:r- tt
pr,rrMFrTN/: ELECTRf CAL: $ fOO- rrTFLTFD. sEi-trlrBrlic, $ ------- r.or"#ii;ffi; ;-:2:L--- orirER: $
V
__ rrb\,r. T.TAL: $*.-*---
ry:;::ri.::;il::i:*'k********* coNrRAcroR rNFoRMArroN *******ir*********ll*******o
Address: Town of Vail Reg. No.
Electrical ConLracto *5 %Leffirc
Phone Nurnber:
Addresst (ba*312( A;llW rown of vail Res. no.2T3€phone Nur.rloer: tlLtr^zlo(-
Plurnbing contractor: e"7oauro7
-
Address: Town of vail Reg. No.Phone Nunrber:Hechanical Contractor.:
Addresd:Town of Vail Req, NO.Phone Nunrber:
FOR OFFICE USE *******?r************rr******:r**:,,
PLUMBING PERMTT FEE:
MECHANICAL PERMI? FEE:ELECTRICAL FEE;
OTHER TYPE OF FEE:
BUTLDING PI,AN CHECK FEE:P]-,I.IIIBING PI,AN CHFC'K FF'F.
I'rEci{ANr cAL praN- -;;il"-x"ien,
RECREATION FEE:
CI,EAN-UP DEPOSTT:
TOTAL PER},TT FEES:
BUTLDTNG:
STGNATUP.-d;
ZONTNG;
STGNATURX:
,fi. [0
t4qll4s 7*
comnEsl-..-
var-uetroE
DFOSII RETUND To:
t
,CIEAT UP
TGWN Oi VAIL FIRE DEPARTMENT
75 S.FRONTAGEROAD
VAIL, CO 8I657
970-479-2t35
Electrical---->
DRB Fee----->
lnv€stigation-->
Will Call------>
TOTAL FEES..>
VAIL FIRE DEPARTMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ALARMPERMIT Permit #:
Job Address: 291 BRIDGE ST VAIL
Location..... :
ParcelNo...: 210108262001
hoject No :
OWNER PIJAZA LODGE ASSOCIATES LTD
ONE TUR?LE CREEK VILIJAGE
3878 OAK IJAfiIN AVE 4OO
DAIJIJAS TX 752L9-4471.
Ll_cense:
CONTRACTOR SUPERfOR ALARM AND ELECTRONIO ,/OGI2OO1 phone: |7O-92G-B1BB
P.O. BOX 2s58
EDWARDS, CO.
81632
License t 429-3
Desciption: instalUupgradealarmpanel
.*.:.1i::.":________1l.1ll__11__,!,,,*,*'..*i,,r,.,!**r*******il,*,r+***..* FEE sL,\{r\.LARy
Status . .
Applied.
Issued .
Expires .
04/06/?OOL Phone:
$s0.00
s0.00
90 - oo
s53 .00
Total Calculated Fees->
Additional Fees----->
Total Permit Fee---->
Pa)T nents--------------->
BALANCE DUE-------->
953.00
s0.00
5s3.00
ss3.00
s0.00
Approvals:II,EM: O55OO FIRE DEPARTMENT
04/05/ZOOL rmraughan Action: AP
:}*:}tili*|**..:}.:}t********t**:}j},}*******)t******'*'}'}*'******l**|*:l.,.,.|*|***,tt|tt|ttN|tttt.||'tN.'l}*********
CONDITIONS OF APPROVAL
,*********:t********tr*rr*)*)tt)*,t,*,1:|,|,a*****x**********++rtj*,tltrt,t,t,t)**,t*******************************rrrr**,r)*r*rr)******rr*****
DECLARATIONS
I hereby aclflowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and
state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this sfucture according to the towns zoning and subdivision codes, design review approved,
Uniform Building Code and other ordinances of the Town applicable thereto.
REQUESTS FoR INSPDCTION SIIALL BE MADE TWENTY-F0UR HOURS IN ADVANCE BY TELEPHOND AT 479-2135 FROM 8:00 AM - 5 PM.
' l.-,--^.\ \),.[\.u.,".- dl. /'\
{ o.L, c., Li. l':t) \L rl5-L-i\*;.- L--.\1.--
A01-0019
.: ISSUED
. : 04/06/2001
. : 05/29/2001.: ll/1412001
S]GNATURE OF OWNER OR CONTRACTORFORHIMSELF AND OWNE
APPUCATION WILL NOT BE ACCEPTED IF IHCOMPLETE OR UI{SIGNED
Project #:
Building Permit #;
Alarm Permit #:
97 O- 47lr- 2135 (I nspections )
rcvn0Fy/,n
75 S. Frontage Rd.
Colorado 81657
Commercial &
COMPLETE VALUATIONS FOR AI.ARM PERMIT
Fire Alarm shop drawings are
application submittal and must include infolmation listed on the Vail,
_ ?"o p"-9-" of this form. Application witl not ue icii$o .itlouti-rris
information.
at time of
(Labor & Materials)
Fire Alarm: $ ItIOO -
COI{TRAMORIMORMATION
**i***tltt******it****n**r!**t|**tt**a******FoR oFFIcE usE ottlLY****i!*******it**:r**i*******,t,r**rr*****n
Utax, ey?G@ zltleot
rIY[1*1h/q/RAMt,s, Fnft"o.
at 970-328-8&10 ar forParcel #
lqrcel # (Required af n-
rob Name: tOreCtW ftAlL ?L+ZA nl*aarex Q15 u . Uo$*l@ QKa-+
Lesal Description fl Lor ll enct: ll ririns:Subdivision:
Owners Name: I eOOress Phone:
Engineer: ll Addres$Phone:
Detailed Location of work: (i.e, floor, unit *, OlOg. #)y\eLH Sootq
Detailed o*ftYtfiil;tt
htlQ {\LfrLm ?ftNeL
WorkClass: New() Addition( ) Remodetffi Repair( ) Retro-fit( ) fther( )
No. of Accommodation Unils in this building:
Does a Fire Alarm Exist: Ves ${ lrto 1 )Does a Fire Sprinkler System kist: .yesV) No ( )
Fire Alarm Contractor:
/>v?zno t NI a-rrw + Lt zvr.'"4%3**'"''Contact and Phone #' :
Lo1-rt9L 12f' E1?'B
Contractor Signature::-y ttx?,?A trdff "
F:/evenpn4fu rms/alrmperm
DEPARTME}TT OF COMMI]NTTY DEVELO
NOTE: THfS PERMIT MUST BE POSTED ON
ELECTRICAL PERMIT
' ).:^-t O.Lf.u.n. \]]
,,,\
1...,\: c* , tt tr.r't 'R,\tt :G
JOBSITE AT AI,L TIMES
Permit #: E98-01_73
TOITIN OF VArL
75 S. FRONTAGE ROADVAIL, CO 81657
970-479-21.38
APPLICAI{T
CONTRACTOR
OWNER
.Iob Address: 291- BRIDGE STLocation. . .: 29L BRIDEG ST (PLAZA #5)ParceI No. . : 2101_-082_62_001Project No.:
Status...: APPROVEDAppIied. . : OB/06/1,999
Issued. . . : 08/06/1,999Ex[:ires. . : 02/02/a999
\\/o"""rrn.ro'
H & S ELEETRTCP. O. BOX 3926, DTLLON, CO 80435H & S ELECTRICP. O. BOX 3926, DILLON, CO 80435
PI,AZA LODGE ASSOCIATES LTD
TURTLE CREEK VILLAGE STE 506, 3878
: HOOK UP FOR REPTACEMEMT HOT TuB
Phone: 970-468-2404
Phone: 97e-468-2404
OAK I,AWN AVE, DALLAS
Valuation:
TX 75219
500.00
Efectrical- - >
Inveshigation>
l.lil-t Ca11---->
Total Calculated Fees--->
Addicional Fees- ----
Total Peflrit Fee-- --- -- ->
Palnnente----------
BAI,ANCE DUE
50 .00
. oo
.00
3.OO
53 .00
.00
53.00
. oo
53.00
Item: 06000 *EI.jECTRICAL DEPARTMENT Dept.: BUILDING Dj_vision:0B/06/L998JRM Acrion-,-[DFii-eppnovED JFr4-Irem: 05600_!'-r_RE DEPARTT4Eih beipr, FrRE Division:08/06/1998 JRM ---Ac-rioii, appn n/a l
CONDTTION OF APPROVAL
l-. FTEIJD rNsPEqrroNs ARE REQUTRED To cHEcK FoR coDE coMpLrANCE.
DECLARATIONS
r hereby acknosledqe that r have read chis applicaLi.on, firled out in fulL the information required, completed an accurate plorplan, and Btate that a1t the infor-|1latio., pro.rided ae required is corr:ect. r agree to comply irith the informatj.on and pl,]t plan,Eo comply l.,iLh arl Town ordinanceB and et'ate 1aws, and to buird LhiE slructurie according to the Town,E zoning and subdivisioncodes, design review approved, uniform Buitding code and ocher ordinanceE of the Town appticabte Lhereto.
REQUESTS FoR rNsPEcrroNs sHAr'l' BE MADE TWEI\rY - FoLIR HouRs rN AD\,eNcE By TELEPHoNE AT 479-2138 oR AT ouR oFFrcE FRoM g:00 AM E:oo pM
STGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OIdNER
Job Narne:
Legal Description: Lot
Owners Name:
Architect:
Job Address:
Block_ Filing
Address:
Address:
General Description:
WorkC1ass:.1l(-wewE3-aJ.teratJoni3,.ouu,.,onffi
Number of Dwe11in9 Units:___ Nunber of Accommodation Units: -
^ {3rnber and Type of Firep}aces: cas AppliancesY.... casl,ogs_wood/Pellet
Ir*x*** ********rr * ****** * * *******,7t| - .x-x'rt**** VALUATToNS *********************************
Ph.
BUTLDING: $Rilnd;il;; i--- 3gST5:911, r.5frOQ . orHER!MECHANICAL: $'Y-=-----.-...- TOTAL:_.--.---
TNFORMATToN *********** ************ ** **ffff::: ."""t,""t",' ttl/(, *.""T.]ii.::.;:ii_;:;lH:H#t
Phone Nurnber: -:='!'z:--
Electricat contractor: 1+[< fU,.+: -Address' ff31-"f,'Yi:l.r"n'.-x 'rc€phone nwrraerz>i Zq-ffi.Plunbing contractor: t.,i
Address; Town of vail Reg. NO.Phone Nunber:MechanicaL Contractor_:Address
Phone Number;* * * * * * * * * ** * * * * * * * * * * * *** * * **** * Ff-lt .itttrr.^BUILDING PERMIT FEE: FOR OFFICE USE *******************************
PLUMBTNG panuir inni BUTLDTNG prAN cHEcK FEE:uEcHANrcAr, pnnr,rri PLUMBTNG praN cHEci Fil;ELECTRICAL FEE:
OTHER TYPE OT FEE:DRB FEE: _______,....._._ CLEAN_UP DEposIT:
sQ. FT.
-r-r-
r----
BUILDING:
SIGNATURX:
ZONING:
SIGNATURE:
CI.EAN UP IlEP.qsIT REFI'LD
VALUATTON
L" \--
rt , \trr \\cr 1\- t-
H \.Tit t( -T3\\(':.-<-
TOWN OF VAIL
75 S. FRONTAGE ROADVAIL, CO 81657
970-479-2L38
DEPARTMEI{T OF COMMI]NITY DEVELOPMENT
NOTE: THrS PERMIT MUST BE POSTED ON
ELECTRTCAL PERMIT
-?\.-(-- \.*.r.\.1.:*.-
JOBSITE AT ALL TTMES
Permit #: E9B-0158
Job Address: 291_ BRIDGE STLocation...: plaza lodge 291 BridgeParcel No. .: 2L01,-082-62-001Project. No.:
Status. . .
StApplied..
Issued...
Expires. .
: ISSI]ED
t o7/22/a998
I o? /22/1-998: 0L/LB /1.999
TX 75219
500.00
APPLICA]IIT H & S ELECTRICP. O. BOX 3926, DTLLON, CO 80435COMTRASIOR H & S ELECTRICP- O. BOX 3926, DTLLON, CO 80435OWNER PLAZA LODGE ASSOCIATES LTD
TI]RTLE CREEK VILLAGE STE 606, 3878
Description: circuL for hot tub
Phone: 970-468-2404
Phone: 970-468-2404
OAK I,Aii{N AVE, DALLAS
Valuat,i-on:
FEE SUMMARY
50.00
.oo
.00
3-OO
53 .00
Electrical--->
DRB Fee
InveatigaCion>
wi 11 call---->
TOTAL FEES -->
ToLal Calculated Fees
AddiLional Fees-- -- -- --- >
Tobal Pemit Fee------ >
Paynents -
EIAIIAN(;U UU!:.----
s3.00
. o0
53.00
53.00
.00
ITCM: O6OOO-E_LECTBICAL DEPARTMENT DCPT: BUILDING DiViSiON:
9.7 / 2z / tg gq
^ CEAB_Li_E aErlon i- AijFii - cnanLrE DAViS -IICM: 05600 FIRE DEPARTMENT -'NC[t: FIRE DiWiSiON:07 /22/1,998 CTIARLTE--AcEioii, AppR N./A
CONDITION OF APPROVAL
1. FIELD INSPECTTONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
DECI,ARATIONS
r hereby acknor''1edge thaL r hav€ read this aPplication, filred out in full che infomation requi::ed, completed an accurate plotplan' and €tate that ar1 the infor-rnatj.on provided ae reguired ie cor-r.ecr. r agre€ to comply wiEh rhe information and pfot pran,to comply !'ith arl Tot,ln ordinances and state Lavs, and to build thi6 structufe according co the Tot'n,s zoning and eubdivioioncodeB, design review approved, unifo1.ln Building coale and other ol-dinances of the To!,rn applicable ther:eLo.
REQUESTS FOR INSPECTIONS SHALT BE MADE TWENIY.FOUR HOURS IN ADVANCE BY
fife a 'r(
PER.\IIT I
Lectrical- [ ]-Mechani'cal [ ]-Other-.-'14/ ,:.',, 1. \ --t-<7,
OR},I
APPLTCATION }flJST BE FILLED OUT COMPI.,ETELY OR IT HAY NOT BE ACCEPTED
4***************************** PERHIT INFORMATION * * * *:r * * * * * * * * * * * * * * * * * * ,( r * * * *
SonCact Eagle CounEy Assessors Offlce
l:"l1o;?zj,s_6|! j?) -p-".9* ! .^-. , rowN oF vArL coNsrRucrroN\RIEL il,-z,
(
-_ ,. rr_(\
|-/[ ]-BuiLding [ ]-plumbing 6-n
fob Name:Job Addressl
Legal Description: Lot Erock-- FiJ.ing- SIIRDTVTereir{;
fwners Nane:Dh
\rchitect:
leneral Description:
,Iork Cl-ass: [ ]-New-[ 1-Alteration [ ]-Additional [ ]-Repair 1 l-other
lumber of Dwelling units: Nunrber of Accon:.odation Units: .-
,rmber and rype of Fireplaces: cas Appliances._ cas Logs . wood/peltet_
i * * il * * tl * * * * t< * * * * >rr * 't * * * * * * * * * * * * * * * VALUATToNs * *
'r :t * * * * * rt * * * * * * * ,t * * tr * * * )t * * * ,k * * * *
a
Address:
Address:
]UILDING T $
]LUMBING: $
!;:::i.:::gl!{{;y.\i
tddress:
ilectrical Contractor:
iddress:
ELECTRICAL: $ 5(s,OHECHANfCAL: $-.-'-----OTHER T
TO?AL:
)luhbing contractor:
',ddraqq'
*****CONTRACAOR INFORMAT,ION't**.t*rr************>rr**rt*****
Tolvn of VaiL R eg. NO.
Phone Nunber:
Town of VaiL
Phone Nurnber:
Torqn of Vait
Phone Nunber:
Reg. No.
BUILDING PLAN CHECK FEE:
PLTiMBING PI,AN CHECK FEE:
MECTTANICAL PIAN CHECK FEE:
.RECREATION FXE:
CLEAN_UP DEPOSIT:
TOTAL PERMIT FEES:
BUTLDING:
SIGNATURE:
ZONTNG:
SIGNATURE:
Iechanical Contractor:
tddress:Reg. No.
: ***rtrt** *>t* ********* rtrt**** * *****FOR OFFICE USE * * * * * * * * * * * * * * * * * * * * )r * * * * x * * * * *}UTLDING PER}IIT FEE:,LUMBING PERMIT FEE:
IECHANICAL PERHIT FEE:
'LECTRTCAL
FEE:
)THER TYPE OF FEE:
)RB FEE:
GROUP
lomments:
VALUATION
DEPOSIT REFTIND TO:
)
CLEAX I]P
!,tEMO
TO:
DATE:
RE:
FROM:
BUILDING PERMIT #
DECEMBER 9, 1993
EXPIRED PERMIT
GARY MURRAIN, CHIET BUILDING OF'FICIAL
THIS PERMIT HAS BEEN VOIDED PER SEC 304(d) OF THE 1991 U.B.C.
EXPIRATION OF PLAN RSVIEW.
|.r|
il'ft
G
.J
0\l
t
-i
l
r'.
U>
UJ
IIJrL
==
uJ
otrlFo2
z
=
d)
.d
z
z
(I
F
E
IJ'z
o
zz
ILZ,<Fl
l() F.l
IEtsroa,,>z
t-
N
H
Julo
=I
(rol!
Fz
tr
IJJz
=oc
!L tl,loz
,:,3cv
<Fz^vz6<
'=O(/,;(O
g8E;$
c.9 q?**
€tEe*eiE=3
! qE,9 -r
g i; sE I
=Esee:.Y -F: €E FE
E S5 E,:;;>53g E F: P
:€B!E
€ qef b
EieeEA<gaF!o.=-o'-'€:o#E
.o=E ?!-c o -.! ''*E EE 0)u6 o 6 UgeEH?
o6:'*:'
EFEg=-aqE;
I is e-E9F55 -
6 i;o:I In=p-E:S!E:
T:F9gF
ig;Egs
is$eiE
.i!
an(n
ao
L]
F
=
LIJ
z
3
ID
6E
3!!
z
6
UJ
(n
UJ
UJu-
F
=
UJ
J
F
tltl
tEl
tfll
t<lq lF{ |.n lql I.c lHlcu | .llE lH '^l'-l
EEIOrrl I
=FlZ uZlo oHl6z-l
= s{lu ir F4 |
ulbl.o irl I'J
<;; l=
zZlZ
ur c) lr'l02td
>E
-I
=(D
z
E
<no
=>a)zrL<
,.' fa* c)>(JFOj<ri
o-
(r
z
Eoo
r5z
tr
E
q.JF
I
z
F
Jtr
IDz
Fz
fzoottr u.J<oo<
>fi>E
x,!6o<z
l_
:lI91
=F-Ir1r O
=trCI
lllr1
I lo1
rHl ri (al \O
I lF.I rr]l \at(jt ._
telI Fqlrl| -"r II orl| .'r
Itltat.dI u-tI tYt F-{lolFrlol <l<l >t:t >t<=IEO
Hz
H
ts
H
cq
t!l
4
t
F4
ts
E{
z
UJ
z
-)
I rllic,
IYt-t<Y.NJ<O F-l
tEdtalxlF{
lF{
I
I
tz
F-i
JTL
€F\
I
|.l-1
N.i
o-
z
F
;l
cnl
U\
LUI
q
CTn
>|
IHI<lzlolF{lHl<lzlel
FIzl-l
Fql
=l
olc)l
=l
trl
r\
Irnc\
I
"lrlr..tl
o') |I
zl
SI
1l
al>l
rLlol
zl
3l
FI
1l
z
HH
4
rrltszH
E
Fl
E
tr
ol
=.1(rl
rl
al>l
tl.l
:l
Bl
9l
I
II
.l
OI
=.1(rl
uJl
1t
al>l
u-tol
zl
3l
9lFI
I
I
I
I
dl-l
#l
-',lal>l
rLlol
zl
BI
f-l
I
I
I
I
I
.lol2l
url
5t
<l>lr!l
3l rol ulFI F
F
LUF
(J
G
<F
IIJ <zEt!F(1 Z
a(J
EF
IJJJ
>Y
>d]FJz
F
Fz
z
r
LIJ
Eh
=.! aY
rJZ
oz
F
=
tJ.jIL
7,4.n=zE 5
=< E
I L
'--.,}4,--..4rXjUICJ
.J."i5
=E=dd=
F
t!
6
|l,
z
foLo
q
E
o-
Jt-ui :-h>
o- t!>(r-OL() r'r
: tlJ6Cr;>
J
tr
uj
rD
o
",/,U
!'/$-reln/"
-G'KrF)r-r
F<J F<] LJ
CD
CO
Lf)()
C)
tu
=U)o
-)zo
Fu-
UJY
lLl ard)oi
6or
F
-Ln> c.l
lr I H
-(l)
ll,F
lJ-oH
o-z
Qa
lH
I LlJ
F
z
ts
=E
trJ
o-zo
F
C)fEFazoo
z
FJ
\)
o
=E
=E
UJo-
o
|l)l
TI
0
U
-1_I
#l
I
o
o--l
J3l
.x\
Il
o
IJJ
UJlrF
=c
u.,
o-
ot!Foz
0
=oJl
.D€g
zz
llJulo
=I
o
G.oF
?
IEFzo()
Eo
v
H
v,o
2
c.9
1? ciEo
;oins
6olro
aE6-9
g-e
.€6.otr;E
arF
EC
!
o
0,ltoO
ct
E
dl
tr
f
oo
o
6
'o
o
o
<t
!0
(,oo
6
=o
'F
@
3
o
o
.o!c
()
|J6
o
f
(t
o
aD
o
t
g,
3(!
o-5i
-- -gGA
IE:
-ooi
Ec?rc-o
cCoii
rtro'-a9o-E-cE=3!o>(6 -o,CC(g:
R 6.
EeEo
OEDa ct.
:oi ll,
.()
1.9
io
(D
o6
oE
oo
o
(o
F
o
o
,6
o
t!
!,
1J
6;
ot
9'o.
@:o.l-;
(6.
(g
o
Olq)l
E65Exotro
5:
EEE'.
.EF
-ato6Sr-o
=E,gEc9-o5Co.ootoc
=:soiE
€e
.E:
o6
SE
at) -Eg
EEo15
Ooierg
-o.60
{)g
IJ' F65:Eo (6'
t6.!E
>.E
_-o g,
s, o-
OE!LO
-()
n
$q
,:n
-\.1\I
\I
N
G
\s
\!
\r'.ft
;;r
l,\
tl
tr
=E
LlJc('z
x
UJ
z
J
o
()t!J
UJ
z
:
2
t!
:E
UJgJ
2
tr
UJ
ulE
z
llt
x
F
lll
at,
U'
IJJ
UJlJ-
ts
=g
uJo.'
J
FoF
oz
J
.D
(J
()
uJ
uJ
oz
I
J
oz
ut-.-a
','
i-lF
rf,DnTnrV^
i
0
1r
1
P
I
(
a,t
x
3It
zo.F
;.oah
uJo
u,z
UJ
='i ,.cl
;-i'(_Eir)
= ,,, E
=r8 Gl- \<)
zz
==
Ed=ur(5lr6Z*s
HA>(JFOr .,.j t
Jl
lll I
BI
1l
fl,l
zIF
5J
tJ-
rri
llJ
F
t:
t<(
lo.tuJ
l"
l;l<lz
IF
lQ
f-l-:
z
<l
0.1
UJIFIJI'l
:l;tuJlzl
-rl<t
FI
zl
zl
.. >lo
UJolrjulz
!,
=E
IJJ
J
z
tr
|ll
J
<t)
<Dll,zx
=
lll
F
I
tr
J
anz
lltltttt
Ez
z9or- ll,too<
=HXr!X.i<z
lllltltltl
oFz,
9z
-F..i ?d63E o
uJ
2x
zFo
/r
T
t
I
I'l
uJ
tr
u)
o
zo
Fo-
uJ
:<
UJo
tn
z
o9z_4(oo
=z=r5de
z-E
-: t\
O IJJ
I's:t f,::
E,.ut'
o-
lJ- |3l0-lololrl
,-t !,
2E
L
.r
u.l
!i ulE()
=zE<
606u,E9=rL.e9Ei
=>E JF
EF=8 5EE XFE U69 lrsE 6S
6!:iF
oi!i
IIJ
@oF
I--
E
=0altlo.zo
F(JfEFozo
C)
0c
dAoe
4=?u
OS
Lu
=,",i
I
I
I
I
_l
6
I
I
IF z
t
l7
K
K
M,
ox
Hf;i
ft-l>l
I
3l<lzl6lql
.-,1
ll'rtto
Llh l+
{lv | $tlil*
rdi lEqfl'l3
$fifl.,$JH'I
EJ>I<<=l4EC)l
o
cq
+l
+l
?l
7)
$t
*l
sl
EI
3ldlrl
t!t
aqi,/{\
ts ,.^
ss
io.
19
6
x
<);
lltt{.
6
dt I
9.1 t$ |
ffltl s
il ?l I
fl Ht
gH!
I
I
I
r1
olurl
tEl
JI
<l>l
bl
zt
FI
I
l
q
olul
5
g
rltltttllol| =.1lol
t5tst lI rrt ltot I
dflill
I
I
I
g
Elol
el itr
E
uJz
=o
F(,
uJF
G
-rO<tFE(JuJ<ZE,
6Zo(J
JCE<o(.)F
i<irG;F-zUJO5
gF
gE
d6()
<^
?()
=<
YZ
=g
=-(l
\JZ
J<c)Q (4.33
lnltn
75 south frontage road
Yall, colorado 81657
(303) 479-2138 or 479-2139 otflce of communlty deyolopm€nl
BUILDING PERI.IIT ISSUANCE TIME FRAI,IE
il^lli:-f"fjt.19ou3,res a Town of Vait Fire Department Approval,rng'rneer"s (.public Works) review and approval ,'a plannin!'Departmentreview or Health Departmint review, anl'a review by the BuirdingDepartment, the estimated time tor-a iJtat "eui"n-ruy'iu[I'as tongas three weekg.
f]] c9mm9r9ia1 (1arge or smail) and aIl mutti_family permits willhave to follow the above mentioned maximum requireminti. Cesidentiarand.small projects shourd take a resser amount of time. However, ifpesidential or sma'l 'l er projects 'impaci the various auove mentioneodepartments with reoard' to-necessai"y revie", il,.i. p"oj..Ii"ruy
a'l so take the three-week period
Every attempt wt.ll be made by thfs department to expedite thispermit as sgon as possible. -
I' the
frame.
undersigned, understand the plan check procedure and time
Communi ty Devel opment Department.
.l
75 south frontage road
Yail, colora0lo 81657
(303) 479-21.38 or 479-2139
TO:
FROM:
DATE:
SU&TECT:
oftlce of communlty development
ALL CONTRACTORS CI]RRENTLYL REGISTERED WITH THETOWN OF VAIL
TOWN OF VAIL PUBLIC WORKS/COMMUNITY DEVELOPT,IENT
MARCH 15, 1988
CONSTRUCTION PARKING & MATERIAL STORAGE
rn summary, ordinance No. 6 states that it is unlawful for anyperson to ]itter, track or deposit any soil, rock, sand, debrisor material, including trash bunpsteri, portable toilets andworkmen vehictes. upon-any streetl siaewaix, -;ii;y or pubJ.icp1?9. or any portion theieof. rhe rishr:;;;;t-;n at_l rown ofVail streets and.fg--d= is approximately 5 ft. off pavement.This ordinance wir.r be strilliy -entorcla ry tue-iown of vair.Publ-ic works Department. p""r-oni found violating this ordinancewilr- be given a 24 hour written ".iiJ"-tJ-;il;;""aid narerial.fn the event the person so notified does not compiy with thenotice within the 24 hour tine sfecitied, ttre-pu[iic worksDepartment wilr remove said nateiiar it trr" -""p""se or personnotified- The provisions of this ordinance "h;ii not beapplicable to cinstruction, o,uirri"rrunce or repair projects ofany street or alley or any utilities in the ,'itti_"_ruy.
To review ordinance No. 6 in fu}], please stop by the Town ofYlll B"llding Department to obtain a copy. rlant you for yourcooperation on this rnatter.
<,et-tfertlrcAtositionTneIaEIonEffifos.Eron/Reratl.nship to project (i.e. contractor, ovrner)
tla Iz+ lqz-
TRANSMITTAT
IETTER
AIA DOCUMENT CBTO
PROJECT: \/Ed{De-t-rA'9(name, address)
t-
FFHoPcL ARCHITECT'S
PROJECT NO:\7€o -q2-e
TO:
=fa\|.5|.,r oF VAtt-G.sa. fuN-
-ee ?Qt4t{V*-;r-C)f Ca1nfnuF)\-fY
,",'Ei34W{u-+
-'l
J
DArE: X epT-t*+5e4- a9, l11z-
lf enclosures are not as noted. please
inform us immediately.
lf checked below, please:
( ) Acknowledge receipt of enclosures.( ) Return enclosures to us.
ATTN:
L
WE TRANSMI:
tr.-/herewith ( ) under separate cover via( ) in accordance with your request
TOR YOUR:
) approval
) rgriew & comment
g,Yuse
( ) distribution to parties( ) record
t,
( ) information
rHE FOTLOvllNc:
k7f Drawings
( ) Specifications
( ) Change Order
( ) Shop Drawing Prints
( ) Shop Drawing Reproducibles()
Samples
Product Literatu re
()
{)
ACTION A. Action indicated on item transmiltedCODI 8. No action required
C. tor signature and return to this office
REMARKS
D. For signature and forwarding as noted below under REMARKS
[. See REMARKS below
coPrES OATE REV. NO.DTSCRIPTION ACTION
CODE
LAfr'ala+ 117 'L glt^uJJj-se- 4eB
(AoW e? CON+T?ZL^4T(aN ft.e-tqr-T-' bd+L(4-r,t..flap I
coPrEs (with enclosures)-ks.s|Flrz=.* 1'<1F<ASI4L+-
AIA OOCUMTNT CsrO . TRANSM ITTAt.I.TTTER . APRII. 1970 EDITION . AIAO . COPYRICHT O 1970THE 4rrrR,CAN rNSTrrUrE or ARCHlrEcrs, rzas AalssAiilUSirii avrruut, N.w., \,v^snrNcroN, D.C.20036
trn
trI
D
ONE PACE
PIan Revier Based onthe 1991 Uniform Codes
NAME:VENDEITA' S
ADDRESS:291 BRIDGE ST.VAIL, COLORADO
OCCUPANCY:A
TYPE OF CONSTRUCTION :V-1HR
DATE: L0-6-92
CONTRACTOR: COLOMBO
ARCHITECT : COLOMBO
ENGINEER: NONE
PLANS EXAMINER:DAN STANEK
WORK CAN BE
CoRRECTTONS REQUTRAD
The itens listed below are not intended to be a complete listingof-all poseible code reguirenents in the adopted codeg. It is aguide to selected sections of the codes. Tha folroring is not tobe construed to be an -approvar of any vioration of any 6e tne pro-visions of tb.e adopted coaes or any 6rdinance of tbe Town of vai-l .
1. FIRE DEPARTMENT APPROVAL REQUIRED BEFORE ANY
STARTED.2. ALL PENETRATIONS TN CEILINGS,WALLS AND FLOORS TO BE SEAIEDWITH A FIRE RATED MATERTAL.3. HANDRA]LS AND GUARDRAILS TO MEET SEC.33O6 & !'II2 OF THE 1991UBC.4. SIGNAGE W]LL BE REOUIRED AT FRONT ENTRY FOR DTSSABILTTYENTRY THROUGH DECK ON WEST SIDE OF BUILDING.5. BUILDING ACCESSIBTLITY WILL BE REOUIRED TO MEET CH.31OF THE 1991 UBC.
QLu",t- kd9 o-
t-{
DEPARTMENT OF COMMUNITY DEVELOPMENT
NoTE:THISPERMITMUSTsepoSTeooNJoBSITEATALLTII,IES
eoo/ar,t MF BUTLD PERMTT Permit #: 896-0096
Add Sq Ft:
Clean-up Deposit Refund
approved T/c g"?,199lt"": 2e1 BRTDGE sr status" ': rssuED
Locatron...: Apptied": 05/10/}996-rF'- - --
-fi-
Location...: APpIred..: u5/.Lv/.Leeo-
amount ldD,?' e--.er No. . : 2101-082-62-007 riiuec. . . : 05./.20/.L996
Jat* Vlr;>lbLproiu"t lr". t -- Expires..: tt'/L6/Lee6
APPLICANT BECK & ASSOCIATES, INC Phone: 3039491800
P O BOX 4030, VAIL CO 81658
TOWN OF VAIL
75 S. FRONTAGE ROAD
vArL, co 81657
970-479-2t38
TOV/Comm. Dev.
coNTRAcToR BECK & ASSOCIATES, INC f\Phone: 13039491800
P O BOX 4030, VArr, CO 81658 ll\l .,r\ 1/owNER DTLLARD DAvrD B & ANNA KAREN . , WV x1t )uY
f \J .t'uJl, +UJU, VIIIII L\J oJ.oJo I. \ I \ll\ y
owNER DTLLARD DAvrD B & ANNA KAREN . ^ Wy ,t1Uuf
2e1 BRTDGE sr, vArr.,, co 81657 / rv^r Lr\l-- aDescription: { ,\j (_(0z -O:aoo roirR sKyLrcHTs AND oNE wrNDow /\r \2. t) A.7 \.fi;";ffit;*""te"*s AND oNE wrNDow {r \7. fz'nY. /\ n* .\[Occupancy: R1 Multi-Family \ ^ /Y >1,Type Construction: V l-HR Type v 1-Hour 1\ (J ' LType Occupancy: U! \-
16,500
#0f Gas Appti ances:#0f Gas Logs:#0f uood/Pa t tet:
FEE SUm ARY *f**ffi**********J*rt*ffi
Bui tdi ng:--> 215.00 Restuarant Ptan Reviev-> .00 Total Catcutated Fees--> 5Ol .75
Ptan check--> 139.75 DRB Fee--------InvestigatioD .00 Recreation Fce-------> .m Total Permit Fee---) 307.75
[ittcatt__>5.00c|'ean-tJpDepo3it-->100.00Payments----..__>
TOTAL FEES-_---**ffi
Item: 05100 BUILDING DEPARTMENT Dept: BUILDING Division:05/10/1996 DAN Action: APPRiL6na'd5400-pr.,aHtcrns-DEFARft4tsNt-- Dept: PLANNTNG Division:
05110/1996 DAN ACTiON: APPR LAUREN APPROVED 5-10_96iiema'.05600-FrRE DEpARsr$ENr - -- - . - Dept: F]RE Division:05/10/1996 DAN Action: APPR N/A
itena'.05500-FuBLrc woRKS' -. ------ - '.-- DepL: PUB woRK Division:05/10/1996 DAN Action: aeen N/l
See Page 2 of this Docunent for any conditions that nay apply to this pernit.
DECLARATIONS
I hereby acknwtcdge that t have read this apptication, fitted out in ful,t the information requi red, conpteted an accurate ptot
plan, and state that alt the infopmation provided as required is cornect. I ag.ee to conpLy |{ith the informtion and ptot ptan,
to conpty sith al,l, Tovn ordinances and state taHs/ and to buitd thls structufe according to the Tounrs zoning and suMivision
codcs, design revier approved, Uniforr Buitding Code and other ordinances of the Tovn appLicabte thereto.
NEOUESTS FOR II{SPECTIONS SI{ALL BE I.IADE ITENTY-FOUR HOURS III ADVAIICE
Send Ctean-Up 0eposit To: BECK
Valuation:
Fireotacc Infornstion: Restricted:
**************************************r.************************:l****************
CONDITIONSpermit #: 896-0096 as of 0Z/20/96 Status: ISSUED
*********************************************************************'***********
Permit Type: ADD/AtT MF BUILD PERMIT
Applicantr BECK & ASSOCIATES, INC
3039491800
Job Address:
Location:
Parcel No: 2101-082-62-007
Applied: os/L0/.7e96
Issued: 05/20/1996
To Expiret LL/L6/L996
Description:
ADD FOUR SKYLIGHTS AND ONE WINDOW
Conditions:
1. FTELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
2. ALL PENETRATIONS IN WALLS,CEILINGS'AND FLOORS TO BE SEALED
WITH AN APPROVED FIRE MATERIAL.3. SMOKE DETECTORS ARE REQUIRED IN Al,L BEDROOMS AND EVERY STORY
AS PER SEC,]-210 0F THE 1991 UBC.4. FIRE DEPARTMENT APPROVAIJ IS REQUIRED BETORE ANY WORK CAN BE
STARTED.
- |*Coritact Edgie County Assessors Offlce
CF 't 970-328-8640 for parcel /1. TowN oF vArL coNsrRUcrroN
npARcEL tt:'zlct egz t'z ooi -pinum AppLrcATroN FoRMtv DAIE: 5-/-?A
PFPt\tTT Jl
^ t APPLTCATToN uusT BE FTLLED oUT CoMPL,ETELy oR rT tIAy NoT BE AccEpTED
X*** *************** **** ******* PEIWIT fNFORI.IATfON ****************** ** * ** ******,l
6*sJaLq^L[ ]-Building [ ]-plurnbing [ ]-Erectrical [ ]-t{echani-cal t
Job Address::JtltndresL
r,egal Description: r,ot_6,( arock__gt ,t rnn Vhl Y$ffi€rrrdrlT.
owners Name:M Address: z4/ 6ndqe S{.
Architect: (-fffi Address:
pn.4/(-o7ob
P:n.A6-zzoL
General Description:UT<T ,-lrdo
r?'Work Class: [ ]-New fff-afJ"=.tion [ ]-AdctitionaL [ ]-Repair [ ]-other
Number of Dwelling Units:Nurnber of Accommodati-on Units:
^ $rnber and Type of Fireplaces: cas Appriances-- cas Logs_ wood/pel1 e\A_-vIt***rl***************************** VALIIATIONS ***r;*:r*******************:t******r,c
BUTLDTNG: Ub^5pO- er;EcTnrcel: $ oTHER: $PLWBfNG: F.- Ff11r'1{'h !!TTf.a".. f-.'-.- - .--=--^ r^r,u.rvr..ElNu: l HEfJEAIIICAL: f -
r * * * * * * * * * * * * * * * * * * * i! .'. * j r' * r *. r--i,d,rTlrrqcroR TNFoRMATTo:I Eeneral Contract .,-, 4vn r/ l;'-;'L-<..-.!.,ContractcirsAJ'i;;;'-ffi -:+,b=p-ff*'ffi ;*r6iRJfr "Xi*,""dJ&wElectrical eontractor:
Address:Town of Va-i.L Reg. NO.
Phone Nuinber:
Plunbing Contractor:
Address:
l,tlechanical Contractor:
Address:
****************ri***************
BUILDTNG PERMTT FEE:
PLUI{BING PERMIT FEE:
I'fECHANICAL PERMTT FEE:
ELECTRTCAI, FEE:
OI}TER TYPE OF FEE:
DRB FEE:
Towrr of Vail.
Phone Numher:
Town of Vail
Phone Nurnber:
Reg. NO.
Reg. NO.
oFFrcE usE ** * ********* *******************
BUTLDING PI,AN CHECK FEE:
PLUI'{BING PLAN CIIECK FEE!
ITIECHANICAIJ PI,AN CHECK FEE:
RECREATION F8E:
CI.,EAN.UP DEPOSIT:
TOTAL PERMTT FEES:
FOR
tsUTLDTNG:
STGNATTIRE:
ZONTNG:
SIGNATURET
cZ- --J S
CI.EAN IIP DEPOSIT REFUI{D r():I6e1 ,1>x* . 6a7 lovat /'.t OD ,ttatB
75 soulh frontage road
uail, colorado 8.1657
(303) 479-2138 or 479-2139
TO:
FROM:
DATE:
SUB.TECT:
olflce of comnunlly deyelopmcnt
ALL CONTRACTORS CIIRREMTLYL REGISTERED IfirlI TIIETOWN OF VArL
TOWN OF VAIL PUBLIC WORKS/COMI4I,NITY DETfELoPMENT
I,IARCH L6, 1988
CONSTRUCTION PARKING & I{ATERTAL STORAGE
rn sunmary' ordinance No. 6 states that it is unrawful for anypelson to ritrer, track or a-fosia ;;t-=;ii-"I"r, sand, debris;:"ffi*T:ii"i::t"dins trasr,-f,"rp=t"rl, poii"iiJ-.toir"a; ;;e--,
p] ?s" ;" ;; ;;;.iii:.iil.ill""l;"'iffililli j:i.L.:, l;i:ij-",Vail streets lnd.roads is approximately 5 ft. Lff pavenent.This ordinance wiri ue ;riE[i;^lnforced bv the rown of vair.Public Works OeoarirnEnt. --p"i=ins round .rilfulir,q this ordinancewilr be siven a 24 hour *.iil;;';"ii""-t"-;;;;;;'="id. marerial.fn the event the person so notified,does not conply with thenotice within *:_30 trour tirne-Jiecitied, the pultic worksDepartment wirr remove said natei:."i ii-irr"'!"plire of personnotified' The oroviri""r-"r-tirl orainance striti not beappricable to c-onstruction, -riiil.rrunge gr repair projects ofany street or alley "" irry'rliiiir". in the right-a_way.
To review ordinance No- 6 in full, please stop by the Toqrn of:::i":lii3i"g"":f,i*mll"::"";ili" a copv. rirani you ror your
(i.e. contractor, owner)
luttn o ||fll
75 louth lrontage .oEd
rril, coloredo 91657(s03) 479-2138 or 479-2L39 offlca of communlty devclopment
BUILDING PERI.IIT ISSUANCE TIME FRAME
If thi.s permrt reoui.res a Town of Vai.l Fire Departnent Approval ,Engineer ''s (.pubr ii wortsj ;;;i.;'rni'rpp"ouul , a prannin!' oepartmentrevrew or Hearth Departmint.review, .ni'. ".ui." Lv-tii."trTroing
Siri[;35',1;"lf l "'rtrrted tirne ro"'.-tut"r
"."i"*-fov,.L[!,as r one
f]] cgrmngrgial (iarse^g1 small) and alt multi_famity permits willhave to follow the ibove menti6ned **irrm requirements. Residentia.land smalr projects shourd fik.-;-i";;ir'amount of time. However, ifresidentiar or smarlgr,projects trpici the various above mentioneddepartments with rega.rd' to-nu."rirli-""ui"*, these projects mayalso take the three-week period
Every attempt wiil b:_llg: by this departrnent to expedite thispermi't aS SOOn aS pOSSfDle 'rsrrL LU e^Peulre Er
i;.,131
undersigned, understand the plan check procedure and time
Date noik-Sheet wa i JuFnEE'"Ti6-ThE
Corrnuni ty Devel oomolt Department.
,l MEMORANDUM
ALL CONTRACTORS
TOWN OF VAIL PUBLTC WORKS DEPARTMENT
MAY 9, 1994
WHEN A ''PUBLIE WAY PERMTT'IS REOUIRED
TO:
FROM:
DATE:
RE:
71,ft
Please answer lhe fotlowing questionnaire regarding the need for a 'public Way perm1":
YES
ls this a new residence?
ls demolition work being performed
that requires the use of the right
of way, easements or public property?
ls any utility work needed?
ls the driveway being repaved?
ls difierent access needed to site
. olher than existing driveway?
ls any drainage work being done
afiecting the right ol way, easements,
or public property?
ls a'Flevocable Right CI Way permit'
required?
A. ls the right of way, easements or
public property to be used for staging,
parking or fencing?
B. lf no to 8A, is a parking, staging
or fencing plar required by Community
Development?
!t-v?Y. "Ty"t?d yes to any ofthese questions, a "Public way permit" must be obtained.?ublic Way Permit" applicationg miy be obtained at the'public works otfice or atc.o.ryir.tu1ity Devetopmeni' .ttyou rrave any questions please ca[ chartie Davis, the Townof Vail Construciion Inspectoi, at 4Zg-215B.'
I have read and answered allthe above questions.
1)
2)
3)
4)
s)
6)
7l
8)
r.)
2)
3)
4)
STRUCTTIRAL SPECIFISATIONS
A1I l-unber sha1l be Doug-Fir #2 S4S or better. provide solidblocking at 8,-Ort on center in all diaphragms. A11 col_umns tobe continuous bearing to supportiung members.Microlams are as manufactured by TRUSS-JOIST CORPORATION, seeshop drawj-ngs and nanufacturers standard details. AII built-up Microlau beams must be glued with pI4O0 and nailed with 2rows of J-6d spikes € 9rt oc. A11 alternates to be reviewed byengr-neer.
Sheath roofs with S/atr plywood with
4O/2O or better. NaiI plywood with
and l-2rr oc at intermediate meubers.Live loads used. for design-
-Roof-8O psf snow (slope gTreater than 3:L2)
-Floor-A0 psf residential
-Deck-1-00 psf .
-Wind-2s psf.
-Earthquake-Zone 1 UBC.5) A11 construction must comply with the l_991
Code as adopted by the Town of Vail Building Departmen therrGeneral Conditions of the Contract for Constructiontt (AIA
Document A201).6) A11 beaus, joists and rafters are to bear upon walls or beamsO! be hung with SIli[psON Strong-Tie hangerF or approved equals.All connection hardware as manufactured by SIMPSON Strong-Tieor approved equals.7) All structural" mernbers are shown in their final_ positionsproperly braced and supported, during construction it rnay benecessary to shore portions of the structure while otherportions are being constructed. Contact the structuralengineer for consultation as required.8) contractor is responsibre for arl non-specified connections,contact structural engineer for details as required. Engineerto approve all structural substitutions.9) Contractor is to coordinate all diaphragm penetrations (ie,chinneys, plumbing sewers, etc.) thrbuqh fltors, roofs and.'foundation walls with appropriate sub-contractors. ceneralContractor is responsible for means, methods, techniques,sequences, procedures and job-site safety associated with thisproject. General Contractor to verify a1l dimensions andelevations with architectural. drawings. Notify engineer of allconflicts or omissions between various erements of tne workingdrawings and the existing conditions before conmencing withthat portion of the project,. Identity of al1 existing hiddenstructural elements based upon visual inspection.Lo) All naterials exposed to exterior and/or moisture conditionsshall be treated for these conditions (ie, chenical treatment,staining, painting, etc. ) as required by code.
Nw) UvtNoRffi'4 &:'t tffiK
DUAPD qeaYarve>
Town of Vail lO /4nq /AOW€^t"M
mr-nr-mum 6Pan
8d@6rroca
,&ne^w oFFlcE cjPY*q"
g99fg opempc 'l!etzszglv ztzz xoq pd
?u!'.oc re1enur [w eqt
almA.
?dbt t..vW 01
ewtawthw4#41 vz-,vabhbrtqq(vV@/Y7 gi+xtt?H tttnq
er4p,1A"V wfrd 6rt{ An fz?fl
, -(-
a
or-t, Jg.lt<a
-
---
I t-I
CL
(}(J
LIJ(J
IIlJ-l.f-O
F
o
F
t
'\tl
$
1\-
$r
-$
s
J
s
$
3
t
Sr
\iJ
u$
z0l
IU \A
$$
$$
$$I
I}
$
$$$
sss
$$:
Ntj
s$o
_\
r--
,-\./rtlFi1t^f l
I
I
I
I
I
I
I
L
REpT131 TOHN OF UAIL, COLORAD{IO9le6l96 O6:5O REEUESTS FOR INSFECTION hltlRK SHEETS FtlRr 9/?6/Sb
PA6E
AREAI EG
eg
ffr:tivity:
Address:
Loeat i on :
Parcel I
De seri pt i on :
Appl icant r
Ownerl
Contraetor:
E96-0119 i/e6/9& Type: B-ELEC
891 BRIDGE ST
PLAZA LTII}GE
a1s1-sae-6e-0r87
REtrESSED LITES
}IHITE RIVER ELECTRIC
DILLARD DAVID B & ANNA KftREN
hIHITE RIVER ELEtrTRItr
Status r ISSUED f,6n5|p3 fiflPf
Occ: Use:
Fhone: 3O394914O3
Phone r
Phone: 39394914O8
Inspeetion Request
Fequestor: JIIHN -Req Tirer OEl6&Iters requested to
AO19S ELEE*Final
Infornat i on. . . . .
hIHITE
Eorrents:Fhonel 949-14S3
be Inspeeted,.. Aetion Enrrentr
Inspection History.....
Iter: gglfS ELEtr-Terp. Fowerfter: 0gl20 ELEC-RoughUgllelg& Inspeetor: EEIter: Ogl3O ELEC-GonduitIter: @146 ELEC-Hisc.Iter: OOl90 ELEtr-FinatIterr O&ee4 FIRE-ALARIi| ROU6HIter: 00538 FIRE-FINAL C/O
/-za"/6
Actionr AtrtrR APPROVED
oz
ts
=t
UJq c\\
U'
UJ
IJJt!
E
=ctlt
o-
aF/$b?lhtlrr t%ss #)
cl\
!:r
z
H
z
Lt!
lo
ICJ
lt!tt!
rot(,tzro
uJF
aroF
eFat-
to
a5z2
outFoz
oz
oJ
.6
o
4z
tt
llt
an
acott
ot-o
Fzoo
o
tr
UJz3od
Bul6z
.-_ t
Ev]|r|FI<F2a'9Zai<
€
.\o(J
(, Fl<r$<FrO
€Xo.MFAFI
Fro<cqtr.'4>
tl
F.r
z
Fl
CJ
EoE
g
.oo
.9
c!o.(f
c,
3ot-g
o
ooo
(!
E
eo
oE
o
E
6
o
oogl
F
=
lo
E
o
=cl
Eo
o
o.o,6
3o
E
j-|lrc
E * E.s)
BFE:
EEHE
=
J_.: O
€ EE:g
+$:.EEE!pc9dE.l oE or
B 5 t.=
E EE:
5E;E
c";s.e
SEre
fE**g
EEEE
-o,y()co'-E5ag (2
ETE€ggl*
P:-eE
Fff;
eEgg
- o (Ug
ln.if oiN
.ir
F-
&
E
=Eurcoz
6J
=to
:(o
uJ
oz
Jo-
J
o
GFoq.l
uj
oz
=J
o
=
(J
llJ-
uJ
uJl!
=ot-
ulEo
uJE
oa
oo
3g
UTGz(J
a
uJo
F
aA
R
UJ
o-
2
ul
o
x
ulol
(f,
UJlljl!t
=E
UJo-
J
FoF
o2
6
E
J
ItF()
|lJJIu
('z
:t
Jo,
I--o
UJ::
-l
NO|lVn]VA
F
F
F
;
t!ozI
D-o-
E
a
uJ
c
UJzqJ
=>E
-Iril3tl*
=loAl
zz99F^V'5?=r9al661>E9l!<ogH6FIjtri
zI
F
J
l!c
ci
o-
o&o
UJo-
F
E-o-
uJ
J
z9
Eoo
xxg
2o
F
E
l1,lF
3
UJ2
v)
2fzPs<oo<
=Hxlr-6ct<2
a
tr2,.
Oz
'iF
dtl}Eo-
lul
CI
at)
at
UJzxo
F
IJJo-
z
tr
J
foz
I
z
z
J-
f
'!jxul
o o3
--'i
><
I
5:
..r I*l
zl
zl
.. >lo
UJ
llJ
|lJzot
=
IJJ
z
E
l
oz
Fo
J
I
t;,;
-d
c\l
-+
OO
z
oPzQ
trro
=z
dP
=f;*aHg
IJJF
CI'
@o?
2o
Fo-
UJY
uto
oF
ts5o,E6uJ o\
Lr{bJiilo>lool
'vlrlgu,
tAFz6
t
=IE
uJo-tt
EE2ZE<ol€UB9ELbs
5i
=>
=ut:-E !EE =EE 33I ltnE Xo-t x>t E-oi!E
utcloF
@
ts
=E
lrJGzo
l-()
G
azoo
ntD
(,z
J
G
l
I
I
IJ
o
FoJ
F
F.{H
p
{c.vr
B:(!,.
€l.'dri
#i
;qil
=zoo-)
uJ
=2
\o
X
.l)
ah
uJ
J
:
lo
IJ1-:r
<D
c
FJ
n =g
t!
u
uJtr
=
H
6
.,d
\l
F
:e
II
I|.\
.iz
cj
uJ
=
ttoz3oF
o(
I
}{FF
u
u
F
=c
oz
ctutE
J
Itoz3oF
=E
oz
ci
IIJE
Ji
lt
23
F
=E
l!
oz
dulE
J
oz
BoF
=Etr
c;z
(9
lu
5
a1
ttoz
3lpl
uJ
JulF.
E
UJz3o
Fo
u.lF
T(JE
E
-rO<FEOrJ<ZEtr,|FttZoo
J
IEFoul)ul
E
?)
Y
z
)
z
0o
=
Jo-
?)
zf:)
i5YF
=3g5
=g
=+Eo2<oa, v,ri' UlJO
mnn
(
t1-t-
=I
I
lo,o
l<
laz
l=
lg,-r9
l:lul
l3{r
to
lr!
l5
tbts
IF
LZlo
lo
o
UJ23otr
lt uJ
:5(rvfuJt- 'r<l-z^zzn<
Ii$-ie
I EsE3$E:E^:sFt ei;F I! :€F;A
H=eiEA
I E;; s;'
I :EFig
I eE !f 5t(l.E*:q;'
gii:;
-c c)* c (E
iE s:s
iE: iE'
-Ee63,- c f Cl
EBE; s
ss:5s
E t;;tt.:.99
i$;e -
9Eo'--3
i5eEa
Q'
luu-s
E
t|.l
</
FI
rvl
x
=>G
-I(r|lur3
7z:?oi^ a55 sEPO2vu3bl
o- c,>(JFO
; a\i
t{
E
o
al
(Jl
JI<l
=t
zl
.. >lotu
UJ
UJz
!
E
UJ
o.
J
z
Eo>o
l!
s
uJz
o
F
2o
F
J
z
ulo
ul
t!-
oz
I
I
I
F.
z;
ol
||lIII
II
I
I
Fz
zotr
o
:
ooo
II
I
I
at,Fz
o
=J!I3o
t:
o
F
ol
:l
:zx
al
tr.
v)
3
F
lu
tr(J
+
Dtn
!
=Elr'-.o.-.tl-t!
Oo<
.E*zrn<.:zkV>+,E*
oFXE#ft-
],+-'u/d-lH=l6=El&rl
F3l
Lj='l3- r.
J
t+.,-
H&
5,1
hr--
coE.ct-o.
o
oal
c
E
EoIJ
o
o,
E
€
-
t-
'e)
0)sfl
\z
Lo
at
z.rPzQoo
=z
o-- P
IJ
"d6z=zd;sJoi
dd=
tran
i't o
-r9 | Z
Jrt
*"1 3h!
s sl €l5t
F(Jrljtr
(Jc
EF ilE=fT il EE8 il dg
't
:,
;
l
I
{
,l
..
LJ
I
iot
|].
t.i
.l
ti
_!
INSPECTION
TOWN OI1\/LAqq bc..t.\
REQUEST
PERMI
DATE
T NUMBER OF PROJECT
JOB NAME
MON
CALLER
TUES /-:.WED ( THU? FRIREADY FOR
LOCATION:
TOWN OF
INSPECTION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGBOUND
-
N FOUNDATION / STEEL tr ROUGH / D.W.V.
tr ROUGH / WATER
- ROOF & SHEER" PLYWoOD NAILING -tr GAS PIPING
tr INSULATION .N POOL / H. TUB
tr SHEETROCK NAIL
tr FINAL tr FINAL
ELECTRIGAL:
tr TEMP. POWER E HEATING
O EXHAUST HOODS
CONDUIT tr SUPPLY AIR _
tr FINAL
; tr APPROVED
CORRECTIONS:
rFqrsnppnoveo f] REINSPECTION REOUIRED
Ppiffisr*p
PERMIT NUMBER OF PROJECT
' ..!r.*fi .I
INSPTCT|aN REQUEST',
TOWN OF VAIL
q..
[ 3do
"^-, ?'-1.$\---\b JoB NAME
READY FOR
LOCATION:
CALLER
INSPECTION:MON TUES WED THUB AM
BUILDING:
tr FOOTINGS / STEEL tr UNDERGROUND
tr FOUNDATION / STEEL
tr FRAMING tr BOUGH / WATER
-n ROOF & SHEER- PLYWOOD NAILING -tr GAS PIPING
tr INSULATION D POOL / H. TUB
D SHEETROCK NAIL
ELECTRICAL:
tr TEMP. POWER tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED REINSPECTION REQUIRED
oarc 3-ia-fa 'rNSpEcroR
- 'jrr(i:-:#
INSPECTION
I
REQUE$I 'VAIL ;.
JOB NAME
+)wN oF.
i:\.)[}\\\DATE
READY FOR
LOCATION:
INSPECTION:
CALLER
TUES WED THUR FRI
PERMIT NUMBER OF PROJECT
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr FOUNDATION / STEE-D ROUGH / D.W.V.
N ROUGH / WATERN FBAMING
_ ROOF & SHEER
" PLYWooo NATLTNG tr GAS PIPING
tr INSULATION O POOL / H. TUB
-
tr SHEETBOCK NAIL
tr FINAL
tr TEMP. POWER tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT O SUPPLY AIR
ffi4eenoveo tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
oor, /8 -fu INSPECTOR
o
=
tr
=t
IJJ
o-
c;
o
(n
ut
uJu-
F
=E
UJ.L
TI
Pdt'i\'l^
(v)c{
+
z,
e.
==
(5
I
I
I
*[4
Ldlcp4I
I
I
luFoz
z
J
ldl
.5
4z
ir,
Itr t<<rool
I
I
I
z. l<: re
=,ot lF
->--t*<o-,tr- l(/t=..-/ '=$-.=b: l=Od'?7loo tz
= t=
UJz
Eo
uJ'r
F
(r
IL
oF
2oo
o
l!
6 i 6.s,
F EE:E
€; cEI
F.= E F 3
€ 9E,g :e
:eE En
c 9 d F-P'- o€ ^-E:E E'i
!Ee* c
5E;FIg";ge+
o=-o'J(5:o*E
f E;96gA.c6E
:EE H!,
iEEi=
60'-:-s: o (/J tr
ef;is€
6 i'=o=
E H:Ea
H:F9g;g;E s€.tg€(0=
:F$ci
oq
F\
t{
U
F
t
=
u.l
z
6Ifo
I
tu
z
Jo-
trFo
IJJJ
UJ
z
6
J
J
z
ul
E
uJ
uJl!z
E
uJ
(,ul
ot
t0
3g
IJJ
z
6(u
tratoL
uJo
o-?z
luJo
x
F
IJJ
U'l
(n
llJ
IIJu-
=
=(r
IJJ
o-
Fo
(,z
o
:)
J
()
EF
C)tuJur
(9z
c0
=
d
a9z
tu
=
NOri.vn'lvA
l
F
y9
EF
,=Z. Z tLF
Y :l v>
Q g 3 6'
lL *, " ar-66 &,rZ \- (J-82 frrt! <(6 0- J<t A $ea6 63HN(9
p).s
:
>E
(r),1 -S., u .n
=.oGl
I
"lIt-12.
1E1o-lo
l=r.{ t-Itdi*l'J L.d
dHJJ
Jft
1n
zotr
q
II
cr
d
o-3
tuo-
F
o
oo
o
E
o-
IJJ
z
Eoo
r!)
t/J
E
IJJ
tr
oz
a
=z,.
9z
"iF
u:" 63ft
r)
zfz
tr
o
=oo
I
l$r.,
l'54,F
l*F
l"il,l-
t$f.lztYl't9l
ITITurl
>lFl
I
Izloli-l
1l
=l6l
=I
ffi
T|t3t ll
el;lpllr LU
z
o
z
tr
at)
J
a0
c\I
I
z
EE
uJ
FJ
3
UJz
!-{
flJ
-l-
OJO(:)
uJFo
EIo-zo
Fo-ItlY
IJJ
@
oF
F
E
HN9
^ tl:M
C"ox1q'.iJ
al | |
i-+t
guJbkzo
Jdfio(J=
=-r1'-: ir !
dd=><-_ESULI
F
tuo-ttoEE2zE<a.]€8B9?ir
'q5EE ir-E f;={ gF
E d59 irrE F*t q-o-i!;
UJ
E-I
z
o9ze
(DOzz
CL tr-
F
=Elrl
A.zoF(JfEFozo(J
n!tr
t
\'
at,d
=tt-
E.
Ldz.(5
t/)ul
ii
=z
dlo-)
ILl4
T14UI
a
=cP4
"l
Ia
Jg
4
F\
tltlll,
ll"|lI a/alult6l
el 3=
*l
-lr{l*l
I
cil
=.1olullEl
;l
zl
elFl
tltlIItl
lellol
t5l>lI r.Llloltzl!31qolEFI
IJJI
1l
al>lttlol
zl
3lolFI
lttltlI cill=ltolI rJJl
t*|loltzl
HFI
I
I
I
"l=.1ol
uJl
5t
al>l
ttlol
el r
E
-.r O<FC()
LlJ <zE
lTJ F6Zo
I
FO
uJJ
TU
>Y
=#fFJZr!o
F
Fz
=+(r t-o2
O
(/>
u,i
UJu-
=
LLt
tl.
o
l!
E
Fo
Fzoo
o
(E
UIz
B
<FZ^
9.2@<
P
o
m
E
f
3
0)
';Eoti
.TL-o-oeBE"i
rqa9
';:!lX(6:vr--r.=(B-FfcX
; o;.9c-o>
o(!c?c - I '::
-*:,-:.: n; >=:
3 EanEiEo
iE5;.e;9e
FE a''.=- |! -o-(s o-o:- o
ondorsgsE
LCrJ:
or oI'"AiHE-c(o:f,
--cl
;,E: =,o:
=!,3 6 >.=.o(!=;
*5F';! xP-q.:Gv o-o "; c o (/).
E
E
e.
z
oJ
f
t/,
UJ
u.JII
F
=
u.l
J
F
=
=:
c)
z
o-
N0rIvn'tvA
IJJ
zz
h -o- I:a -.r
J;=
FYIJ
<DOZ:.
5:r!<
do>o
<$l
Y
=
zo
J
.. >lo
uJ
tuulz
u)
=
UJ
zo
F
6o
tr
l
U)z
J
z
E
o
z
tr
E
F
=uJz
z:
l!
\i\
is
S)
!\
a$
rjj
z
'-')
tltlttllJllttltltltltlIJ.t uttuttdtg
=I J
sl g5
cjl
=.1oluli
CEI
JI
<l>l
rLlol
zl
=lFI
I
=l(rlul
:l
<l>I
l!lol
zl
a
tltltltltlt.ltol| =.1tolI ujll:ltall>lI ttlloltzl
=t
x
rr-l Fl
I
I
I
I
I
I
dlzl
z'ilt!l
rEl
JI<l>l
trlolzt ..13t Iol urFI F
UJ
o2
O
FO
z
o
z
t-
UJ
=
(Jc)zr-
;#
]F!z|ro
O
<oQF
l-<i, g.HF
LU \-,
<FE(Jur<zE
(nZ
J<(Janul 4J
\\
J
z
,n9
=<cnO>z
dP
T-l f-'tT-'1L_J t_t L l
-J."i5>=2
^:sdd=
::l
IJ.Je.<i
,^lE vl
E =ts =lH -l'0|
i .l
E Pf-E HI=E =*lgE
=15E o15I , lr.u
E ;t>F t- lFi ai
t!J
tn!
o
ii -o
=.o a
u'- c O6--
(5 O-.F .6
= .6v C(o
Jq- (,-H .- (f) O-tl- v C X
'r G)ca=
U- (4 LP(nE CJo<uJ qJ o-
u =r C)
(J=our_o=H L (J+J
(5 L$- .
Z, \- O a .
orJ
=Lulgl-o c, .p.- oJ {-r cJ B 3J+)(r1rOo (u !- $-L- J C\l -(f o
luF
ox
oFt
lrJ
tl-
o
I
uJ
t-oz
t!-^^F r{ (\J
FtJ)
I+J
\n
v
$6
'O
@FIF
F{oo
uJF
U)oo-zo
F(L
utY
lrJo
oF
F
=EEH.+
1! oto-1
O- rola ".1t-';l
gur
:^FY6
z-
.nY OZe +tlnn (t'
==
e;F;
Ef;Idd=
.=
ul(L
ttoEE2ZE<of60ti e,a9ltL
'EI
J>
=ul:-E E=o o-- EE >(LE Ub
9 \utE X'Lt x>6=Fa'ioi!i
4llo
F
---
E
=E,lrl
o-z9l-
C)f
E,Fozo(J
-ftt=t
an
UJ
UJu-
E
=E
uJ
ot!
Foz('z
6J
l(lt
od
I
IteN,o
.:r3LrFa-t (.,
z
Et=
;:;'ilE
v,,z
Isroqlxsl6
I
i
I
cta
(l'J
{-)<{+6
ffE.o
I!z3
lt-
uJ
F
.9o;
EQ)
!6 9..E:6g9i
-66.9'aa'= o.
=(E
ES
o\
F.$oI'
.CO
E x/ooE)NP\
-oattFo
.,P F+'=oor.o
PF
E€oo
8oocD
o.S
=oti'=idl!-aE,b
Ef
-Tt
^0)op
o-!o.cd*;
o.g
6g
o
6
o
6
a,)
(D
6
=
dioF
.;
Eo
o
i
=
E
d
F6
E
;
'
E
o
c
Eoti
o:
EE
c.9o_
EEE'i
BUcr-'-o
O(E.C.^_o
=-Yg>
-o
o.9
o6
i=
FY(! "t:
-Y-
O(E
|'r(E-- -c.F
C,
= .r'
C!
E6OE
ON
6Ccs
-o.60
og
ll, !E
of;5o(!
.Y=(s!
>g.oo9a=-!cEr-O
-o
allJ
I.JJu-t
&
uJo-
FoF
z
ao
=J
vE
=Zzu-o ootr ^ 6z
P d ; Fx
an a Elt5i 3o(Jzx-
l!<35 3i9 E EEF o f c);niE,d
=>E
Ps s
L!
c
o-l
-Nl;
^>lIuo
uJulza
F
tf
UJ
o-
J
zo
E
o
z
tr
J
foz
aFz.
9=
do3tr
z
tr
UJFJ
=UJz
ctz
ts
=c
UJo-
(,z
=tr
dl
ad
an.p
!oo-
a,t)
.{J
tn
L
I
uJ
z
(D
-)
F
01'l
q.|1
?E
4
+J(I)
(uI+tv7
(U
!
!m
c',
@
C\I
<4lU&
e1
sJ
=
sfsf(\l
$lI(o
F\
(t
E
L
(U.c
tn
LL
(u
+JLoE
TE
tItI3qt!(c(qFgEt-trl
I(v,
<t.1
Iadql9l -HGa>Iq=Eo
co
.tJ
(J
L{J
IA
o(J
otn
=
t!-
I$tcf)
Fl
z
dt!
)
ILoz3
9lr-1
(v
(f
I
F
uiJ
uJ =tr
=.
ur
:
t!oz
3
9lF]
=E
tr
z
li
uJ
J
ll-
z3
F
=oI(5
oa
(uoI
=&tr
xI
.iz
ti
ul
J
a1
t!oz
3lpl
(f
F\
F..(r)
I\o(\!
01
UJ
6F'
ITJz
=
F
uJ
=To
E
--r O<FEOr!<zE[!FtnZoo
I
F()
UJJ
trJ
Y
)
Y
a)
(JOzl-
=ffF
rr- oo
i5:IF7()
=tYZ
=g
E
Ei\
=o2
J<c)au)5H a
5
,
!Ttr
s
\
v
\\.I
s
\
o
IJJ
UJ
Lr-
F
=Eul
ilttl tll:*-- |,6<i It(N I
i**lisrlrl
l.l
NI
NgI
f l\^lro l: I
't4
l+.
tHIA,l'T IIt..I
T?IklIdl
tflti.l
IE;H
!g
g"Hq*-l
=?l@- s.l I
9?I2e- |ar €t- |
II
ulo
=
ol!
UJz3
lto
ul
F
z
o
o
q)
(s
:QI rt)rcl
(d
o
o
c0
3
q,
.9q
a)
,i
a)
o
.9a
'(E
iol
LN
io,}ro
o
o
c)|o
an
^i
I
(E
ol
l:€3
| fic:I .Y-- sI o-(5 o_I FEE
lfE.'l:fi8
IE;EI -as'I er CI GO-.
I s.e:.| ;'s =;I o;;,| ;5 \.
I t$gl
>\i ^ r
!., o o)6F9{
"luJIzl3lol
5l
0
\
ut
p
vl
a
c
0
b,[
(\
9
$
(
fl
o
a
a
\
p
V
{
\
=qJ
z
)
o
(J
z
J
F
llJ
llJ
z
=
z
I
c)
uJ
UJul
z
tr
u.l
0t
ulE
o
.D
3
u,l
gJ
Ez
6
IJJo
UJ
o-
z
luJ
x
F
r.llol
oulul
l!
==u.l
o-
J
FoF
z
oJ
l
EF()trl
r!
z.a
J
J
z
UJ:
s\ts
F(t
NO[vnlv^
'l
I
I
uJ
F
x
=t!
zotro-
J
IJJz
lll
c.i
N\=
>G
i::t!- Y'-< $t:\ps
===x<fEP69o6drJZ5f;rrii6FO
-;Ai
s2r
ui r'
z
tr
J
s
El
Io-l
EI'l
I
l
uJlo-l>I*l
o
a\r"
a at!z
iF
o.
l;ll | |tsil | I
lull et^il <
l=ll a n
l:ll A g
IEII ; Hl<ll E ol^ll " z
;ll ll3ll ll<E I9J[ =?il ih^il:=
;ll dgyll " r
ull
2I
-.Jfaz
.. >lo
UJoul
UJzo
tr
UJ
z
E
o UJo
z
o.
z
FuJrL u->o
J
3
F
ul
It
N
F
E
uJ6rE q =R5. 3 c3$€ a ;5s€ t
=3\)b 0 dP{i'=(E-:}lDtrE + t-t5 h=l rbi g [l :Fff=E 5 c,l !5x
EH E rl ;HEE€ I lll
.lU
@
F
I
I
lr\
IN
'rfl
\
$
r.r'l
t,
(5z
J
tr-J
J
td
N
lht\
IN
t\
l\^h\l'\
Ir^t\
l$
v
ii
z
-)
-lR$$
}| Nl'i
$il\
Nd$dnlE :j >lasEl--lslo!
I
Il.
lo-I'tll!
d.{
HO:j
E(J
ll.l
IH[-$l
l\_,1 $
-l
url
TI
flol
zl3l
9l
lllttltlttl"lt4t.ltot| . u.,lIEIlill>ltbt I
=l il 'rlE ol 'rll/-l Fl Fl
tliltltttlI.ltoltilt(,tI tJJll5l lt<t Il>l Itbt IJil jl
!u H Fl
lltl
lrltsl
l$l -i\l ;l
$l iltzl
FI FI
N 9l ^(| El ?
"Al 3l
"$l'{l slNltzl .l
=l 3l u.ll
=t vt ulrrr Ft Fl
J<O<5 .J'tu uJ
-iO
F
tr.lF.-
<F
l!<zE
I.rJ F
oo
JE*9
=<ir G;F;6
ZH
=<5gd5()
Jlr<F
=FzQS;<
i,z
-(J
gE
o2
,4+
\ u/fl=v/J=
I
I
/ ^r
0)c
u)
v
,o
----J
.-l : I
CTION REOUEST.
TOWN OF VAIL
DATE
READY FOR
LOCATION:
MON .
.'r,
',' ti
CALLER
TUES
.t.
THUR FRI
tr FOOTINGS
tr FOUNDATI
tr FRAMING
/ STEEL
PLUMBING:
tr UNDERGROUND
'b noucx / D.w.v.
tr ROUGH / WATER
ON / STEEL
,-'' ROOF & SHEERlJ nr rrrirzrnn rrrrr tr GAS PIPINGn\J\Jr Or DnEEI't
PLYWOOD NAILING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL tr
tr
tr
tr
tr FINAL FINAL
ELECTRIGAL:MECHANICAL:
tr TEMP. POWER tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
tr FINAL tr FINAL
itr APPROVED
CORRECTIONS:
tr DISAPPROVED tr HEINSPECTION REQUIRED
DATE INSPECTOF
oz
ts
=Etuo-
o
\o
oo
ot-o
o
o
cf)
F
It
an
UJt!u-
tr
=
uJo-
,,rffb, {Jcr,rt +il l'-
@
o\
Ft
c{
E{0tE
z
)\,a
H
FDrl
H
4l9r
n-
@
d\
Eooc\t
tJU
I
LZ<D94
ii F{om
zz60J El
f
IIJ
F
o
e.
F
l--U)z:
zz
d
1Ul
6
H
s
DIH4c\t4
Bl€q
FIH l'.od
tsl
AI
Pl sl
1o
I'l
;l
Hq
ct)I!
t-
z
z
o
5
d)
06
=zo
uJz
Eo
uJI
z
',.Jt
i.l-r
t.l.
F
EFzoo
o
ul
tutrlF
z(,
o
;-.,
F
A'D
4
H|lU
'6;o;!o)
c
3o.i,
d)
.n
q
&(.)
.E
0)
o
o
O
o)
==f
(D
E
o
=
l
,.t
o
'.o
o)
c
.9
.9
.=
o
'-
oN
^<tc
3oF
c)
o
o)
€
o
o
o
o
a
E
=f
U;
3
'.9oFio
E8E
=.2 *,
EEH
;OY
'- v,e:5:98
; >=c9o'- oc
35=_F >,
E EA
==Ecc'
3ceF! c,=- (6
o-o o,O:*o.E o
(/)FO.
E9o-(!C
EP b
a (o'!
ise
-!C
P *-c
!l; -3Eio=33d>,96a.Y=E9; e"xuhtB9Eq)qEE.LOU)
-o.g
c\
LO
|.r)
<r
F-l
F.l
F{
Ln
Lrl ol ooc!rO
F.
rO
01
rr.l
(f
C\
c\
F
<A
F
=EqJ
.L(,z
.0
Yo
uJ
(Jz
Jo-
aF
u./J
uJ
z
ql
J
gz
oItl
UJlu
z
tr
LU
Lu
=UJt
UJ
z
6
UJo
c
UJ
z
J
X
F
llJ
C'tr
o
LU
I,JJII
F
=(l
uJ(t-
J
F
z
fd
J
o
F(J
UJ.)
IJJ
z
J
9z
c)lu
=
c
NO|lVnlVA
I(a
,E4
r{ EtF{ Fl
I l-.1s6Ht4cpltq
"{EJH
r{ FlIXFl lrl
qtl
HIHUz-looqAlz
H8
-'E
3
z
tro-
or
UJ
u.iz
UJ
=>E
=do\i
zz
Fo_ AxfF9 0
tnoRr5:|'r<
,., f
rE8
.i ai
z
tr
fJ
LL
c
l
u.lo-
F
c
o
.-.
&ul
x?$
J
z
Eoo
.ix
X
z
tr
uJF
=u.lz
azlzOa
;ll'J<o6<
>ii>E
xrL6ci<z
aFz,
z=_iF
LrJ O-trOI
dl
ztl
I_l
ztI
-J>r
I--l
I
I
I
5l
;l
o
IJ,J
u,.l
llJz
U)F
(E
l!t!
J
z
Eoo
ulfJ
E
z
9IF
z
F
5oz
Fl
F{
I
I
}'4IXI
I
Ilr
ol3
oa
IIJ F'(L L! <lo*
/i
J
UJ
rl'1
l=
fil
o
(u
.Fl
t{o
a)+
c)t{o
D
o
B
U
Eoo
i
F
uJ
I
"qFl
,l
.f,
/-/z
./A
\J I
12
./l:-///
'-/-ul
tra
@o-zo
F(L
IJJY
LU
dt
oF
F
(r
ul
rLo
0-oo
I
l,uFoz
IJJF
o
tr
uJ
lr
: ^IJJE2E<tIlo9EB9tt;ie'EE
E i*E h=O:J;E =tE 3boF,.,E ?o-*E X>T ii F
o-:!tr-
llJdl
F
rR
\ v/ns.\dJ=
-.. ct d
a
)./
.+d
F-o
01
r.l
!Oc\
E{
f"](n
txt-r-'rrxrrlLJ
z
.n9ztd)o
=z
O- tr
iff(Jo=
=r,*A;E
F+rF+' P$
ud h4J xl
F
=E
LrJo-zo
FofEFazo(J
l,l14 (,lI b't
-r ,91o '-ll
{illFl -tll' '-lHCf>q
l5 z.F-.i
-J lL
'Jf'l
oEtrlfr
trlueo
'i4!{4}J
ui
=z
")
I(|
vlM
s8
Io>
\.1 | E a
,7af U5-loqc{
Ha.JHFtd
Lul {
=l i<t <42
o-
X
F-t
a(t
fdn
ts
..1
J1
uro
I
B
cr)
Et
tr
f{
tlU
()
tro
F-lo
)
uJ
IJn-t
3
do(\l
c{
I
(L
FI
...1
d
F
(J
a
H(
H
a
4
q
14Otl
E
tr
Ir-
FI
o
IJJl
5l
<rl>l
3l
zl
3l
FI
F
F
F.
I
.-.
N
@
lt
trF
LF
f
;tr
H
il
L]
q
E
tr
I
$
.iz
(t
rul
1l
al>l
ttlol
zl
3l
FI
fn
s
r{
I
Ol.n|
or
lliJ
rU
t4zH
an
E
F]
P.t
F.lHz
al
E
trl
I
Al
JI|-l
1
olzlol crJJl ocl r"Jl sSl I
.)l s
zt 7.
Ft i =tr
z
uJ
J
a>l
ILo
zl
3l
9l =E
I
I
I
I
ol
=l(Jl
gl
<l>l
rLlol
3l s9l !,1
E
I.IJz
=
otu
=T
E
-:o<F(ts()uJ<ZE
I.IJ F(rzo(J
<o(JF
itrXF
-rOVO
ZY
=#fF:z
,J
9z
-
uJ
r
I
z
E
H
\rz
(-)
<Oan:l
U'
r.lJt!
lJ-
F
=
u.,,
is
i-\.< roil
ll
u-
Jtuo
=
cr
UJz3o
uj'r
F
z
':t
c;
Oo)
iito-o0)o5
:v
= .r,)0)rclrc'(E
:E
.o
to
'E
$
o
o)c
=J(D
o
=cl
o
''t
q)
).>
-E
lo
cio
LN
=-o)C)B
:F
'o
:.
Or(J'
(u
o
=a
ttI
o:
oi€2
E(
,;a>'a!!
-(l)
DO
)G
;8
.,'
JF
i;
)(E
i3i >.,
,o
'ot-l
a
(E
c
.=i
q)l
-'i
;l
>\':
o+o-
:(
o)aDo:;
6.,:,:
:oft
9X
)-
:\--'=
:o
- at)
D(E
d):n
:>
'ElE
:L
: (D'
r-C
iG'
ctl
a'
clGl-l
(!i
€a
;(
o+(sr
o>€7
6:
HaEr
E-ctsi
o(l
q)
c)
.9
;
=
.-c
f
q)
=
co'
tE-
.Y-
O",!o!
'Fr
d'
o)(
o(
-io(
o9ori
o:3iOcCex.:
(.)'f('E
>g
o;
oF-c6
-(l
I
\
N
d
Iv
U'
urF
2
oz
6J
ca
zzo
<t>
UJ
UJrL
L
.J
Fo
l!ozotro-aoulgJo
J
Eluzluo.
-Em
= ,.. o
zzoo
F^IA
<fEg 6
tt1 g<>E9rL<.o1
-td>(JFO
;ni
ll.
tr
o
o-3
G
o-
flJ
oF
Elrlo.
z
Eoo
,l
Ict) |6l
UJ0- rl:o
(t)
JJ
3
F
uJf
J
(r
l/)
uJz
9I
uJo
zz
trtt
-)
@
z
tr
GtuF
=UJz
b.
\s
|.,rJ
F.< crt
rq
l,!Fodlo-zo
F
UJY
ut
@
o
-F
a
lJf
l-l$
131
1] d
311
{
{d IF...iY u--
u;
z
(D
1
l9Stl*|dN+jl 5€l ;g
T1 H -
dg l
1,qa
YI HZ
Fl giil
.ll
Hi
gq_
4el n
Fl ffl q
$flqE ;l u.lldl 0l dl/rl-r Ft Fll
ldu.
ldf,q
1fl$ts 3l "llH Pl -'l
Iql
ld(fl{l
;{1t{
-81 |:lg
sl <
bl6
*t :
FI F
I
I
I
I
fl
sJltrlJl
<l>l
l!lol
zl
FI E
I
I
I
I
I
.lol
=lHI
-lJl
?t>l
ttlolzt ..:3t fOl uJFI F=(r
-J<OA) u)t! uJ
-.1 O
Lllz
=
F
UJF
T
iT
-rO<F
ITJ <zEL!F<tz
*9
FOE<
figil
99
g3
-:--JF:z
o
<^
:IFz()-<
Y,z>E
o
-|lJ*8.o2
L)X.xx><=
z
,r9
=e
=z
a'P
..id
=E==o*aHg
rrr io<=<Eu,y1 [
\./ AEO
EsgF-'- {tsx#;-dtIrr o
-F E
.=LJ;
=FqilFf ] *
== uI -E_ F S8=5 HE6: d
E jp 5
F r..+ 5 u.tEr.,-5 $EsE'€q;
= trl*oIp
*F**
E!
-et
IJJF
o
IJ.o
oo
I
UJFoz
F
=Glrl
o-zoF()fEFQzo(J
tr!n
\1><X
RNT
Town of YaiI
75 S. Frontage RoadVail , Colorado 81857
Plan analysis based onthe 1985 Uniform Bullding Code
ProJect Id: PLAZA LODGE ADD.Address: VAII VITLAGE
Occupancy: 82,A3,Rl
Type of Const: V-IHR
Date: November 18, 1987Contractor: BECK & ASSOC.Architect: SNOWDON & HOPKINSEngineer: TIM BOYLE
Plans Examiner: GARY MIJRRAIN
NOTE:The code items llsted ln this report are not intended to be a completelistlng of all possible code requirements ln the 1985 UBC. It is a guide toselected sections of the code.
---*--i=:==::====:=============::====::===:=========:=!::============TYPE Ot' CONSTRUCTION:V-1HR
SEPARAT]ONDIRECTION BOUNDARY AREA INCREASE FIR.E PROTECTIONNORTH Building 8.0 Feet 0.0 FeetEAST Public l{ay 31.0 Feet 18.b FeetSOUTH Buildlng 1?.0 Feet ?.0 FeetWEST Public Way 41.0 Feet 21.0 FeetArea j-ncreased 13.75 % for open area on 2 sides.
FL NAME occ AREA ATLOWED A,/A OCC LOAD REQ'D EXITS EXIT WIDTH
3 Apartment/Condo R1 b446 11944 0.46 27 Z O.b4TOTAT 5446 11944 0.46 27( 27t 2 0.54( 0.54)2 Hotel/Mote1 Rm Rl b9B1 11944 0.S0 30 Z 0.602 Retail $ales fttr BA 316 1b92b 0.02 11 1 O.ZtTOTAr 6297 12095 0.52 40 ( 54) 2 0.81( 1.08)1 Retail Sales tur BA 4380 1b9ZS 0.ZA 146 Z Z-gz1 Dinlng Room AB 1514 11944 O.tS 101 Z Z.Ozl Stock Room B2 Z9B 1bg2b 0.02 1 1 0.021 Retail Sales nm BZ Z6ZL tbg25 0.16 87 Z t.7ETOTAL 8813 15062 0.59 335( 362) 2 6.71( 7.25)B Retail Sales Rrn BZ ZSAL 15925 0.18 tg Z 1.96B Dinins Room AB 4L7L 11944 0.3S Z7B 2 b. E6B Stock Roorn 82 1Z1S 1S9Zb 0.08 4 I 0.0gTOTAL 8325 13646 0.61 380( 558) 2 7.60( 11.16)BUIIDING TOTAL 20556 28326 o.78 403* NOTE: Indicates that this occupancy is not allowed on this floor-Table b-D
_i_I9ll:_l:11::::" that this occupancy is an accessory area-sec. 3s02.(a) exc.
N,EQUIRED OCCUPANCY SEPARATIONSB2-R1 t hr Shops and offices less thanseparated. -- Sec. 503. (a) ex *2CA3-R1 t hr
10% of floor area need not be
AII glazing
be of safety
in hazardous locationsglazing material . --(see section 5406.(d)) 1s required toSec.5406.
HANDICAP REQUIRTMENTS :
Handicap access is required to this bullding. -- $ec. 3301.(e) and Table 33-AIf a ramp l-s used for handicap access, the max slope ls 1:LZ, -- $ec 3307.(c)If water fountains are provided, one must have a spout within 33 inches ofthe floor and up-front controls. -- Sec, Fll.(c)TOITET FACILITIES:1. All doorways leading to a toilet room for handicapped are requlred. toprovlde 32 inches clear width. -- Sec. b1f.(a)2. Provide 44 inches clear on each side of doorways. *- sec. s11.(a) 1.3. Provi.de a 60 inch diarneter crear area within the toilet room(s).-- Sec.511. (a)2.4. Provide a clear area 42 lnches wide and 48 lnches long in front of atleast one water closet. If 1n a compartment and door is on the sl-de,provide a clear access width of 34 inches. Door may not encroach intoclear area. -- Sec. b11.(a)3.5. A 48 inch access width is roquired to the handlcap compartment.-- Sec. 511. (a)8.6. Grab bars are required behind and on one side or on both sides ofhandicaP water closet. Slde bar ls requJ-red. to be 42 inches long (min) andextend 24 inches in front of water closet. Rear bar ls to be 24 lncheslong in a room or 36 lnches long in a compartment. Bars are to be 33inches to 36 Lnches above the floor. -- Sec. b11.(a)4.7. Provide a clear area under at least one lavatory. 30 inches wide X 2ginches hieh X 1? lnches deep minimum. -- See. b11.(b)1.8- The bottom of one mitror, oBenJ-ng of a towel fixture, ana disposal ftxtureis required to be within 40 lnches of the fIoor. -- sec. 511.(t)e.as.R-1 HANDICAP REQUINEMENTS:
If,' there ig more than 20 units on the site, handicap units are required.21 through gg unlts on slte-one unit100 & over-one' plus one for each additional 100 units of fraction thereofArr doors in the unit are required to provide 32 inches clear width.Toilet facilltles in these units are required to comply with sec. b11.These requirements are Ber Sec. 1213.The 60 lnch clear area is not requlred withln units. -- see. b11.(a)1.Grab bars are not required within a dwell1ng unit. -- sec. b11.(a) 4.The slnk cLearance, mirror height, and flxture helght are not required wlthina handicap unit. -- Sec. b11.(b)
EXTERIOR WALI F'IRE RATINGS
NONTH EAST
OCC BBG NON-BRG OPNG BRG NON-BRG OPNGWALI WALL PROT WALL WAIL PROTBZ thr* thrx NOP thr thr None
A3 thr* thrx NOP
R1 thr* thr* NOP
AND OPENING PROTECTION
SOUTH WEST
BRG NON-BRG OPNG BRG NON_BRG OPNGI{ALL WALL PROT WALL WALL PROTthr* thr* Prot thr thr None
The
None
Prot
NOP
x
OTHER
EtE}MNTInterior Bearing wallInterlor nonbrg walLStructural FrameExterior Struct FrameShaft EnclosureFloor/Ceiling Assenbly
Roof /Ce11lng AssernblyStairs
BUILDING ELEMENTS Table 17-A
thr thr None thr* thrx Prot thr thr None
thr thr None thr thr None thr thr None
exterior walls may be of COMBUSTIBLE materlal .-- No fire protection requirements for openings.-- Openings are to be protected with B,/4 hr fire assemblies.
50% of the area of the wall maxlmum. Sec b04. (b)-- Openings are not permltted ln this wall.-- These walrs may be required to have a parapet wall B0 inehesabove the roofing. The parapet wall is requlred to have the samefire ratlng as the wall. $ee section 1709. for details and exceptLons.
MATERIAT
ANY
FIRE RATINGt hr.t hr.t hr.
t hr.t hr.I hr.
NONE
ANY
ANY
NOTES AND EXCEPTIONS
Sec. 1705. (b)1.
$ee footnote f1
ANY
AT{Y
ANY
ANY
FOOTNOTES:
1) Minimun on exterior side also basedProvlde a thr cell1ng ln the basernent.
on exterior brg. wal1 requirements.-- Sec. 1703.
Based on sectlon 3202. (b)
The roofing on thts building is to be flre retard.ant.see sectLon 3203. (e) and lcBo research reports for requireuents.
EXIT NOTES;
Stairways connecting 3 or more floors are requlred to be in exit enclosuresThe walrs of the enclosure are requLred to be t hr flre assembries.The openings into the exit enclosure are required to be t hr assemblies.A connectLon to the exterior is required wtttr the same fire protectlon as theexit enclosure. -- Sec. 3309. (d)A_barier is required at grade level . -* Sec. S30g.(e)The space under the stalrs (enclosed or not) may not be used for any purpose.-- Sec. 3309. (f)
See sectLon 3309. for additional infornation.
The uraxirnum rise of a step is ? inches and the minimum run is 11iuches. -- See_ 3306. (c)
The nlninum width of a stairway is 36 inches, 44 inches if theoccupant road is greater than b0. -- sec. 9906.(b) see sectlon3303. (b) when occupant load is greater than 1gB.Provide a guard rair where drop off is greater than 30 inches.
1?11.
$l:"Ti:':T"l;1:i::1,"1 f il; - ri.i"ifiii;, - ;.iff ' f, 3
u;1"'
noncombust'ible door betwean basEment and lst story. -- See. 1?03.Provlde a landlng within 1 lnch (t/2 tnch at doors with handicapaccess) of the threshold. -- Sec. 3304.(h) Sec sectl-on 3304.(t) forsiae requirements.
The naximum travel distance in thiE bullding is 150 feet. -- gec.
3303. (d)
ADD]TIONAI F,EQUIREMENTS BASED ON OCCUPANCY
['or 82 occupancyIn all areas customarily occupied by hunans, provide natural orartifical lieht and ventilatlon. -- Sec. Z0S.tr'loor-BSMT Occupancy-Retail Sales RnExit slgns are requlred fron all areas serving an occupant load of 50or more. -- Sec. 3314.(a)corridors serving an occupant load of 30 or moro are required tohave thr constructlon and rated openlngs -- Sec. 3g0S.tgiAthlExlts are required to be separated by l/2 of the dlagonil of thisar€a. *- Sec, 3303. (c)
Doors are required to swing in the directLon of exit frorn this area.-- Sec. 3804. (b)Floor-1st Oceupancy-Retail $ales RnExit signs are requlred fron all areas Eerving anor more. -- Sec. 3314. (a)
Corridors serving an occupant load of B0 or morehave thr construction and rated openings -- Sec.Exlts are required to be separated by l/Z of tnearea. -- Sec. 3303. (c)
Doors are reguired to swing in the direction of exit from this area.-- Sec. 3304. (b)Floor-1st Occupancy-Retail Sales RmExlt slgns are required from all aroas serving an occupant load of 50or moxe. -- Sec. 3314. (a)corridors serving an occupant load of 30 or more are required tohave thr constructlon and rated openings -- Sec. 3305. te)AthlExits are required to be separated by t/2 of the diagonil ot thtsarea. -- Sec. 3303. (c)
Doors are required to swing in the directlon of exit from this area.-- Sec. 3304. (b)
For 43 occupancy
An automatic flre-extinguishlng system is required ln the basement.-- Sec.3802. (c)2.
An automatic sprinkler systen is reguired in enelosed usable spacebelow or over a stairway. -- $ec. 3802.(c)4.Floor-BSMT Occupancy-Dlnlng RoomExit signs are required from all areas serving an occupant load of b0or more. -- Sec. 3314. (a)corridors serving an occqpant load of 30 or more are requrred tohave thr constructlon and rated openings -- Sec. 3805.(e)&(h)Exits are required to be separated uy 172 of the diagonii or'trrrsarea. -- Sec. 3303. (c)
Doors are required to swing in the direction of exlt from this area.-- Sec. 3304.(b)Exit doors are required to have panic hardware. see exception formain door. -- Sec. 38f8,(a)
278 occupants.
occupant load of 50
are required to
3305. (s)&(h)
diagonal of this
The capaclty of this area is required to be posted at-- Sec. 3302. (c)Eloor-1st Occupancy-Dining RoomExit slgns are required from all areas servLng an oecupant load of S0or more. -- Sec. 3314. (a)
corul-dors serving an occupant load of 30 or more are required tohave thr constructlon and rated openings -- $ec, 380b. (e)&(h)Exlts are required to be separated by 7/z of the dlagonii of-thisarea. -- Sec. 3303. (c)
Doors are required to swing in the dlrection of exit from this area.-- Sec. 3304. (b)
main door. -- Sec. 3318. (a)
lPr!31"3i3|.?i,tnis (}a is required to be nostf at 101 occupants.
For R1 occupancy
Storage and laundry rooms used ln common by tenants to be separatedby a one hour occupancy separatlon. -- Sec. 1402. (b)
A flre alam systen nay be reguired in this building. -- Sec.
1202. (b)
Provlde a window or door to the exterior fron every roon used forsleeping.
A window must provide a crear open area of 5.T sq.ft., a clear hetghtof 24 inches, and a clear width of 20 inches(ninfunum). -- sec, tzo[,All habitable roons require exterior glaaed openings equal to l0j[ ormore of the floor area. (mln 10 sq.ft.) -- Sec. 120b.(a)All habitablo rooms requlre an openable exterior openings equal to 5%or more of the floor area. (min b se.ft.) -- Sec. 120b.(a)The minl-mun celling in a habitable space is T feet 6 inches exceptkitchens, halls, and baths nay have a celling heieht of T feet. --Sec. -- 1207. (a)Floor-Znd Occupancy-Hotel,/Motel RmCorridors serving an occupant Load of 10 or morehave thr constructlon and rated openlngs -- Sec.Exite are required to be separated by t/2 of ttrearea. -- Sec. 3303. (c)Floor-3rd Occupancy-Apartnent/CondoCorridors servin6 an occuBant load of 10 or morehave thr construetion and rated openings -- Sec.Exite are required to be separated by L/Z of t]nearea. -- $ee. 3303. (c)
are regulred to
3305. (s)&(h)
diagonal of this
are required to
3305. (e)a(h)
dlagonal of thls
EEST
CCIPY
-'
. !.#*
AVAL*FITE );
t
Town of Val I75 B. Frontage RoadVellr Colarado B16EZ
Flan corractl,on bered enthe 1985 Unifonm Bulldlng Code
FroJect Id. FLAZA LODBE ADD.Addreeel VAIL VILLABE Dater Novanbar 1g, ,.qATContrastors Bfltrl(, & A8SOC.Occupencyl B?rA$rRl Architectr SNOWDON & HOPKINAType of Conetl V-IHR Engineerl TII'I EUyLE
PIdrng Examinerl 6ARY I'IURRAIN
CtrRRECTION REOUIRED
1 All sheetr to be etampad and rigned by an Archttect and Engineerregistered in this Etata.
2 The roofing on thte buildinE ie requ{rad to be {ire ratsrdant andclase (A) -- Eiec. BZOZ. (b).
S Provide attic ventilqtion that complies with rection I?OF. (c)
4 Prnvide an attic atrcegs (zzx$o min) to each attte ar..ea.-- 6es.$2O8, (a)
5 AII elamentr of the gtructural frame are required to have l hn {ireprotectien. -- Table lZ-A and gac. L7OZ.
6 Ehow all deeign loadE uEed In the design o{ this butlding on theplans. (Enow, windn selemic, llve, etc.t
7 t'luet have a vent in each bathroorn to to the outsrde.
I All doorE to corridor muEt h*ve cloger6.
I Need shop drewing* trn aprlnkler and fira alarm systems.
10 AIl railing must comply with l?ES UBC.
CONTRACTOR'S MATERIAL & TEST CERTIFICATE
PARTS A & C - SPRINKLER & WATEfl SPRAY ABOVEGROUND PIPING {Fill Out Separate Certilicate For Each Riser}
PFOCEDURE
UPON COMPLETION OF WORK. INSPECTION AND TESTS SHALL BE MADE AY THE CONTRACTOR'S REPRESENTATIVE ANO WITNESSED BVAN OWNER'S REPRESENTATTVE. ALL DEFECTS SHALL BE CORRECTEO AND SYSTEM LEFT tN SERVtCE BEFORE CONTRACTOR'5 MENFINALLV LEAVE THE JOA.
A CERTIFICATE SHALL BE FILLED OUT AND SIGNEO 8Y BOTH REPR ESENTAT tV E5. COPIES SHALL BE PREPARED FOR APPROVINGAUTHORITIES, OWNERS AND CONTRACTOR. tT IS UNDERSTOOO THE OWNER's R EPR ESENTAT IV E'S SIGNATURE IN NO WAY PREJ.
UOICES ANY CLAIM AGAINST CONTRACTOR FOR FAULTY MATERIAL. PC}OP WORKMANSHIP. OR FAILURE TO COMPLY WITH AP-
PROVING AUTHORITYIS REQUIREMENTS OR LOCAL ORDINANCES.
PR.PERTY NAME
fr-nzn /,nni:i fanrnnt fr,re, fr DATEc-2-W
PRoPE RTY ADDRrss ,/ Ar/ .af//4/L C.OL-O
PLANS
ACCEPTED AY APPROVING AUTHORITY('S) NAMES
ADD R E55
INSTALLATION CONFORMS TO ACCEPTEOEQUIPMENT USED IS APPROVEOIF NO, STATE DEVIATIONS
PLANS:YES
YES ff rsg
INSTRUC.
TIONS
HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTEO AS TO LOCATION
OF CONTROL VALVES AND CARE OF THIS NEW EQUIPMENT?
IF YES, GIVE NAME. IF NO, EXPLAIN.
vrs ff NO fl
HAVE COPIES OF APPROPRIATE INSTRUCTIONS AND CARE AND MAINTENANCE
CHARTS AND NFPA 13A BEEN LEFT ON PREMISES?
IF YES, GIVE NAME. IF NO. EXPLAIN.
ves p NO o
TEST
DESCR IP-
T ION
HYDRoSTATIC: Hydtottatlc te5t5 shall be made at not less than 2OO PSI (I3,8 bars) for two hours or 50 PSI (3,4 bars)
abov€ stalic prossure in exc€ss ot 150 psl (10.3 bars). oitferentiat dry-pips valve ctappers shalt be teft open during tert toprevent clamage. Alt aboveground piping teakage sha be stopped-
PNEUMATIC: Establish 40 PSI (2.8 bars) air pressur€ and measurq drop whlch ihall not exceed lV? PSI (0.1 bars) in 24hour'. Test presture tanks at normal waler level and alr paessur€ and measure air or€ssure drop whlch ghall not exceed lV2
PSI {0.1 bari) ln 24 hour5.
TESTS
R EOUIR E D
HYDROSTATIC: ALL PlPlNG.
PNEUMATIC: DRV PIPING
EQUIPMENT OPERATION: ALL.
ORAIN
LOCATION
SERVES BLDGS:
4 ///)/7<ktaoz
SPRINKLERS
OR
SPRAY
NOZZLES
MAKE MODEL s tzE QUANT ITY TEMPERATURE RATING
TeuAAtE Bpxs Eht,c /o"/4L 12,;o
PIPE AND
FITTINGS
MATER IAL AND KIND ao*roW STANDAR'
IF NON€. EXPLAIN
ALARM VALVE
OR FLOW
IN DICATOR
ALARM DEVICE MAXIMUM TIME TO OPERATE THROUGH TEST PIPE
TYPE MAKE MOOEL I MIN.
tt)F.fi,frsrrt<aF,b | -{5'
FORM 85 AC, REVISED APRIL I9'9 PRINTED tN U.S,A. FOR NAS & FCA, tNC., p.O. AOX 719, MT. K|SCO, N,v. 10549
o
ilkERY
PIPE
VALVES
OPERATING I E5I HE5IJL I5:
TIME WATER I ALARM
REACHEO IOPERATED
"JFLEt lenoeenrvMAKEMO DEL SER,
NO,
tiME To rRlP
TH ROUGH TEST PIPE WATER
PRESS.
AIR
PRESS.
TIPPOINT
AIR
PRESS.WITHOUT
Q. O. O.
WITHo.o.D
MtN, I SEC.M IN.sEc.P.S.r,P.S.r.P.S.r.MrN. I sEC.YES NO
f--T--l l-t ll
IF NO, EXPLAIN
OPERATION PNEUMATIC N
plptNc sUpERVtsED! YEs E No C
E O^T' 'TrrE MANIIAI TRIP AND/OR
n
"":"' il h
PREACTION
VALVES
ELECTRIC U Fl
>ericrttue MEDIA SIJPERVlsEot YEs E No
orruote co*rnoL STATIONS? v€s 0 NO
tr
rs rHERE AN AccEsstBLE FAclLlrY lN EACH clRculr FoR TEsrlNG? YEs C No o
IF NO. EXPLAIN
, i : : :::: ;. -.:; ;;;;;: I ;;::;;;-r;" T.
MAKE MODEL
Do.i Esch Cltcult OPcrtte
suo"rvision Loss AlarmT
uoel carjn vtr!urr vPerql! |
Vatve Releasel I oPlrg1e
f- "E' I _19_VES MI N.
-
Psl s6p' Z
YES ti
YEs tr
{OURS{oE{oE
TESTS
ALL PIPING I-IYDROSTAT!CALLY TESTE
DRV PI PING PNEUMATICALLV TESTED:
EQUIPMENT OPERATES PROPERLV:
IF NO, STATE REASON
ORAIN TEST: READING OF GAGE LOC'
NEAR WATER SUPPLY TEST PIPEI
DAT _
{TEO
-- REslouAL PREsSURE wlrH vALV€
TEST P|PE OPEN WIDE
PSIPSI
YES E]F
CTOR THAT WELOING PROCEOURES COMPLV WITH THE €€QU
ERFoRMED B'', wELoERs QuALtFrEo 'N coTPb'ANcE WJLH;
IED OUT IN COMPLIANCE WIl H A OOCUMENTEO QUALITY CI
i?ttr'.rii5Lii;RrE"f J"?"il'i:i,+x."'.:l[%fiT,=.tff +
IN
NUMBER USED LOCAaloNS
TEST BLANKS
INKLER CONTRA
. A R-3?
WELDING WAS F
.9, LEVEL AR.3?
)ING WAS CAR R
E THAT ALL OI
ELOING RESIDUI
ED?
IRE-
'HE
I
)N.
TH'
OF
WE LDI NG
WELOED PIPING
OO YOU CERT IFY A
MENTS OF AWS DI
oo You c€RTIFY 1
REQUIREMENTS OF
DO YOU CERTIFY']
TROL PROCEDURE
THAT SLAG AND
PIgtNG ARE NOT I
S THE SPR
0,9, LEVET
.HAT THE
AWS Dlo
:HAT WELI
TO INSUR
OTHER W
'ENETRAT
oqie uerr rN sERvlcE wlrH ALL coNTRoL vALVES oPEN:
NAME-oF SPRINKLER CONTRACToR / / ./')A) l-/ "/-ra / '-" , /1 ^., f--' /) '/ f.A ^ f | ,
REMARKS
(UtHtE / h(t:
oWNER (slcNEc
@
t 4u/- \-/o ir)
*
SIGNATUFIES
I Fon enoeenrv
l_
1.,-" -:::-.
."lK :---I+
Ronr:IJA
T
,,-F1a,T#F,^#1-hffiiffi
Snowdon and Hopkins o
201 Gore Creek Drive
Vail, Colorado
Architects
303-476-2201
81657
March 9, 1988
Mr. Gary Murrain
Town of Vail Building Depa!tment
75 So. Frontage RoadVail, CO 81657
Re: Plaza Lodge, Phase III Remodel, Unit No. z
Gary:
Thank you again for meeting with Beck and Associates,Frankie Tang and myself last week, and I appreciate youropen approach to the problem. As we had discussed, we needto provide the following remedies to lessen the problems ofthe Unit No. 2 storage area in the plaza Lodge Building:
1.) Provide an electronic alarm system (connected tolighting) to warn persons gaining access to thespace of the limited headroom at the top of thestai r .
2.) Designate the storage area as an uninhabitable
space and note such as a deed restriction runninswith the ownership of the unit.
3.) Modify all drawings of the space to showdesignation as an uninhabited space.
The owners (Mr. and Mrs. Oscar Tang) have agreed to do theabove mentioned items. and appreciated your input to tbeproblem. I apologize for any confusion that may have beencreated by our drawings and/or eonversations and I am gladwe were able to come to a reasonable and amenable solution.
If you have any questions or need additional information,please let me know. I will provide you with the updateddrawings for your file as soon as possible.
S i.ncereJ-y
Snowdoi:
CSlnpm
.;
7_lq q
PERMITNUMBER OF PROJECT
:: ltT a.t :,"
INSPECTION REQUEST
DATE
READY FOR
LOCATION:
JOB NAME
CALLER
MON TUES
TOWN OF
INSPECTION:
f
=)
tr DISAPPROVED tr REINSPECTION REQUIRED
( lvhJil
PERMIT NUMBER OF PROJECT
DATE O JOB NAME
g)'.lii
READY FOR
LOCATION:
INSPECTION:
CALLER
MON TUES
I
INSPECTION REQUEST
{ 11 L-,--t
t""Yr\ oF vArL
UrU t, !
THUR
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
E ROUGH / D.W.V.
T] ROUGH / WATERtr FRAMING
r_r ROOF & SHEER- PLYWOOD NAILING E GAS PIPING
T1 INSULATION
T] SHEETROCK
tr POOL / H. TUB
NAIL E
tr tr
trtr FINAL FINAL
ELEGTRICAL:
tr TEMP. POWER
MEGHANICAL:
tr HEATING
RoucH f, *tr EXHAUST HOODS
tr
tr
tr
CONDUIT tr SUPPLY AIR
FINAL tr FINAL
VnppRoveo
'CORRECTIONS:
tr DISAPPBOVED tr REINSPECTION REQUIRED
i,,tt'Rt I
JOB NAME
-l
INSPECTIONTOWN OF
REQUEST
VAIL
DATE
READY FOR
LOCATION:
INSPECTION:
CALLER
TUES WED rHUR e-r:)Q!4- ' PM
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATERtr FRAMING
tr GAS PIPING
tr POOL / H. TUB
tr SHEETROCK
n_
NAIL
tr FINAL tr FINAL -
ELECTRICAL:
tr TEMP. POWER
MECHANICALI
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
S Ddlal tr FINAL
tr DISAPPROVED tr REINSPECTION REQUIRED
ECTIONS:
INSPECT
\I
INSPECTION REQUEST
VAIL
NAME 't-. -t
CALLER
TOWN OF
\
READY FOR
LOCATION:
".,*='.lINSPECTION: ..-"MON )TUES WED THUR FRI
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDEHGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER- PLYWOOD NAILING tr
tr
tr
tr
tr
GAS PIPING
tr INSULATION
tr SHEETROCK
POOL / H. TUB
NAIL
tr
tr FINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
tr tr
trtr FINAL FINAL
Z APPFOVED
]ORRECTION
tr DISAPPROVED tr BEINSPECTION REQUIRED
//,
DATE INSPECTOR
r /t./ lI
PERMIT NU R OF PROJECT
DATE i'/ /j JOB NAME
''..,
INSPECTION, TOWN OF
,fi'ttlL ,
THUR FRI
,/
I
t
REOUEST
VAIL
(tl /,t 'r
READY FOR
LOCATION:
INSPECTION:
/t';,
CALLER
MON TUES WED
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr,UNDERGROUND
fl noucn / D.w.v.
E+OUGH / WATER
tr FOUNDATION / STEEL
tr
tr
tr
tr
tr
FRAMING
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION
SHEETROCK
tr POOL / H. TUB
NAIL tr
n
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANICAL:
tr HEATING.
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
-tr
o pr(rnr-tr FINAL
APPBOVED tr DISAPPROVED tr REINSPECTION BEQUIRED
CORRECTIONS:
INSPECTOR
rl \i\\ |
;\ \ \
PEBMIT NUMBER OF PROJECT
\ \. .*. d+. _iT|
DATE \-t .) ir,'.-, JOB NAME
t
PE CTION
TOWN OF
REQUEST
VAIL
tNs
INSPECTION:MON
CR""\
6[i]THUR FRI AM ('il'',READY FOR
LOGATION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr FOUNDATION / STEEL tr
tr
tr
tr
E]
tr
tr
ROUGH / D.W.V.
ROUGH / WATER
tr FOUNDATION / STEEL
,r \1 t\^\
ft rnnutttc lr \',\tl t t
\ _^^_ - _
E
tr
tr
ROOF & SHEER
PLYWOOD NAILING GAS PIPING
INSULATION
SHEETROCK
POOL / H. TUB
NAIL
tr
tr FINAL FINAL
ELECTRIGAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
-tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FI}IAL tr FINAL
:.1 ( ,' '.2
U UISAPPROVED NSPECTION REQUIRED
CORRECTIONS:
.z'4r*<(
-1-+:- r2.
,r---A'f
i
- /-/-"t "-z .1'a
rNsPECrOqa,
PERMIT NUMBER OF PROJECT
I
INSPECTION REQUEST
TOWN VAIL
L- r-!2
L-") € --..1
WED THUR
oor= i i, '-f t I
INSPECTION:
JOB NAME
MON
CALLER
4ues;'-_.-.
FRI AMREADY FOR
LOCATION:
BUILDINGT
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
ptEnutruc tr BOUGH / WATER
- ROOF & SHEER
" PLvwooD NAILING tr
tr
tr
tr
tr
GAS PIPING
ry TNSULATTON
tr SHEETROCK
POOL / H. TUB
NAIL
tr
tr FINAL FINAL
ELEGTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
trtr FINAL FINAL
,/')rt
PROVED tr DISAPPROVED tr REINSPECTION REQUIRED
GORBECTIONS:
INSPECTO
t
INSPECTION
TOWN OF
REOUEST
VAIL
DATE
READY FOR
LOCATION:
JOB NAM
rNSpEcroN: /il6i) rues wED rHUB FRI PMAM
|
-
rrt
RMIT NUMBER OF PFOJECT
BUILDING:
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
FRAMING
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION
SHEETROCK
tr POOL/ H. TUB
ELECTRICAL:
N TEMP. POWER
tr CONDUIT
- tr SUPPLY AIR
tr FINAL
APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
INSPECTOR
INSPECTION
TOWN OF VAIL
REOUEST
READY FOR
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr
tr
tr
tr
tr
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATERtr FRAMING
-n ROOF & SHEER- PLYWOOD NAILING GAS PIPING -
F TNSULATON
\sHeernocx
tr'\,
POOL / H. TUB
NAIL tr
tr
tr FINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
FML tr FINAL
ED tr DISAPPROVED tr REINSPECTION BEQUIRED
CORRECTIONS:
DATE
- 'i .o.z -.-,2;:1:i;-1-
INSPECTOB :,
peRMrr Nut'aaEn or pnotEci INSPECTIONTOWN OF
REQUEST
VAIL ., ,'.i |t
,ATL .''l -*r*''r^ h{
READY F R TNSPEC||ON:
LOCATION:
JOB NAME
CALLER
ON TUES WED trun @ AM ,@
! nennoveD ct+' '7
CORRECTIONS:
tr DISAPPBOVED tr REINSPECTION REOUIBED
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
n ROOF & SHEER- PLYWOOD NAILING
tr INSULATION tr POOL/ H. TUB
EETROCK NAI
ELECTRIGAL:
tr TEMP. POWER tr HEATING
tr EXHAUST HOODS
tr tr SUPPLY AIR
INSPECTIONTOWN OF
REQUEST
VAILPROJECT\r,NAME I ,{JOB
CALLER
READY FOR
LOCATION:
-------@"
PEBMIT NU
E!J!'DJSJu--'
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr
tr
tr
tr
u
tr
Tl
UNDERGROUND
ROUGH / D.W.V.
BOUGH / WATER
GAS PIPING
tr INSULATION
tr SHEETBOCK
tr
POOL / H. TUB
NAIL
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr
tr
CONDUIT trSU
-h=
PPLY AIR
O FINAL
IJ
tr FINAL
q tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
INSPECTION REQUEST
ruES (yil,, rHUR
PERMIT N
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON
UM
3
FRI
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W,V.
N F|NI IGIJ / WATFFI
tr FOUNDATION i STEELt.-*r
N trRA]\'ING )<:_*_'-
n ROOF & SHEER" PLYWOOD NAILING tr
tr
tr
n
GAS
POOL
PIPING
Drrnrsur-nrlor.r
ffieraocrc
tr'
/ H. TUB
NAIL
tr FINAL tr FINAL -
ELECTRICAL:MEGHANICAL:
tr
tr
tr
tr
TEMP. POWEB tr HEATING,
ROUGH tr EXHAUST HOODS
CONDUIT tr
tr
SUPPLY AIR
grlfot tr FINAL/'i
ED tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
I
INSPECTION
TOWN OF
REQUEST
VAIL
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON ruES wED rHUR @ --€) pM
PERMtT NUMBER or pRo.leci
BUILDING:
tr FOOTINGS / STEEL tr UNDERGBOUND
-
tr FOUNDATION / STEEL tr ROUGH / D.W.V.
-
tr ROUGH/WATER
n ROOF & SHEER
"_r1;1Alg.eD NA;L;NG tr cAS ptptNc
tr POOL / H. TUB
tr FINAL
tr TEMP. POWER tr HEATING -
tr EXHAUST HOODS
tr SUPPLY AIR
-
tr DISAPPROVED tr REINSPECTION REQUIRED
GORRECTIONS:
o.-.\\ \
PERMIT NUMBER OF PROJECT
l.
INSPECTION REQUEST
TOWN OF VAIL I
\
THUR FRI
CALLER
READY FOB
LOCATION:
TION:MON WED PM
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
,_ ROOF & SHEER" PLYWooD NAILING tr GAS PIPING
tr INSULATION tr POOL i H, TUB
F SHEETBOCK NA|L tr_
tr tr
tr FINAL tr FINAL
ELECTRIGAL:
tr TEMP. POWER
MECHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FINALI tr FINAL
t _,1,PAPPROVED
]ORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
INSPECTO
PERMIT NUMBER OF PBOJECT
oere j'' t *\' 'ff ,toa NAME
INSPECTION:MON
o
PE
!
REQUEST
VAIL .a
INS CTION
TOWN OF
.ALLER - '..17
TUES ,WED, THUR FRIREADY FOR
LOCATION:
fi'Aeenoveo
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION BEQUIRED
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEE-
tr UNDERGBOUND
tr ROUGH / D.W.V.
tr ROUGH / WATERtr FRAMING
n ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL tr
tr
tr FINAL
tr
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
foRoucn tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
tr FINAL tr FINAL
DATE INSPECTOR
PERMIT NUMBER OF PROJECT
D^rE /t //[ ly NAME
READY FOR
LOCATION:
INSPECTION: MON
-!-
-trNSPEg:rlON_ REQUEST
T) t: OWN oF VAIL
l y'*.(t -i-. t-
<'-/L
TUES @ THUR
7ljcy'-
FRI PM
:i '( TL'. r tl-
BUILDING:
T] FOOTINGS / STEEL
PLUMBING:
E UNDERGROUND
tr ROUGH i D.W,V.tr FOUNDATION i STEEL
tr FRAMING tr ROUGH / WATER
n ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
{sueernocr NAIL tr
trtr
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
E CONDUIT tr SUPPLY AIR
tr
E/frNrnL FINAL
\PPROVED
RRECTIONS:
tr DISAPPROVED N REINSPECTION REOUIRED
f?/n9
JECT
DATE
READY FOR INSPECTIO
LOCATION:
JOB NAME
INSPECTION REQUEST
THUR @ AM@TUES WED
ROFPR
BUILDING:
tr FOOTINGS / STEEL tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
E FOUNDATION / STEEL
tr FRAMING
n 1995^&^sLFFl -tr GAS PIPINGPLYWOOD NAILING
N INSULATION D POOL / II. TUB
tr SHEETROCK NAIL
D FINAL tr FINAL
ELECTRICAL:
T] TEMP. POWER tr HEATING
tr ROUGH
tr CONDUIT tr SUPPLY AIR
tr DISAPPROVED tr REINSPECTION REQUIRED
oo'r, 8-(2 -yD rNSpEcroR
PERMIT NUMBER OF PHOJECT INSECTION REQUEST
TOWN OF VAIL
ruEs @ ."u*
JOB NAME
MON
CALLER
FBIREADY FOR
LOCATION:
INSPECTION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
N UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH /WATERtr FRAMING
n ROOF & SHEER- PLYWOOD NAILING N GAS PIPING
tr INSULATION tr POOL / H. TUB
O SHEETROCK NAIL E
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
D HEATING
tr ROUGH tr EXHAUST HOODS
O CONDUIT tr SUPPLY AIR
L-l
E FINAL
APPROVED -4 EI DISAPPROVED tr BEINSPECTION REQUIRED
CORRECTIONS:
oo'. 7- /*- F), rNSpE
REQUEST
VAII-
NAMEDATE
READY FOR
LOCATION:
INSPECTION:@
CALLER
TUES @
rn
t^o *t '.'t/
tr DISAPPRO
\gT l-t*.. t ncrJ
tr REINSPECTION REQUIRED
COBRECTIONS:
FINAL INSPECTION'S COMPLETED
The belov items need to be complete beforegiving a permit a final C of 0.
Please check off in the box provided.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL BUILDING
DATT:
CERTIFICATE OF OCCUPANCY
TEMPORARY C of O
DATE:
oz
t
=E
IIJo-
!{.ir F .ir
crt
*
U>
uJ
IJJ
TL
E
=Ir
uJ
o-
r\\$s\I6' @lcO1 cOlcht ch'ir Fil
; . LIJ
c'{l-u olEN< c'lr Olo
Ht r"l'
A{r Oil<r <l
lr4
I 'trZt ,9
ir_, ?tF
Erf . FrE
EtE dr=
alg ui3*ro Hl =-r= -, Z
a,
llJF
z
z
J-
od
=z
h
F
F
{a.a
.l(
tr
uJz
3
UJ'r
F
oz
3
d,.t
,$g
419t
#
dUi
e(/
,e
6
FI
z
Ff
q)
q)
.c
I
a!
=o-
(s
c
3
F
oq)
E$
.s
0)
c(6
o)
o)
;
=gl
E
=l;
o)
=.q
o
3gt$96F;
=.eR€*rEeF=!ci -_.: o€ 6P:Ac-o>
eT
=E- 6.0;;E!pc96E
E sE
='EEiRI!Eo* o O?iEo=':ePP
Elseo-o o--sEieoiEorE q)-.9*E EpP6 (! 6E: s E
or oE *
E6ES_o.:o
d o'-;E;'(JoEEi:3E =;gglE
o (0;;
Efi s;
e6eE
!u o- tD -eEg:
c.l
c{\o
c\
o\
E
=Eu,o-
(9z
5
TD
-
UJT()z
J
9
F
IJJ
uJ
('z
co
=Jo-
J
z
I
<)
trJ
=
ujtll
z
Eul
llJ(r
=g
uJ
z
6
IJJo
trq,oc
uJo
o-
z
uJ
x
llJo
ob
uJtut!
==E
uJ
o-
FoF
z
f
J
EF
uJ
ul
z
=
J
()
z
()
uJ
=
Fl
H
E{
NO|lVnlVA
E
F2
2F
z
F
Fuz
J
=zzvI oo
F^62
= R =;FYanaoi2>()oo9?'<)zX
t! <f9q iH6-e.-R 2
H (\l (,
N
a\l
=>E z
az
X
H
Fl
Fl
zs
F
J
l!
4
UJo-
\'
cn
E.
o-
llJ
j
z
Eoo
XE5zo
e
llJ
=UJz
(!)
=zlz9. e.
<Oo<
=fi:(ER'6o<z
=z.
9z
no3tr
luf)J
cc
L!z
iF
ut
F
z
F
5oz
\I
--.1q
'i
:
51
{JI'-sLl!l-l
zt/
'rl
l
I
;l
o
IJJ
UJ
uJz
oF
Eul
zI
=oo
z
tr
J
NlltlI t(Elol{tStdl'''
l*-,Itog
cr)
I
,Y)
r--sl
cf)
O
4,ri
UJ
'/.'>a'11
Ar,&
ulF
.t)
(Do-)zo
Fo-
trtY
uJdl
oF
tr
trcoTRb1
CJ
l,\ F{;<H\,, 04rqguJ
:^F\Jz6
ts
=E
IJJ
o-zoF(J
:)
E,F(nzoo
a
sl
q
$
(9
z.
=LL
I
IJ
6
Fl
E
vl
ts
z
i,i
=z
-)
.-\
F{vltrl&
Hv,
-l
u.{E
z
in
FI
H
N
an
ule.oo
Ja
F
ln
I\o
F1H
E
E
tr
\t).
o
N
U>tu
I
E
c{
I
-c
FJH
=
v
HH
F
cnz
z
Hz€!
=tr
Fq
I
oz
o
IJJ
o
z
E
9lr-1
U't
(\
I
r\.$
u
E
H
F
Flftl
E-r
=tr
I
o
=u
T
|.l-o
z3I
I
oo
c1(n
u
I
F
zH
E
tsJ
F.l
Flj
Fl
3
tr
Io
:
J
IJJ
:
a>l
t!l
ol
zl
3ipl
r-l
F\|.\
l.-
I
.iI
uiJ
IJJF
(-5zH
E
d
FJFl
F-lH
E
d
I
I
z
rultrl
JI
<l>l
lLlol
zl
3lolFI
f\
f\
f\
I
=ttr
o
(,
UJI
<l>l
I
FI
lllJ
UJ
UIz
=o
O
l,rJ
=t()
E,
-rO<F(tsOuJ<zE
I.IJ FrnZ ul
ul
Y
.'
,
9o1t-
=#1) a-r!o
O
<^
:JF7<)-<
iz
=o-o
tr
Eirg
Oz
J<Oau>||r LU
=o
z
oPzeoo
=z
d8
E!D
"3{ZEft
35*
=Hg-}<__IHI|4I IHX!
=
ut4
Lr-oEU
E5€8B9!ir
'EI
=>E dEE b=o o-- EE >.LE UB
9 \utE XO-t x>t q-
q'-i!tr
UJ
F
-F
lIJ c)J'eco +r<.sL)qr< aqJFo-oo-x<(u
L!(nFr Ctvc
.3c .ttalr,/|E
G'
!c,E-l
EtrI
e .rl
!g-l
L(,
OP.POJ
.{JA4oJ C\t
FI (\J
I
I
olol
8lol
r\||
Nl
l"
I
oo
$
l*
I
I
"]ol.t
olol
I
X
l^
I
I
I
J
o
\I
N
an
uJ
UJu-
==
UJ
Ir
IJ
l"
lfl{lrd('\4gd
rl
:l
F
F2
=
ozz
xX
E;*5'=o(a;{o
[EE-"9
c.oo9€
€PE5*s1EsI
Ecb;d
:frE55-t.= il-; >= Y'c9oEP'- o.E -=i xE E';
tEals--€ sEg
eqseE3i: q ba.;: {a=-ov.!): o-!o!Ecoc
= *e€Ix(/,'"oogP 5 3oo.-; t P
EE Fg=- ats 9;
e€is€
a) ?;EJ
3 s:Fatr-=->
E$E:i
eE-: q s
eSggx
o
L.
\
0"1
to
t
\("
ri a'\{\i
Jt,
d
VT
N I
I
$N
F
ulooz
J
l
xo
I(Jz
J
E
llJ
llJ
oz
=lJ
2
()ttl
=
tu
UJll-z
tr
IJJ
UJ
=a!
UJ
z
qJ
Fa
ltl
z
u,
()
x
tuo
i
(n
UJ
UJu-
Frg
urlo-l
JIsl
-lol*l
o
:
=f,
J
o
o(F()
UJ
tr
z
=
J
2
(J
uJ
=
J
F
F
NOrlVnlvA
B
9fr'
3o
6a
Efi2
FEI
ll
IUT\
|::E
l\lri El\l - ttl-- - Ol= - vl=a:I\J
I
Ilz z.to o
l< f,EP Oga
89u-<
v=g'g
FO;ni
lhlr
fl:
:r<
I,9
TI
1rPlvl
q
z
tr
{l+tcl(rl
.lllOIEI
"l
:l
t
$
N
(L
ll
lo
IEol
4
Xzlol
EI
rrJ IFIJIol
^il
;tl
vtl
2
JIslFI
zl
zl
>l
ct
UI
ul
UJzo
F
uJ
J
zo
tr
o
z
f
z
G}
t
I
q
*,
$
N
I
L
I
I
d
z
JF
J
)
c
?
Pi
-{ltl
FI
7l
$t
EI<lzl
tDl
-)l
I
)
tfl2l
>-lFIol
(,)
a
*i
io
\9Iql
J
C[)
F
c)I
o
s
sr
+l
$
ol ozl t/|
Fl $
f,$zl
B|HFIF
oU
t:
{
€l
alg
e
c..l
=l
nt
p
J
f
Nfl
IJJ
UJF
z3
F
I
I
I
I
I
af
5t q
sl r;l fol(r
3l ,lol trHF
I
I
Iql
,il
1
z.l
('l
uJl
:l
<l>l
ttl
zl
EI
I
I
Il.
ctl t/4zl a.lt{rEl -
:t c"
ils
;t Iol uJFt l-i
I
.l
$l
sl
cgl,1
t^Jlal
EI
rpl
=ltrItrl
t.ljz3o
FoIu
=:E()
-.l o<Fc(()uJ<zE
(1 Zoo
6P;C)i<
fr? f_,2tro()
eoz,*;o
=#!z
C)
*6
=F-7()<t
i. z.
=g
e. irg4J<c)ou)TJJ UJ
JO
.- \--tX,XX><><"Sz
.. lrlFJHcoE<EL)lrl r<o-J
z
ar9z?
coo>z
a.,P
Nntr
.^i5zYz;*S
--..:uJco trj =
6aE<rE
l.tq4r#b
Es q
F^<)ax I;-6i tJ O*=F-FE
=- ai=: -E=H =od!{;;sg g
I .o u-E-o o
Ep< r lUlu-x o-E :>3Hq *g<=
" r.r.l tr
=l|'T5
*F*+
Ltoz.<
JLl.
1l- !
otrlJ- V,
orE
IJoo
z.a(J
anFTE
c5!z.\-
=LooJ.P
Oo]J- J
t!
F-r
UJ
tsU'dlo-)zo
F
uJY
uJdl
oF
I.IJF
ox
F
EGlll
-.q-l!'o
oo
I
UJFoz
ltlH.iE l:Is f ;.\lll t-
o-zo
l-()f,EFazo(J
/,G\(cDE\zrj=
-E[}D
f,o,U.
boyle engneeflng. irc
143 e meocJo,'v cf surle n 10
crcssroods sf{)pprr€ cente{
r,/tcrl. colcrocio 81657
3O3/476_2170
4**4 xl*\br lrVz "L ae,4 Ex6rq/r,o
b rb* 6/s / o*46**xr/s
lfit-4
EY,rtr/dl''f
ee*+,l
tlL-(tf.
,lhv
4&>q{ Fr i;T
t-ttLL U l-jprr1">.-
E+1trtitr.-t ft.,i
u$'MiFiu"rMAut4 t.-i
7\o' 14tX.
6fdFild q
Elrsfi ri di
CoLu I't fl
_ ,.1 _--*--- -' -',tt
..-"-- 4 aeF' E-'LE'VAfraN
/yr,"Qr 4" b,g ,J twtlstp
1\
(
7oq".sf'Wr€ fei-_--",Req'u
LXI}T? H.;Felil
Heil 4
L- ;t*\rA T-l <-' t'{
&" #u?F
llAvt-
SgcTTol""l
ft* fl-.e;tlAflc'ri
/hi
3?:]' o
INSPECTION REQUEST
TOWN OF VAILPERMIT NUMBER OF PROJECT
DATE
READY FOR INSPECTION:
CALLER
ro* (r@ WED THUR FRI
JOB NAME
LOCATION:
TOWN OF
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr FOUNDATION / STEEL 4rRouGH i D.w.v.
TFRAMtNG
/ or"r'..c o c
'pnoucrl/ wATEB
L/
OK
; ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL / H. TUB
NAIL D
tr tr
trtr FINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
96o'tr FINAL
)IOVED
CTIONS:
T] DISAPPROVED tr REINSPECTION REQUIRED
3 zl3
PERMIT NUMBE
./
DATE
I
JO NAME
t,I/Vtr
l
INSPE
IJ
CTION
TOWN OF
REQUEST
VAIL
CALLER
READY FOR
LOCATION:
INSPECTION:MON TUES WED THUR ,E\_-/
AM@
F
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D,W.V.tr FOUNDATION / STEEL
tr FRAMING tr
tr
tr
tr
o
ROUGH / WATER
,r ROOF & SHEER" PLYwooD.NAILING GAS PIPING
tr INSULATION POOL / H. TUB
tr SHEETROCK NAIL
tr
tr FINAL -FINAL
ELEGTRICAL:
'#+E+d.*trtltR
MECHANICAL:
tr HEATING
p/noueH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
trtr FINAL FINAL
tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
INSPECTOR
uoISsdsNl
csHrnosu NO|ICSdSNI ofAo
:sNorrcSuHoc
oSAOHddV tr
JnoNoc tr
soooH rsnvHx3 tr
-ilvN ycoHrs3Hsj(
sn|H /'tood tr NorrvrnsNt tr
9Nrdrd sv9 tr 0NntvN oooM^td
HflHs t looH
HfIVM / HENOU tr
'A'M'O / Henou tr
oNnoHgH3oNn tr
:cNtgnn'td
-l3fls / NO|IVONnOI tr
"rf3ls / se Nuooj tr
:cNtoltns
tld :NOll-C3dSNl
:NOttvco-l
uor Acv3UlHlunHr otM sSnl-
ul'rlvc:''))'''''''.:\...'
IIVA JO NMOIrs3nosu Notrc
'NOhl--)\:=--r'-
3tlVN €Ol'\ \'\-\- -\ '...
''.
NI
I- srVO
!tdso
IC3fOUd JO U3S14nN I|l lu3d
, r,,r tJ.I
-
I.a!r(.r -- /)
PEBMIT NUMBER OF PRP
!''( ll
DArE s'/7ll{Y
INSPECTION
". -"-.-'n' TOWN OF
,Lr (,{ ,' ,
REQUEST
VAILJECT
JOB NAME
READY FOR INSPECTION:MON
LOCATION:
r Jt).1| ) \'.',
CALLER
THUR FRI
,-12 4"J
iAM,t pMruES {i,
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr BOUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
n BOOF & SHEER" PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr HEATING
tr EXHAUST HOODS
-tr SUPPLY AIR
APPROVED
RRECTIONS:
tr DISAPPROVED tr REINSPECTION BEQUIRED
-/; ,/ --'INSPECTOR
I
SPEIN CTION
TOWN OF
REQUEST
VAILPERMIT NUMBER OF PROJECT
DATE
INSPECTION:
JOB NAME
CALLER
MON TUESREADY FOF
t
LOCATION:l
BUILDING:
tr FOOTINGS / STEEL tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATEB
tr FOUNDATION / STEEL
n ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL / H, TUB
tr EXHAUST HOODS
tr CONDUTT . tr SUPPLY AIR
tr DISAPPROVED tr REINSPECTION REQUIRED
A-.C*t\lt\l*T-'
FINAL INSPECTION'S COMPLETED
The below items need to be complete beforegiving a permit a final C of 0.
Please check off in the box provided.
FINAL PLUMBING
FINAL MECHANICAL
DATE:
FINAL ELECTRICAL
DATE :
T FINAL BUILDING
CERTIFICATE OF OCCUPANCY
TEMP0RARY C of 0
DATE: