HomeMy WebLinkAboutB12-0309 REV 14 PLANS approvedBy David Rhoades at 4:29 pm, Jan 02, 2013
Reviewed for Code Compliance
Code: 2009 International Building Code (IBC)
By Martin Haeberle at 3:22 pm, Jan 07, 2013
Reviewed for Code Compliance
Code: 2009 International Building Code (IBC)
By Martin Haeberle at 3:22 pm, Jan 07, 2013
PROJECT: VAIL FIRE STATION #2 ENGINEER:CTL
PROJECT #: 12017 VOLTAGE:120/208V, 3P, 4W
MOUNTING: RECESSED MAINS:100A MLO
TYPE: AIC:10K
PHASE PHASE
DESCRIPTION A B CBKR PCIRCIR P BKR A B CDESCRIPTION
LIVING ROOM OUTLETS1080 20112120500 LIGHTING
LIVING ROOM OUTLETS 1080 20134120 500 LIGHTING
BED OUTLETS 90020156120 500LIGHTING
BATH OUTLETS230 20178120500 LIGHTING
KITCHEN OUTLETS 900 201910120 500 LIGHTING
KITCHEN OUTLETS 90020111120 0SPACE
FRIDGE1500 20113141201500 WASHER
MW 1500 2011516230 2500 DRYER
DW 15002011718 2500"
DISP1500 20119200 SPACE
OVEN/RANGE 0 4022122 0 SPACE
" 02324 0SPACE
SPACE0 25260 SPACE
SPACE 0 2728 0 SPACE
SPACE 02930 0SPACE
0 0
0 0
0 0
0 0
0 0
0 0
LOAD CALCULATION SUMMARY
CALCULATED POWER FACTOR:
0.99
CONNECTED LOAD CONNECTED AMPS DEMAND LOAD DEMAND AMPS
LIGHTING850024850024
RECEPTACLES504014504014
MECHANICAL1550519256
KITCHEN1380038897025
TOTAL28890812443569
EHU A PANEL
PROJECT: FIRE STATION #2 ENGINEER:CTL
PROJECT #: 12017 VOLTAGE:120/208V, 3P, 4W
MOUNTING: SURFACE MAINS:100A MLO
TYPE: AIC:10K
PHASE PHASE
DESCRIPTION A B CBKR PCIRCIR P BKR A B CDESCRIPTION
LIVING ROOM OUTLETS1080 20112120500 LIGHTING
LIVING ROOM OUTLETS 1080 20134120 500 LIGHTING
BED OUTLETS 90020156 0SPACE
BATH OUTLETS230 201780 SPACE
KITCHEN OUTLETS 900 201910240 4400 OVEN/RANGE
KITCHEN OUTLETS 90020111120 4400"
FRIDGE1500 20113141201500 WASHER
MW 1500 2011516230 2500 DRYER
DW 15002011718 2500"
DISP1500 20119200 SPACE
SPACE 0 2122 0 SPACE
BED OUTLETS 9002012324 0SPACE
BATH OUTLETS230 20125260 SPACE
SPACE 0 2728 0 SPACE
SPACE 02930 0SPACE
0 0
0 0
0 0
0 0
0 0
0 0
LOAD CALCULATION SUMMARY
CALCULATED POWER FACTOR:
0.99
CONNECTED LOAD CONNECTED AMPS DEMAND LOAD DEMAND AMPS
LIGHTING1000310003
RECEPTACLES612017612017
MECHANICAL1600519756
KITCHEN19800551287036
TOTAL28520802196562
EHU B PANEL
PROJECT: FIRE STATION #2 ENGINEER:CTL
PROJECT #: 12017 VOLTAGE:120/208V, 3P, 4W
MOUNTING: SURFACE MAINS:200A MLO
TYPE: AIC:10K
PHASE PHASE
DESCRIPTION A B CBKR PCIRCIR P BKR A B CDESCRIPTION
KITCHEN OUTLETS900 201121201000 LIVING /DININGLIGHTING
KITCHEN OUTLETS 900 20134120 1000 KITCHEN LIGHTING
KITCHEN OUTLETS 90020156120 1000MECH RM LIGHTING
FRIDGE1500 201780 SPACE
FRIDGE 1500 201910 0 SPACE
MW 15002011112 0SPACE
DW1500 20113140 SPACE
DISPOSAL 1500 2011516 0 SPACE
OVEN/RANGE 50002011718 0SPACE
DORM LIVING RM OUTLETS540 20119200 SPACE
DORM LIVING RM OUTLETS 540 2012122 0 SPACE
DORM LIVING RM TV 15002012324 0SPACE
DINING RM OUTLETS540 20125260 SPACE
SPACE 0 2728 0 SPACE
SPACE 02930120 1200WASHER
SPACE0 31322302200 DRYER
SPACE 0 3334 2200 "
SPACE 03536 0SPACE
SPACE0 37380 SPACE
SPACE 0 3940 0 SPACE
SPACE 04142 0SPACE
LOAD CALCULATION SUMMARY
CALCULATED POWER FACTOR:PROVIDE FEED THRU LUGS TO DORM B PANEL. LOADS FROM DORM B PANEL ARE SHOWN BELOW.
0.99
CONNECTED LOAD CONNECTED AMPS DEMAND LOAD DEMAND AMPS
LIGHTING450012450012
RECEPTACLES13020361151032
MECHANICAL1300416005
KITCHEN16900471098530
TOTAL357201002859580
DORM A PANEL
PROJECT: FIRE STATION #2 ENGINEER:CTL
PROJECT #: 12017 VOLTAGE:120/208V, 3P, 4W
MOUNTING: SURFACE MAINS:100A MLO
TYPE: AIC:10K
PHASE PHASE
DESCRIPTION A B CBKR PCIRCIR P BKR A B CDESCRIPTION
BEDROOM OUTLETS1080 20112120500 HALL/UTILITY LIGHTING
BEDROOM OUTLETS 1080 20134120 500 DORM LIGHTING
BEDROOM OUTLETS 108020156120 500DORM LIGHTING
BEDROOM OUTLETS1080 201780 SPACE
HALL OUTLETS 1080 201910 0 SPACE
UTILITY RM OUTLETS 10802011112 0SPACE
BATH OUTLETS410 20113140 SPACE
BATH OUTLETS 410 2011516 0 SPACE
SPACE 01718 0SPACE
SPACE0 19200 SPACE
SPACE 0 2122 0 SPACE
SPACE 02324 0SPACE
SPACE0 25260 SPACE
SPACE 0 2728 0 SPACE
SPACE 02930 0SPACE
SPACE0 31320 SPACE
SPACE 0 3334 0 SPACE
SPACE 03536 0SPACE
SPACE0 37380 SPACE
SPACE 0 3940 0 SPACE
SPACE 04142 0SPACE
LOAD CALCULATION SUMMARY
CALCULATED POWER FACTOR:PROVIDE FEED THRU LUGS TO DORM A PANEL. LOADS FROM THIS PANEL ARE SHOWN ON DORM A PANEL
1.00
CONNECTED LOAD CONNECTED AMPS DEMAND LOAD DEMAND AMPS
LIGHTING1500415004
RECEPTACLES720020720020
MECHANICAL1000112.50
KITCHEN0000
TOTAL880024881324
DORM B PANEL
PROJECT: FIRE STATION #2 ENGINEER:CTL
PROJECT #: 12017 VOLTAGE:120/208V, 3P, 4W
MOUNTING: SURFACE MAINS:200A MLO
TYPE: AIC:10K
PHASE PHASE
DESCRIPTION A B CBKR PCIRCIR P BKR A B CDESCRIPTION
MENS PUBLIC BATH430 20112120352 EXTERIOR LIGHTING
WOMENS PUBLIC BATH 430 20134120 256 ENTRY STAIR LIGHTING
HALL OUTLETS 120020156120 584OFFICE/HALL LIGHTING
OFFICE OUTLETS1500 20178120500 WEST STAIR LIGHTING
OFFICE OUTLETS 1500 201910120 1280 GARAGE LIGHTING
OFFICE OUTLETS 15002011112120 320GARAGE LIGHTING
GARAGE OUTLETS1080 2011314120305 BATH LIGHTING/POWER
GARAGE OUTLETS 1080 2011516120 0 FLAG LIGHTING (FUTURE)
GARAGE OUTLETS 10802011718120 1800HAND DRYER
GARAGE DOOR1200 20119201201800 HAND DRYER
GARAGE DOOR 1200 2012122120 720 OFFICE OUTLETS
GARAGE DOOR 12002012324120 320MEZZANINE LIGHTING
ENGINE BLOCK HEATERS1800 20125260 SPACE
EXTERIOR OUTLETS 720 2012728 0 SPACE
HOLIDAY LIGHTING 10002012930 0SPACE
SPACE0 31320 SPACE
SPACE 0 3334 0 SPACE
SPACE 03536 0SPACE
SPACE0 37380 SPACE
INFORMATION KIOSK 1500 2013940 0 SPACE
LV TRANSFORMER 5002014142 0SPACE
LOAD CALCULATION SUMMARY
CALCULATED POWER FACTOR:PROVIDE FEED THROUGH LUGS FOR CONNECTION TO FUTURE GARAGE B PANEL
0.95
CONNECTED LOAD CONNECTED AMPS DEMAND LOAD DEMAND AMPS
LIGHTING498714498714
RECEPTACLES14720411236034
MECHANICAL745024790026
KITCHEN0000
TOTAL27157792524774
GARAGE A PANEL
PROJECT: FIRE STATION #2 ENGINEER:CTL
PROJECT #: 12017 VOLTAGE:120/208V, 3P, 4W
MOUNTING: SURFACE MAINS:200A MLO
TYPE: AIC:10K
PHASE PHASE
DESCRIPTION A B CBKR PCIRCIR P BKR A B CDESCRIPTION
SPACE0 120 SPACE
SPACE 0 34 0 SPACE
SPACE 056 0SPACE
SPACE0 780 SPACE
SPACE 0 910 0 SPACE
SPACE 01112 0SPACE
SPACE0 13140 SPACE
SPACE 0 1516 0 SPACE
SPACE 01718 0SPACE
SPACE0 19200 SPACE
SPACE 0 2122 0 SPACE
SPACE 02324 0SPACE
SPACE0 25260 SPACE
SPACE 0 2728 0 SPACE
SPACE 02930 0SPACE
SPACE0 31320 SPACE
SPACE 0 3334 0 SPACE
SPACE 03536 0SPACE
SPACE0 37380 SPACE
SPACE 0 3940 0 SPACE
SPACE 04142 0SPACE
LOAD CALCULATION SUMMARY
CALCULATED POWER FACTOR:PROVIDE FEED THROUGH LUGS FOR CONNECTION TO FUTURE GARAGE B PANEL
#DIV/0!
CONNECTED LOAD CONNECTED AMPS DEMAND LOAD DEMAND AMPS
LIGHTING0000
RECEPTACLES0000
MECHANICAL0000
KITCHEN0000
TOTAL0000
GARAGE B PANEL (FUTURE)
AFCI required
per Article
210.12 NEC
Reviewed for Code Compliance
Code: 2009 International Building Code (IBC)
By Martin Haeberle at 3:22 pm, Jan 07, 2013
Reviewed for Code Compliance
Code: 2009 International Building Code (IBC)
By Martin Haeberle at 3:22 pm, Jan 07, 2013