HomeMy WebLinkAboutWinston Townhouse District PowerPoint 2Vail - Townhouse Zone District 1 Direction so far Form a strong, irregular street wall primarily of 2 stories Upper floors should step back sufficiently to give pedestrians a perception of a 2 story building Harmonize with adjacent lots and neighborhood character. Simplify zoning and property development limits (no more 250s) Keep redevelopment constant with context and master plan framework “One additional floor over existing” “3-4 floors at 9’ floor-to-floor” (27’-36’) Shift towards the Vail Village design guidelines Encourage (force) verity of design 2 How we got here 3 Height Limits 4 Build-out Test 1.35 FAR & 40’ 5 Build-out Test ~1.35 FAR & 40’ 6 Build-out Test ~1.35 FAR & 40’ 7 Townhouse Zone District Maximum building height = 40’ Front/Rear Setback = 20’ Not setback along adjoining lots 8 Townhouse Zone District The building is divided into zones. Each zone is stacked one on top of the other. The zone *height is a flexible distance decided by the development team. Measured from the historic or interpolated grade. *floor-to-floor <= x <= 11’ 9 Height - follow terrain 10 Zone 1 Min 60% bldg face built within 20'-28' of street side property line. 11 Zone 2 Min 60% bldg face built within 20'-28' of street side property line. 12 Zone 3 Min 60% bldg face built with 10' or greater setback from the Zone 2 surface. 13 Zone 4 All faces built with 10' or greater setback from the Zone 2 surface. 14 Zones Zone 1 – Min 60% bldg face built within 20'-28' of street side property line. Zone 2 – Min 60% bldg face built within 20'-28' of street side property line. Zone 3 Zone 2 Zone 1 Zone 4 Zone 3 – Min 60% bldg face built with 10' or greater setback from the Zone 2 surface. Zone 4 – All faces built with 10' or greater setback from the Zone 2 surface. 15 Zones – how NOT to measure Zones – how to measure 16 Zones – measured in elevation Zone 3 Zone 2 Zone 1 Zone 4 17 FAR of Dimensional Build-out 18 Volume vs FAR 19 Existing vs 60/40 Box 20 Existing vs 60/40 Box 21 Existing vs 60/40 Box 22 Existing vs 60/40 Box 23 Existing vs 60/40 Box 24 Existing vs 60/40 Box 25 Existing vs 60/40 Box 26 Roof Standards - Pitch Primary Roof = 3:12 – 6:12 Other Roofs = 6:12 – 9:12 +? 27 Roof Types 28 Roof Types 29 Roof Types 30 Roof Types 31 Roof Types 32 Dimensional Standards - Recap Maximum building height = 40’ Front/Rear Setback = 20’ Not setback along adjoining lots 33 Harmony Dos & Don’ts 34 Dos & Don’ts Harmony 35 Dos & Don’ts Continues Façade 36 Continues Façade Dos & Don’ts 37 Dos & Don’ts Combined Lots / Continuous Rooflines 38 Combined Lots / Continuous Rooflines Dos & Don’ts 39 Dos & Don’ts Repetition 40 Repetition Dos & Don’ts 41 Dos & Don’ts Cantilever 42 Cantilever Dos & Don’ts 43 Dos & Don’ts Flat Roof 44 Flat Roof Dos & Don’ts 45 Dos & Don’ts Monolithic 46 Monolithic Dos & Don’ts 47 Screening – Good Examples 48 Screening – Poor Examples 49 Screening – Landscape Good 50 Screening – Landscape Bad 51 Screening – Landscape 52 Screening – Balconies Solid (or less than 60% transparent) balconies will be counted in the 60/40 analysis. 53 Recap… 40’ max building height (measured from grade) 20’ setback front/rear No setback side 60%-40% Setbacks (20’-28’, 20’-28’, 10’, 10’) Max cantilever depth 3’ and cannot be stacked Roofs All roof forms shall be sloped Dominant roof pitches shall be 3:12 to 6:12 Other roofs shall be 6:12 to 9:12 Rooflines shall not be continuous across multiple buildings Screening Landscape 7 ft height limit Lower 3.5 ft can be solid Upper 3.5 must have 60% or greater translucence Balcony railing must have 60% or greater translucence 54