Direction so far
Form a strong, irregular street wall primarily of 2 stories
Upper floors should step back sufficiently to give pedestrians a perception of a 2 story building
Harmonize with adjacent
lots and neighborhood character.
Simplify zoning and property development limits (no more 250s)
Keep redevelopment constant with context and master plan framework
“One additional floor
over existing”
“3-4 floors at 9’ floor-to-floor” (27’-36’)
Shift towards the Vail Village design guidelines
Encourage (force) verity of design
2
How we got here
3
Height Limits
4
Build-out Test1.35 FAR & 40’
5
Build-out Test~1.35 FAR & 40’
6
Build-out Test~1.35 FAR & 40’
7
Townhouse Zone District
Maximum building height = 40’
Front/Rear Setback = 20’
Not setback along adjoining lots
8
Townhouse Zone District
The building is divided into zones.
Each zone is stacked one on top of the other.
The zone *height is a flexible distance decided by the development team.
Measured from the historic
or interpolated grade.
*floor-to-floor <= x <= 11’
9
Height - follow terrain
10
Zone 1
Min 60% bldg face built within 20'-28' of street side property line.
11
Zone 2
Min 60% bldg face built within 20'-28' of street side property line.
12
Zone 3
Min 60% bldg face built with 10' or greater setback from the Zone 2 surface.
13
Zone 4
All faces built with 10' or greater setback from the Zone 2 surface.
14
Zones
Zone 1 – Min 60% bldg face built within 20'-28' of street side property line.
Zone 2 – Min 60% bldg face built within 20'-28' of street side property line.
Zone 3
Zone 2
Zone 1
Zone 4
Zone 3 – Min 60% bldg face built with 10' or greater setback from the Zone 2 surface.
Zone 4 – All faces built with 10' or greater setback from the Zone 2 surface.
15
Zones – how NOT to measure
Zones – how to measure
16
Zones – measured in elevation
Zone 3
Zone 2
Zone 1
Zone 4
17
FAR of Dimensional Build-out
18
Volume vs FAR
19
Existing vs 60/40 Box
20
Existing vs 60/40 Box
21
Existing vs 60/40 Box
22
Existing vs 60/40 Box
23
Existing vs 60/40 Box
24
Existing vs 60/40 Box
25
Existing vs 60/40 Box
26
Roof Standards - Pitch
Primary Roof = 3:12 – 6:12
Other Roofs = 6:12 – 9:12 +?
27
Roof Types
28
Roof Types
29
Roof Types
30
Roof Types
31
Roof Types
32
Dimensional Standards - Recap
Maximum building height = 40’
Front/Rear Setback = 20’
Not setback along adjoining lots
33
Harmony
Dos & Don’ts
34
Dos & Don’ts
Harmony
35
Dos & Don’ts
Continues Façade
36
Continues Façade
Dos & Don’ts
37
Dos & Don’ts
Combined Lots / Continuous Rooflines
38
Combined Lots / Continuous Rooflines
Dos & Don’ts
39
Dos & Don’ts
Repetition
40
Repetition
Dos & Don’ts
41
Dos & Don’ts
Cantilever
42
Cantilever
Dos & Don’ts
43
Dos & Don’ts
Flat Roof
44
Flat Roof
Dos & Don’ts
45
Dos & Don’ts
Monolithic
46
Monolithic
Dos & Don’ts
47
Screening – Good Examples
48
Screening – Poor Examples
49
Screening – LandscapeGood
50
Screening – LandscapeBad
51
Screening – Landscape
52
Screening – Balconies
Solid (or less than 60% transparent) balconies will be counted in the 60/40 analysis.
53
Recap…
40’ max building height (measured from grade)
20’ setback front/rear
No setback side
60%-40% Setbacks (20’-28’, 20’-28’, 10’, 10’)
Max cantilever depth 3’ and cannot be stacked
Roofs
All
roof forms shall be sloped
Dominant roof pitches shall be 3:12 to 6:12
Other roofs shall be 6:12 to 9:12
Rooflines shall not be continuous across multiple buildings
Screening Landscape
7
ft height limit
Lower 3.5 ft can be solid
Upper 3.5 must have 60% or greater translucence
Balcony railing must have 60% or greater translucence