ADD/ALT COMM BUILD PERMT Permit #: B09-0182
Project #: 5 - Ua
Job Address: 321 E LIONSHEAD CIR VAIL
Location......: DOBSON ICE ARENA
Parcel No....: 210106407005
R .oos iEtr F aG a, (3 oc. , tor 5
OWNER TOWN OF VAIL 07/29/2009
C/O FINANCE DEPT
75 S FRONTAGE RD
VAIL
CO 81657
APPLICANT ROOFMASTERS ROOFING & SHEET 07/29/2009 Phone: (785) 628-3614
PO BOX 664
HAYS
KANSAS 67601
License: 825-S
CONTRACTOR ROOFMASTERS ROOFING & SHEET 07/29/2009 Phone: (785) 628-3614
PO BOX 664
HAYS
KANSAS 67601
License: 825-S
Description:
DOBSON ICE ARENA: REPLACE ROOF, GUTTERS, AND SNOW GUARDS,
RFPAIR SKYLIGHTS
Occupancy:
Type Construction:
Status . . : ISSUED
Applied . . : 07l29/2009
Issued . .. : 08/04/2009
Expires . ..: 01/31/2010
Valuation: $565,000.00
Total Sq Ft Added: 0
x.,....x ..........................,........,,..........,,...... FEE SUMMARY ,.........,..........,....,....._,.....,...,..,,..,.,....,....,..............
Building Permit Fee------> $3,542.50 Will Cal Fee---------------------> $4.00 Total Calculated Fees-------------> $16,949.13
Plan Check--------------------> $2,302.63 Use Tax Fee---------------------> $11,100.00 Additional Fees-----------------------> 16,949.13)
Add'I Plan Check Hours-> $0.00 Restuarant Plan Review-----> $0.00 TOTAL PERMIT FEES--------------> $0.00
Investigation-----------------> $0.00 Recreation Fee-----------------> $0.00
Payments-------------------------------> $0.00
Total Calculated Fees--------> $16,949.13 BALANCE DUE------------------------> $0.00
x>=,....,......,.,.
DECLARATIONS
t hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION LL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 AM - 4:00 PM
CJ
Signature o wn ntractor , , D te
Print Name
b I d_a It_co n st ru ct i o n_p e rm it_041908
P
I
a*,, _ ,,.
4
M ,. m .
k
m
M
75'
f x " '
Ve
R
4d,r r.,... .,.-.1:v.,;: :',.',..
uni#y-pevelopment'
suth Frpntage Ro d,,.
d1 y G`Q:i 0Y8C p' i%`,;
E.' 9 '
C 1,.}24;.
vvvV r v at v dr
Separate permits are required for electrical, plumbing, mechanical, fireplace, etc.
ProjectStreetAddress: ' OfficeUse:
0
C)
Pro ect #:
b
3' 1 ,> »., 5, e.,1 C, «.1 -
Number) (Street) (Suite #) ' DRB #: i Q
Building/Complex Name: o sc; Z. /- re-. c. ' Building Permit #: _ '
g
a.,., ». „ ttm u,,, ._am., . ,. H.. , ,.,.,.. . ,., ., .,,,. ,,.,, ,. w:,.,:
Lot #: Block # Subdivision: v I L Z
Contractor Information:
Company:l u n,...5 {oo,',s t ',
CompanyAddress: 1t'( /"loccu i Da. DetailedDescriptionofWork:z 4 • zw};.
City: c.e ln i.tl2 State: O Zip: $1UC7 ti..,ob l . c cu . , •. r o l t
i
Contact Name: . 4 s --l-Aa tES t.,. : \..c:u s.v e
y
a4_
Contact Phone: `3R b°-7 57 ,r
L Q`^C (
e additional sheet if necessary)
E-Mail ' S d_ . ...r..,.,.a.,, .m „..w,,,..
Work Class:
Town of Va' Contractor R istration No.: .5 - S
p New Addition Remodel Re air Other
x,..,mm w ,......,,,h.,,.,...r...,<..W....,.,.,,.... ..,,,,,.....n
S Work Type
n actor Signa {required) Interior O Exterior (X) Both O
v,,.»,.,,.,,a. ._.,..x:,.... .,.,» ,...,,.,.,,.,...,, . _.
F„., .,,,::, . ,_,..,.,_.,.,.,w,.. ....,, . %.,x.:y,,,, _.,.,,,,m.w n
Property Information Type of Building:
Parcel #: a f { '- (6 - U C U - Single-Family ( ) Duplex ( ) Multi-Family ( )
For parcel #, contact Eagle County Assessors Office at 970-328-8640 or COmmercial () Othef O
visit www.eaglecounty.us/patie) ,,,,,_ __- __.___,:_.,._._ ____.__w._W._,._._.,_---_..___.
m____ ._.__.._ _..___ ._..._._.._...__. ......_.___._.,,._____..__....
Tenant Name: Vc..; i c,cc,;.,'., 1 'i ct Does a Fire Alarm Exist? Yes (X) No O
Owner Name: To--r u Vc..c Monitored Alarm? Yes () No ()
i Does a Sprinkler System Exist? Yes ( No ( )
Valuations (Labor 8 Material))
Building:
Plumbing:
Electrical:
Mechanical:
Total:
SS C i , °
o
ro, o0 0 . °`' _
S6s vov . '=
C `U l °"
Type of Existing Fireplaces: Gas Appliances
Gas Log Wood/Pellet Wood Burning
Type of Proposed Fireplaces: Gas Appliances
Gas Log Wood/Pellet Wood Burning _
Date Received:
UL 2 8 2009
TOWN CiF i AIL ,
8-Jun-09
1 1
1 riii
July 21, 2009
aiva or
Phone: (678)367-3151
Cell: (770) 301-5817
Toll Free: (877)346-5126
Mr. Scott O'Connell
Facilities Manager
700 South Frontage Rd E
Vail, CO 81657
Phone: 970 477 5264
Dear Mr. O'Connell:
690 Wood Valley Trace
Roswell, Georgia 30076-2672
P.E E
Fax: (866) 815-4682
salgranata@att.net
The following snow load calculations have been provided to address the questions you and the town of Vail
have regarding snow drifting and snow retention design on the Dobson Ice Arena. 1 have reviewed the plans
and revised the snow fence pattern based on information provided by The Garland Company, Inc. While
snow loads vary based on weather patterns and sun exposure, the snow loading is designed equally on both
sides of this roof for the worst case scenario. This worst case scenario is a combination of the balanced
snow load, sliding snow load from high roof to low roof, and leeward snow drifting loads. My attached
calculations address these and result in the snow fence pattern shown on the roof plan.
Thank you and please let me know if yo e any questions.
1
Salv,atore R. Granata, P.E., S.E.
of Va 1
ToWr
f p aFF
1
D
JUL 2 8 2009
9ji
TOVV i l °., m, _. ..'
oo EC,sr
vP 7RE G',i,yt
y.,•,
i , 3 9 ;
t
CG SlD;JAI N \
2 0
July 29, 2009
MARTI N / MARTI N
CONSLJLTING ENGINEERS
Mr. Scott O'Connell
Vail Recreation District
700 South Frontage Road East
Vail, Colorado 81657
w t
ll1j ,,,
4.,'
Town of Vail
FFIG COPY
APPROVED
Community DevelopmAnt Department
E3 Iding Safiety anJ !n ,.^'nn ervices
RE: Dobson Arena Roof vti = , ,_..,._.--- , _, ., , . ? a
Martin/Martin Project No. 216,,.1 ,. , .: s o 4ell a - ,
II
Cot; c ; :s.:.. i s tc r g . ., - . . . .
y, ..._.. ,' ± t,n c r ^i i".t f f C :.. ut .._. . °.' ' . ....
1 f
Mr.O'Connell: not - ,.,
any o# t".: ._. _ .S tr, . -, _ .I the
jurisdict ar ..:' ^u •be
Per your request, I have reviewed the tii odesQ c'i'e Dofison Ac na roof. I used Y i doriginal
t. . n C L.':, .,+ .r' '. .
construction drawings that were stored Yr l nib'biilm in' ce.,l sl this review.
other p -' ,. ;
ru t on L u'
t he
t"^ , corre: • r a
Back d bwld _ .... p ., .. ..
i is c Cfe cr cf t.r,• :_ of
StfUCi 'f ; ..,'. ' .
The Dobson arena was designed in 1978h1 t K B`hTA Eng' ' s. e original roof const c i fi
wood shingles on 5/8" plywood spannin q - RtT d
girders. The design snow load was 65 pounds per square foot (ps.
The proposed reroofing project will remove the wood shingles and replace them with a standing seam metal
roof. Four rows of snow fencing are proposed to hold the snow on the roof.
Discussion
The current snow load requirements are 100 psf for flat roofs and 80 psf for roofs with slopes of 4:12 or
greater. The Dobson Arena roof is sloped at 4:12 so the required snow load is 80 psf which is 15 psf heavier
than what the roof is designed for. The current building codes require the design of roof structures to account
for drifted snow (snow that is blown off the windward facing slope of the roof and deposited on the leeward
slope of the roo fl. The Dobson Arena roof was not designed for this loading condition as it was not a common
practice at that time.
Our analysis, including assessment of the actual loading with the replacement roof, showed that the roof
structure is capable of supporting a 65 psf snow load. The roof will not meet the current building code
requirements. Therefore, if the building is to stay in operation during periods of heavy snow accumulation, the
snow must be removed from the roof when it reaches 65 psf in any given area.
Recommendations:
The Vail Recreation District should develop a snow removal action plan for the Dobson Arena. The weight of
the snow on the roof should be measured on a timely basis when the accumulation of snow on any given area
of the roof approaches three (3) feet. The measurements can be ta.ken with commercially available snow
measuring tubes or a homemade tube constructed of PVC pipe or similar material. To measure the snow, the
pipe is pushed down to the level of the roof. The snow should be retained in the tube. The tube is then
suspended from a spring scale that measures the weight of the tube and the retained snow. The weight of the
Dobson Arena Roof
July 29, 2009
Page 2
snow is computed from a predetermined conversion chart. The weight of any ice that has accumulated on the
roof and wasn't captured in the snow tube should also be added to determine the actual snow load. When the
weight of the snow approaches 65 psf, most of the accumulated snow should be removed from the roof.
There are margins of safety for a temporary snow load that may go above 65 psf. This will allow for some
flexibility in the timing of the snow removal. In no case should snow loads greater than 65 psf be allowed to
remain on the roof for more than 7 days.
This report is based on information gathered from the original structural drawings. No visual observations,
invasive testing or inspections were performed. We do not accept responsibility for structural deficiencies that
may exist. This report is only intended to esta.blish the snow load capacity of the existing roof structure.
A visual structural condition assessment of the roof would be prudent based on the limited snow load capacity.
The roof may have sustained damage if the snow load during its 30 year life has exceeded 65 psf.
We appreciate this opportunity to be of service. Please ca11 if you have any questions regarding this report, our
recommendations or if we may provide you with a structural condition assessment of the roof/building.
Respectfully Submitted,
Martin/Martin, Inc.
David J. Wittman, P.E.
Associate, Investigative Engineering
Copy: Martin Haeberle
John Gallegos
DJW:dt
G:PROJECTS 21662 Ol\WP Roof Invest Ltr July 09.dce
i, Y .. y s
i . _
September 4, 2009
Mr. Ser tt O'Connell
Vaa! Recreatian District
700 South Frontage Road East
Vail, Golorada 81657
RE: Snow Retention System
Dobson Ar na Roaf
Martin/Martin Project Na. 21Ei62.S.01
Mr. O'Connell:
Per your request, I hav reviewed the snflw retention system propnsed for ihe new standing seam raof of
the Dc bson Arena. I have alsc reviewed the Garland Company sh} drawings and calculatic ns that were
prepared for this project.
Back r
The I7obsan arena was designed in 1978 by KK.BNA Engineers. The ariginal roafcanstruction consisted
of r ood shingles an 51$" p(ywood spanning hetween 16" d ep waod-web t joists on glued-laminated
wood purlins and girders. The design snow load wxs 65 pounds per square foot (pst.
The propased reroofing project will remc ve the wt ad shingles and replace them with a standin seam
metal roof. Faur rows af 5-5 Colorgard fences are prcapased to hald the snow on the raaf. Our previous
review af the original roof framing has shown that remnval of accumulated snow wi1) be required when
the weight of the retained snow on the raaf exceeds 65 psf.
Discussion
The snow retention system has been designed to hold the 65 psf snaw lt ad and any drifted sttaw on the
roof. Their calculatians indicate that two (2) 3/8" diameter balts are needed at each seam in the roof to
hald the snow in place. The shop drawings shaw that a total c f fc ur (4) 3/8" diam ter bolts will be
pravided at the top two connections ofeach rooipanel; twice what the calculations say is needed.
The S-5 Colorgard fences will be held in p(ace at each roaf seam r,vith a Versaelip that is attached to an S-
5 Clamp with a/8" diarneter bolt. I"he fences will be stabilized with one ( I) 5-5 4" Snowclip in the
middle of each roof panel.
Recommendation:
The Garland Campany is providin twice the number of bolts that their calculations show is needed to
hold the snaw on the raof and we are comf rtable with that. °f'he attachmeni of the snow fences to the
roof seams appears to be adequate if the clamps arc properly instalied.
Llabsc n Arena Roof
Septemb r 4, 2009
Page ?
Because snow on the roof will need to be unlaaded when the accumuiated wei ht af the snaw approaches
65 ps% we recornmend that the snow fences be flagged ar marked in sotne way sa that workers on the
roaf can lacate the snaw fences and protect them from damage during snow remaval a eratians.
This report is based on information provided by The Garland Company. No wisua! observatians, testing or
inspections were perform d. We do not aecept responsibifity far the structural adequacy of the snaw
retention system. 'i'his report is anly intended to repart the results of nur review of the snaw retention
system.
We appreciate this opportunity to be of service. Please call if vou have any questions regarding this
report, our recommendatic ns.
Respectfuliy Submitted,
Martin/Martin, tnc.
avid J. Wit#rnan, P.E.
Assaciate, Investigative Fngineering
Cc py: Martin Haeberle
Jahn Galiegos
DJ W :di
G',PRDJF C`iS 21662, O I',WP`,Sncrw Retentian Syatem Ltt Sept 09.doc
Salvatore (Sal ) Ray Granata, PE, SE
690 Wood Valley Trace
Roswell, GA 30076-2672
Phone:(678)367-3151
salgranata@att.net
VII. Snow Loads - from adiacent buildina or roof:
H I er Roof
Roof slope = 18.4 deg
Horiz. eave to ridge dist (V1 = 9.3 fr
Roof length parallel to ridge (L) = 227.0 ft
Type of Roof Hip and gable w/ trussed systems
Ground Snow Load Pg = 77.0 psf
Importance Category = III
Importance Factor I = 1.1
Thermal Factor Ct = 1.10
Exposure Factor Ce = 0.9
JOB TITLE Dobson Ice Arena
321 E Lionshead Cir Vail, CO 81657
JOB NO. G-09041 SHEET NO.
CALCULATED BY SRG DATE
CHECKED BY DATE
Lower Roof
18.4 deg
66.8 ft
227.0 ft
Hip and gable w/ trussed systems
77.0 psf
IlI
1.1
1.10
0.9
Pf=0.7•Ce'Ct•I*Pg = 58.7 psf 58.7 psf
Pf min = 0.0 psf 0.0 psf
Flat Roof Snow Load Pf =
Rain on Snow Swchazge Angle =
Code M imum Rain Surcharge
Rain on Snow Surchazge =
Unobstructed Slippery
Surface (per Section 7.4) _
Sloped-roof Factor Cs =
Design Roof Snow Load (Ps) _
Building Official Minimum =
58.7 psf
0.19 deg
5.0 psf
0.0 psf
58.7 psf
1.34 deg
5.0 psf
0.0 psf
yes yes
0.86 0.86
Ex osure Factor, Ce
Exposure of roof
Terrain Full Partiall Sheltered
A n/a 1.1 13
B 0.9 1.0 12
C 0.9 1.0 l.l
D 0.8 0.9 1.0
Above treeline 0.7 0.8 n/a
Alaska-no trees 0.7 0.8 n/a
50.4 psf 50.5 psf ("balanced" snow load)
NOTE: Altemate spans of continuous beams and othei
50.4 psf 50.5 psf areas shal I be oadea' wrth hatf ihc desrgrr rocn''snow iban
so as to produce the greatest possible effect - see code.
HipJ Roof Unbalanced Snow Loads - for Hio & Gable roofs oniv
Lazger of 2.38 degrees or 70/W + 0.5 = 8.1 deg Unbalanced snow loads must be applied
Windward snow load = 15.1 psf = 0.3Ps
Leewazd snow load from ridge to 10.81' = 82.9 psf = hdy / S + Ps
Leeward snow load from 10.81' to the eave = 50.4 psf = Ps
Leeward Snow Drifts - from adjacent higher roof
Upper roof length lu = 227.0 ft
Projection height h= 47.0 fr
Building sepazation s= 0.0 ft
Adjacent structure factor = 1.00
Snow density y= 24.0 pcf
Balanced snow height hb = 2.10 ft
hc = 44.90 ft
hcMb >0.2 = 21.4 Therefore, design for drift
Drift height hd = 6.51 ft
Drift width w= 26.04 fr
Surchazge load: pd = g'hd = 156.3 psf
Balanced Snow load: = 50.5 psf
Slidina Snow - onto lower roof
Sliding snow = 0.4 Pf W= 2172 plf
Distributed over 15 feet = 14.5 psf
Balanced snow load = 50.5 nsf
Total snow load within 15' of higher roof = 65.0 psf
Town of Vail
PY
Lu '"
Surchs ge Load
Dua ta Dnf6tipD
i€ /
h hc
pd , ' .:k
a - Batancatl Snow Loatl
h
w
UPPER ROOF
15' I
SLIDING
sxow Loan
BALANCED
SNOW L AD
LOWER ROOF I
P' RE G Sr`
vP 9;y'o
Q
33539
y
w
Fss N.;, lv
Salvatore (Sal ) Ray Granata, PE, SE JOB TITLE Dobson lce Arena
690 Wood Valley Trace 321 E Lionshead Cir Vail, CO 81657
Roswell, GA 30076-2672 JOB NO. G-09041 SHEET NO.
Phone: (678) 367-3151 CALCULATED BY SRG DATE
salgranata@attnet CHECKED BY DATE
VII. Snow Loads :
Roof slope = 18.4 deg
Horiz. eave to ridge dist (Vl = 9.3 ft
Roof length parallel to ridge (L) = 227.0 ft
Type of Roof Hip and gable w/ trussed systems
Ground Snow Load Pg = 77.0 psf
Importance Category = ID
Importance Factor I = 1.1
Thermal Factor Ct = 1.10
Exposure Factor Ce = 0.9
Pf = 0.7*Ce'Ct*I*Pg = 58.7 psf
Pf min = 0.0 psf
Flat Roof Snow Load Pf =
Rain on Snow Surcharge Angle =
Code Maximum Rain Surcharge
Rain on Snow Surcharge =
Unobstructed Slippery
Surface (per Section 7.4) _
Sloped-roof Factor Cs =
Design Roof Snow Load (Ps) _
Building Official Minimum =
58.7 psf
0.19 deg
5.0 psf
0.0 psf
yes
0.86
Ex osure Factor, Ce
Exposure of roof
Terrain Full Partiall Sheltered
A n/a 1.1 13
B 0.9 1.0 1.2
C 0.9 1.0 l.l
D 0.8 0.9 1.0
Above treeline 0.7 0.8 n/a
Alaska-no trees 0.7 0.8 n/a
50.4 psf ("balanced" snow load)
50.4 psf
NOTE: Altemate spans of continuous beams
and other areas shall be loaded with half the
design roof snow load so as to produce the
greatest possible effect - see code.
Unbalanced Snow Loads - for Hio & Gable roofs onlv
Larger of 2.38 degrees or 70/W + 0.5 = S.1 deg Unbalanced snow loads must be applied
Windward snow load = 15.1 psf = 0.3Ps
Leeward snow load from ridge to 10.81' = 82.9 psf = hdy / JS + Ps
Leewazd snow load from 10.81' to the eave = 50.4 psf = Ps
Leeward Snow Drifts - from ad acent hi er roof
Upper roof length lu = 227.0 ft
Projection height h= 47.0 ft
Building separation s= 0.0 ft
Adjacent structure factor 1.00
Snow density y= 24.0 pcf
Balanced snow height hb = 2.10 ft
hc = 44.90 ft
hc/hb >0.2 = 21.4 Therefore, design for drift
Drift height hd = 6.51 ft
Drift width w= 26.04 ft
Surchazge load: pd = g*hd = 156.3 psf
Windward Snow Drifts - Aeainst walls. oazace[s. etc more than I S' lone
Building roof length lu = 227.0 ft
Projection height h= 47.0 ft
Snow density y= 24.0 pcf
Balanced snow height hb = 2.10 ft
hc = 44.90 ft
hc/hb >0.2 = 21.4 Therefore, design for drift
Drift height hd = 4.88 ft
Drift width w= 19.53 ft
Surcharge load: pd = g•hd = 117.2 psf
LU
Surcha ge LoeC
j Due Do Dr1Arg
h Pd ': -
Ba anceo snow o
h' '
o
a0 E G,S,`
0 G ,FvP R9,y,
1,/
33539 1
i IIIN
1
The Garland Company
3800 East 97 st Street
R-MER SNOW RETENTION DESIGN RESULTS
ASCE 7-05
Project: Dobson Ice Arena
Roof Section: Snow Drift Leeward within 26' of Ridge
Sales Representative: Eric Tscharner
Ground Snow Load 221.3 psf
Roof Pitch 4 /12
Panel Width 16 in
Panel Type R-Mer Span
Panel Material 22 ga Galfan
Snow Guard Type S-5! Color Gard
Run to Ridge 26.04 ft
Importance Factor III
Exposure B
Terrain Factor Fully
Thermal Factor 1
Safety Factor 2
Snow load
Vector Force
Tributary Vector
Amount of Snow Guards
Bolts Per Panel
243.43 psf
77.0 Ibs
2817 sq ft
2 row(s)*
6
NOTE: The above calculations require S-5! Clamps to be
attached at each standing seam.
NOTE: Set screw tension = 115 in-Ibs. except for 22 gauge steel
22 gauge steel set screvv tension = 180 in-Ibs.
REFER TO THE GARLAND STANDING SEAM SHOP DWG'S FOR
LOCATION OF SNOW RETENTION SYSTEM.
The Garland Company
3800 East 91 st Street
R-MER SNOW RETENTION DESIGN RESULTS
ASCE 7-05
Project: Dobson Ice Arena
Roof Section: Balanced Snow Load over 66'
Sales Representative: Eric Tscharner
Ground Snow Load 50.5 psf
Roof Pitch 4 /12
Panel Width 16 in
Panel Type R-Mer Span
Panel Material 22 ga Galfan
Snow Guard Type S-5! Color Gard
Run to Ridge 66.9 ft
Importance Factor III
Exposure B
Terrain Factor Fully
Thermal Factor 1
Safety Factor 2
Snow load 55.55 psf
Vector Force 17.6 Ibs
Tributary Vector 1652 sq ft
Amount of Snow Guards 2 row(s)*
Bolts Per Panel 4
NOTE: The above calculations require S-5! Clamps to be
attached at each standing seam.
NOTE: Set screw tension = 115 in-Ibs. except for 22 gauge steel
22 gauge steel set screw tension = 180 in-Ibs.
REFER TO THE GARLAND STANDING SEAM SHOP DWG'S FOR
LOCATION OF SNOW RETENTION SYSTEM.
FILENAME: S-5 SNOW COLORGUARD SYSTEM APPLICATION
r,.4?c_p pn33<;%?'r,':'3 ;';"ti.RS S'"d.
a._5 CG(.+2.".@SY
caz; a, ; ni.K,;<t.ia
ZY'iC;l_ `-5i t(_.QF t E J L SYSTEM APPLICATION
N.T,S.
THE GARLAND COMPANY, INC.
GAp GARLAND CANADA, INC.
THE GARLAND COMPANY UK, LTD
since 1895
SYSTEM APPLICATION
PS) PANEL SYSTEM INSTALLATIONS
O 2006 Garland Industries, Inc.
0
The Garland Company, Inc. - TRADE SECRET MATERIAL
SECTION 07710
PREFABRICATED ROOF
SNOW RETENTION
PART 1- GENERAL
1.1 SECTION INCLUDES
0 J
I
JUL 2 8 009
TOW i O Ai .
A. Work described in this section includes a metal standing seam roof
mounted snow retention system complete with clamps, cross members,
and snow and ice clips.
1.2 RELATED SECTIONS
A. Drawings and general provisions of the Contract, including General Supplementary
Conditions and Division 1 Specification Sections apply to this section.
B. Related Work
1. Section 07410 - Roof and Wall Panels
2. Section 07610 - Metal Roofing
3. Section 07220 - Insulation
4. Section 07620 - Flashing and Sheet Metal
5. Section 07720 - Roof Accessories
1.3 REFERENCE STANDARDS
A. American Society of Civil Engineers (ASCE):
1. ASCE 7-98 Minimum Design Loads for Buildings and Other Structures.
1.4 SUBMITTALS
A. Shop Drawings: Shop drawings showing details of all components to be utilized in their
prescribed, pre-manufactured, three-dimensional form.
3/l5/99
B. Shop drawings must be completed by the snow retention device supplier's engineering
department.
C. Product Data:
07710 - Page 1
Manufactured Roof Specialties (word97)
The Garland Company, Inc. - TRADE SECRET MATERIAL
Manufacturers' product catalogues or descriptive data, standard specifications
and details.
2. Technical data to substantiate compliance with these specifications.
D. Samples: Submit sample of S-5! Clamp and 24" section of ColarGard crossmember
including matching sheet metal color strip, splice connectar, and other hardware. Submit
mockups of special assemblies mounted on panel specimens if requested.
E. Testing: Provide certified test reports from an independent testing laboratory to show
compliance with performance criteria secified in article 1.9. Furnish evidence of product
testing performed specifically on the panel seam and gauge being utilized on the project.
Test report is to clearly indicate tensile load-to-failure of clamp in a direction parallel to
the seam.
F. Design Loads: Submit copy of manufacturer's minimum design load calculations
according to ASCE 7-98, Method 2 for Components and Cladding, sealed by a registered
professional engineer employed by the system supplier as a full-time staff engineer. In
no case shall the design loads be taken to be less than those detailed in article 1.9 of this
specification.
1.5 ALTERNATE MANUFACTURERS
A. Alternate Manufacturers: The following manufacturer criteria must be submitted.
Alternate systems will not be considered for approval unless each of these items has been
submitted for review at least 10 business days priar to bid opening:
l. Submit each item listed in article 1.4 (A through E) for evaluation of the
proposed system.
2. Tests shall have been made for identical systems within the ranges of specified
performance criteria.
3. Empirical calculations for roof performance shall only be acceptable for positive
loads.
4. A list of a minimum of five (5) jobs where the proposed alternate material was
used under similar conditions. The reference list shall include date of project,
size of project, project address, and telephone number of architect/owner
contact.
5. A financial statement demonstrating current liabilities.
6. A written statement from the manufacturer stating that they will provide the
building owner with a daily site inspection for a minimum of one (1) hour per
day by an experienced, full time employee of the company.
7. Proof that the manufacturer has been in business for a minumum number of
years equal to the warranty period required far this project.
07710 - Page 2
3/15/99 Manufactured Roof Specialties (word97)
0
The Garland Company, Inc. - TRADE SECRET MATERIAL
1.6 QUALITY ASSURANCE
A. Installer Qualifications:
1. Installer shall have completed the manufacturer's Approved Roofing Contractor
course and/or demonstrates competence in the installation of manufactured roof
specialties.
2. Installer shall further provide evidence that the superintendent and foreman
selected for supervision on this job have been approved by the manufacturer, or
submit for manufacturer's approval a resume of past jobs of similar scope and
complexity that these personnel have been involved.
B. Submit certifications of compliance with regulatory requirements:
1. Applicable state, city and local Unifarm Building Code.
3/IS/99
2. Compliance with Recycled Materials Act.
C. Supplier's Qualifications:
1. Snow retention system supplier shall be a nationally recognized, prime
manufacturer of inetal roof systems.
2. Supplier shall have direct authority and control over all fabrication of steel
components as well as the raw materials used in their fabrication.
3. Supplier shall be a member of the National Roofing Contractors Association
NRCA) and shall abide by the published standard practices of the organization.
4. Supplier shall have in place a documented, standardized method for maintaining
quality control such as ISO-9001 approval.
D. Designer/Inspector Qualifications:
L The snow retention system shall be designed by an employee of the supplier
who has visited the job site and has familiarized himself with all conditions of
the job.
2. The designer shall conduct all required periodic inspections of work in progress
as described herein and shall furnish written documentation of all such
inspections.
07710 - Page 3
Manufactured Roof Specialties (word97)
The Garland Company, Inc. - TRADE SECRET MATERIAL
1.7 DELNERY, STORAGE, AND HANDLING
A. All componnet shall be delivered to the jobsite properly packaged for protection against
damage in transportation.
B. All accessories shall be packed in sturdy cardboard cases with paper slip sheets or similar
separatar between any and all painted surfaces to minimize scratches.
C. It shall be the responsibility of the installer to verify and correct the quantity and
condition of all materials prior to accepting delivery.
D. All copper, lead, or other material that might induce galvanic corrosion shall be
removed, replaced or protected prior to the installation of steel products that
might be adversely affected by direct exposure to dissimilar materials.
E. All plumbing, mechanical, electrical, or demolition trades shall be coordinated so that
newly installed materials are not unnecessarily damaged.
1.8 JOB CONDITIONS
3/IS/99
A. Field Measurements: It is the installers responsibility to confirm field
dimensions prior to ordering for fabrication.
B. Pre-Installation Conference: Shall be required a minimum of three weeks prior to job,
and shall include:
1. Review of specifications and proposed deviations discussion of shop
drawings and verification substrate conditions.
2. Clarification of site access, storage areas, and crane access, and
coordination with trades for sequencing work.
3. Verification of exact measurements of roof areas enable ordering of
materials.
4. Determination of the need for manufacturer support.
07710 - Page 4
Manufactured Roof Specialties (word97)
The Garland Company, Inc. - TRADE SECRET MATERIAL
DESIGN AND PERFORMANCE CRITERIA
A. Uniform Snow Load Capacity: Installed snow retention system shall withstand snow
loading complying with the following criteria.
Design Code: ASCE 7-98, Method 2 for Components and Cladding
2. Safety Factor: 2.0 aier any load reduction or material stress increase.
3. Snow Load: 50.5 psf.
4. Roof Pitch: 4/ 12 inches per foot.
1.10 WARRANTY
A. All steel and paint finishes shall be warranted by the manufacturer to be free from red
rust, chipping, cracking, flaking, blisters or peeling for a period of 20
twenty) years.
B. The snow retention system shall be warranted by the Garland CO.
PART2-PRODUCTS
2.1 SYSTEM DESCRIPTION
A. Roof Attachement Clamps: Provide aluminum standing seam roof clamp. Carbon steel
or plastic parts are not acceptable. No fastener penetrations of the roof inembrane will be
permitted. No systems that rely on adhesives for attachment will be permitted. Clamp to
attach to the standing seam will have two stainless steel set screws (3/8" minimum
diameter) having rounded point.
B. Crossmember: S-5! "ColorGard" extrusion with receptacle in face to provide for insert
of color strip. Color strip is to be the same prefinished material and originate from the
same supplier as the roof panels. Crossmember is to be continuous and include splice
connectors to join adjacent sections, ensuring alignment and structural continuity. Cross
member is attached to clamps using 3/8" diameter stainless steel bolts.
C. Snow/ Ice Clips: Mandatory on panel seam heights of 2" or greater. Furnish only if
shown on plans for panel seam heights below 2" S-5! "SnoClips" are to be aluminum or
stainless steel, with rubber "foot". Clip to attach to cross member and rest on panel flat,
between panel seams to retard movement of snow/ice beneath crossmember. Use two
clips per panel for seam spacing of 16" or more; one clip per panel for seam spacing
under 16".
07710 - Page 5
3/15/99 Manufactured Roof Specialties (word97)
2.2
23
The Garland Company, Inc. - TRADE SECRET MATERIAL
Iu/:rY l:/iG
A. Clamps and VersaBracket: Manufactured from certified 6061 T6 extruded aluminum, in
strict conformity with The Aluminum Association, Incorporated "Aluminum Standards
and Data" and ASTM standard B-22 L Cast parts are not permitted.
B. Crossmember: Manufactured from certified 6061 T6 aluminum, in strict conformity with
The Aluminum Association, Incorporated "Aluminum Standards and Data" and ASTM
standard B-221. Minimum breaking strength of 175 pounds per linear inch.
Crossmember must be furnished with splice pieces to align adjacent sections and
maintain continuity.
C. Color Strip
1. Steel : Aluminum-Zinc Alloy Coated, ASTM A792, Coating Designation AZ-
50, in thickness of .0217 or .0336 by min. 36 in. by coil, chemically treated,
commercial lock-forming quality.
2. Steel Finishes: Fluorocarbon, epoxy primer baked both sides, as approved by
finish coat manufacturer:
Property Test Method Fluorocarbon
Pencil ASTM D-3363 HB-H
Hardness NCCA II-2
Bend
Cross-Hatch
Gloss
60° angle)
Reverse
Impact
Nominal
Thickness
primer
topcoat
TOTAL
ASTM D-4145 O-T
NCCA II-19
ASTM D-3359
ASTM D-523
ASTM D-2794
G7.91_Y 3[ID7.7
no loss of
adhesion
25+/-5%
no cracking or
loss of
adhesion
0.2 mils
0.8 mils
1.0 mils
D. Fasteners and Other Hardware: Each Clamp is to be secured to the panel seam with a
minimum of two set screws, having nominal diameter of 0375". Set screws are to have a
round nose point to prevent damage to the panel finish. Cup point set screws are not
acceptable. Set screws and other clamp hardware is to be either 300 series stainless steel
18-8 alloy) having no iron content, ar aluminum. Attachment bolt for clamp is to be
0.375" diameter with washer
SOURCE QUALITY CONTROL
07710 - Page 6
3/15/99 Manufactured Roof Specialties (word97)
The Garland Company, Inc. - TRADE SECRET MATERIAL
A. Manufacturer shall furnish written documentation that all products were furnished by said
single-source manufacturer.
B. Manufacturer shall furnish all other documentation as required herein.
PART 3 - EXECUTION
3.1 PREPARATION
A. Clean Surface: Verify that panel seam area is reasonably clean and free
of visible dirt and foreign matter at the clamp locations prior to installing clamps.
B. Seaming Complete: Verify that any required machine seaming is complete prior to
installation.
C. Panel attachment: Verify that panels are adequetly attached and supported to the building
structure to resist any loads imposed on the S-5! Clamp.
D. Free Drainage: Verify that completed assembly installation will not in any way impede
proper drainage of roof panels.
E. Discrepencies: Report any discrepencies to the above to the Project Architect before
proceeding with the work.
3.2 INSTALLATION
A. Layout: Carefully lay out desired assembly locations true-to-line prior to installing
clamps or Versabrakets. Clamps shall avoid panel attachment clips if the clip is a single
piece design.
B. Clamp Installation: Assemble set screws to clamp and clamp to seam following all
manufacturers printed instructions. Both set screws are to be at the same side of clamp.
When application relies upon tested load-to-failure values, manufacturer's minimum
recommended set screw tension shall be randomly verified using calibrated torgue
wrench per manufacturer's instructions.
C. System Installation: Install snow retention assemblies straight and true-to-line. Secure
all color strip material to ColorGard per manufacturer's instructions. Join adjacent
sections with splice pieces provided. Do not cantilever crossmember more than 6" past
the last clamp in an assembly.
D. Fall Protection: Provide necessary fall and other hazard protection in accordance.with
OSHA regulationswhen installing snow retention assemblies.
E. Cleaning: Clean roof of any residual debris resulting from installation.
3.4 CLOSEOUT
A. Waste Disposal: Dispose of excess materiasl and packaging and remove debris from site.
B. Warranties: Deliver all warranties to Owner ar Owner's designated representative.
07710 - Page 7
3/15/99 Manufactured Roof Specialties (word97)
The Garland Company, Inc. - TRADE SECRET MATERIAL
END OF SECTION
07710 - Page 8
3/IS/99 Manufactured Roof Specialties (word97)
since 1895
HPRFireTite°FRBaseSh
PRODUCT DESCRIPTION
The Garland HPR Fire-Tite FR Base Sheet is a self-adhering,
m ulti-pu rpose, fire retardant u nderlayment designed to provide
a self-sealing, waterproof, fire barrier under a variety of roof
systems. It is uniquely constructed to prevent the ignition of
combustible decks at approved slopes.
This versatile system can be used in conjunction with virtu-
ally any roof including: Built-up, Modified Bitumen, Single
Ply, Metal, Tile and Shingle systems. It can also be applied
in a single layer as a temporary roof, providing a"Class A"
fire rating over combustible decks in approved assemblies
at approved slopes.
PRODUCT ADVANTAGES
Fire Resistant -The membrane's unique design prevents both
penetration and spread of flame. This fire retardant material
provides.a "Class A" fire rating over a combustible deck in a
single layer application, when used in approved assemblies
at approved slopes.
Self Adhering -This outstanding feature can eliminate the need
for kettles and torches. Simply remove the release paper and
apply the membrane to the substrate. This greatly increases
the speed of application and lowers the overall job cost. In
addition, Garland's HPR Fire-Tite FR Base Sheet provides a
watertight seal during the installation of a new roof system.
This material may be used as both the temporary roof and
as a fire resistant barrier when used with other roof systems
such as: Built-up, Modified Bitumen, Single Ply, Metal, Tile,
and Shingle systems.
Non-Slip Surfacing - HPR Fire-Tite FR Base Sheet provides
a non-slip substrate for foot traffic during the roof applica-
tion. Many applications for Garland's HPR Fire-Tite FR Base
Sheet are on roofs with steep slopes where falls are a greater
concern.
Self-Sealing - Unique technology allows the membrane to
seal around fasteners which penetrate the membrane. This
feature is critically important when attaching clips or hat chan-
nels which must be fastened through the HPR Fire-Tite FR
Base Sheet and into the structural deck.
Cutting Edge Technology - Revolutionary technology pro-
vides a water tight environment with a fire protection in a
single layer application over a combustible deck without the
need for barrier boards or insulation.
APPLICATION
Ju 8 zoo9
awr v
HPR Fire-Tite FR Base Sheet can be used in conjunction
with a variety of roof systems including: Built-up, Modified
Bitumen, Single Ply, Metal, Tile and Shingles. The membrane
can be either self adhered or mechanically attached to the
structural deck. In addition, it can be used as a fire barrier
in conjunction with insulation in some metal assemblies.
The roof system or insulation will then be installed over the
HPR Fire-Tite FR Base Sheet following the manufacturer's
specifications. Additionally, when bonding the roof system
directly to the HPR Fire-Tite FR Base Sheet, you must first
mechanically fasten the HPR Fire-Tite FR Base Sheet to the
structural deck. Adhering directly to a sheet that has not been
mechanically attached is prohibited.
NOTE: HPR Fire Tite FR Base Sheet rolls are individually boxed.
Store rolls in these closed containers until ready for installation.
Apply when the ambient air temperature, roll temperature and
substrate temperature are 50°F (10°C) or above. Application
in cool temperatures will negatively affect adhesion.
T'n` i.,: i:lL.
E ^
1.
Town of Vail
oFFICE COPY
I'PR Fire Tite Base Sheet
Technical Data HPR Fire-Tite Base Sheet
Tensile Strength MD 75 Ibf/in. (13.1 kN/m)
XD 75 Ibf/in. (13.1 kN/m)
Lap Adhesion MD 25 Ibf (111.2 N)
Adhesion to Plywood MD 40 Ibf (177.9 N)
Test Method ASTM D 5147 is tested at
2 in/min @ 73.4± 3.6°F
50 mm/min @ 23 ± 2°C)
Roll Dimensions HPR Fire-Tite Base Sheet
Width 3 ft. 3 in. (1 m)
Length 34 ft. (10.4 m)
Weight 85 Ib. (38.55 kg)
Nominal Thickness 55 mils (1,397 microns)
Net Coverage 100 ft (9.29 m)
Packaging 20 rolls/pallet
For specific application recommendations, please contact
your local Garland Representative or Garland Technical
Service Department.
a
a.
s i n e i s s s For more information, visit us at: www.garlandco.com
The Garland Company, Inc.
3800 East 91 st Street
Cleveland, OH 44105
FAX: 216-641-0633
Phone:216-641-7500
Toll Free:800-327-9336
Garland Canada, Inc.
1290 Martin Grove Rd.
Toronto, Ontario
Canada, M9W 4X3
FAX 416-747-1980
Phone: 416-747-7995
Toll Free: 800-387-5991
0nly in Canada)
The Garland Company UK, Ltd.
Unit 5 Glevum Works, Upton Street
Gloucester, United Kingdom GLt 4LA
FAX: 01452 330 657
Ol l 44 1452 330 657 (outside UK)
Phone: 01452 330 646
Ol l 44 1452 330 646 (outside uK)
Toll Free: 0800 328 5560
Only in UK)
s:u «a..
o F cou rwaw
MIAM4011DE 1/ 1 \ ser«o.m.nnam m
IUI 1 .m.,.ifl.w.ach
c e..,ra.. 7 sr
The HPR Fire-Tite Base Sheet product is protected by U.S.
6,641,896 and Pending in Canada 2,365,658
Test verified by independent laboiatories. Actual roof pei-
formance specifications will vary depending on test speed
and temperature. Data reFlects samples randomly collected.
10% variation may be ezperienced. The above data
supersedes all previously published information. Consult
your bcal Gadand Reprezentative or the home offi[e for
more information.
HPR Fire-Trte is a trademark ofThe Garland Company, Inc.
and Gadand Canada, Inc
2006 Gadand Industries, I c.
HPR FT BS 1006
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
owxoFV;
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
ADD/ALT COMM BUILD PERMT Permit #: B09-0322
Project #: '- —c;:
Job Address: 321 E LIONSHEAD CIR VAIL
Location......: DOBSON ICE ARENA
Parcel No....: 210106407005
OWNER TOWN OF VAIL
C/O FINANCE DEPT
75 S FRONTAGE RD
VAIL
CO 81657
APPLICANT GT WOODWORKS
3105 BELLFLOWER DR
VAIL
CO 81657
License: 318-A
CONTRACTOR GT WOODWORKS
3105 BELLFLOWER DR
VAIL
CO 81657
License: 318-A
11 /05/2009
11/05/2009 Phone:970-476-4027
11/05/2009 Phone:970-476-4027
Description:
TENANT IMPROVEMENT: INSTALL STRUCTURAL DECKING, "SHIP"
LADDER AND HANDRAIL ABOVE OFFICES FOR STORAGE
Occupancy:
Type Construction:
Status . . : ISSUED
Applied . . : 11/05/2009
Issued . .. : 11/16/2009
Expires . ..: 05/15/2010
Valuation: $15,000.00
Total Sq Ft Added: 0
FEE SUMMARY ..,..,.««>.........,.........,...,>......<.,.,.......................,..x.,..
Building Permit Fee------>
Plan Check-------------------->
Add'I Plan Check Hours->
I n v e s t i g a t i o n----- ------------>
251.25 Will Cal Fee--------------------->
163.31 Use Tax Fee--------------------->
0.00 Restuarant Plan Review----->
0.00 Recreation Fee----------------->
Total Calculated Fees-------->
4.00
100.00
0.00
0.00
518.56
Total Calculated Fees------------->
Additional Fees----------------------->
TOTAL PERMIT FEES-------------->
Payments------------------------------->
BALANCE DUE------------------------>
518.56
518.56)
0.00
0.00
0.00
x,>.,.....,...................,<,....,.<.<
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FO SPECTION S LL BE M DE TW TY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM
8:00 AM - 4: M.
lC ! 4
Si nature of Ow r or ntractor - Date
Print Name
bld_a It_construction_permit_041908
S
4
1-
w f` ' d ,
r .
k'+'=i$. a .
Tq 3
K ..
S » '
k T
p
u
Departmen of Cornmunity Developmentq":
75 South Frontage Ro d ,:
Va l C lorada 8 7
n;. t Tel:`, 97A 47 i g
t.; .. . & p f.`'.
d . .Afl s A .•
Neb:
eve`lupment
BUILDING PERMIT APF'LICATION
Separate permits are required for electrical, plumbing, mechanical, fireplace, etc.
Project Street Address Office Use: % n
C ' Project #: 1`-'V 3 1 r. L, e, , e
Number) (Street) (Suite #) i DRB #:
Building/Complex Name: Op L fe c.` ', guilding Permit#: __ " v` `—"
Contractor Information:
a TS n~ z^y ," ~~vx
Lot #: Block # Subdivision: t
Company: C/OOCY O, J -.. -
Company Address:0 S i 11 1 c...e/
City: !/G , State: C-v Zip: 65
Contact Name: P,D L -Z- /
Contact Phone: /7C 3 7'f 5S v
E-Mail C .v Cy .J4c . G v-+
Town of Vail Contractor Registration No.:
Detailed Description of Work:.,s.. r,.,-N c.1
ec- ,, , . c ;
S r"-G . T 4, 1c.\ C^. - i.7 I C^.Q Qi
n c_1 c. c L' c
use additional sheet if necessary)
Work Class:
New ( ) Addition ( ) Remodel ) Repair ( ) Other ( )
X j .....
v„.. ._.. .M._... ,w..,,,.
Work Type
Contractor ignature (required) Interior (O E erior { ) Both ( )
Property Information
Parcel #: ° C71 — f 6 4— O`UO —
For parcel #, contact Eagle County Assessors Office at 970-328-8640 or
visit www.eaglecounty.us/patie)
TenantName: Vc,.1 \c_,.cec,- - T
Owner Name: O 1..•1 Y v . 1
Valuations (Labor & Material))
Building: $ S UC?C .
Plumbing: $
Electrical: $ '
Mechanical: $
c U
Total: $ S G
Type of Building:
Single-Family ( ) Duplex ( ) Multi-Family ( )
Commercial (S Other ( )
Does a Fire Alarm Exist? Yes (c)
Monitored Alarm? Yes (C)
Does a Sprinkler System Exist? Yes (C)
Type of Existing Fireplaces: Gas Appliances
Gas Log Wood/Pellet Wood Burning
Type of Proposed Fireplaces: Gas Appliances
Gas Log Wood/Pellet Wood Burning _
Date Received
No ( )
No ( )
No ( )
4
V
I Mr
E ° " ^ 2009
O 1/i/ I "; .
8-Jun-09
TOWN OF VAIL FIRE DEPARTMENT
75 S. FRONi;GE ZOAD
VA1L, CO 81`657
970-479-2135
VAIL FIRE DEPARTMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ALARM PERMIT
Job Address: 321 E LiONSHEAD CIR VAIL
Location.....: DOBSON ICE ARENA
Parcel No...: 210106407005
Project No :
OWNER TOWN OF VAIL
C/O FINANCE DEPT
75 S FRONTAGE RD
VAIL
CO 81657
APPLICANT BEST ELECTRIC, THE
P.O. BOX 273
EAGLE
CO 81631
License: 640-5
CONTRACTOR BEST ELECTRIC, THE
P.O. BOX 273
EAGLE
CO 81631
License: 640-5
10/20/2009
Permit #: A09-0078
Status . . . : ISSUED
Applied . . : ] 0/20/2009
Issued . . . 10/28/2009
Expires . .: 04/26/2010
10/20/2009 Phone: 970-328-1610
10/20/2009 Phone: 970-328-1610
Uesciption: DOBSON 10E ARENA: REPLACE FIRE ALARM SYSTEM/DEVICES
Valuation: $20,303.00
r*+***«r+*s*s+*s******************+**«*«****«a****r r*+*rs* FEE S UM MARY *+****+*******t***ss*:r**s*******r**+****+*++********a
Elcctrical---------> $0. 0o Total Calculated Fees--> $1, 049.36
DRE3 Fee---------> $ 0. 0 0 Additional Fees----------> $1, 04 9. 3 6)
Investigation----> $ o. 0 0 "rotal Permit Fee--------> $ o. 0 0
Will Call---------> $0. 00 Payments------------------> $0. 00
TOTAL FEES--> $1, 04 9. 3 6 BALANCE DUE--------> $ 0. 0 0
m*e*******v**..*a**:****r:***w**e+**.**a+**+*..*+:.+v*****rs+e+s*:s+***v********w***.**+*:**********:.sx*x**ea****s****r*s*e*r
Approvals:
Item: 05600 FIRE DEPARTMENT
10/21/2009 McGee Action: AP
CONDITIONS OF APPROVAL
Cond: 52
Monitored fire alarm system required and shall comply with NFPA 72 (2002 ed.) and VFES
Standards
DECLARATIONS
1 hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE "fWENTY-FOUR IIOURS IN ADVANCF. BY TELEP IONE AT 970-479-2252 FROM 8:OU AM - 5 PM.
J ,
TURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
oo.
Department of Community Developmen
75 South Frontage Road
Vail, Colorad4 $1 i
7e1 ` 970=479-212ii °°`
n :.\ F ,70=479-2452
c Web ww'i v.vailgov cQ
Deu opmenkReview Coordrr
o
FIRE ALARM PERMIT
Commercial and Residential Fire Alarm shop drawings are required at the time of application
submittal and must included information listed on the 2nd page of this form. Application will
not be accepted without this information.
Project Street Address
f rl iLiK l 1 T'i.\
Number) (Street) (Suite #)
BuildinglComplexName: o s-, ' c •
Office Use:
Project #: Q O
Building Permit #: Q Q g
Alarm Permit #: Q Z
Contractor Information: Lot #: _ Block # Subdivision:
Company: 1 t,..T (Cft'(
Company Address: ! ' (3CX Detailed Description of Work:
c ty: : state:z p: 1(3% C«'-c n-c i c-%Girtq ¢
Contact Name: is S. l% C/t,`j 4($ f.'
Contact Phone: __ 71' ! 7 C-' lL
use additional sheet if necessary)
E-Mail 1 L.JC:.1 /Y'LCi . 1 , . .
Town of Vail Contractor Registration No.: ' "
Does a Fire Alarm Exist? Yes (X) No O
7 Does a Sprinkler System Exist? Yes ( No O
X ., -- - _
Work Class:
Contr ctor Signature required)
New ( ) Addition ( ) Remodel ( ) Repair ( )
Property Information
1
Retro-Fit ) Other ( )
Parcel#: ,,lrCil - 3 1 0`(a ' J __
For parcel #, contact Eagle County Assessors Office at 970-328-8640 or Type of Building:
visit www.eaglecounty.us/patie) ; Single-Family ( ) DUpleX ( ) MUlti-Family ( )
Tenant Name: V:a• L , ek w i ,c.! V t Commercial Restaurant ( ) Other ( )
Owner Name: Ta:.. n l TiJV,
Date Received:
Complete Valuation for Fire Alarm Permit:
Fire Alarm $: i (, .
o ' ,
li D
v
Approved as
rQ qpproved
l"
r e:
Q8t@:________ l
f
Z1_
1 V E
II'
i
29-May-09
i'
o vo u . Town of Vail Community Development
75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139 f. 970.479.2452 inspections 970.479.2149
ELECTRICAL PERMIT
Job Address: 321 E LIONSHEAD CIR VAIL
Location.......: DOBSON ICE ARENA
Parcel No.....: 210106407005
OWNER TOWN OF VAIL
C/O FINANCE DEPT
75 S FRONTAGE RD
VAI L
CO 81657
APPLICANT A.K. ELECTRIC
PO BOX 6241
AVON
CO 81620
License: 117-E
CONTRACTOR A.K. ELECTRIC
PO BOX 6241
AVON
CO 81620
License: 117-E
10/14/2009
10/14/2009 Phone: 970-390-4975
10/14/2009 Phone: 970-390-4975
Permit #...: E09-0240
Project #..: PRJ09-0288
Issued......: 10/23/2009
Desciption of Work: INSTALL HEAT TAPE ON ROOF
Valuation: $45,100.00 Square feet: 0
CONDITIONS OF APPROVAL
Cond: 12
BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
INSPECTIONS
If more than two inspections are performed an additional inspection fee will be applied for each inspection requested/needed.
All electrical inspections are performed on Tuesdays and Thursdays. Requests must be received the day before and not later
than 4 p.m.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes,
design review approv , a ial Codes and other ordinances of the Town applicable thereto.
SIGNATURE Date l aY_
Master / homeowner / or non-licensed contractor performing work)
PRINTED NAME: SC i I / t?I II
elec_permi100109
Department of C6mmuni#y Development
75 South Frontage Roadan . ` - ..
z< a . u.. ,
x . ,
mwti
Vail, Co1.o ac o 8 If
Tef: 970-479 212$
4.3 '
F x 970=479 2452
f
z4
Y
INeb wuv.w.vail ov cor a .'
t ; " ~ - Developtneni,Review Coo dEn t i
e „y s:: ., a " w'u" .;.sa ', ..:
e ' a r. `a. , x , `sf
a o-
r . , ; ;
s,
ELECTRICAL PERMIT
1 l'e+n,.sln.e.a., Gr
Project Street Addres :
7 ' l
Number) (Street) Suite #)
Building/Complex Name: /J f/'r T` C ,^'/7
Contractor Information:
Company: ,/ ' +` `
I Office Use:
I
Project #: ' ''
Building Permit #: `
Electrical Permit #: —" Q
Lot #: Block # Subdivision:" I
Company Ad ess %, f rj C C ._.
p. ;
Detailed Description of Work: // G° F> lr'
City: ' State: Zi
1`(' f —G'm c `' Contact Name: -.( i1y
Contact Phone: L-" G%r L -'
E-Mail use additional sheet if necessary)
Town of Vail G6ntr c ,egistration . / `
a Work Class:
X %`
F' '
New Addition
fr :
f ( ) Remodel ( ) Repair ( ) Other ( )
Cof t"ra tor Signature (required) _ . _
Type of Building:
i Single-FamilY ( ) Duplex (
Property Information ' ( ) Restaurant ( ) Other (
Parcel #: /f) l.C l% JQ '%.
For parcel #, contact Eagle County Assessors.Office at 970-328-8640 or
visit www.eaglecounty.us/patie) Date Received: ,
Tenant Name:
Owner Name: v w (i J J t I
COMPLETE SQ. FOOTAGE FOR AREA OF WORK AND VALUA-
TION OF WORK (Labor & Material)
Amount of SQ Ft.:
Electrical $:
o
Multi-Family ( ) Commercial,..
t
LUVI 1
r 1 3
T'. '" '' i i
29-May-09
i J
11-20-2009 Inspection Request Reporting Page 16
4:05 pm Va l, GO - Citv Of
Requested Inspect Date: Monday, November 23, 2009
Inspection Area: JRM
Site Address: 321 E LIONSHEAD CIR VAIL
DOBSON ICE ARENA
A/P/D Information
Activity: B09-0322 Type: A-COMM Sub Type: ACOM Status: ISSUED
Const Type: Occupancy: Use: Insp Area: JRM
Owner: TOWN OF VAIL
Contractor: GT WOODWORKS Phone: 970-476-4027
Description: TENANT IMPROVEMENT: INSTALL STRUCTURAL DECKING, "SHIP" LADDER AND HANDRAIL ABOVE
OFFICES FOR STORAGE
Requested Inspection(s)
Item: 90 BLDG-Final
Requestor: GT WOODWORKS
Comments: 471-2847
Assigned To: JMONDRAGON
Action: Time Exp:
Requested Time: 10:30 AM
Phone: 970-476-4027
Lv
Entered By: JMONDRAGON K
ll
Inspection History O C'
Item: 30 BLDG-Framing *"' Approved *' /
11/17/09 Inspector: cg Action: COND APPROVED/CONDITIONS
Comment: ADD BLOCKING AT NORTH EAST CORNER PER PLANS
Item: 60 BLDG-Sheetrock Nail
Item: 70 BLDG-Misc.
Item: 90 BLDG-Final
REPT131 Run Id: 10668
r
c> z ''
11-11-2009 Inspection Request Reporting Page 25
4:45 pm Vail, CO - Citv Of
Requested Inspect Date: Thursday, November 12, 2009
Site Address: 321 E LIONSHEAD CIR VAIL
DOBSON ICE ARENA
A/P/D Information
Activity: E09-0240 Type: B-ELEC Sub Type: ACOM
Const Type: Occupancy: Use:
Owner: TOWN OF VAIL
Contractor: A.K. ELECTRIC Phone: 970-390-4975
Description: INSTALL HEAT TAPE ON ROOF
Requested Inspection(sl
Item: 190 ELEC-Final
Requestor: A.K. ELECTRIC / JOHN
Comments: WILL CALL JOHN, DOBSON ICE ARENA
Assigned To: JMONDRAGON
Action: Time Exp: _
Q /
i °
Inspection History
Item: 120 ELEC-Rough
Item: 190 ELEC-FinaT
Status: ISSUED
Insp Area:
Requested Time: 08:00 AM
Phone: 970-376-8165, JOHN
Entered By: LCAMPBELL K
l y 1 W
REPT131 Run Id: 10624