Loading...
HomeMy WebLinkAboutDRB130005 CR1 RESPONSE LETTERHans Berglund From: Hans Berglund Sent: Tuesday, January 22, 2013 11:17 AM To: 'Rachel Friede Dimond' Subject: RE: comments on Milmo Page 1of 2 1/22/2013 Rachel, I have uploading the revised drawings and the transmittal to the file share under the Berglund Architects account. I have added a response to your comments below shown in red. Please call or email with any questions Hans Berglund, AIA      LEED AP Home      BERGLUND ARCHITECTS, LLC  210 Edwards Village Blvd, Suite A103  P. O. Box 2378, Edwards, CO 81632  Phone 970 926 4301 Fax 926 4364  email: hans@berglundarchitects.com  Web: www.berglundarchitects.com      From: Rachel Friede Dimond [mailto:RDimond@vailgov.com] Sent: Thursday, January 17, 2013 3:05 PM To: Hans Berglund Subject: comments on Milmo Hans‐ Here are my requested changes:  • show compliance with parking requirements . Noted on enclosed Site plan   • show compliance with landscaping requirements (shade areas that count as hardscape and  softscape) Noted on enclosed Site plan   • show compliance with height requirements Noted on enclosed Site plan   • Fix math on page two: Existing GRFA on level two is 1994 instead of 1984.  Adjust total numbers  and other locations.  Correct. It was a typo   • Change basement deduction‐ only one % for entire structure, not per unit.   We are only using one % for the entire structure as outlines on sheet A2.2 for the proposed addition. On sheet A2.1 we show the existing % which is different from the proposed calculations do to the additions.  • Any changes to outdoor lighting? if so, provide outdoor lighting plan and cut sheets No changes proposed   • Provide plans with both sides of duplex, full site plan Now show other half of duplex on the plans   • Show limits of disturbance fencing and fencing specs‐ show construction plan   On the enclosed Construction management Plan, we show a silt fence at the downhill area of the limit of disturbance which is also the entire limit of disturbance . The contractor plans to hand dig the new foundation at the east side of the house since there is no access for a piece of equipment, so the limit of disturbance is pretty small. Excess soil material will be transported via a wheel barrel to where it can be loaded in a truck. No foundation work is required for the addition at the east side of the house since it is an infill with existing space below and an existing roof above.        Rachel F. Dimond Town Planner Community Development Department 970.479.2440  vailgov.com twitter.com/vailgov     Page 2of 2 1/22/2013