HomeMy WebLinkAboutPRJ04-0286 B04-0287 LEGALTOWN OF VAIL DEPARTMENT OF COMMT]NITYDEVELOPMENT
75 S.FRONTAGEROAD
VAIL, CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TMES
ADD/ALTMFBUILDPERMIT Permit #: 804-0287
OWNER PEARSON, VICKr - DE MOCTE?LI409/27/2004 phone:
BARBARA
PO BOX 6235
VAIL CO 81-558
License:
CONTRACTOR MASTER SEALERS 09/27/2004 Phone: 910-475-3975P. O. BOX 4473VAIL, CO
tJl-bfd
I-,icense: 577-B
APPLTCANT MASTER SEAIJERS 09/27/2004 Phone: 9'70-416-3975P. O. BOX 4473VA]L, CO
81658
License : 577 -B
Desciption:
REROOF OVER EXISTING TO MATCH UNITS NEXT DOOR, GRAVEL. THIS
WORK THAT WAS APPROVED SAME FOR SAME BY ANOTHER CONTRACTOR
THAT WAS NOT COMPLETED CORRECTLY
Occupancy:
Type Construction:
Type Occupancy: ??
Job Address.: 303 GORE CREEK DR VAIL
l,ocation.....,: Vail Rowhouses Units 2A & 2C
Status.....: ISSUED
Applied...: 09127/2004
Issued...: 10105/2004
Exoires...: 04/03/2005
Add Sq Ft: 0
# ofGas Logs: 0 # of Wood Pellet 0
FEE SUMMARY ***r*r.rrlt'rr'*.*r.rrttr.r*rtr*.'rr*r*r,.1nr'*rrtr'ri**rrl.a'r
S0 . 00 Total Calculated Fees-> 9509 . 96
S0. 00 Additional Fees-----> 50 . 00
s0.00 Total Psrmit Fec-----> 5509.95
50.00 Payments--------) 5509.96
s0.00
*:*i:i** **,* i.* **,1.* * t+,.,t ** * * *,1. *:* +* * a* * *{. '1.*+,r*:i* * a:t tr+.** +:}r' **,t r** *
Valuation: $18,500.00
Fir€place Information: Restricted: Y # ofGas Appliances: 0
Building---> 53 07 . 2 5 Restuarant Plan Review-->
Plan Check*-> S199.?L DRB Fee------------->
lnvestigation->
Will Call---->
S0.00 RecrstiooFee-----..--->
S3.00 Clean-upD€{Dsit----->
TOTAL FEES---------> 5509.96 BALANCE DUE------>
Approvals:
Item: 05100 BUfI-.,DING DEPARTMENT
09/27/2004 JS Action: AP
Item: 05400 PLANNING DEPARTMENT
It.ern: 05600 FIRE DEPARTMENT
Item: 05500 PUBIJIC WORKS
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hoeby acknowledge that I have read this applicatioa, filled out in full the iaformation require4 completed m accumte plot plan,
and stat€ that all the information as required is corregt. I agree to comply with the inforrration and plot plan, io'comply with all
Town ordinances and state laws, and to bnrild this sEucture according io the 16sns zoning and codes, designrwiew
approvd uuiform Building code and othcr ordinmces of the Towa applicable thereto.
REQUESTS TOR hISPECTION SHALL BE MA.DB TWENTT.FOUR HOURS IN ADVA}.ICE OR AT OUR OFFICE FROM E:00 /{ll - 4 PM.
OWNER OR CONTRACTOR FOR HIMSEIf, AI{D OWNER
PAGE 2**'|.*{.****!****,}'|.*{.:t.'t'**:}:t.****!*'t*****{.:l'**+{.+*******,F**{.*'l.,i:|.'.:&**{.!}**,t.*|td(:***,
CONDITIONS OFAPPROVAL
Permit #: B'04-0287 as of 10-05-2004 Status: ISSUED*!f*4t:t*:t*'t*+:8*'t****,***,l.**:t.*{.*{t:t|*****!**,***:t,}!t****:t.**|'tt*ttt******,r:**'**,t**!*'},t{.{.!8*!**:***'t*.&*********
PemritTvpe: ADD/ALTMFBTJILDPERMIT Applied: e9/27/2004
Applicant: MASTER SEALERS Issued: t0/0512004970-476-397s To Expire: o4/03/200s
Job Address: 303 GORE CREEK DR VAIL
Location: Vail Rowhouses Units 24, & 2C
ParcelNo: 210108230003
Description:
REROOF OVER EXISTING TO MATCH I.]NITS NEXT DOOR, GRAVEL. THIS
WORK THAT WAS APPROVED SAME FOR SAME BY ANOTHER CONTRACTOR
THAT WAS NOT COMPLETED CORRECTLY
Conditions:
Cond: 12
@LDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 14
(BLDG.): ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: 16
(BLDG.): SMOKE DETECTORS ARE REQUIRED IN AI-L BEDROOMS AND
EVERY STORY AS PER SEC.31O.9.I OF THE 1997 UBC.
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQI.]IRED BEFORE A}IY
WORKCANBE STARTED.
***lt{'l'*****{r'l'***ar**++tftt+++*atttttfft***fttrr****+****{.*titttfttff+++*li*tl*tllt****a*tttt
TOWNOFVAIL, COLORADo stat€G€Nrt*+*{rt{r+{.1.1**+lr*t+**aaa*tlal+++tttt+fttft'}+ttat*t*********ft+++++++tt+++**+***********r***rt**
Statenent Nurnber: R040006820 Amount.: $509.96 lO/05/2OO409:18 A!{Payment Method: Check . Init: DDGNotation: Mater Sealers
7827
. Permit No: 804-028? I!4le: ADD/AIT Ur BUILTD PER!(ITParcel No: 210108230003 --
Site Address: 303 @RE CREEK DR \TAIIJLocation: Vail Rowhouses Units 2A &. 2C Total FeeE: $509.95This Payrnent: $509.95 Total ALI" pmts: 5509.96Balance: 30.00**t+{t{tt{'{'+'arlt*'i*+a111*aa**a*:}{.1r4't{'*t *tl**t'f*'}**att t*tt***'}*|.ttttt*t{'**{.**t'+**+******t++t+{tt
ACCOIJNTITEM LtrST:
Account Code Description Current plntg
BP OO1.OOOO31111OO BUIIJDING PERMTT FEES 307.25
PF 00100003112300 pIJAI{ CHECK FEES 199.17
v',c 00100003112800 WILL CetL TNSPECTTON FEE 3.00
MWNOFYIN
75 S. Frontage Rd.
Vail, Colorado 81657
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR
CONTRACTOR INFORMATION
tl
Project #:r&,0 z-od I
I it #:
TION
, etc.t
,+zry''tzz gEict/-z
rnd Phone #'s:
c.zet 7fa' 6>a?
Email address:
COMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials
BUILDING: $ELECTRICAL: $orHER: $,/t SaG-ct-'
PLUMBING: $MECHANICAL: $ToTAL: g e v tz:
For Parcel # Contact
*+***+*+***+*r***:r1.:r******sr.r*****FoR oFFlcE USE ONL
Assessors Office at 970-328-8640 or visit wvwv.
P=ari€!"#V,zaz ? t& 7a aez
Job NameS4z/. a/,{ o..o,az.,
L-^-/ t ,h4to'oP9y €a-</ - /--2./z//1az-..
Legal Description Lot:Block:Filing:subdivision:
=:17
K-;* ""
Owners Name->Z;"Z"aec{ c c C Address:-F.€-FgF /?aa. . -€tqSPhone:ArchitecUDesigner:Address:Phone:
Engineer:Address:Phone:
Detailed description of work
4fZzcf Qa-t/-t E+.rfrz-{ E -*.-y'.o
y'e*cZ ea)--.- t- €tzaz-// ,
-.n-rfi ,nr'z,{.aaz:-<
WorkClass: New() Addition( ) Remodel ( ) Repair( ) Demo( ) Other(4rtad
Work Type: lnterior ( ) Exterior ff eotf, ( )Does an EHU exist at this location: Yes ( ) No ( )
Type of Bldg.: Single-famif ( ) Two{amily ( ) Multi-family ( ) Commercial ( ) Restaurant ( ) Other ( )
No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building:
No/Type of Fireplaces Existing: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq (
No/Type of Fireplaces Proposed: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq (NOT ALLOWED)
Does a Fire Alarm Exist: Yes (lf No (Does a Fire Sprinkler System Exist Yes ( ) No ( )
//
\Wailbata\cdev\FORMS\PERIVIITS\BLDGPERM.DOC
tt
ruffi\,m
Questions? Callthe Building Team at 479-2325
Depaftment of Community Development
Project Name:
Project Address:
/ This Chelclist must b ampleM tuforc a Buitdino Permit aoolication is
arcoEd,
u2zAll pges of application is complete
a UHF DRB approval obtained (if required) Provide a copy of approval form
s//tondominium Association letter of approval attached if project is a Multi-Family complex
o r /omplete site plan submittedr'.
ic Way Permit application included if applicable (refer to Public Works checklist)
ng plan included (refer to Public Works checklist) No dumoster,parkinq or material storaoe
/AEbegrcs test and results submitted if demolition is occurring
/ lfchitect stamp and signature (All Commercial and Multi family)
s Full floor plans including building sections and elevations(S sets of plans for MultFFamily and
Co7rmercial Buildings)
o y')lindow and door schedule
{ fult structural plans, including design criteria (i.e.loads)
7.,Ar,Atruflural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
D Soils Report must be submitted prior to footing inspection
afne resistive assemblies specified and peneb-ations indicated
2 ,Smoke detectors shown on plans
,p/ Types and quantity offireplaces shown
Applicanfs
Date of submittal:
Wail\data\cdev\FORMS\PERMITS\BLDGPERM.DOC
Received By:
04,n2no03
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Enginee/s (Public Works)
review and approval, a Planning Department review or Health Department review, and a review
by the Building Department, the estimated time for a total review will take as long as three (3)
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for.
Agreed to by:
Project Name:,6.a.t E-rz -7o..at/r- /
,/Date: 7 / 7)/-r
4.t/a,r'/
F:everyone/forms/bldperm3
HOW DID WE RATE WITH YOU?
Town of Vail Survey
Community Development Department Russell Forrest Director,
(970)47s-213s
Check all that applies.
1. Which Departnent(s) did you contac0
Building _ EnvironmenEl_ Housing_ AdminPlanning DRB PEC _
2. Was your initial contact with our stafiimmediate
no one avaitabte4fo2l?
slow
3' tl:,iiir.Wwas it berore You were
4. Was your project revieured on a timely UasisZ 6l ruo
lf no, why no?
5, Was this yourfirsttimeb fte a DRB "p{erc ^ppBldg Permit I\UA
Counter?
9. Any comments you have which would allow us to beter serue you
next time?
Thank you for taking the time b complete this survey. We are
commited b improving our service.
i',
6. zP&gse rate the performance of he staffperson who assisted you:(9t 3 z l Name: J.+,/'
(knowled ge; responsiveness, availability)
7. Overallefiectiveness of the FrontService Countq) + I 2
L Whatisthe bestlime
1
pf day for you to use fie Front Service
rh l//
WHEN A *PUBLIC WAY PERMIT" IS REQUIRED
PLEASE REAE AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A
"PUBLIC WAY PERMIT'':
No/o
o
o
o
o
0
Does demolition work being performed require the Usgdf tne Right-of-Way, easements or
public property? yES_' NO_ d-_
Is any utility work needed? YES- NO!
./
Is the driveway being repaved? YES- NO--tr
Is a different access needed to the site other than the existing driveway? YES_
Is this a new residence? YES
Is any drainage worlq bg|afYES NO //
No/
done that affects the Right-of-Way, easemenB, or public property?
n
o
Is a "Revocable Right-of-Way Permit" required? YES_ NO_5_
i?y" *"tti$:Ury*Ofr or public property to be used for stasins, parkins or fencins?
If answer is NO, is a or fencing plan required by Public Works?
YES NO
If you answered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-2t98.
ED ALL THE ABOVE QUESTIONS.
Job or Project Name:
Date Signed:
F:/everyone/forms/bldperrn4
I HAVE READ AND A
Contractor Signature Company Name
APPLICATION
FOR TOWN OF VAIL
PUBLIC WAY PERMIT 19
PW*:TT TTTN
PATCEI#:!ITT'[[T-TN-TtrT A(h
Brds.Permit#:E I I,[ [ f I rumvffi
z.
Job Namo
Excavating Contractor Name
|-l Tl n-n (lfunknowncatl
L_' | | | r LJ 479-2139sxt.9
TOV Contractor's License Number REQUIRED
()
ziPCity Phone #
Completion Date (Permit Explration Date)
Water Sewer Gas Electric Telephone CATV Landscaping Temp. Site Access
Slart Dale
Work is for (circte one)
Other
Trench-width
(min.4')
BondAmount $
ALL MATERIAL, EQUIPMENT,
JOB IS STARTED.
Bubber out-riggers are required on
Asohalt surfaces undemeath lhe
A signature below indicates a
Depth
TolalsF $
Toral LF $
Permil Fee Total Permit Fee $
7.
D TRAFFIC BE ON THE JOBSITE BEFORE THE
working on asphalt.
at all times.
utilily locations and approvals. Once all utility company
application through the Public Works office 1o obtain the
8.
signalures are obtained,
necessary Town ol Vail up to one week to process.
Public Service Company (1
Public Service Natural Gas (1-800-922-1987)
U.S, West (1-800-922-1987)
TCI Cablevision of the Rockies (1 -1e87)
Eagle River Water & Sanitation District {970-476-7480, ext. 114)
Holy Cross Electric Company (1-$00-922-19871 _
Town of Vail Efectricians (970-478-2158) _
Town of Vail Inigation (970-479-2158)
9.
10.
11.
12.
Town of Vail Public Works Construction Inspeclor (970-479-2198)
THERE WILL BE NO TOTAL STREET CLOSURESI A constructi
Public Works Department prior to lissuance of the permit.
THERE WILL BE NO TOTAL STREET CLOSURESI A construction traffic control plan must be approved by the
Public Works Department prior to lissuance of the permit. i'
Failure to nolity
the Town will result in forfeiture ol I money. Scheduled inspections which are not ready may result in the Town
fee. ''charging the contractor a
I certify that I have read all chapters of Title I - Public Ways and Property, of the Vail Municipal Code and all utility
company agreements, signed by rne, and will abide by the same, and that all utillties have been notified as required.
Contractor's Signature of Agreement
ATTACH PLAN OF WORK, INCLU
Prlnt name clearly
G CONSTRUCTION TRAFFIC CONTROL PLAN
All excavation must be done by hand within 18" of utilities - (Senate Bill 172),
Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT.
Signature
PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
How it relates to Building Permits:
Fill out the attached check list with the Building permit Application.
If yes was answered to any of the questions then a "Public Way" permit is required. You
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verifi7 (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November lst and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Work's office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to peform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
I have read and u
F:/everyone/forms/bldperm5
IUmY0r
The Town of Vail Building Depaftment has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
The Town of Vail Public Works Department will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culverts at access points from the road or street onto the construction
site. Such approval fiust be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other
inspection. Please calJLeonard Sandoval at479-2198 to request an inspection from
the Public Works Depai'tment. Allow a minimum of 24 hour notice.
o Also, the Town of Vail Public Works Department will be approving all final drainage
and culveft installatio4r with resulting road patching as necessary. Such approval
must be obtained prior to any Final Certificate of Occupancy issuance.
Agreed to by: .z:a,t*ruzr'c ,(4 -o 'f
Project Name:
Date Signed:
,/^/,4.a.2 /a c-,1 4 azz, ,a/y'-
-/7r"/' '-/e, "2
Please read and check off each of the items below:
F:/everyone/forms/bldperm6
Please read and check off each of the items below.
(Copies of complete text are available upon request)
CoDE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED
a Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any
other debris or material upon any street sidewalk, alley or public place, or any portion thereof.
D Notice; Abatement: The Director of Public Works may notify and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
diG snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public Works, In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified.
D Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 1-4-l of this code.
o Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 6 (1979).
CODES 7-3A-I AND 7-3A.3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
o No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) 5 1)
o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge, (Ord. 2(1968) g 3: Ord. 28(1981) 5 1)
I have read and will comply with the above code provisions:
Position or Relationship to Project:
Date Signed:
F:/everyone/fomrVbldpernr7
a..*'/n t€--
Signature
Vail Village a
actively participate to minim
New for 2004-2006 will be
utility related
All Gonstruction projects
Bluhm Town of Vail
Givens
The following givens are
in the Villages:
The public's health, safety
Adequate pedestrian,
be maintained.
- No construction
September 5.
areas.
all
Scott
at all
the Vail
refer to
shall occur on Saturday or Sunday between June 19 and
VaiI 2004
Information Handout
Problem Statement
The Vail Mllage and Village are invaluable asseb to the community. Thousands of people
come to Vail each year to recreate, shop and to enjoy everything the Vail Valley has to offer.
The community and mercha
expect a pleasant experience
rely upon our guest to generate revenue. Our summerArinter guests
Lionshead Village Construction Hours
in Vail.
To insure that all of the construction has as little negative impact on the community and on our
guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village and
Lionshead Village Hours Handout.
It would be irresponsible for Tortn of Vail. the the Merchants. to not
the impact of
Vail Village
The hours of Outside Activity shall be as follows:
- April 15 - June 18 &nber 7 - November 19, 7 a.m. until 7 p.m., seven days a week.
June 18 thru 10, work must end by 4:00 p.m. on Fridays.
November 13 - April 1 , 2005 work allowed within daylight hours only.
Deliveries shall be to the hours of 7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m.
to 8:30 a.m. on Bridge
Special Construction permits must be requested in advance, from Public Works in
conjunction with Code Enforcement at Checkpoint Chadie.
No outside construction activity shall occur on the following dates:
Saturday, February 14, Sunday, February 15, and Monday, February 16.
(President's Weekendl
Saturday, May 22, Sunday, May 23 and Monday, May 24 (Memorial Dav)
Friday, June 25, Saturday, June 26 and Sunday, June 22. (Vail Arts Festival)
Friday, July 2, Saturday, July 3 and Sunday, July 4 and Monday July S.
(lndependence Dav)
Saturday, September4 , Sunday, September 5 , and Monday, September 6.
{Labor Dav Weekend).
Friday, September 10, Saturday, September 11, Sunday, September 12 in (Llqnghead)
Saturday, September 18 and Sunday, September 19- at ryail Villaoe) - (October Fest)
Thursday, November 25,
Sunday, November2S.
. November2T and
Friday, December 24, Saturday,
{Christmas Dav Holidavl
Friday, December 31, Satu Work
allowed the entire week of
The Town of Vail Noise
construction activities from
The Noise Ordinance shall be
November 13, 2004 to April 15,
All construction sites will be
of Vail Public Works
staging/parking plan is
waming),
Expectations
The following expectations are estrablished to insure the success of the Vail Village and Lionshead Village
Construction Hours Plan:
r Full and complete cooperation and understanding from all parties involved in the construction activity
in regards to this plan.
r Strict adherence and compliance with the requirements outlined in the construction plan.
. Respect and consideration for the affected intErests and parties.
lf you have any questions, Please contact the Town of Vail Public Works Department
(Construction Inspector) or the Vail Police Department (Gode Enforcement Officer)
for
19.
970.479-2198 970476-7603
TOWN0'FVAIL
Vail 2004 Staging / Parking Plan Information
The Staeine / Parkins PIan Philosophv- Is a very important step in the buitding
process. Striking a balance between safe public access and giving construction projects
room to build is becoming increasingly challenging, for us to meet all the needs of those
who will be impacted by construction projects. The fact is, there is less room to build in
the Town of Vail.
Developing a creative Staging Plan is a must. Staging in the Tovrn of Vail Public Right of
Way is a Privilege, not a given right. We take into account when we review and approve
staging / parking plans, impacts on neighborhoods, tourism, business and the traveling
public along with your right to build.
The General Contractor is resoonsible for all subcontractors and aII construction
activitv relating to the building proiect. The staging plan will be enforced according to
the Approved Set of Building and Staging Plans. You are required to keep a copy of the
Approved Staging Plan on site.
Two staging /parking plans are required, a surtmer and winter. Summer staging plans
expire on November l, and winter staging plans expire on April 15. (Note: There is nS_gg
street parking in the winter season and all materials" equipment. etc must be l0' offthe
eds.e of asohalt).
Enforcement of all staging / parking plan is as follows.
A) Staging / Parking Plans to scale required.
B) Once the plan is approved, they will be held to complete compliance.
C) We will use a 3 step and you're out, process.
Step One- Verbal and written warnings as to the staging plan violation, then have
contractor sign and date field memo waming.
Step Two- Police Departrnent issue tickets and tows or public works writes second
written waming to all violators who have been notified under step one and who are still
in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building
Official will call the contractor and notify flrem, the next time any violation happens, the
building department will red tag the construction site for 48 hours.
Step Three- If still in violation after step two, a 4$_bour_Belul-Ag will be issued to the
project site.
If you have any Questions, Please contact the Town of Vail Construction Inspector at
970-479-2198
Requirements for an Acceptable Staging Plan
It is preferred that and Approved site Plan is used to draw a staging plan, but a hand
drawn plan may be used as long as it is dawn to scale and is neat and legible.
1.) The Staging Plan must show the following:
(a) Show all parking that is required for the job site. (Including construction
equipment).
(b) Show the location of all material that will be staged on site.
(c) Show the location of all dumpsters and port-o-john ttrat are to be on site.
(d) If a fence is required, then show the location of the fence and describe the
material used for the fence.
(e) Iftrees and / or vegetation is required to be protected, then show how this will be
done.
(f) If this staging plan is for a Demo Permit, then show staging for dump trucks and
all related equipment. If the Town of Vail Right of Way area is needed for
staging, then a Traff,rc Control Plan is required in conjunction with the staging
plan.
(g) Please provide and show an Erosion Control Plan,
(h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in
the Winter Staging Plan.
2.) If work needs to oscur in the right of way, then add a Traffic Control Plan to the
staging plan showing the following:
(a) The work zone (area that is to be performed)
(b) Traffic Control Devices (waming, signs, cones, flaggers, etc,)
(c) Distances that all devices will be set up from the work zone. AIso show all
dimensions of work being performed in the right of way. All traffic control plans
must conform to the MUTCD manual.Manual of Unifom Traffic Control
Devices)
2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and
Community Development Department. Once the staging plan is approved, it will be
registered with the departments listed above and enforced.
3.) The Village and Lionshead area have outside construction restrictions, please become
familiar with the Vail 2004, Vail Village and Lionshead Construction Hours handout.
Design Review Board
ACTION FORM
Departnent of Cofiimunity De\dopmert
75 South Frontage Road, Vail, @lorado 81657
tel: 970.479.2139 Jax: 970.479.2452
web: www.ci,wll,co,us
Proiect Name: Pearson Residence Addition DRB Number: DRB020024
Project Description:
Fianl rerriew of remodel to Units 2A&2C, Vail Rowhouses
Partlclpails:
OWNER PEARSON, VICKI - DE MOCIEZUM02/06/2002 phone:
BARBARA
PO BOX 6236
VAIL@ 81658
License:
APPUCANT Pam Hopkins 040612002 Phone:476-2201
Snowdon & Hopkins Archltecb, rc
POB 3340
Vall, Co
Pam@snowdonhopkins.com 81658
License:
Prcject Addrcss: 303 GORE CREEK DR VAIL Location:
Vail Rowhouses Units 2A & 2C
l€gEl Descdption: loE 2 Blodc 5 Subdivision: VAILVILI-AGE RUNG I
Parcel Number: 210108230003
C.omments: Approred per plans submltted
BOARD/STAFF ACTTON
Action: APPROVED
Gonditions:
Cond:200
A conceptual revieu, is NOT a Design Redew Board approval.
Cond: CON0005248
Approved per plans submltted and stamped approved 41til002
Planner: George Ruther
-1