PLUMBING PERMIT Permit #: P02-0032
Job Address: 612 W LIONSHEAD CR VAIL Status . . . : ISSLIED
Location.....: 610 W LIONSHEAD CIRCLE Applied . . : M/24/2002
ParcelNo...: 270106307024 Issued. .: 05/02/2002
ProjectNo ' f {:f OZ-0 IO1 Expires. .: 1'0/29/2002
ovlNER SCHNETDER!{ArV, CHARTJES S' E[-'YSO4/24/2O02 Phone:
12 BERMT'DA I,AKE DR
PAI,M BEJACH GARDEIIS FI,
33418 -4583
License:
CoIITRACTOR COLORADO PLUMBTNG SERVTCE O4/24/2OO2 P]rone:
2335 AIRPORT ROAD
RIFITE, CO
81550
L,icense t L29-P
AppIJICAIim COIJORADO PIJUMBING SERVICE O4/24/2OO2 Phone: 970-625-0766
2335 AIRPORT ROAD
RIFIJE, CO
81550
License:
Desciption: RELOCATE KIT. SINK ROUGH AND REPLACE ADD 1 t-A'V AND REPLACE
2LAVSANDFAUCETS
Valuation: $2,900.00
Fireplace hfornution: Restricted: ??# of Gas Appliances: ?? # of Gas Logs: ?? # of
Wood Pallet
Plumbing-> 945 . 0o Restuarant Plan Review-> $0. 00 Total Calculated Fees-> $59 ' 25
plan Check-> S11 .25 DRB Fee------> gO . OO Additional Fe€s-> SO. OO
Investigation-> $0. oo ToTAL FEES--------> $59 .25 Total Permit Fee--> 559.25
will call->$3.00
BAL\NCE DUE->90. 00
Item: 05100 BUILDING DEPARTMENI
o4/3o/20o2 ,JRvi Action: AP
Item: O55OO FIRE DEPART!,IEN|
CONDITIONOF APPROVAL
Cond: 12
(BI,DG.): FIELTD INSPECTIONS ARE REQUIRED TO CHECK FOR CODB COMPLIAIICE.
DECLARATIONS
I hereby acknowledge that I have read this applicatior; filled out in full the information required, comPleted an
Payments--> S59.25
accurate plot Plan, and state that all the infornration as required is correct. I agree to comply with the inforuration and
plot plan" to comply with all Town ordinancee and state laws, and to build this stmcture according to the towns zoning
and subdivisioncodee, designreview approve4 Unifonn Building C-ode and other ordinances of the Tov.rnapplicable
REQT'ESISFORII\ISFECNONSHALLBEMADETWENTY.FOIJRHOTJRSIN ADVANCEBYIELEPFIONE AT479-A38 ORATOUROFFICE FROM 8dDAM.5
'l'******* ****+++**** **+ ****t{.* * ***,tot*** *****+t t{.* *f+{. !i * + * * * * * * {. {. * * * * * * * ********* ******+*** ***
TOWN OF VAIL. COLORADO Statement
f *t * * * * * ** ++ ++ + *t f **t***i***+*++************ *l**t*** ********++**+*** ***t * * ************{.*****
stat.enent. Nuiber: R000002280 Arnount 3 $59.25 05/02/20O2t2.25 Pl,4
Paltment Method: Check Init: L,C
NoEation: #305061/Colo
Plumbing Srv
Permit No: P02-0032 Type: PIJITMBING PERMIT
Parcel No: 2\0106307024
Sit.e Address: 512 W LIONSHEAD CR VAIL
Location: 510 W TIONSHEAD CIRCIJE
Total Feea: $59.25
This Payments: $59.25 Totsa1 ALL Pmts: S59.25
Balance: $0.00
**** * * ******+** * *+ * * * f*+ * + +* ** * ** * + f *++* * * *t + t * * +++ *:t + *+ * **'*** *** ** * * * lt * * + +* * + * t+ ** **+ * f ***
ACCOIJNT ITEM LIST:
Account Code DescniDtion Current Pmts
PF 00100003112300 PLAN CHECK FEES 11.25
PP OO1OOOO31112OO PLUMBING PIRI',IIT FEES 45.00
I,JC OO1OOOO31128OO I,'JILL CALL ]NSPECTION FEE 3.OO
IJ//WT{WYAE
75 S. Frontage Rd.
Vail, Colorado 81657
CONTRACTOR INFORMATI ON
Contact and Phone #'s:w;:;;;;"ftragil;{/,t',
uctioA
COMPTETE VALUATIOiI FOR PLUMBING PERUIT (tabor & Materials)
PLUMBII{G: $ LqOO
ff,aahgtec or forPatel #
'f,Emmm I ZtOt O;SorLOzv
@'L?tontn,rk, lrtn R6s.
robAddress: tlilrtttzr 9',?^r?,;" t tr
Legal Description Lot:Block ll Filing:Subdivision:
owners name: 721nta/ [nooress:Phone:
Engineer:Mdress:Phone:
Detailed description of workt
Rebc*Ie U+.g)nkgor,,L.*Reotacc-. MA lLav, +Kepl<cc ZLq.vs { Fq'r&s
WorkClass: New() Addilion( ) AlteraUon(y'j Repair( ) fther( )
Type of Bldg.: Single-family ({) Duptex ( ) Mutt-family ( ) Commercial ( ) Restaurant ( ) Other ( )
No. of Existing Dwelling UniB in this building:No. of Accommodation Units in this building:
Is this a conversion from a wood buming fireplace to an EPA Phase il device? Yes ( ) No ( )
*|l*i*r**.ir*tr**r*i**i**ir*****r*.****iFioR oFFIcE usE oNLY*r*r*.*t**r*rr*ir*a*'.i*.*rrr*t.ri*r**
\>[3
F/e\rerlprie/forms/plrnbperm
fi€eitveo
APR z '' 2002
rov-9!9u'oEv'
ftv^
TOI^/NOF VAIL DEPARTMENT OF COMMLINITY DEVELOPMENT
75 S. FRONTAGEROAD
VAIL CO 81657
970479-2138
NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL UMES
ADD/ALT MF BUILD PERMIT Permit #:802-0070
Job Address.: 612 W LIONSHEAD CR VAIL Status.....: ISSLIED
Location......: LANDMARK #T-24 Applied...: 04/1.6/2002
Parcel No....: 210106307024 Issued ...: 04/19/2002
Project No...: ( (rtbL -610\ Expires...: 1.0/1.6/2002
oI{NER SCHNETDERMAN, CHARIJES & ELYS04/16/2OO2 Phone:
12 BERMUDA IJAKE DR
PA]JM BEACH GARDENS FI-|
3 3418 -4s83
I_,icense:
coNrRAcroR T & M coNsTRucTroN 04/L6/2OO2 Phone: 970-32A-4467
P.O. BOX 2034
EAGIE, CO
81_531_
License: 551-B
APPr.,rCArinr T & M CONSTRUCTTON O4/L6/2002 Phone: 970-32A-4467
P.O- BOX 2034
EAGLE, CO
8 r_531
Lricense: 651-B
Desciption:
REMODELOF KITCHEN
Occupancy: R1 Multi-Family
Type Construction: III 1-HR Type III l-Hour
Type Occupancy: ??
Valuation: $24,958.00
Fireolace Information: Restricted: Y
AddfuFr 0
# of Gas Appliances: 0 # of Gas Logs: 0 # of
S0 . 00 Total Calculated Fees-> $489 .75
S0 . OO Additional Fees->$0.00
SO . OO Total permit Fee__> 9499. ?5
$0.00 Paymmts--> 5489.75
TOTAL FEES--> S489.7s BALANCE DUE-->
Wood Pelleh
Building-> 9295.00 Restuarant Plan Review-->
Plan Check-> 9191.75 DRB Fee.-----._._>
Investigation->
will call->
90 - 00 Recaeation Fe€*-->
$3 . 00 Clean-uP DePosit->
90. 00
Approvals:f€em: 05100 BUILDING DEPARTMENT
o4/t8/2jo2 JRNL Action; AP
Item: 05400 PLANNING DEPARTMENI
ItCM: O55OO FIRS DEPARTIi{ENT
Iten: 05500 PIIBLIC WORKS
PAGE 2
Permit #: BO2-0fJ70
CONDITIONS OF APPROVAL
asof M-79-2002 Status: ISSIIED
PermitType: ADD/ALTMFBTIILDPERMIT Appted: 04/76/2002
Applicant T&MCONSTRUCTION Issued: 04/19/2002
970-32V4467 To Expire: 70/1.6/2002
|ob Address: 612 W LIONSHEAD CR VAIL
Location: LANDMARK#T-24
Parcel No: 270106307024
Description:
REMODEL OF KITCHEN
Conditions:
Cond:1.2
(BLDG.): FIELD INSPECTIONS ARE REQLIIRED TO CHECK FORCODE
COMPLIANCE.
Cond:14
(BLDG.): ALL PENETRATIONS IN WALISCEILINGS,AND FLOORS TO
BE SEALED WITH ANAPPROVED FIRE MATERIAL.
Cond:16
(BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALLBEDROOIvISAND
EVERY STORY AS PERSEC.31O.6.1 OF THE 1997 UBC.
Cond: L
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in ftrll the information required completed an
accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and
plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning
and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable
thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN
PM.
Send Clean-up Deposit To: N/A
AT 479-2138 OR AT OUR OFFICE FROM 8:ffi AM - 5
CTOR FOR HIMSETJ AND OWNEF
tl
APPLICA OR UNSIGNED
Project #:
Building Permit #:
e7 o47 9 -2149 (Insp€di_.nq)
Geqeral Contractor:Town of Vail Reg. No.:Contact and Phone
1'1"1-lo7"lL (Y\ottie_ 329_44a7
PLUMBING: $Jq5YS
Tutrt{OFVIN
75 S. Frontage Rd.
Vail, Colorado 81657
uired for
t-
R INFO
PLETE VALUATIONS FOR BUILDING PERMIT & Materials
9f- ?*
Parcel# zrotObbC-1.oa4
(application will not be accepted
rob Name: Mannlesi JencS-Job- Address ford,Xl*t-
WorkClass: New() Addition( ) Remodel({) Repair( ) Demo( ) Other( )
Does an EHU exist at this locationt Yes ( ) No Cf )) Exterior( ) Both( )
Type of Bldg.: Single-family ( ) Two-family ( ) MultFfamily ( ) Commercial ( ) Restaurant ( ) Other
No, of Accommodation Units in this building:No. of Existing Dwelling Units in this building:
Wood Burninq (NOT ALLOWED
Does a Fire Sprinkler System Exist: YesDoes a Fire Alarm Exist:
...fiHT.irfil
F:/everyone/formybldgperm
For Parcel # Contact
** ** * ** ***
Assessrc Office at 97O-328-864O or visit
cE usE oNLY***********************r!**************
l)D.rit4,,l-
Questions? Call the Building Team at 479-2325
rul|/Ar
Department of Community Development
Project Name:
Project Address:
r' This Chekhlst mu# be omoleted beforc a Buildino Permit application is
arcoted.
o All pages of application is complete
- '{ nut DRB approval obtained (if required) Provide a copy of approval form
o Condominium Association letter of approval attached if project is a Multi-Family complex
d Complete site plan submitted
d Public Way Permit application included if applicable (refer to Public Works checklist)
q Staging plan included (refer to Public Works checklist) No dumpster,oarkano or materaal storaoe
allowed on roadwavs and shoulders without written aooroval
e/ Asbestos test and results submitted if demolition is occurringd Architect stamp and signature (All Commercial and Multi family)
d Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and
Commercial)
0/ Window and door schedule
ctl Full structural plans, including design criteria (ie.loads)
e/ Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
{Soils Report must be submitted prior to footing inspection
6 Fire resistive assemblies specified and penetrations indicated
( Smoke detectors shown on plans
{types and quantity of fireplaces shown
Date of submittal: _
Received By: _
F:/everyon{forms/bldperm2
HOW DIDWE RATE WTTH YOU?
Toum of Vail Survey
Gommunity Dwelopment Deparfnent Russell Fonest Direstor,
(970)179-2139
Check all that applies.
1. Which Departnent(s) did you contact?
Building _ Environmenbl_ Housing_ Adnin;
Planning . DRB _ PEC _
2. Was yourinitialconbctwiilr oursffiimmediate dow
no one available__?
3. lf you were required to wa[ how long was it before you were
helped?
Was your project reviewed on a lfunely basis? Yes / No
lf no, why no0-
5. Wasfiis yourfirstlimeb fle a DRB app_ PEC app
Bldg Permit_ N/A
Please rate fie perfonnance of he staffperson who assisbd you:54321Name:
(knowledge; responsiveness, avdlability)
Overall efiecliveness of he Front Service Counter. S 4 I 2
What is the best lime of day for you to use fre Front Service
Counter?
9. Any comments you have which would allow us to betbr serve you
nextlime?
Thank you for taking the lime b conpleb ilris survey. We are
commitbd h improving ourservice.
7.
8.
TUR4VOF
WHEN A *PUBLIC WAY PERMIT'IS REQUIRED
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESNONS REGARDING THE NEED FOR A
"PUBLIC WAY PERMIT'':
tr Is this a new residence? YES
tr Does demolition work being performed requi easements or
public propefi?
NO t/
'i jlf" "e
Ris ht-of-way,
No,/-o
B
tr
o
Is any utility work needed? YES
Is the driveway being repaved?NO_-/__
Is a different access needed to the site other than the existing driveway? YES- NO
Is any drainage work bging done that affects the Right-of-Way, easements, or public property?
YES NO /
Is a "Revocable Right-of-Way Permit" required?YES
Is the Right-of-Way, glsements or public property to be used for staging, parking or fencing?
YES NO I./
If answer is NO, is aparking, staging or fencing plan required by Public Works?
YES_ NO_Z_
If you answered YES to any of these questions, a'tPublic Way Permit" must be obtained.
"Public Way Permif applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-2198.
I HAVE READ AND ANSWERED ALL THE ABOVE QUEfiONS.
--a* 1|\ Qout\ar^c\\ur\
Job or Project tlamell\
Date Signed:
F : /everyoneforms/bld perm4
Company Name
TOVTNOF
PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
How it relates to Building Permits:
Fill out the attached check list with the Building Permit Aoplication.
If yes was answered to any of the questions then a "Public Way" permit is required. you
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective
utilifies prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November 1st and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Work's office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to peform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
NOTE: The above process is for work in a public way ONLY. Public Way
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
I have read and understand the above.
Signature
F :/everyone/forms/bldperm5
Date Signed
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Depaftment Approval, Engineer's (Public Works)
review and approval, a Planning Depaftment review or Health Depaftment review, and a review
by the Building Department, the estimated time for a total review will take as long as three (3)
weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projecls may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for.
Agreed to by:
Project Name:
(T\o\\,v- daq,
Print name J
F:everyoneformtbldperm3
APPLICATION
FOR TOWN OF VAIL
PUBLIC WAY PERMIT 19-
pw*:I I-l I n n
PATCEI#:T T X N' T I T' T T' T T T
Brds. Permit#'E I ! - [ f f I
1.Job Name
Excavating Conlractor Name
Street Address nnn-[l (lfunknowncallrrl rr LJ 479-2139
"*1.
g
2.Maillng Address TOV Contractor I Licenae Number REQUIREO
Phone #zbCity
-' Slarl Date
4. Work is lor (circt€ one)
Comol€tlon Date
Water Sewer Gas Electric Telephone
(P€rmit Explration Dat€)
CATV Landscaping Temp. Site Access
Other
Trench-width
(min.4')
Bond Amount $
ALL MATERIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTEO,
7.Rubber out-riggers are required on
Asphalt surfaces underneath the
A signature below indicates a
signalures are obtained, permittoe
necessary Town of Vail signatures.
BE ON THE JOBSITE BEFORE THE
working on asphalt.
al all times.
utility locations and approvals. Onc€ all utility company
application through the Public Works office to obtain the
up to one week to process.
Depth
ToralSF $
Total LF $
Permit Fee Total Permit Fee $
8.
Public Service Natural Gas Group (1'800-922'1987)
Public Service Company (1
U.S. West (1 -800-922-1 987)
TCI Cablevision of the Rockies (1'800-922-1 987)
Eagte River Water & Sanitatlon District (970'476-7480, ext. 114)
Holy Cross Electric Company (1-800-922'1987)
Town of Vail Electricians (970479-2158)
Town of Vail lrrigation (970-479'2158)
Town of Vall Public Works Construction lnspector (970'479'2198)
9. THERE WILL BE NO TOTAL STREET CLOSURESI A construction trafiic control plan must be approved by the
Public Works Department prior to issuance of the permit.
All excavation must be done by hand within 18" of utilities - (Senale Bill 172)'
Permittee must contacil Publlc Works Dopartment et 479-2198 24 hours prior to commencing of work' Failure to notify
the town wjll result in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town
chargirig the contraclor a reinspection fee.
I certify that I have read all chapters of Title I - Public Ways and Property, of the Vail Municipal Code and all ulility
company agreements, signed by me, and will abide by ihe same, and that all utilities have been notified as required.
10.
11.
12.
Contractor's Signature of Agro€menl
ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN
show streets with names, buildings, and location of cuts. usE DASH LINES FOR CUT.
Pdnt name clearly Dale ol Signature
Whit€ - Public Works
Yellow - Contractor
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS!
Please read and check off each of the items below:
q The Town of Vail Building Department has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
o The Town of Vail Public Works Department will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culvefts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at479-2t98 to request an inspection from
the Public Works Department. Allow a minimum of 24 hour notice.
o Also, the Town of Vail Public Works Depatment will be approving all flnal drainage
and culveft installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Ceftificate of Occupancv issuance.
Agreed to by: fr\r^trro t\a^^
Print Name\-J
Project Name:
Date Signed:4\-\Ob?-
F:/everyoneformtbldperm6
Please read and check off each of the items below.
(Copies of complete te)C are available upon request)
CODE 5-2-10: DEPOSTTS ON PUBLIC WAYS PROHIBTTED
o Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, san(, gravel, rocks, mud, dirt, snow, ice, or any
other debris or material upon any street, sidewalk, alley or public place, or any portion thereof.
o Notice; Abatement: The Director of Public Works may notiff and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public Works. In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Work, or other authorized agent, may
cause any such sandr gravel, rocK, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified.
o Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 14-1 of this code.
o Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 14-1 of
this Code. (1997 Code: Ordinance 5 (1979).
CODES 7.3A-IAND 7.3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
o No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) $ 1)
o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) g 3: Ord. 28(1981) 5 1)
I have read and will comply with the above code provisions:
Position or Relationship to Project:
Date Signed:
F:/€veryone/forms/bldpennT
Arr,l2.2tt02 l;24P|l|DESTINAII(]N FESORT lio.l79l P, l
DESTINATION RESORTS
6tO WTST LIONSHBAD C'RCIE
v-All- cotonADo tt6r7-rzet
TELEPHONE (970) 476-lt5o
FAX {9m) {76-1517
Fpnl 12,2Wt
Town Of Vail
Building Dept.
75 S. Frontage Rd.
Vail, GO E1657
Re: Landmak T l+24 Remodel
To lMrom I May Concem:
Please let this fetter serve notice that T&M construction has the landmark
cordorninir.rm Association's permission to proced with their kitcfien remodel of
Tor,rrrrhouse#24. Please fet me knour if yoir require anything else.
CreotrWright
General Manager, l-andmark
Destination Resgrt Managemenl. Inc.
A Lrrrft E ictprirdE (bmpny
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S.FRONTAGEROAD
VAIL, CO 81657
97M79-2138
NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES
ELECTRICAL PERMIT
|ob Address: 612 W LIONSHEAD CR VAIL
Location.....: 610WLIONSHEADCIRCLE
ParcelNo...: 270706307024
ProjectNo : ($-SW-oOq
OlrlNER SCHNETDERIIAII, CHARIJES & F.LYSO4/24/2OO2 Phone:
12 BERMUDA LAKE DR
PALM BEACH GARDENS FI,
33418-4583
Iricense:
CONIRACTOR NE!iI ELECTRTC INC,
P O BOX 957
AVON CO
8162 0
License: 1l-0-E
APPIJICAI\M NEW EIJECTRIC INC,
P O BOX 957
AVON CO
4L620
I-,icense: 110-E
Desciption: REMODELELECTRICALSYSTEM
Valuation: $1,900.00
04/24/2oo2 Phone : 97o-949-465L
04/24/2oo2 Phone: 97o-949-465L
Permit #: E02-0043
Status...: ISSUED
Applied. . : 04/24/2002
Issued. .: 04/30/2002
Expires. .: 1.0/27/2002
Total Calculated Fees-> Ss3 .00
Additional Fees----->$0.00
Total Permit Fee-> 953 - 00
Payments---> $53 .00
BALANCE DUE-->$0.00
FEE SUN'MARY
Elechical-->
DRB Fee----->
lnvestigation-->
will call-_>
$s0. 00
$0.00
$0.00
$3 .00
TOTAL FEE}> S53. OO
Approvals:Item: 05000 EI-,ECTRICAIJ DEPARTMEMT
o4/24/2oo2 DF Action; AP
Item: 05500 FIRE DEPARTMEM
CONDITIONSOF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPI-,IAIiICE.
DECLARATIONS
I hereby ackno$iledge that I have read this applicatioo filled out in full the information required, completed an
accurate plot plan, and state that all the in{ormation as required is correct. I agree to comply with the information and
plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoninl
and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable
thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TVVENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM - 5
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OI^/NE}
ft+ttlf*ta*rlr*'afll''ff+flffll***rlirl*tl*'a*'}ffltlll{.**rfltl*'}*l'tft}lttf*frlfftft'}ttfl*l'lff,+l'f*
TOIVNOFVAIL, COITORADO San€tneot
*la*a*alatta*t*al*lfl*+ltal*+**l+laa+l***'illattaf**{'*aflll**a*+**allt**tltaaa*{tlt*alfllfll*+a
Staternent lihrniber; R000002253 Arnount: $53.00 04/30/2002L1 :15 Alt
Pa)ment Method: Check Init: LC
Notation: *33737lNEw ErJEcTRre
Permit No! 802-0043 Type: EtEqfRIeAJJ PERI4IT
Parcel lilo: 2L0L06307O24
SLte Addreee: 612 W IJIONSHEAD CR \IAIL
IJocation: 510 lY LIONSHE;AD CIRCLE
Total Fees: S53. OO
ThiE Paytn€nt,: $53.OO Total ALL Pmta: $53.00
Balance: 90.00
*al'++fa*1ti****'.a***a**a*'ia*{rt*+**{'laa*aal}**+fl+******{'a{'{t*t***l**l*+lr*f****a**faaalff***t**
ACCOUNT ITEM LIST:
Account Code DescriDtion Current Pmu
EP OO1OOOO31114OO TEHPORARY POI,{ER PERMITS
l\lc OO1OOOO31128OO WILL CALL INSPECTION FEE
s0 .00
3. 00
OEt:53A New E]ectric P -O2r-24-oz
IF II{COMPLETE OR
BuildingaElectrical Permit #:
g7 O- 47 I -2,119 (I nsPections)
mrll0pYi,IL
75 S. Fronugc Rd.
Vail, Colondo 81657
ractor:Contact and Phone *'s:
N€-ur,t €.1 F ('l-Y?-l(-ln<.n 1 D-1,/9 -t l(a5/
Itractor Slgnature:
COI||PIETE sQ. FEET FOR NEW BUILDS and VALUATIONS FOR ALL OTHERS (Labor & Ma :rials)
AMOUNT OF SQ FT IN STRUCTURE:ELECTRICAL VAIUATION: f
Contect Assessors Ofllce ,;t 97O-3.or Yisit for P. "cel #
# (Required if no bldg. permit {!above)
JobNamc:LOndrnarK 6H - l/,rUl TOT#.lobAddress: lotZ_ g, Lrrrnljhnc.r.d CrrC0P
r***tr.tt*tt*trr*i*t**+*t**t*t t*at*rlrFOR OFFICE USE ONLY
t*t* r * r l***a *
F :/evEryorra/3(rtis/ElECPG| In
BEST
COPY
AVAILABLE
descripticn gf work:_fu etEtu* qv\W. _=,
Work Class: Ncw ( ) Addition ( ) Remodet (X) n"pttt t I Tttp P"*"'t Jffi-ffi
Type of Bldg.: Slnglefarnily ( ) Duplex (I ItUtr+"tifv tp. tommercial ( ) Restaurant ( ) other ll
No. of Accommodation Unlts in this building:ito. of ErFting Dwelling Units in this building:{
Is this perrnit for a hot tub: Yes ( ) No
dffi'File-FfiEer Svstcm Exist Yes
ooes a rire Alarm Exist: Yes (K ) No (
;BE-*c*ffi.8?..
z 4 ?0c2