HomeMy WebLinkAboutPRJ02-0163 B02-0306 LEGALTOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S.FRONTAGEROAD
vArL, co 8t657
970479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT MF BUILD PERMIT Permit #: 802-0306
JobAddress.: l3l WMEADOWDRVAIL Status.....: ISSUED
Location......: l3l W MEADOW DR Applied...: 09/1612002
Parcel No....: 210107102000 Issued ...: 10/0412002
ProjectNo...: Expires...: 04/O2|2OO3
or{NER SCORPIO CONDOS 09/t6/20O2 phone: 524-7629
EII,EEN iIACOBS
I-,icense :
COIITRACTOR AROSA CONSTRIICTION, INC . 09/L6/20O2 Phone: 970-477 -26Lt
2548 AROSA DRIVE
vArIJ, co
4t657
Iricense: 24A-B
APPr.,rCAr\flt AROSA CONSTRUCTTON, rNC. 09/t6/2002 Phone: 970-477-26Lt
2548 AROSA DRIVE
VAIIJ, CO
81557
License:24A-B
Desciption:
SIDEWALK EXTENSIONNEW PARKING GATES-REPLACING STEL POST
WITH ROCK PILARS.DUMPSTER ENCLOSURE
Occupancy:
Type Construction:
Type Occupancy: 2?
Valuation: $18.200.00
Fireplace Information: Restricted: Y
Building--> $23 5 . 00 Restusrant Plan Review->
Plan Check--> 3152.25 DRB F€e-_--->
Add Sq Ft 0
# ofcas l,ogs: 0 # of Wood Pellet: 0
FEE SUMMARY Ja'it*t*:rr't*+ttr:r'1rt'r'ra'r1l+'lll*'l.r*tl+'l'i:l'lltrta**.'rr.{*'..*t'r**r
So. Oo Total Calculated Fees-> $390.75
s0.00 AdditionalF€€s---->so. o0
$0.00 Total Permit Fee---> $390.?5
$0.00 Pryrnents-----------> 5390.?5
# ofcas Applianc€s: 0
Investigation->
Will Call-->
$0. 00 Recr€ation Fe€------->
$3 .00 Clean-uP DePosit---->
TOTAL FEES--.-.--.> S390. ?5 BALANCE DUE--*-->$0.00
Approvals:Ifen: 05100 BUIL,DING DEPARTMENT
Lo/o4/2oo2 gcd Action: AP
Item: 05400 PIAliIl{IliIG DEPARTMEMI
o9/L7/2oo2 bgibson Actsion: AP
Item: 05600 FIRE DEPARI'I{ENT
Item: 05500 PITBI-,IC WORKS
tll I tt* +a* *a** atl * **l*tl I *:t* *l * * t+ ll +r l*ll lt++*il *tl *l'l *'l'l{ araa al+ l+ +*:la'l
See page 2 ofthis Document for any conditions that may apply to this perrrit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information rcquired, completed an accurate plot plan,
and state thd all the infonnation as required is conect. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this stucture according to the towns zoning and subdivision codes, design review
approved Unifonn Building Code and other ordinances of the Town applicable thereto.
nEQLJESTI FOR INSPECTION SI{ALL BE MADE Ttr/ENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT ouR OFFICE FROM 8:00 AM - 4 PM.
a
OR CONTRACTOR FOR HMSELF AND OWNET
PAGE 2
'||t**t'|,}*:i*'t**!i|**{t*ttt|******tt****'ii'|*'|!t**tt*:|.,*+****t**|*'t*l.**!t*t,t.+{t:t*,t!tl.***,t*{.'f{.,t***i*************t****i
CONDITIONS OF APPROVAL
Permit #: B02-0306 as of 10-04-2002 Status: ISSUED
**|*t**|'}***{',lt**,}{t*|**l':it*t}lt*'}**.+|'|'ft{t'}'}*'}{.{tl'***'}*{.**'t't*'t:|.*{.***{.!}:|t***|:}*{t:|.*'t
Permit Type: ADD/ALT MF BLIILD PERMIT
Applicant: AROSA CONSTRUCTION, INC.
970477-26rr
JobAddress: 13l WMEADOWDRVAIL
Location: 131 WMEADOWDR
ParcelNo: 210107102000
Description:
SIDEWALK EXTENSION,NEW PARKING GATES-REPLACING STEL POST
WITH ROCK PILARS,DUMPSTER ENCLOSI.JRE
Conditions:
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CANBE STARTED.
Applied: 09/1612002
Issued: 10/04/2002
To Expire: 04/0212003
** *+ + + +**** t ft ** *{''l't{t*** * * i t+ + + +*** * t**l* f +* * +++ t +* * +**** * ** * *r*+++* * + ++ + + **+ + * ** ******* * ****
TOWNOFVAIL, COLORADO Statement
****+l * t* * * * ++ + + * +t 1** ** * * *******+****l +* ** * **** ** * ***** f +*+****** * * * **** **t*t+ + ++ ** *+****++
Statement Nudber: R000003205 Amount: S390.75 tO/O4/2OO2I1 :42 AM
Palment Method: Check Init: LrC
Notation: 1?80/Mountain
Caretaker, Inc.
Permit No: 802-0305 Type 3 ADD/ALT MF BUIIJD PERMIT
Parcel No: 21010 7102000
Site Addrese: 131 lV MEADOV| DR VAIIJ
L,ocation: 131 Vl MEADOI{ DR
Total Fees: $390.75
This Palznent: $390.75 Total ALL Pmt,s: 5390.75
Balance: $0.00
t +* * * **** **+t***{' ** + ** ******** * ** ** ** ** t** * *** * * * * ** * * * I ** {.1.***** * * tl. + {i +*++ ***** * * *** ** +* +**
ACCOIJNT ITEM LIST:
Account Code DescniDtion Current Pmts
BP OO1OOOO31111OO BUILD]NG PERMIT FEES 235.00
PF OO1OOOO31123OO PLAN CHECK FEES 15?.75
llc 00i00003112800 I,'JILL CALL INSPECTION FEE 3.00
mm',lwyall
75 S. Frontage Rd.
Vail, Colorado 8165i
APPLICATION WILL NOT BE
Separate Permits
^4.|rfttffi
PE
electrical-, plumbing ,."ffi,,"9.'
8 657
CONTRACTOR INFORMATION 6 hhes- 496-G
General Contractor:
AaosA corurramoNl, tNa.
rounqif '
--?[11"8"
Contact and Phone #'s:
furr AAs4us 37A-4ha
Email address:
ContractorSignature: ffi-/,(Mu'[ bnn[,tw-
COMPLETE VALUATIONS FOR B UILDING PERMIT bor & Materials
BUtLptNG: S l8.2o0,ccr ELECTRICAL:s fu/n OTHER:$
PLUMBING:$ trJ/A MECHANICAL:$ N/k rorAL:$ /$rCO,Cn
For Parcel # C
t*****f*****i*********,.f**tr***t***FoR oFFlcE USE ONLy"**ffi*****r*****************.
ontact Assessors Office at 97U328-8640 or visit
Fe-rsil#
a lrlo?/oacn
JobName: ^ , ^ , ^ 1 p",p:ler-
i)c-o.plo - Nebr ddtn+"rug14ur1 €rclosorr
JobAddress: Bt \).Hp,rolotr b.. qi\
Lesarpescription ll r-ot: Dl fl enck; ll riling: !,,1 a"* F,li.rq ll Subdivision:
o*n"o N"t"'i--f.?c"-,
x4rdr?5s I Phone:
ArchitecUDesigner:Address:Phone:
Engineer;Address:Phone:
Detailed description of work: Si&L
'rt>cK pl [au's, t)os€lsler, ?_.lcloso,.e_-
workclass: New() {ddgl!]__Iry1"]$4 Repair( ) Demo( ) other( )
Work Type: Interior ( ) Exterior (yQ Both ( )Does an EHU exist at this location: Yes ( ) No ( )
Type of Bldg.: single-family ( ) Two-famity ( ) Multi-family ({ commerciat ( ) Restaurant ( ) other ( )
No. of Existing Dwelling Units in this buitding: ?D No. of Accommodation Units in this buildino:
Noffvpe of Fireplaces Existing: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq (Do
No/Type of Fireplaces Proposed: Gas Appliances ( ) Gas Loqs ( ) Wood/peilet ( ) Wood Burninq (NOT ALLOWED)
Does a Fire Alarm Exist Yes (;Q lrlo (Does a Fire Sprinkler System Exist: Yes ( ) No f4)
\\Vailldatabdev\FORMS\PERMITS\BLDGPERM.OOC
T0t{,i\,m
Questions? Call the Building Team at 479-2325
Department of Community Development
Project Name:
Project Address:
/ This Checklist must be ompleted before a Building Permit aopliation is
accepted.
d All pages of application is complete
{ tlas DRB approval obtained (if required) Provide a copy of approval form
{C-ondominium Association letter of approval attached if project is a MultFFamily complex
. d Complete site plan submitted
dAo Public Way Permit application included if applicable (refer to Public Works checklist)
/a^ $lcbsor<-
ul+ "
p/A o
N7n'
r l^ n
N/et -
{/" -tNltv-
o,/r o
tlryo
;'J/fr o Staging plan included (refer to Public Works checklist) No dumoster,oarkinq or material storaqet"u atlJwid on roadwavs and shoulders without wiitten iooroval
"h o Asbestos test and results submitted if demolition is occurring' o Architect stamp and signature (All Commercial and Multi family)
Nh" Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and
' Commercial)
Window and door schedule
Full structural plans, including design criteria (ie.loads)
Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
Soils Report must be submitted prior to footing inspection
Fire resistive assemblies specified and penetrations indicated
Smoke detectors shown on plans
Types and quantity of fireplaces shown
z,-'ly laAppficant'sSignature: /<*-laJD"ri,\<=.--'
Date of submittal:
F:/e\reryonqforms/bldperm2
Received By:
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Depaftment Approval, Engineer's (Public Works)
review and approval, a Planning Department review or Health Depaftment review, and a review
by the Building Department, the estimated time for a total review will take as long as three (3)
weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements, Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for.
Agreed to by:G, G ilq"ot -g
Print name
-T.YtQo,o<-"^'-_-
Signature
/\
ProiectName: c-\Corroio * 8*r{r,+.0.e L)*o,-oj.' I b"-'pta* Znlcfo:o'€-'
trDare: ?/to/o p-
F: everyoneforms/bldperm3
,ffi^^f+/,/nf||ilny
HOW DID WE RATE WITH YOU?
Town of Vail Survey
Community Dwelopment Departnent Russell Fonesl Directoq
(970)4n-2139
Check allthat applies.
1. Which Departnent(s) did you contact?
Building _ Environmenbl_ Housing_ Admin
Planning DRB _ PEC
3. lf you were required b wai[ how long was it before you were
helped?_
4. Was your project reviaved on a timely basis? Yes / No
lf no, why not?-
6. Please rde the performance of tre staf person who assisted you:
51321Name:
(knor'rledge; responsiveness, availability)
7. Overall efiectiveness of fie Front Service Counter. 5 4 3 2 1
8. What is the best time of day for you to use the Front Service
Counter?
9. Any comments you have which would allow us b better serve you
nexttime?
Thank you for taking fie time to complete this survey. We are
committed b improving our seMce.
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING
"PUBUC WAY PERMIT":
ONS REGARDING THE NEED FOR A
WHEN A'PUBLIC WAY PERMIT" IS REQUIRED
Is this a new residence? YES NO
Is the driveway being repaved?
Is a different access needed to the site other than the existing driveway?
QUESN
Does demolition work being performed require the ute of the Right-of-Way, easements or
public property? YES- NO_-l-_/
Is any utility work needed? YES- NO--l-
No v/
o
D
o
o
n
o
YES-No v/
o
n Is the Right-of-Way, e/sements or public propefi to be used for staging, parking or fencing?YES NO V
Is any drainage work p€ing done that affects the Right-of-Way, easements, or public property?YES_ No_r1_
/
Is a "Revocable Right-of-Way Permit" required? YES- NO---V1
NO, is a Ffrng, staging or fencing plan required by Public Works?
NO_l'
If you answered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permit" applications may be obtained at the Public Work's office or at Communify
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-2L98.
I HAVE READ AND ANSWERED ALL THE ABOVE QUESTIONS.
Contractor Signature
Job or Project Name:
Date Signed:
F :/everyone/forms/bldperm4
If answer is
YES
Company Name
EW*:T !'! T T T
APPLlcArtoN parcer#:IIf l'f If 'Il'M
FOR TOWN OF VAIL
PUBLTcwAYPEFMIT te- Bldg.Permit#,8 n [-I I I I Tgrr?Vmy
Job Name Street Address
2.Excavating Contractor Name
1,
n Tl n - Tl (ltunknowncallI | | | I | | | 479-2138ext.0
Maillng Address TOV Contractor's License Number REOUIREO
ZpCity Phon€ f
Start Date
Work is for (circt€ one) Waler
Other
Completion Dat€
Sewer Gas Electric
(P€rmit Expiration oat€)
Telephon€ CATV Landscaping Temp. Site Access
c.Trench-width
(min.4')
Bond Amount $
6. ALL MATERIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED.
7.Rubber out-riggers are required on
Asphalt surfaces underneath the
A signature below indicates a
signatures are obtained, permittee
necessary Town of Vail signatures.
BE ON THE JOBSITE BEFORE THE
working on asphalt.
at all times.
utility locations and approvals. Once all utility company
application through the Public Works office to obtain the
up to one week to Process.
Depth
Total SF $
Total LF $
Permit Fee Total Permit Fee $
Public Service Company (1-800-922
Public Service Natural Gas Group (1-800-922-'19871
U.S. West (1-800-922-1987)
TCI Cablevision of the Rockies (1-800-922-1987)
Eagle River Water & Sanitation District (970-476-7480, ext. 114)
Holy Cross Electric Company (1-800-922-1987)
Town of Vail Electricians (970-479-2158)
Town of Vail lnigation (970-479-2158)
Town of Vail Public Works Construction Inspector (97C479-2198)
9. THERE WILL BE NO TOTAL STREET CLOSURESI A construction traftic control plan must be approved by the
Public Works Department prior to issuance ol the permit.
10. All excavation must be done by hand within 18" of utilities - (Senate Bill 172)'
11 . Permittse must contact Public Works Deoartment al 479-21 98 24 hours prior to commencino of work. Failure to notify
the Town will result in forfelture of bond monev. Scheduled inspections which are not ready may result in lhe Town
charging the contractor a reinspection fee.
12. I certity that I have read all chapters ol Title 8 - Public Ways and Property, ol the Vail Municipal Gode and all utility
company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required.
Con[actor's Signature of Agreem€t
ATTACH PLAN OF WORK, ]NCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN
Show streets with names, buildings, and location of cuts. USE DASH LINES FOB CUT.
White - Public Works
Yellow - Contractor
PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
How it relates to Building Permits:
Fill out the attached check list with the Building Permit Application.
If yes was answered to any of the questions then a "Public Way" permit is required. You
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Work, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.), This
plan will expire on November 1st and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Work's office for review, If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew, The locates take place in
the morning, but may require up to 48 hours to perform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permif'to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
) NOTE: The above process is for work in a public way ONLY. Public Way
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
I have read and understand the above.
Signature
F:/everyone/forms/bldperm5
Date Signed
TVWNOF
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS!
Please read and check off each of the items below:
o The Town of Vail Building Department has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
o The Town of Vail Public Works Department will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culverts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at 479-2198 to request an inspection from
the Public Works Department. Allow a minimum of 24 hour notice.
o Also, the Town of Vail Public Works Department will be approving all final drainage
and culveft installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Ceftificate of Occupancv issuance.
Agreed to by:
Project Name:
Date Signed:
Print Name
Signature
F:/et eryoneforms/bldperm6
9- to- oL
MATERIAL STORAGE AND CONSTRUCTION PARKING
Please read and check off each of the items below.
(Copies of complete text are available upon request)
CODE 5-2-10: DEPOSITS ON PUBUC WAYS PROHIBITED
q Unlavvful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dift, snow, ice, or any
other debris or material upon any street, sidewalk, alley or public place, or any portion thereof.
o Notice; Abatement: The Director of Public Works may notify and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public Works. In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Work, or other authorized agent, may
cause any such sand, gravel, rocK, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified.
D Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 1-4-1 of this code.
o Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incured by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 6 (1979).
CODES 7-3A-1 AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
o No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance, (Ord. 2(1968) 5 1)
o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) $ 3: Ord. 28(1981) I 1)
I have read and will comolv with the above code orovisions:
Position or Relationship to Project:
Dare signed: 4' n- A-
F:/everyone/fornrs/bldpemrT
6.c.
T0t4ft,m
Vail 2002
Vail Village/Lionshead Gonstruction Hours Handout
Problem Statement
The Vail Village and Lionshead are invaluable assets to the community. Thousands of
people come to Vail each year to sightsee, recreate, shop and to enjoy the Vail Valley.
The community and merchants rely upon the summer/winter tourism to generate
revenue. Our summer/winter guests expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the
community and on our guest as possible, the Town of Vail finds it imperative to create
and implement the Vail Village/Lionshead Construction Master Plan. Maps of the Village
and Lionshead are included to show areas of construction being affected by this plan.
It would be irresponsible for the Town of Vail, the Construction Contractors and the
Merchants, to not actively participate to minimize the impact of construction on the Village
and Lionshead areas.
Givens
The following givens are intended to provide the basic foundation by which construction
will be completed in the Village:
. The public's health, safety and welfare shall be honored at all times.
. Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and
circulation shall be maintained.
. Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
o All construction deliveries, equipment, tools, materials, etc. to the Village must go
through Check Point Charlie. All Lionshead construction activity must go to the Vail
Police Department for a parking permit. Do not use delivery zones for construction
parking, refer to approved staging plan or make other arrangements for parking.
. The hours of Outside Construction Activity shall be as follows:
- April 15 - June 21 & September 9 - November 15, 7 a.m. until 7 p.m., seven days
a week. Between June 22 -September 6 work must end bv 4:00 p.m. on Fridavs.
November 1 5 - April 15, 2003 work allowed within daylight hours only.
- Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek
Drive and 7 a.m. to 8:30 a.m. on Bridge Street.
- special delivery permits must be requested in advance, from Public Works in
conjunction with Code Enforcement at Checkpoint Charlie.
- No construction activity shall occur on Saturday or Sunday between June
22 & September 6
No outside construction activity shall occur on the following dates:
Friday, February 15, Saturday, Februaryl6, Sunday, February 17, and Monday,
February'18. (Presidents Weekend'l
Saturday, May 25, Sunday, May 25 and Monday, May 27 (Memorial Day)
Friday, June 28, Saturday, June 29 and Sunday, June 30. (Vail Arts Festival)
Wednesday, July 3, Thursday, July 4. Friday, July 5, Saturday, July 6 and
Sunday, July 7. (lndeoendence Dayl
Saturday, August 31, Sunday, September 1, and Monday, September 2
{Labor Day).
Friday, September 13, Saturday, September 14, Sunday, September 15 in
(Lionshead) and then on Saturday, September 21 and Sunday, September 22.
(Vail Village) - {October Fest)
Thursday, November 28, ffhanksqivinq Davl Friday, November 29, Saturday,
November 30 and Sunday, December 1.
Wednesday, December 25, Thursday, December 26, Friday, December 27
Saturday, December 28, Sunday, December 29. (Christmas Dav Holidav)
Monday, December 30, Tuesday, December 3'1, Wednesday January 1,
(New Year 20031 No Work allowed the entire week of the Christmas/New Year
Holiday.
The Town of Vail Noise Ordinance has been waived by the Town Manager from 7a.m.
- 7p.m. For construction activities from April 15 through June 21, and from September
9 through November 15. The Noise Ordinance shall be in effect and strictly regulated
from June 22 through September 8 and November 15 to April 15, 2001
All construction sites will be required to obtain an Aporoved Construction-Staqino
Plan from the Town of Vail Public Works Department in conjunction with Code
Enforcement. (The approved staging/parking plan is required to be on site at all
times).
The Town of Vail reserves the right to amend the Vail Village/Lionshead Construction
Plan regulations at anytime should abuses or problems arise.
The Three-Strike Rule will be enforced. Step 1. (Written warning), Step 2'
(Written warning), Step 3. (Construction site will be Red Tag until all issues are
resolved).
The following expectations are established to insure the success of the Vail
Village/Lionshead Construction Master Plan:
r Full and complete cooperation and understanding from all parties involved in the
construction activity in regards to this plan.
r Strict adherence and compliance with the requirements outlined in the construction
plan.
. Respect and consideration for the atfected interests and parties.
lf you have any question, Please contact the Town of Vail Public Works Department
(Construction Inspector) or Vail Police Department (Code Enforcement Officer)
970-479-2198 970-476-7603
TOli/iN OFVAIL
Vail2002 Staging / Parking Plan Information
The Staeins / Parkine Plan Philosophv- Is a very important step in the building
process. Striking a balance between safe public access and giving construction projects
room to build is becoming increasingly challenging, for us to meet all the needs of those
who will be impacted by construction projects. The fact is, there is less room to build in
the Town of Vail.
Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of
Way is a Privilege, not a given right. We take into account when we review and approve
staging / parking plans, impacts on neighborhoods, tourism, business and the traveling
public along with your right to build.
The General Contractor is resoonsible for all subconlractors and all construction
activitv relatine to the building proiect. The staging plan will be enforced according to
the Approved Set of Building and Staging Plans. You are required to keep a copy of the
Approved Staging Plan on site.
Two staging /parking plans are required, a summer and winter. Summer staging plans
expire on November l, and winter staging plans expire on April 15. (Note: There is no on
streetparking in the winter season and all materials. equipment. etc must be 10'offthe
edge ofasphalt).
Enforcement of all staging / parking plan is as follows.
A) Staging / Parking Plans to scale required.
B) Once the plan is approved, they will be held to complete compliance.
C) We will use a 3 step and you're out, process.
Step One- Verbal and written warnings as to the staging plan violation, then have
contractor sign and date field memo waming.
Step Two- Police Department issue tickets and tows or public works writes second
written warning to all violators who have been notified under step one and who are still
in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building
Official will call the contractor and noti$ them, the next time any violation happens, the
building department will red tag the construction site for 48 hours.
Step Three- If stitl in violation after step two, a 48 hour Red Tag will be issued to the
project site.
If you have any Questions, Please contact the Town of Vail Construction Inspector at
970-479-2198
F:\cdev\FORMS\PERMITS\Staging-Parking.doc
Requirements for an Acceptable Staging Plan
It is prefened that and Approved Site Plan is used to draw a staging plan, but a hand
drawn plan may be used as long as it is dawn to scale and is neat and legible.
l.) The Staging Plan must show the following:
(a) Show all parking that is required for the job site. (Including construction
equipment).
(b) Show the location of all material that will be staged on site.
(c) Show the location ofall dumpsters and port-o-john that are to be on site.
(d) If a fence is required, then show the location of the fence and describe the
material used for the fence.
(e) Iftrees and / or vegetation is required to be protected, then show how this will be
done.
(f) If this staging plan is for a Demo Permit, then show staging for dump trucks and
all related equipment. If the Town of Vail Right of Way area is needed for
staging, then a Traffic Control Plan is required in conjunction with the staging
plan.
(g) Please provide and show an Erosion Control Plan.
(h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in
the Winter Staging Plan.
2.) If work needs to occur in the right of way, then add a Traffic Control Plan to the
staging plan showing the following:
(a) The work zone (area that is to be performed)
(b) Traffic Control Devices (warning, sigrs, cones, flaggers, etc.)
(c) Distances that all devices will be set up from the work zone. Also show all
dimensions of work being performed in the right of way. All traffic control plans
must conform to the MUTCD manual.(Manual of Uniform Traffic Control
Devices)
2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and
Community Development Department. Once the staging plan is approved, it will be
registered with the departments listed above and enforced.
3.) The Village and Lionshead area have outside construction restrictions, Please become
familiar with the Yail2002,Vail Village and Lionshead Construction Hours handout.
F lcdev\FORMS\PERMITS\Sta ging-Pa rking. doc
b
J's=l
fl
sl
@s
&
F
\
*
3zAI
oall)5o-t
ts
a
${g
I
&
gA
:E2
Y?
ss
fr3
E$n Sr/t ?t{urDa
#'B e'EE g*;
iiiB€iEEE
it3iiiffii'
#tE*
Ei,ii'g€ e qli
';g;;ssEisr?
kl^r.;G)
9>
CI .)() !)t:
od
CJ
a
9
=@
3b
CJ OrEEGt:o6a8i)A
il
U
6
$.1\?
C
?
t
Lq
a
4
z
ult-CLO
(-)
l*$" "l'U,
lJ-u-O
F
ot3
P }I
fr{c)zL'-
isFT
\9z
A.J
rs
a
N-
OLO
\,(n
$
*\A
&
\gIs
)Lz
\
++\
$t
$
h
\$3
3-'
t
Tzo,
$s
2t,h
$l
$s
$z
$)e
2
.\i a(:- tuces;
HDIAte2t4
e$slos
s
R
13
J$t
)ri6
Z.<(
_]s-
$
€
$
3
s
\-!
-\\
-N
z
\
-
>
tl I
-JI'J
b
IrJ
=
zsF
-\
.l I I
_f
ll_I
K7
1-i
=l-.1
\-l-
rll
----1
I
Ei
a;fl
61
A:tll
"i____).
13':IlVn
i:UEISdlflnOioiduocs
g991g oPeropc llsLzsaozv iiiz-{q1va
?u!roc Jalpnu| [u eqr
-F
L
Dt
z_
zooz u380lco e
,ro',vl
{s$B
H$
eH
tH*
o
II
tl
<f,
z
J
o-
ffri gf ;ff;$i*; iii:
ei
oozOTEEOo Elt<U H.sb {qie E
iiliiiil
iitiiilt
ii*,;ili;r
iifii,liiiiii
Qzo
o
IL
o
]U(L
U)
J
EfFoD
CEFa FIn
,T
,,* P3
tF
tB
\q
T
899t8 ' operops'l!3LZgZ.g,Li LvLZ xoq'o'd
!i$rvrto;
H,l
.bl:9.".et
oc'llvnrluilsdlrnGrrotduoSs
zoo4 u]gorco e
r$ti
*itc
*
$$
P3
Se
s&0..
.i\ $g',s
$;\AS
9t\) cs
€[s
S,_l--
zo
EFo
IJJa
--o'
3
ostsl
,*
P
UI(to
+eas
I
€*nh
g$
\t .t
t-' , s' s6E 'e 3gSloiso' * Srnt d S+P+ur*tr**
V IL
E8
9 Lu.; c.5PE:
[J-etc^L|ary 6Y-.hlAtL
1of'd's
-$'/2
tsN'
Wt4o'
ilt
I
Vn'-dL )
. l',.
L*!:! +
+N=ce:q,(tra
I w''t)l'r t i
;.
tl
.F
:ii
a.-:.' t:ii i""'
.., tl. *l:
, i f.,,i-., .' )t '..,
.a.\
''.-ll----
q
!'!.BEST
coPy
I
Inftrrfu$€(-
-.-r'
6+t{r.b,l.r*.
el
I
I
I
I
I
a
t
1l.!
e
I2
BEST
COPY
AVATLABLE
rsg
trt
Jltrr.i]JL
t
tF
rl
x:
COPY
AVAILABTE
0cT-08-2004 FRI
0cT-30-2002 l,ltD
02r19 Ptl
l2 r54 Prl
NHCC0G
Nricc00
ELEVATOR PERMIT A
F h onc # : -'ip,,f . J.l:l': l-:-.."i.4.,,.''t 9-
Ct:r+s oIWorl<:
Dcsrrilrc Work,firs
-*!r-*.-*.,-,*-.,-.ar;,*
NOflce
I hs|clv/ ccrtify thrt t hrrc rcsd itr'rl craninr:d thts
i3pthatLrr rtr,t
-li'ro*
th€ ttnlt t0 b" tr'J{ lnd cortcct All
ril,.lsl,rni 0f lotr't qnd ortlinlnrur gotcriirg rhil typr ol'
i'ork rtill [c conrplicri wtdr s h,:ihcr lptciflril hrcin Qr nor
1'h,: gnrnlirrg of u ptrnrk 'loci ntrl nfrrJUme to gll' suihsrily
to ri,rl,rtr: or,Cltttlvl tlt,t ptouiltonl 0f l)'olh':r $ilic 0l lo':Dl
i1,, s,..1,,l,lirng cor'rtiucti0n or thu grrfontunu'" ol
corsit/Criorr.//--". -l
, .: .._ /.(/A;; rll
=
tl/f@
r-il:1.{ul nf courri{ctcr ot authurizsd rlcnl (D:rts}
Si11n;rlr.rrr Cf olvncl
\i ,.i-5a,.?5
'Iu(lll lrta
(D;tt)
0-8'
Datc Fnl,l Rcceipt #
.\ppllc:rtion Pr ccccscd bYl Appro*cd bY:
l)l!I:Itcvicw r\l4trovcrl b; ;Plrn
rcvictr it$d llcttt intPccli005 rvilt bo co[dttciEd
P1615 rvill be lorrrrrded to NNCCOC" for tcrictv
NWCCOC F.ltt'rlor Inspcctor flt (970) 'l6S'029i
Jurisdiction --I<t;a1.-.,!1 .,/nrL
ENervlnslrllatiun HFl."jo'Altcrrriort
*o'r0,,*..-yraori . =-oi+i i.-" *-t5-'-&e5,*-h+e1' .''
N.lv r N s-LtJ,I "lll-Qr)Jf,llilP$rr\.n:!dr or frcigh t !l!ratorr csc!Llt!r, nofinE vrll(-
uo io nn,l rnctutli:'.! s50.OO0 00 otvalr:rriqn ' S3J0'0
Ol.cr Sin.C0o,rn oir'il',::rrion' S350.tt0 rlur 56 00 l'o
c:,:i i t ,OOo,o0 nr frgclion hirco l'0vrr 950.000'00
D0mb\y'riltt ot ptlvdt! fclidrn(c cltv tori
Up tu o,rC iociuCro5 St0.00ll.U0 ofvclurtiun ' 5X50 0
0'rJr5?0.000.00 of trlttuicn ' 3150,00 plur Si'00 f!
orh 5 t,000.00 or l'rudlron rhcrcot'ovcr 520'000'00
[tA"l!lt3.ll,LU'B'UIOnLtJ'tr.,5r
Fc* lor rtrqjoi tl5.'r,liioni shrll bu ',rs set t'or'h ln Tcblc 3'
,t* Unli.^t Arlninitnrrhc CoCc orTnblcNo' izrof *
Urrilcrm Builrlinl Codc.
l.L
vAr,u^rroN -t! */-O;?r;l I' oc)
Pcnnit * 9*:-Ui9-
Z.'rs\\s:s--'to , /-.- ke...oE"l ,C.9
by thc Northrvs.rl Colorl(to Council of
anrl approv:rL Sthcdulc inspcctionr by
x t0S, Flcrsc nrrrttc chcckt Pey:rblo to
l+:cEtv
P, 0t
P. 03
8o435
04681208
I'PLICATION
.RECEIVEE'
OCT0ll ,;ui
v-coM.DEV.
OCT 0 I 200'l'