HomeMy WebLinkAboutB02-0182 LEGALTOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGE ROAD
VAIL. CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT MF BUILD PERMIT Permit #: 802-0182
Job Address.: l146 SANDSTONE DR VAIL Status.....: ISSUED
Location......: Casolar II both sides of duplex (EAST SI Applied...: 06/11/2002
Parcel No....: 210301414015 Issued ...: 06/17/2002
Project No...: Expires...: 12114D002
owNER WOOD, GIEN E. O6/tt/2OO2 Phone:
PO BOX 2895
EDWARDS CO
81632
L,icenge:
coNrRAcToR eANwEsT VEIITI'RES rNc. 06/Lt/2oo2 Phonez 39o-t592
11-45 Sandstone Drive
VaiI, Co
4L657
License: 459-B
APPrrrcAlIT cAlrwEsT VENTURES rNc. 06/LL/2oo2 Phone: 39o-L592
1146 Sandstone Drive
Vail, Co
81557
License: 459-B
Desciption:
Addition of 99 sq. ft. each side of duplex; new metal seam
roof; new exterior stucco & paint
Occupancy: R3 Single Family Residence
TypeConstruction: VN TypeVNon-Rated
Type Occupancy: ??
Valuation: $25.000.00 Add Sq Ft 99
Firepface Infomation: Restricted: Y # ofcas Applisnces: 0 4 ofcas Logs: 0 # of Wood Pellet: 0
|'}|**|l|++|i|.|'|'*'*.lt+''*|1lttt'ltt'}t|+||t.ii**l*i't.l||t**|}|'||,}+||1'i
Building---> g295.OO Restuarant Plan Review-> $0.00 Total Calculated Fees-> 5524.40
plan Check-> 5191..?5 DRB F€e----------.> $0.00 Addilional Fees----> 90.00
Investigation-> gO .00 Recreation F€e---> $34 .55 Total Permit Fee----> $524 .40
Will Call-> $3.00 Clean-up Deposit--> 50.00 Payments---'-'-->' Ss24 '40
TOTAL FEES------> $52,r.40 BALANCE DUE----> s0.00
Approvals:Item: 05100 BUITDING DEPARTMENf
o6/L3/2oo2 rRYt Action: AP
Item: 05400 PLANNING DEPARTMENT
o6/L2/2002 bgibson Action: AP
fTeM: O55OO FIRE DEPARTMEMT
Item: 05500 PIIBIJIC WORKS
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the infonnation as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, Uniform Building Code and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY.FOUR HOURS IN ADVANCE BY
Send Clean-up Deposit To: N/A
OFFICE FROM 8:00 AM - 5 PM.
SIGNATURE R FOR HIMSELF AND OWNEF
PAGE 2
*t!t'*,}*'t******:},l'|''|t*'t***f,}*!i'f*,}l':*,|t{t,|'l'l.'}**l*'}****!*+'f****+'}*'***l.'i****{t'l'|'}***+******{.l**'|'|l*:|'}*+
CONDITIONS OF APPROVAL
Permit#: 802-0182 as of 06-17-2002 Status: ISSUED
,ft*'}|**!t'i*:|'**t}*'}*{.*'l.*t'|*'t*******'i|'}'i*'}''}*'t't'}{.****'t*'}'}'}*{.'}*!t'}'}**+***'}'}{!'t******
Permit Type: ADD/ALT MF BUILD PERMIT Applied: 06lllf,002
Applicant CANWEST VENTURES INC. Issued: 06/17/2002
390-1592 To Expire: 12/14/2002
JobAddress: Il46SANDSTONEDRVAIL
location: Casolar ll both sides of duplex (EAST SI
ParcelNo: 210301414015
Description:
Addition of 99 sq. ft. each side of duplex; new metal seam
roof; new exterior sfucco & paint
Conditions:
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: l4
(BLDG.): ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: l6
(BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND
EVERY STORY AS PER SEC.3I0.6.I OF THE I997 UBC.
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE AI{Y
WORK CAN BE STARTED.
* * *+ ** +* * + + f+ * * + *** ***** * *** * * ++ + ++ + ** + 'i ** ++ * * * * +++ * * * ** * * ****** * *** * * ** * * * **+* + ++ * **** | * ** *
TOWNOFVAIL, COLORADO Stat€ment
{"}*{' + ***** * f+ * * * ++i**+*+*+t* * ** f*** * l**** | ** t * t * *+* * + i *+ +* ** ***** +*tl. * * f* * * * ** * * * *{' i **+** + *+ +
Statements Nruriber: ROO0OO2592 Anount: 9524.40 06/I7/2oo203:l-8 PM
Payment Method: Check Init: DDG
Notation: GIen Wood 232 9
Permit No: 802-0182 T!T)e l
Parcel No: 210301414015
Site Address: 1146 SANDSTONE DR VAIL
L,ocation: Casolar II boEh sides
This Palment r $524 .40
ADD/AI,T MF BUII,D PERMIT
of duplex (EAST SI
Total Fees:
Total ALL Pmts :
Balance :
Cunrent Pmts
$524.40
5524 -40
$0.00
't * 'f** + + * + I *** + + rf + + * {. + * * * {. + {. * * f, * * * * * *,}*****t* *tt **** ** !t* * * * t * * * *,1. * + * * * * * * * ** * * * ** * * * * * * * * 'l **'}
ACCOUNT ITEM LIST:
Account Code
BP 00100003111100
PF 00100003112300
RF 11100003i12700
|,Jc 00100003112800
Descri pti on
BUILDING PERM]T FEES
PLAN CHECK FEES
RICRTATION FEIS
WILL CALL INSPECT]ON FEE
295.00
r9r.75
34.65
3. 00
APPLICA
COMPLETE VALUATIONS FOR BUILDING PERMIT
?,;xiw
Building Permit #:
970-479-2t49
/J
Vail,
Town of Vail Reg. No.:Contact and Phone #'s:
l"^* l)o.-( 9?o 29cs-
For Parcel # Conhct Assessrc Offie at 970-328-8640 or visit
PatCel f ero ?e I qty etS- 6a.*) Lt o 3o ty tV oiV (Qetl )
(application will not be:accepted without partel number)
lob Name: 0,^,l"',r, F,.'1o,,;., (e-u-t *4 :'<
SuMivision: Coso/o.Filing:
Phone:?z o ,16. / fj 'Owners Name: G/.^ E. Q-...<Address: ttYa t*'Jc+.".
(74.2t7o
-lt:):,-A,f t^l re.dl l)t,n, rl-.!:7 tc-€ m4-.L
WorkClass: New() Addition(2Q Remodel( ) Repair(x) Demo( ) Other( )
Does an EHU exist at this location: Yes ( ) No ( )Work Type: Interior ( ) Exterior (;4) Both ( )
Type of Bldg.: Single-family ( ) Two-familyft ) MultFfamily ( ) Commercial ( ) Restaurant ( ) Other ( )
No. of Accommodation Units in this building:No. of Existing Dwelling Units in this building: z
of : Gas Aooliances ( ) Gas Pellet ( ) Wood
Wood Burninq (NOT ALLOWED
Does a Fire Sprinkler System Exist: yes ( ) No (-<)Does a Fire Alarm Exist: Yes ( ) No (<)
**************************************FOR OFFICE USE ONLY**************************************
of Construction:
F :/ereryone/f orms/bldgperm JUN 0 7 2m2
ruh,r\,m
,l:
Questions? Call the Building Team at 479-2325
*.. t
Department of Community Development
o
o
o
o
tr
o
Project Name:
ProjectAddress: 4, .4(.,,,
/ This Checkh'st must be ompleted before a Buildina Permit appliation is
arephd.
All pages of application is complete
Has DRB approval obtained (if required) Provide a copy of approval form
Condominium Association letter of approval attached if project is a Multi-Family complex
Complete site plan submitted
Public Way Permit application included if applicable (refer to Public Works checklist)
Staging plan included (refer to Public Works checklist) No dumoster,oarkino or material storaoe
allowed on roadwavs and shoulders without written aooroval
Asbestos test and results submitted if demolition is occurring
Architect stamp and signature (All Commercial and Multi family)
Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and
Commercial)
Window and door schedule
Full structural plans, including design criteria (ie.loads)
Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
Soils Report must be submitted prior to footing inspection
Fire resistive assemblies specified and Denetrations indicated
Smoke detectors shown on plans
Types and quantity of fireplaces shown
o
n
o
tr
u
o
D
n
D
o
Appficant's Signature: Z fu
Date of submittal:
F:/everyoneforms/bldperm2
Received By:
7,.* Llz-
4.
HOW DID WE RATE WITH YOU?
Town of Vail Survey
Community Development Departnent Russelt Fonest, Director,
(970)47s-213e
Check allthat applies.
1. Which Deparfnent(s) did you contac0
Building _ EnvironmenEl_ Housing_ Admin
Planning DRB _ PEC
Was your initial conhct witr our staff immediab
no one available ?
slow 0r
lf you were required to wait how long was it before you were
helped?_
Was your project reviewed on a timely basis? Yes / No
if no, why not?._
Was fris your first time to file a DRB app- PEC app
Bldg Permit_ l{/A
Please rate the performance of fie stafiperson who assisbd you:54321Name:
(knowledge, responsiveness, availability)
Overallefiecliveness ofthe FrontService Counter. 5 4 3 2
What is the best time of day for you to use fre Front Service
Counter?
9. Any commenb you have which would allow us to beter serve you
nexttime?
Thank you for taking the time to complete this survey. We are
commited b improving our service.
o.
7.
8.
WHEN A *PUBLIC WAY PERMIT" IS REQUIRED
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESNONS REGARDING THE NEED FOR A
"PUBUC WAY PERMIT":
0 Is this a new residence? YES NO*d-
D Does demolition work being performed require the use of the Right-of-Way, easements or
public property? YES
Is any utility work needed? YES
Is the driveway being repaved?
NO
NOX
NO ,<
Is a different access needed to the site other than the existing driveway? YES NO_2s_
Is any drainage work being done that affects the Right-of-Way, easements, or public property?YES_ NO_x_
Is a "Revocable Right-of-Way Permit" required?NO___X_
Is the Right-of-Way, easements or public property to be used for staging, parking or fencing?
YES NOx
If answer is NO, is a parking, staging or fencing plan required by Public Works?YES NO
If you answered YES to any of these questions, a "Public Way Permit" must be obtained,
"Public Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-2198,
I HAVE READ AND ANSWERED ALL THE ABOVE QUESTIONS.
(^^,---.,4 J.-J-.-, /.--
Job or Project Name: rt le
Date Signed:
Contractor Signature
F :/everyonqforms/bldpenn4
Company Name
How it relates to Building Permits:
Fill out the attached check list with the Building Permit Application,
If yes was answered to any of the questions then a "Public Way" permit is required. you
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verifli (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November lst and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Work's office for review, If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew, The locates take place in
the morning, but may require up to 48 hours to peform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
NOTE: The above pr(rcess is for work in a public way ONLY. Public Way
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete, Re-application each November 15th does not
mean an automatic renewal.
I have rcad and understand the above.
Signature
F:/everyone/forms/bldperm5
Date Signed
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Depaftment Approval, Engineer's (Public Works)
review and approval, a Planning Department review or Health Depar.tment review, and a review
by the Building Department, the estimated time for a total review will take as long as three (3)
weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this depaftment to expedite this permit as soon as possible,
I, the undersigned, understand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect future permits that I apply for.
Asreed tooy: 6 L^ f . ()., -l
Project Name: )) Vo fo*2s1e-a dr
Date: J-'--- 6 1o -
Print name
F: everyone/forms/bldperm3
J^: I
APPLICATION
FOR TOWN OF VAIL
PUBLICWAYPERMIT 19-
pw*:!tr-lIIl
PATCEI#:T T T f ' T T T' ! T - ! T T
Brds.Permit#,8I !-I I n f
1.Job NamE Street Address n n n - [-l (ltunknowncall
t_J LJ r,_J | | 479-2138 exl. 0)
Excavatlng Contraclor Name Mailing Address TOV Contractor's Lic€nse Numb€r BEOUIRED
()
Phone #ApCity
4.
Start Date
Work is for lctrcle one)
Compl€tion Date
Water Sewer Gas Electric Telephone CAW Landscaping
(Permit Explralion Date)
Temp. Site Access
Other
Trench-width
(min.4')
Bond Amount $
ALL MATERIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED.
Rubber out-riggers are required on
Asohalt surfaces undemeath the
A signature below indicates a
signatures are obtained, permittee
necessary Town of Vail signatures.
BE ON THE JOBSITE BEFORE THE
working on asphalt.
at all times.
utility locations and approvals. Once all utility company
application through the Public Works office to obtain the
up to one week to process.
Depth
Total SF $
Total LF $
Permit Fee Total Permit Fee $
6.
7.
Public Service Nalural Gas Group (1'800-922'19871
Public Service Company (1
U.S. West (1-800-922-1987)
9.
10.
11.
12.
TCI Cablevision of the Rockies (1-800-922'1987)
Eagle River Water & Sanitation District (970-476'7480, ext. 114)
Holy Cross Electric Company (1'800'922-1987)
Town of Vail Electricians (970-479'2158)
Town of Vail lrrigation (970-479-2158)
Town ol Vail Public Works Construction Inspector (970-479'21981
THERE W|LL BE NO TOTAL STREET CLOSURESI A construction trafiic control plan must be approved by the
Public Works Department prior to issuance of the permit.
All excavation must be done by hand within 18'of utilities - (senate Bill 172).
permittee must contact public Works o€partmont et 479-2198 24 hours prior to commencing ot work. Failure to notify
the Town *ill res,.,lt in forfeiture of bond money. Scheduled inspections which are not ready may resull in the Town
chargirig lhe contractor a reinspection fee.
I certify that I have read all chapters ot Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility
company agreements, signed 6y me, and will abide by the same, and that all utilities have been notified as required.
contractor's signature of Agteemont
ATTACH PLAN OF WORK,INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN
show streets with names, buildings, and location ot cuts. usE DASII LINES FOR CUT.
Prlnt name cl€arly Date ol Signature
White - Public Works
Yellow - Contractor
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS!
Please read and check off each of the items below:
o The Town of Vail Building Department has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
u The Town of Vail Public Works Department will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culvetts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at479-2198 to request an inspection from
the Public Works Depaftment. Allow a minimum of 24 hour notice.
a Also, the Town of Vail Public Works Depatment will be approving all final drainage
and culvet installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Ceftificate of Occupancy issuance,
Agreed to by:
-.'/- ' 'i
Signature I
Project Name: L l ./ C .C ,-P..1* l r
Date Signed:
F :/everyone/forms/bldperm6
, Please read and check off each of the items below.
(Copies of complete text are available upon request)
CODE 5-2-10! DEPOSITS ON PUBTIC WAYS PROFTIBITED
o Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any
other debris or material upon any street, sidewalk, alley or public place, or any portion thereof.
o Notice; Abatement: The Director of Public Works may notifo and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dift, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public Works, In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such snd, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified.
o Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 14-1 of this code.
o Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 6 (1979).
CODES 7-3A.L AND 7-34-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
o No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) $ 1)
o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord. 2(f968) $ 3: Ord. 28(1981) 5 1)
I have read and will comply with the above code provisions:
Position or Relationship to Project:
Date Signed: A-*- 1A z-
F :/everyone/forms,bldpermT