HomeMy WebLinkAboutPRJ08-0057 B08-0054 LEGALNOTE: rHrS PERMIT MUST BE POSTED ON JOBSTfE AT ALL TIMES
,'-:'-\
l-\".4t
10fl!{trvt[,17
Town of Vail, Community DevelopmentJffiuth Frontage Road, Vail, Colorado 81657
p. 97 0.47 9.21 39 t. 97 0.47 9.2452 inspection s 97 0.47 9.21 49
Permit #: Eo8-0065 Gor oo5'r
Project #: PRJ08-0057
ELEGTRICAL PERMIT
AMF
Job Address: 434 GORE CREEK DR VAIL
Location.....: ALL SEASONS B-5
Parcel No...: 210108237012
OWNER WYMAN, TIMOTHY E.. MORGAN, O4I25NOO8
TRUSTEES
31 S HARRISON ST
EASTON
MD 21601
APPLICANTBOSTONELECTRIC O4l25l2OO8Phone:970-748-6980
P.O. BOX2472
AVON
co 81620
License: 155-E
CONTRACTORBOSTONELECTRIC 04l25l2OOBPhone:97G748-6980
P.O.BOX2472
AVON
co 81620
License: 155-E
Desciption: KITCHEN REMODEL ADD 1 ART LIGHT, PUCK LIGHTS lN LIVING
ROOM, AND 3 PLASMA TV OUTLETSValuation: $5,000.00 Squa,€ feet: 1600
FEE SUMMARY
ISSUED
0/.t25t2008
o4t25t2008
10t2212008
Electrical Permit Fee----->
I nvestigation Fee-------->
Will Call Fee---------->
U se Tax Fee------------------>
Total Calculated Fees---->
$86.25
$0.00
$4.00
$0.00
$90.25
Total Calculated Fees->
Additional Fees---------->
TOTAL PERMIT FEE-.>
Payments----
BALANCE DUE----..>
$90.25
$0.00
$90.25
$90.2s
$0.00
APPROVALS
Item: 06000 ELECTRICAL DEPARTMENT
0412512008 tlt Action: AP
Item: 05600 FIRE DEPARTMENT
CONDITIONS OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plol plan, and state that
all the information as required is correct. I agree to comply wilh the information and plot plan, to comply with all Town ordinances and state
laws, and lo build this struclure according to the towns zoning and subdivision codes, design review approved, International Building and
Residenlial Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR I
OFFICE FROM 8:00
Date
elec orm 041908
or Contractor
Print Name
elec_prm_041908
*
'3
* * | | * * * r.,r * * * * * * * * r * * * tt* i I r r * * * * * * * * * i * * * * * 't 'l 'l 't t't't* * * * I * * *** * * * * * 't,t't 'f 'lrl* * * * **l*t,t,t,l * * * * * * *
TOWNOFVAIL, COLORADO Statement
* * ** * * * * * * * * * * * | | t * * r. * * * * ** | | * * * * * * I * {r | * * I | | | I | | * * 't 't * ** * 't 't '} * * * * I I *:t 'l 'l 'l'
l' * * * * * * * 't* | t 'f l* * * * * * * *
Statement Number r R080000541 AmounE, I $90,25 04/25/200803:53 PM
PaymenL Method: Check
EI,ECTRIC
INit: SAB
Notation: 1712 BOSTON
Permit No!
Parcel No:
Sit.e Address :
Irocation:
This Palment:
ACCOIJNT ITEM LIST:
Account Code
EP 00100003111100
wc 00100003112800
E08 - 0065
2t0t-o82-370t-2
434 GORE CREEK DR VAIL
AI.,I, SE]ASONS B-5
s90.2s
Descriotion
Type; EIJECTRICAL PERMIT
tt* * **********t t * I t*tt *l * *t********trt tft'|' tlt 't* f tr* * 'l I t' | * * * | * * * | * t * * *:t:l' 'l * * * * * * * * * * * {' I ll 't * + * 'l 'i I'
Totsal FeeE :
Total ALL Pmts:
Balance :
$90.2s
$90.25
$0.00
CurrenE Pmts
86.25
4.00
EIJECTRICAIJ PERMIT F'EES
WfLL CALL INSPECTION FEE
75 S. Frontage Rd.
Vail, Colorado 81657
CONTRACTOR INFORMATION
Town ofVail Reg. No.:
5\r\e-tC<-\N.L
FOR AREA OF WORK AND VATUATION OF WORK (Labor & Materials)
AMOUNT OF SQ FT IN STRUCruRE: k-c)D ELECIRICALVALUATIoN: $ SOCI\- (,
2}?O
Job Name: flo\.^ [aUd-t,..<Job Address:t3'1' Cr""e.
Subdivision: $,\\ Se.osons /L,
11 S.\nr.l,r,^ Sli
:':':Poon lworl: K,Vh,","ss;4. qn L [r\ ir*,.,..",.. ..
_
ile-\ , q\L 0\ c"F\ \';\\, e-.1, \'r\h .1
WorkOass: New() Addition( ) Remodel M Repair( ) TempPower( ) Other( )
b<terior( ) Both( )Does an EHU exist at this location: Yes ( ) No ( )
Typeof Bldg.: Single-family( ) Duplex( ) Multi-familyffi Commercial ( ) Restaurant( ) Other( )
No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building:
for a hot tub: Yes ( ) No
Does a Fire Alarm Exist: Yes ( ) No (
TOWN OF VAIL
Conbd Awrc Offie at 97h328-86tttt or visit
***************************************FOR OFFICE USE ONLY******
I
F :\cdev\FORMS\PERMm\Buildi ng\€lectical_!ermit_l 1-23-2005. DOC
for Patel #
Page I of 2 7r1231200s
,*m
o
o
o
o
Amendmentto the 2OO2 N.E.C. Town of Vail Ordinance 4, Series of 2005
Overhead seruices are not allowed in he Town of Vail.
tlnderground serices shallbe in conduit (PVC) from the utility tansformer to the electric meter, main
disconnect switch, and to the first electrical distribution circuit breaker panel.
the main disconnect sfftch shall E radily arcssiile, andlocated next to the meter on the exterior wall of
the structure. All underground conduits are required to be inspected before back-filling the trench.
In multi-fami[ dwelling units, no electrical wiring or feeder cables shall pass from one unit to another. Common
waffs and spaces are exempt-
NM Cabfe (ttomex) can b uN only in single and mufti-family dwellings net qding 3 sbrfiB.
Type NM cannot b u*d in any building mixd with lype +B.EEH,I/M &S oanpnde.
Aluminum onducbrs smaller than size #8 are not permitted with the Town of Vail.
TOWN OF VAIL ETECTRICAL PERMIT GUIDEUNES
All installations of oderior hot tubs or spa's require a DRB approval from planning. This application will
not be accepted without a copy of the DRB approval form attached (if applicable).
If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over
30" above grade, you must also obtain a building permit.
If this perrnit is for installation of an exterior hot tub or spa on any existing deck or elevated platform,
a structural engineer must review the existing condition and veriff that it will support the added
concenbar:ed load. Please provide a copy of the structural engineers wet stamped lefter or drawing
with this applicaUon.
If this is a remodel in a multi-family building with a homeowners association, a letter of permission
from the association is required.
If this permit is for a commercial space, two (2) sets of stamped drawings are required. Elsfrical
oneline and pnel schedule arc tquircd if load is added or distribution is alhrcd.
I have read and understand the above,
Date Signed
If you have questions regarding the above information or have additional questions,
pfease contact the Town of Vail Electrical Inspector at97O-479-2I47. The inspector can be.
reached on Monday thru Friday mornings betyneen the hourc of 8am and 9am. You may also
leave a voice mail and the inspector will call you back.
F:\cdev\FORMS\PERMm\Building\electical]ermit-l 1-23-2005. DOc Page 2 of 2 LU23l2OOs
TOWN OF VAIL DEPARTMENT OF COMMLTNITY DEVELOPMENT
75 S,FRONTAGEROAD
VAIL, CO 81657
9'10-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT MF BUILD PERMIT Permit #: 808-0054
Project #: 08-0057
Job Address.: 434 CORE CRJEK DR VAIL Status.....: ISSUED
Location......: ALL SEASONS B-5 Applied...: 03/252008
Parcel No....: 210108237012 Issued ,..: 03/3112008
Expires...: 09/2712008
ohrNER WYMAN, TTMOIHY E. - MORGAN, 03/25/2008
TRUSTEES
31 S HARRISON ST
EASTON
MD 21_607
APPLICANT ATLAS CONSTRUCTION 03/25/2OOg Phone: 970-926-L455
144 WILDCAT STREET
EDWARDS
co 8L632
License: 255-A
CONTRACTOR ATLAS CONSTRUCTION 03/25/2OOA Phoner 970-926-1455
].44 WILDCAT STREET
EDWARDS
co 81532
License: 255-A
Desciption:
WINDOWADDITION
Occupancy: R2
Type Construction: VA
Valuation: $20,000.00 Revision Valuation: $0.00 Total Sq Ft Added: 0
''l.'l|lt+t+*.:tl...|.*..*|**t'|*t*|t|l|'l''lt+.*.|t.*'}:}**.:|*t.l:}|+'t+.'||.+FEESUMYBuilding---> $321.25 Restuannt Plan Review-> $o.oo TotalCalculated Fees-> 5534.06
Plan Check--> $208. 81 Rccrealion Fee-----------> go. oo Additional Fees-----> So. oo
lnvestigataon-> 90.00 TOTAL FEES-------> $534.06 Total Permit Fee------> 9s34.06
Will Cdl--> g{ . OO Pa}ments-._..----_---> S534. 06
BALANCE DUE-----> 50.00
t l rl a+*a +r a+r +a t t
Approvals:Item: 05100 BUILDING DEPARTMENT
03 /28/2009 cgunion Action: AP
a * * r* l t*a t* l l r *'l. r
See Conditions page of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns mning and suMivision codes, design review
appnoved, Intemational Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHAII BE MAI'E TWENTY.FOUN I|OURII IN TDLEPHONE AT 479-214t OR AT OUR OITICE FROM t:00 AM '
4 PM,
WNEROR ANDOWNER
**********'t.*1.**'t{t{t*'***'l.*****'i{.'}*'|.**,}'t!i.**,}****'|.********'|'l.******:t****f'}*d.,}!t,|.******|}*'|.*******
CONDITIONS OF APPROVAL
Permit #: 808-0054 as of 03-3 I -2008 Status: ISSUED
{.'t{.**tl.*{.{.*'l.,}{.**i.*{.*'|.***'!**'i*****:t**.|.,}***l.*1.****'|.'}*.|.**'t*,t,l.'|l.+:l.***************+
Permit Type: ADD/ALT MF BUILD PERMIT Applied: 0312512008
Applicant: ATLAS CONSTRUCTION Issued:
03/31/2008
970-926-1455 To Expire: 0912712008
Job Address: 434 GORE CRXEK DR VAIL
Location: ALL SEASONS B-5
ParcelNo: 210108237012
Description:
WINDOWADDITION
***,i*'t't*{.'}'1.******+*'1.*****'1,1.*,t**********'*rl.**'t*{.{.Conditions.{.**r.t 'r***{.{.'t*********{.*{.*.1.'t*'t**************{.*
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: l4
(BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED,
Cond:40
(BLDG): (MFRiCOMM) FIRE ALARM REQUIRED PERNFPA 72.
{ {' * t * * {' * t t t t { {' I t * {' * * + * * * r' * * I' I t {t * a' * t a a' * ** **r't*t***t*t*****{'aif**rr*rf***t*a**rti**r**'}***'l *t*t
TOWNOFVAIL, COLORADO Statement
aaa**alaatattt*'|*tt'}tatt*+tlt||'|'|a*atal * i'* + ft tt t t * | | l a t t t * | | t * ****f * | t '} * t **t* * t * | | | 't 't * * * * * * * *
sEatement Number: Ro8ooo0364 Amount: s534.06 03/3L/2OO8L0:07 All
Payment Method: eheck
ConsuructioD 5544
Inits: DDG
Notation: Atlas
Permit No:
Parcel No:
Sit.e AddreBE:
L,ocation:
This Payment:
BP 00100003111100
PF 00100003112300
wc 00100003112800
B08-00s4
2101- 082 - 3 701- 2
434 GORE CREEK
ALIJ SEASONS B-5
$s34. 06
T)G)e: ADD/ALT MF BUfIJD PERMIT
DR VAII,
Total FeeE:
TOtAl I\IJIJ E\NtA :
Balance :
$534 . o5
$s34 . 05
$o. oo
* * * * i t * * * * * 'l '|'
* *a * * * * * * * * * * * * * * * * * * * * * * * * | * | * *'l * * * * * * * * * {' * * 'l * * * f t * {' t * * l' {' * * * * * * * * 'l * 'l * 'l 'l * {t t 'l t t *
ACCOIJNT ITEM LIST:
Account Code Description Current PmtE
BUII,DING PSRIIIIT SEES
PIA}I CHECK FEES
WfLIJ CAIJJ INSPECTION FEE
321 .25
208.81
4.00
tl
Iffiyl{trIftll,t.7
75 S. Frontage Rd.
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR
BUI APP TION
Separate @lumbing, mechanical, etc.l
CONTRACTOR INFORMATION
Vail, Golorado 81657
Project #:
Buildinq Permit #:
To-so',. ?r"r* ?zo
COMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials
For Parcel # Contact Cou Assessors Office at 970-328-8640 or visit
Ato 1 - ct 02- -37at -L
JobAddress: {3{ (uz' cre-cLJobName: fu
WorkClass: New() Addition( ) Remodelp{ Repair( ) Demo( ) Other( )
Does an EHU exist at this location: Yes ( ) No ( )WorkType: Interior( ) Exterior( ) Both
Type of Bldg.: single-family ( ) Twe.family ( ) Multi-family pQ commercial ( ) Restaurant ( ) other ( )
No. of Accommodation Units in this building:No. of Existing Dwelling Units in this building:
: GasAooliances( ) GasLoss( ) Wood/Pellet( ) Wood
GasLoqs( ) Wood/Pellet( ) Wood
FOR OFFICE USE ONL
Bc8'ccSq
l',iAil 2 I Zt]tifl
TOWN OF V,AIL
F:\cdev\FoRl.lS\Permits\Building\building jermit-+ 17-2007. DOC Page 1 of 7 MlL7l2ffi7
J
rtloo-s3 IC.r-rN-o'=rn-o:\oz.
E -r E ITsgF(E (tr--(J
3{s+
rrrz
E,Fo
LJJ(/l
o-
Eo-
Eu33
;EHHg:R*
=;?'Jif x*o|.i
.G
oc
3
P
ca
cg
-
Ulfr<(,z
tr(,
=Lll
?392aeE#EB
6gm+=trtts>''r5rSilGOZr-rrIlHl! -\ 'r l- r8si-?nJ-unT-Fa\=*tso?lF
!==:Eni6-r.rI
-z-)-l-=<>zzFrgoo
A-G'
CJl*l
C5IlJ-U-G'
P.O. BOX 2494
AVON. CO 81620
PH 970.949.7100
FAx 970.949.3377
lulions
NGINEERING
PROJECT MORGAN REMODEL
JOB NO.
SHEET NO.
CALCULATEP 3Y JPL P415
GENEFT\L NOTES: MOAGAN FEMOOEL JOB# 030248
0ESIGN CRITERIAI
ROOF UVE LOAD: lOO PSF
ROOF DEAD LOAO: 15 PsF
BASIC WND SPEED (3 :lEC GUSD: 90 MPH
WIND EXPOSURE B
SEISMIC DESIGN CAIESOFY: C
IRC EDITION: 2OO3
S'IFUCIUFAL WOOD F ?AMING:
1, EXCEPTWHERE NOTED OTHEBWISE, ALL ? NOM1NAL LUMBER EXC€PTSTUDS
SHALL BE DOUGTAS FIR-LAFCH #2 AND BET]ER. ALL SOLID TII\,IBER POSTS AND
BEAA'S 3'NOMNALAND WIDER SHALL BE DOUGLAS FIF.LAFCH #2 UNLESS
NO'IED OTHER1flISE Oi PIAN.
2, STUDS SHALI BE S']UD GFADE AND BETTEF HEM FIB OR DOUGLAS FIF-LARCH
3. BLOCKINGWTHIN T:LOOF JOIST SPACES BENEATH POSTS NO]ED ON PT.AN
SHALI- BE OF EOUIVALENT AFEA OF ]HE COLUMN ABOVE. SINGL€ STUD
TFIMMERS DO NOT FIEOUIRE ADDINONAL BLOCKING IN THE FLOOR,
4. REFEF TOTITE 200:r IRC TABLE R602.3(1) OR 2OO3 tBC TABTE 2304.9.1 FOF
MINIMUI.r| FAS]ENING I;CHEDULE. A COPY OF TllIS TABLE CAN BE PROVIDED
UPON REOUEST. AS S IATED IN SECION 2304.9.5 OF]HE 2OO3 IBC SECNON
2304.9.5: FASTENERS FOF PRESEFVAII!€-'IFEATED AND
FIRE-RETAFDANT.'IFEATED WOOD SHATI BE OF HOT-DIPPED ZNC-COATED
GALVANIZED S]EEL, STAIN|"ISS S'IEEL SILICON BFONZE OF COPPER.
FASIENINGS FOF WOOD FOUNDATIONS SHALI BE AS REOUIRED IN AF&PA
TECHNICAL REPOFT No 7.
5. UNLESS NOIED OIHERWSE. STEEL CONNECTORS SHAL BE USED TOJOIN
FAFIERS, JOISTS ANO BEAMS SUCH AS SII,IPSON SIRONGTIE CONNECTORS OF
EOUIVALENT
6. NUMBER OF STUDS INDICATED ON PTANS FOR BUTLT UP POSTS ARE
TFIMMERS ONLYANO DO NOT INCTUDE KJNG STUDS.
7. AT EEAM BEAFING -OCATIONS IN STUO WALLS. PROVIDE MULTIPLE.S'TUD
POSTS EOUAL TO WCTH OF BEAM UNLESS NO'IED O'THEFiWSE,
8, t-AMINATED V€NEE ] LUMBER (LVL) SHALL HAVE]HE FOLLOWNG MINIMUM
PFOPERTIES:. FLEXUFAL BENDIN3 SI;IESST mOO psl
. MODULUS OF ELAIITICITY: 1.9OO.OOO psl
. TENSION PARALLELTO GRAIN: 185OPSl. COMPRESSION PA?ALLEL TO GRAIN: 2310 PSI. COMPRESSION PAIAU-EL TO GRAIN: 750 PSt
PERPENDICULAI TO Gi-UE LINE. HOFIZONTAL SrlB\F:285 PSt
FOLLOW lHE MANUFI.CTURER'S RECOMIVENDAIIONS F=GAROING BLOCKING,
BRACING AND WEB SI1FFENEFS Al.lD l\,IULT|PLE MEMBEB CONNECTIONS.
GENERAL REOUIREMENTS
i. CHECK ALL DIMENIJIONS AAAINST ARCHITECTURAL DRAWINGS PRIOR TO
CONSTRUCTION, DO NOT SCALE DRAWINGS. CONTACTENGINEER IF
DISCREPANCIES lN Ol !,IENSIONS ARE o|SCO\€FED.
2. T}IE S1FUCTURAL I)RAWINCS DESCRItsE THE COMPLETED STFUCTURE
IHESE DRAWNGS HA'/E BEEN PREPARED FOR THE USE OF A OUALIFIED
CONTFACTOF WIIH E XP ERIENCE ] N -THE CONSTRUCT]ON SYSTEI\,IS AND
TECHNIOUES DESCFI3EO. THE CONTRACTOB SHALL PROVIDE ADEQUATE
SHORING AND BRACI!G IN THE PROPER SEOUENCE, AS MAY BE REOUIREO TO
ACHIEVE THE FINAL CCMPLETED S]RUCTURE. THE SEAUENCE OF
CONSTFUCIO\I lS TF E FESPONS|BIL]TY OF INE CONTBACTOR. CONSULT wT TH
THE ENGINEER FOR SJHORING DESIGN AND RECOMMENDATIONS (NOT IN
coNTRACl.
3. THE CONTFACTOF IS FESPONSIBLE FOF ]HE MEANS, ME'THODS SEOUENCES
AND PROCEDUFES F()R CONSTFUC]ION OF IHIS PFOJECT. NOTIF/
SMUCTURAL ENGINE:ER OF ERFORS OR OMISSIONS IN THE CONS'IRUSTION
DOCUMENTS IMMEDI,\TELY. DO NOT PROCEEO UNl]L ERRORS OF CIMISSIONS
ARE RESOL\€D, COC)RDINAIE BEQUIREMENTS FOR ALL PENE'IIAT]ONS
THFOUGH STFUCTUNAL MEMBERS \A1lN STRI]CTURAL ENGINEER, JOBS]]E
SAFETY IS THE SOLE IIESPONSIBILITY OF]HE CONTRACTOR.
4, OBSERVATION !1S TS BY THE STRUCTURAL ENONEERARE FOR
DETERMINATION OF (iENERAL COMPLIANCE WITH lHE CONSTRUCIION
DOCUMENTS THIS CIBSERVATION VISIT IS NOT AAI INSPECTIoN ]HE
CON]XACTOF SHALL CONTACT THE ENGINEEB AT THE APPFOPF]ATETIME TO
SCHEDULE THIS VLSII
5. IF NEW CONSTFUCTION ADJO1NS AN EXIS]ING STRUC'IURE ]HE
CONIFACTOF SHALL BE BESPONSIBLE FORVERIFflNG DIMENSIONS.
EIEVA'TIONS AND ALL EXIST]NG CONDINONS. UNDERPINNINGAND SHORING OF
EXISTING STFUCTURES SI-iALL BE lHE FESPONSIBIUTY OF]HE CCNTRACTOR
CONSULTWIH THE ENGINEER FOF SHORING DESIGN AND RECOMMENDATIONS
(NOT IN CONTRACTI.
6, WHILE E\,€RY EFFOFT IS I\,IADE TO PRO\IOE A COI,4PLETE AND ACCUFA]E SET
OF CONS]RUCTION DOCUMENTS, ERRORS OF OIVISSIONS MAY OCCUR.
RELEASE OF THESE DRAWINGS ANTICIPATES CONNNUED COOPEFANON ANO
COMMUNICATION BETWEEN THE CONTFACTOR, AFCHIIECT AND ENGINEER TO
PFOV]DE T.IE BEST DOSSIELE STtIUCTUqL,
ABBREVIATIONS LIST
ABV.
BLKG.
BM.
BRG.
coL.
EQ,
EXSTG.
HDR.
JSTS,
K.S,
LVL
o.c.
R.
REF.
T
TYP.
VIF
ABOVE
BLOCKING
BEAM
BEARING
COLUMN
CRIPPLE POST
EOUAL
EXISTING
HEADER
JOISTS
KING STUD
LAMINATED VENEER LUMBER
ON CENTER
PLATE
REFERENCE
TRIMMER
ryPICAL
VERIFY IN FIELD
WITH
P.O. BOX 2494
AVON. CO 81620
PH 970.949.7100
FAX 970.949.3377
lutions
N G I T\E E RIN G
MORGAN REMODEL
SHEET NO.
CALCULATEp gy JPL
ll
_L_l _r_L-J_ |
[,' ., ' lt, -l E| | cd'gr@s,e{z-(r)l ,rl r tl Allrrrrll' t2
II||l
-r:t.*\ t hI lllr'4fu,i iii ili u),i
xa
ql-,a>l,l lr XDllll|,' I a^ll, t rl ,-uE.TiT_---1_>1|'4^
,'r | 1l (JAll , o;ll:l I z*o
,,o
= lltlltlit ,rz* ll ':lril lJLUlrrl
gg ll_i_l_l_
-r-l-t-l-f-l-t-l-tl
_lr
II
s
-
... :
TJJ
(5z
ax
uJao-ul-
=t
z
o_
CDz
r
LL
LLoot
r.l
=h_U.Jx1UJ
EUJul>>oU'D
6.(
xoy.J
9=d
\)>
-l- Jz_E
H;
o{cc(9o-r
T
I
I
I
I
Il:
l
=
o
LUF
()
dz
z
=EIL
3
uJz
z
:
I
I
J
alIFa
ot!
k
ooza;zz>>dgo
lL:qx
=iF-'-;-\
--al
I
ciluF
(J
oz
[!
I=.. a')oiu.l ]uk9
^x>Y
g1 Z
<z
=Rd66Zg) uJ?>
--'! (D
=<tr><o
OLL
AAql66
HIP Rzl=='rrll! t!
<l= z
ilt;N(9
Dclgn Rwlcw Borrd
ACTIOI{ FORII
DtDrtln|at of @nnunltt Mm.nt
t5 Sot dr fil*re. lo.d, W!, Color.do alatt
trl: tm.|,t.utt frr: tto.att.rtl
rel: rrr.vdllw.ecn
Proiect Name: MORGANAVYMAN WINDOW
Prcject Description:
Padicipanb:
APPUCANT ATLAS CONSTRUCNON
144 WILDCAT STREET
EDWARDS
co 81632
License: 255-A
CONTRACTOR ATI-AS CONSTRUCNON
1,T4 WIT-DCAT STREET
EDWARDS
co 81532
License:255-A
434 GORE CREEK DR VAIL
DRB Numb€r: DR8080057
03/10/2008 Phone: 970-926-1455
03/10/2008 Phone: 970-926-1455
Location: ALLSEASONS B-5
FINAL APPROVAL FOR A TMNSOM WINDOW ADDMON
owNER WYMAN, TIMOTHY E. - MORGAN,03/10/2008
TRUSTEES
31 S HARRISON ST
EASTON
MD 21601
Proiect Address:
Legal Description:
Parcd Number:
Comments:
loh B Block Subdivision: ALL SEASONS CONDO
2101-082-3701-2
BOARD/STAFF ACTION
l.lotion By: Gillette
Second By: Dantas
Vote: 4-0-0
Conditions:
Action: APPROVED
Date of Approval: 03/19/2008
Cond: 8
(P|-AN): No dranges to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
(PLAN): DRB approval shall not become valid for 20 days following the date of
approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEAIS.
@nd:202
(PI-AN): Approval of this proJed shall lapse and beome void one (1) year following
the date of final approval, unless a building permit is lszued and @nstructlon is
commenced and ls diligenUy pursued toward ompleton.
Cond: CON0009828
The applicant shall add a center mullion to the proposed window to match the sliding
door below and shall submit a revlsed renderirp at the tme of building permlt.
Planner: Nlaole Peterson DRB Fee Paid: S2!tO.0O
ALL SEASIONS COITDOMINITIM ASSOCIATION
.I34GORE CREH(DRTT/E
vArr,, c0E1657
Muth 6,2008
Towuof Veil
ConmrnityDcvelopmart
l l l S. Frontage Road West
Va,ll, CO 81657
RE: Rcmodcl - rVindow Addition in Unit 85.
Dcar Ladics and Gentlcmqr:
This letcr is to infonn you tba the Board of lvlaoragas of thc All Seasons Condomlnigm
Associatiou has approvcd the addition of a wlndow above thc dcsk door on thc sorlb side of Unit
B5.
Permission has also becn granted to vsnt onc appliance eitbcrtbmqhthc cast wall ortbroughthe
roof.
If you should have any qucsdons, pleasc do not hesitate to @ntact mG.
Sinccreln
Y^r1-T*l P \-e'e"+
IrryG. Barnes
ManagingAgcnt
tl
f0m,,ffi
Questions? Callthe Building Team at 479-2325
Project Name:
Project Addrcss:
This Chedrlist murt fu omoleW fufore a Building permit application is
a'
All pages of application is complete
Co
6K,'s?
{1la6€5,tcE test and results submitted if demolition is occuring Lt/vDe)L
6tz Architect stamp and signature (All Commercial and Multi family)
/uo4
o Full floor plans including building sections and elevations(s sets of plans for Multi-Family and
Commercial Buildings)
o -Window and door schedule
6 Full structural plans, including design criteria (i.e.loads)
6Y Sptdrural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
r.a/ |oils Report must be submitted prior to footing inspection
d fre resistive assemblies specified and penetrations indicated
o Smoke detectors shown on plans
o Types and quanUty offireplaces shown
Applicant's Signature:
Date of submittal:3 fu/or
Department of Community Development
,{nutDRB approval obtained (if required) Provide a copy of approval formy' Condominium Association letter of approval attached if project is a MultFFamily complex
,{ Cnmpletesite plan submitted
f 9nlic Way Permit application included if applicable (refer to Public Work checklist)
pd Saging plan included (refer to Publh Works chectdist) No dumoster,oarkinq or materiat storaoe
\WailWata\cdev\FORMS\PERM ITS\BLDGPERM.DOC
Received By:
ut0212003
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Depaftment Approval, Engineer's (Public Works)
review and approval, a Planning Department review or Health Department review, and a review
by the Building Department, the estimated time for a total review will take as long as three (3)
weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may afFect future permib that I apply for,
Project Name:
out", 3lzu [o8
-T-T
Signature
F:everyone/forms/bldperm3
/'1\ -
ISJ'r.-At=s/, J
TowdvnV
HOW DIDWE RATE WITH YOU?
Town of VailSurvey
Community Development Departnent Russell Fomst Directot
(970)479.2139
Check all thd applies.
1. Which Deparfnent(s) did you contact?
Building la Environmenbl_ Housing_ AdminPlanning DRB }( PEC
2. Was yourinfial contactwilh ourstaffimmediate o4 sbw
no one avdlable
lf you were required b wait, how long was it bebre you were
helped? N l*'
4.Was your project revieured on a timely nasisZ @l No
lf no, why not?
5, Was this your first time to fle a DRB ep-F - PEC app
Bldg Permit k NilA
7. Overall efiectiveness of tre Front Service Counter.@ 4 3 2 1
8. What is the best time of day for you to use fie Front Service
Counter?
9. Any comments you have which would allow us to better serve you
nexttime?
Thank you for taking the time b complete this survey, We ue
commifted b improving our seMce.
Please rate the performance of $e sbffperson who asssfud you:(S)t 3 21 Name: tj..it-- -loest-ril*r*
{nowledge; responsiveneffi
WHEN A'PUBLIC WAy PERMIT" IS REQUIRED
PLEASE REAS AND CHECK OFF EACH OF THE FOLLOMNG QUESTIONS REGARDING THE NEED FOR A
"PUBUC WAY PERMIT":
o Is this a new residence?
o Does demolition work being
public propefi?
performed require the use of the Right-of-Way, easements or
YES No__!<-
NO.K
YES No D<
Is a different access needed to the site other than the existing driveway? YES- NO\
Is any drainage work being done that affects the Right-of-Way, easements, or public property?
YES NO 4
Is a "Revocable Right-oFWay Permit" required?NO_K -
Is the Right-of-Way, easements or public property to be used for staging, parking or fencing?YES NO h
yag** is NO,is lqrkinO, staging or fencing plan required by Public WorK?
If you answered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permit" applications may be obtained at the Public Workt office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-2198.
I HAVE READ AND ALL THE ABOVE QUESTIONS.
4Ans &s{zue:zhr)
Contractor Signature
Job or Poect Name:
Date Signed:
YES NO K
Is any utility work needed? YES
Is the driveway being repaved?
D
J -lo-Ot
F:/everyone/forms/bldperm4
Company Name
APPLICATION
FOR TOWN OF VAIL
PUBLIC WAY PERMIT 19
PW*:Tf'TTfT
Parcer#:I r f, [ - I I I - [ ! - I I I
Brds. Permit#,8 n I' n I I I
't.
Job Name Str€et Address T] n n-[-l (tfunknowncetlI ll ll | | | 479.2198 ext. O)2.Excavating Contractor Nams Mailing Addr€8s TOV Contrac{or's License Number REOUIREO
()
Phone #ApCity
4.
Start Dat6
Work is for lcircle one;
Comolslion Dale
Water Sewer Gas Electric Telephone
(Psrmit Explratlon Dat€)
CAW Landscaping Temp. Site Access
Other
Trench-width
(min.4')
Bond Amount $
ALL MATERIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED.
7.Rubber out-riggers are required on
Asphalt surfaces underneath the
A signature below indicates a
signalures are obtainedr permitt€e
necessary Town ol Vail signatures.
ST BE ON THE JOBSITE BEFORE THE
working on asphalt.
at all times.
utility locations and approvals. Once all utility company
application through the Public Works ofiice to obtain the
up to one week to prooess.
Depth
Total sF $
Total LF $
Permit Fee Total Permit Fee $
Public Service Company (1
U.S. West (1 -800-922-1 987)
Public Service Natural Gas Group (1-800-922-19871
TCI Cablevision of the Rockies (1-800-922-1987)
Eagle River Water & Sanitation District (970-476-7480, ext. 114)
Holy Cross Electric Company (1-800-922-1987)
Town ol Vail Electricians (970479-2158)
Town of Vail lrrigation (970-479-2158)
Town of Vail Public Works Construction Inspector (970'479'2198)
9. THERE WILL BE NO TOTAL STREET CLOSURESI A construction trafiic control plan must be approved by the
Public Works Department prior to issuance of the permit.
1 0. All excavation must be done by hand within 18" of utilities - (Senate Bill 172).
11. pennitte€ must contact Publlc Works D€oartment al 479-2198 24 houGt prior to commencino ol work. Failure to notify
lhe Town will result in forfeiture of bond money. Scheduled inspections which are nol ready may result in lhe Town
charging the contractor a reinspection fee.
12, I certify that I have read all chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility
company agreements, signed by me, and will abide by lhe same, and that all utilities have been notified as required.
Contractor's Signature ot Agrooment
ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN
show streets with names, buildings, and location of cuts. usE DASH LINES FOR CUT.
Pdnt namo clearly Dale ol Signature
Whits - Public Works
Y€llow - Conlractor
NW0FYt
PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
How it relates to Building Permits:
Fill out the attached check list with the Building Permit Application.
If yes was answered to any of the questions then a "Public Way" permit is required. You
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verifli (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November lst and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Work's office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to perform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
NOTE: The above process is for work in a public way ONLY. Public Way
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
g/../o*
nd the above.
Date Signed
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS!
Please read and check off each of the items below:
/tnu Town of Vail Building Department has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
A The Town of Vail Public Works Department will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culverts at access points from the road or street onto the construction
site. such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Depaftment for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at 479-2798 to request an inspection from
the Public Works Depatment. Allow a minimum of 24 hour notice.
sy' Also, the Town of Vail Public Works Depaftment will be approving all final drainage
and culvert installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Certificate of Occupancv issuance.
Agreed to by: . \^r^ Po^et"
Project Name:
Date Signed:
F:/everyone/forms/bldperm6
?-zu - 96
MATERIAL STORAGE AND CONSTRUCTION PARKING
Please read and check off each of the items below.
(Copies of complete text are available upon request)
-,- CODE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED
./
S{ Unlav'fiul deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or- deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any
other debris or material upon dny street sidewalk, alley or public place, or any portion thereof.
F Notice; Abatement: The Director of Public Works may notiff and require any person who violates or- causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand; gravel, rocks, mud,
dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public Works. In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified,
1g,/Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hyevnder be punished as provided in Section 1-4-1 of this code.
6 Notace and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public WorK as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 6 (1979).
CODES 7.3A-I AND 7.3A-3I PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
o{ no person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) g 1)/'
Et-11{hene\ter any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Atticle, or left unattended for a period of twenty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) g 3: Ord. 28(1981) 5 1)
I have read and will cornply with the above code provisions:
Position or Relationship to Project:
Date Signed: 3 | zo l"*
F:/everyone/fomrs,6ldpermT
;-t
Jnso^ ?o.pt.-
Vail 2004
Vail Village and Lionshead Village Construction Hours
Information Handout
Problem Statement
The Vail Village and Lionshead Village are invaluable assets to the community. Thousands of people
come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer.
The community and merchants rely upon our guest to generate revenue. Our summer/winter guests
expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the community and on our
guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village and
Lionshead Village Construction Hours Handout.
It would be irresponsible for the Town of Vail, the the Merchants, to not
actively participate to minimize the impact of
New for 2004-2006 will be the Vail Village
utility related improvements,
All Construction projects and/or
Bluhm Town of Vail Stleetscape
Givens
The following givens are intended to
in the Villages:
r The public's health, safety and
o Adequate pedestrian,
be maintained.
areas.
all
Scoft
construction
the Vail
, refer to
The hours of Outside Construction Activity shall be as follows:
- April 15-June 18& SeptemberT-November 19,7a.m. until 7 p.m., seven daysaweek.
June 18 thru September 10, work must end by 4:00 p.m. on Fridays.
November 13 - April 1 5, 2005 work allowed within daylight hours only.
- Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore-Creek Drive and 7 a.m.
to 8:30 a.m. on Bridge Street.
- Special Construction delivery permits must be requested in advance, from Public Works in
conjunction with Code Enforcement at Checkpoint Charlie.
- No construction activity shall occur on Saturday or Sunday between June 19 and
September 5.
-3418 for
No outside construction activity shall occur on the following dates:
Saturday, February 14, Sunday, February 15, and Monday, February 16.
(President's Weekend)
Saturday, May 22, Sunday, May 23 and Monday, May 24 (Memoriat Dav)
Friday, June 25, Saturday, June 26 and Sunday, June 27. (Vail Arts Festival)
Friday, July 2, Saturday, July 3 and Sunday, July 4 and Monday July 5.
(lndependence Dav)
Saturday, September4 , Sunday, September 5 , and Monday, September 6.
(Labor Day Weekend).
Thursday, November 25,
Sunday, November28.
Friday, December 24, Saturday,
(Christmas Dav Holidav)
warn ing),
The following expectations are established to insure the success of the Vail Village and Lionshead Village
Construction Hours Plan:
. Full and complete cooperation and understanding from all parties involved in the construction activity
in regards to this plan.
r Strict adherence and compliance with the requirements outlined in the construction plan.
. Respect and consideration for the affected interests and parfies.
lf you have any questions, Please contact the Town of Vail Public Works Department
(Construction Inspector) or the Vail Police Department (Code Enforcement Officer)
970479-2198 970476-7603
TOIriN0,FVAIL
Vail2004 Staging / Parking Plan Information
The Staeine / Parkine Plan Philosophv- Is a very important step in the building
process. Striking a balance between safe public access and giving construction projects
room to build is becoming increasingly challenging, for us to meet all the needs of those
who will be impacted by construction projects. The fact is, there is less room to build in
the Town of Vail.
Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of
Way is a Privilege, not a given right. We take into account when we review and approve
staging / parking plans, impacts on neighborhoods, tourism, business and the traveling
public along with your right to build.
The General Contractor is responsible for all subcontractors and all construction
activitv relatine to the buildins proiect. The staging plan will be enforced according to
the Approved Set of Building and Staging Plans. You are required to keep a copy of the
Approved Staging Plan on site.
Two staging /parking plans are required, a summer and winter. Summer staging plans
expire on November 1, and winter staging plans expire on April 15. (Note: There is no on
street parkine in the winter season and all materials. equipment. etc must be l0' offthe
edge ofasphalt).
Enforcement of all staging / parking plan is as follows.
A) Staging i Parking Plans to scale required.
B) Once the plan is approved, they will be held to complete compliance.
C) We will use a 3 step and you're out, process.
Sten One- Verbal and written warnings as to the staging plan violation, then have
contractor sign and date field memo waming.
Step Two- Police Department issue tickets and tows or public works writes second
written waming to all violators who have been notified under step one and who are still
in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building
Official will call the contractor and notify them, the next time any violation happens, the
building department will red tag the construction site for 48 hours.
Step Three- If still in violation after step two, a 48 hour Red Taq will be issued to the
proj ect site.
If you have any Questions, Please contact the Town of Vail Construction Inspector at
970-479-2t98
Requirements for an Acceptable Staging Plan
It is preferred that and Approved site Plan is used to draw a staging plan, but a hand
drawn plan may be used as long as it is dawn to scale and is neat and legible.
l.) The Staging Plan must show the following:
(a) Show all parking that is required for the job site. (lncluding construction
equipment).
(b) Show the location of all material that will be staged on site.
(c) Show the location ofall dumpsters and port-o-john that are to be on site.
(d) If a fence is required, then show the location of the fence and describe the
material used for the fence.
(e) Iftrees and / or vegetation is required to be protected, then show how this will be
done.
(0 If this staging plan is for a Demo Permit, then show staging for dump trucks and
all related equipment. If the Town of Vail Right of Way area is needed for
staging, then a Traffic Control Plan is required in conjunction with the staging
plan.
(g) Please provide and show an Erosion Control Plan.
(h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in
the Winter Staging Plan.
2.) If work needs to occur in the right of way, then add a Trafhc Control Plan to the
staging plan showing the following:
(a) The work zone (area that is to be performed)
(b) Traffic Control Devices (warning, signs, cones, flaggers, etc.)
(c) Distances that all devices will be set up from the work zone. Also show all
dimensions of work being performed in the right of way. All traffic control plans
must conform to the MUTCD manual.(Manual of Uniform Traffic Control
Devices)
2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and
Community Development Department. Once the staging plan is approved, it will be
registered with the departments listed above and enforced.
3.) The Village and Lionshead area have outside construction restrictions, please become
familiar with the Vail 2004, Vail Village and Lionshead Construction Hours handout.