Loading...
HomeMy WebLinkAboutB12-0189 REV2 approved plansTRANSMITTAL FORM Project Street Address: __________ ______________________________ ___________ (Number) (Street) (Suite #) Building/Complex Name: ________________________________ Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) Building: $_____________________ Plumbing: $_____________________ Electrical: $_____________________ Mechanical: $_____________________ Total: $_____________________ Description / List of Changes: __________________________________________________ __________________________________________________ __________________________________________________ __________________________________________________ __________________________________________________ __________________________________________________ (use additional sheet if necessary) Permit #(s) information applies to: Attention: ( ) Revisions ( ) Response to Correction Letter ____________________________________ __________________________ ___attached copy of correction letter ( ) Deferred Submittal ____________________________________ __________________________ ( ) Other Revision Submittals: 1. “Field Set” of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re-issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Date Received: 01-Oct-11 Department of Community Development 75 South Frontage Road Vail, CO 81657 Tel: 970-479-2128 www.vailgov.com Development Review Coordinator For Office Use Only: Fee Paid: _________________________________________ Received From: ____________________________________ Cash _________ Check # ___________ CC: Visa / MC Last 4 CC # _________ exp. date: ________ Auth # _________ Contractor Information Business Name: ________________________________________ Business Address: ______________________________________ City _____________________ State: _______ Zip: ____________ Contact Name: _________________________________________ Contact Phone: _________________________________________ Contact E-Mail: _________________________________________ I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review ap- proved, International Building and Residential Codes and other ordinances of the Town applicable thereto. X___________________________________________________ Owner/Owner’s Representative Signature (Required) Applicant Information Applicant Name: _______________________________________ Applicant Phone: _______________________________________ Applicant E-Mail: _______________________________________ Owner'sRepresentative B12-0189Haeberle 1416Moraine Drive GilletteLLC PostOfficeBox5821 VailCO81658 BrianGillette 970.390.7981 brian_gillette@gillettellc.con JobHernandez 970.333.2097 jobhernandezmn@prodigy.net.mx 1.DeleteWindow26fromentry. a.SeeA2.1,A3.2 2.AddgableandtrapatSWBedroomslider. a.SeeA2.3,A3.1,A3.2,S4,REScheck 0 28 26 MORAINE DRIVE (50') 81 3 0 .5'X 8 1 27.5 'X 812 5 .4'X S44°09'23"E 177.62' LOT 9 86.81' N44°22'31"W 169.28' N39°18'43"E 72.51' LOT 7 28 26 MORAINE DRIVE (50') 81 3 0 .5'X 8 1 27.5 'X S44°09'23"E 177.62' 86.81' N44°22'31"W 169.28' N39°18'43"E 72.51' LOT 7 8 1 3 0 8 1 2 8 8126 8 1 3 2 8 1 3 0 8128 8126 8 1 2 4 8122 8120 8120 8122 8124 81 1 0 81 1 0 LOT 8 15,136 SQUARE FEET 0.348 ACRES DRIVEWAY SLAB ASPHALT - NO HEAT 1,350 SQ. FT. LIGHT FIXTURE NOTE: (2) WALL MOUNTED LIGHT FIXTURES SHOWN. ALL OTHERS ARE RECESSED CANS, NOT SHOWN. UNDISTURBED GRADES SNOW STORAGE AREA: 30% OF DRIVEWAY = 405 SQ. FT. 8125' 8125.5' 8124.5' 8124' 8125' MAIN LEVEL - F.F. 8126'-0 3/4" (0'-0") UPPER LEVEL - F.F. 8137'-2 1/8" (11'-1 3/8") ON-GRADE PATIO 8125'-10" 9X18 CAR 9X18 CAR 9X19 CAR GARAGE LEVEL 8125'-6" (-0'-6") EXISTING SIDEWALK SE T B A C K SE T B A C K SETBACK ENTRY PATIO 8125'-10" WATERPROOF DECK OVER LIVING AREA 8131' BOULDER RETAINING WALL: 2' HEIGHT T.O.WALL = 8128'-0" B.O.WALL = 8126'-0" CONC RETAINING WALL: 3' HEIGHT T.O.WALL = 8129'-0" B.O.WALL = 8126'-0" METERS G WATER S EWE R GAS PHONE/TV ELEC CONTRACTOR TO VERIFY LOCATION OF UTILITY STUB-OUTS PRIVACY WALL 1.25% SLOPE 64 ' - 0 " 11 ' - 7 1 / 8 " CONSTRUCTION BOUNDARY FENCE: EROSION CONTROL - FENCE/BAIL 10 ' - 0 " BOULDER RETAINING WALL: 2' HEIGHT T.O.WALL = 8127'-6" B.O.WALL = 8125'-6" 8130' EXTERIOR LIGHTING: (2) WALL SCONCES BOULDER RETAINING WALL: 2' HEIGHT T.O.WALL = 8129'-6" B.O.WALL = 8127'-6" 10'-0" 10 ' - 0 " 5' - 0" 8150'-8 13/16" T.O.RIDGE 8157'-0 5/16" T.O.RIDGE 8150'-3 11/16" T.O.RIDGE 8157'-0 5/16" T.O.RIDGE 8143'-7 11/16" T.O.RIDGE 8152'-11 5/8" T.O.RIDGE 8158'-6 5/16" T.O.CHIMNEY 8156'-0 5/16" T.O.RIDGE 8157'-6" T.O.PARAPET 8154'-1 7/8" T.O.ROOF8150'-8 5/16" T.O.RIDGE FOUNDATION DRAIN PIPES AND TERMINATION RE: SOILS INVESTIGATION REPORT FOUNDATION DRAINS HIGH-POINT, START OF SLOPE REVISION 6-6-12 PERMIT CHECKLIST REVISION 6-6-12 PERMIT CHECKLIST LOWER ROOF 4:12 PITCH DECK 2 2 8 1 3 0 8 1 2 8 8126 8 1 3 2 LANDSCAPE LEGEND SYMBOL NAME SIZE QUANTITY COLORADO BLUE SPRUCE (PICEA PUNGENS) 6' - 8' TALL 4A QUAKING ASPEN (POPULUS TREMULOIDES) 2" - 3" CAL.6B FLOWERING CRAB APPLE (MALUS SPP.) 3" CAL.1C WESTERN SANDCHERRY (PRUNUS BESSEYI) 5 GALLON 4D VANHOUTTE SPIREA (SPIREA VANHOUTTE) 5 GALLON 4E LILAC FRAGRANT (SYRINGA VULGARIS) 5 GALLON 4F SNOWBERRY (SYMPHORICARPOS ALBUS) 5 GALLON 4G NATURAL GRASSES AREA = 2850 S.F. LANDSCAPE NOTE: ALL DISTURBED AREAS SHALL RECIEVE REVEGETATION SEEDING WITH NATURAL GRASSES AND WILDFLOWER SEED MIX. IRRIGATION NOTE: ALL AREAS OF NEW SOD TO RECIEVE SPRAY IRRIGATION. ALL AREAS OF GROUND COVER AND TREE/SHRUB PLANGINGS TO RECEIVE UNDER-GROUND DRIP IRRIGATION. ALL IRRIGATION SYSTEMS TO BE DESIGNED BY A LANDSCAPE CONTRACTOR AND SUBMITTED TO THE ARCHITECT AND/OR OWNER FOR APPROVAL PRIOR TO INSTALLATION. RAIN SENSOR NOTE: THE IRRIGATION SYSTEM SHALL BE EQUIPPED WITH A RAIN SENSOR. EROSION CONTROL NOTE: ALL DISTURBED AREAS WITHOUT FORMAL LANDSCAPING TO RECIEVE REVEGETATION SEEDING. EROSION CONTROL SHALL BE MAINTAINED BY PLACEMENT OF HAY BAILS AND SILT FENCING ON DOWNSLOPE SIDE OF LOT AND IN DRAINAGE SWALES.A G D BB G A F F F E D A G C E G E B B E A D B B F D OWNER GARDEN NATURAL GRASSES NATURAL GRASSES NATURAL GRASSES 97 0 . 3 2 8 . 5 1 5 1 O F F I C E PO B o x 1 5 8 7 , E a g l e , C O 8 1 6 3 1 ww w . m a r t i n m a n l e y a r c h i t e c t s . c o m Project number Date REVISIONS 7/ 2 4 / 2 0 1 2 4 : 2 6 : 1 4 P M Du a p h i n a i s - M o s e l e y F i l i n g 1 , L o t 8 To w n o f V a i l , E a g l e C o u n t y , C o l o r a d o A1.1 SI T E & L A N D S C A P E P L A N 0408 14 1 6 M O R A I N E D R I V E BU I L D I N G P E R M I T 6-6-23 PERMIT: 5-1-12 BR I A N G I L L E T T E 1" = 10'-0"1 SITE PLAN 1416 MORAINE DRIVE - LOT 8 GRAND TRAVERSE - VAIL 1" = 10'-0"2 LANDSCAPE PLAN GRFA ALLOWED: NOT APPLICABLE GRFA PROPOSED: 6,392 SQ. FT. LIVING AREA PROPOSED:5,579 SQ. FT. LOT AREA = .348 ACRES x 43,560 SQ. FT. = 15,136 SQ. FT. SITE COVERAGE ALLOWED (25% OF SITE) = 3,784 SQ. FT. SITE COVERAGE PROPOSED = 3,780 SQ. FT TOWN OF VAIL - SPECIAL DEVELOPMENT DISTRICT: SSD 22 - GRAND TRAVERSE - LOT 8 HEIGHT LIMIT = 33'-0" PROPOSED HEIGHT = 32'-11" PARKING SPACES REQUIRED: 3 SPACES PARKING SPACES PROPOSED: 2 SPACES (INTERIOR) 1 SPACE (EXTERIOR) Single Family Residence - New Construction Location: 1416 Moraine Drive, Vail, CO 81657 Lot 8, Dauphinais-Moseley, Filing 1 Parcel #2103-122-09-032 Owner: Job G. Hernandez & Ana P. Rosas PO Box 3708 Vail, CO 81658 Contractor:Gillette LLC Construction Brian Gillette - 888-719-1123 PO Box 5821, Vail, CO 81658 brian_gillette@gillettellc.com Architect: Martin Manley Architects John G. Martin - 970-328-0592 john@martinmanleyarchitects.com PROJECT / CODE SUMMARY Class of Work: New Construction Type of Construction: Type V-N Type of Occupancy: R3 (single family) Levels: 2-story ROOF OVERHANGS ALLOWED INTO SETBACK: 2 FEET PATIO ENCROACHMENT INTO REAR SETBACK: 5 FEET Architectural Drawing List Sheet Number Sheet Name A1.1SITE & LANDSCAPE PLAN A2.1MAIN LEVEL FLOOR PLAN A2.2UPPER LEVEL FLOOR PLAN A2.3ROOF PLAN A3.1ELEVATIONS - NORTH & EAST A3.2ELEVATIONS - SOUTH & WEST A4.1FRAMING SECTIONS A4.2SECTIONS A6.2WINDOWS Grand total: 9 REFRENCE NO R T H Engineering Drawing List Sheet Number Sheet Name S1 GENERAL NOTES/DETAILS S2 FOUNDATION PLAN S3 UPPER FLOOR FRAMING PLAN S4 ROOF FRAMING PLAN S5 FRAMING DETAILS M1.0 MECHANICAL E1.1 MAIN LEVEL LIGHTING E1.2 UPPER LEVEL LIGHTING No . D e s c r i p t i o n D a t e 1 R e v i s i o n 1 6- 6 - 1 2 2 R e v i s i o n 2 7- 2 4 - 1 2 1/4"=1'-0" A2.1 MAIN LEVEL 05.01.2012 0000 1416 Moraine Drive Lot 8 Filing 1 Dauphinais Moseley Vail, Colorado 14 1 6 M o r a i n e D r i v e 06.06.2012 Permit Resubmittal 07.23.2012 Financing Submittal 09.25.2012 Resubmittal GILLETTE LLC CONSTRUCTION POST OFFICE BOX 5821 888.719.1123 VAIL COLORADO 81658 gillettellc.com 10.28.2012 Framing Plans 11.24.2012 Framing Plans 12.07.2012 SE Bath Revision 01.13.2013 Revisions T.O. CONC 8125'-6" W4 8'-0"28'-0"6'-0"2'-0"8'-0"4'-0"30'-0"2'-0"6'-0" 2'- 0 " 18 ' - 0 " 2'- 0 " 4'- 0 " 2'- 0 " 1'- 6 " 8'- 0 " 4' - 6 " 2'- 0 " 2'- 0 " 4'- 0 " 14 ' - 0 " 3'-1034"3'-103 4"3'-634"3'-63 4" 10 ' - 0 " 3'-0" 11 ' - 0 " 3'-0" 9'- 0 " 8' - 0 " 4'- 0 " 2'- 6 58" 7'-0"12'-0" 2'-1014"5'-914" 9'-0" 3'-11" 0'-312"3'- 2 12" 0'- 3 12" 2'- 8 12" 0'- 3 12" 2'- 8 12" 2'- 4 " 3'- 0 " 2'- 4 " 7'- 5 " 0' - 1 1 12" 3' - 0 " 1'-8"5'- 6 " 3'-0" 3' - 0 " 4'-6" 0'-312" 2'- 0 " 2'- 1 0 12" 0'-7" 0'-312" 3'-812"3'-9"9'-512" 1'- 1 0 12" 2'-6"2'-6"2'-1112"3'-1112" 2'-2" 1'-9"2'-3"5'-312"6'-2" 1'-112"2'-0"3'-712" 3' - 9 12" 2'- 5 12" 7'- 1 " 1'- 0 " 3'- 0 " 0'- 3 12" 2'-1012" 2'- 0 " W4 W4 W6 W6 W4 W4 W6 W3 W1 W6 W3 W4 W1 W4 W1 W4 W1 W4 W1 W4W1 W4W1 W4 W1 3'-9" W8 Finished Floor 8126'-3/4" T.O. CONC 8125'-10 1/2" Slope 1/4" per 1'-0" Slope 1/4" per 1'-0" UP 18 Risers @ 7-7/16" 16 Treads @ 11" Hand and Guardrail per 2009 IRC UP 18 Risers @ 7-7/16" 12 Treads @ 11" Hand and Guardrail per 2009 IRC Heat -N-Glo Direct Vent Gas Fireplace MASTER BEDROOM LIVING ROOM DINING ROOM KITCHEN BAR PANTRY WATER CLOSET FAMILY ROOM MECHANICAL MUD ROOM GARAGE A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 11 12 13 W2W10 W9 1'- 6 " 2'- 4 12" ENTRY 7'-312" W10 W10 W7 2' - 8 18" 01 02 04 03 05 06 08 09 24 25 26 07 24 25 27 28 29 30 31 32 33 343536 373839 20 min Self Closing Door 20 min Self Closing Door See 9/A4.1 for handrail detail Metal stud garage partitions by drywall subcontractor. Install after ceiling is drywalled to maintain 1 hour fire rating. Wrap steel column with type x drywall to maintain 1 hour fire rating. W2 W11 W11 2'- 2 12" 5' - 5 " 3'-612"1'-11" 10 ' - 5 12" 3'- 6 12" D W 1/4"=1'-0" A2.2 UPPER LEVEL 05.01.2012 0000 1416 Moraine Drive Lot 8 Filing 1 Dauphinais Moseley Vail, Colorado 14 1 6 M o r a i n e D r i v e 06.06.2012 Permit Resubmittal 07.23.2012 Financing Submittal 09.25.2012 Resubmittal GILLETTE LLC CONSTRUCTION POST OFFICE BOX 5821 888.719.1123 VAIL COLORADO 81658 gillettellc.com 10.28.2012 Framing Plans 11.24.2012 Framing Plans 12.07.2012 SE Bath Revision 01.13.2013 Revisions 8'-0"28'-0"6'-0"2'-0"8'-0"4'-0"30'-0"2'-0"6'-0" 2'- 0 " 18 ' - 0 " 2'- 0 " 4'- 0 " 2'- 0 " 1'- 6 " 8'- 0 " 4' - 6 " 2'- 0 " 2'- 0 " 4'- 0 " 14 ' - 0 " 9'- 0 " 8'- 0 " 9'-0" 2'-6"2'-6" 1'-0" 5'-11" 2'-2" 1'-9"2'-3"5'-312"6'-2" 1'-112"2'-0"3'-712" 3' - 9 12" 2'- 5 12" 7'- 1 " 1'- 0 " 3'- 0 " 0'- 3 12" W5 Finished Floor 8137-2 1/8" T.O. Plywood 8136'-11 1/8" DN 18 Risers @ 7-7/16" 12 Treads @ 11" Hand and Guardrail per 2009 IRC SW BEDROOM A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 11 12 13 FUTURE GUEST SUITE NE BEDROOM SE BEDROOM LAUNDRY ROOM LINEN CLOSET DN 18 R i s e r s @ 7 - 7 / 1 6 " 16 T r e a d s @ 1 1 " Ha n d a n d G u a r d r a i l p e r 20 0 9 I R C 4'-0"14'-0"12'-0"8'-0"7'-0" 10 ' - 0 " 3'-0" 3'-0" 11 ' - 0 " 6'-0" 1'-0"4'-514"5'-514"4'-514"5'-1018"5'-1018" 7'- 0 " 7'- 0 " 6'-3" 5'- 6 " 4'- 0 " 4'- 0 " 1'-10"10'-2" 2'- 0 " 1'- 1 0 " 4'- 7 12" 5'- 7 12" 1'-512" 0'-6" 3'-0" 0'-1112" 3'-6"1'-7"5'-1"4'-412"4'-11" 2'- 1 0 " 2' - 8 " 3'-1"4'-6" 1'- 5 14" W5 W1 W1 2' - 0 " Top of Decking 8137-0 3/8" Finished Floor 8137-0 3/8" T.O. Plywood 8136'-8 3/4" 4'- 1 " 9'- 7 " 12 13 14 16 17 18 21 22 10 04 01 02 20 19 09 03 11 12 13 14 15 16 17 21 2223 05 06 07 08 18 2'-0" 4'- 5 12" 3' - 0 " 2'- 1 0 " 3'- 1 1 12" 3'- 1 0 " 3'- 1 1 " 3' - 0 " 2'- 7 12" 4' - 0 " 2'-712"1'-4"2'-0" 5'-6"6'-0" 4'-0" 5'-6"9' - 5 " 19 2'- 5 12" 3'- 6 12" 1'- 3 " 11 ' - 6 " 3' - 0 " 13 ' - 6 12" 1'-0" 1'- 3 " 40 1/4"=1'-0" A2.3 ROOF PLAN 05.01.2012 0000 1416 Moraine Drive Lot 8 Filing 1 Dauphinais Moseley Vail, Colorado 14 1 6 M o r a i n e D r i v e 06.06.2012 Permit Resubmittal 07.23.2012 Financing Submittal 09.25.2012 Resubmittal GILLETTE LLC CONSTRUCTION POST OFFICE BOX 5821 888.719.1123 VAIL COLORADO 81658 gillettellc.com 10.28.2012 Framing Plans 11.24.2012 Framing Plans 12.07.2012 SE Bath Revision 01.13.2013 Revisions 8'-0"28'-0"6'-0"2'-0"8'-0"4'-0"30'-0"2'-0"6'-0" 2'- 0 " 18 ' - 0 " 2'- 0 " 4'- 0 " 2'- 0 " 1'- 6 " 8'- 0 " 4' - 6 " 2'- 0 " 2'- 0 " 4'- 0 " 14 ' - 0 " A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 11 12 13 1'- 6 " 1'-0" 1'- 6 " 3'-0" 1'- 6 " 1'- 6 " 1'- 6 " 1'- 6 " 8157'-516" 8152'-11 5/8" 8156'-5/16"8154'-1 7/8" 8150'-8 5/16" 8143'-7 1116" 8150'-3 1116" 8150'-8 1316" 8:128:12 8:12 8:12 8:12 8:12 8:12 8:12 8:12 8:12 8:12 8:12 8:12 8:12 14'-11" 11 ' - 4 12" 1'-5"7'-7" 4'- 0 " 8158'-6 516" Notes: 1.All eaves 2'-0" unless otherwise noted. 2.Shingles are Class A DaVinchi Multi-width shakes. 4:12 1'- 6 " 1' - 6 " 8153'-6 516" 8:12 8:12 01 Main Level 8126' - 0 3/4"Roof Plate 8146' - 2 1/8"02 Upper Level 8137' - 2 1/8"4' - 10 3/4" ME T E R CL O S E T GA S M E T E R ME T A L R A I L I N G W/ W O O D C A P VE R T I C A L C E D A R BO A R D A N D B A T T E N SI D I N G STUCCO WALL W/ DEEP INSET WINDOWSSYNTHETIC WOOD SHAKE SHINGLES WITH STAGGARD BUTTS "RAINBOW ROCK" STONE VENEERCEDAR "BELLY BAND" ST U C C O CO P P E R C A P STONE SILL AT ALL WINDOWS IN STUCCO WALLS 1 2 4 10 24 27 2 01 Main Level 8126' - 0 3/4"Roof Plate 8146' - 2 1/8"02 Upper Level 8137' - 2 1/8"3 16 17 18 19 20 21 22 23 32 34 35 36 37 38 39 5' HEIGHT MAX.COLD STORAGE 2 2 3 970.328.5151 OFFICE PO Box 1587, Eagle, CO 81631 www.martinmanleyarchitects.com Project number DateREVISIONS 1/10/2013 4:31:31 PM A3.1 ELEVATIONS - NORTH & EAST04081416 MORAINE DRIVE BUILDING PERMIT 6-6-23 PERMIT: 5-1-12BRIAN GILLETTE Duaphinais-Moseley Filing 1, Lot 8 Town of Vail, Eagle County, Colorado 1/4" = 1'-0"1ELEVATION - NORTH 1/4" = 1'-0"2ELEVATION - EASTNo.DescriptionDate 2Revision 27-24-12 3Revision 31-10-13 01 Main Level 8126' - 0 3/4"Roof Plate 8146' - 2 1/8"02 Upper Level 8137' - 2 1/8" 13 14 15 29 31 33 3 01 Main Level 8126' - 0 3/4"Roof Plate 8146' - 2 1/8"02 Upper Level 8137' - 2 1/8"33' HEIGHT 33' - 0" 5 6 7 8 9 11 12 25 28 303 3 970.328.5151 OFFICE PO Box 1587, Eagle, CO 81631 www.martinmanleyarchitects.com Project number DateREVISIONS 1/10/2013 4:31:38 PM A3.2 ELEVATIONS - SOUTH & WEST04081416 MORAINE DRIVE BUILDING PERMIT 6-6-23 PERMIT: 5-1-12BRIAN GILLETTE Duaphinais-Moseley Filing 1, Lot 8 Town of Vail, Eagle County, Colorado 1/4" = 1'-0"1ELEVATION - SOUTH 1/4" = 1'-0"2ELEVATION - WESTNo.DescriptionDate 3Revision 31-10-13 A4.1 FRAMING 1/4"=1'-0" 05.01.2012 0000 1416 Moraine Drive Lot 8 Filing 1 Dauphinais Moseley Vail, Colorado 14 1 6 M o r a i n e D r i v e 06.06.2012 Permit Resubmittal 07.23.2012 Financing Submittal 09.25.2012 Resubmittal GILLETTE LLC CONSTRUCTION POST OFFICE BOX 5821 888.719.1123 VAIL COLORADO 81658 gillettellc.com 10.28.2012 Framing Plans 11.24.2012 Framing Plans 12.07.2012 SE Bath Revision 01.13.2013 Revisions SECTIONS Note: Finishes not shown for clarity. 8125'-10 1/2" 8136'-11 18" 8:12 8:12 C1 C1 W1 F3 F4 W1 W1 W1 10 ' - 0 " 14 ' - 0 " Continuous 34"x112" Flat Bar Handrail. Mount to 42" high knee wall. Max. height 38" above nosing. Min height 34" above nosing. Min. gap between handrail and wall 112". Return handrail to wall at bottom riser. Class A Davanchi Multiwidth Shake (install per manufacture's instruction) over full coverage ice and water shield. (typ) Kynar coated metal flashing at all eaves, rakes, valleys, crickets, step/wall, parapets, and chimney caps. R-56 BIB fiberglass insulation in un-vented roof cavity. Provide Certainteed MemBrain (install per manufacture's instruction) vapor barrier at bottom of ceiling cavity. (typ) Cedar Siding over Tyvek (install per manufacture's instruction) building wrap. (typ) R-21 BIB fiberglass insulation in exterior wall cavity. Provide Certainteed MemBrain (install per manufacture's instruction) vapor barrier at the interior. (typ) Provide 2 layers of grade D paper behind stone veneer and stucco. (typ) Provide sill seal between bottom plate and concrete wall. Seal joint with (1) strip of Ice and water shield that extends 2' up the framed wall and 1' down the concrete wall. (typ) Provide continuous R-6 Insultarp (install per manufacture's instruction) underslab insulation and vapor barrier. Install passive sub slab depressurization system. See M1.0 for more details. (typ) R-10 Drain & Dri (install per manufacture's instruction) insulation/wall drain over Dissco (install per manufacture's instruction) dampproofing at frost walls or Dissco (install per manufacture's instruction) waterproofing at basement walls. (typ) Install 4" perforated peremiter drain at footing per Gore Range Engineering's Soils Report dated April 23, 2012. Daylight SW corner of lot, (typ) Provide surface drainage per Gore Range Engineering's Soils Report dated April 23, 2012. (typ) A4.2 FRAMING 1/4"=1'-0" 05.01.2012 0000 1416 Moraine Drive Lot 8 Filing 1 Dauphinais Moseley Vail, Colorado 14 1 6 M o r a i n e D r i v e 06.06.2012 Permit Resubmittal 07.23.2012 Financing Submittal 09.25.2012 Resubmittal GILLETTE LLC CONSTRUCTION POST OFFICE BOX 5821 888.719.1123 VAIL COLORADO 81658 gillettellc.com 10.28.2012 Framing Plans 11.24.2012 Framing Plans 12.07.2012 SE Bath Revision 01.13.2013 Revisions C4 SECTIONS Note: Finishes not shown for clarity. 8125'-10 1/2" 8125'-6" 8125'-10 1/2" 8136'-11 18" 8136'-11 18" 9'- 0 " 10 ' - 0 " 8:12 8:12 8:12 8:12 8:12 9'- 0 " 10 ' - 0 " 10 ' - 4 12" 8'- 0 " 16 ' - 0 " 16 ' - 0 " 10 ' - 0 " 8'- 0 " 10 ' - 0 " 2'- 6 " C1 C1 C3 C1 C1 C1 C1 W9 W9 W4 W6 W1 W1 W3 W6 W1 W1 W1 W1 W1 W1 W6 W3 W9 W9 W11 W2 W10 F3 F4 F4 F3 F3 F4 F4 F4 F1 W11 F6 F3 Provide access for future radon fan. Conditioned attic below un-vented ceiling assembly. Conditioned attic below un-vented ceiling assembly. 37 38 39 VCMT3030 24 25 26 28 29 31 32 34 35 36 27 32 30 VCMT3030 VCMT3030 15 16 17 20 21 22 231819 VCMT3030 1 2 3 4 5 6 7 8 9 10 11 12 13 14 40 A6.2 WINDOWS 1/4"=1'-0" 05.01.2012 0000 1416 Moraine Drive Lot 8 Filing 1 Dauphinais Moseley Vail, Colorado 14 1 6 M o r a i n e D r i v e 06.06.2012 Permit Resubmittal 07.23.2012 Financing Submittal 09.25.2012 Resubmittal GILLETTE LLC CONSTRUCTION POST OFFICE BOX 5821 888.719.1123 VAIL COLORADO 81658 gillettellc.com 10.28.2012 Framing Plans 11.24.2012 Framing Plans 12.07.2012 SE Bath Revision 01.13.2013 Revisions 6'- 9 14" 15 ' - 0 " 6'- 1 0 14"8'- 9 " 6'- 9 14" 6'- 9 14" 6'- 9 14" 6'- 9 14"9' - 4 12" 13 ' - 1 1 " 7'- 1 34" 4'- 8 34" 5'-034" 4'- 8 34" 5'-034" 7'- 5 14" 7'- 1 3 4" 13 ' - 1 1 " 6'- 1 0 34" 11 ' - 2 " 6'- 9 14" 6' - 9 14" 8' - 7 11 16 " 8'- 0 " 8'- 3 " 8'- 2 " 14 ' - 4 18" 14 ' - 4 18" 8'- 2 " 8' - 6 14" 8'- 6 14" 8'- 6 14" 8'- 6 14" 8'- 6 14" 8'- 6 14" 10 ' - 0 " SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SG SGSG SG SG Notes: 1.U-Factor of fenestration shall be <.31 2.SG = Saftey glazing required by 2009 IRC 3.All Dimensions to structural rough opening. 2x4 inset framing will sit inside of dimensioned rough opening. 9'-218" 2'- 6 34" 2'-634" 3'-034" 8'-034" 7'- 0 34" 3'-03 4" 4'- 8 34" 3'-034" 4'- 8 34" 2'- 0 34" 2'-034" 5'-73 4" 3'-33 4" 12 ' - 5 14" 21'-1" 5'- 4 14" 8:12 16'-134" 9'- 5 14" 3'-334" 2'-934" 2'- 1 1 14" 7'- 4 12" 2'- 1 0 12" 2'-9" 7'- 4 12" 2'- 1 0 12" 2'-9" 6'- 9 14"4'- 0 34" 6'-034" 2' - 6 34" 2'-634" 2'- 6 34" 2'-634" 6'- 9 14" 2'-6" 2'- 6 " 2'-634" 2' - 6 3 4" 3'-034" 8'- 0 " 3'-03 4" 5'-934" 7'- 3 34" 2'- 1 0 12" 2'-9" 12'-134" 12 ' - 6 34" 5'-034" 2'- 1 " 21'-1" 8' - 0 12" 12 ' - 6 34" 5'-034" 16'-13 4"3'-334" 4'- 1 1 14" 4' - 1 1 14" 3'-334" 4'- 1 1 14" 3'-334" 3'-734"3'-734"3'-734" 4'- 5 14" 4'- 5 14" 4'- 5 14" DELETED SG 8:12 0'- 6 58" 2'- 1 716 " 12'-134" 1/4"=1'-0" A7.1 MAIN LEVEL REFLECTED 05.01.2012 0000 1416 Moraine Drive Lot 8 Filing 1 Dauphinais Moseley Vail, Colorado 14 1 6 M o r a i n e D r i v e 06.06.2012 Permit Resubmittal 07.23.2012 Financing Submittal 09.25.2012 Resubmittal GILLETTE LLC CONSTRUCTION POST OFFICE BOX 5821 888.719.1123 VAIL COLORADO 81658 gillettellc.com 10.28.2012 Framing Plans 11.24.2012 Framing Plans 12.07.2012 SE Bath Revision 01.13.2013 Revisions B/O Drop Framing MASTER BEDROOM LIVING ROOM DINING ROOM KITCHEN BAR PANTRY WATER CLOSET FAMILY ROOM MECHANICAL MUD ROOM GARAGE ENTRY +9'-4 1/2" Slab CEILING PLAN B/O Framing +10'-4 1/2" Slab B/O Framing +10'-0" Slab B/O Framing +10'-0" Slab B/O Framing +10'-0" Slab B/O Framing +10'-0" Slab B/O Framing +3'-11-7/8" Slab B/O Framing +10'-0" Slab B/O Framing +10'-0" Slab B/O Framing +10'-0" Slab B/O Framing +10'-0" Slab B/O Framing +10'-0" Slab B/O Framing +10'-0" Slab B/O Framing +10'-0" Slab B/O Framing +10'-0" Slab B/O Framing +10'-0" Slab B/O Framing +10'-0" Slab B/O Framing +10'-0" Slab B/O Framing +10'-0" Slab Plate Height +10'-0" Slab 8:12 8:12 8:12 8:128:12 8:12 8:12 8:12 8:12 8:12 8:12 8:12 8:12 8:12 TOILET SHOWER CLOSET BATHROOM Plate Height +10'-0" Slab Plate Height +16'-0" Slab 1/4"=1'-0" A7.2 UPPER LEVEL REFLECTED 05.01.2012 0000 1416 Moraine Drive Lot 8 Filing 1 Dauphinais Moseley Vail, Colorado 14 1 6 M o r a i n e D r i v e 06.06.2012 Permit Resubmittal 07.23.2012 Financing Submittal 09.25.2012 Resubmittal GILLETTE LLC CONSTRUCTION POST OFFICE BOX 5821 888.719.1123 VAIL COLORADO 81658 gillettellc.com 10.28.2012 Framing Plans 11.24.2012 Framing Plans 12.07.2012 SE Bath Revision 01.13.2013 Revisions SW BEDROOM LIVING ROOM SE BEDROOM SE BATH LINEN LAUNDRY NE BEDROOM FUTURE GUEST SUITE ENTRY CEILING PLAN Plate Height +8'-0" Ply B/O Framing +10'-0" Slab 8:12 8:12 8:128:12 8:12 8:12 8:12 8:12 8:12 8:12 8:12 8:12 8:12 TOILET SHOWER CLOSET BATHROOM Plate Height +8'-0" Ply 8:12 8:12 8:12 Plate Height +8'-0" Ply B/O Drop Framing +8'-6 1/2" Ply STAIR B/O Drop Framing +8'-6 1/2" Ply B/O Drop Framing +8'-6 1/2" Ply B/O Drop Framing +8'-6 1/2" Ply B/O Drop Framing +8'-6 1/2" Ply B/O Drop Framing +8'-6 1/2" Ply B/ O D r o p F r a m i n g +8 ' - 6 1 / 2 " P l y DRESSING NE BATH 8:12 Plate Height +9'-8" Ply UPPER HALL SE DRESSING SE TOILET 8:12 8:128:12 8:12 Plate Height +10'-4" Ply Plate Height +9'-0" Ply B/O Drop Framing +8'-6 1/2" Ply B/O Drop Framing +8'-6 1/2" Ply 8:12 8:12 Plate Height +10'-0" Ply B/O Drop Framing +8'-6 1/2" Ply Plate Height +10'-10" Ply 8:12 8:12 6060 250 250 D W 1/8"=1'-0" M1.0 MECHANICAL05.01.2012 0000 1416 Moraine Drive Lot 8 Filing 1 Dauphinais Moseley Vail, Colorado 14 1 6 M o r a i n e D r i v e 06.06.2012 Permit Resubmittal 07.23.2012 Financing Submittal 09.25.2012 Resubmittal GILLETTE LLC CONSTRUCTION POST OFFICE BOX 5821 888.719.1123 VAIL COLORADO 81658 gillettellc.com 10.28.2012 Framing Plans 11.24.2012 Framing Plans 12.07.2012 SE Bath Revision 01.13.2013 Revisions Provide external shut off at appliance 1" black iron to 40,000 btu/h fireplace appliance 1" csst gas in conduit to 100,000 btu/h range. 1" HDPE medium pressure gas below grade pressure reducing valve 1-1/2" black iron gas to (2) 250,000 btu/h 95% efficient gas boilers Gas Meter Terminate 4" round bathroom exhaust at side wall. Size fan per manufactures instructions. Provide additional backdraft damper. Terminate 4" round bathroom exhaust at side wall of laundry room dormer above. Size fan per manufactures instructions. Provide additional backdraft damper Terminate 6" round, 400 cfm exhaust hood at side wall. Provide additional back draft damper Terminate 3" pvc boiler flue and combustion air at side wall per manufactures instructions. Rough in for future 2nd 250,000 btu boiler. Terminate fireplace appliance flue in side wall per manufactures instructions PROJECT SUMMARY Outdoor Temp -21F Elevation 9000 Wind Speed 10 mph Supply Fluid 135F Total Heated Area 4922sf Radiant Load 192,537 BTU/h Snowmelt Load 198,315 BTU/h Domestic Hot Load 486,000 BTU/h Terminate 4" round bathroom exhaust in soffit. Size fan per manufactures instructions. Provide additional backdraft damper. FUTURE:Terminate 4" round bathroom exhaust in soffit. Size fan per manufactures instructions. Provide additional backdraft damper. Terminate 4" round bathroom exhaust in soffit. Size fan per manufactures instructions. Provide additional backdraft damper. Terminate (2) 4" round dryer vents in soffit. FUTURE ZONE 6 FUTURE ZONE 5 ZONE 7 ZONE 8 ZONE 9 ZONE 10ZONE 1 ZONE 2 ZONE 3 ZONE 4 Provide 1469 SF of snowmelt at entry, driveway, and guest suite entry. Locate test manifold under guest suite stairs. Install tubing, mains, and rough-in for sensors and controls. Do not install manifold, pump, controls, or glycol. Provide 4" PVC passive sub slab depressurization system. Connect to perforated pipe embedded in 4" layer of free draining gravel below sub slab insulation/vapor barrier. Route through NE bath attic to allow for future inline fan. Extend 12" above roof surface. Label "Radon Reduction System" at each floor and in attic. 60 60 25 0 25 0 D D D F D M D D D D 2 4 D D D D S 24 DD D DD D M D M M M M M M M DD T M 1/4"=1'-0" E1.1 MAIN LEVEL LIGHTING 05.01.2012 0000 1416 Moraine Drive Lot 8 Filing 1 Dauphinais Moseley Vail, Colorado 14 1 6 M o r a i n e D r i v e 06.06.2012 Permit Resubmittal 07.23.2012 Financing Submittal 09.25.2012 Resubmittal GILLETTE LLC CONSTRUCTION POST OFFICE BOX 5821 888.719.1123 VAIL COLORADO 81658 gillettellc.com 10.28.2012 Framing Plans 11.24.2012 Framing Plans 12.07.2012 SE Bath Revision 01.13.2013 Revisions 400A Service Guest Suite Sub-panel to be installed with feeders for future use. Main House Sub-panels Switch leg to holiday lighting Switch with path lighting upper level. Future switch with 3-way dimmer up stairs Future switch with pendants above. RECESSED CAN CEILING SCONCE OR PENDANT EXHAUST FAN TRACK LIGHTING D DIMMER MOTION TIMER M T CEILING FAN FAN CONTROLF Notes: 1.50% of lighting to be high effiacency. 2.Only select receptacles shown. Electrical contractor to provide all required by code. 24 HOUR TIMER24 RECEPTICLE FLOOR OUTLET STEP LIGHT UNDER CABINET FIXTURE 120V UL 217 SmokeS 120V UL 217 Smoke / UL 2034 CO ComboC D W D D M D D F D T D D M M M D DT DF D DF DT D D FD DDD D D D D2 4 D D D D T 1/4"=1'-0" E1.2 UPPER LEVEL LIGHTING 05.01.2012 0000 1416 Moraine Drive Lot 8 Filing 1 Dauphinais Moseley Vail, Colorado 14 1 6 M o r a i n e D r i v e 06.06.2012 Permit Resubmittal 07.23.2012 Financing Submittal 09.25.2012 Resubmittal GILLETTE LLC CONSTRUCTION POST OFFICE BOX 5821 888.719.1123 VAIL COLORADO 81658 gillettellc.com 10.28.2012 Framing Plans 11.24.2012 Framing Plans 12.07.2012 SE Bath Revision 01.13.2013 Revisions RECESSED CAN CEILING SCONCE OR PENDANT EXHAUST FAN TRACK LIGHTING D DIMMER MOTION TIMER M T CEILING FAN FAN CONTROLF Notes: 1.50% of lighting to be high effiacency. 2.Only select receptacles shown. Electrical contractor to provide all required by code. 24 HOUR TIMER24 RECEPTICLE FLOOR OUTLET STEP LIGHT UNDER CABINET FIXTURE Future switch with 3-way dimmer below. Switch with path lighting below. Future switch with exterior lighting below. Provide power for future inline radon fan in attic. 120V UL 217 SmokeS 120V UL 217 Smoke / UL 2034 CO ComboC HI L L S T R U C T U R A L D E S I G N 07/24/2012 HI L L S T R U C T U R A L D E S I G N 07/24/2012 HI L L S T R U C T U R A L D E S I G N 07/24/2012 HI L L S T R U C T U R A L D E S I G N 01/13/2013 HI L L S T R U C T U R A L D E S I G N 07/24/2012 Project Title: 1416 Moraine Drive Report date: 01/15/13 Data filename: Page 1 of 10 Generated by REScheck-Web Software Compliance Certificate Project Title: 1416 Moraine Drive Energy Code:2009 IECC Location:Vail, Colorado Construction Type:Single Family Project Type:New construction Building Orientation:Bldg. faces 180 deg. from North Glazing Area Percentage:23% Heating Degree Days:9248 Climate Zone:6 Construction Site:Owner/Agent:Designer/Contractor: 1416 Moraine Drive Vail, Colorado 81657 Compliance: Passes using UA trade-off Compliance: 8.5% Better Than Code Maximum UA: 1190 Your UA: 1089 The % Better or Worse Than Code index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value Glazing or Door U-Factor UA F6: All-Wood Joist/Truss Over Uncond. Space 40 48.0 0.0 1 F4,5: Heated Slab-On-Grade 271 10.0 185 Insulation depth: 4.0' F2,3: All-Wood Joist/Truss Over Uncond. Space 752 30.0 0.0 25 W2: Solid Concrete or Masonry 279 13.0 10.0 11 Orientation: Right Side Wall height: 4.5' Depth below grade: 4.0' Insulation depth: 4.5' C1: Cathedral 4124 56.0 0.0 78 C2: Flat or Scissor Truss 123 43.0 0.0 3 North: Wood Frame, 16in. o.c.1476 21.0 0.0 66 Orientation: Back Door 07: Glass 92 0.400 37 SHGC: 0.23 Orientation: Back Window 24: Wood Frame, 2 Pane w/ Low-E 26 0.310 8 SHGC: 0.23 Orientation: Back Window 27: Wood Frame, 2 Pane w/ Low-E 47 0.310 15 SHGC: 0.23 Orientation: Back Window 1: Wood Frame, 2 Pane w/ Low-E 59 0.300 18 SHGC: 0.23 Orientation: Back Window 2: Wood Frame, 2 Pane w/ Low-E 5 0.260 1 SHGC: 0.23 Orientation: Back Window 4: Wood Frame, 2 Pane w/ Low-E 53 0.290 15 SHGC: 0.23 Orientation: Back Window 9: Wood Frame, 2 Pane w/ Low-E 6 0.260 2 SHGC: 0.23 Orientation: Back Window 10: Wood Frame, 2 Pane w/ Low-E 36 0.290 10 SHGC: 0.23 Orientation: Back South: Wood Frame, 16in. o.c.1512 21.0 0.0 36 Orientation: Front Project Title: 1416 Moraine Drive Report date: 01/15/13 Data filename: Page 2 of 10 Window 13: Wood Frame, 2 Pane w/ Low-E 85 0.290 25 SHGC: 0.23 Orientation: Front Window 14: Wood Frame, 2 Pane w/ Low-E 181 0.290 52 SHGC: 0.23 Orientation: Front Window 15: Wood Frame, 2 Pane w/ Low-E 112 0.300 34 SHGC: 0.23 Orientation: Front Window 19: Wood Frame, 2 Pane w/ Low-E 24 0.280 7 SHGC: 0.23 Orientation: Front Window 20: Wood Frame, 2 Pane w/ Low-E 4 0.260 1 SHGC: 0.23 Orientation: Front Window 29: Wood Frame, 2 Pane w/ Low-E 100 0.290 29 SHGC: 0.23 Orientation: Front Window 31: Wood Frame, 2 Pane w/ Low-E 172 0.300 52 SHGC: 0.23 Orientation: Front Window 33: Wood Frame, 2 Pane w/ Low-E 132 0.300 40 SHGC: 0.23 Orientation: Front Window 40: Wood Frame, 2 Pane w/ Low-E 45 0.280 13 SHGC: 0.00 Orientation: Front Window 25: Wood Frame, 2 Pane w/ Low-E 26 0.310 8 SHGC: 0.00 Orientation: Front East: Wood Frame, 16in. o.c.1713 21.0 0.0 85 Orientation: Right Side Window 3: Wood Frame, 2 Pane w/ Low-E 18 0.310 6 SHGC: 0.23 Orientation: Right Side Window 16: Wood Frame, 2 Pane w/ Low-E 27 0.290 8 SHGC: 0.23 Orientation: Right Side Window 17: Wood Frame, 2 Pane w/ Low-E 6 0.290 2 SHGC: 0.23 Orientation: Right Side Window 18: Wood Frame, 2 Pane w/ Low-E 6 0.330 2 SHGC: 0.23 Orientation: Right Side Window 21: Wood Frame, 2 Pane w/ Low-E 6 0.260 2 SHGC: 0.23 Orientation: Right Side Window 22: Wood Frame, 2 Pane w/ Low-E 6 0.290 2 SHGC: 0.23 Orientation: Right Side Window 23: Wood Frame, 2 Pane w/ Low-E 6 0.260 2 SHGC: 0.23 Orientation: Right Side Window 32: Wood Frame, 2 Pane w/ Low-E 61 0.290 18 SHGC: 0.23 Orientation: Right Side Window34: Wood Frame, 2 Pane w/ Low-E 13 0.280 4 SHGC: 0.23 Orientation: Right Side Window 35: Wood Frame, 2 Pane w/ Low-E 13 0.260 3 SHGC: 0.23 Orientation: Right Side Window 36: Wood Frame, 2 Pane w/ Low-E 13 0.280 4 SHGC: 0.23 Orientation: Right Side Project Title: 1416 Moraine Drive Report date: 01/15/13 Data filename: Page 3 of 10 Window 37: Wood Frame, 2 Pane w/ Low-E 13 0.290 4 SHGC: 0.23 Orientation: Right Side Window 38: Wood Frame, 2 Pane w/ Low-E 13 0.290 4 SHGC: 0.23 Orientation: Right Side Window 39: Wood Frame, 2 Pane w/ Low-E 13 0.290 4 SHGC: 0.23 Orientation: Right Side West: Wood Frame, 16in. o.c.2176 21.0 0.0 114 Orientation: Left Side Window 5: Wood Frame, 2 Pane w/ Low-E 13 0.280 4 SHGC: 0.23 Orientation: Left Side Window 6: Wood Frame, 2 Pane w/ Low-E 22 0.260 6 SHGC: 0.23 Orientation: Left Side Window 7: Wood Frame, 2 Pane w/ Low-E 22 0.260 6 SHGC: 0.23 Orientation: Left Side Window 8: Wood Frame, 2 Pane w/ Low-E 13 0.280 4 SHGC: 0.23 Orientation: Left Side Window 11: Wood Frame, 2 Pane w/ Low-E 6 0.290 2 SHGC: 0.23 Orientation: Left Side Window 12: Wood Frame, 2 Pane w/ Low-E 36 0.300 11 SHGC: 0.23 Orientation: Left Side Window 28: Wood Frame, 2 Pane w/ Low-E 6 0.290 2 SHGC: 0.23 Orientation: Left Side Window 30: Wood Frame, 2 Pane w/ Low-E 61 0.290 18 SHGC: 0.23 Orientation: Left Side Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name - Title Signature Date Project Title: 1416 Moraine Drive Report date: 01/15/13 Data filename: Page 4 of 10 Generated by REScheck-Web Software Inspection Checklist Energy Code:2009 IECC Location:Vail, Colorado Construction Type:Single Family Project Type:New construction Building Orientation:Bldg. faces 180 deg. from North Glazing Area Percentage:23% Heating Degree Days:9248 Climate Zone:6 Ceilings: q C1: Cathedral, R-56.0 cavity insulation Comments: q C2: Flat or Scissor Truss, R-43.0 cavity insulation Comments: Above-Grade Walls: q North: Wood Frame, 16in. o.c., R-21.0 cavity insulation Comments: q South: Wood Frame, 16in. o.c., R-21.0 cavity insulation Comments: q East: Wood Frame, 16in. o.c., R-21.0 cavity insulation Comments: q West: Wood Frame, 16in. o.c., R-21.0 cavity insulation Comments: Basement Walls: q W2: Solid Concrete or Masonry, 4.5' ht / 4.0' bg / 4.5' insul, R-13.0 cavity + R-10.0 continuous insulation Comments: Windows: q Window 24: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.310 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 27: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.310 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 1: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.300 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 2: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.260 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 4: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 Project Title: 1416 Moraine Drive Report date: 01/15/13 Data filename: Page 5 of 10 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 9: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.260 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 10: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 13: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 14: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 15: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.300 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 19: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.280 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 20: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.260 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 29: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 31: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.300 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 33: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.300 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 40: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.280 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 25: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.310 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Project Title: 1416 Moraine Drive Report date: 01/15/13 Data filename: Page 6 of 10 Comments: q Window 3: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.310 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 16: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 17: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 18: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.330 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 21: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.260 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 22: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 23: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.260 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 32: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window34: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.280 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 35: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.260 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 36: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.280 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 37: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 38: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 Project Title: 1416 Moraine Drive Report date: 01/15/13 Data filename: Page 7 of 10 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 39: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 5: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.280 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 6: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.260 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 7: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.260 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 8: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.280 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 11: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 12: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.300 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 28: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window 30: Wood Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: Doors: q Door 07: Glass, U-factor: 0.400 Comments: Floors: q F6: All-Wood Joist/Truss Over Uncond. Space, R-48.0 cavity insulation Comments: Floor insulation is installed in permanent contact with the underside of the subfloor decking. q F4,5: Heated Slab-On-Grade, 4.0' insulation depth, R-10.0 continuous insulation Comments: Slab insulation extends down from the top of the slab to at least 4.0 ft. OR down to at least the bottom of the slab then horizontally for a total distance of 4.0 ft. Project Title: 1416 Moraine Drive Report date: 01/15/13 Data filename: Page 8 of 10 q F2,3: All-Wood Joist/Truss Over Uncond. Space, R-30.0 cavity insulation Comments: Floor insulation is installed in permanent contact with the underside of the subfloor decking. Air Leakage: q Joints (including rim joist junctions), attic access openings, penetrations, and all other such openings in the building envelope that are sources of air leakage are sealed with caulk, gasketed, weatherstripped or otherwise sealed with an air barrier material, suitable film or solid material. q Air barrier and sealing exists on common walls between dwelling units, on exterior walls behind tubs/showers, and in openings between window/door jambs and framing. q Recessed lights in the building thermal envelope are 1) type IC rated and ASTM E283 labeled and 2) sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. q Access doors separating conditioned from unconditioned space are weather-stripped and insulated (without insulation compression or damage) to at least the level of insulation on the surrounding surfaces. Where loose fill insulation exists, a baffle or retainer is installed to maintain insulation application. q Wood-burning fireplaces have gasketed doors and outdoor combustion air. q Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. Air Sealing and Insulation: q Building envelope air tightness and insulation installation complies by either 1) a post rough-in blower door test result of less than 7 ACH at 50 pascals OR 2) the following items have been satisfied: (a)Air barriers and thermal barrier: Installed on outside of air-permeable insulation and breaks or joints in the air barrier are filled or repaired. (b)Ceiling/attic: Air barrier in any dropped ceiling/soffit is substantially aligned with insulation and any gaps are sealed. (c)Above-grade walls: Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier. (d)Floors: Air barrier is installed at any exposed edge of insulation. (e)Plumbing and wiring: Insulation is placed between outside and pipes. Batt insulation is cut to fit around wiring and plumbing, or sprayed/blown insulation extends behind piping and wiring. (f)Corners, headers, narrow framing cavities, and rim joists are insulated. (g)Shower/tub on exterior wall: Insulation exists between showers/tubs and exterior wall. Sunrooms: q Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum skylight U-factor of 0.75. New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Materials Identification and Installation: q Materials and equipment are installed in accordance with the manufacturer's installation instructions. q Materials and equipment are identified so that compliance can be determined. q Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. q Insulation R-values, glazing U-factors, and heating equipment efficiency are clearly marked on the building plans or specifications. Duct Insulation: q Supply ducts in attics are insulated to a minimum of R-8. All other ducts in unconditioned spaces or outside the building envelope are insulated to at least R-6. Duct Construction and Testing: q Building framing cavities are not used as supply ducts. q All joints and seams of air ducts, air handlers, filter boxes, and building cavities used as return ducts are substantially airtight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Tapes, mastics, and fasteners are rated UL 181A or UL 181B and are labeled according to the duct construction. Metal duct connections with equipment and/or fittings are mechanically fastened. Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three equally spaced sheet-metal screws. Exceptions: Joint and seams covered with spray polyurethane foam. Where a partially inaccessible duct connection exists, mechanical fasteners can be equally spaced on the exposed portion of the joint so as to prevent a hinge effect. Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in. w.g. (500 Pa). q Duct tightness test has been performed and meets one of the following test criteria: (1)Postconstruction leakage to outdoors test: Less than or equal to 513.4 cfm (8 cfm per 100 ft2 of conditioned floor area). Project Title: 1416 Moraine Drive Report date: 01/15/13 Data filename: Page 9 of 10 (2)Postconstruction total leakage test (including air handler enclosure): Less than or equal to 770.0 cfm (12 cfm per 100 ft2 of conditioned floor area). (3)Rough-in total leakage test with air handler installed: Less than or equal to 385.0 cfm (6 cfm per 100 ft2 of conditioned floor area). (4)Rough-in total leakage test without air handler installed: Less than or equal to 256.7 cfm (4 cfm per 100 ft2 of conditioned floor area). Temperature Controls: q Where the primary heating system is a forced air-furnace, at least one programmable thermostat is installed to control the primary heating system and has set-points initialized at 70 degree F for the heating cycle and 78 degree F for the cooling cycle. q Heat pumps having supplementary electric-resistance heat have controls that prevent supplemental heat operation when the compressor can meet the heating load. Heating and Cooling Equipment Sizing: q Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code. q For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial Building Mechanical and/or Service Water Heating (Sections 503 and 504). Circulating Service Hot Water Systems: q Circulating service hot water pipes are insulated to R-2. q Circulating service hot water systems include an automatic or accessible manual switch to turn off the circulating pump when the system is not in use. Heating and Cooling Piping Insulation: q HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-3. Swimming Pools: q Heated swimming pools have an on/off heater switch. q Pool heaters operating on natural gas or LPG have an electronic pilot light. q Timer switches on pool heaters and pumps are present. Exceptions: Where public health standards require continuous pump operation. Where pumps operate within solar- and/or waste-heat-recovery systems. q Heated swimming pools have a cover on or at the water surface. For pools heated over 90 degrees F (32 degrees C) the cover has a minimum insulation value of R-12. Exceptions: Covers are not required when 60% of the heating energy is from site-recovered energy or solar energy source. Lighting Requirements: q A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following: (a)Compact fluorescent (b)T-8 or smaller diameter linear fluorescent (c)40 lumens per watt for lamp wattage <= 15 (d)50 lumens per watt for lamp wattage > 15 and <= 40 (e)60 lumens per watt for lamp wattage > 40 Other Requirements: q Snow- and ice-melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting off the system when a) the pavement temperature is above 50 degrees F, b) no precipitation is falling, and c) the outdoor temperature is above 40 degrees F (a manual shutoff control is also permitted to satisfy requirement 'c'). Certificate: q A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values; window U-factors; type and efficiency of space-conditioning and water heating equipment. The certificate does not cover or obstruct the visibility of the circuit directory label, service disconnect label or other required labels. NOTES TO FIELD: (Building Department Use Only) Project Title: 1416 Moraine Drive Report date: 01/15/13 Data filename: Page 10 of 10 2009 IECC Energy Efficiency Certificate Insulation Rating R-Value Ceiling / Roof 56.00 Wall 21.00 Floor / Foundation 30.00 Ductwork (unconditioned spaces):_____ Glass & Door Rating U-Factor SHGC Window 0.29 0.23 Door 0.40 0.23 Heating & Cooling Equipment Efficiency Heating System:____________________________ Cooling System:____________________________ Water Heater:_______________________________ Name:Date: Comments: