Loading...
HomeMy WebLinkAboutB08-0075 permit NOTE: ' TH�S PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES .� r��rro�vAri � Community Development 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2138, f. 970.479.2452, inspections 970.479.2149 ADD/ALT COMM BUILD PERMT Permit # B08-0075 Project# 07-0534 Job Address: 1300 WESTHAVEN DR VAIL Status . . . : ISSUED Location.......: VAIL CASCADE/ARIA SPA Applied .. . : 04/07/2008 Parcel No....: 210312100012 Issued . . . : 05/15/2008 Expires......: 11/11/2008 OWNER L-O VAIL HOLDING INC 04/07/2008 C/O DELOITTE &TOUCHE LLP 555 17TH ST STE 3600 DENVER CO 80202 APPLICANT WEITZ COMPANY, INC. (THE) 04/07/2008 Phone: 303-860-6600 4725 S. MONACO STREET, STE 100 DENVER CO 80237 License: 131-A CONTRACTOR WEITZ COMPANY, INC. (THE) 04/07/2008 Phone: 303-860-6600 4725 S. MONACO STREET, STE 100 DENVER CO 80237 License: 131-A Desciption: VAIL CASCADE HOTEL REMODEL: PORTE COCHERE, NEW POOL AND POOL DECK, MEETING ROOM REMODEL, LANDSCAPING ETC. Occupancy: mixed Type Construction: IB Valuation: 1,500,000.00 Revision Valuation: $0.00 Total Sq Ft Added: 0 ,.....<...�,....,.��,<.,......�...���.,,,.,.,..�«,,.,�,.,�.,<.>.,.,,...,,.,.,«.,,. FEE SUMMARY ..����......,.,,..,�«,.«,,.,�,.�,,.�.<.,.,...,.,,�,..,..,.,�„�,.,.�..��..<,..,,,.,,.�,,.,,. Building Permit Fee---> $7,433.75 Will Call--------------------> $4.00 TOTAL FEES----------------> $42,069.69 Plan Check-------> $4,831.94 Restaurant Plan Review $0.00 Payments----------------------> $42,069.69 Addl Plan Hrs---> $0.00 Recreation Fee-------> $0.00 BALANCE DUE-------------> $0.00 Addl Plan Review $0.00 Investigation Fee--------> $0.00 ***************„*««*:***,.**,.****«««**********,.*************«*****..*««*****:*******,+******************««*********************************,+**:**** See the Approval and Conditions sections (following pages) of this document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970-479-2149 OR AT OUR OFFICE FROM 8:00 AM -4 PM. YOU MUST PROVIDE THE CORRECT PERMIT NUMBER TO OBTAIN AN INSPECTION. ��- iy -�� j` DATE SIGNATURE OF OWNER R CONTRACTOR FOR HIMSELF AND OWNER � " ' Q��S, j•(o��,.f. PRINT SIGNA URE ««***�***,�******,**«*************«„*********************««*******««.,***********«****««*«*****************«*********«********************************* APPROVALS Permit#: B08-0075 as of 05-15-2008 Status: ISSUED *****,,.,«****,.**,*****«**««**************«*********�*..************,***.,,,,,*„***,.*,.�*****************,.,.**********«««*********„***********.**�.*****.**** Permit Type: ADD/ALT COMM BUILD PERMT Applied: 04/07/2008 Applicant: WEITZ COMPANY, INC. (THE) Issued: 05/15/2008 303-860-6600 To Expire: 11/11/2008 Job Address: 1300 WESTHAVEN DR VAIL Location: VAIL CASCADE/ARIA SPA Parcel No: 210312100012 Description: VAIL CASCADE HOTEL REMODEL: PORTE COCHERE, NEW POOL AND POOL DECK, MEETING ROOM REMODEL, LANDSCAPING ETC. w,r�+++,+***,r,r*******,r,r******,r,r,r*,r*r***,r**,r**,r«************,r**�,r*,r**APP rova I s***,.*****«***************************************„********.,��*********„ Item: 05100 BUILDING DEPARTMENT 04/22/2008 cgunion Action: CR F:\cdev\CH RIS\PERMIT.COMMENTS\B08-0075\B08-0075.DOC 05/07/2008 cgunion Action: AP approved revised corrected plans dated 4/25/08 Item: 05400 PLANNING DEPARTMENT 05/06/2008 npeterson Action: AP Plans approved date stamped May 1, 2008 (Office Copy). Reference DRB 08-0019, approval. Item: 05600 FIRE DEPARTMENT 05/12/2008 mvaughan Action: AP Item: 05500 PUBLIC WORKS 05/13/2008 csalli Action: AP **«***««***********,.***.,.�«***«««*******«.,�**..*»*,.***«*********«****«««„************�*************************«««*«*********************.,*********,.*., CONDITIONS OF APPROVAL Permit#: B08-0075 as of 05-15-2008 Status: ISSUED **.,*****************«**«„*„************�**********„*„*****************************.,�„**„***************************„*****«******«******«******««*„*** Permit Type: ADD/ALT COMM BUILD PERMT Applied: 04/07/2008 Applicant: WEITZ COMPANY, INC. (THE) Issued: 05/15/2008 303-860-6600 To Expire: 11/11/2008 Job Address: 1300 WESTHAVEN DR VAIL Location: VAIL CASCADE/ARIA SPA Parcel No: 210312100012 Description: VAIL CASCADE HOTEL REMODEL: PORTE COCHERE, NEW POOL AND POOL DECK, MEETING ROOM REMODEL, LANDSCAPING ETC. ************************,r,r********,t*****,t****************,e**,t***,tCon d itio ns*************�**************�*************************************.**** Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: CON0009961 SPECIAL INSPECTION REPORTS REQUIRED PER STATEMENT OF SPECIAL INSPECTION Cond: CON0009962 DEFFERED SUBMITTAL ITEM: POOL STRUCTURAL DRAWINGS Cond: CON0009983 Impairment letters required for temporary egress and exiting. � ************�******************************************************************************************* CONDITIONS OF APPROVAL Permit#: B08-0075 as of OS-15-2008 Status: ISSUED ******************************************************************************************************** Permit Type: ADD/ALT COMM BUILD PERMT Applied: 04/07/2008 Applicant: WEITZ COMPANY, INC. (THE) Issued: OS/15/2008 303-860-6600 To Expire: 11/11/2008 Job Address: 1300 WESTHAVEN DR VAIL Location: VAIL CASCADE/ARIA SPA Parcel No: 210312100012 Description: VAIL CASCADE HOTEL REMODEL: PORTE COCHERE,NEW POOL AND POOL DECK, MEETING ROOM REMODEL, LANDSCAPING ETC. ***********************************************Conditions:************************************************ Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: l 2 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: CON0009961 SPECIAL INSPECTION REPORTS REQUIRED PER STATEMENT OF SPECIAL INSPECTION Cond: CON0009962 DEFFERED SUBMITTAL ITEM: POOL STRUCTURAL DRAWINGS Cond: CON0009983 Impairment letters required for temparary egress and exiting. c TOWN OF V,4IL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT COMM BUILD PERMT Permit # B08-0075 Project# 07-0534 Job Address: 1300 WESTHAVEN DR VAIL Status . . . : ISSUED Location.......: VAIL CASCADE/ARIA SPA Applied .. . : 04/07/2008 Parcel No....: 210312100012 Issued . . . : OS/l 5/2008 Expires.....: 11/11/2008 OWNER L-O VAIL HOLDING INC 04/07/2008 C/0 DELOITTE & TOUCHE LLP 555 17TH ST STE 3600 DENVER CO 80202 APPLICANT WEITZ COMPANY, INC. (THE) 04/07/2008 Phone: 303-860-6600 4725 S. MONACO STREET, STE 100 DENVER CO 80237 License: 131-A CONTRACTOR WEITZ COMPANY, INC. (THE) 04/07/2008 Phone: 303-860-6600 4725 S. MONACO STREET, STE 100 DENVER CO 80237 License: 131-A Desciption: VAIL CASCADE HOTEL REMODEL: PORTE COCHERE,NEW POOL AND POOL DECK, MEETING ROOM REMODEL, LANDSCAPING ETC. Occupancy: mixed Type Construction: IB Valuation: 1,500,000.00 Revision Valuation: $0.00 Total Sq Ft Added: 0 *�******►r**rs�s*s*�***+****r»r*ss*�**+*********��******►r»�****�*a* FEE S UMMARY ■s*x***x******+*****r**ss********+�***r*r*s***�*+�:�+**r**+*■ Building------> $7,433.75 Restuarant Plan Review--> $0.00 Total Calculated Fees--> $42,069.69 Plan Check---> $4,831.94 Recreation Fee--------------> $o.o o Additional Fees----------> $o.00 Investigation-> $o.o o TOTAL FEES-------------> $4 2,0 6 9.6 9 Total Permit Fee---------> $4 2,0 6 9.6 9 Will Call-----> $4.00 Pa ments-------------------> y $42,069.69 BALANCE DUE---------> $o.o 0 ■***x�****s*:+:**s�*�****�***s:+**:****t*t**srM�*+►a*****+�*.****.+.+s***t*►s**.***+*r*.**■*rs*******.*s�r***rsr**s***s*�*s.sr***t*r*M****+.*«*s�. Approvals: Item: 05100 BUILDING DEPARTMENT 04/22/2008 cgunion Action: CR F: \cdev\CHRIS\PERMIT.COMMENTS\B08-0075\BOS-0075 .DOC 05/07/2008 cgunion Action: AP approved revised corrected plans dated 4/25/08 Item: 05400 PLANNING DEPARTMENT � 05/0,6/2008 npeterson Action: AP Plans approved date stamped May l, 2008 (Office Copy) . Reference DRB 08-0019, approval . Item: 05600 FIRE DEPARTMENT 05/12/2008 mvaughan Action: AP Item: 05500 PUBLIC WORKS 05/13/2008 csalli Action: AP ....*..+*:.*.*.�»�+*�*.�**.**.*�*.**�*.*.:..*.*.*+*.*.*�....*.*.*:«****.�.*.*«*..*«..+�****+*�.*.*...**�«.*.�.*.*«:.+**.���..**+.*.�***++*.:.*+�* See the Conditions section of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM• 4 PM. v� ��' 1f��'�IN SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER ******************************************************************************************************** CONDITIONS OF APPROVAL Permit#: B08-0075 as of OS-15-2008 Status: ISSUED ******************************************************************************************************** Permit Type: ADD/ALT COMM BUILD PERMT Applied: 04/07/2008 Applicant: WEITZ COMPANY, INC. (THE) Issued: OS/15/2008 303-860-6600 To Expire: 11/11/2008 Job Address: 1300 WESTHAVEN DR VAIL Location: VAIL CASCADE/ARIA SPA Parcel No: 210312100012 Description: VAIL CASCADE HOTEL REMODEL: PORTE COCHERE,NEW POOL AND POOL DECK, MEETING ROOM REMODEL, LANDSCAPING ETC. ***********************************************Conditions:************************************************ Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: CON0009961 SPECIAL INSPECTION REPORTS REQUIRED PER STATEMENT OF SPECIAL INSPECTION Cond: CON0009962 DEFFERED SUBMITTAL ITEM: POOL STRUCTURAL DRAWINGS Cond: CON0009983 Impairment letters required for temporary egress and exiting. . __ _ . � . ***********************+**********************************»***********************�**+****** TOWN OF VAIL, COLORADO Statement ************w*****************************+*********************+*************************** Statement Number: R080000714 Amount: $42, 069.6905/15/200803:13 PM Payment Method: Check Init: SAB Notation: 13538408 WEITZ ----------------------------------------------------------------------------- Permit No: B08-0075 Type: ADD/ALT COMM BUILD PERMT Parcel No: 2103-121-0001-2 Site Address: 1300 WESTHAVEN DR VAIL Location: VAIL CASCADE/ARIA SPA Total Fees: $42, 069.69 This Payment: $42, 069.69 Total ALL Pmts: $42, 069.69 Balance: $0.00 *******************************+*+********************************************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 7,433 .75 PF 00100003112300 PLAN CHECK FEES 4, 831.94 UT 11000003106000 USE TAX 4% 29, 800.00 WC 00100003112800 WILL CALL INSPECTION FEE 4.00 ----------------------------------------------------------------------------- . u � r APPLICATION WILL N(�'�BE ACCEPTED IF INCOMPLETE OR UNSIGNE�'/�v�.�S�� . �,� _.: Project#: r�v Building Perm�t# �'' � _ ��,��?'�?�������!����� ������' � 75 S. Frontage Rd. ♦ Vail, Colorado 81657 TOWN IL BUILDING PERMIT APPLICATION Separate Permits are required for electrical, plumbing, mechanical, etc.! CONTRACTOR INFORMATION General Contractor: Town of Vail Reg. No.: Contact Person and Phone#'s: -� ta��'� ��tP ���-A� �lah a �1`�n.�`1°1.oH`��t Email address: �� ,�,,,��,�pG� 4,�, Fax#: �, 6$,c�yon Contr tor Signature: �(G �;c ,_` --�.�- ��� COMPLETE VALUATIONS FOR BUILDING PERM L�o�.& �1lateri�ls ;'�;� BUILDING: $ 1�S�,oab� ELECTRICAL: $ OTHER: $ � � PLUMBING: $ MECHANICAL: $ TOTAL: $ °�;� For Parcel# Contact Ea le Count Assessors Office at 970-328-86�¢0 0��� � �:e� �:-count .com � parcel#. .' , , � l L� � % ��%v'_� � Job Name: � Job Address: VAN/ GA�/i�$ PovV �J�G Vt�Pf���$��5 I?ioo w�yS v��.l 9� VI>U. (A 8 65 Legal Description Lot: Block: Filing: Subdivision: �n��rs Nar�e� � Address� S �IU.�•a� hone: St��tPc�c� �'�� '7 2�oMlS o +E. r� �f a+ a v o b(o Architect/Designer:� dre�s: hqne: �'G ►{.►S� A S Q�G, `�' 4�• (lo C�Bas�/L Co o v a�,1 852 �6 2 Engineer• Ac�dresg: ��C� a 17�gne: � S A ` S 1r5 L G� ✓I�- Co � '7.a u LG1 zi 3�oo Detailed description of work: IMPRn � I Poat� 0�-�- tza�C" k'IkGKI� ryt WP��Po.o ('' �S�ti �-S Work Class: New( ) Addition ( ) Remodel (✓S Repair( ) Demo ( ) Other( ) Work Type: Interior( ) Exterior(✓j Both ( ) Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Single-family( ) Two-family( ) Multi-family( ) Commercial( ,,Y Restaurant( ) Other( ) No. of Existing Dwelling Units in this building: No. of Accommodation Units in this building: No/T e of Fire laces Existin : Gas A liances Gas Lo s Wood/Pellet Wood Burnin �/� NolT e of Fire laces Pro osed: Gas A liances Gas Lo s Wood/Pellet Wood Burnin NOT ALLOWED Does a Fire Alarm Exist: Yes ) No ( ) Does a Fire Sprinkler System Exist: Yes ( No ( ) - � , � � �:-� FOR OFFICE USE ONLY*�r***i""*�`* - � � i' Date Received: � I . Received E3y: � �� I TOWN OF VAIL . ,_..�� F:\cdev\FORMS�Permits\Building\building�ermit_4-17-2007.DOC Page 1 of 7 04/17/2007 ��,. .—.. ,ti� y ,�{._ i ,. ; _ , �I I i �; , �� ,i i `. a;��� i i� i �� ,�. _ . � � _ � i u. �.61 _ ', ,:i I __� � i ` I I I I i� � i < �i � �, � � I � i � }. � _,_,_ -- , i --��__ �• /` � ii � � � ��.,� �� -_ ,% �. � ;� / � Y �„ / ��,,. . CONFERENCE '_ % ' � CENTER j,i / / � ah' @�'► r � .• � / „ / i-*�• PENTHOUSE,7HEATER, - { ) AND CMC o . 1� ' e� � .. -... ,a `• ,. F 3 ' _ r � r'�i �t'`� � � S�_,' � y�, � _4' �. ,� �i'�'(C • i •, • i:�1%� ,� � � .. ':�I, ��' j 't;i�. ❑ � �r � . �+ -- _ _ �� � l ' . - 4 . ❑ / . _....._. .__._ , r � . ; � I ��v ;: _ _. ._.... '���; I � yy ,_ ❑ f�. _..- j / x �P�A�) ❑ � f� � � � � � �.r owc . 3 �. i j � — � � � � 3 . tiy, A�;�w (, —� a � "1�, ' . ' i- -....—_�___ „ ' � . , � _.... — ; ....,. � � . / � � � � �� '`/ � � _ __....._L existing f ; , ` 3 �. - � � ! � I � �' � � L__ 6 6 20 , � � • existing fdc to rer� � _ � i:�/ exlst ' to remain � - �• k deliveryl � . __ _t- zo , - . s � material �" � � : staging � 'f�61- ,. ' — — — — — — ` area �.\ ;i � i `•. , : . � _- 6 . - i �`�, �cle acc ss ! '� 1 i �o ; � q � �9 6 ! I 4 O3 17 6 � 17 17 3 . 17 . 6 77 6 , _ _.. 5 _ e: � UTILI7V EASEMEN7 — I,_ 6 VAIL CASCADE HOTEL � � Phase 2 will commence following the completion of Phase 1. Again-access to FDC's and Fire Hydrants will remain. Guesl�' �' access will be through the Porte Cochere. q I � J:;� Again-vehicles will have to enter and exit the same way they come in-the drive through element will not be open during this r1Ye frame. No overhead work contemplated at the porte cochere at this time frame. Exact dates to be coordinated with the hotel. ,� �_�___. �:� y ��{.- i — � � I� i � � � 1,:�,_ ... p�C4 I._I ..... � �: . I � � i ; Lif � i - 1�� �, , ` __ � �I ` , , i �, j � ` � � . . .� ___, �, � � , � i �,.,�_ ' d. _ I � — � - e: `� �.�,� I , �, ._ � � �� r ��,: , � x CONfERENCE . � .,... � CENTER �� 'i / � � PENTHOUSE,THEATER, ����� / µ /Y�� AND CMC -o� �� '� � . . r . z � - � � .-- � ' � s �. , , ; � �, � �� �. _q ,,,, � � z � . � �, ,�;: � a ., �.. , �+ �___ .__ __ __ } ., � --- � � � � ' �' � ' __ .__ , ❑ , I � :,`.�; , � ;x�,�l�' .� . - - - ...... � �, I � � ❑ �.��.� .... / � •1 (TVP ALI O �� , _ � �I� � I�� �� � iT F O= 3 �. ir � � 3 i – I � � - � I —1— �..,"'>, � i r, —� „ .:`� y��c- I . , ---_ , _.. — - - , .;. / \ 7 \,, I :`...:�:. � �� 3 : .._....... . - - .._......_. .,.,�:.. � I . \ _L 20 � I s c � s � � �-- 20 19 , , � ' , ( \ I;/ , 8 j – – r; �. ,. _ __ ..___. L d ' � � ZO ' I �� ..:�^ \ _ _ I 6 ; g � �e,. �� - - - - - - � � , � � ' ' � B , _ _ , � � ' ;, ,u a � �a s ' i 4 i � �� s � 17 17 3 6 17 � � 17 6 Temp access to te � __ 5 - ` — , 3 _ — �I UTILIT'EASEMENT— 6 VAIL CASCADE HOTEL I Once Phase 1 and 2 are complete, phase 3 will start. r. � I This wil�require a temporary access to the hotel while the porte cochere work is ongoing. During this time frame-there isq I a door on the east side of the hotel that can be utilized for temporary entrance into the hotel. � '�; I �'� 4 Gm+'s aa�'.� i,� a,, iskc-0a^��� � '.. k ��, 4 R �.t� � ', `d.'., `. P '�rE�{'t ^ „y ��. 'e � .t�',. 3a� �». �. �4riY-�. Z-. Y%s,,,, q , . �" Y ';,x` n° .,.,: f, :..n "z � ,: a;m �*. �.,, ,�.�.-� �i�� _ � _Y"° _� .,..w �' i � 7 �_. I X � � I�. I ���� ��. I � l � C` �A �Rt 5 . � ��3 ;'� t s'�a, s� � 7 k8g �s .�,q. + ' �o � �' i a .a �5, g s -,' .:�� a�� �e � � � �� 2- , y� ' �� � �i�#���� .�������. � z$� . a# �,# . a';� �` `� � iW%9� ��� Ka�. � '��a I ' s t �� �� �f � ���� � � ka;e'���'����§�, •: � "�� � . < `�" '�3 '*� § � m���. � � ; „� �� � �� i�• � ,�� # �� � � � ���&;" , ��< �� + I I �������������� I � ��n. � ��: _ _ ' — � ,�'S� ��—,- '.c-"'-�e . a��#. .�_ �nTp � j _ _ ' ��fi}�� _ 9 »'�<� ,'�:T� +� I �� � � � I 1 �� a g j �:1 f �"t $ I'' n '& '� � �'& g 4� s''-e? � �' y f � ,�� '� � � � �;.�Y G � � . ��,„ °, , � . � �, �� 'i! � , �s� a . . � ° � , r�� �� j f�.�,� , ,�„ . � .;, � : �� � �� ' �,�, � � �rz� . z � ' �n�� aia� �7 � � _ � �` - .�;�.�.-;���,.t. { � — - —- �....���...:�'� — } - - - - � �%' a � ; � �., � , � � � , �� ��xa.t � 4�'.�" ,��• + I n I �;;: �� �, a ' ' I $,3� �� � .� � ���'� � � ,� . .� . ... . . �: >, , , �- ., , . - �_ ,„ ,_ : r ., , - . i n r t A . � L " '�_ � � '.— , .,-E;��v � ��^�.,��°� �, k t4 1' - — - � - =--�< : °� , a � , � , s '� 5'I s '�a. .�.; -., � _ �� i i �, . �� , i ., , � � � �_ , . ` � _» � �.. �,i�' a.� �� �( , . �� ���e ,. qss �b > "* ��,,, --n---- . ,�„_ t�as . . ., _ � _.�.. ��. . .. , _,,, xt �� � � � � � � � ��, � �� �� � �'����p� ���Itb�� .�� t � F4 i (A ' < I { -0� '% - ! _ . _ — _ — — _ _ _ _ — _ •r x��� �A�' k � � � � i � � � �` "� r ��� � ;� � Main entra ce and exit to th�hotel while the� e � � � � '� .,. ��?� €� I,I Cochere w�rk is ongoing. � ` I a� � �I� I I I I � '-'� I I I I � - - - - - -�- � - - - - -�- - - i - - - - - - - - - - ,� , ' I I I i �I� I i I I � ��i ' II I I � , , - - - - - - - - - - - �- r - - - -i- - - - - - � - - - - - - , , �� ;i� i i i i � �i� i i i � II , I i — - — - — - - — -�- — - — - — i� — - — - — N — — �1— - — - — - — �I� ! I I I � i,i i —�I�— — — I--I-- — I I I I - - � - - -� - �- - - - - I - — - — - ��--�-�-i m — � i I � i _� o i - - - t - - - - - - i — - - - - - - � i � � w N � Emerge�cy Egress to be I�e t op�n o Will pro ide covered walkyvay forlexit in e��rgency condi� ile overhead� ��,�,r work is�ngoing. � � � �� ���� �'� I � � I � � ' I I � �� I I I , � I � , � I I I ; � I ° � I ; � I � - - - � - - - - - i - - -� - - - - - -�- - - - - - } , - - 1==== =— �—� - - - - - - - - -�- - - - - - � — , � � � , � - - H- - � I I ' , ' ' I 1 ili I I I I � �,_v� �� :: � �s - � ��� ' � � �� � � � � � � � p � � : #- '''Ft��#� � �: � 9 �� _ _1 L _ _ _- — _ � _ 1 — _ — _ — _ ��� „ �u;M1 f.. _ — _— _ — - . � I I I I ,� `� � y a ,� � r x�: r���"� t�. L '� �.,.. �+. a � v .^ ��"����' & -�.�� . 1�I , , . T . . `Town of Vail COMcheck Software Version 3.5.3 "';�,, . � Envelope Compliance i e 2003 IECC Report Date:07/01/08 Data filename:C:\Documents and Settings\sean\Desktop\Vail Cascade Resort.cck Section 1: Project Information Project Type:Addition Project Title:Vail Cascade Resort Construction Site: Owner/Agent: Designer/Contractor: 1300 Westhaven Dr. Rick Burcham JG Johnson Architects Vail,CO 81657 Destination Hotels&Resorts 730 17th St.Suite 110 10333 E.Dry Creek Rd.Suite 450 Denver,CO 80202 Englewood,CO 80112 (303)892-7062 (303)268-4610 rburcham @destinationhotels.com Section 2: General Information Building Location(for weather data): Vail,Colorado Climate Zone: 15 Heating Degree Days(base 65 degrees F): 9248 Cooling Degree Days(base 65 degrees F): 44 Vertical Glazing/Wall Area Pct.: 42% Activitv Tvpe(s) Floor Area Restaurant 1415 Section 3: Requirements Checklist ..• �- . . .- ..- Climate-Specific Requirements: Component NamelDescription Gross A�ea Cavity Cont. Proposed Budget or Perimeter R-Value R-Value U-Factor U-Factor Roof 1:Metal Roof with Thermal Blocks 1816 0.0 38.0 0.026 0.045 Roof 2:Structural Slab 3018 --- 38.0 0.025 0.045 Exterior Wall 1: Metal Frame, 16"o.c. 3120 0.0 19.0 0.047 0.064 Window 1:Metal Frame with Thermal Break:Double Pane with 832 --- -- 0.290 0.520 Low-E,Tinted,SHGC 0.32 Window 2:Metal Frame:Double Pane with Low-E,Tinted,SHGC 78 --- --- 0.290 0.520 0.32 Window 3:Metal Frame:Double Pane with Low-E,Tinted,SHGC 78 --- --- 0.290 0.520 0.32 Window 4:Metal Frame:Double Pane with Low-E,Tinted,SHGC 18 --- --- 0.290 0.520 0.32 Door 1:Glass,Tinted,SHGC 0.32 57 --- --- 0.290 0.520 Door 2:Glass,Tinted,SHGC 0.32 18 --- --- 0.290 0.520 Door 3:Glass,Tinted,SHGC 0.32 57 --- -- 0.290 0.520 Door 4:Glass,Tinted,SHGC 0.32 57 --- -- 0.290 0.520 Door 5:Glass,Tinted,SHGC 0.32 57 --- --- 0.290 0.520 Door 6:Glass,Tinted,SHGC 0.32 57 --- --- 0.290 0.520 Floor 1:Concrete Floor(over unconditioned space) 4423 --- 19.0 0.045 0.040 Project Title: Vail Cascade Resort Report date: 07/01/08 Data filename: C:\Documents and Settings\sean\Desktop\Vail Cascade Resort.cck Page 1 of 7 ` (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements: � 1. All joints and penetrations are caulked,gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance with the manufacturer's installation instructions. � 2. Windows,doors,and skylights certified as meeting leakage requirements. � 3. Component R-values 8�U-factors labeled as certified. � 4. Insulation installed according to manufacturer's instructions,in substantial contact with the surface being insulated,and in a manner that achieves the rated R-value without compressing the insulation. � 5. Stair,elevator shaft vents,and other dampers integral to the building envelope are equipped with motorized dampers. � 6. Cargo doors and loading dock doors are weather sealed. � 7. Recessed lighting fixtures are:(i)Type IC rated and sealed or gasketed;or(ii)installed inside an appropriate air-tight assembly with a 0.5 inch clearance from combustible materials and with 3 inches clearance from insulation material. � 8. Building entrance doors have a vestibule and equipped with closing devices. Exceptions: Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq.ft.in area. � 9. Vapor retarder installed. Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed envelope system has been desi d to meet the 2003 IECC requirements in COMcheck Version 3.5.3 and to comply with the mandato requirement ' the u� ents Checklist. N{ J!� 0'�t�5b� ? ! � Name-Title AQC���� ignature Date Project Title:Vail Cascade Resort �� Report date: 07/01/08 Data filename: C:\Documents and Settings\sean\Desktop\Vail Cascade Resort.cck Page 2 of 7 . COMcheck Software Version 3.5.3 Interior Lighting Compliance Certificate 2003 IECC Report Date:07/01/08 Data filename:C:\Documents and Settings\sean\Desktop\Vail Cascade Resort.cck Section 1: Project Information Project Type:Addition Project Title:Vail Cascade Resort Construction Site: Owner/Agent: Designer/Contractor: 1300 Westhaven Dr. Rick Burcham JG Johnson Architects Vail,CO 81657 Destination Hotels&Resorts 730 17th St.Suite 110 10333 E.Dry Creek Rd.Suite 450 Denver,CO 80202 Englewood,CO 80112 (303)892-7062 (303)268-4610 rburcham@desti nation hotels.com Section 2: General Information Building Use Description by: Activity Type Activitv Tvae(s) Floor Area Restaurant 1415 Section 3: Requirements Checklist Interior Lighting: � 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 1274 552 YES � 2. Exit signs 5 Watts or less per side. Exterior Lighting: � 3. Efficacy greater than 45 lumens/W. Exceptions: Specialized lighting highlighting features of historic buildings;signage;safety or security lighting;low-voltage landscape lighting. Controls, Switching, and Wiring: � 4. Independent controls for each space(switch/occupancy sensor). Exceptions: Areas designated as security or emergency areas that must be continuously illuminated. Lighting in stairways or corridors that are elements of the means of egress. � 5. Master switch at entry to hotel/motel guest room. � 6. Individual dwelling units separately metered. � 7. Each space provided with a manual control to provide uniform light reduction by at least 50%. Exceptions: Only one luminaire in space; An occupant-sensing device controls the area; The area is a corridor,storeroom,restroom,public lobby or guest room; Areas that use less than 0.6 Watts/sq.ft. Project Title: Vail Cascade Resort � Report date: 07/01l08 Data filename:C:\Documents and Settings\sean\Desktop\Vail Cascade Resort.cck Page 3 of 7 ' � 8. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: Areas with only one luminaire,corridors,storerooms,restrooms,or public lobbies. � 9. Photocell/astronomical time switch on exterior lights. Exceptions: Lighting intended for 24 hour use. � 10.Tandem wired one-lamp and three-lamp ballasted luminaires(No single-lamp ballasts). Exceptions: Electronic high-frequency ballasts;Luminaires on emergency circuits or with no available pair. Section 4: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2003 IECC,Chapter 8, requirements in COMcheck Version 3.5.3 and to comply with the mandat requirement ' the quirements Checklist. J�,0.� A Jos� o � Name-Title }�QGt{-tT�S Signature Date Project Title: Vail Cascade Resort Report date: 07/01/08 Data filename:C:\Documents and Settings\sean\Desktop\Vail Cascade Resort.cck Page 4 of 7 COMcheck Software Version 3.5.3 Interior Lighting Application Worksheet 2003 IECC Report Date: Data filename:C:\Documents and Settings\sean\Desktop\Vail Cascade Resort.cck Section 1: Allowed Lighting Power Calculation q g C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts I ft2 (B x C) Restaurant 1415 0.9 1274 Total Allowed Watts= 1274 Section 2: Proposed Lighting Power Calculation q B C D E Fixture ID:Description/Lamp/Wattage Per Lamp I Ballast Lampsl #of Fixture (C X D) Fixture Fixtures Watt. Restaurant(1415 sq.ft.) Compact Fluorescent 1:Downlight/Triple 4-pin 32W/Electronic 1 14 32 448 Compact Fluorescent 2:Wall Sconce/Twin Tube 24/26/27W/Electronic 1 4 26 104 Total Proposed Watts= 552 Section 3: Compliance Calculation If the Total Allowed Watts minus the Total Proposed Watts is greater than or equal to zero,the building complies. Total Allowed Watts= 1274 Total Proposed Watts= 552 Project Compliance= 722 . �- . . .- ..- Project Title: Vail Cascade Resort �Report date: 07/01/08 Data filename: C:\Documents and Settings\sean\Desktop\Vail Cascade Resort.cck Page 5 of 7 _ COMcheck Software Version 3.5.3 Mechanical Compliance Certificate 2003 IECC Report Date:07/01/08 Data filename:C:\Documents and Settings\sean\Desktop\Vail Cascade Resort.cck Section 1: Project Information Project Type:Addition Project Title:Vail Cascade Resort Construction Site: Owner/Agent: Designer/Contractor: 1300 Westhaven Dr. Rick Burcham JG Johnson Architects Vail,CO 81657 Destination Hotels&Resorts 730 17th St.Suite 110 10333 E.Dry Creek Rd.Suite 450 Denver,CO 80202 Englewood,CO 80112 (303)892-7062 (303)268-4610 rbu rcham @desti nationhotels.com Section 2: General Information Building Location(for weather data): Vail,Colorado Climate Zone: 15 Heating Degree Days(base 65 degrees F): 9248 Cooling Degree Days(base 65 degrees F): 44 Section 3: Mechanical Systems List uanti Svstem�ae 8 Description 1 HVAC System 1:Heating:Hydronic or Steam Coil,Hot Water/Cooling:Hydronic Coil,Capacity<54 kBtu/h, Water-Cooled Condenser/Single Zone Section 4: Requirements Checklist Requirements Specific To: HVAC System 1 : � 1. Balancing and pressure test connections on all hydronic terminal devices � 2. Separate hot and cold water supply and returns � 3. Multiple boilers must have automatic controls that sequence operation with load � 4. Single boiler>500 kBtu/h input capacity must have a multistaged or modulating burner � 5. Two-pipe changeover heating/cooling controls must have:a)15 degrees F deadband where boiler and chiller can not operate,b)allow operation in either heating or cooling for at least 4 hrs.and c)prevent difference between heating and cooling set points greater than 30 degrees F Generic Requirements: Must be met by all systems to which the requirement is applicable: � 1. Load calculations per 2001 ASHRAE Fundamentals � 2. Plant equipment and system capacity no greater than needed to meet loads - Exception:Standby equipment automatically off when primary system is operating - Exception:Multiple units controlled to sequence operation as a function of load � 3. Minimum one temperature control device per system � 4. Minimum one humidity control device per installed humidification/dehumidification system � 5. Thermostatic controls has 5 degrees F deadband - Exception:Thermostats requiring manual changeover between heating and cooling `�____, ._...,...__.___.__ _.�.,__ Project Title:Vail Cascade Resort Report date: 07/01/08 Data filename:C:\Documents and Settings\sean\Desktop\Vail Cascade Resort.cck Page 6 of 7 � � 6. Automatic Controls:Setback to 55 degrees F(heat)and 85 degrees F(cool);7-day clock,2-hour occupant override, 10-hour backup � - Exception:Continuously operating zones - Exception:2 kW demand or less,submit calculations � 7. Automatic shut-off dampers on exhaust systems and supply systems with airflow>3,000 cfm � 8. Outside-air source for ventilation;system capable of reducing OSA to required minimum � 9. R-5 supply and return air duct insulation in unconditioned spaces R-8 supply and return air duct insulation outside the building R-8 insulation between ducts and the building exterior when ducts are part of a building assembly - Exception:Ducts located within equipment - Exception:Ducts with interior and exterior temperature difference not exceeding 15 degrees F. � 10.Ducts sealed-longitudinal seams on rigid ducts;transverse seams on all ducts;UL 181A or 181 B tapes and mastics - Exception:Continuously welded and locking-type longitudinal joints and seams on ducts operating at static pressures less than 2 inches w.g.pressure classification � 11.Mechanical fasteners and sealants used to connect ducts and air distribution equipment � 12.Hot water pipe insulation:1 in.for pipes<=1.5 in.and 2 in.for pipes>1.5 in.Chilled water/refrigeranUbrine pipe insulation: 1 in.for pipes<=1.5 in.and 1.5 in.for pipes>1.5 in.Steam pipe insulation: 1.5 in.for pipes<=1.5 in.and 3 in.for pipes>1.5 in. - Exception:Piping within HVAC equipment - Exception:Fluid temperatures between 55 and 105 degrees F - Exception:Fluid not heated or cooled - Exception:Runouts<4 ft in length � 13.Operation and maintenance manual provided to building owner � 14.Balancing devices provided in accordance with IMC 603.15 � 15.Stair and elevator shaft vents are equipped with motorized dampers � 16.Three-pipe systems not used Section 5: Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2003 IECC requirements in COMcheck Version 3.5.3 and to comply with the mandatory require ts in e Re�uirements Checklist. � J� o o � ° , Name-Title ,QQc��T�c-T`.� Signature Date Project Title: Vail Cascade Resort� Report date: 07/01/08 Data filename:C:\Documents and Settings\sean\Desktop\Vail Cascade Resort.cck Page 7 of 7 �c � 05-02-2012 Inspection Request Re orting 0 _ Page 15 4:19 m �' Requested Inspect Date: Thursda , Ma 03, 2012 Site Address: VAIL C SCADE/ARIA S AL AIP/D Information Activity: B08-0075 Type: A-COMM Sub Type: ACOM Status: ISSUED Const Type: Occupancy: Use: IB Insp Area: Owner: L-O VAIL HOLDING INC Contractor: WEITZ COMPANY, INC. (THE) Phone: 303-860-6600 Description: REMODEL LAND�CAPING E�CEL: PORTE COCHERE, NEW POOL AND POOL DECK, MEETING ROOM Requested Inspection(s) Item: 540 BLDG-Final C/O Requested Time: 08:00 AM Requestor: Phone: Comments: follow u�* Entered By: JMONDRAGON K Assigned To: Action: Time Exp: W" I�I� �/ � � � rV " v � � � � � Inspection Historv /��� Item: 21 PLAN-ILC Foundation Plan "*Approved'" 12/03/08 Inspector: npeterson Action: AP APPROVED Comment: Approved upon reciept of DIA and cash in the amount$142,312.09,for unfinished exterior work as specified in the atfached estimate. 05/15/09 Inspector: Warren Action: AP APPROVED Comment: Before providing a final sign off ensure the mechanical venting equipment on the north side of teh roof is painted dark brown to match the metal roof color. Item: 30 BLDG-Framing *"Approved"" 10/31/08 Ins pector: GCD Action: PA PARTIAL APPROVAL Comment: PORTE COCHER UNDER FRAMING FOR CEILING. 12/11/08 Inspector: JRM Action: PA PARTIAL APPROVAL Comment: AHAT REVIDSED PLANS�ND APPROVA�LS FOR THIS WORK BE GRANT�DIBY PL�ANNIINON DEPT. PROCEED AT GC RISK. Item: 60 BLDG-Sheetrock Nail ""`Approved"* 11/04/08 Inspector: GCD Action: PA PARTIAL APPROVAL Comment: PORT COCHER DENS SHIELD 12/02/08 Inspector: GCD Action: NR NOT READY FOR INSPECTION Comment: 12/11/08 Inspector: JRM Action: PA PARTIAL APPROVAL Comment: INTERIOR SIDE OF MECH ROOM WEST END OF BREEZEWAY. SEE NOTES ON FRAMING. Item: 70 BLDG-Misc. **Ap_�proved"" 10/31/08 Insp ector: GCD Action: PI PARTIAL INSPECTION Comment: LATH RESTARAUNT COLUMNS, SOFFIT AND FACIA ON 8 LINE BETWEEN 3.5 AND 8.5. 11/25/08 Insp ector: GCD Action: PI PARTIAL INSPECTION Comment: LATH ON S LINE FROM 13 TO 17 LINE 12/02/08 Insp ector: GCD Action: PA PARTIAL APPROVAL Comment: LATH� FACIA ON S LINE BETWEEN 7 AND 9. WESt END COLUMN, SOFFIT AND FACIA ON 2 LINE BETWEEN Q AND S. Item: 90 BLDG-Final Item: 533 PLAN-TEMP. C/O "`Approved'* 12/19/08 Inspector: npeterson Action: AP APPROVED Comment: Approved upon reciept of DIA and cash in the amount of$142,312.09,for unfinished exterior work as specified in the atfached estimate. Item: 530 BLDG-Temp. C/O '"Approved'"' REPT131 Run Id: 14402 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-213 8 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT COMM BUILD PERMT Permit # B08-0075 Project# 07-0534 Job Address: 1300 WESTHAVEN DR VAIL Status . . . : FINAL Location.......: VAIL CASCADE/ARIA SPA Applied .. . : 04/07/2008 Parcel No....: 210312100012 Issued . . . : OS/15/2008 ` Expires.....: OS/03/2012 OWNER L-0 VAIL HOLDING INC 04/07/2008 C/0 DELOITTE & TOUCHE LLP � 555 17TH ST STE 3600 DENVER CO 80202 APPLICANT WEITZ COMPANY, INC. (THE) 04/07/2008 Phone: 303-860-6600 4725 S. MONACO STREET, STE 100 DENVER i co so23� License: 131-A CONTRACTOR WEITZ COMPANY, INC. (THE) 04/07/2008 Phone: 303-860-6600 4725 S. MONACO STREET, STE 100 DENVER I CO 80237 License: 131-A Desciption: VAIL CASCADE HOTEL REMODEL: PORTE COCHERE, NEW POOL AND POOL DECK, MEETING ROOM REMODEL, I,ANDSCAPING ETC. Occupancy: mixed Type Construction: IB Valuation: 1,500,000.00 Revision Valuation: $0.00 Total Sq Ft Added: 0 •***►*►�******+**+******+*�+s+�**+�*+�:*�*�:+�+***********+*s*+*�*+**� FEE S UMMARY ***s*s******�+**a*�****s�x*��*�*►*►*►***«**ass»as*a*ss+*►*s* Building------> S7,933.75 Restuarant Plan Review--> $0.00 Total Calculated Fees--> $92,069.69 Plan Check---> $4,8 31.9 9 Recreation Fee--------------> $0.00 Additional Fees----------> $0.00 � Investigation-> 50.00 TOTAL FEES-------------> $92,069.69 Total Permit Fee---------> 592,069.69 Will CaII-----> 59.00 Payments-------------------> 592,069.69 BALANCE DUE---------> $0.00 *******a**e*+***+**t**�**r**»**��*�++*�:***+**e****+****�**+***+*******►***s***�***�*►�s+s******+**r�+e*s*�**+*s**+*r**+��+*ss�*a�*�****s***sr►sr* Approvals: Item: 05100 BUILDING DEPARTMENT 04/22/2008 cgunion Action: CR F: \cdev\CHRIS\PERMIT.COMMENTS\B08-0075\B08-0075. DOC 05/07/2008 cgunion Action: AP approved revised corrected plans dated 4/25/08 Item: 05400 PLANNING DEPARTMENT 05/06/2008 npeterson Action: AP Plans approved date stamped May 1, 2008 (Office Copy) . Reference DRB 08-0019, approval . Item: 05600 FIRE DEPARTMENT 05/12/2008 mvaughan Action: AP Item: 05500 PUBLIC WORKS 05/13/2008 csalli Action: AP *...,:*..***..*,:..,«*.�*.......*..*...+*.�....*....�:*.*+..*.*.*...*,�,�,...*..+..*....*.+*.....***...:.*................*+....+.*.».......,�.....:. See the Conditions section of this Document for any conditions that may apply to this permit. � DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM• 4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER a 's ******************************************************************************************************** CONDITIONS OF APPROVAL Permit#: B08-0075 as of 01-31-2013 Status: FINAL ******************************************************************************************************** Permit Type: ADD/ALT COMM BUILD PERMT Applied: 04/07/2008 Applicant: WEITZ COMPANY, INC. (THE) Issued: OS/15/2008 303-860-6600 To Expire: OS/03/2012 Job Address: 1300 WESTHAVEN DR VAIL Location: VAIL CASCADE/ARIA SPA Parcel No: 210312100012 Description: VAIL CASCADE HOTEL REMODEL: PORTE COCHERE,NEW POOL AND POOL DECK, MEETING ROOM REMODEL, LANDSCAPING ETC. ***********************************************Conditions:************************************************ Cond: I (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. _ . NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ,. �wtvo�v� � Community Development 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2138, f. 970.479.2452, inspections 970.479.2149 ADD/ALT COMM BUILD PERMT Permit # B08�OO7�J Project# 07-0534 Job Address: 1300 WESTHAVEN DR VAIL Status . . . : FINAL Location.......: VAIL CASCADE/ARIA SPA Applied .. . : 04/07/2008 Parcel No....: 210312100012 Issued . . . : 05/15/2008 Expires......: 05/03/2012 OWNER L-O VAIL HOLDING INC 04/07/2008 C/O DELOITTE &TOUCHE LLP 555 17TH ST STE 3600 DENVER CO 80202 APPLICANT WEITZ COMPANY, INC. (THE) 04/07/2008 Phone: 303-860-6600 4725 S. MONACO STREET, STE 100 DENVER • CO 80237 License: 131-A CONTRACTOR WEITZ COMPANY, INC. (THE) 04/07/2008 Phone: 303-860-6600 4725 S. MONACO STREET, STE 100 � DENVER CO 80237 License: 131-A Desciption: VAIL CASCADE HOTEL REMODEL: PORTE COCHERE, NEW POOL AND POOL DECK, MEETING ROOM REMODEL, LANDSCAPING ETC. Occupancy: mixed � Type Construction: IB Valuation: 1,500,000.00 Revision Valuation: $0.00 Total Sq Ft Added: 0 .......�...«*„*.,.<,..,.,.,..�.**�....«.,>...,..�«�.,.....«..........,��... FEE SUMMARY .��.�...«....»�.,....�...�«......,,...,«.,,....,......x..,..,«...,....».... Building Permit Fee---> $7,433.75 Will Call--------------------> $4.00 TOTAL FEES----------------> $42,069.69 Plan Check-------> $4,831.94 Restaurant Plan Review $0.00 Payments----------------------> $42,069.69 Addl Plan Hrs---> $0.00 Recreation Fee-------> $0.00 BALANCE DUE-------------> $0.00 Addl Plan Review $0.00 Investigation Fee--------> $0.00 ««««*****************,.*************.,+**.,,**************,+****«*«*�«*,+***«*«******�***.****************************�*****************«,.****««****** See the Approval and Conditions sections (following pages) of this document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970-479-2149 OR AT OUR OFFICE FROM 8:00 AM -4 PM. YOU MUST PROVIDE THE CORRECT PERMIT NUMBER TO OBTAIN AN INSPECTION. DATE SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER . r PRINT SIGNATURE *.,**,.*.,,*******.*««„*******««*«********,.***********.,.,.,.*«*«.,*******«*****«****,�**.,*«**,.****«*„«*.,*******«**************.***„*««*««*«***.****,.,.,..«*.,«« APPROVALS Permit#: B08-0075 as of 01-31-2013 Status: FINAL ««**«*******«*******„******«««******.«*�*****„**«««*****�,,,.,.**„*********«««*„*****,.,,�,,,,,,**.****«««*�*..*******,*,*,«****«******.*,..,,..,,,.,****«*„******,. Permit Type: ADD/ALT COMM BUILD PERMT Applied: 04/07/2008 Applicant: WEITZ COMPANY, INC. (THE) Issued: 05/15/2008 303-860-6600 To Expire: 05/03/2012 Job Address: 1300 WESTHAVEN DR VAIL Location: VAIL CASCADE/ARIA SPA Parcel No: 210312100012 Description: VAIL CASCADE HOTEL REMODEL: PORTE COCHERE, NEW POOL AND POOL DECK, MEETING ROOM REMODEL, LANDSCAPING ETC. *,r,r+**««,r*,r,r*w****«*********w,r,r***,rw****«,r,r,r,r,r,rw,r**,r,r*+r*,r,r*w***x**AP P rova Is«************.,*******.,.****«**************„**********,.,,****«*******.** Item: 05100 BUILDING DEPARTMENT 04/22/2008 cgunion Action: CR F:\cdev\CHRIS\PERMIT.COMMENTS\B08-0075\B08-0075.DOC 05/07/2008 cgunion Action: AP approved revised corrected plans dated 4/25/08 Item: 05400 PLANNING DEPARTMENT 05/06/2008 npeterson Action: AP Plans approved date stamped May 1, 2008 (Office Copy). Reference DRB 08-0019, approval. Item: 05600 FIRE DEPARTMENT 05/12/2008 mvaughan Action: AP Item: 05500 PUBLIC WORKS 05/13/2008 csalli Action: AP I� ..**,..,««***.**«***«**********««***,.******,.*****««*«***,.,.********«*****„****„«««******«*******.,**„««**.***«,,,,******„***«**,,,..,*«*«**...,**«***,.**„«,,,,,,*. CONDITIONS OF APPROVAL Permit#: 608-0075 as of 01-31-2013 Status: FINAL **,.*„**,...*«****,.,,********��***.**�***********„******««*.,**********««*«***.*****,.,.*„****««****«******��**�*****„«**.,.*�*«***�*****««*�*«**.**«***w*,,,« Permit Type: ADD/ALT COMM BUILD PERMT Applied: 04/07/2008 Applicant: WEITZ COMPANY, INC. (THE) Issued: 05/15/2008 303-860-6600 To Expire: 05/03/2012 Job Address: 1300 WESTHAVEN DR VAIL Location: VAIL CASCADE/ARIA SPA Parcel No: 210312100012 Description: VAIL CASCADE HOTEL REMODEL: PORTE COCHERE, NEW POOL AND POOL DECK, MEETING ROOM REMODEL, LANDSCAPING ETC. a**,r**«*,r************,e**,r*,r,r***,r**�****:***,r,r,r**,r,r,e*,r***,v*****,r,r*Cond itions****************«*********..***********************.*****************.* Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. I nspection Items for B08-0075 13:54 01/31/2013 Sec Item Id Descri tion A r Re Items Action Inheritable " 21 PLAN-ILC Foundation Plan Yes O 2 AP No ` 30 BLDG-Framin Yes O 2 PA No * 60 BLDG-Sheetrock Nail Yes O 3 PA No 70 BLDG-Misc. Yes O 3 PA No ' 90 BLDG-Final Yes R 1 AP No * 533 PLAN-TEMP.C/O Yes O 1 AP No * 530 BLDG-Tem . C/O Yes O 2 AP No * 539 PW-FINAL C/O No O 0 No ' 537 PLAN-FINAL C/O Yes O 1 AP No ' 538 FIRE-FINAL C/O No O 0 No " 540 BLDG-Final C/O Yes R 1 AP No Total Rows: 11 � I Page 1 B08-0075: Entries for Item:540 - BLDG-Final C/O 13:54 01/31/2013 Action Comments By Date Unique_ Ke AP Approved by GCD sgremmer 05/03/2012 A000150 405 Total Rows: 1 Page 1 i ************++***********+***+****************+******************************+**+*********** TOWN OF VAIL, COLORADOCopy Reprinted on 01-31-2013 at 13:53:48 O1/31/2013 Statement ******++**************+************************************++*****************************�* Statement Number: R080000714 Amount: $42, 069. 6905/15/200803: 13 PM Payment Method: Check Init: SAB Notation: 13538908 WEITZ ----------------------------------------------------------------------------- Permit No: B08-0075 Type: ADD/ALT COMM BUILD PERMT Parcel No: 2103-121-0001-2 Site Address: 1300 WESTHAVEN DR VAIL Location: VAIL CASCADE/ARIA SPA Total Fees: $42, 069. 69 This Payment: $42, 069. 69 Total ALL Pmts: $42, 069. 69 Balance: $0.00 **********************+********************************************************************* ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 7, 433.75 PF 00100003112300 PLAN CHECK FEES 4, 831. 99 UT 11000003106000 USE TAX 40 29, 800.00 WC 00100003112800 WILL CALL INSPECTION FEE 9 .00 -----------------------------------------------------------------------------