HomeMy WebLinkAboutB06-0208,j
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
{,t^ii,HTTA?E
R.AD
'-\ uo ' 3\\- rD
"i*970-479-2138 \)c-^\ \J,L\..o . . '
dNOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT COMM BUILD PERMT Permit # 806-0208
Project# PRJ06-0325
Job Address: 12 VAIL RD VAIL Starus . . . : ISSUED
Location.......: GATEWAY PLAZA UNITS C-5 AND C-4 Applied .. . : Wl28l\ffi6
ParcelNo....: 210108264012 Issued...: 0911y2ffi6
Expires.....: 0311212W7
oUINER MG HoLDrNcs rJLc 07/29/2006
PO BOX s963
VAILco 81658
APPLICANT COITRTOIS BUILDING GROUP, INCOT /28/2OO5 phone: 970-331-8233
P.O. BOX 1313
VAIIJco 815s8
License:305-B
coNrRAcToR couRTors BUIr-,DING GROUP, TNCOT /28/2006 phone : 970-33L-8233
P.O. BOX 131_3
VAILco 816s8
. T.icense : 3 05 -B
Desciption:
INSTALL OFFICE PARTITION WALL-S
Occupancy: B
Type Construction: II A
i( * ** x* rt * +:f :l + *di {r:l,ir
Building--- > S353.25 Restuarant Plan Review-> go-oo Total Calculated Fees- > $602-36
Plan Check--> $236.11 Recreation Fee---- --------> 50-00 Addltional Fees------ - > So.oOInyesdgation-> $0.00 TOTAL FEES------- > 9502.36 Total Permir Fee-----> 9602.35
Will Calt---> g3 . 00 Payments---------- > g5o2 .36
BALANCE DUE.....--- > SO . OO
Approvals:
ITEM: O51OO BUILDING DEPARTMEIVT
09/L3/2006 ,JRI'I Action: AP
Item: 05400 PIJANNING DEPARTMENT
07/28/2006 JS Action: Ap
Item: 05600 FIRE DEPARTMEMr
08/08/2006 mvaughan Action; AP see l/h/n's
See the Conditions section of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby dcknowtedge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto,
REQI,,F^STS FOR INSPECTION SHALL BE MADE TWENTY.FOTJR HOURS IN ADV
AM.4PM.
BY TELEPIIONE AT 47y2149 OR AT OUR OFFICE FROM 8:fi)
OF OWNER OR HIMSELF AND OWNEF
+*************:l{.1.*****{t**i.,&******ttl.*!F*,{.********t!,i***{(*******X.**i.**i.,F**.***{*i.i({.i(*:,|.**+'F***********tr*)rt '**4.d.*
CONDITIONS OF APPROVAL
Permit#: 806-0208 asof09-13-2006 Status: ISSUED
********:&*:1.********i.rt*:8+tr ******:t*:F:t,t****:f ****:f **+************:t**+,r{.**.**********:t*:8+*,t!8****{c{<:t:t*:F*****r<:t *
Pennit Type: ADD/ALT COMM BUILD PERMT Apptied: 0712812Cf,i6
Applicant: COURTOIS BUILDING GROUP,INC. Issued: 09/l3l2m6970-331-8233 To Expire: O3ll2l2007
Job Address: 12 VAIL RD VAIL
l.ocation: GATEWAY PLAZA UNITS C-5 AND C-4
Parcel No: 2101082&0t2
Description:
INSTALL OFFICE PARTITION WALLS
**:fr*,t*'****{.r*******,*lr*********r*,********:t(********Conditions. t *!r.***!r***'F*,k*i.*i.***:r********:r****tr *'t*,t*********
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
t'i.,tr*:a'i**,i*******rr'r*,t't*********'rt******'t'r*******+{.t,**,t,}*!i*!****,tr,}***+****,*t{,********t+******{,**
TOWNOFVA]L. COLORADO Stat€ment*********+**** ** {.,N* ****+** * ** * * ****+* * * * * * * * * * + * * * * * * * * * * * * * * t + + * * * * * * * ***'t*****************
St,atement Number: R050001445 Amount: $602.3G 09/t3/200604:23 pM
Pay'ment Method: Check
Building croup Inc.
Init: LC
Nolation: #?228/CourtoiB
Permi.t No!
Parcel No:
Site Address :
Locati-on:
This Payment:
BP 001000031111_00
PF 00L00003112 3 00
wc 00100003112I00
806-0208
2ror- 082 - 640L -2
12 VAII., RD VAIIJ
GATEWAY PLAZA UNITS C.5
I1rtr)e 3 ADD/AJ,T COMM BUII.,D PERI'IT
AND C-4
Total Fee6:
Total ALI-, Pmt.s:
Balance:
$602.36
$502 .36
$0.00
$602.36
'1..1***+**********************tt********+**************'t t*{.*f+*****************+***************
ACCOT]NT ITEM LIST:
Account Code Description CurrenE. Ernt8
BUII,DING PERMIT FEES
PIJAN CHECK FEES
WIIJIJ CAIJIJ INSPECTION FEE
363 .2s
236 . Ll
3.00
8oU:'52U8*
Separate Permits ane requ
t
OI. VAIL
75 S. Frontage Rd.
Vail, Colorado 81657
CONTRACTOR INFORMATION
General Contractor:
C-e u?:td is bW a G k'.r&
Town of Vail Reg. No.:
3ee-- b
Contact Person and Phone #s:
Phutere V- c-avrz"etl
Emaif addressz C (? 4 v 4L L-@, a-e *48p-j11. F-l Sf Fax #:
Contractorsignabre^ / / r'+< ltazq-t'o )./
COMPLETE VALUATIONS FOR BUILDING PERMIT & Materials
BUILDfNG: $ kap.oo ELECTRICAL: $ -7 -,_-, --OTHER: $ _-
PLUMBING: $MECHANICAL:$TOTAL: S 23-aa-z --
For Parcel # Contact Assessors Office at 970-328-8640 or visitffi'?-to\ ob>cA ot> /?tot e QLaq otl
JobName: G*+gN *i L/A JobAddress: 1/rt*it- lzD
Lesal Description ll Lofi ll Btock ll Fiting:Subdivision:
owners *t tt fi.G(&il Awrl Address: LL v"+iu. fLD phone:477- l-tb S
f€Htrg?sftg"ec lB Address:r5vR 0?4- I3!y'D PtBTz, -et?z-z-Ensineer: Fl/A llAddress:Phone:
Detailed clescription of work:affi,(4 ?*e:rt rtu y' t4 xva,
WorkClass: New( ) Addition( ) Remodel(,Q Repah( ) Demo( ) Other( )
WorkType: Interior(r^), Exterior( ) Both( )Does an EHU exist at this location: Yes ( ) No (xI
Type of Bldg.: Single.family ( ) Two-family ( ) Multi-family ( ) Commercial (,.). Restaurant ( ) Other ( )
No. of Existing Dwelling Units in this building: ..-'No. of Accommodation Units in this building:
4\,filoflfpeof FireplacesExistinq: GasAppliances{ ) GasLoqs( ) Wood/Pellet( ) WoodBurnino( )
-a\Nti/lpeof Firepl?gesProposed:GgsAppliances( ) GasLoss( ) Wood/Pellet( ) WoodBurninqe€rE{t+OtAIEDL
Does a Fire Alarm Exist: Yes ('/) No (Does a Fire Sprinkler System Exist: Vps t*FJqQJ
FOR OFFICE USE ONL
ffiry ft
F:\cdev\FORMS\Permits\Building\buildingJermit. DOC b**,.,",,.
1t
l9 $m
'5 Hai' finf
-_Frf
Questions? Call the Building Team at 479-2325
Depaftment of Community Development
Project Name:
Project Address:
/ This Checklist mu* be omoleted before a Building permit aooliation isawpH.
tJ/
pca."tl9
6 All pages of application is complete
@ Aas DRB approval obtained (if required) provide a copy of apprwal form /1/.+
t'plan Check Fee required at submittal for projects valued over $1O0,0OO.0O (see attached fee
;chedule)y' Complete site plan submitted ,'f/*
B- Asbestos test and results submitted if demolition is occuning M,f*
{j-,/Architect stamp and signaiure (All Commercial and Multi fanil$---:-$_Arcntect stamp and signaiure (All Commercial and Mul!Bnily)--<---..-
(-p/ Fullfloor plans inclyding building sections and elevationH3sellb, *roOfr < sets of plans for SFR
and Duplex, 5!a6of pla ns for M u ltFFamity end-Commercial Eu[]EsI-
s-Tubfic Way Perrlit application included if applicable (refer to Public Works checklist) ll/n
o' Staging plan included (refer to Public Works checklist) No dumpster,oarkino or material storaoe
I winaw and door schedule
,f Fullstructural plans, including design criteria (i.e.loads) x//,,a
y' Structural Engineer sbmp and signature on structurdl plans (All Commercial and Multi Family) ,/1
-/ Soits Report must be submitted prior to footing inspection /,/2 ,
flnnresistive assemblies speciflred and penetntions indicated ////n ' t'
$)/ Smok,.e detectors shown on plans
-
ftvp*andquantityoffireptacesshown ^//* -Ta Fau-eAl
'/
f tVp*and quantity of fireplaces shown ^//r4
Applicanfs Signature:
F: \cdev\FoRM S\Permits\Building\bu!ldi ngjermit. DOC
AJe,hlrcdD)
6?,p4 #Ulc h,wbJ**t
Q1o 4ot ez-41
Date of submittal:
Received By:
Page 2 of 16 040912005
PLAN CHECK FEES TABLE
Dery{ilrl€jnt of hmmunity Devdopment
Builcling Safety and In$dion Seryi@s
75 South Ftonbge R@d
Vail, Cdondo 81657
970479-2138
FM 970479-2452
www.vallgov.com
Plan check fees are required for pr$ects with a valuation over $100,000, at the time of Building permit
submittal. Please use the table below to calculate your plan check fee total.
$100,000-$150,000 Multiply by
$150,001-$250,000 Multiply by
$250,00 1-$400,000 Multiply by
$401,000-$750,000 Multiply by
$750,001-$1,000,000 Multiply by
.0055 of Valuation Total
.005 of Valuation Total
.0045 of Valuation Total
.004 of Valuation Total
.0035 of Valuation Total
Valuations over $1,000,000 will be calculated by the Town of Vail Building Department.
If you have any further questions, please contact the Town of Vail Building Department at970-479-2LZB.
F: \dev\FoRMS\Permits\Buildin g\bui lding_Jermit DOC Page 3 of 15 02l09l2ms
AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR BUILDING PEBI',IIT APPUCATION
FORALL REMODEL, ADDmoN oR orHER pRoJEcrs INVoLVING ANy DEMollnolrcn-flrMovnib>surLorrrri '
ASBESTOS TESTTNG REQUTREM ENTS
THE TOWN OF VAIL AND STATE OF COLOMDO DEPARTMENT OF PUBLIC HFALTH REQUIRE ASBESTOS TESNNG
ANYTIME WHEN MORE THAN 160 S.F. OF MATERI.AL WILL BE DISTURBED ON RTIAOVEO.
rvK ALL Ktrr'ruutrL, Auul |ruN oR o tHER PROJECTS INVOLVING ANy DEMOLITI9}}AIREMOVA|_ o]fl{il_DtNe
MATERIAIS rHAT MAY CONTAIN ASBEsros. BUTLDTNGS coNSTRUcrEo nrr(ocroBER 12, rse9pft1--H1yg
No AsBEsros coNTAINING MATERIAIS ARE E(EMpr. l_-_===-__i--
o I have included the asbestos test and report with my building permit application
applicant signature
s date
r I certiff my project will not disturb or remove more than 160 s,f. of building
plans submitted with my application clearly indicate this information. (Ihis will
review, and will delay your project if found to be inaccurate)
material. The construction
be verified during plan
applicant signafure
OR
date
o The building was constructed after October 12, 1988. The date of construction was
original construction date
F: \cdev\FoRMS\Permib\Building\buildingjermit. DOC Page 4 of 16 0210912w5
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval,
a Planning Department review or Health Departrnent review, and a review by the Building Department, the
estimated time for a total review will take as long as three (3) weeks.
All commercial (large or small) and all mulU-family permits will have to follow the above mentioned maximum
requirements. ResidenUal and small projects should take a lesser amount of time. However, if residential or
smaller projects impact the various above mentioned departrnents with regard to necessary review, these
projecb may also take three (3) weeks to review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit
is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may
affect future permits that I apply for.
Agreed to by:
Print name
Signature
Project Name:
Date:
F: \cdev\FoRMS\PermiB\Buildin g\building_trermit.DOC Page 5 of 16 o2l0slz}os