HomeMy WebLinkAboutDRB070114Ct�sign R�vie�uv �c��rd
ACTICIN F€}RI�1
��' '" ,_� # Department of Community Derreitr�ament
��J�`V� ��` # i'S 5outf� Fran;tage Rnad, V�il, Colora�da $165�
�� t�l: �7C1.47�.%139 fax. 9�i1,4i9.�452
�r�rrr.�r�u�►,��r w�eb: rMww.vaiEgov.com
Project Name: RAETHER RESIDENCE
Project Description:
Participants:
DRB Number: DRB070114
FINAL APPROVAL FOR AN ADDITION OF GRFA (BEDROOMS & DINING ROOM)
OWNER RAETHER FAMILY 1992 TRUST
9 W 57TH ST 4200
NEW YORK
NY 10019
APPLICANT BETH LEVINE, ARCHITECT
P.O. BOX 1825
AVPM
CO 81620
License: C000001399
ARCHITECT BETH LEVINE, ARCHITECT
P.O. BOX 1825
AVPM
CO 81620
License: C000001399
03/26/2007
03/26/2007 Phone:970-926-5099
03/26/2007 Phone:970-926-5099
Project Address: 227 ROCKLEDGE RD VAIL Location: 227 ROCKLEDGE RD
Legal Description: Lot: 13 Block: 7 Subdivision: VAIL VILLAGE FILING 1
Parcel Number: 2101-071-1502-9
Comments:
Motion By:
Second By:
Vote:
Conditions:
BOARD/STAFF ACTION
Action: STAFFAPR
Date of Approval: 04/02/2007
Cond: 8
(PLAN): No changes to these p�ans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond:201
DRB approval shall not become valid for 20 days following the date of approval.
Cond:202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued ana construction is commenced
and is diligently pursued toward completion.
Cond:113
All development applications submitted to the Town after the effective date of
Ordinance 26, Series 2006 shall be subject to the pending employee housing
regulations in whatever form they are finally adopted; provided, however, that if
the Town fails to adopt the pending employee housing regulations by April 15, 2007,
this Ordinance shall not apply to such development applications.
Planner: Bill Gibson DRB Fee Paid: $300.00
***********�******************************************++**+*********************************
TOWN OF VAIL, COLORADOCopy Reprinted on 02-07-2013 at 13:37:33 02/07/2013
Statement
********************************************************************************************
Statement Number: R070000357 Amount: $300.00 03/26/200703:17 PM
Payment Method: Check Init: JS
Notation: 2745/BETH
LEVINE
-----------------------------------------------------------------------------
Permit No: DRB070114 Type: DRB - Addition of GRFA
Parcel No: 2101-071-1502-9
Site Address: 227 ROCKLEDGE RD VAIL
Location: 227 ROCKLEDGE RD
Total Fees: $300.00
This Payment: $300.00 Total ALL Pmts: $300.00
Balance: $0.00
********************************************************************************��**********
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
DR 00100003112200 DESIGN REVIEW FEES 300.00
a��
�
�.�+
k '➢
3 „�
J I�
5�
r�s�r,�k°
Prescriptive Package Worksheet
International Energy Conservation Code (IECC)
Builder Name �'"��t! ��a � G.�p � �� Daie � ` � �� ��
Builder Address �'ifi ex ��13 V/�' ��► �-+ 8� � 4�b
Building Addressl �► 2 �"pG�iL b' i�
Zone Number �� Package Number IECC Edition
Submitted By _�M1'���t'�� Phone Number �►3�' �9Z'3 3
Glazing Area
100 X —
Glazing Area Gross Wall Area
lt ���' �{. 2 u 3.S �•'2 � g �
R-Value��� 4,2" 3,� S.� y"�
2 �S''-� =1'� (�'-vx 8
_ ��*7� %
Proposed Glazing Area
Proposed
Description Comments n-va�ue
Ceiling --�__._'._'.,__.______._.__._� R-
Wall __."_ � r A R- � °�
Floor Over Unconditioned Space � r R- "/ �
Floor Over Outside Air % R-
Basement Wall R- `
Slab Floor R-
Crawl Space Wall �-
U-Factor
Proposed
Description Comments U-Factor
EqUlp111e11t EfflCl@IICy (This section may be left blank if Norma! is selected on the right.)
Heatfng
Coolfng
AFUEMSPF
SEER
Make & Model Number
iEnforcement Agency: i
iPermit # i
iChecked By i
� Date I
L-----J
%
Maximum Glazing Area
Minimum
R-Value
R-
R-
R-
R-
R-
R-
R-
Maximum
U-Factor
U-
u- 0.35
Check One
dormal
❑ High Heating
❑ High Cooling
❑ High Heating & Cooling
Statement of Compliance: The proposed building design represented in these documents is consistent with the building plans, specifications,
and other calculations submitted with the permit appiication. The proposed building has been designed to meet the requiremenis of the
Internatio I Energy Conservation Code..
� ' �� �. s` '/ 5� 0 7
Builde /Designer Company Name Date
Version 3.5 f April 20D3. f U.S. Dept. 01 Hasing and Urban Development / Rural and Economfc Communtty Developmeni / U.S. Dept. of Energy / Paciffc Northwesl National Laboratory
O
�
�
�
O
�
O
V
� �� UC LC�Y �
� 7 fA C (6 p)U+,
� �mEQoc�uco� a°?°�o�Y�-,c�.nmC7w3���E�N�c�
p n-Y'� cA C�N C O O O O� 3 �`pL� � 7�.� O f0 fC (0 N 7��� 7
V JJJJJJ������OOd�O..n.d�'�'�fnCnUifnfni-��i-
�
C tf')hM�MMMf���C`')M�Lnf�Mf���-�t�f�Cflf��fiMI�MMMM
Nr'l�rr'rTTrrrr[�rTrrrrT[�rrr'rrrrTrrr
�
� � C C
NO+��' �NC� W >+ �tAN O C'd ��CCp N
� E°f°�m}.��>.U'�:.3�'co>�rn�m�°°���'���Y�com
U����ma�io�s°—��oo°�ia�io'o°cc'n—'��m,—°_-����c�aa�ioU
QQQQmoom�UUUUUUU�O�OW W WItC7C�C�(7=2�-�YY
a�
C c+�(DMCO.-�MCOMI�C�CD�(DMM�MtnMC��tnc7f�t�ti�t�C�'�MM
N��e--��r���t-����c-���r���c-�r���e-�c-�c-
� M tf') (O f�
� � � � �
� N N � �
O O O O O
N N N N N
�oa��
0
0
0
N
.Q
c
M
�
>
Zone 11 Single-Family Prescriptive Packages -1998/2000/2003 IECC
MAXIMUM MINIMUM Heating/Cooling
Glazing Giazing Ceiling Wall Floor Basement Siab Perimeter Crawl Space Equipment
Packa e Area %� U-Factor� R-Value3 R-Value' R-ValueS Wall R-Value6 R-Value' Wall R-Valuee Efficien 9
1 8% 0.52 R-30 R-13 R-19 R-9 R-7 R-16 Normal
2 12% 0.55 R-38 R-18 R-19 R-9 R-6 R-17 Normal
3 12% 0.45 R-38 R-16 R-19 R-9 R-6 R-16 Normal
4 12% 0.40 R-38 R-13 R-19 R-9 R-6 R-16 Normal
5 15% 0.45 R-38 R-18 R-19 R-9 R-6 R-17 Normal
6 15% 0.35 R-38 R-13 R-21 R-10 R-9 R-18 Normal
7 18% 0.40 R-49 R-18 R-19 R-9 R-6 R�16 Normal
8 18% 0.37 R-38 R-16 R-19 R-9 R-7 R-17 Normal
9 20% 0.36 R-38 R-19 R-19 R-9 R-6 R-16 Normal
10 22% 0.40 R-49 R-19 R-30 R-13 -- -- Normal
11 22% 0.35 R-49 R-18 R-21 R-10 R-10 R-19 Normai
12 25% 0.29 R-38 R-19 R-19 R-9 R-6 R-17 Normal
13 12% 0.65 R-26 R-13 R-19 R-8 R-2 R-17 High Heating
14 12% 0.50 R-26 R-13 R-11 . R-6 R-0 R-8 High Heating
15 15°k 0.60 R-38 R-13 R-19 R-9 R-2 R-20 High Heating
16 15% 0.45 R-30 R-13 R-11 R-6 R-0 R-9 High Heating
17 18% 0.60 R-38 R-17 R-19 R-9 R-2 R-22 High Heating
18 18% 0.45 R-30 R-13 R-15 R-7 R-2 R-14 High Heating
19 22% 0.50 R-38 R-17 R-19 R-9 R-2 R-22 High Heating
20 22% 0.40 R-26 R-13 R-19 R-9 R-2 R-22 Hi h Heatin
21 12% 0.70 R-26 R-13 R-19 R-9 R-2 R-22 High HeaVCool
22 12% 0.55 R-30 R-11 R-13 R-6 R-0 R-10 High HeaUCool
23 15% 0.60 R-26 R-13 R-21 R-10 R-4 R-30 High HeaUCool
24 15% 0.50 R-30 R-13 R-13 R-6 R-2 R-10 High HeaUCool
25 18% 0.65 R-38 R-19 R-21 R-10 R-3 R-28 High Heat/Cool
26 18% 0.45 R-38 R-13 R-13 R-6 R-2 R-10 High HeaUCool
27 22% 0.50 R-38 R-16 R-19 R-8 R-2 R-20 High HeaUCool
28 22% 0.40 R-38 R-13 R-15 R-7 R-2 R-12 Hi h HeaUCool
Zone 13 Single-Family Prescriptive Packages -1998/2000/2003 IECC
MAXIMUM MINIMUM HeatinglCooling
Glazing Glazing Ceiling Wall Floor Basement Slab Perimeter Crawl Space Equipment
Packa e Area %� U-Factor� R-Value3 R-Value° R-Values Wall R-Values R-Value' Wall R-Valuee Efficien 9
1 8% 0.45 R-38 R-16 R-19 R-10 R-7 R-16 Normal
2 12% 0.45 R-49 R-18 R-21 R-10 R-9 R-19 Normal
3 12% 0.40 R-38 R-18 R-19 R-10 R-6 R-16 Normal
4 15% 0.45 R-49 R-19 R-30 R-t4 -- — Normal
5 15% 0.35 R-38 R-18 R-21 R-10 R-9 R-20 Normal
6 18% 0.34 R-49 R-22 R-19 R-10 R-8 R-17 Normal
7 20% 0.31 R-49 R-24 R-19 R-10 R-7 R-17 Normal
8 22% 0.35 R-49 R-26 R-30 R-14 — — Normal
9 25% 0.25 R-49 R-19 R-21 R-10 R-9 R-20 Normal
10 12% 0.60 R-30 R-13 R-26 R-11 R-8 -- High Heating
11 12% 0.45 R-26 R-13 R-15 R-8 R-2 R-14 High Heating
12 15% 0.55 R-38 R-16 R-19 R-8 R-3 R-18 High Heating
13 15% 0.45 R-30 R-13 R-19 R-9 R-4 R-22 High Heating
14 18% 0.50 R-38 R-18 R-19 R-9 R-4 R-22 High Heating
15 18% 0.40 R-38 R-13 R-19 R-9 R-3 R-19 High Heating
16 22% 0.45 R-49 R-18 R-21 R-10 R-6 R-30 High Heating
17 22°h 0.35 R-38 R-13 R-19 R-9 R-4 R-22 Hi h Heatin
18 12% 0.65 R-38 R-16 R-15 R-8 R-2 R-14 High Heat/Cool
19 12% 0.50 R-30 R-11 R-19 R-9 R-3 R-20 High HeaUCool
20 15% 0.60 R-38 R-18 R-19 R-9 R-3 R-22 High HeaUCool
21 15% 0.45 R-30 R-13 R-19 R-9 R-3 R-20 High HeaUCool
22 18% 0.55 R-38 R-17 R-26 R-11 R-9 — High HeaUCool
23 18% 0.45 R-38 R-13 R-26 R-10 R-6 — High HeaUCool
24 22% 0.45 R-49 R-19 R-19 R-9 R-4 R-22 High HeaUCool
25 22% 0.35 R-38 R-11 R-21 R-10 R-5 R-30 H' h HeaUCool
Zone 15 Single-Family Prescriptive Packages -1998/2000/2003 IECC
MAXIMUM MINIMUM Heating/c.�_
Glazing Glazing Ceiling Wall Floor Basement Siab Perimeter Crawl Space Equipment
Packa e Area %� U-Factor� R-Value3 R-Value° R-ValueS Wall R-Values R-Value' Wall R-Valuee Efficien
1 8% 0.42 R-38 R-16 R-19 R-11 R-8 R-16 Normal
2 12% 0.40 R-49 R-21 R-19 R-10 R-9 R-17 Normal
3 12% 0.40 R-38 R-21 R-21 R-11 R-13 R-22 Normal
4 12% 0.35 R-38 R-19 R-19 R-10 R-8 R-17 Normal
5 15% 0.35 R-49 R-21 R-21 R-11 R-13 R-20 Normal
6 15% 0.30 R-49 R-18 R-19 R-10 R-8 R-16 Normal
7 18% 0.35 R-49 R-21 R-30 R-15 — -- Normal
8 18% 0.33 R-49 R-25 R-30 R-15 — R-25 Normai
9 18% 0.30 R-38 R-19 R-26 R-14 — — Normai
10 20% 0.30 R-49 R-26 R-21 R-11 R-12 R-19 Normal
�1]� 22% 0.30 R-49 R-22 R-30 R-15 -- -- Normal
12 " 25%o w" 0.25 R-49 R-19 R-30 R-15 — Normal
13 12% 0.65 R-38 R-18 R-19 R-10 R-4 R-22 High Heating
14 12% 0.50 R-38 R-13 R-19 R-9 R-4 R-20 High Heating
15 15% 0.55 R-38 R-17 R-21 R-11 R-7 -- High Heating
16 15% 0.40 R-38 R-13 R-19 R-9 R-3 R-18 High Heating
17 18% 0.50 R-49 R-19 R-21 R-11 R-7 R-28 High Heating
18 18% 0.40 R-38 R-17 R-15 R-8 R-2 R-14 High Heating
19 22% 0.40 R-38 R-19 R-21 R-11 R-6 R-28 High Heating
20 22% 0.35 R-38 R-13 R-26 R-12 R-13 -- Hi h Heatin
21 12% 0.65 R-38 R-17 R-19 R-10 R-4 R-22 High Heat/Cool
22 12% 0.50 R-38 R-13 R-19 R-9 R-3 R-19 High Heat/Cool
23 15% 0.55 R-38 R-19 R-19 R-10 R-4 R-22 High HeaUCool
24 15% 0.45 R-38 R-13 R-21 R-11 R-6 R-28 High Heat/Cooi
25 18% 0.45 R-38 R-17 R-19 R-10 R-4 R-22 High HeaUCool
26 18% 0.40 R-38 R-13 R-26 R-11 R-8 -- High HeaUCool
27 22% 0.40 R-49 R-18 R-19 R-10 R-4 R-22 High HeaUCool
28 22% 0.35 R-49 R-15 R-19 R-10 R-4 R-22 Hi h HeaUCool
Zone 16 Single-Family Prescriptive Packages - 1998/2000/2003 IECC
MAXIMUM MINIMUM Heating/Cooling
Glazing Glazing Ceiling Wall Floor Basement Slab Perimeter Crawl Space Equipment
Packa e Area %' U-Factor� R-Value3 R-Value' R-Values Wali R-Value6 R-Value' Wall R-Value° Efficienc '
1 8% 0.42 R-38 R-16 R-19 R-16 R-8 R-16 Normai
2 12% 0.40 R-49 R-21 R-19 R-16 R-9 R-17 Normal
3 12% 0.40 R-49 R-19 R-21 R-18 R-12 R-20 Normal
4 12°k 0.35 R-38 R-19 R-19 R-16 R-9 R-17 Normal
5 15°k 0.35 R-49 R-21 R-21 R-18 R-14 R-20 Normal
6 18°� 0.33 R-49 R-25 R-30 R-19 - R-25 Normal
7 18°� 0.30 R-49 R-21 R-21 R-19 R-14 R-22 Normal
8 20% 0.30 R-49 R-26 R-21 R-19 R-12 R-19 Normal
9 22% 0.30 R-49 R-22 R-30 R-28 - -- Normal
10 25% 0.25 R-49 R-19 R-30 R-28 - - Normal
11 12°� 0.60 R-49 R-19 R-13 R-11 R-2 R-11 High Heating
12 12°k 0.50 R-38 R-13 R-19 R-15 R-3 R-18 High Heating
13 15% 0.60 R-49 R-19 R-21 R-19 R-7 R-28 High Heating
14 15% 0.45 R-49 R-13 R-19 R-16 R-4 R-20 High Heating
15 18% 0.50 R-49 R-18 R-21 R-19 R-6 R-28 High Heating
16 18°k 0.40 R-49 R-13 R-21 R-18 R-5 R-24 High Heating
17 22% 0.40 R-49 R-17 R-19 R-17 R-5 R-22 High Heating
18 22°� 0.35 R-49 R-19 R-13 R-11 R-2 R-11 Hi h Heatin
Zone 17 Single-Family Prescriptive Packages - 1998/2000/2003 IECC
Heating/Cooling
Giazing Glazing Ceiling Wall Floor Basement Slab Perimeter Crawl Space Equipment
0 1 3 4 5 6 _ 7 _ B
1 8% 0.42 R-38 R-16 R-19 R-16 R-11 R-16 Normal
2 12°k 0.40 R-49 R-21 R-19 R-16 R-11 R-17 Normal
3 12% 0.40 R-49 R-19 R-21 R-18 R-16 R-20 Normal
4 12°� 0.35 R-38 R-19 R-19 R-16 R-11 R-17 Normal
5 15°k 0.35 R-49 R-21 R-21 R-19 R-18 R-20 Normal
6 18% 0.33 R-49 R-25 R-30 R-19 - R-25 Normal
7 18% 0.30 R-49 R-21 R-21 R-19 R-18 R-22 Normal
8 20% 0.30 R-49 R-26 R-21 R-19 R-16 R-19 Nom�81
9 22% 0.30 R-49 R-22 R-30 R-28 - - Normal
o - -
11 12% 0.60 R-49 R-18 R-13 R-11 R-2 R-11 High Heating
12 12°k 0.50 R-38 R-15 R-15 R-13 R-2 R-14 High Heating
13 15% 0.60 R-38 R-21 R-21 R-19 R-8 R-28 High Heating
14 15% 0.45 R-49 R-13 R-19 R-16 R-5 R-19 High Heating
15 18°k 0.50 R-49 R-19 R-19 R-17 R-6 R-24 High Heating
16 18% 0.40 R-49 R-13 R-19 R-17 R-6 R-24 High Heating
17 22% 0.40 R-38 R-19 R-19 R-77 R-6 R-22 High Heating
o - -
Zone 11 Multifamily Prescriptive Packages - 1998/2000/2003 IECC
MAXIMUM MINIMUM Heating/Cooling
Glazing Glazing Ceiling Wall Floor Basement Slab Perimeter Crawl Space Equipment
Packa e Area %� U-Factor� R-Value3 R-Value` R-ValueS Wall R-Value6 R-Value' Wall R-Value° Effcien 9
1 15% 0.70 R-38 R-13 R-11 R-6 R-0 R-6 Normal
2 15% 0.60 R-19 R-13 R-13 R-6 R-0 R-7 Normal
3 20% 0.60 R-38 R-13 R-15 R-8 R-2 R-11 Normal
4 20% 0.50 R-26 R-13 R-11 R-5 R-0 R-6 Normal
5 25% 0.52 R-30 R-13 R-11 R-5 R-0 R-6 Normal
6 25°k 0.50 R-30 R-13 R-19 R-9 R-5 R-15 Normal
7 25% 0.45 R-49 R-13 R-11 R-5 R-0 R-6 Normal
8 25% 0.40 R-26 R-11 R-11 R-6 R-0 R-6 Normal
9 30% 0.45 R-38 R-18 R-13 R-6 R-2 R-8 Normal
10 30% 0.45 R-38 R-13 R-19 R-10 R-8 R-18 Normal
11 30% 0.40 R-26 R-11 R-19 R-9 R-4 R-14 Normal
12 30% 0.35 R-26 R-13 R-11 R-5 R-0 R-5 Normal
13 15% 0.90 R-19 R-11 R-11 R-5 R-0 R-6 High Heating
14 20% 0.75 R-26 R-11 R-11 R-5 R-0 R-7 High Heating
15 25% 0.65 R-38 R-11 R-11 R-5 R-0 R-7 High Heating
16 25% 0.60 R-26 R-11 R-11 R-5 R-0 R-6 High Heating
17 30% 0.60 R-26 R-13 R-19 R-8 R-2 R-19 High Heating
18 30% 0.55 R-26 R-11 R-13 R-6 R-0 R-10 Hi h Heatin
19 20% 0.75 R-19 R-11 R-13 R-6 R-0 R-9 High HeaUCool
20 25% 0.65 R-30 R-11 R-11 R-5 R-0 R-7 High HeaUCool
21 25% 0.60 R-19 R-11 R-11 R-5 R-0 R-7 High HeaUCool
22 30°� 0.60 R-38 R-13 R-13 R-6 R-0 R-9 High HeaUCool
23 30% 0.55 R-19 R-13 R-13 R-6 R-0 R-10 Hi h HeaUCool
Zone 13 Muitifamily Prescriptive Packages -1998/2000/2003 IECC
MAXIMUM MINIMUM Heating/Cooling
Glazing Glazing Ceiling Wall Floor Basement Slab Perimeter Crawl Space Equipment
Packa e Area %' U-Factor� R-Value3 R-Value4 R-ValueS Wall R-Values R-Value' Wall R-Value° Efficien 9
1 12% 0.75 R-30 R-13 R-15 R-7 R-2 R-9 Normal
2 12% 0.55 R-19 R-13 R-11 R-5 R-0 R-6 Normal
3 15% 0.70 R-38 R-13 R-19 R-9 R-6 R-16 Normal
4 15°Jo 0.50 R-26 R-13 R-11 R-5 R-0 R-5 Normai
5 20°k 0.60 R-49 R-17 R-15 R-8 R-2 R-11 Normal
6 20% 0.50 R-26 R-13 R-19 R-9 R-5 R-14 Normal
7 25% 0.51 R-30 R-13 R-19 R-10 R-7 R-16 Normal
8 25% 0.50 R-49 R-19 R-15 R-8 R-2 R-11 Normal
9 25°/a 0.40 R-38 R-13 R-13 R-6 R-2 R-8 Normal
10 30% 0.44 R-38 R-19 R-19 R-10 R-8 R-18 Normal
11 30% 0.40 R-38 R-13 R-21 R-11 R-12 R-22 Normal
12 12% 0.90 R-19 R-11 R-11 R-4 R-0 R-5 High Heating
13 15% 0.90 R-26 R-13 R-11 R-6 R-0 R-8 High Heating
14 15% 0.75 R-19 R-11 R-11 R-5 R-0 R-5 High Heating
15 20% 0.70 R-30 R-13 R-11 R-5 R-0 R-7 High Heating
16 20% 0.60 R-19 R-11 R-11 R-5 R-0 R-6 High Heating
17 25% 0.65 R-30 R-13 R-19 R-9 R-4 R-22 High Heating
18 25% 0.55 R-26 R-11 R-11 R-6 R-0 R-8 �High Heating
19 30% 0.50 R-38 R-13 R-11 R-5 R-0 R-7 Hi h Heatin
Zone 15 Multifamily Prescriptive Packages - 199812000/2003 IECC
MAXIMUM MINIMUM Heating/Cooling
Glazing Glazing Ceiling Wall Floor Basement Slab Perimeter Crawl Space Equipment
Packa e Area %' U-Factor� R-Value3 R-Value" R-ValueS Wall R-Value6 R-Value' Wail R-Value° Efficienc B
1 12% 0.60 R-49 R-18 R-19 R-11 R-9 R-18 Normal
2 12% 0.45 R-49 R-13 R-19 R-10 R-8 R-16 Normal
3 15% 0.50 R-49 R-19 R-19 R-11 R-9 R-18 Normal
4 15% 0.35 R-38 R-13 R-19 R-10 R-7 R-16 Normal
5 20% 0.40 R-49 R-21 R-19 R-11 R-10 R-18 Normal
6 25% 0.35 R-38 R-16 R-19 R-11 R-9 R-18 Normal
7 25% 0.35 R-49 R-24 R-21 R-12 R-18 R-24 Normal
8 25% 0.30 R-49 R-16 R-19 R-10 R-8 R-16 Normal
9 30% 0.32 R-49 R-21 R-30 R-18 - - Normal
10 30% 0.30 R-49 R-25 R-21 R-12 R-16 R-24 Normal
11 12% 0.70 R-38 R-13 R-13 R-7 R-2 R-10 High Heating
12 12°k 0.60 R-26 R-13 R-11 R-6 R-2 R-8 High Heating
13 12% 0.50 R-19 R-13 R-11 R-6 R-0 R-7 High Heating
14 15% 0.65 R-38 R-11 R-21 R-12 R-12 - High Heating
15 15% 0.60 R-38 R-13 R-15 R-8 R-2 R-12 High Heating
16 15% 0.50 R-30 R-13 R-11 R-6 R-0 R-7 High Heating
17 20°� 0.50 R-30 R-13 R-19 R-11 R-8 -- High Heating
18 25% 0.50 R-49 R-18 R-19 R-11 R-7 - High Heating
19 25% 0.40 R-38 R-13 R-15 R-8 R-2 R-15 High Heating
20 30% 0.40 R-49 R-18 R-15 R-8 R-2 R-15 Hi h Heatin
Zone 16 Multifamily Prescriptive Packages - 1998/2000/2003 IECC
Heating/Cooling
Glazing Giazing Ceiling Wall Floor Basement Slab Perimeter Crawl Space Equipment
0 1 3 4 5 6 7 8
1 12% 0.55 R-49 R-19 R-15 R-12 R-3 R-11 Normal
2 12% 0.45 R-49 R-19 R-11 R-8 R-2 R-6 Normal
3 15% 0.50 R-49 R-19 R-19 R-17 R-10 R-18 Normal
4 15% 0.35 R-38 R-13 R-19 R-16 R-8 R-16 Normal
5 20% 0.40 R-49 R-19 R-21 R-19 R-16 R-22 Normal
6 25% 0.35 R-38 R-16 R-19 R-17 R-10 R-18 Normal
7 25% 0.35 R-49 R-24 R-21 R-20 R-19 R-24 Normal
8 30% 0.32 R-49 R-21 R-30 - - - Normal
0
10 12°k 0.70 R-30 R-13 R-13 R-11 R-2 R-11 High Heating
11 12% 0.60 R-26 R-13 R-11 R-8 R-0 R-7 High Heating
12 15% 0.65 R-30 R-13 R-19 R-19 R-7 R-28 High Heating
13 15% 0.50 R-38 R-11 R-11 R-8 R-0 R-7 High Heating
14 20% 0.50 R-30 R-13 R-19 R-18 R-6 R-26 High Heating
15 20% 0.40 R-38 R-11 R-11 R-8 R-0 R-7 High Heating
16 25°k 0.45 R38 R-15 R-19 R-19 R� R-28 High Heating
17 25% 0.35 R-38 R-13 R-11 R-8 R-0 R-7 High Heating
18 30% 0.40 R-38 R-19 R-15 R-13 R-2 R-15 High Heating
0
Zone 17 Multifamily Prescriptive Packages - 1998/2000/2003 IECC
MAXIMUM MINIMUM Heating/Cooling
Glazing Giazing Ceiling Wall Floor Basement Slab Perimeter Crawl Space Equipment
Packa e Area °�� U-Factor� R-Value' R-Value° R-Values Wall R-Value6 R-Value' Wall R-Value° E�cien 9
1 12% 0.40 R-38 R-25 R-19 R-17 R-14 R-18 Normal
2 12% 0.30 R-38 R-16 R-19 R-16 R-11 R-16 Normal
3 15% 0.35 R-49 R-25 R-19 R-17 R-14 R-18 Normal
4 15% 0.30 R-38 R-21 R-19 R-16 R-12 R-17 Normal
5 12% 0.65 R-49 R-18 R-15 R-13 R-3 R-14 High Heating
6 12% 0.50 R-30 R-13 R-19 R-18 R-8 R-26 High Heating
7 12% 0.45 R-30 R-13 R-15 R-13 R-3 R-15 High Heating
8 15% 0.50 R-38 R-17 R-15 R-13 R-3 R-14 High Heating
9 15% 0.40 R-38 R-13 R-15 R-13 R-3 R-14 High Heating
10 20°� 0.40 R-38 R-18 R-15 R-14 R-3 R-15 High Heating
11 20% 0.35 R-38 R-19 R-11 R-9 R-2 R-8 High Heating
12 25% 0.35 R-38 R-23 R-i5 R-14 R-3 R-15 Hi h Heatin
FOOTNOTES:
' Glazing area is the ratio of the area of the glazing assemblies (including sliding-glass doors, skylights, and basement windows
but excluding opaque doors) to the gross wall area, expressed as a percentage. Up to 1% of the total allowed glazing area
may be excluded from the U-value requirement. For example, 3 ft2 of decorative glass may be excluded from a building
design with 300 ftZ of glazing area.
Z Glazing U-factors must be tested and documented by the manufacturer in accordance with the National Fenestration Rating
Council (NFRC) test procedure or taken from the glazing U-factor table in Appendix B. Center-of-glass U-factors cannot be
used.
' The ceiling R-values do not assume a raised or oversized truss construction. If the insulation achieves the fuil insulation
thickness over the plate lines of exterior walis, R-30 insulation may be substituted for R-38 insulation and R-38 insulation may
be substituted for R-49 insulation. Ceiling R-values represent the sum of cavity insulation plus insulating sheathing (if used).
For ventilated ceilings, insulating sheathing must be piaced between the conditioned space and the ventilated portion of the
roof.
" Wall R-values represent the sum of the wall cavity insulation plus insulating sheathing (if used). Do not include exterior
siding, structural sheathing, and interior drywall. For example, an R-19 requirement could be met EITHER by R-19 cavity
insulation OR R-13 cavity insulation plus R-6 insulating sheathing. Wall requirements apply to wood-frame wall constructions.
Metal-frame wall or mass (concrete, masonry, log) wall equivalent R-values can be found in the Prescriptive Packages User's
Guide.
5 The floor requirements apply to floors over unconditioned spaces (such as unconditioned crawlspaces, basements, or
garages). Floors over outside air must meet the ceiling requirements.
6 Walls of conditioned basements below uninsulated floors must be insulated from the top of the basement wall to a depth of 10
ft below ground level or to the level of the basement floor, whichever is less. The entire opaque poAion of any individual
basement wall with an average depth Iess than 50% below grade must meet the same R-vatue requirement as above-grade
walis. Windows and sliding glass doors of conditioned basements must be included with the other glazing. Basement doors
must meet the door U-factor requirement described in Note b.
' The R-value requirements are for unheated slabs. Add an additional R-2 for heated siabs, except in Zone 1 which does not
require slab insulation. For packages with a slab insulation requirement, the insLlation must extend a total linear distance of
at least 24 in. in Zones 2-12 and 48 in. in Zones 13-17. The insulation must extend 1) down from the top of the slab, or
2) down from the top of the slab to the bottom of the slab and then horizontally underneath the slab, or 3) down from the top
of the slab to the bottom of the slab and then horizontally away from the slab, with pavement or at least 10 in. of soil covering
the horizontal insulation.
e The crawl space wall R-value requirements are for walls of unventilated crawl spaces. The crawl space wall insulation must
extend from the top of the wall (including the sill plate) to at least 12 in. below the outside finished grade. If the distance from
the outside finished grade to the top of the footing is less than 12 in., the insulation must extend a total vertical plus horizontai
distance of 24 in. from the outside finished grade.
' High Heating means a fumace AFUE of 90°� or more, or a heat pump HSPF of 7.8 or more. High Cooling means a SEER of
12 or more. High HeaUCool means both heating and cooling equipment must meet these minimum efficiencies. If you plan
to install more than one piece of heating equipment or more than one piece of cooling equipment, the equipment with the
lowest efficiency must meet or exceed the efficiency required by the selected package. The following Califomia counties do
not qualify for the cooling equipment credit: Alameda, Contra Costa, Los Angeles, Marin, Monterey, Napa, Orange, San
Benito, San Diego, San Francisco, San Luis Obispo, San Mateo, Santa Barbara, Santa Clara, Santa Cruz, Solano, Sonoma,
and Ventura.
NOTES:
a) Glazing areas and U-factors are maximum acceptable levels. Insulation R-values are minimum acceptable levels. R-value
requirements are for insulation only and do not include structural components.
b) Opaque doors in the building envelope must have a U-factor no greater than 0.35. Door U-values must be tested and
documented by the manufacturer in accordance with the NFRC test procedure or taken from the door U-factor table in
Appendix B. If a door contains glass and an aggregate U-factor rating for that door is not available, include the glass area of
the door with your windows and use the opaque door U-factor to determine compliance of the door. One door may be
excluded from this requirement (i.e., may have a U-factor greater than 0.35).
c) If a ceiling, wall, floor, basement wall, slab-edge, or crawl space wall component includes two or more areas with different
insulation levels, the component complies if the area-weighted average R-value is greater than or equal to the R-value
requirement for that component. Glazing or door components comply if the area-weighted average U-factor of all windows or
doors is less than or equal to the U-factor requirement (0.35 for doors). Use the R-Value/U-factor Weighted Average
Worksheet for these computations.
d) Hyphens (—) in any foundation column indicate that the package which contains the hyphens cannot be used with the
indicated foundation type.
e) In Zones 1-7, the area-weighted average SHGC value of all glazing c8nnot exceed 0.4. SHGC vatues must be determined in
accordance with the NFRC test procedure or taken from the default SHGC table in Appendix B.