Loading...
HomeMy WebLinkAboutB07-0131TOWN OF VAIL 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-213 8 NOTE: DEPARTMENT OF COMM DEVELOPMENT . ~c~-~0~~ THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Permit #: B07-0131 Project #: ? ? ~~ S~5 --65 ~~ Job Address.: 1190 CASOLAR DEL NORTE DR VAIL Status.....: ISSUED Location......: 1190 CASOLAR DEL NORTE DRIVE UNIT 'B' Applied...: 05/08/2007 Parcel No....: 210312101007 Issued ...: 07/19/2007 Expires...: O 1 /15/2008 OWNER BERINGAUSE, ERIC H. 05/08/2007 223 SHERWOOD LN STERLING NJ 07980 ARCHITECT FRITZLEN PIERCE ARCHITECTS 05/08/2007 Phone: 970-476-6342 1650 EAST VAIL VALLEY DR, #C-1 VAIL CO 81657 License: 0000001402 APPLICANT NEDBO CONSTRUCTION 05/08/2007 Phone: 970-845-1001 P.O. BOX 3419 VAIL CO 81658 License: 251-A CONTRACTOR NEDBO CONSTRUCTION 05/08/2007 Phone: 970-845-1001 P.O. BOX 3419 VAIL CO 81658 License: 251-A Desciption: ADD ELEVATOR, CHANGE STAIRCASE, ADD SQUARE FOOTAGE, REMODEL KITCHEN AND BATHS, EXTERIOR LANDSCAPING AND NEW ROOF Occupancy: R-3 Type Construction: VB Valuation: $500,000.00 Revision Valuation: ?? Total Sq Ft Added: 694 ****************************************** ************************** FEE SUMMARY ************************************************************ Building---> $3, 233.75 Restuarant Plan Review--> $o . 00 Total Calculated Fees--> $5, 546.69 Plan Check---> $ 2 , 101.94 Recreation Fee-----------> $ 2 o e . 2 o Additional Fees----------> So.oo Investigation-> $0 . oo TOTAL FEES-------------> $5,546.89 Total Permit Fee--------> $5, 546.89 Will Call---> $ 3. o o Payments-----------------> $ 5, 5 4 6. 6 9 BALANCE DUE--------> $ 0 . 0 0 ************************************************************************************************************************************************* Approvals: Item: 05100 BUILDING DEPARTMENT 06/01/2007 jplano Action: CR SEE CORRECTION LETTER, F:\cdev\CHRIS\PERMIT.COMMENTS\B07-0131\B07-0131.DOC 07/13/2007 jplano ® Action: AP CORRECTIONS. RECEIVED AND APPROVED Item: 05400 PLANNING DEPARTMENT 05/11/2007 Warren Action: DN Awaiting a revised site plan that does not have all the unapproved retaining walls, spa, fire pit, etc. This should arrive the week of May 14th. 06/06/2007 Warren Action: DN permit set shows a new entry that wa DRB. A DRB change to approved plans coming in. Planning cannot sign off giving on the changes. 07/17/2007 Warren departmetn has approved Item: 05600 FIRE DEPARTMENT 05/14/2007 JJR 05/16/2007 JJR 5/14/07. The building s not approved by application will be till DRB approval is Action: AP The planning the revisions. Action: AP See conditions. Action: AP Site plan revision Item: 05500 PUBLIC WORKS 05/11/2007 gc bottom of retaining walls. Provide a staging plan. Show limits of disturbance Provide an erosion control .Provide a site plan at 10 07/13/2007 gc foot. Action: DN Call otu topo and fence. plan. scale. Action: AP No walls over 4 See Conditions page of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN AI)7JiANCE,~Y T~ EP~ lyE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM 4 PM. /J ~~ TURF OF OW~¢$I~OR CONTRACTOR FOR HIMSELF AND OWNER 0 • ******************************************************************************************************** CONDITIONS OF APPROVAL Permit #: B07-0131 as of 07-19-2007 Status: ISSUED ******************************************************************************************************** Permit Type: ADD/ALT MF BUILD PERMIT Applied: Applicant: NEDBO CONSTRUCTION 970-845-1001 To Expire Job Address: 1190 CASOLAR DEL NORTE DR VAIL Location: 1190 CASOLAR DEL NORTE DRNE UNIT 'B' Parcel No: 210312101007 Description: ADD ELEVATOR, CHANGE STAIRCASE, ADD SQUARE FOOTAGE, REMODEL KITCHEN AND BATHS, EXTERIOR LANDSCAPING AND NEW ROOF 05/08/2007 Issued: 07/19/2007 01/15/2008 ***********************************************Conditions:********************************************* Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: CON0008940 Fire sprinkler system required and shall comply with NFPA 13R(2002) and VFES standards. Cond: CON0008941 Monitored fire alarm system required aand shall comply with NFPA 72(2002) and VFES standards. • TOWN OF VAIL, COLORADO Statement ***********+*********+** *r~«**********************+**«***********************r************** Statement Number: 8070001285 Amount: $3,546.89 07/19/200712:08 PM Payment Method: Check Init: LC Notation: #32100/NEDBO CONSTRUCTION - ------------------ Permit No: ---------------------------------------------------------- B07-0131 Type: ADD/ALT MF BUILD PERMIT Parcel No: 2103-121-0100-7 Site Address: 1190 CASOLAR DEL NORTE DR VAIL Location: 1190 CASOLAR DEL NORTE DRIVE UNIT ~B~ Total Fees: $5,546.89 This Payment: $3,546.89 Total ALL Pmts: $5,546.89 Balance: $0.00 ************************ **~*****+*****+******************r******************************~*** ACCOUNT ITEM LIST: Account Code ------------------ Description Current Pmts --- ------- BP 00100003111100 ----------------------- ------------ BUILDING PERMIT FEES 3,233.75 PF 00100003112300 PLAN CHECK FEES 101.94 RF 11100003112700 RECREATION FEES 208.20 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 75 S. Frontage Rd. Vail, Cobiado 81657 old .~~2 !t~ /00 ~ are Job Name: f~~~,,~~~. fe ~5'~/~-vG~2 Le9a1 Descriptioh Lot:. G ~ Block; Filing: for or `JS- o ~, ~ etc.! Job Address: !! g~ ~fsf~2 ~'L Riov1.~ Subdivision: C()~liC./1 /P i/~4/L - _- .. _ _,,,,.a. ,.,, . Haaress: /~-p !/~ ~~ v.~c.u r .01 Phone: ~ '/ c~ ~?6 -a6 3 yZ Engineer:? r.~ /Jrr y~ Address: /~s~a v,~~~ vgt~,e y ~,y~ _ Phone: Detail descxiption of work: ,~j ~~Ii.97~ C 5'f76 ~/ 7 a Irr ~crravtJ ,~.~3ArHS ~~ ~ '~- •SY.9~/1c-Qd~~ ~ I~•,yJ ~S'4 F~ ~~ ~'-r-a: f T?2~u~1 ~CA..d~,SG,rs~/~-rs_ /1/,GsN /1p u~ / -Work Class: New O Addition ( ) Remodel Repair ( ) Demo ( ) Other ( ) Work TYPe~ interior ( ) Exterior ( ) Both Does. an EHU exist at this location: Yes ( ) No ( ) Type of Bidg.: Single-family ( ) Two-family ~ Multi-family ( ) Commercial. ( ) Restaurant OfirO No. of Existi~ Dw~ling Units in this buiidin9: ~ No. of Accommodation Units in this !wilding: „~ ~YPe of Firepia~ces Existing: Gas Appliances (1) Gas Logs ( ) Wood/Peilet ()Wood Bumina ( 1 a OR OFFICE USE ONL ~~~~~~ C~C~L~OdC D f~s~er,rns~~l~Wu~ ooc L - -. 4 APPLICA WILL h~OT BE ACCEPTED IF INCOM OR UN ,~ 3 s~ ~ .8s Page 1 of 16 ozros~ . G'di]liaari f Pi~~a e, An hitc~ l~~un (~c'a~clall Dire .~~i .~i,~r: I~itE~ctiirt~ Ka1fi~. It:~~!in,;a C)•,'ic :~f;inca4;~ + LETTER OF TRANSMITTAL Date: Friday, June 29, 2007 To: TOV Building Dept. Attn: John Plano From: James Ohlson Re: Beringause Attached Please Find: Progress Prints Specifications x Plans Shop Drawings x Other ~J D TOWN OF VAIL QG~ G~'M Item No. No. of Co ies Descri tion 1 3 Revised sets of drawin s 2 1 Rescheck 3 1 Letter with comments on revisions 4 1 GA listin for 1 hr. fire rated wall The Items Listed Above Are: For Review and Comments x For Your Use x As Requested Returned After Review Other Remarks: FRITZLEN i v>C I_a,i A ' \ a;Ir ~ [ )rivt~, l ~ <~ PIERCE fail,-d~~.'.~i,7r~5- f, ~, } . F' 9 ~'~, - l'r~ _.~..,,~.,, ~ I~>r_b. xn h t ~;,, brut ;,~u~~ Pn ~~~~_~, vr,lt?llc~~;~. C ~r3z <F,u>~rdan~c I(}\;fjG '~~ i°-I cans )uI-~ii flan,, d+,r FRITZLEN ~ERCE ARCHIT ECTS VAIL, COLORADO T~'n of Vall OFFlCECOPY ~' '' ~"``~` 11` ;~r`1"'`~``~ FRITZLEN ~RCE AR RITE T 1rUilliaan I~ Ei~~rcc, ~~r nite~t C C S T~u,n Ih~arcl„t( 7?iri.:~~~ oi:~lr~ Ii 1_•clt~ff' VAIL, COLORADO Kaiht FIr°~lin~;., Ojrt ~ '~9a3xt~;er To: John Plano I.C.C. Plans Examiner Town of Vail Building Safety and Inspection Services 970-479-2140 iplano@vailgov.com From: James Ohlson Fritzlen Pierce Architects Project Manager 970-476-6342 johlsonCa?vailarchitects.com Date: Permit #: Owners Name: Site Address: Occupancy Group: Type of Construction June 26, 2007 B07-0131 Beringause 1190 Casloar Del Norte R-3 VB Response to Building Safety and Inspection Services Plan Review Comments: 1. The attached survey shows the property lines of the subdivision as well as the amended building envelope locations. There are no property lines dividing the building lots. 2. The revision to drawing A201 shows a new wall being added to the east wall of new garage and the GA listing and detail on the sheet. 3. Door swing on door 1/212 has been changed so that door does not swing over the proposed ramp 4. See attached sheet 5. See revised sheet S1 6. See ST101 and L-1 through L-3 for these comments. These plans have been delivered directly to George C. at the Public Works Department. FRITZLEN 1 E>>n [a~i \ ail ~ ~!~~t Uri~r~, I i Irirl~e (_' PIERCE \;"ail,(~~~; ~I,' ~, ca-,~ ~ t. ~a a I n' rct~ir~ ~ t~ ~ ~,m WALLS AND INTERIOR PARTITIONS,. WOOD-FRAMED GA FILE NO. WP 3445 PROPRIETARY * 1 HOUR GYPSUM WALLBOARD, WOOD STUDS, FIRE MINERAL FIBER INSULATION, FIBER-CEMENT BOARD, CERAMIC TILE One layer s/a" proprietary type X gypsum wallboard applied parallel on ONE SIDE of 2 x 4 wood studs 16" o.c. with 17/a" smooth shank nails, 0.093" shank, 0.284" heads, 7" o.c. 3Vz" mineral fiber insulation 3.0 pcf, friction fit in stud space. OPPOSITE SIDE: One layer she" proprietary fiber-cement board applied parallel to studs with 1 Vs" galvanized roofing nails 6° o.c. Ceramic tile, s/te" thick, joints grouted, installed Thickness: 5° with latex-modified portland cement mortar. Approx. Weight: 10 psf Rating based on the lesser of loading to 800 Ibs per stud or 31% of full design toad. Fire Test: OPL 11710-92851, 9-9-92 (LIMITED LOAD-BEARING) PROPRIETARY GYPSUM BOARD BPB America Inc. - s/e" ProRocTM~ Type X Gypsum Panels GA FILE NO. WP 3510 I GENERIC 1 HOUR 35 to, 39-STC ' GYPSUM WALLBOARD, WOOD STUDS FIRE SOUND One layer 5/e" type X gypsum wallboard or gypsum veneer base applied parallel or at right angles to each side of 2 x 4 wood studs 24" o.c. with 6d coated nails, 1~/s" long, 0.0915" shank, Va" heads, 7" o.c. Joints staggered 24" on opposite sides. (LOAD-BEARING) Thickness: 4~/s" Approx. Weight: 7 psf Fire Test: UL R3501-47, -48, 9-17-65, Design U309; UL R1319-129, 7-22-70, UL Design 0314 Sound Test: NGC 2404, 10-14-70 'GA"F-LE NO: WP'3514 I ~~ENERIC ~ - GYPSUM WALLBOARD, wooD sruDS FIRE SOUND ~e layer a/e" type X gypsum wallboard or gypsum veneer base applied parallel or at right angles to each side of 2 x 4 wood studs 16° o.c. with 1~/a" Type W drywall screws 12" o.c. nts staggered 16" on opposite sides. (LOAD-BEARING) Thickness: 43/a" Approx. Weight: 7 psf Fire Test: SWRI 01-4511-619, 8-19-92 Sound Test: See WP 3520 (G&H NG-246FT, 7-2-65) GA' FILE NO'. WP 3520 GENERIC 1. HOUR 35 ~0 39 STG GYPSUM WALLBOARD, WOOD STUDS FIRE - SOUI~ID One layer 5/e" type X plain or predecorated gypsum wallboard applied parallel to each side of 2 x 4 wood studs 24" o.c. with. 6d coated nails, 1~/e" long, 0.0915" shank, ~/a" heads, 7" o.c. at joints and top and bottom plates and a/s" beads of adhesive at intermediate studs. Joints staggered 24" on opposite sides. (LOAD-BEARING) Thickness: 4~/a" Approx. Weight: 7 psf Fire Test: FM WP 90, 8-21-67 Sound Test: G&H NG-246FT, 7-2-65 GA-600-2003 t Contact the manufacturer for more detailed information on proprietary products. 57 L`! I Project Title: Beringause Residence Report Date: 05/23/07 Data filename: K:\0505 -Beringause\Project Notebook\Beringause Residence.rck REScheck Software Version 4.0.1 Compliance Certificate Energy Code: 2003 IECC Location: Vail, Colorado Construction Type: Single Family Glazing Area Percentage: 20% Heating Degree Days: 9248 Construction Site: 1190 A Caslor del Norte Dr Vail, CO 81657 Owner/Agent: James Ohlson Fritzlen Pierce Architects 1650 East Vail Valley Dr. #C-1 Vail, CO 81657 970-476-6342 johlson ~ vailarchitects.com Designer/Contractor: Rollie Kjesbo Nedbo Construction 40690 HWY 6 & 24, Suite D Avon, CO 81620 970-845-1001 rollie ~ nedbo.com Ceiling 1: Cathedral Ceiling (no attic): 852 38.0 21.0 14 Skylight 1: Metal Frame with Thermal Break:Double Pane with 24 0.480 12 Low-E: Wall 1: Wood Frame, 16" o.c.: 1600 21.0 0.0 71 Window 1: Wood Frame:Double Pane with Low-E: 200 0.350 70 Door 1: Solid: 42 0.320 13 Door 2: Glass: 112 0.350 39 Floor 1: All-Wood Joist/Truss:Over Outside Air: 621 38.0 21.0 11 Floor 2: Slab-On-Grade:Heated: 105 28.0 67 Insulation depth: 4.0' Floor 3: Slab-On-Grade:Unheated: 149 28.0 95 Insulation depth: 4.0' Compliance Statement. The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2003 IECC requirements in REScheck Version 4.0.1 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name -Title Signature Date Project Notes: Owner: Eric Beringause Beringause Residence Page 1 of 4 Compliance: Passes Maximum UA: 393 Your Home UA: 392 --> 0.3% Better Than Code (UA) 1~A'N~~AIL • Department of Community Deve%pment Building safety and Inspection Services 755ouifi Fronbge Road jai/, Co%rddo 8i6s7 970-479 2138 FAX 970-479 2452 www. vai/gov.com BUILDING SAFETY AND INSPECTION SERVICES PLAN REVIEW COMMENTS• TO: Contractor/Applicant Nedbo Construction FAX/Email #: rollie@nedbo.com NUMBER OF PAGES: FROM: DATE: BUILDING PERMIT #: OWNERS NAME: SITE ADDRESS: OCCUPANCY GROUP: TYPE OF CONSTRUCTION: NUMBER OF STORIES: BUILDING AREA: Architect Fritzlen Pierce prof#0505 476-4901 2 John Plano, Building Plans Examiner 06/01/2007 607-0131 Beringause 1190 Casolar Del Norte R-3 VB The documents submitted for this project have been reviewed for compliance with the 2003 International Building Code, 2003 International Residential Code, 2003 International Mechanical Code, 2003 International Fuel Gas Code, 2003 International Plumbing Code, 2003 International Energy Conservation Code and 2005 National Electrical Code as modified and adopted by the Town of Vail. The fo/%wing comments wi//need to be addressed prior i~v issuance ofa bui/ding permit: For processing: • Please submit four complete sets of revised construction documents containing the requested information with all elan revision items clouded or otherwise identified. Partial plan sets or loose plan sheets are not accepted. • Please respond in writing to each comment by marking the attached list or creating a response letter. Indicate which plan sheet, detail, specification, or calculation shows the requested information. Please send revisions to the attention of the plans examiner with the building permit application number noted. • Please be sure to include on the resubmittal the engineer's or architect's "wet" stamp signature registration number and date on the cover page of any structural calculations all structural details and structural sheets of the plans For commercial or multi-famil r~projects all sheets of the plans must be stamped. ~SvR~~~ Building Deuartment Comments: rJ~ ~rovide a survey or copy of the plat showing a act location of all property lines. Amend site plan and floor plans to show location of the existing property line between dwelling units. Provide party wall detail. Common walls adjacent to property line shall consist of (2) 1 hour wall assemblies per the IRC section R302, "Location on Lot" provisions. Provide a UL or gypsum association listing for the 1 hour wall assemblies. The new garage walls are in question. Door 1/212 is shown swinging over a step. Doors are not allowed to swing over a step. Please change the drawings accordingly. (IRC R311.4) ~4 Provide a ResCheck report verifying the addition meets energy requirements. (IRC Chapter il) ~dd a pad schedule to the structural plans or supply a engineer stamped pad schedule that can be attached to the plans. `-~ Public works has comments to be addressed. Please contact them directly at 477-3507. Please refer to the cover sheet for information on resubmitting plans. In order to avoid delays in issuance of a permit, please check ~1 requested infont~ation is included with the resubmitted plans. Please submit revised plans as a complete set Partial plan resubmittals will not be reviewed. John Plano I.C.C. Plans F~caminer Town of Vail Building Safety and Inspection Services 970.479.2140 jplano@vailgov.com F: \Cdev\CHRIS\PERMIT.COMMENTS\607-0131\807-0131. DOC • L`! I REScheck Software Version 4.0.1 Compliance Ce~~i#icate Project Title: Beringause Residence Report Date: 05!23107 Data filename: K:10505 -Beringause\Pro}ect Notebookl8eringause Residerce.rck Energy Code: 20031ECC Looation: Vail, Colorado Construction Type: Single Family Glazing Area Percentage: 20°0 Heating Degrae Days: 9248 Construction Site: Owner/Agent: Designer/Contractor: 1190 A Castor del Norte Dr. James Ohlson Holiie Kjesbo Vail, CO 81657 Fritzlen Pierce Architects PvEdbo Canstrur_4ien 1650 East Vail Valley Dr. BC-1 40690 HWY 6 & 24, Suite D Vail, CO 81657 r'1von, CO 8 i 620 970-476-6342 970-845-1001 johlsonwailarchitects.com roilie~nedbo.~~m . • . . i ..- Ceiling 1: Cathedral Coiling (no attic): 852 38.0 21.0 14 Skylight 'I: Metal Frame with Thermal Break:Double Pane with 24 0.480 12 Low-E: Wall 1: Wood Frame, 16" o.c.: 1600 21.0 0.0 71 Window 1: Wood Frame:Double Pane with Low-E: 200 0.350 70 Door 1: Solid: 42 0.320 1 Door 2: Glass: 112 0.'350 39 Floor 1: All-Wood Joist/Truss:Over Outside Air: 621 3fi.0 21.0 11 Floor 2: Slab-On-Grade:Heated: 105 ?_8.0 67 Insulation depU1: 4,0' Floor 3: Slab-On-Grade:Unheated: 149 28.0 95 Insulation depth: 4.0' Cvntpiiance Statement: Tho proposed buiidiny design described here is consistent wiili ti:e building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to sleet the 2003 IECC requirements in RGScheck Version 4.0.1 and to comply with the mandatory requirements listed in ttie A~~Sch2ck Inspection Ciiecl<list. Name -Title Signature Date Project Notes: Owner: Eric Beringause - _ _-- Beringause Residence Page 1 of 4 ~`~.. :~ . ******************************************************************************************** TOWN OF VAIL, COLORADO Statement ******************************************************************************************** Statement Number: 8070000647 Amount: $2,000.00 05/08/200710:47 AM Payment Method: Check Init: JS Notation: 15080/NEDBO CONSTRUCTION ----------------------------------------------------------------------------- Permit No: B07-0131 Type: ADD/ALT MF BUILD PERMIT Parcel No: 2103-121-0100-7 Site Address: 1146 SANDSTONE DR VAIL Location: 1190 CASOLAR DEL NORTE DRIVE UNIT ~B~ Total Fees: $5,338.69 This Payment: $2,000.00 Total ALL Pmts: $2,000.00 Balance: $3,338.69 ******************************************************************************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ PF 00100003112300 PLAN CHECK FEES 2,000.00 t Questions? Call the Building Team at 479-2325 T~'~`' ~ Buildin4 Permit Submittal Checklist Department of Community Development Project Name: l3«iti~ Avis ~~7 Si~~~l,c Project Address: _ //old ~ C.9SGL/~ic. ~~ ~ /l~a2i2 i~2/~2 / This Checklist must be completed before a Building Permit apulication is accepUe~d, ~6-All pages of application is complete -~~Has DRB approval obtained (if required) Provide a copy of approval form flan Check Fee required at submittal for projects valued over $100,000.00 (see attached fee schedule) `Complete site plan submitted ^ Public Way Permit application included if applicable (refer to Public Works checklist) ~taging plan included (refer to Public Works checklist) No dumpster,oarkina or material storage allowed on roadways and shoulders without written approval o Asbestos test and results submitted if demolition is occurring ~ Architect stamp and signature (All Commercial and Multi family) dull floor plans including building sections and elevations(3 sets for remodels, 4 sets of plans for SFR wand Duplex, 5 sets of plans for Multi-Family and Commercial Buildings) ~ Window and door schedule -c~Full structural plans, including design criteria (i.e.loads) ^ Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) ^ Soils Report must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated smoke detectors shown on plans Types and quantity of fireplaces shown /~ z~~ic.-~~`"" Applicants Signature: Date of submittal: Received By: 0 F:kdev\FDRNIS\Permits\Building\building~ermitDOC Page 2 of 16 02/09/2005 • e i ~~oFV~ ASBESTOS TESTING REQUIREMENTS THE TOWN OF VAIL AND STATE OF COLORADO DEPARTMENT OF PUBLIC HEALTH REQUIRE ASBESTOS TESTING ANY TIME WHEN MORE THAN 160 S.F. OF MATERIAL WILL BE DISTURBED OR REMOVED. AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION FOR ALL REMODEL, ADDITION OR OTHER PROJECTS INVOLVING ANY DEMOLITION OR REMOVAL OF BUILDING MATERIALS THAT MAY CONTAIN ASBESTOS. BUILDINGS CONSTRUCTED AFTER OCTOBER 12, 1988 THAT HAVE NO ASBESTOS CONTAINING MATERIALS ARE EXEMPT. A COPY OF THE REPORT MUST BE SUBMITTED W1TH YOUR BUILDING PERMIT APPLICATION • I have included the asbestos test and report with my building permit application applicant OR date z • I certify my project will not disturb or remove more than 160 s.f. of building material. The construction plans submitted with my application clearly indicate this information. (This will be verified during plan review, and will delay your project if found to be inaccurate) applipnt signature OR date • The building was constructed after October 12, 1988. The date of construction was applicant signature date original wnstruction date F:\cdev\FORMS\Permits\Building\building~ermit.DOC Page 4 of 16 02/09/2005 '1~N'Nf~VA1L WHEN A "PUBLIC WAY PERMIT" IS REQUIRED 0 PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A "PUBLIC WAY PERMIT": o Is this a new residence? YES NO_~ o Does demolition work being performed require the use of the Right-of-Way, easements or public property? .YES NO~_ o Is any utility work needed? YES NO ~ o Are there any improvements being done to the driveway? YES C NO ~iq~/~ `~~ o Is a different access needed to the site other than the existing driveway? YES, N0~_ o Is any drainage work being done that affects the Right-of--Way, easements, or public properly? YES NO_~ o Is a "Revocable Right-of-Way Permit' required? YES NO~~ o Is the Right-of-Way, ~a~ements or public property to be used for staging, parking or fencing? YES NO X If answer it NO, is a~king, staging or fencing plan required by Public Works? YES NO If you have answered YES to any of these questions, a "Public Way Permit' must be obtained. "Public Way Permit' applications may be obtained at the Public Works office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Works at 970-479-2198. I HAVER D AND ANSWERED ALL THE ABOVE QUESTIONS. Contractor nature Company Name Job or Project Name: ~~2i-yGsgJy~ ~2 Si~i,.~l~ Date Signed: c"S~~ z,~o`~ PRJ#:__-____ F:\cdev\FOftMS\Permits\Building\building._permit.DOC Page 7 of 16 _:. How it relates to Building Permits: - FII out the attached check list with the Building Permit Application. If yes was answered to any of the questions then a "Public Way" permit is required. You can pick up an application at either Community Development, located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. - Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective utilities prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. - A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This plan will expire on November 1~ and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. - Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a site plan for the job. - Submit completed application to the Public Works office for review. If required, locates will be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to perform. - The Public Works Construction Inspector will review the application and approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released 48 hours of being received, but please allow up to one (1) week to process. - As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit" with the "Building PermiY'. - NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15"'. Anew Public Way Permit is required each year if work is not complete. Re- application each November 15"' does not mean an automatic renewal. I hav d and understand the above. _ :~ Signat TUate Signed t 1C?WNdFY11CC F:\cdev\FORMS\Permits\Building\building~ermit.DOC Page 9 of 16 02/09/2005 MATERIAL STORAGE AND CONSTRUCTION PARKING Please read and check off each of the items below. (Copies of complete text are available upon request) CODE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED ^ Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or material upon any street, sidewalk, alley or public place, or any portion thereof. ^ Notice; Abatement: The Director of Public Works may notify and require any person who violates or causes another to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Works. In the event the person so notified does not comply with the notice within the period of time herein specified, the Director of Public Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed from any street or alley at the expense of the notified. ^ Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,. any person who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section 1-4-1 of this code. ^ Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of this Code. (1997 Code: Ordinance 6 (1979). CODES 7-3A-1 AND 7-3A-3: PARIQNG OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED ^ No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968) § 1) ^ Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) § 3: Ord. 28(1981) § 1) I have read and will comply with the above code provisions: U ~ /~ iT~~'S~ P'tN /° // Signa Position or Relationship to Project: ~~~ mil/?~L~Z (c~.~T~'1~GT~ Date Signed: F:/everyone/forms/bldperm7 F:\cdev\FORMS\Permits\Building\building~permit.DOC Page 11 of 16 02/09/2005 m I~ ~ A & D Aslbestos 7~esting and. Consulting John R. Peterman ~- P.O. Box 1230 Clifton, CO. 81520-1230 Cell 970-270-3689 Home Phone 970-464-5265 INSPECTION REPORT PREPARED FOR: Nedbo Construction P.O. Box 3419 Vail, CO. 81658 970-845-1001 LOCATION: Residence 1190 ~ Casolar DeI Norte Drive ~ Vail, CO. 81657 REPORT PREPARED B ~: John R. Peterman Inspector Manager Certificate No. 6601 2 g•d e~Z~OT GO TT add A & D Asbestos Testing and Consulting John R. Peterman Asbestos Testing, Project Design, and Consulting INTRODUCTION: On April 3rd, 2007 aninspection/survey was conducted and 9 bulk samples were collected from the: Residence 1190 A Casolar Del Norte Drive Vail, CO. 81657 The purpose of the inspection/survey was to locate and sample suspected Asbestos containing materials that aught be present in the area of the Residential Unit that is planned for renovation. The inspection was made, and the samples were collected by John R. Peterman, an A.H.E.R.A. and State of Colorado Certified Asbestos Inspector. Great care was taken during the inspection and sampling to be as accurate as possible. It should be noted that minimal damage was done to the existing building structures during the inspection so there is no documentation for unseen conditions or stored items. All samples were analyzed by DCM Science Lab in Wheatridge, CO. This laboratory is deemed "Proficient" in the E.P.A.Quality Assurance (QA) program for the determination of asbestos in bulk materials, and is accredited by the American Hygiene Association (AHA). SAMPLING PROTOCOL: A random sampling scheme was used to sample the suspect materials that were discovered. If during any future demolition or renovation work, suspect material is discovered that hasn't been sampled and would be disturbed, work should be halted until the material has been tested. ~•d et+Z =0T LO I T add C~ A & D Asbestos Testing and Consulting John R. Peterman AsbestosTesting, Project Design, and Consulting Residence 1190 A Casolar Del Norte Drive Vail, CO. 81657 RENOVATION AREA DESCRIPTION: 1190 A Casolar Del Norte Drive is planned for selective renovation. The exterior walls are covered with stucco, and wood siding; the soffit is exposed wood. The interior walls are covered in sheetrock with a texture applied to it. The ceilings are covered with sheetrock like the walls, and aspray-on texture in isolated areas. The floors are covered with carpet, and ceramic tiles. CONCLUSIONS & RECOMMENDATIONS: Laboratory analysis, of the bulk samples, indicate that no Asbestos was detected in any of the bulk samples. if the spray-on ceiling texture will be disturbed, additional samples would be required to properly document that the spray-on texture is NON-ASBESTOS. a g•d ebZ=OT GO TT add w J Q Z Z Z Z Z Z Z Z Z i i i i a0 ,, ~ 7 ~ 7 O x x x x x ttttt d 3 3 3 3 3 3 YYYYY ~+ x V V V V V 0 0 0 0 0 ~ d d m d ~ ~ Z Q/ Ql v v v a> d m a> a> C ~ ~ 7 ~ N f~fs~(L'a> W ~ •-. •.• a~ a~ m m m V ~ ~ .. N = = = •" O v c L L L y y !A y y O o o o ° ° ° ° ° , , a . a c . a. a~, . W ~ U W tuUUUUUcn ~ i ~ ~ Z ~ ~~ °' ° 3 ~ o w > °' d - O W V U ~ ~ - O - V 7 ~ a N w ~+.yZUU p, Q Q ~ 3 Cn ~ .i i i i .C ~ (~ L L L rte. .~. .~. +~. •~ O O O V y y V r W y y ~~ ~~ ~~ ~. C C C C ~, .. .. ..x,3333 v ~ Z ~ a ., ~iwwwp°p°p°p°w = O ~ ~' o ~ [-~ N ac ~ ~ Q~ U O m r2 r N M of to tD 1~ ap ~ O O O O O O O 0 0 M~ a z •a w = o a mmmmmmm~m ,, ;~ ~ J aaaaaaaaa aj co G. o0 0000000 Q ~ c~rnwrnc~rno~a~o~ r r r r r r r - 0 ~ Q r ~ r r r r r r r r r 9•d eSZ~OT LO TT add 000oooooa 0 000000000 0oooooaoo o ~ f- o^noc~oQOo w zz O zzzzzzz ~ a .~ ai i ~ i i i i d 0 7 7 3 0 x x x x x 0 33333''• .x se x ~e ~e ~ ~. (a ~ o ~ ~ ~ i 0 0 0 0~ ~ 01 G1 d d y Qf C ~ U Z O V V C~t.i.C.CL' ~ ~ 3cncncntoN'e, f/1 (~ to = ~.' ~ ~ C 0 0 0 0 0 0 0 0 0 U 'i'i'i ~.Q aQ-G.A * ' ~ :: :;;;EEEEE~ _ O iiw~iUUUUU Val ~ V i; O ~ RV ~ ~ !JJ ~ T N c'o ~ t:') to I~ GO 01 0 0 0 0 ~ ~ ~ 0 0 0 0 0 "' ~ x Z •~. w a c a mmmmmmmmm ~ w ~~~~ ~ ~.+ ~ ~ J a 0 0 0 0 0 0 0 0 0 d rnwo~o>o~o~c~o>o~ Y r ~ ~ r r r r r r r r r r r r O '^ v1 r T r r r G7 V d d n N O N O a a O Z n a Z C L•d eSZ=OT LO TT add w ° a a a aaaaaaaaa a ~zz~zzzz~z~zz~ r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 tsi O 0 0 0 0 0 0 0 0 0 ~ zzzzzzzzz a A ti ca w z 0 o U o ~ O Rf V ~ J J O D^ ~^^ d ~ 0 > ~ 0 0 0 0 0 0 0 0 0 Q > C7 CSC~C~C3L'JC~C7t3 ~ ° O Z J a ~ ~ ^ ~ W ~ z ~ U ,..,~ a a ~ N ~ ~ _" O LL ' ,- ~ O W >>~>>>>>> ,,,,Z a u3 to to cn cn cn c~ to N ~ Q H ~ ~ N a~ ~ H Ll.l m T N M ~ lA <O 1~ CO Qf 0 0 0 0 0 0 0 0 0 0 M t r = 0 0 o O o 0 0 0 . I- H ZZ ~ ~ a U mmmmmaommm ~ ~ ~ aaaaaaaaa ca o ~ a ~ 0 0 0 0 0 0 0 0 0 rno>a~wc~c~rno~a~ //~/~ a T T T T T T T r T V1 rn c ~U L 3 } w Y g•d eSZ~OT LO TT add n E c m a c ~~ 0 0 0 0 0 0 0 0 0 ~~ Z Z Z Z Z Z Z Z Z O ~ J . c c 3~3~333~3 ~, ~ 000000000 y ~! J J J J J J J J 0 i a ,R ri co T O U ~ .~ ~ ~, ~ y i 0 0 0 0 0 0 0 0 0 ~,p JJ JJJJJJJ ~ ' _ > C 0 d O Z ~ ~ U ar tC = _ _ _ _ _ _ _ ~ !° ~ __~___~_~ 0 ~ a ~' U ~ z ~ o r a T d ~ y C (n fn U) tJ) (A tI) (A N N U ~,.~ y y W W W W W W W W W ~ A ~ ~ r~~~~~~~-~ o~ x . a N ~ ~i ~ r N t'7 ~ l17 t0 I~ t0 07 0 0 0 0 0 0 0 0 0 u a ~ o a o 0 0 0 0 0 0 co ~ ~° ~ z °'o Q W ~ mmmmmmmmm ~- aaaaaaaaa o O ~ oodooooo0 ~ ~~~rn~rn~rnrn ~ C] ..1 II~~ h+l N r r r . r r r r r rr rr rrrr r 0 0 0 111 Y 6'd - - -.. __ .. eSZ=OT LO TT add Apr 09 07 1 0: ?.3a :~ ^'s.~ ~i,~ ~~.:~ ~,~ JE'T'` ~~ r _: ~~ C F d O z J LL a me < Q o~ o Q Q F a ~ ~ o 0 1-r<~_ a w m ~ Z ~ ~ ~ -`v a ~. v in Y~ j •'. ~ cu w ~ z ° `~ ~ V: ` Q ~ r 0.i ~ ~ r o - .G,TO ~.~, ~ou?o~ z E- W v z:u~:_x~ o U ~ C ~ ~ ^ ~ x O NNE-- , ~ L' C N = •~ C 3 ~. a h Z 2 L d m U z C v v z v; ~ E-- v Q~ou ;/J 4 L. -. < ~ ~ h ~ u 0. F- Z L" ~i UCM Scipnr.a lahnratnry ~n8-463-8267 r_1 s ~ o 0 o° o 0 0 0 o g g g S c o 0 0 0 ° ° ° D o c ~ ° ° o o c c o 0 0 0 ¢ - - o o o ~ o - - - o o o o° °o $ '3 °o °c °o F Z ` ~ _ - - - - - - - - ~ W 2 O C W i wa "` f ~ ~~ o c ~$ ~ o 0 0 °ooo 0 0 0 0 0 °O °O ° 0 o c o ° ° 0 0 0 0 0 o c o °5 0000 OO O o o oa o~'cP-. °o°a a m'~. ' . . u F ~z 0 V ~~ o X o~ o o C' K oc(--l- O O o 5 C o 00H o O O o cgo-- 0 o O? ooo~ C p O o cdd ~~ c - m ~ ~ ~ ~ N W Z = O ~ ~-' V1 V.1 a n d Q z Q z z z ° z N ~ ° ~ i I ~ < z ~ 1 e ~ Z ^p ~ z Z Z qq Z Z Z Z Z Z z D Z 2 C C C C C , z Z , Z z z Z z z w U Z < Y C L G. D [-. a F. ~`: o of qo ~ 'P o 0 E~oo 0 ' 0~~~ 00000 0 2~ e e o000 e e~ e ooc a '° a o o0 V o~ ~+ocn~ N~ N w: rv n r~i - N f~1 O O l~ q ~ Q 1~ x 00 r ~/1 ~ Q ~ N ~p a ~' :L -' C L~ d V z o v j H FW., ~+ O ~ C~ z W U o z ~ z 0 > > 7 0 ~ C - ~ j p ~_~ .a ~ ~ .-7 ~ ~ ~~ f .~ z ~ z z z z~~ z~ ~" N 3 3 [- 3 N 3 ~} 3 '__ x Z Cz- ~3 33 v 0.' ~ 3 3vm x ~2 sr33 S Q 33 ? o d r3' o a~i <~:iQ <nici ^:c:i <cUG ~- <cC:Cr E . s~c.id w ~ w 0. F- Q O e-1 O ;:; o r'~ O O n O Vl ~ v ~ v v W C O O c O °• ~ ~ N c V °o F- ,,,~ rt) y y fL I m < ~ 1 p ~ m , ~ ~ ,~ ~ p O < 0 O ~ v :~ z _ P _ c ~ ,- ~ _ ~ z P u I ,~ ` w I N C Q ~ N M v ~ ~~z OT'd e9z=0T LO iT add Apr 09 07 10:'2~ia U J_ N C F~- a O z w A d a O h s U o c o ? ~ .n c, e y ~ p o ~QQc_a ~ N w ~ ? a r H Y V ~ C cti ~ .. w ~z~ ri °U <CS~p u: .~o ~n hZ QOF" oG > ~<°° y0 yz~t-~4 ~ ~,~ ~ O« ...t u ZGar`n :J a. ~O Z~ ~1aU ~ za V ~Q 4xs4Uc.Q ~ N3r ~ o ~ ry ~ ~ S ~ O _ U ~ V 7 K w a Z .-a ti z O z F o W F h O C 00 u o p K ..e VI Q ~ Q b y J <~~ LC c; DCM Science Laboratory ~ o e o S~'gg 0 o e o o ooc aF 0 0 0 0 ~ O ~ Z F- ~ c ~ J J ~ c N I 0 0 0 0 0 0 o C OK~ °og°~ SS°~ A L' z ~ "L Z p ~ J ~~ 0 0 0 0 C O O- a o c 0 0 O C QO R1 ~ c% OC F N Z ~ U O ~ ,, O z ~ F ~ ~ ~ ~ ~ a ~ ° ° ° z ° ° o z z z z z z z m u z O s u ' ~ . N 3U3-463-8267 0 0 0 0 O O 8 S O O F a z zz r (-+ J ~ e e ~ o n e e \° z` ~ o 0 0 o c o q $ o W~ r~ Q q N f~ N` 0 0 (i ~ ~ y ::1 °" O y a ' ~ O ~ g ~ J ~ a < Y a a } O <~ c S Q ~ ~ 6. ~ n Q t L U ~ 3 ~ x .~ = Z S 3 s~r I... 3 ~ 3 4 I Q c U Q Q 17 U Q ~:~ n. F. ° o ~ C i ~ <:, ~ a ~ 4 c L` ` ~ ~ 0 ~ ~ ~ G q m F, Q' Q v z ~ a °~ ~ ` ~ °° ~~~ U z Q~ t_ x r V z w :J Y L d 1.~. L'.: .1 ~ :- 3 ~ < L^ n a e ce C v F (- O :J Q ~ ~ ~ z z H C z ~: :n w h a ~ ~ - a z -~ 0 ~ m < ~ 5 a J y J Z K o v p.2 ~. TT'd e9z=0T GO TT add ~t ~7 -~i3i T. Boyle Engineering, Inc. 1650 E. Vail Valley Drive, Unit C-2 Vail, Colorado 81657 James Ohlson Fritzlcn Pierce Architects 1650 E. Vail Va1leyDr., Suite Vail, Colorado 81657 Field Report The following items were observed: Date: 02/29/08 Project: Beringause Remodel Location: Vail, Colorado Contractor: Nedbo Const. Owner: WCDT}fOt: S11t1IIY, it1 C~Pg Present at Site: Mark Stevenson Tim Boyle The framing for the project is lUU°1o complete et thts time. The purpu~c of lLi~ uL,yvctivn waa to makc o fu-nl rvvio~v of the framing and To scrutinize the penetrations through the framing members that have been made by the subcontractors. I found that the fi~sming hes been done according to the plans gad specifications certified by this office. I did not find any issues with the penetrations through the members made by the tradesmen. I noted a couple of floor joists from the origiaat coatn,ctinn that had been excessively notched prior to this ct,-tren remodel. These two joists were repaired to my satisfaction during my visit to the jobsite. 1 hereby approve of this remodel as framed. Feel free to give rne-a cal; if you ht:re r.^y Y~es*~^ns or eo~±+me~nts regarding this report. ,cf`'~ a00 RFG V- ~ y vswf+.1F~. '9 Respectfulty,,Submi ~ ;~r ~ ~ a .1 /~ !o - -- - c. T. BOYLI~'F1G II11Cf~'-•~~" Timnthy M~At~ _ .. . SON A t :•', ~ . President ~ Cc: Mark StevQrsot: - Nedba Cc~nstn~rtioa ray ~~~-G13~ T. Boyle Engineering, Inc. 1650 E. Vail Valley Drive, Unit C-2 Vail, Colorado 81657 James Ohlson Fritzlen Pierce Architects - 1650 E. Vail Va1leyDr., Suite C1 Vail, Colorado 81657 Field Report -- - The following items were observed: 0 Date: 02/29/08 Project: Beringause Remodel Location: Vail, Colorado Contractor: Nedbo Const. Owner: Wandaor: Suany, .11 deg Present at Site: Mark Stevenson Tim Boyle The framing for the project is lUU'Yo cocnpiete at this time. the purpu~c of tl,;s iu~~tion waa to mcko o fi:-nl rvvio~v of the framing and to scrutinize the penctrations through the framing members that have been made by the subcontractors. I fo~md that the &sming hes been done according to the plans end specifications certified by this office. I did not find any issues with the penetrations through the members made by the tradesmen. I noted a couple of floor joists from the original contn~Minn Char had been excessively notched prior to this torten remodel. These two joists were repaired to my satisfaction during my visit to the jobsiie. 1 hereby approve of this remodel as framed. Feel free to give me-s call Tryon htve. ^y Y~er*i^ss er eoR+~te~nts regarding this report. ~ ~0~`P~~ c EG~flr Respectfulty ubmi ~ ~~y ~C ~ ~o T. BOYL)L~'I,'I•IG 11110' ~~~`'" Timnttiy M~An .._ . ~0N A i :•`,;•- . President ~ Cc: Mark Stevorsot: - Nedbo Canstrvrtion ray 17/2007 11:48 9709269089 LKP Engineering, Inc. CNIIJGFA'IEC,HNICAL August 17, 2007 LKP ENGINEERING INC t3 ~ ~ ~o~~/ - /~ ~ X2665 -oS~ d ~.,~ n ~ . Mr. 11~Iark Stevenson ~: Opem Role Observation/Soils &)Foundation Nedbo Construction Investigation, Beringause Residence P.O. Box 3419 Lot 6-B, Casolar Vail Vail, CO 8168 1190 Casloar Drive Town of Vail Eagle County, Colorado Project No. 07139 Dear Mark: At your request, on August 13 and 17, 2007, we visited ttxe construction site at Lot 6-B, Casolar Vail, 1190 Casolar Drive, Town o£ Vail, Eagle County, Colorado. The purpose of our site visits was to observe and test the soil exposed in the foundation excavation fox a proposed addition The excavation, consisted of az~ "L" shaped trench excavated on the west side of the existing residence. The excavation cuts ranged from 4 to 8 feet below the existing grade. The soil exposed at the bottom of the trench consisted of sandstone bedrock. The soil exposed in the foundation excavation for the proposed addition is suitable for the designed maximum allowable soil bearing pressure of 2000 psf. The bottom of the excavation was compacted. Soft spots were not reported We recotzunend compliance with the recommendations of the above-named soil report during the remainder of the construction, specifically with the sections on drainage, grading and izxigation. If you have any questions, please do not hesitate to call. Sincerely, LKP Engineering, Xnc. +aN1°~ .•`" R ~ ~;~~'; ~~ Lui2a Petxovska, PE ~ 2~ President ~ I:\WP 12•LKP~07139opcn.wpd P.O. Box 2837, Edwards, CO 81632, (970) 926-9088 Tel, (970) 926-9089 Fax 08/17/2007 11:48 9709269089 .~ LKP Engineering, Inc. C[VIIJGFATECEtNICAL August 17, 2007 LKP ENGINEERING INC PAGE 03 Mr. Mark Stevenson liE: Open Bole Observation/Soi1s & 1~oundation Nedbo Construction Investigation, Beringause Residence P.O. Box 3419 Lot 6-B, Casolar Vail Vail, CO 81658 1190 Casloar Drive ~L~!/~~ ~3~ 7 -a~.3~ Town of Vail Eagle County, Colorado Project No. 07139 Dear Mark: At your rcquest, on August 13 and 17, 2007, we visited the construction site at Lot 6-B, Casolar Vail, 1190 Casolar Drive, Town of Vail, Eagle County, Colorado. The piuposc of our site visits was to observe and test the soil exposed in the foundation excavatioQ for a proposed addition The excavation consisted of an "L" shaped trench excavated on the west side of the existing residence. The excavation cuts ranged from 4 to 8 feet below the existing grade. The soil exposed at the bottom of the trench consisted of sandstone bedrock. The soil exposed in the foundation excavation for the proposed addition is suitable for the designed maximum allowable soil bearing pressure of 2000 psf. The bottom of the excavation was compacted. Soft spots were not reported We recor~end compliance with the recommendations of the above-named soil report dwring the remainder~of the construction, specifically with the sections on drainage, grading and irrigation. If you have any questions, please do not hesitate to call. Sincerely, LIa' E>agineering, X1ac. ~~ Luiza Petrovska, PE President I:\WP I Z-LKP10~ 139opcn.wpd ~~ P.O. Box 2837, Edwards, CO 81632, (970) 926-9088 Tel, (970) 926-9089 Fax ~- J 08-13-2008 Inspection Request Reporting Page 4 4:27 pm Vail, n City Cif Requested Inspect Date: Thursday, August 14, 2008 Inspection Area: JP Site Address: 1190 CASOLAR DEL NORTE DR VAIL 1190 CASOLAR DEL NORTE DRIVE UNIT'B' A/P/D Information Activity: 607-0131 Type: A-MF Sub Type: AMF Status: ISSUED Const Type: Occupancy: Use: VB Insp Area: JP Owner: BERINGAUSE, ERIC H. Architect: FRITZLEN PIERCE ARCHITECTS Phone: 970-476-6342 Contractor: NEDBO CONSTRUCTION Phone: 970-845-1001 Description: ADD ELEVATOR CHANGE STAIRCASE, ADD SQUARE FOOTAGE, REMODEL KITCHEN AND BATHS, EXTERIOR LANdSCAPING AND NEW ROOF Requested Inspectionls Item: 90 BLDG-Final Requested Time: 11:00 AM Requestor: NEDBO CONSTRUCTION Phone: 977-0326 Comments: will call Mark 977-0326, west side Assigned To: JMONDRAGON Entered By: DGOLDEN K Action: Time Exp: ~~~ ~ '~ ~ ~~,~~ ~~~ - (~ ° ~ v ~ ~~ . i ~v~s Inspection History Item: 10 BLDG-FOOTING ** Approved ** 08/22/07 Inspector: JRM Acti PA PARTIAL APPROVAL Comment: PERMITER FOOTINGS ONLY APPRO D y5 1 ~1~, LIFER INSTALLED 08/23/07 Inspector: JRM Action: PA PARTIAL APPROVAL Comment: ELEVATOR FOOTER ONLY APPROVED 10/15/07 Inspector: JRM Action: AP APPROVED Comment: APPROVED 3 PADS AND SONO TUBE FOR WEST DECK Item: 20 BLDG-Foundation/Steel ** Approved ** 08/31/07 Inspector: GCD Action: AP APPROVED Comment: ELEVATOR WALLS, AND EXTERIOR WALLS, NOTE WALL HEIGHT CHANGED DUE TO SOILS Item: 30 BLDG-Framing ** Approved ** 03/10/08 Inspector: JRM Action: AP APPROVED Comment: APPROVED PENDING ILC Item: 22 PLAN-ILC FRAMING ** Approved ** 03/18/08 Inspector: Warren Action: AP APPROVED Comment: Item: 50 BLDG-Insulation ** Approved ** 03/19/08 Inspector: JRM Action: AP APPROVED Comment: Item: 60 BLDG-Sheetrock Nail ** Approved ** 03/31/08 Inspector: JRM Action: AP APPROVED Comment: Item: 70 BLDG-Misc. Item: 90 BLDG-Final Item: 534 PLAN -FINAL C/O ** Approved ** 08/12/08 Inspector: Warren Action: AP APPROVED Comment: Paint vent on roof, place stone cap around hottub, install wood trim around exterior elevator door. REPT131 Run Id: 8359 _~