HomeMy WebLinkAboutLionshead Redevelopment Master Plan 2011LIONSHEAD
REDEVELOPMENT
MASTER PLAN
Adopted December 15, 1998
Updated May 20, 2010 Updated December 22, 2011
i
Lionshead lacks the charm, character, appeal and vibrancy expected of a world class resort. It
lacks a sense of arrival and a sense of place. Pedestrian flow through the mall can be confusing
and disconnected. The architecture lacks a unique identity or reference to Vail’s historical
antecedents and its alpine environment. Many of the buildings are physically aging and
functionally under-utilized, resulting in negative impacts to property values, private profits and
public revenues. Potential hospitality, retail and recreational uses, and community amenities
are unmet or unrealized. It would be short-sighted to ignore these conditions and do nothing.
The opportunity exists for the public and private sectors to act collaboratively to renew and
revitalize this important component of our community.
Vail Town Council, November 4, 1996
ii
Acknowledgments
The Lionshead Redevelopment Master Plan is the cumulative result of over two years of
concerted effort on the part of many individuals without whose commitment to improving
Lionshead and their contribution of time and energy this project could not have happened.
Vail Town Council
Rob Ford, Mayor
Ludwig Kurtz, Mayor Pro-Tem
Bob Armour
Sybill Navas
Michael Arnett
Kevin Foley
Michael Jewett
Paul Johnston
Town of Vail Staff
Bob McLaurin, Town Manager
Russell Forrest, Current Director of
Community Development
Dominic Mauriello, Project Planner
Suzanne Silverthorn, Community
Information Officer
Greg Hall, Town of Vail Engineer
Susan Connelly, Former Director of
Community Development
Michael Mollica, Former Assistant Director
of Community Development
Design Review Board
Brent Alm
Bill Pierce
Clark Brittain
Hans Woldrich
Planning and Environmental Commission
Galen Aasland
Brian Doyon
John Schofield
Diane Golden
Greg Moffet
Ann Bishop
Tom Weber
Greg Amsden
Henry Pratt
Gene Uselton
Consultants
Design Workshop Inc. Vail, CO
Lead design consultant
Ethan Moore
David Kenyon
Sherry Dorward
Felsburg Holt & Ullevig Denver, CO
Transportation analysis
Chris Fasching
Zehren and Associates, Inc. Avon, CO
Architectural design guidelines
Jack Zehren
Dave Kaselak
Stan Bernstein and Associates Inc.
Denver, Colorado
Economic revenue analysis
Stan Bernstein
The master plan team would like to thank David Corbin for his support and presence as an
invaluable information resource, as well as all the other community members, property managers
and owners, business owners, developers, architects, landscape architects and designers who were
continually involved throughout this project. The project team also expresses its gratitude to Vail
Associates Inc. for the company’s involvement and financial support throughout this important
effort. Although this project was funded jointly by the Town of Vail and Vail Associates, all
consultants were contracted by and accountable only to the Town of Vail.
iii
Revisions Page
1. Resolution No. 8, Series of 2003
a. Building Height Provisions (see pages 8-18 to 8-21).
2. Resolution No. 18, Series of 2004
a. Architectural Design Guidelines (see pages 8-2 to 8-6).
3. Resolution No. 15, Series of 2005
a. Detailed Plan Recommendations (see Chapter 5.19)
4. Resolution No. 23, Series of 2005
a. Detailed Plan Recommendations (see Chapter 5.19)
5. Resolution No. 4, Series of 2006
a. Policy Objectives (see page 2-3)
b. Master Plan Recommendations (see Chapter 4.13)
c. Detailed Plan Recommendations (see Chapters 5.13 and 5.15)
6. Resolution No. 17, Series of 2006
a. Detailed Plan Recommendations (See Chapters 5.11 and 5.12)
7. Resolution No. 3, Series of 2007
a. Development Standards (see Chapter 7)
8. Resolution No. 4, Series of 2007
a. Master Plan Recommendations and Detailed Plan Recommendations (see Section
4.1.5, Chapters 4.5, 4.6, 4.8, 4.9, 5.9, 5.17, 5.18, 5.20)
9. Resolution No. 9, Series of 2008 (see Sections 1.3.5, 1.3.6, 3.9.4, 4.5.2.1, 4.6.6, 4.9.4.3,
5.8.3, 5.9)
10. Resolution No. 26, Series of 2008
a. Glen Lyon Office Building (see Sections 2.6, 4.1.5, 4.5, 4.9, 5.17)
11. Resolution No. 5, Series of 2010
a. Solar Panel Regulations (see Section 8.4.2.7)
12. Resolution No. 13, Series of 2010
a. Recommendations- Overall Study Area (see Sections 4.1, 4.5, 4.6, 4.7, 4.8, 4.9)
b. Detailed Plan Recommendations (see Sections 5.3, 5.5, 5.6, 5.9, 5.10)
13. Resolution No. 6, Series of 2011
a. Recommendations- Overall Study Area (see Sections 4.4.3, 4.6.2)
b. Detailed Plan Recommendations (see Section 5.17, 5.20)
iv
TABLE OF CONTENTS
CHAPTER ONE EXECUTIVE SUMMARY
1.1 Structure of the Master Plan Document 1-1
1.2 Master Plan Framework 1-2
1.3 Recommended Actions 1-3
1.3.1 Development/ Redevelopment 1-3
1.3.2 Pedestrian Circulation 1-3
1.3.3 Connections with the Natural Environment 1-4
1.3.4 Vehicular Circulation 1-4
1.3.5 Transit 1-4
1.3.6 Parking 1-4
CHAPTER 2 INTRODUCTION
2.1 Purpose of the Master Plan 2-1
2.2 Definition of a Master Plan 2-1
2.3 Policy Objectives 2-2
2.3.1 Renewal and Redevelopment 2-2
2.3.2 Vitality and Amenities 2-2
2.3.3 Stronger Economic Base Through Increased Live Beds________________2-2
2.3.4 Improved Access and Circulation 2-2
2.3.5 Improved Infrastructure 2-3
2.3.6 Creative Financing for Enhanced Private Profits and Public Revenues 2-3
2.4 Ground Rules for the Master Planning Process 2-3
2.5 Urban Design Principles 2-4
2.6 Master Plan Study Area 2-4
2.7 Methodology 2-4
2.8 Adoption and Amendment of the Master Plan 2-5
CHAPTER 3 EXISTING CONDITIONS ASSESSMENT
3.1 Introduction 3-1
3.2 Existing Land Uses 3-1
3.2.1 Residential 3-1
3.2.2 Retail/ Commercial 3-1
3.2.3 Lodging 3-1
3.2.4 Conference/ Meeting Facilities 3-2
3.2.5 Light Industrial 3-2
3.2.5.1 Sanitation Plant 3-2
3.2.5.2 Amoco Service Station 3-2
3.2.5.3 Vail Associates Service Yard ______________________________3-2
3.2.6 Recreation and Open Space 3-4
3.3 Existing Zoning 3-4
3.4 Regulatory Issues 3-5
3.4.1 Building Height 3-5
3.4.2 Gross Residential Floor Area (GRFA) 3-5
3.4.3 Density 3-5
v
3.5 Fire Safety 3-5
3.5.1 Emergency Vehicle Access 3-6
3.5.2 Sprinkler Fire Protection 3-6
3.6 Utilities 3-7
3.6.1 General Capacity Data 3-7
3.6.1.1 Gas - Public Service of Colorado 3-7
3.6.1.2 Electric - Holy Cross Electric Association 3-7
3.6.1.3 Water and Sewer - Eagle River Water and Sanitation District 3-7
3.6.1.4 Telephone - US West 3-7
3.6.1.5 Cable TV - TCI 3-7
3.7 Environment 3-10
3.7.1 Resort Zone 3-10
3.7.2 Open Space Zone 3-10
3.7.3 Low-Density Residential Zone 3-10
3.8 Transportation and Circulation 3-10
3.8.1 Vehicular 3-10
3.8.1.1 I-70 South Frontage Road 3-13
3.8.1.2 East Lionshead Circle 3-13
3.8.1.3 West Lionshead Circle 3-16
3.8.1.4 Lionshead Place 3-17
3.8.1.5 Forest Road 3-18
3.8.2 Dedicated Pedestrian and Bicycle Networks 3-19
3.8.2.1 Lionshead Pedestrian Core 3-19
3.8.2.2 Gore Creek Recreation Path 3-19
3.8.3 Transit 3-21
3.8.4 Service and Delivery 3-21
3.9 Parking 3-21
3.9.1 Parking Generation 3-21
3.9.1.1 Parking Demand Generated by Lodging 3-21
3.9.1.2 Parking Demand Generated by Retail/ Commercial Space 3-23
3.9.1.3 Day Skier and Special Event Parking 3-23
3.9.2 Existing Public Parking 3-23
3.9.3 Existing Parking Shortfall 3-23
3.9.4 Vail Associates Employee Parking 3-23
3.10 Visual Assessment 3-23
3.10.1 Architecture 3-24
3.10.1.1 Form 3-24
3.10.1.2 Detail and Ornamentation 3-24
3.10.2 Vehicular Streetscape 3-24
3.10.3 Pedestrian Streets and Retail Mall 3-24
3.11 Economic Conditions 3-25
CHAPTER 4 RECOMMENDATIONS- OVERALL STUDY AREA
4.1 Underlying Physical Framework of Lionshead 4-1
4.1.1 Lionshead Master Plan Concept 4-1
4.1.2 East Lionshead - Civic Hub 4-1
4.1.3 Resort Retail and Commercial Hub 4-1
vi
4.1.4 Resort Lodging Hub 4-2
4.1.5 West Lionshead - Residential/ Mixed-Use Hub 4-2
4.2 Connection to Vail Village 4-3
4.3 Connections to the Natural Environment 4-3
4.3.1 Visual Connections 4-3
4.3.1.1 View Corridors 4-3
4.3.1.2 North-South Orientation of Buildings 4-4
4.3.2 Physical Connections 4-4
4.3.2.1 Landscape and Greenbelt Corridors 4-5
4.3.2.2 Skier Bridge 4-5
4.3.2.3 Access to the South Side of Gore Creek 4-5
4.4 Public View Corridors 4-5
4.4.1 Public View Corridors Protected under the Town of Vail View Corridor
Ordinance__________________________________ 4-6
4.4.1.1 View Corridor One 4-6
4.4.1.2 View Corridor Two 4-7
4.4.2 Public View Corridors Where Redevelopment of the Viewpoint
or the Foreground is Likely _____________________________________ 4-7
4.4.2.1 View Corridor Three 4-8
4.4.2.2 View Corridor Four 4-8
4.4.2.3 View Corridor Five 4-8
4.4.3 Ever Vail View Corridors _______________________________________4-10
4.4.3.1 Public View Corridor Six _________________________________4-10
4.4.3.2 Public View Corridor Seven _______________________________4-10
4.4.3.3 Public View Corridor Eight _______________________________ 4-11
4.5 Public Transportation 4-11
4.5.1 Connection to West Lionshead 4-12
4.5.2 Maximum Efficiency and Utilization 4-12
4.5.2.1 Regional Transit Stop _______ 4-12
4.5.2.2 Concert Hall Plaza ________________ 4-13
4.5.2.3 The North Day Lot __________________________________ 4-13
4.5.2.4 Transit Station at Lionshead Parking Structure/Frontage Road ____4-13
4.5.3 Addressing Existing Problems 4-13
4.5.3.1 Vehicle-Bus Conflicts 4-13
4.5.3.2 Dobson Ice Arena Stop 4-14
4.5.3.3 East Lionshead Circle and South Frontage Road Intersection 4-14
4.5.3.4 East Lionshead Circle Skier Drop Off _______________________4-15
4.5.4 Future Considerations 4-15
4.5.4.1 Alternative Local Transit Systems 4-16
4.5.4.2 Regional Rail System 4-16
4.6 Vehicular and Pedestrian Circulation 4-22
4.6.1 Interstate Highway 70 4-22
4.6.2 South Frontage Road 4-22
4.6.2.1 Potential Realignment 4-22
4.6.2.2 Road Improvements to Handle Increased Traffic Volume 4-24
4.6.2.3 Provision for Bicycles and Pedestrians 4-24
4.6.2.4 Visual Improvements 4-25
vii
4.6.3 Modification to East Lionshead Circle 4-25
4.6.3.1 Eastern Connection to South Frontage Road 4-25
4.6.3.2 West (Current) Entrance 4-26
4.6.3.3 Main Lionshead Pedestrian Portal 4-26
4.6.3.4 Visual Improvements 4-26
4.6.3.5 Pedestrian Sidewalks 4-26
4.6.4 Modifications to West Lionshead Circle and Lionshead Place 4-27
4.6.4.1 East Intersection of W. Lionshead Circle and S. Frontage Road 4-27
4.6.4.2 Intersection of Lionshead Place and West Lionshead Circle 4-27
4.6.4.3 Pedestrian Sidewalks and Crossings 4-27
4.6.4.4 Visual Improvements 4-27
4.6.5 Forest Road 4-27
4.6.5.1 Mountain Service Access Issues 4-28
4.6.5.2 Pedestrian Connections 4-28
4.6.5.3 Realignment of South Frontage Road 4-28
4.6.6 Simba Run Underpass _______________________________ 4-28
4.7 Loading and Delivery 4-30
4.7.1 Properties with Direct Service Access 4-30
4.7.2 Properties Without Direct Service Access 4-30
4.7.3 Potential Sites for Centralized Service and Delivery Facilities 4-30
4.7.3.1 West End of Lionshead Parking Structure 4-30
4.7.3.2 Lifthouse Lodge Alley 4-31
4.7.3.3 Vail Associates Core Site 4-31
4.7.3.4 Landmark Townhomes Alley ______________________________4-31
4.8 Parking 4-33
4.8.1 Potential Displacement of Existing Parking 4-34
4.8.1.1 North Day Lot 4-34
4.8.1.2 West Day Lot 4-34
4.8.1.3 Charter Bus Parking Lot 4-34
4.8.2 Residential Properties 4-35
4.8.3 Public Parking 4-35
4.8.3.1 Existing Parking Shortfall 4-35
4.8.3.2 Potential New Parking Demand 4-35
4.8.3.3 Potential New Parking Sites 4-35
4.8.4 Parking for Employee Housing 4-36
4.9 Housing 4-37
4.9.1 No Net Loss of Employee Housing 4-37
4.9.2 Visual Issues 4-37
4.9.3 Policy Based Housing Opportunities 4-37
4.9.4 Potential Housing Sites 4-37
4.9.4.1 South Face of the Lionshead Parking Structure 4-37
4.9.4.2 Top Deck of the Lionshead Parking Structure 4-38
4.9.4.3 West Lionshead _____________________________ 4-38
4.9.4.4 Red Sandstone Parking Area 4-39
4.9.4.5 Old Town Shops 4-39
4.9.4.6 North Day Lot __________________________________________4-39
4.10 Gateways, Landmarks, and Portals 4-40
viii
4.10.1 Gateways and Portals 4-41
4.10.1.1 Vehicular Gateways 4-41
4.10.1.2 Pedestrian Portals/ Gateways 4-41
4.10.2 Landmarks 4-41
4.11 Public Art 4-42
4.12 Youth Recreation 4-42
4.13 Live Beds 4-42
4.13.1 Live Bed Definition ___________________________________________4-43
4.13.2 Location of Live Beds 4-43
4.13.3 Hotel-types of Services and Amenities ____________________________ 4-43
4.13.4 Review of New Development and Redevelopment Projects ____________4-43
CHAPTER 5 DETAILED PLAN RECOMMENDATIONS
5.1 Vail Civic Center 5-1
5.1.1 History of Vail Civic Center 5-1
5.1.2 Potential Development Scenarios 5-1
5.1.3 Functional Relationships 5-1
5.1.3.1 Access 5-2
5.1.3.2 Relationship to East Lionshead Circle 5-5
5.1.3.3 Relationship to Dobson Ice Arena 5-5
5.2 South Face of the Lionshead Parking Structure 5-6
5.3 Lionshead Tourist Information Center 5-6
5.4 Gore Creek Corridor 5-6
5.4.1 Creation of a Recreation Path ‘Bypass’ Around the Ski Yard 5-6
5.4.2 Picnic and Seating Areas along the Recreation Path 5-8
5.4.3 Safety Issues 5-8
5.4.4 Lowland Area South of Gore Creek 5-9
5.4.5 Revegetation and Landscaping West of the Ski Yard 5-9
5.5 East Lionshead Bus Drop-off Area 5-10
5.5.1 Pedestrian Connections 5-10
5.5.2 Transit Stop 5-10
5.5.3 Potential Building Infill Site 5-10
5.6 West Face of the Parking Structure 5-10
5.7 Vail 21, Lionshead Arcade, Lifthouse Lodge, Lions Pride Cluster 5-11
5.7.1 Expansion of Ground Floor Retail Space 5-11
5.7.2 Architectural Improvements 5-11
5.7.3 Pedestrian Circulation Between Vail 21 and Lionshead Arcade 5-11
5.7.4 Pedestrian Access from Vantage Point Condominiums to the Retail Core 5-11
5.7.5 Lions Pride Building and Parking Deck 5-11
5.7.6 Service and Delivery 5-12
5.8 Lionshead Retail Core 5-15
5.8.1 Build-To Lines 5-15
5.8.2 Ground Level Retail Expansion Opportunities 5-15
5.8.3 Pedestrian Connections Through the Core Site 5-15
5.8.4 Hierarchy of Pedestrian Space 5-15
5.8.5 Retail Space Allocation 5-18
5.8.6 Plazas and Nodes 5-18
ix
5.8.7 The Core Site as a Priority Location for a Resort Hotel 5-18
5.8.8 Pedestrian/ Retail Connection to West Lionshead Circle 5-18
5.9 North Day Lot 5-21
5.10 Montaneros, Concert Hall Plaza, Landmark Tower and Townhomes 5-22
5.10.1 Landmark Tower and Townhomes 5-22
5.10.2 Concert Hall Plaza/ Montaneros 5-23
5.11 Ski Yard 5-23
5.11.1 Relationship to the Lionshead Pedestrian Mall 5-23
5.11.2 Skier Bridge 5-24
5.11.3 Connections 5-24
5.11.4 Screening and Landscaping 5-25
5.11.5 Potential Setback Encroachments by Adjacent Property Owners ________5-25
5.12 Lion Square Lodge 5-25
5.12.1 Traffic Concerns 5-25
5.12.2 Pedestrian Connection between the Main Building and the North Building 5-25
5.12.3 Ski Yard Pedestrian Access 5-25
5.12.4 Potential Development and Redevelopment Scenarios 5-25
5.12.5 Potential Setback Encroachments Adjacent to the Ski Yard ____________ 5-26
5.13 The Marriott 5-28
5.13.1 Redevelopment or Development of the Parking Structure 5-28
5.13.2 Infill Opportunities 5-28
5.13.3 Opportunities for Facade Renovation 5-28
5.13.4 West Lionshead Circle in Front of the Marriott 5-28
5.13.5 Preservation of Existing Accommodation Units _____________________5-28
5.14 Antlers Lodge 5-30
5.15 Lionshead Inn, Vailglo, Enzian Cluster 5-30
5.15.1 The Pedestrian Street 5-30
5.15.2 Access and Street Frontage 5-30
5.15.3 Building Height 5-30
5.15.4 Preservation of Existing Live Beds _______________________________5-30
5.16 Vail Spa 5-33
5.17 Ever Vail ___________________________________ 5-34
5.17.1 South Frontage Road Realignment ________________________________5-34
5.17.2 Vehicular Access and Circulation ________________________________ 5-36
5.17.3 Parking _____________________________________________________ 5-37
5.17.4 Public Transportation __________________________________________ 5-38
5.17.5 Gondola and Vail Mountain Portal ________________________________5-38
5.17.6 Pedestrian and Bike Access _____________________________________ 5-40
5.17.7 Public Spaces and Plazas _______________________________________ 5-41
5.17.8 Preservation of Existing Office and Retail Space ____________________ 5-42
5.17.9 Development Pattern, Program and Uses ___________________________5-43
5.17.10 Relationship to Red Sandstone Creek and Gore Creek ________________5-44
5.17.11 Employee Housing ____________________________________________5-46
5.17.12 Development Standards ________________________________________5-47
5.17.12.1 Building Height ______________________________________ 5-47
5.17.12.2 Setbacks ____________________________________________5-49
5.17.12.3 Landscaping _________________________________________5-50
x
5.17.12.4 Site Coverage ________________________________________5-51
5.17.13 Architectural Improvements ____________________________________ 5-51
5.17.14 Green Building ______________________________________________ 5-52
5.18 Old Town Shops 5-52
5.19 Evergreen Lodge at Vail 5-52
5.19.1 Pedestrian Access 5-53
5.19.2 South Frontage Road Improvements and Vehicular Access ____________5-53
5.19.3 Preservation of Existing Accommodation Units 5-53
5.19.4 Impacts on Middle Creek Stream Tract 5-54
5.19.5 Relationship to the Vail Valley Medical Center and the proposed
Vail Civic Center _____________________ 5-54
5.19.6 Service and Delivery 5-54
5.19.7 Setbacks from the South Frontage Road 5-54
5.19.8 Architectural Improvements 5-55
5.19.9 Public Transit Stop 5-55
5.20 Eagle River Water and Sanitation District _____________________________5-55
CHAPTER 6 SITE DESIGN GUIDELINES
6.1 Primary Pedestrian Mall 6-1
6.1.1 Spatial Proportions 6-1
6.1.2 Pedestrian Surfaces 6-1
6.1.3 Site Furnishings 6-1
6.1.4 Lighting 6-1
6.1.5 Signage 6-2
6.1.6 Landscaping 6-2
6.1.7 Artwork 6-2
6.1.8 Diversification of Activity in the Public Right-of-Way 6-3
6.2 Secondary Pedestrian Mall 6-3
6.2.1 Pedestrian Surfaces 6-3
6.2.2 Site Furnishings 6-3
6.2.3 Lighting 6-3
6.2.4 Signage 6-3
6.2.5 Landscaping 6-3
6.3 Primary Pedestrian Walk 6-3
6.3.1 Pedestrian Surfaces 6-4
6.3.2 Width 6-4
6.3.3 Site Furnishings 6-4
6.3.4 Lighting 6-4
6.3.5 Landscaping 6-4
6.4 Secondary Pedestrian Walk 6-4
6.5 Vehicular Pedestrian Retail Street 6-4
6.6 Pedestrian Path 6-5
6.7 Signage 6-5
6.8 Fences and Enclosures 6-5
6.8.1 Allowable Occurrences 6-5
6.8.2 Dumpster Enclosure Area 6-5
6.8.3 Fence and Screen Wall Criteria 6-6
xi
6.9 Compliance with Town of Vail Streetscape Master Plan 6-6
CHAPTER 7 DESIGN STANDARDS
(FYI- This chapter was deleted but original text remains for historical purposes)
7.1 Landscape Area 7-1
7.2 Site Coverage 7-1
7.3 Setbacks 7-1
7.4 Gross Residential Floor Area (GRFA) 7-1
7.5 Density (Dwelling Units Per Acre) 7-2
7.6 New Unit Definition 7-2
7.7 Building Height 7-2
CHAPTER 8 ARCHITECTURAL DESIGN GUIDELINES
8.1 Vision Statement 8-1
8.2 Organization, Scope and Purpose 8-1
8.3 New and Existing Structures 8-3
8.3.1 Special Provisions 8-3
8.3.2 Development Master Plans 8-4
8.3.3 Redevelopment Prioritization and Triggers 8-4
8.3.3A Review Criteria for Deviation to the Architectural Guidelines for
New Development ____________________________________________ 8-5
8.3.4 Transition Tools 8-6
8.3.4.1 Build-to Lines _________________________________________8-6
8.3.4.2 Roof Replacements ____________________________________ 8-6
8.3.4.3 Door and Window Enhancements _________________________8-6
8.3.4.4 Building Finishes ______________________________________8-7
8.3.4.5 Detail and Ornamentation ________________________________8-7
8.4 Design Guidelines 8-7
8.4.1 Planning Considerations 8-7
8.4.1.1 Introduction ___________________________________________8-7
8.4.1.2 Building “Roles” _______________________________________8-7
8.4.1.3 Pedestrian Streets ______________________________________8-10
8.4.1.4 Transition Spaces ______________________________________8-12
8.4.2 Architecture _________________________________________________8-13
8.4.2.1 Introduction ___________________________________________8-13
8.4.2.2 Building Form and Massing _______________________________8-14
8.4.2.3 Building Height ________________________________________8-14
8.4.2.4 Exterior Walls ________________________________________ 8-20
8.4.2.5 Exterior Doors and Windows ______________________________8-24
8.4.2.6 Balconies, Guardrails and Handrails ________________________8-28
8.4.2.7 Roofs ________________________________________________8-29
8.4.2.8 Fireplaces and Chimneys ________________________________8-35
8.4.2.9 Detail _______________________________________________8-36
8.5 Summary Table of Quantitative Data _________________________________8-37
CHAPTER 9 IMPLEMENTATION
xii
9.1 Project Prioritization 9-1
9.1.1 Public Improvements 9-1
9.1.1.1 North Day Lot Transit Center 9-1
9.1.1.2 The East Lionshead Pedestrian Portal 9-2
9.1.1.3 The West Lionshead Pedestrian Portal 9-2
9.1.1.4 Public Space Improvements in the Pedestrian/ Retail Core 9-2
9.1.1.5 Sidewalk and Streetscape Improvements 9-2
9.1.1.6 Development on the South Face of the Parking Structure 9-2
9.1.1.7 South Frontage Road Realignment and Improvements 9-3
9.1.1.8 Parking 9-3
9.1.1.9 Vail Civic Center 9-3
9.1.1.10 West Lionshead Circle and Lionshead Place Realignment 9-4
9.1.1.11 Gore Creek Corridor Improvements 9-4
9.1.2 Private Improvements 9-4
9.1.2.1 Individual Property Redevelopment and Exterior Renovations 9-4
9.1.2.2 Core Site Hotel 9-4
9.1.2.3 Retail Expansion 9-4
9.1.2.4 Concert Hall Plaza/ West Lionshead Pedestrian Portal 9-5
9.1.2.5 West Lionshead Local/ Employee Housing 9-5
9.2 Mitigation of Construction Impacts 9-5
9.2.1 Phasing 9-5
9.2.2 Construction Mitigation 9-5
9.2.3 Marketing 9-5
9.2.4 Short-Term Relocation 9-5
9.3 Financing 9-6
9.3.1 Private Development Incentives 9-6
9.3.1.1 Parking Pay-in-Lieu Relief 9-6
9.3.1.2 Parking Requirement Reduction 9-6
9.3.1.3 Density Incentives 9-6
9.3.1.4 Tax Incentives 9-6
9.3.2 Public Improvements 9-6
9.3.2.1 Tax Increment Financing (TIF) 9-6
9.3.2.2 Special Assessment District 9-7
9.3.2.3 Application of Impact Fees 9-7
9.3.2.4 Real Estate Transfer Tax (RETT) 9-7
9.3.2.5 Municipal Bonds 9-7
9.3.2.6 Grants 9-7
9.4 Revenues and Costs 9-7
9.4.1 Revenues 9-7
9.4.1.1 Tax Revenue 9-8
9.4.1.2 Revenue from Development 9-8
9.4.2 Costs 9-9
9.5 Next Steps 9-10
9.5.1 Joint Funding Agreements 9-10
9.5.2 Rezoning 9-10
9.5.3 Downtown Development Authority 9-10
9.5.4 Parking Analysis 9-10
xiii
9.5.5 Employee Generation __________________________________________9-10
APPENDICES
A. Lionshead Transportation Analysis
B. Economic Impact Analysis
C. Vail Retail Study
D. Projected Development Model
E. Hypothetical Redevelopment Cost Analysis
F. Lionshead Master Plan Public Input Wishlist
CHAPTER 1: EXECUTIVE SUMMARY
This chapter outlines the general structure of the Lionshead Redevelopment Master Plan and
summarizes the broad goals, objectives, and recommendations contained in the document. It is
intended as a general policy guide; a thorough review of the entire document is encouraged for anyone
considering development or redevelopment of properties in Lionshead.
1.1 Structure of the Master Plan Document
The analysis and recommendations in this document are contained in nine chapters organized
in the general headings described below.
• Chapter 2: Introduction: The opening chapter summarizes the purpose, policy
objectives, design principles, and methodology for the two-year process that has
culminated with this plan document.
• Chapter 3: Existing Conditions Assessment: This chapter identifies and describes
the existing conditions, problems, and issues that are addressed in the master plan.
Reflecting the purpose and intent of the master plan, this information provides the
rationale for the improvements that are recommended in the plan.
• Chapter 4: Master Plan Recommendations for the Overall Study Area: This chapter
discusses recommendations that apply to the study area as a whole, as well as
several site-specific recommendations that deal with issues of concern in the entire
study area.
• Chapter 5: Detailed Plan Recommendations: This chapter addresses individual
parcels or significant clusters of parcels within the Lionshead study area, providing
both general and specific planning and design recommendations for each area.
• Chapter 6: Site Design Guidelines: This chapter addresses the Lionshead pedestrian
environment and proposes a hierarchy of six specific pedestrian areas:
1. Primary Pedestrian Mall
2. Secondary Pedestrian Mall
3. Primary Pedestrian Walk
4. Secondary Pedestrian Walk
5. Vehicular Pedestrian Retail Street
6. Pedestrian Path
Specific planning and design recommendations are proposed for each of these sub-
environments.
• Chapter 7: Development Standards
This chapter contains recommended development standards to set parameters for
development and redevelopment, including gross residential floor area (GRFA),
building heights, density, setbacks, landscape areas, and site coverage, and proposes
a new definition of a unit - the “lodge unit.”
1-1
• Chapter 8: Architectural Design Guidelines
This chapter outlines new guidelines specific to Lionshead that are intended to
encourage a higher quality of architecture in new development as well as renovation
projects. The guidelines address issues of character, building height and massing,
roofs, doors and windows, detailing and materials, and the relationships between
buildings and the adjacent pedestrian environment.
• Chapter 9: Implementation
This chapter addresses timing, phasing, project priorities, financing mechanisms,
order of magnitude costs, and implementation strategies to achieve the public
improvements recommended by the master plan.
1.2 Master Plan Framework
The Lionshead Master Plan is based on a set of fundamental design objectives that relate to the
entire study area:
• The Pedestrian Environment
The defining characteristic of Lionshead is its pedestrian environment, and the
emphasis of the master plan is to improve its quality as a generator of activity.
Pedestrian connections are intended to be the underlying framework of the physical
plan. Two primary pedestrian corridors are proposed to provide for a cohesive,
consistent, well-defined pedestrian and retail environment serving both the
destination guest and the local community. The first of these two corridors is an
east-west connection between the west end of Dobson Ice Arena and the western
edge of Lionshead. The second is a north-south connection between the gondola ski
yard and the north day lot.
• Connections to the Natural Environment
The master plan recommends ways to enhance and strengthen the physical and
visual connections to the natural environment of Gore Creek and Vail Mountain.
• Vehicular Circulation
The master plan anticipates a network of streets and driveways that provides
efficient access to public and private destinations but minimizes the negative impact
of vehicles on the pedestrian environment and residential areas.
• Transit
The master plan considers that an efficient and flexible public transit system serving
the entire Lionshead study area, including potential new development in the west
end of the district, is essential to its future success.
• Service and Delivery
The master plan describes a consolidated, efficient service and delivery system that
reduces interference with pedestrian areas, emergency vehicle routes, and traffic in
general. The proposed facilities satisfy the current and projected service and
delivery needs of the Lionshead study area.
1-2
• Parking
The master plan provides for adequate public parking in Lionshead and the
community as a whole but acknowledges that parking private vehicles is only one
part of the overall Lionshead public access strategy.
1.3 Recommended Actions
The following list summarizes the recommended actions, both public and private, that are
contained in the master plan. Please refer to individual chapters for more detail on specific
topics and individual properties.
1.3.1 Development/ Redevelopment
• Encourage, facilitate, and provide incentives for the redevelopment and renovation
of existing structures in Lionshead.
• Create a Vail Civic Center comprised of the Dobson Ice Arena, the Vail Public
Library, and new development on the existing charter bus lot.
• Develop the south face of the Lionshead parking structure with ground floor retail/
commercial space and locals/ seasonal housing above.
• Develop the Town of Vail infill parcel at the east portal to the Lionshead pedestrian
and retail mall; make it an active entry landmark.
• Encourage first floor retail expansions in the retail core improving the spatial
proportions of public spaces by extending into the pedestrian street.
• Encourage, facilitate and provide incentives for the creation of a five-star resort
hotel in the Lionshead core.
• Encourage, facilitate, and provide incentives for the creation of seasonal housing in
the western end of Lionshead.
1.3.2 Pedestrian Circulation
• Implement the Vail Streetscape Masterplan for the Vail Village-Lionshead
connection along West Meadow Drive.
• Redevelop the existing east Lionshead pedestrian portal.
• Develop, with public-private cooperation, two continuous pedestrian axes (north-
south and east-west) through Lionshead. Create new walkways and plazas and
replace deteriorated pavements.
• Install a snowmelt system in the Lionshead pedestrian mall.
• Require pedestrian walks and paths along all streets.
• Connect the Gore Creek recreation path below the Gondola lift line.
• Provide for pedestrian and bicycle traffic along the South Frontage Road.
• Encourage, facilitate, and provide incentives for the creation of one or more new
west Lionshead pedestrian portals through redevelopment of Concert Hall Plaza, the
Montaneros Condominiums, and the Vail Associates core site.
• Create a new north Lionshead pedestrian portal in conjunction with development of
a public transportation facility on the north day lot.
• Replace the existing skier bridge.
• Implement a comprehensive directional signage program.
1-3
1.3.3 Connections with the Natural Environment
• Create a passive recreation trail system on the south side of Gore Creek.
• Establish public view corridors to preserve the visual connections to Lionshead’s
natural environment.
• Encourage, facilitate, and provide incentives for the creation of green landscape
corridors penetrating into the Lionshead environment.
• Enhance the western end of the Gore Creek recreation path through landscape and
environmental remediation.
1.3.4 Vehicular Circulation
• Restrict the vehicular traffic on East Lionshead Circle to Town of Vail “in-town”
transit, emergency vehicles, and adjacent local property owners.
• Provide all necessary improvements to the South Frontage Road including
widening, acceleration/deceleration lanes, landscaped medians, and other
appropriate measures to facilitate and clarify traffic flows.
• Realign the South Frontage Road at the western end of Lionshead.
• Realign the West Lionshead Circle and Lionshead Place intersection.
• Encourage, facilitate, and provides incentives for the removal of snowcats and
winter mountain service vehicles from Forest Road.
• Create a central skier drop-off point on the north day lot.
• Implement a comprehensive directional signage program for vehicles.
1.3.5 Transit
• Create dispersed transportation centers in Lionshead to accommodate local and
regional transit, local shuttles, skier drop off, and charter buses. Locations for these
facilities may include the North Day Lot, the Lionshead Parking Structure, and
West Lionshead (aka EverVail).
• Remove the existing Concert Hall Plaza bus drop-off.
• Relocate the existing Lionshead Place regional bus stop to the north day lot,
Lionshead Parking Structure, or West Lionshead area..
• Improve the now difficult left turn from East Lionshead Circle onto the South
Frontage Road.
• Connect the future development in west Lionshead to the Town of Vail in-town
transit route.
• Investigate alternative clean transit technologies.
• Investigate potential intermodal connections to future non-vehicular regional transit
systems.
1.3.6 Parking
• Add at least one more deck to the Lionshead parking structure.
• Conduct studies to establish the user profile of people accessing Lionshead from the
parking structure; use this to determine the desired user profile and true parking
demand.
• Investigate the possibility of a secondary parking structure in the western end of
Lionshead.
1-4
CHAPTER 2: INTRODUCTION
2.1 Purpose of the Master Plan
This master plan was initiated by the Town of Vail to encourage redevelopment and new
development initiatives within the Lionshead study area. Both public and private interests have
recognized that Lionshead today lacks the economic vitality of Vail Village, its neighboring
commercial district, and fails to offer a world-class resort experience. Lionshead’s economic
potential has been inhibited by a number of recurrent themes: lack of growth in accommodation
units (“hot beds”), poor retail quality, the apparent deterioration of existing buildings, an
uninteresting and disconnected pedestrian environment, mediocre architectural character, and
the absence of incentives for redevelopment.
Redevelopment is critical for Vail and Lionshead if the community is to remain a competitive
four-season resort. Other resorts are spending millions of dollars to upgrade their facilities in
order to attract more visitors year-round. Growth in the number of skiers annually has slowed
to one to two percent, intensifying competition for market share. Skiers are spending less time
skiing and more time shopping, dining out, and enjoying other off-mountain activities. As a
result, the demand for quality retail shopping and a greater diversity of experiences has
dramatically increased. All of these are sorely in need of improvement in Lionshead. Vail, and
specifically Lionshead, will fall behind if the community fails to upgrade the quality of its
facilities and correct the existing flaws in its primary commercial nodes.
This master plan, developed over a period of two years and with extensive involvement by the
community, is a comprehensive guide for property owners proposing to undertake development
or redevelopment of their properties and the municipal officials responsible for planning public
improvements. The plan outlines the Town’s objectives and goals for the enhancement of
Lionshead and proposes recommendations, incentives, and requirements for redevelopment and
new development of public and private properties. It also recommends specific public
improvement projects that are strategically important to the future success of Lionshead. The
master plan is intended to provide direction over the next 15 to 20 years.
2.2 Definition of a Master Plan
In the development of the Lionshead Master Plan, the following definition has been used as the
basis for this work:
A master plan is a guide, a flexible framework for future action. It articulates a community’s
fundamental land use policies, principles, and goals in a broad and general way. It plans for
the future physical development or redevelopment of an area of the community, including its
functional and circulation systems and its public facilities.
The land use policies in a master plan are generally implemented through zoning ordinances.
Existing zoning and land use codes may be modified and new provisions enacted in order to
conform to the master plan and carry out the plan’s objectives.
A master plan does not convey approval for particular development proposals or concepts, nor
can it be implemented in a short time frame. After adoption of the Lionshead Master Plan,
every development proposal will have to go through the applicable development review and
approval process, with its attendant public notices and public hearings. A proposal’s
2-1
adherence to the policies contained in the adopted master plan will be one of the factors
analyzed by staff, the Planning and Environmental Commission (PEC), the Design Review
Board (DRB), and the Town Council (as applicable) in determining whether to approve or
disapprove the specific proposal.
2.3 Policy Objectives
The Town Council adopted six policy objectives on November 4, 1996 to outline the important
issues to be addressed in the master plan and to provide a policy framework for the master
planning process.
2.3.1 Renewal and Redevelopment
Lionshead can and should be renewed and redeveloped to become a warmer, more
vibrant environment for guests and residents. Lionshead needs an appealing and
coherent identity, a sense of place, a personality, a purpose, and an improved aesthetic
character.
2.3.2 Vitality and Amenities
We must seize the opportunity to enhance guest experience and community interaction
through expanded and additional activities and amenities such as performing arts
venues, conference facilities, ice rinks, streetscape, parks and other recreational
improvements.
2.3.3 Stronger Economic Base Through Increased Live Beds
In order to enhance the vitality and viability of Vail, renewal and redevelopment in
Lionshead must promote improved occupancy rates and the creation of additional bed
base (“live beds” or “warm beds”) through new lodging products. Live beds and warm
beds are best described as residential or lodging rooms or units that are designed for
occupancy by visitors, guests, individuals, or families on a short term rental basis. In
order to improve occupancy rates and create additional bed base in Lionshead,
applications for new development and redevelopment projects which include a
residential component shall provide live beds in the form of accommodation units,
fractional fee club units, lodge dwelling units, timeshare units, attached accommodation
units (i.e, lock-off units), or dwelling units which are included in a voluntary rental
management program and available for short term rental. Further, it is the expressed
goal of this Plan that in addition to creating additional bed base through new lodging
products, there shall be no net loss of existing live beds within the Lionshead
Redevelopment Master Plan study area.
2.3.4 Improved Access and Circulation
The flow of pedestrian, vehicular, bicycle and mass transit traffic must be improved
within and through Lionshead.
2-2
2.3.5 Improved Infrastructure
The infrastructure of Lionshead (streets, walkways, transportation systems, parking,
utilities, loading and delivery systems, snow removal and storage capacity) and its public
and private services must be upgraded to support redevelopment and revitalization efforts
and to meet the service expectations of our guests and residents.
2.3.6 Creative Financing for Enhanced Private Profits and Public Revenues
Financially creative and fiscally realistic strategies must be identified so that adequate
capital may be raised from all possible sources to fund desired private and public
improvements.
2.4 Ground Rules for the Master Planning Process
On November 4, 1996, the Town Council adopted the following ground rules for the master
planning process in order to clarify the initial parameters and rules under which the master plan
would be developed.
1. The master plan to be developed for all public and private lands in Lionshead will serve as the
policy framework for all future decision-making on specific development and redevelopment
proposals in Lionshead. The master plan will be based on the Lionshead Policy Objectives
adopted by the Town Council to reflect the community’s interests.
2. The Town of Vail will work collaboratively with Vail Resorts, Inc. on the master plan for
Lionshead and will involve all other interested citizens, business owners and property owners in
the master planning process. The master plan ultimately recommended may or may not reflect
development approaches currently being explored by VRI.
3. Proprietary information of any private property owner or developer will remain private and
confidential unless it becomes part of a public record.
4. There will be no net loss to the Vail community of either locals’ housing or parking spaces
(public and private) now existing in Lionshead.
5. Collaborative public/private redevelopment and financing ventures, including urban renewal
authorities and downtown development authorities, will be considered.
6. The intent of redevelopment includes minimizing short-term construction-related impacts of
redevelopment on existing businesses and residents and increased cooperation between the
public and private sectors.
The Town Council will have final decision-making authority on the Lionshead Master Plan,
adoption of implementing actions, use of public lands, public improvements, and public
financing mechanisms. The Town Council or its authorized boards (PEC and DRB) will make
final decisions on subsequent site-specific development proposals consistent with the master
plan.
2-3
2.5 Urban Design Principles
On November 4, 1996, the Town Council adopted the following set of urban design principles to
guide the development of the master plan:
1. Connect Lionshead physically and visually to the mountain landscape.
2. Make people physically and emotionally comfortable in Lionshead.
3. Provide a sense of arrival to demarcate the Lionshead district.
4. Create landmarks and turning points to guide people through the area and make it
memorable.
5. Provide gates and portals to help define the sequence of public spaces and places.
6. Define appropriate land uses adjacent to outdoor spaces.
2.6 Master Plan Study Area
The boundaries of the Lionshead Master Plan study area (see Map A) were established by the
Town Council at the outset of the master planning process. They are defined by the following
features:
On the north by I-70
On the east by Middle Creek (west of the Vail Valley Medical Center)
On the south by the Town of Vail boundary (south of Forest Road, not including
single-family lots)
On the west where Tract K intersects the South Frontage Road, to the west of
the Glen Lyon Office Building site.
2.7 Methodology
The master planning process was based on a model for intensive citizen input and community
collaboration intended to maximize public participation and allow the community to provide
direction on all plan elements. Exhaustive efforts were made to involve local citizens, property
owners, local businesses, and second homeowners. A web page, extensive direct mailings, and
the notification of local homeowners’ associations and managers were all utilized to solicit
public input and inform the public about the process and progress of the master planning effort.
Meetings and workshops were held on weekends and holidays in order to achieve maximum
second homeowner and guest involvement in the process.
The planning process consisted of five stages, each with a public input component. A one-year
timeframe was initially anticipated, but the process was later extended for an additional year.
Stage One - Define Opportunities and Constraints
This step commenced with two public walking/bus tours through Lionshead to look at existing
constraints and opportunities with interested community members. After the tours two public
forums were held, participants were asked to review the list of opportunities and constraints
assembled from the tours. This step also included a “Best and Worst of Lionshead” contest to
invite further public comment. During this stage, the master planning team assembled base
data about the physical environment of Lionshead.
2-4
Stage Two – Brainstorm “Wish List”
The goal in stage two was to gather from the community as many ideas as possible about
preferred land use policies, changes needed in the physical environment, desired
improvements, new public facilities, and other areas of concern. In several public workshops
and hearings, participants were asked to review the wish list of ideas and indicate their
preferences by “dot-voting.” Input was also obtained via survey response forms and on the
Internet. A total of 173 individual wish list items were submitted, categorized and documented.
(See appendix F.)
Stage Three - Analyze Alternatives and Select Preferred Alternatives
This stage concentrated on the review and evaluation of alternatives developed from public
input and the selection of preferred concepts for traffic circulation, land uses, building bulk and
mass, pedestrian corridors, and loading and delivery systems. Also in this stage, several public
workshops and hearings were held to focus specifically on the identification of public view
corridors in Lionshead. A Saturday work session with local architects and planning
professionals was held to brainstorm design ideas on public facilities and transportation
systems, improved access to the Gore Creek corridor, housing opportunities, and the network
of public spaces and resort amenities. The drawings that were done in this charrette were
displayed for community review in several open houses. Finally, a market feasibility study was
conducted to analyze the existing constraints and future potential of the retail market in
Lionshead.
Stage Four - Develop and Adopt the Master Plan and Architectural Design Guidelines
In this stage of the master planning process, the project team refined and expanded the ideas
and principles identified in stage three and consolidated them into the final master plan
document. This stage involved ongoing community review in public Town Council meetings.
Stage Five - Adopt Required Code Modifications
This stage will occur subsequent to the adoption of this master plan document.
2.8 Adoption and Amendment of the Master Plan
The Lionshead Master Plan was adopted by resolution No. 14, Series of 1998, on December
15th, 1998, by the Vail Town Council following a recommendation to approve by the Planning
and Environmental Commission. Future amendments to this master plan must be approved by
resolution or motion by the Town Council following a formal recommendation by the Planning
and Environmental Commission. Implementation activities and ordinances will be approved in
accordance with the Town of Vail Municipal Code.
2-5
CHAPTER 3: EXISTING CONDITIONS ASSESSMENT AND PROBLEM IDENTIFICATION
3.1 Introduction
The initial task in the Lionshead master planning process was to conduct a thorough assessment
of existing physical and regulatory conditions in the study area. The goal of this assessment
was to identify the problems, opportunities, and constraints that the master plan
recommendations must recognize and address.
3.2 Existing Land Uses
A wide variety of land uses exist within the Lionshead study area:
3.2.1 Residential
Residential properties in Lionshead can be divided into two categories corresponding to
location and density. To the south of Gore Creek is Forest Road, a low-density single-
family and duplex neighborhood. To the north of Gore Creek is a mix of multi-family
condominium products, with densities ranging from 16 to 60 units per acre. Within this
area of Lionshead there are approximately 735 condominium units ranging in size from
studios to four bedrooms, with the majority being two-bedroom units.
Of these units, approximately 50% to 60% are included in short-term rental pools
(“warm beds”). In addition, there are approximately 56 non deed-restricted employee
housing units (approximately 110 beds), most of which are in the Sunbird Lodge owned
by Vail Associates. Existing residential and lodging properties are shown on Map K.
3.2.2 Retail/ Commercial
Retail/ commercial space totaling approximately 133,000 square feet currently exists
within the Lionshead study area (by comparison, the Vail Village core has
approximately 244,000 square feet of retail/commercial space). Although considered a
resort shopping area, the Lionshead retail core (see Map N) averages lease rates and
sales per square foot that are less than corresponding space in Vail Village. This is at
least partially attributable to visual and functional problems plaguing the area’s retail
spaces. For a detailed analysis of existing retail conditions in Lionshead, refer to the
Vail Retail Market Study in appendix C. Existing retail and commercial space in
Lionshead is shown on Map J.
3.2.3 Lodging
There is a sizeable bed base in the Lionshead study area but only a small portion of
these are accommodation units (“hot beds”). The true lodging base in Lionshead today
consists of about 440 units, the majority of which are in the Marriott. All of the
accommodation units are located west of the Lionshead retail core (west of West
Lionshead Circle and the Lionshead Place cul-de-sac), and together they represent
about 35% of the total Lionshead bed base, excluding the private residences south of
Gore Creek. Existing residential and lodging properties are shown on Map K.
3-1
3.2.4 Conference/ Meeting Facilities
The Lionshead study area contains several public and private conference facilities (see
Map L), with the majority of space in private ownership. Aside from Dobson ice arena,
which is not suitable for smaller conferences and meetings, the only publicly available
conference room in Lionshead is in the Vail Public Library, a small and heavily utilized
facility. In general, there is a growing need for additional conference space in
Lionshead, especially as the local economy seeks to diversify and provide a wider range
of destination resort activities in addition to skiing.
3.2.5 Light Industrial
Currently, the western end of Lionshead is home to several operations that could be
classified as light industrial. These include the Vail sanitation plant, the Vail
Associates service yard, and the Amoco service station.
3.2.5.1 Sanitation Plant
The Vail sanitation plant is currently operating near capacity. It is
anticipated that future Lionshead redevelopment/ development, as well as
continuing development in Vail, will necessitate plant expansion. According
to the Eagle River Water and Sanitation District, the most likely direction of
plant expansion would be to the west into the old town shops property. A
less likely but potentially viable alternative would be to expand the plant to
the east into the plant’s existing parking lot.
3.2.5.2 Amoco Service Station
This existing service station (see figure 3-1) is located on the western
perimeter of the Lionshead study area east of Red Sandstone Creek. While
there are no serious functional issues with the service station today, visual
and access issues may become important as the western end of Lionshead
develops.
3.2.5.3 Vail Associates Service Yard
The Vail Associates service yard, bordered by the South Frontage Road on
the east and south and Red Sandstone Creek on the west, currently contains
a wide variety of mountain operation functions such as snowcat service and
fueling, warehouse storage, and maintenance shops. While the service yard
is critical to Vail Associates’ mountain operations there is a strong interest
on the part of the Town of Vail to see the majority of these facilities
relocated on-mountain. According to Vail Associates it may be possible to
relocate many of the facilities, but the snow cat service and fueling
operations must remain at or near its current location. Specific issues
regarding the service yard include:
3-2
3-3
a. Visual
Like its neighboring Amoco service station, the service yard is at the
western front door to Lionshead. Much of the yard is screened by an
existing berm, but the facility is inconsistent with the existing land uses in
Lionshead and the desired visual character of a destination resort. As
redevelopment occurs in west Lionshead it will become increasingly
important to address these visual concerns.
b. Access
The snow cat fueling and maintenance operations are a significant
component of the service yard functions. Snow cats and snowmobiles must
cross the South Frontage Road to access the mountain, frequently conflicting
with traffic on the frontage road.
c. Forest Road Mountain Access
Snow cats from the service yard currently access the mountain via Forest
Road to the Born Free ski run. Though a pre-existing condition, the
presence of the snow cats on Forest Road has long been a consistent
complaint of the Forest Road property owners. It is clear that the removal of
snow cats from Forest Road is desirable but there is no existing secondary
route to the mountain and the alternatives for creating a new access way,
while possible, are problematic. (See section 4.6.4.1.)
3.2.6 Recreation and Open Space
The Gore Creek open space corridor roughly bisects the Lionshead study area. Portions
of this corridor, which widens significantly at the eastern end of the study area, are
owned by the Town of Vail and by Vail Associates (see Map B). The existing tennis
courts at the eastern end of Forest Road, while part of the agricultural and open space
zone district, are unattractive (see figure 3-2) and visually inconsistent with the rest of
the Gore Creek corridor. The Gore Creek corridor is described in greater detail in
section 3.7.2.
3.3 Existing Zoning
The Lionshead study area is currently comprised of 11 zoning districts (see Map C). For
detailed information on these zone districts, consult the existing Town of Vail zoning code. If
any discrepancies exist between the zoning map included in this document and the official
Town of Vail zoning map, the official Town of Vail zoning map takes precedence. Zones
represented in Lionshead include:
• Primary/ Secondary Residential
• High Density Multi-Family
• Medium Density Multi-Family
• Commercial Core 2
• Arterial Business
• General Use
• Special Development District (the
Marriott)
• Agricultural and Open Space
• Natural Area Preservation
• Outdoor Recreation
• Parking
3-4
An analysis of the existing properties in Lionshead shows that many of the multi-family
structures are in violation of existing zoning standards, particularly regarding GRFA,
density, and building height. This is largely due to the fact that many zoning provisions
currently in effect were established subsequent to the construction of much of the
Lionshead core area. As a result, current zoning is largely irrelevant to the existing
condition or the desired redevelopment character of Lionshead. A primary function of
the master plan is to develop a policy framework to guide zoning revisions so that the
goals of the master plan can be implemented in accordance with the Town of Vail’s
regulatory structure.
3.4 Regulatory Issues
3.4.1 Building Height
Map M of this document shows the peak roof height of all the structures in the
Lionshead study area, excluding the residential area south of Gore Creek. These
building heights were taken from a ground level survey that established the peak
elevations of each building relative to the ground elevation. Because the grade
changes across the face of many buildings in Lionshead, the average elevation
around the base of the structure was used to calculate the building height. (Note:
This building height information was acquired for the purposes of this master plan
and does not supercede any prior existing legal building height determination
recorded by the Town of Vail.) Except for the residential area south of Gore Creek,
the allowable building height for most of Lionshead today is 45’ for a flat-roofed
structure and 48’ for a pitched roof structure. (Height limits in the MDMF zone
district are 35’ and 38’ respectively.)
3.4.2 Gross Residential Floor Area (GRFA)
GRFA is a provision in the existing Town of Vail land use code that regulates the
allowable residential floor area relative to the overall developable site area. In
theory, the intent of GRFA is to limit the mass and bulk of a building, resulting in a
more dynamic, less boxy architectural form. However, it is possible for a building
to meet the GRFA limitations without accomplishing desired goals for building
massing and quality architecture. GRFA appears to have had little positive impact
on the quality of structures in Lionshead.
3.4.3 Density
The existing Town of Vail zoning code limits density to 25 dwelling units (DU) per
acre in the Commercial Core 2 zone district. Existing densities in Lionshead
residential condominium projects range from 16 DU/ acre to as many as 55-60
DU/acre.
3.5 Fire Safety
As Lionshead redevelops, it is critical that fire and emergency access be considered in the
planning process. The existing fire safety system in Lionshead suffers from two serious
deficiencies: the difficulty of access and the lack of sprinkler fire protection systems in
many buildings.
3-5
3.5.1 Emergency Vehicle Access
One of the more appealing attributes of the Lionshead core area today is its
pedestrian environment. However, this same feature presents a challenge to
emergency vehicle access. There are numerous locations in Lionshead today
where fire protection is significantly compromised. Although there is an existing
emergency vehicle access route through the Lionshead pedestrian core (see map
G), this route may be inadequate in winter when snow reduces accessibility. In
some locations (such as the south side of the Landmark tower), ground level retail
extensions make the vertical mass of the building inaccessible. As redevelopment
occurs it is essential that existing structures and new development work with the
fire department to insure that these access issues are corrected.
3.5.2 Sprinkler Fire Protection
The single most effective means of providing fire protection to taller buildings in
a restricted pedestrian environment is the installation of fire sprinkler systems.
Fire sprinkler protection is required by fire and building codes in large multi-
family structures today but many of the older structures in Lionshead predate
these regulations and are still unsprinklered. Fire sprinkler systems lessen the
need for immediate fire vehicle response times, thus reducing the impact that fire
access has on the planning of the pedestrian environment. Adding sprinkler
protection to existing Lionshead buildings is a top priority. The buildings in the
Lionshead study area without sprinkler fire protection are as follows:
• Lionshead Center (The parking garage, Garfinkel's restaurant, and Ski School areas are
sprinklered.)
• Lodge at Lionshead, phases 1, 2, and 3 (The parking garage is sprinklered.)
• Tree Tops Condos
• Tree Tops retail plaza (The parking garage is sprinklered.)
• Vantage Point Condos (The parking garage is sprinklered.)
• Vail 21 Condos
• Lifthouse Lodge
• Westwind Condos
• Landmark Tower (The retail component is sprinklered.)
• Landmark Townhomes
• Sunbird Lodge (The parking garage is sprinklered.)
• Old Gondola Building (Kaltenberg Brewery and Trails End restaurant are sprinklered.)
• Lion Square Lodge North
• Lion Square Lodge phases 1-3 (partially sprinklered)
• Antlers Condos (Below-grade elements are sprinklered.)
• Vail Spa (The parking garage is sprinklered.)
• Enzian Condos
• Lionshead Inn (scheduled to be sprinklered by 1999)
• Concert Hall Plaza (Only the lower level is sprinklered.)
• Montaneros (The parking garage is sprinklered.)
• Lionshead Arcade
• Lions Pride Building
• VailGlo Lodge
• Vail International
• Lionshead parking structure (This is of particular concern on the north side of the structure,
where the streetside access is below grade, hidden by a berm and landscaping.)
3-6
3.6 Utilities
A prerequisite for new development or additional density in Lionshead is the ability of
the utility companies to provide service to support the incremental growth of the district.
Discussions with the utility companies raised no significant concerns about the state of
their existing systems or their ability to expand or upgrade their facilities. Research has
indicated that the only significant utility constraint is the current capacity of the Vail
sanitation plant.
3.6.1 General Capacity Data
The capacity of various utilities to serve future development and redevelopment
in the Lionshead study area is outlined below. (For a complete study of existing
infrastructure in Lionshead and the Town of Vail as a whole, please refer to the
Town of Vail carrying capacity analysis.)
3.6.1.1 Gas - Public Service of Colorado
The Town of Vail carrying capacity analysis indicates that there is
adequate natural gas supply to accommodate future development.
3.6.1.2 Electric - Holy Cross Electric Association
The Town of Vail carrying capacity analysis indicates that there is
adequate electrical supply to meet the demands of future development.
3.6.1.3 Water and Sewer - Eagle River Water and Sanitation District
According to ERWSD, the Vail wastewater treatment facility was
serving approximately 5,374 single-family equivalents (SFEs) as of
December 1996, and was operating at over 90% of the plant’s design
capacity. It is anticipated that the future build-out of Lionshead (see
the Lionshead development model in appendix D) would trigger a
plant expansion of some magnitude. Future plant expansion scenarios
and the potential associated costs are discussed in the Town of Vail
carrying capacity analysis. Increased demand for water in Lionshead
could result in decreased stream flows between the golf course and the
wastewater treatment plant. This can be mitigated by a pump-back
system to bring water up to the golf course.
3.6.1.4 Telephone - US West
US West anticipates no problems in providing expanded telephone
service to the Lionshead study area.
3.6.1.5 Cable TV - TCI
It is a policy of TCI of the Rockies, the local cable television service
provider, not to provide letters as to their ability to serve projected
future development. However, no significant hurdles are anticipated
in providing expanded cable television service to the Lionshead study
area.
3-7
3-8
3-9
3.7 Environment
Three broadly defined environmental zones, described below, are represented in the
Lionshead study area (see Map F). These environmental character zones are a
representation of the physical and visual attributes of the study area and do not represent
any land use designation or recommendation.
3.7.1 Resort Zone
The resort zone is the highly developed and urbanized area on the north side of
Gore Creek. While there are pockets of green space within this area it is
characterized primarily by paved streets (both vehicular and pedestrian),
sidewalks, plazas, and buildings. There are no undisturbed soils or original
vegetative stands in this area.
3.7.2 Open Space Zone
The primary component in the open space zone is Gore Creek and the natural area
that flanks it (see figure 3-3). This vitally important open space corridor is
characterized by thick riparian vegetation along the creek embankments, low-
lying wetlands to the south of the creek, and the grassy slopes of the lower ski
trails. The eastern end of Gore Creek (see figure 3-4) supports large evergreen
trees, but the western stretches of the creek (see figure 3-5) are largely devoid of
tree cover and in need of rehabilitation.
The secondary components of the open space zone are the Middle Creek and Red
Sandstone Creek corridors that run north from Gore Creek, forming the east and
west boundaries of the study area (see figures 3-6 and 3-7). The 100-year flood
plain of these creeks is shown in Map D. Both Middle Creek and Red Sandstone
Creek have been significantly impacted by adjacent development but retain some
high quality vegetation.
3.7.3 Low-Density Residential Zone
The third environmental zone is the residential area flanking the south side of the
Gore Creek open space corridor. While this area is by no means a pristine natural
environment it has been less affected by development, both visually and
environmentally, than the higher density resort core north of Gore Creek. This
zone of lower density primary and secondary residences at the lower forest edge
is characterized by stands of mature lodgepole pine.
3.8 Transportation and Circulation
During President’s Day weekend in 1997 the transportation planning firm of Felsburg, Holt,
and Ullevig conducted an in-depth inventory and analysis of the existing transportation
patterns in the Lionshead study area. Their report is contained in appendix A. The following
is an overview of the existing transportation and circulation systems in Lionshead:
3.8.1 Vehicular
The vehicular access system in Lionshead is comprised of one primary route (the
I-70 South Frontage Road) and four secondary routes (East Lionshead Circle,
West Lionshead Circle, Lionshead Place, and Forest Road).
3-10
3-11
3-12
3.8.1.1 I-70 South Frontage Road
The I-70 South Frontage Road (see figure 3-8) borders the northern
edge of the study area and provides vehicular access for all of
Lionshead. General issues associated with the frontage road are
described below:
a. Bicycles and Pedestrians
There are no continuous bicycle paths or lanes along the South
Frontage Road nor are there adequate shoulders that bicyclists or
pedestrians could use instead. The need for a bicycle lane was
documented in the 1991 Vail Transportation Master Plan and the 1988
recreation trails masterplan. The pedestrian core of Lionshead is an
obstacle to bike traffic through Lionshead to Vail Village, forcing
bikes to take the frontage road instead and causing dangerous conflicts
between cyclists and motorists.
b. Turning Movements
There is one eastbound and no westbound turning lanes from the
frontage road into Lionshead, which results in traffic backup during
peak travel periods. Westbound vehicles often veer onto the gravel
shoulder to pass cars waiting to make a left turn. As Lionshead
redevelops and expands its bed base, this problem will intensify.
c. Directional Signage
Visitors to Lionshead often complain of difficulty finding their
destination. Bewildered motorists slow down at each intersection
because there is no signage directing them to their lodgings. The
cumulative effects are traffic congestion and irritated guests.
d. Overflow Parking.
Each winter during peak ski weekends the westbound shoulder of the
frontage road becomes a default overflow parking area, stretching
westward from the turn across from the Evergreen Lodge to the entry
of the Vail Associates service yard. This situation creates a dangerous
conflict between through-traffic and pedestrians, as there are no
delineated crossings and no sidewalk on the south side of the frontage
road. Safe crossings are made even more difficult by winter road
conditions and traffic congestion and because pedestrians are often
wearing ski boots and carrying skis.
3.8.1.2 East Lionshead Circle
East Lionshead Circle (see figure 3-9) serves four primary purposes:
a) providing access to eight lodging facilities; b) serving as the transit
route for private shuttles and the public bus system; c) accommodating
loading and delivery functions; and d) providing a place for private
skier drop-off.
3-13
a. Lodging Access
East Lionshead Circle accesses four lodge properties west of the main
bus drop-off/ pedestrian crossing and four others to the east of the bus
stop. Vehicular traffic to the four properties to the east poses a
significant conflict with the large volume of pedestrian traffic crossing
from the western end of the parking structure into the Lionshead core.
The southern edge of East Lionshead Circle is fragmented by four
separate curb cuts accessing the Lodge at Lionshead.
b. Transit
Transit traffic on East Lionshead Circle consists of Town of Vail buses
as well as local and regional shuttle bus traffic. Town buses have
difficulty making a left turn from East Lionshead Circle to the west-
bound lane of the South Frontage Road because of the street gradient
and the volume of traffic that competes with the bus for breaks in the
frontage road traffic. This backup occasionally causes two westbound
buses to stack at the intersection simultaneously and makes it difficult
for buses to finish their circuits on schedule.
The volume of shuttle van traffic on East Lionshead Circle is greater
than it needs to be. In order for westbound shuttles to reach their
queuing area in front of the Subway sandwich shop at the western end
of the parking structure, they must drive the entire length of the road,
turn around across from Dobson ice arena, and drive back to the
queuing area. This movement requires the shuttles to conflict with the
west pedestrian crossing twice each trip.
3-14
The most significant issue with the transit system along East
Lionshead Circle is the drop-off area located at the western end of the
public parking structure. This drop-off area, home to buses, shuttle
vans, delivery trucks, and personal vehicles, is poorly organized. As
the main pedestrian portal into Lionshead, it is one of the least
functional and most congested elements in the study area. The
primary problem with the drop-off area is the lack of any clear and
safe pedestrian crossing from the parking structure into the Lionshead
pedestrian mall. Pedestrians often walk through the bus lanes and
across the small planter islands. Delivery vans obscure sight lines
when pedestrians step into the traffic lane of East Lionshead Circle.
c. Loading and Delivery
Delivery vehicles need to access all of the residential and retail
properties on East Lionshead Circle, but the vast majority travel only
to one of two locations. The first is the alley behind Vail 21,
Lionshead Pride, and the Lifthouse Lodge. Service vehicles here
conflict with a designated fire lane and significantly downgrade the
pedestrian and vehicular arrival experience to these buildings. The
other concentration of service vehicles occurs at the East Lionshead
bus drop-off. Vehicles parking here cause major conflicts at the
pedestrian crossing from the parking structure and detract from the
visual image of the primary pedestrian entry into Lionshead. Because
these two areas together cannot adequately accommodate peak
delivery volumes, service vehicles will occasionally stage outside the
areas, further exacerbating traffic congestion.
d. Pedestrian Traffic
The pedestrian systems along East Lionshead Circle are marginal in
quality and, in some cases (such as the connection between the public
parking structure and the Lionshead mall), hardly functional at all.
The section of the street from the eastern drop-off area to Dobson
arena has a sidewalk but lacks pedestrian crossings to the residential
properties. It also lacks a dedicated pedestrian connection to the
walkway east of Dobson that continues into Vail Village. The lack of
a sidewalk on the south side of the street forces pedestrians to cross
East Lionshead Circle twice or, more commonly, to walk in the street.
e. Skier Drop-Off
During the ski season the drop-off area at the western end of the
parking structure is often used by private motorists as a skier drop-off
area although there are no designated skier drop-off locations.
Automobiles pose a major conflict with delivery vehicles and further
compromise the safety of pedestrians crossing from the parking
structure. Although it is convenient, skier drop-off at this location is
dangerous and should be eliminated or redesigned.
3-15
3.8.1.3 West Lionshead Circle
West Lionshead Circle (see figure 3-10) functions primarily as the
access route to Lionshead Place, several lodging facilities, and the Vail
Associates core site. In addition the road carries a significant amount
of service and delivery traffic and serves as a transit route for the
Town of Vail bus and the Eagle County regional bus.
a. Transit
There are two Town of Vail transit stops on West Lionshead Circle,
the first located in front of the Marriott and the other at Concert Hall
Plaza. According to the traffic study (see appendix A), only eight
percent of the total traffic entering Lionshead – and only two percent
of passengers on the Town of Vail bus - used the Concert Hall Plaza
stop. The Town of Vail Public Works Department has recommended
that the transit stop at Concert Hall Plaza be discontinued.
b. Service and Delivery
Two service and delivery areas are accessed from West Lionshead
Circle, one at the Concert Hall bus-stop and the other in the alley
between Concert Hall Plaza and the Landmark Townhomes. The
delivery vehicle staging behind the Landmark Townhomes is ad-hoc
and illegal, as this is a designated emergency vehicle access lane.
Both areas occasionally back up and cause trucks to stage temporarily
on West Lionshead Circle.
3-16
c. Pedestrian Traffic
Concert Hall Plaza is intended to be the western portal into the
Lionshead mall, but the pedestrian paths along West Lionshead Circle
are fragmented and the point of entry is unclear. A partial sidewalk
runs along the south side of the street in front of the Marriott but it is
not continuous. The gradient is difficult in places, and pavements are
often icy in winter. There is no pedestrian crosswalk at the
intersection of West Lionshead Circle and Lionshead Place. Dark and
compromised by stairways, the passage through Concert Hall Plaza is
seriously deficient as a pedestrian and retail environment. Very few
pedestrians from west Lionshead ever make the connection through
Concert Hall Plaza to the mall.
3.8.1.4 Lionshead Place
Lionshead Place, a cul-de-sac spur off West Lionshead Circle, is short
but heavily utilized. As the vehicular access point to the Vail
Associates core site, Lionshead Place functions as lodging access,
service and delivery access, a transit stop, skier drop-off, and a heavily
used pedestrian corridor. It is also an important portal to the Gore
Creek open space corridor.
a. Lodging Access
Lionshead Place provides access to the Marriott, Montaneros, Antlers,
Lion Square Lodge, and the Vail Associates core site. Although the
road adequately handles current traffic loads its visual appearance is
inconsistent with that of the front door to a high quality lodging
neighborhood. Motorists going to the Lion Square Lodge must pass
through the VA service lot to get to the lodge’s entry and parking.
b. Transit
The Lionshead Place cul-de-sac is the drop-off location for the Eagle
County regional transit service. Shuttle vans and skier drop-off traffic
also stop in the cul-de-sac. Problems with this location for the
regional bus stop include the lack of proximity to connecting Town of
Vail transit, the distance buses must travel from the main arterial road
and the additional traffic on a cul-de-sac that is already heavily used.
c. Service and Delivery
The majority of truck traffic on Lionshead Place is going to the Vail
Associates core site. The core site has an internal service yard but the
high volume of deliveries means that trucks often have to stage along
the access road or outside the Vail Associates property. This creates
conflicts with the lodging traffic and with pedestrians walking along
Lionshead Place to the ski yard.
d. Pedestrian Access
Lionshead Place is the second most heavily utilized but worst
functioning and least inviting pedestrian corridor in Lionshead. The
high volume of pedestrian traffic is generated by the west Lionshead
lodging properties (the Marriott, Vail Spa, and the Enzian). Seeking
3-17
the shortest route to the ski yard, skiers staying in these properties
bypass the out-of-the-way Concert Hall Plaza and take Lionshead
Place instead, even though there is no continuous pedestrian walkway
on either side of the street. In the absence of sidewalks and
crosswalks, pedestrians tend to cross the street anywhere, creating a
very dangerous conflict with private vehicles, delivery vehicles, and
the regional transit bus. Past the cul-de-sac, pedestrians must walk
along the core site access road (where there is no separation between
pedestrians and vehicles) and into the ski yard by way of a narrow, icy
pathway along the north end of Lion Square Lodge (see figure 3-11).
An additional circulation problem is the lack of a pedestrian
connection between the main Lion Square Lodge building (phases 1-3)
and the Lion Square Lodge north building. These buildings are on
opposite sides of Lionshead Place, and there is no delineated
pedestrian crossing between them.
e. Skier Drop-Off
Lionshead Place handles a significant volume of private skier drop-
offs. This traffic adds one more layer of conflict to the traffic
generated by transit, lodging, service and delivery, and pedestrians.
3.8.1.5 Forest Road
Forest Road functions separately from vehicular circulation systems
that serve the resort core. Connected to Beaver Dam and Rockledge
Roads in summer, West Forest Road becomes a dead end street in the
winter when the middle section is covered by the Born Free ski run.
While West Forest Road is primarily a residential street it handles a
small amount of local skier drop-off traffic and also functions as the
mountain access route for snow cats in the winter.
3-18
3.8.2 Dedicated Pedestrian and Bicycle Networks
Apart from the pedestrian walkways on vehicular streets, there are two primary
pedestrian environments in Lionshead: the Lionshead pedestrian core and the
Gore Creek recreation path.
3.8.2.1 Lionshead Pedestrian Core
The Lionshead core is a pedestrian oriented, mixed-use mall built in
1972. Today, the pedestrian environment suffers from a poor
hierarchy of public spaces, fragmented connections, and a lack of
memorable architectural landmarks. It is often difficult for people not
familiar with the area to navigate through the mall and find their
destination. In addition, some of the physical elements in the core
(such as the pavement, handrails, site furniture, and planters) are in a
general state of disrepair inconsistent with the desired image of a high
quality destination resort.
There are three primary and two secondary points of entry for
pedestrian traffic into the Lionshead core area. The primary entry
points are the east Lionshead bus drop-off, the Concert Hall Plaza bus
drop-off, and Lionshead Place. The secondary entry points are the
Gore Creek recreation path and the I-70 pedestrian bridge. According
to the transportation study (see appendix A), these secondary portals
bring less than 1% and 4% respectively of the pedestrian traffic into
Lionshead.
3.8.2.2 Gore Creek Recreation Path
The Gore Creek recreation path is one of Lionshead’s most
appreciated recreational amenities. With the growth in popularity of
mountain biking, however, there is a growing conflict between
pedestrian and bicycle traffic conflict on the heavily utilized path.
Another recurring complaint is that the two sections of the path east
and west of the ski yard do not connect with one another.
a. East of the Ski Yard
This section of trail is beautifully wooded and close to the water level
of Gore Creek. There are several picnic areas, but they seem to be in
disrepair and infrequently utilized (see figure 3-12). Fences around
adjacent residential properties border the north side of the trail.
b. West of the Ski Yard
This portion of the trail lacks trees and is set at quite a distance above
the creek (see figure 3-5). There is a dangerous blind curve where the
trail passes by the Antlers swimming pool deck (see figure 3-13).
From this point west, the trail is rather barren and in need of
revegetation.
3-19
3-20
3.8.3 Transit
The only portion of the in-town shuttle route where buses must bypass the
pedestrian environment and return to the South Frontage Road is in the core area
between the East Lionshead transit stop and Concert Hall Plaza. This interruption
in the dedicated shuttle circuit forces buses to make several left turns to get on and
off the frontage road, frequently causing delays in the transit schedule. To resolve
the problem, the planning team explored the concept of punching an internal
transit route through the pedestrian core or reserving a corridor for future transit
needs. Both of these ideas met with extreme resistance from residents and
business owners alike. Although there may be no physical solution to this
problem, the issue of how to connect the east half of Lionshead to the west half
must be considered a priority in all future transportation and transit planning for
the Town of Vail.
3.8.4 Service and Delivery
A detailed discussion of the existing service and delivery system is contained in
appendix A. For a discussion of how existing service and delivery areas affect the
streets where they occur, see the individual street descriptions above.
3.9 Parking
The ground rules of the Lionshead master plan state that future redevelopment will not
cause a net loss of parking. An assessment of existing parking conditions is discussed in
this section. For additional parking information on a town-wide basis, please refer to the
Town of Vail carrying capacity analysis and the Master Transportation Study. Existing
public and private parking facilities in Lionshead are shown on Map I.
3.9.1 Parking Generation
Parking demand and generation in a mixed-use resort environment is difficult to
quantify. It is somewhat easier to analyze when broken out into its three
components: parking generated by the lodging bed base, parking generated by
retail/ commercial activity, and parking generated by the ski mountain and other
destination activities and events. However, the ski mountain, the retail shops, and
the lodging facilities do not represent discrete and separate populations, so the
calculation of public parking demand is complicated by the high degree of
overlapping between these different parking generators. To understand the
relationship between future improvements in Lionshead and the public parking
demand they will generate, one must first understand how visitors will arrive and
what they will be doing during their stay in Vail. Only then can the incremental
increase in public parking demand be estimated.
3.9.1.1 Parking Demand Generated by Lodging
All private residential and lodging properties in Lionshead provide
their own parking, either in surface or structured facilities. None,
whether existing or planned, is expected to increase the demand for
public parking facilities. To the contrary, lodgings within easy access
of the ski mountain and the resort core may actually reduce the
demand for public parking facilities.
3-21
3-22
3.9.1.2 Parking Demand Generated by Retail/ Commercial Space
The retail base in Lionshead, with a few exceptions, utilizes the Town
of Vail public parking facilities. Through the Town’s parking pay-in-
lieu system, retail businesses pay a one-time assessment on a square
footage basis for the parking demand they generate. The pay-in-lieu
formula does not fully adjust for the probability that the parking for
many retail customers is already accommodated in their lodgings.
3.9.1.3 Day Skier and Special Event Parking
During the ski season, day skiers are the largest users of the Lionshead
public parking structure. While it is generally assumed that skiing, not
retail, is the primary destination for the majority of wintertime users of
the parking structure, no survey data confirms this.
3.9.2 Existing Public Parking
The Lionshead public parking structure has a capacity of approximately 1,200
cars. In addition, a charter bus parking area is located at the eastern end of the
Lionshead parking structure (see figure 3-14).
3.9.3 Existing Parking Shortfall
According to the Town of Vail Master Transportation Study, the Lionshead
parking structure is filled to capacity approximately 20 to 30 times during the
winter, or roughly 20 percent of the ski season. During these times of capacity
usage (Christmas, President’s Day, Martin Luther King holiday), overflow
parking occurs on the north side of the South Frontage Road.
3.9.4 Vail Associates Employee Parking
Vail Associates currently utilizes two large surface parking lots within the study
area for its employee parking needs. The North Day Lot (see figure 3-15), with a
capacity of approximately 105 cars, is located behind the Landmark tower and is
the site proposed for a transportation facility, employee housing, and other uses
contemplated under the zoning on the property (LMU-1 ). The west day lot,
located just west of the Marriott parking structure, has an approximate capacity of
160 cars and represents a significant development opportunity. Parking displaced
by redevelopment of these sites must be replaced within the Lionshead study area
to satisfy the ground rule requiring no net loss of parking. The displaced parking
will be provided in West Lionshead within a parking structure as part of the
EverVail project.
3.10 Visual Assessment
The poor visual quality of the built environment and the lack of visual connection with
the natural environment are among the biggest concerns in Lionshead. With as many
skiers accessing the mountain through Lionshead as through Vail Village, it is extremely
important that the visual quality of Lionshead reflect the premier winter resort image
desired by the Town of Vail.
3-23
3.10.1 Architecture
Architectural issues in Lionshead generally fall into two broad categories: form
(massing, height, rooflines) and materials (surface treatments, detailing, visual
interest). Many Lionshead buildings are dated, in disrepair, unattractive, and not
in compliance with current codes. The visual quality of some subsidiary
structures, such as the existing skier bridge, is equally inconsistent with the
desired image of a portal as important as Lionshead (see figure 3-16).
3.10.1.1 Form
Most of the buildings in Lionshead have flat roofs and walls that
extend from ground to parapet with little or no horizontal movement in
the building façade (see figure 3-17). Many have unbroken rooflines
the entire length of the building and architectural forms more
reminiscent of warehouses than alpine lodges. The frequent use of
vertically exposed pre-cast concrete elements reinforces the perception
of many structures as over scaled and monolithic.
3.10.1.2 Detail and Ornamentation
Another visual problem with the architecture in Lionshead is the lack
of detail and the prevalence of large, unbroken building faces
composed of the same material (see figure 3-18). There are too few
visually interesting and differentiated retail storefronts, and the retail
experience is generally uninviting. The overuse of exposed structural
concrete, concrete block, and T-111 siding is visually monotonous and
yields an overall appearance incompatible with that of a thriving world
class alpine resort.
3.10.2 Vehicular Streetscape
Visual quality is as important to vehicular streets as it is in Lionshead’s pedestrian
core. Many streets are characterized by deterioration of concrete curbs, gutters,
and sidewalks, the lack of consistent landscaping treatment, and the poor quality
of adjacent retaining walls and site furniture (see figure 3-19). There is no
unifying design or streetscape image tying Lionshead together.
3.10.3 Pedestrian Streets and Retail Mall
In several areas of the pedestrian core, the lack of connection between the retail
storefronts and the pedestrian street is a significant problem (see figure 3-20).
Caused primarily by grade changes, intrusive planting beds, and the excessive
dimensions of public spaces, these separations have the cumulative effect of
reducing the viability and success of the retail environment. In the existing
Lionshead mall there is a need for more unified design concepts, materials, and
paving patterns in pedestrian areas. There is also an urgent need for maintenance
and repair, especially of paving, walls, site furniture, and the spaces connecting
buildings to the pedestrian environment (see figure 3-21).
3-24
3.11 Economic Conditions
The third Lionshead policy objective adopted by the Vail Town Council states a desire
for a “stronger economic base through increased live beds.” This policy objective
recognizes that a large percentage of the Town of Vail’s operating budget comes from
sales tax revenue. Tax revenue is derived from retail and commercial sales and, in a
resort environment, the primary source of retail revenue is the destination visitor.
Following is a comparative analysis of sales tax revenues in the Vail Village and in
Lionshead over the previous nine years. For a more detailed analysis of the retail
business environment in Vail and Lionshead, refer to the Vail Retail Market Study,
contained in appendix C.
Total Sales
Tax Revenue
% Increase
Over Previous
Year
% of
TOV
Total
Total Sales
Tax Revenue
% Increase
Over Previous
Year
% of
TOV
Total
Total Sales
Tax Revenue
% Increase
Over Previous
Year
1989 5,230,492$ 50.73% 2,139,147$ 20.75% 10,309,504$
1990 5,341,017$ 2.11% 49.62% 2,245,264$ 4.96% 20.86% 10,763,785$ 4.41%
1991 5,666,065$ 6.09% 50.24% 2,212,358$ -1.47% 19.62% 11,277,754$ 4.77%
1992 5,883,647$ 3.84% 50.67% 2,288,127$ 3.42% 19.71% 11,611,042$ 2.96%
1993 6,405,762$ 8.87% 51.68% 2,330,782$ 1.86% 18.80% 12,394,681$ 6.75%
1994 6,730,570$ 5.07% 51.78% 2,442,419$ 4.79% 18.79% 12,999,271$ 4.88%
1995 6,645,666$ -1.26% 48.41% 2,462,561$ 0.82% 17.94% 13,728,046$ 5.61%
1996 6,887,967$ 3.65% 50.18% 2,715,875$ 10.29% 19.79% 13,725,182$ -0.02%
1997 7,192,189$ 4.42% 48.92% 2,979,245$ 9.70% 20.27% 14,701,020$ 7.11%
Vail Village Lionshead TOV Total
3-25
3-26
3-27
3-28
3-29
4-1
CHAPTER 4: MASTER PLAN RECOMMENDATIONS - OVERALL STUDY AREA
This section of the master plan addresses issues that affect Lionshead as a whole. These issues – and
recommendations to address them - should be considered in all planning and policy decisions as
Lionshead redevelops.
4.1 Underlying Physical Framework of Lionshead
The Lionshead resort area (that portion of the study area north of Gore Creek) is a mixed-use
urban environment with several discernible land-use sub-areas, or “hubs” (see Map N).
Although the hubs overlap somewhat, there is no consistent and comprehensive pedestrian
connection between them. The primary goal of the master plan is to create a visually interesting
and functionally efficient pedestrian environment that connects the hubs to create a cohesive
and memorable resort environment.
4.1.1 Lionshead Master Plan Concept
Two primary pedestrian streets form the backbone of Lionshead’s physical plan: an east-
west corridor connecting Dobson Ice Arena with the west end of Lionshead and a north-
south corridor connecting the proposed north day lot transportation center with the ski
yard. The circulation system and new retail and lodging components will follow the
underlying pattern set by these corridors (see Map T) and the entry portals associated
with them.
4.1.2 East Lionshead - Civic Hub
The civic hub of Lionshead is comprised of Dobson Ice Arena, the Vail public library,
the Lionshead public parking structure, and the proposed Vail Civic Center site on the
east end of the parking structure. Although this area also contains several lodging
properties and may support office or retail development in the future, all planning and
design decisions here should be respectful of and compatible with these civic
components.
4.1.3 Resort Retail and Commercial Hub
This area, also known as the Lionshead pedestrian core, is the heart of Lionshead and
the epicenter of pedestrian and retail activity. A mixed-use environment, this area is
comprised of retail shops, skier services, offices, residential units, and restaurants, but it
has no coherent identity. More people access the mountain from here than from Vail
village, yet the area experiences low retail sales and weak evening activity. Non-retail
businesses in what should be a high volume retail environment further erode its retail
potential.
The priority for this area is to reinforce and enhance the identity of a premier
destination resort. This requires higher quality retail activity, an active pedestrian
environment, greater diversity of public spaces, and a focus on lodgings that reinforce
activity. All planning and design decisions should further this goal. A priority need
identified by the master plan is a high quality resort hotel in the Lionshead core to
provide the dynamic infusion of people that will support a vibrant retail district. A
corollary need is a more identifiable pedestrian portal into the Lionshead core from the
4-2
west; the absence of a well-designed gateway from this side is a significant obstacle to
the capture of the west Lionshead bed base by core area retailers.
4.1.4 Resort Lodging Hub
This area of Lionshead is located just west of the Lionshead retail core and is comprised
almost exclusively of high-density residential and lodging products. All future planning
and design decisions in this area should work to reinforce the residential nature of the
neighborhood and retain the sense of privacy desired by individual properties. New
development in this area should aim for quieter pedestrian streets, well-defined
pedestrian connections, more intensive landscaping and higher quality streetscape
development.
4.1.5 West Lionshead - Residential/ Mixed-Use Hub
West Lionshead includes the Vail Associates Service Yard, Holy Cross site, Vail
Professional Building site, Cascade Crossings site, Glen Lyon Office Building site,
former gas station site and the Eagle River Water and Sanitation site.
This area of Lionshead is generally under utilized and from an aesthetic standpoint is
not in keeping with what the Town would like to see Lionshead become as it redevelops
in the coming years. The Town of Vail does place a high value on maintaining the
office and retail areas in West Lionshead and any redevelopment should reasonably
increase the square footage of existing office and have “no net loss” of retail square
footage in West Lionshead.
With their recent acquisition of additional properties in this area, Vail Resorts has the
opportunity to bring lift service to this part of Lionshead. Lift service brings with it
great potential for the re-development of this area and in doing so expand all of
Lionshead to the west with improved pedestrian connections, new retail and office
activity and other improvements. While lift access will certainly energize this area
during the winter months, attention should be given to creating a year-round attraction
within this area of Lionshead (see detailed plan recommendations in Chapter 5)
The master plan recommends that this hub become a residential/ mixed use area with an
emphasis on meeting the needs of both the local community and our guests.
Appropriate uses could include high density residential development, lodging,
community and visitor based office and retail space, employee housing and parking, bus
or transit functions and a ski lift connection to Vail Mountain. The catalyst for this
mixed use hub is ski lift access to Vail Mountain. Consideration should be given to
integrating employee housing into the redevelopment of West Lionshead in accordance
with the Town’s employee housing policies and regulations. To the extent possible
development patterns in this area should reflect north-south orientation of buildings,
visual penetrations to the mountain, and a pedestrian oriented environment. The degree
of north-south building orientation may be difficult given the relatively narrow east-west
orientation of this area. In addition, the introduction of ski lift access in this location
creates a catalyst for a structured public parking facility. All service and delivery
demands created by development in this area shall be accommodated on-site.
4-3
The site will continue to accommodate the existing and potentially expanded functions
of the Vail sanitation plant. The mountain service yard could be reduced in size, as some
functions can be moved to less central locations. It may also be possible to relocate the
entire mountain service yard to a new location in the West Lionshead area which would
allow for greater flexibility in the redevelopment of this site. However as the area
develops it is critical that new uses be connected to the primary pedestrian corridors and
that they be served by the Town of Vail in-town transit system.
4.2 Connection to Vail Village
The lack of connection between Lionshead and Vail Village was identified early in the master
planning process. Although both West Meadow Drive and East Lionshead Circle connect the
village to Lionshead, the pedestrian systems along this corridor are poor and the streetscape has
no consistent visual character. The eastern entry to the Lionshead study area is at Middle Creek
(at the Vail public library and Dobson Ice Arena), but the true entrance to the Lionshead retail
core is at the western end of the Lionshead parking structure. Pedestrian connections should be
sensitive to the residential uses on West Meadow Drive and East Lionshead Circle. It is also
important that they be continuous from the intersection of Vail Road and East Meadow Drive in
Vail to the west end of the parking structure in Lionshead. The Town of Vail Streetscape
Master Plan recommendations for West Meadow Drive should be implemented in a way that is
consistent in design and character with the entire Vail Village/ Lionshead connection.
4.3 Connections to the Natural Environment
One of the outstanding characteristics of Vail Village is its spectacular visual connection to
Vail Mountain, particularly the protected view corridors up Bridge Street from the village
parking structure and toward the Gore Range from East Meadow Drive. Over the years the
village has also strengthened its physical connections to the natural environment by improving
creek side parks and trails and by integrating landscape into the built environment at every
opportunity. Lionshead has no similarly strong connection to the natural environment even
though it is situated even closer to the base of the mountain. To remedy this critical deficiency,
the following recommendations are made:
4.3.1 Visual Connections
As development and redevelopment occur in Lionshead, it will be vital to protect visual
connections to the ski mountain. These visual relationships strengthen the identity of
Lionshead as an alpine resort and provide a visual reference that helps Lionshead
visitors to find their way through the core. Visual connections to the natural
environment should be established utilizing the following techniques:
4.3.1.1 View Corridors
Creating and establishing view corridors is an effective way to link the urban
core of Lionshead visually to the natural environment of Gore Creek and the
mountain. The master plan is recommending the creation of several
dedicated public view corridors. In addition, all private development and
redevelopment should endeavor to create visual connections from and
through their properties.
4-4
View corridors do not have to be expansive to be effective. In many cases, a
slender but well targeted view corridor can be just as effective as a broad
view. Nor do visual connections have to be continuous; they can reoccur,
providing intermittent views from different angles.
4.3.1.2 North-South Orientation of Buildings
The predominant east-west orientation of buildings in Lionshead acts as a
visual and physical barrier, interrupting the connection to the natural
environment. It should be a priority in future development and
redevelopment to orient vertical building masses along a north-south axis
whenever possible. This will help to accomplish the following objectives:
a. Sun Access
During the winter months, the sun is low in the southern sky, providing the
greatest solar exposure to the south faces of buildings and to streets and
spaces open to the south. A north-south orientation of building masses will
increase the amount of sun reaching the Lionshead pedestrian core and the
buildings to the north.
b. Views from New Buildings
In double loaded buildings oriented on an east-west axis, units on the south
side of the building get great views of the mountain, but units on the north
side do not. Orienting the building mass on a north-south line creates angled
southern views for both sides of the building, and units on both sides will get
direct sun sometime during the day.
c. Views from Existing Buildings
Public input throughout the master planning process indicated that existing
property owners in Lionshead are concerned that new development will
block their private views to the mountain. By orien ting new buildings on a
north-south axis, the potential visual impact on existing buildings is reduced.
d. Creation of Streets
A strong view corridor in the Vail Village is Bridge Street. The orientation
of the street toward the mountain provides a constant sense of direction and
draws people to the destination at the top of the street. Likewise, the
proposed north-south orientation of buildings in Lionshead will help to
create streets oriented to the views, something that is almost completely
lacking today.
4.3.2 Physical Connections
Physical connections to the natural environment are essential to the experiential quality
of a mountain resort. There are several ways to achieve a physical connection in
addition to creating north-south oriented streets:
4-5
4.3.2.1 Landscape and Greenbelt Corridors
Wherever possible the natural landscape of the Gore Creek corridor should
be allowed to penetrate into the more urbanized portions of Lionshead (see
Map O). This will open up access points to the Gore Creek corridor,
enhance the quality of individual properties, and improve the image of
Lionshead as an alpine resort.
4.3.2.2 Skier Bridge
The skier bridge is the primary existing connection between Lionshead and
the south side of Gore Creek. It is too narrow and enclosed, and could be
much more dramatic in design. The replacement of the skier bridge, as both
a skier and a pedestrian connection, should be a priority. This is a major
opportunity to replace a weak architectural element with a significant
landmark.
4.3.2.3 Access to the South Side of Gore Creek
In addition to the skier bridge, one additional footbridge connects the
Lionshead core to the south side of Gore Creek. An opportunity exists to
create a significant connection between the ski yard and the beautiful
lowland area south of Gore Creek. Regarding this area, the following
recommendations are made:
a. Preservation of Natural Character
Any recreational use in this area must be subordinate to the preservation of
the natural environment and its inherent character.
b. Creation of a Low-Impact Trail System
A consolidated trail system to prevent further degradation of this area by
social trails is needed. Asphalt paving or other, more urbanized paving
systems are environmentally and visually inappropriate. Interpretive signage
and educational opportunities should be considered as part of any
recreational improvements. Trail systems should have provisions for seating
and waste disposal.
c. Connection to the Riparian Environment
The extension of low-impact trails to the water’s edge is encouraged,
creating safe, designated areas for adults and children to get their feet wet
and interact with the creek. The safety of users must be a primary concern in
design.
4.4 Public View Corridors
On May 20, 1997, recognizing the importance of visual connections, the Vail Town Council
approved the use of the existing Town of Vail view corridor ordinance to designate the first
protected public view corridors in Lionshead. In order to qualify for protection under the
Town’s ordinance, a view corridor must meet the following criteria:
a. Is the view critical to the identity, civic pride, and sense of place of Lionshead? A nice
view is not sufficient.
4-6
b. Is the view seen from a widely used, publicly accessible viewpoint? Views from private
property cannot be recognized or protected by this ordinance.
c. Is the view threatened? Is there a possibility that development on nearby property would
block the view?
It is critical to note that the following recommended public view corridors will create a
development constraint that will work with all other applicable development and regulatory
guidelines and standards. The suggested location and outline of any view corridor is not
intended to create a “build-to” line for a vertical architectural edge that would not be allowed
under other applicable guidelines and standards. According to these criteria and following an
intensive public input process, protection of the following public view corridors is
recommended (see Map O):
4.4.1 Public View Corridors Protected under the Town of Vail View Corridor
Ordinance
It is proposed that two legally protected view corridors be established according to
existing Town of Vail code:
4.4.1.1 View Corridor One
This view corridor (see figure 4-1) is seen from the west end of the Lionshead
parking structure, standing at street level at the main pedestrian exit and
looking southwest toward the gondola lift line. This view fulfills the
following criteria:
a. It fosters civic pride and is central to the identity of Lionshead
b. It is taken from a commonly used, publicly accessible viewpoint. This area
is the primary point of entry for pedestrian traffic from the parking structure
and is also the primary Lionshead transit stop.
c. It is potentially threatened by redevelopment in the foreground of the view.
Figure 4-1: Public View Corridor One
4-7
4.4.1.2 View Corridor Two
This view corridor (see figure 4-2) is seen from the pedestrian plaza at the
east end of the Lifthouse Lodge, looking south directly up the gondola lift
line. This view fulfills the following criteria:
a. It fosters civic pride and is central to the identity of Lionshead.
b. It is taken from a commonly used, publicly accessible viewpoint.
The mountain view from this point is currently very broad, crossing much of
the Vail Associates core site. As part of the redevelopment of the Vail
Associates core site this view corridor should become narrower and more
focused on the new gondola terminal. Given the current lack of a defining
architectural edge, the dimensions of this corridor should roughly correspond
to the suggested view boundaries outlined in figure 4-2.
Figure 4-2: Public View Corridor Two
4.4.2 Public View Corridors Where Redevelopment of the Viewpoint or the Foreground
is Likely
It is proposed that the following three views be established as critical design
parameters, but not as benchmarked and surveyed corridors. The extent to which an
applicant for redevelopment creates or maintains these views will be a consideration for
approval or disapproval by the reviewing board. Prior to approval of a redevelopment
application by the Town Council the new view corridor should be surveyed and
formally adopted in accordance with existing Town code.
4-8
4.4.2.1 View Corridor Three
This view is from the east end of the Lionshead parking structure looking
south across the Lodge at Lionshead buildings toward the ski mountain (see
figure 4-3). This site has been identified for future development as a civic
facility; when that happens, this view may become more important.
Figure 4-3: Public View Corridor Three
4.4.2.2 View Corridor Four
This view, seen from the southeast corner of the north day lot, looks south
over the Vail Associates core site toward the ski slopes (see figure 4-4). In
designating this view, the intent is to ensure that future development on the
Vail Associates core site retains an upper-level visual connection to the
mountain and the gondola lift line. Protection of this view corridor ensures
that visitors will be able to see the Gore Creek corridor and the mountain
when they arrive at the new transit center, much as one sees Pepi’s Face
from the bottom of Bridge Street.
4.4.2.3 View Corridor Five
The intent of this view (see figure 4-5) is to provide both a visual and
physical pedestrian connection through the Vail Associates core site to the
ski yard. As seen from the main Lionshead plaza, this view will be framed
by the architecture of the retail environment, not a panorama of the ski
mountain.
4-9
Figure 4-4: Public View Corridor Four
Figure 4-5: Public View Corridor Five
4-10
4.4.3 Ever Vail View Corridors
The photographs in this section are intended to show a general view to be protected. Due to the
existing development on the site and the proposed Ever Vail improvements, the exact views are not
possible to photograph at this point in time. Upon completion of Ever Vail, the new view corridors
should be photographed, surveyed and adopted in accordance with the provisions of Chapter 12-22,
View Corridors, Vail Town Code. View corridors within Ever Vail will need to be reviewed as an
element of each major exterior alteration application in order to determine the location for the origin of
each view. Tools such as, but not limited to, photo renderings and digital models will be utilized in
this review.
4.4.3.1 Public View Corridor Six
This view corridor looks south to the proposed park area confluence of Red Sandstone Creek and Gore
Creek.
Figure 4-5a: Public View Corridor Six
4.4.3.2 Public View Corridor Seven
This view corridor is seen from the Central Plaza, up the lift line of the Ever Vail gondola. This is the
defining view of Ever Vail, as it is in the center of the development, taken from a publicly accessible
view point. The proposed gondola terminal is in the center of this view, and is integral to the view
corridor.
4-11
Figure 4-5b: Public View Corridor Seven
4.4.3.3 Public View Corridor Eight
This view corridor is intended to provide a visual connection to Lionshead, and is seen from the
pedestrian connection into Ever Vail from West Lionshead Circle. This view is framed by the Vail Spa
and Ritz Carlton Residences.
Figure 4-5c: Public View Corridor Eight
4.5 Public Transportation
An efficient transit system is critical to the character and environmental quality of any
pedestrian-oriented resort. It is also assumed that as growth and redevelopment continues in the
Lionshead area an expansion of existing transit facilities will be necessary.
In 2009 the Town of Vail completed the Lionshead Transit Station project. While this study
address a number of transit, transit related functions (skier drop-off, loading, hotel shuttles,
charter buses, etc.), and other related master plan goals (inviting portals, pedestrian experience,
etc.), the focus of this effort was to define a solution for establishing a central transit station
4-12
within the Lionshead area. A “model” for a central station would be the transportation center in
Vail Village. By way of comparison, transit operations in Lionshead are dispersed throughout
the area and lacking the efficiency’s of the Vail Village center.
Transit station facilities necessary to accommodate in-town shuttles, local buses and ECO buses
were assessed based on both near term and long term needs. It was determined that over the
near term between 9 and 11 bus bays will be needed and that in the long term up to 12 to 14 bus
bays could be necessary (Lionshead Transit Study, LSC 2009).
Given the existing “built condition” of Lionshead there are no perfect solutions for a transit
station from either the standpoint of location or cost. For these reasons a phased approach for
transit station improvements is appropriate.
4.5.1 Connection to West Lionshead
West Lionshead consists of the Vail Associates Service Yard, Holy Cross site, Vail
Professional Building site, Cascade Crossings site, Glen Lyon Office Building site,
former gas station site and the Eagle River Water and Sanitation site. Because it is an
area of potentially significant growth, it is important that it be fully integrated into the
Town of Vail transit system. The West Lionshead properties are at the outside edge of
the acceptable walking distance to the ski yard (1200 feet). With a mixed use
development in the area which integrates a ski portal, retail space, office space and
residential development, transit service to this area and interconnections to other portals
will be critical to develop in the future. In addition, the update of the Vail
Transportation Master Plan and the 2009 Lionshead Transit Study shall provide
direction on the ultimate location of a Lionshead Transit Facility along with needed
interconnections between ski portals, regional transit stops, and other transportation
modes. The addition of a ski lift in this area would make this area more viable to
redevelopment as it would be within the acceptable walking distance of a lift (1,200
feet).
4.5.2 Maximum Efficiency and Utilization
The following recommendations are made to enhance the efficiency and functionality of
the Lionshead transit connections in anticipation of future redevelopment in the area:
4.5.2.1 Regional Transit Stop
Alternative locations considered for a regional transit station include the
North Day Lot, the West Lionshead area and the Lionshead Parking Structure.
Of these alternatives the preferred location is the Lionshead Parking
Structure.
The Structure is well-sited from a locational standpoint, allows for convenient
connections with shuttles, local and in-town bus routes, and may allow for the
phased development of a transit station that can respond to Lionshead’s
transit needs over time.
Affordable housing (in lieu of a transit center) was deemed to be the preferred
use for the North Day lot and the west Lionshead area was considered too
4-13
remote from the rest of Lionshead to be a suitable location for a centralized
transit center. Notwithstanding the above, facilities for skier drop-off, private
shuttle vans, regional buses (ECO), charter buses and the Vail In-Town bus,
as defined by the West Lionshead Transit Study (LSC, 2009), should be
included in the design of the ski lift and parking facility at West Lionshead.
4.5.2.2 Concert Hall Plaza
The elimination of the Concert Hall stop would free up space needed to
implement a meaningful redevelopment of Concert Hall Plaza and create a
better western portal to the Lionshead core (as more thoroughly described in
section 5.10.2). However, the transit and loading/short-term parking provided
in this location provide an important service to this part of Lionshead. Any
redevelopment of the Concert Hall Plaza or Montaneros will need to address
these transit and other related functions.
4.5.2.3 The North Day Lot
The North Day lot presents a location for two important community-based
uses – a transit center and affordable housing. It has been determined that this
site is most suited for housing and transit related functions on this site should
be limited to skier drop-off and potentially short-term parking/loading
functions.
4.5.2.4 Transit Station at Lionshead Parking Structure/Frontage Road
The "Lionshead Transit Center and Related Transportation Enhancement
Improvements Design Study" completed in 2009 by the 4240 Architecture
Design Team concluded that the Lionshead Parking Structure presents the
most viable location for a centralized transit station in Lionshead. In order to
address the near-term transit needs an initial phase is recommended that
includes a transit stop along the Frontage Road immediately north of the
structure. This solution has minimal impacts on the parking structure, can be
implemented at a relatively low cost and will meet Lionshead's anticipated
transit needs for the near term future.
As a long term solution, the Transit Center should be integrated within the
Lionshead Parking Structure site; either within a new redevelopment, as
contemplated in the 2006 Lionshead Parking Structure Redevelopment Plan,
or on top of a future reconstruction of a Lionshead Parking Structure.
Transit requirements should be met as outlined within the 2009 Lionshead
Transit Study.
4.5.3 Addressing Existing Problems
4.5.3.1 Vehicle-Bus Conflicts
Potential conflicts between vehicular traffic and transit buses should be
addressed as streets are redesigned and engineered. Conflicts are most likely
4-14
at intersections, transit stops, and any location where vehicular traffic could
back up and block the bus lane.
4.5.3.2 Dobson Ice Arena Stop
There are periodic conflicts between pedestrians and buses at the Dobson/
public library bus stops. This problem is particularly severe when events at
Dobson ice arena bring large numbers of pedestrians into the bus drop-off
area. Potential solutions include the reconfiguration of the Dobson drop-off
area and the creation of a secondary bus stop at the western end of Dobson
arena. A west Dobson transit stop would operate in conjunction with the
potential development of a Town of Vail civic center on the existing bus/RV
lot, as well the utilization of the west entry to the arena as the primary access
for special events. (The latter would greatly reduce the pedestrian-bus
conflicts occurring today in front of Dobson arena.)
4.5.3.3 East Lionshead Circle and South Frontage Road Intersection
The intersection of the South Frontage Road and East Lionshead Circle is a
severe problem for Lionshead transit service. The first problem with this
intersection is the steep approach gradient, making it difficult in severe
weather for the bus to turn onto the South Frontage Road. The second issue,
often exacerbated by the first, is the left turn movement across traffic onto
the frontage road. There is no easy solution to this problem. Reduction of
vehicular traffic on East Lionshead Circle would decrease competition for
openings in the frontage road traffic, but this is only a partial solution. Other
mitigating measures could include the following:
a. Gradient
Reduction of the gradient at the intersection can be accomplished by
lowering the entire intersection or by increasing the approach gradient of
East Lionshead Circle. Either would create a level platform where buses can
wait to make a left turn into traffic.
b. Roundabout
The construction of a roundabout at this intersection would slow traffic on
the frontage road, ease the left turn movement from East Lionshead Circle,
and reduce the stacking of westbound vehicles waiting to make a left turn
onto East Lionshead Circle. However, the spatial requirements of a
roundabout, as well as its proximity to the eastbound lane of I-70, will make
this solution difficult.
c. Signalization
Traffic signals are extremely unpopular in Vail (there are none at present).
However, a special use signal triggered only by approaching transit buses
might be considered to facilitate their movements.
d. Acceleration and Deceleration Lanes
4-15
As shown in figure 4-6, there is the opportunity to create westbound and
eastbound acceleration and deceleration lanes. With a dedicated left turn
lane and westbound acceleration lane, buses will have less
competition for breaks in traffic and will only be required to cross the
eastbound traffic lane.
e. Removal of Transit from the Frontage Road
The frontage road section between East and West Lionshead Circle is the
only portion of the Town of Vail in-town transit route on the frontage road.
Frontage road traffic and the difficulty in making left turns cause frequent
delays in transit service. The route could be modified in several ways:
• Create a parallel transit lane on the south side of the South Frontage
Road (see figure 4-8). Although physically feasible, this alternative
would require the acquisition of land from adjacent lodging properties
currently used for parking, an action these property owners would likely
resist. A dedicated transit lane would also exacerbate conflicts at
intersections and lodging driveways.
• Create a new underground transit corridor between the North Day Lot
and East Lionshead Circle. This option should be pursued with the
cooperation of property owners when and if the properties in this area
redevelop.
• Terminating the in-town shuttle bus route at the East Lionshead drop-off
(see figure 4-7) was suggested as an alternative to consider in the original
Lionshead Redevelopment Master Plan. This idea was re-visited during
the 2009 Lionshead Transit Station project. Due to strong public input to
maintain in-town shuttle service to the western side of Lionshead this
idea was not pursued. In the future it may be desirable to have the ability
(for operational purposes) for buses to turn around on East Lionshead
Circle at the east entry to Lionshead. The re-design of the east entry to
Lionshead should not preclude the possibility of this turning movement
being accommodated at some point in the future.
4.5.3.4 East Lionshead Circle Skier Drop Off
Lionshead is lacking sufficient, well-located skier drop off facilities. For
many years residents and guests have been using the East Lionshead Circle
area at the pedestrian entry to Lionshead to drop off and pick up skiers. This
“illegal” activity is cause for much of the congestion, confusion and
pedestrian conflicts in this area. Efforts should be made to provide alternative
locations for convenient and accessible skier drop off. Possibilities include
the North Day Lot and the Lionshead Parking Structure.
4.5.4 Future Considerations
The average life span of a Town of Vail transit bus is approximately twelve years.
Given the evolving and changing nature of transit systems, new transit technologies and
opportunities should be considered. Several future technology issues warrant
consideration by the master plan:
4-16
4.5.4.1 Alternative Local Transit Systems
One complaint with the existing Vail transit system is the noise and exhaust
associated with diesel buses. As the existing bus fleet ages,
alternative technologies such as electric people movers and light rail should
be considered.
4.5.4.2 Regional Rail System
In 1996, Union Pacific Railroad applied for abandonment of its Tennessee
Pass rail corridor through Minturn west to Dotsero. The potential
abandonment of this line sparked many ideas about the future use of the
corridor, including the concept of an Eagle Valley commuter rail connection
between the Eagle Airport and Vail. If this commuter rail connection were
to occur, it would be a regional, county-wide transit system, not a local
connector. The extreme cost of such a rail connection would warrant the
creation of a major transit stop in Vail, such as in the I-70 corridor and/ or
above the interstate. Such a solution should be pursued in contrast to
incorporating the rail connection into either the existing Vail Transportation
Center or the proposed North Day Lot transportation center. The primary
challenges for a Vail Valley commuter rail connection are the high cost, the
difficult physical connection through Dowd Junction, and the availability of
a conveniently located site for a stop in Vail.
4-17
4-18
4-19
4-20
4-21
4-22
4.6 Vehicular and Pedestrian Circulation
4.6.1 Interstate Highway 70
I-70 is the primary vehicular circulation corridor for the Vail Valley and is critically
important to the economic health of the Vail community. It does, however, create both
a visual and physical division between the south and north sides of Vail, as well as
consuming a significant amount of land. As Vail continues to grow over time it is
strongly recommended that the ideas of potentially burying or bridging I-70 through the
Town of Vail be studied and the potential benefits and impacts considered. Specifically,
consideration should be given to securing the air-rights over I-70 so that future
development and circulation scenarios are not precluded.
4.6.2 South Frontage Road
Recommendations outlined below address the potential realignment of portions of the
frontage road, ingress and egress improvements, bicycle/ pedestrian improvements, and
visual improvements. For a detailed discussion of capacity and the impacts of future
development on the frontage road, see the traffic impact study contained in appendix A.
With Vail Resorts’ acquisition of the Glen Lyon Office Building, the Vail Professional
Building and Cascade Crossing, realignment of the South Frontage Road along the
south side of I-70 is a reality. Study of this realignment throughout 2007 and 2008
allowed the Town of Vail, Vail Resorts, CDOT and FHWA, to come to a general
agreement as to the road section, right-of-way width, and access points. This alignment
and design is the preferred alternative, and is indicated in figure 4-9.
4.6.2.1 Potential Realignment
The concept of realigning the South Frontage Road at the western end of the
study area grew out of public discussions about land development and traffic
flow in West Lionshead. Relative to traffic flow, realignment will remove
the conflict that now exists between through-traffic and mountain service
vehicles (snow-cats and snowmobiles) entering and exiting the Vail
Associates service yard. Realignment will position the road to the north of
most new development, thus reducing the potential for conflicting turning
movements.
Regarding future land use, the realignment of South Frontage Road will
allow the west day lot and the service yard to be combined into a contiguous
development parcel. This is an important consideration for the development
conceptually depicted in figure 4-9a, and it would be necessary if the service
yard property is used for a secondary public parking facility or other uses.
Any existing parking on the West Day Lot must be replaced within the
Lionshead study area. Through the Transportation Master Plan update it is
anticipated that a significant traffic control device will need to be installed in
the West Lionshead area. Such a device may include a round about.
4-23
Figure 4-9: Conceptual Realignment of the South Frontage Road
Specific considerations regarding realignment are:
a. Proposed Alignment
The proposed realignment of the South Frontage Road is depicted in figure
4-9a. Critical design issues include the width of the road and the radius of
the curves. Both of these factors will be important in reducing the speed of
vehicles entering the Lionshead area and the amount of land consumed by
the two curved road sections. Cooperation between property owners,
developers, the Town of Vail, and the Colorado Department of
Transportation will be necessary to implement the realignment of the
Frontage Road.
b. West Lionshead Circle Connection
It is proposed that West Lionshead Circle connect back to the frontage road
at the west side of the Vail Spa. The alignment depicted in figure 4-9a
terminates perpendicular to the frontage road and does not require the
acquisition of private property. A new parcel of developable land, suitable
for offices or non-resort retail, would be created on the southeast corner of
this intersection.
c. Forest Road Connection
4-24
Forest Road could be realigned to cross through the newly created
development parcel, providing access to that site and connecting at right
angles to the frontage road. Another alternative that should be considered is
to connect Forest Road to West Lionshead Circle via the existing Frontage
Road right-of-way.
d. Transit and Emergency Vehicle Corridor
A transit and emergency vehicle corridor should remain in the existing
alignment of the frontage road. This connection is necessary to provide a
through-transit route to the west end of Lionshead and also keeps in place the
existing utility corridor.
e. Feasibility of Realignment
The ability to realign the frontage road will be heavily influenced by costs,
CDOT (Colorado Department of Transportation), and the Federal highway
administration. Future west Lionshead developments will require significant
upgrades and widening of South Frontage Road, potentially including the
widening or reconstruction of the bridge over Red Sandstone Creek. The cost
of realigning the frontage road is in addition to the mandatory costs of
improving the road.
f. Future Frontage Road Re-alignment
The opportunity may exist to re-locate the Frontage Road the full length of
the West Lionshead planning area. The benefit of this alternative would be
to eliminate the “Frontage Road barrier” between the Holy Cross site and the
Vail Professional Building. While this alternative would require
coordination with other surrounding land owners, it could warrant further
study and evaluation in the future.
4.6.2.2 Road Improvements to Handle Increased Traffic Volume
The potential expansion of the Lionshead bed base and the corresponding
increases in traffic volumes will necessitate traffic mitigation measures.
Increased road width, acceleration/ deceleration lanes, and perhaps
roundabouts may be required in conjunction with new development. These
improvements are described in the traffic impact study, attached as appendix
A. It is important to note that the potential widening of the frontage road
depicted in the overall masterplan graphic is not necessarily the best or
required solution. It is a potential solution but the final design of road
improvements will need to consider not only the traffic volume requirements
but visual impacts and community preferences as well.
4.6.2.3 Provision for Bicycles and Pedestrians
A pedestrian/ bicycle path should be created on the south side of the frontage
road running the entire length of the Lionshead study area. Providing an
unbroken pedestrian/ bicycle path to connect the main Vail roundabout to
Cascade Village, this pathway will conform to the current Town of Vail
standards regarding width and material.
4-25
4.6.2.4 Visual Improvements
It is essential that improvements for better traffic flow be accompanied with
aesthetic improvements in order to break up the perceived width of the
improved roadway and to give a stronger image to this north edge of
Lionshead (see figure 6-5). Improvements could include landscaped
medians and a consistent landscape treatment between the South Frontage
Road and the eastbound lane of I-70. Fragile understory plantings should be
avoided in favor of street trees and hardy ground covers that can survive
winter snowplowing activities. This corridor should also include new
directional signage, described in section 4.10.1.1
4.6.3 Modification to East Lionshead Circle
The overriding goal for East Lionshead Circle is to de-emphasize vehicular traffic and
create a quality, safe, and vibrant pedestrian corridor. Specific recommendations are as
follows:
4.6.3.1 Eastern Connection to South Frontage Road
A prerequisite for improving safety in the pedestrian crossing between the
Lionshead parking structure and the eastern entrance to the Lionshead retail
core is a significant reduction in the volume of vehicular traffic (except for
transit, emergency vehicles, and adjacent residents). It was initially thought
that the most effective means to accomplish this would be to connect East
Lionshead Circle back to the frontage road on the east end of the parking
structure. However, there are several serious problems.
a. Gradient
The biggest hurdle is a 34-foot rise between the frontage road and the cul-de-
sac at the east end of the parking structure. This would result in a gradient
approaching 9 percent on the connecting road segment.
b. Traffic Conflicts
An increase in the volume of traffic using the new connection would likely
trigger a significant intersection upgrade at the frontage road (acceleration/
deceleration lanes, center turn lanes, or a roundabout). Relocation of the
parking entrance to the north side of the structure might alleviate some of
these concerns.
c. Transit Conflicts
Connection of the street to the frontage road could introduce a new point of
conflict between cars and buses at the driveway down to the Library and
Dobson Arena, especially if a vehicular drop-off point is introduced at the
west end of Dobson.
As an element of the 2009 Lionshead Transit Station Project the feasibility
of creating an eastern connection of East Lionshead Circle to the Frontage
Road was evaluated. The conclusion of this evaluation was that the existing
gradient and land ownership patterns rendered this idea to be infeasible. The
4-26
idea of an east connection could be reconsidered if ownership patterns
changed or in conjunction with the redevelopment of Vail International.
4.6.3.2 West (Current) Entrance
As the eastern connection appears unfeasible, it is recommended that other
measures be undertaken to de-emphasize the current (west) entrance to East
Lionshead Circle as a vehicular portal into Lionshead. The only traffic
entering East Lionshead Circle at this point should be service vehicles,
buses, and local residents. Signage, road width, and other roadway design
modifications should be utilized to discourage traffic from entering at this
point. These measures are important to reduce conflicts between vehicles
and pedestrians at the crossing from the parking structure and to reduce the
outgoing traffic that competes with the buses for the left-turn movement onto
the South Frontage Road.
4.6.3.3 Main Lionshead Pedestrian Portal
This congested and confused pedestrian portal is the area most in need of
corrective action. It is recommended that vehicular traffic through this
crossing be removed or greatly reduced and that skier drop-off, local and
regional shuttle vans, and service and delivery vehicles be removed from this
location. The area would then be dedicated to two primary uses: a pedestrian
connection between the parking structure and Lionshead and a transit stop
for the Town of Vail in-town shuttle.
4.6.3.4 Visual Improvements
As an important link in the transit connection between Vail Road and the
east Lionshead pedestrian portal, East Lionshead Circle plays an important
role in setting the visual tone and character for people arriving from Vail
village. Toward that end, any architectural additions to the south face of the
parking structure should comply fully with the architectural design
guidelines, and the pedestrian walkway should create a consistent visual
character connecting Dobson Arena with the east Lionshead pedestrian
portal. In addition, it is recommended that the Town of Vail coordinate with
the adjacent residential properties to provide a visually consistent vegetative
screen on the south side of East Lionshead Circle.
4.6.3.5 Pedestrian Sidewalks
A new, more intensively developed pedestrian walkway is recommended
along the south face of the parking structure to connect the main Lionshead
pedestrian portal with the Dobson/ Civic center pedestrian plaza. This
walkway will provide access to the potential new retail face of the parking
structure and permit unimpeded pedestrian flow between the two ends of the
parking structure (see figure 6-6). Given the long and linear nature of this
façade, a covered arcade across the walkway, as suggested during the master
plan public input process, may help to break it up. If covered, the walkway
4-27
should be wide enough to accommodate the flow of pedestrian traffic along
the retail face and designed as an integral element of the building.
4.6.4 Modifications to West Lionshead Circle and Lionshead Place
West Lionshead Circle and Lionshead Place currently handle the heaviest load of
lodging access and delivery traffic in Lionshead and will likely continue to do so. The
recommended improvements to these roads are both aesthetic and functional, working
to provide for safe and efficient vehicular traffic while also insuring a safe pedestrian
environment visually consistent with the overall goals of the master plan.
4.6.4.1 East Intersection of W. Lionshead Circle and S. Frontage Road
This intersection will experience the greatest increase in traffic volume due
to the projected increase in lodging units and the proposed north day lot
transit center. Mitigation measures may be required, as outlined in the traffic
study (see appendix A).
4.6.4.2 Intersection of Lionshead Place and West Lionshead Circle
Due to the projected volume of lodging traffic that will be accessing
Lionshead Place (Monteneros, Antlers, Lionsquare Lodge, and the Vail
Associates core site), it is recommended that this intersection be realigned so
the primary through-traffic axis is north-south (see figure 4-10). West
Lionshead Circle would form a T-intersection at the northeast corner of the
Marriott. In addition to facilitating traffic flow, this realignment will create a
much safer, logical pedestrian crossing from West Lionshead Circle into the
Lionshead pedestrian core.
4.6.4.3 Pedestrian Sidewalks and Crossings
A series of primary and secondary pedestrian walks should be created
connecting the West Lionshead area with the Lionshead core, the frontage
road, and the ski yard. These walks and crosswalks are identified on Map Q
and Map T.
4.6.4.4 Visual Improvements
As the road systems and adjacent lodging properties in west Lionshead are
upgraded it is critical that a consistent visual character be developed through
the design of new pedestrian walkways, landscaping, retaining walls,
lighting, and site furnishings. For further information on these systems, see
chapter six, Site Design Guidelines.
4.6.5 Forest Road
The primary goal for Forest Road is to maintain and enhance its residential character
by mitigating present or future uses that would detract from this character. Specific
recommendations are as follows:
4-28
4.6.5.1 Mountain Service Access Issues
Forest Road currently plays an important role in mountain service access,
both during the summer and winter. It was made clear during the public
input phase of the master plan process that the adjacent property owners are
deeply concerned about the winter activity of snowcats on Forest Road and
would like to see this operation removed. While mountain access must be
provided for, the removal of this winter traffic from Forest Road should be a
priority for the Town of Vail and Vail Associates.
A potential solution is to bridge Gore Creek just west of the old Town shops
and construct a road that connects to the existing “Cascade Ho” ski trail.
Previous studies have shown that a connecting road across the forested slope
could have serious visual impacts because of the extreme cross-slope
gradient and resultant cut and fill requirements. It is also likely that the
Cascade Village property owners would resist this alternative. If this
approach is to be implemented, visual mitigation of the new connecting road
must be an important consideration.
4.6.5.2 Pedestrian Connections
A pedestrian and bicycle path should be created along the east side of Forest
Road (north of Gore Creek) to provide a connection to the Gore Creek
recreation path.
4.6.5.3 Realignment of South Frontage Road
If the South Frontage Road is re-aligned, Forest Road likewise may be
realigned as a point of access for the redeveloped west end of Lionshead. As
shown in figure 4-9, it is recommended that the section of Forest Road north
of Gore Creek be the primary access for new lodging developments in west
Lionshead. Realignment will consolidate the access points from South
Frontage Road and remove the existing conflict between Forest Road
vehicular traffic and mountain service traffic exiting the Vail Associates
service yard.
4.6.6 Simba Run Underpass
Currently the Town of Vail has only two north/south access points between the North
Frontage Road and South Frontage Road between Main Vail and West Vail. It has been
contemplated that an additional north/south connection be established west of Cascade
Crossing. The need for this underpass will be accelerated as a result of the Town’s
redevelopment plans for Timber Ridge, West Vail and West Lionshead. The
redevelopment of the West Lionshead area should be done in a manner that encourages
this new connection to be established in the future. It is recommended that the proposed
amendments to the Vail Transportation Master Plan provide direction on when public
improvements on the Frontage Road need to occur and how they are paid for between
public and private funds. The current boundaries of the Lionshead Urban Renewal
Authority should be amended to include the location of the Simba Run underpass.
4-29
4-30
4.7 Loading and Delivery
4.7.1 Properties with Direct Service Access
As a general rule, properties that can provide for their own service and delivery needs
should comply with the following guidelines:
a. Loading and delivery facilities should be located deep enough into the property that
the estimated peak volume of service vehicles does not back up into or block the
access road or pedestrian areas.
b. Service drives and loading docks must be screened with landscaping, fencing,
retaining walls or other appropriate design techniques.
c. All reasonable measures shall be taken to prevent noise and exhaust impacts on
adjacent properties.
d. In no case shall a property utilize the public roadway or pedestrian area to stage
service and delivery vehicles.
4.7.2 Properties Without Direct Service Access
Properties lacking direct service access from a public street must utilize a designated
public service and delivery facility. They must make all reasonable efforts to coordinate
and schedule their delivery needs with other users of the facility in order to reduce peak
volume usage. For a discussion of projected service and delivery volumes, see the
traffic impact study, attached in appendix A. Potential locations and opportunities for a
central facility are described below.
4.7.3 Potential Sites for Centralized Service and Delivery Facilities
The potential facilities described below would be designed to provide unloading and
staging space for deliveries into the Lionshead core. Transport from the delivery truck
to the retail destination will most likely be made by hand-trucks, although the use of
small golf cart-like delivery vehicles could be considered. The goods delivery system
should be as quick and efficient as possible and should not cause noise, pollution, or
congestion in the pedestrian core.
4.7.3.1 West End of Lionshead Parking Structure
The idea of a non-structured central loading facility at the west end of the
Lionshead parking structure was presented in the original version of the
Lionshead Redevelopment Master Plan. This idea was further evaluated as
an element of the 2009 Lionshead Transit Station Project. Due primarily to
the grade of East Lionshead Circle (+8%) as well as the visual impact of this
use and conflicts with parking structure snow removal areas, this idea was
deemed to be infeasible.
The goal of removing loading from the east entry to Lionshead in order to
improve safety and the overall pedestrian experience remains. Loading for
businesses in the eastern end of Lionshead can be accommodated from the
public loading spaces located within the Arrabelle project.
4-31
4.7.3.2 Lifthouse Lodge Alley
This alley accesses the Lifthouse lodge, Vail 21, and the Lionshead Arcade.
If redevelopment occurs along this corridor, the existing service and delivery
functions should be redesigned to meet the parameters outlined in section
4.7.1 and to permit a clear fire lane.
4.7.3.3 Vail Associates Core Site
As the single largest service traffic generator in Lionshead, the Vail
Associates core site redevelopment (Arrabelle) will provide for its own
service and delivery needs. In addition, the project will provide a minimum
of three loading spaces and up to six loading spaces available for public use.
These spaces will provide loading facilities for properties in Lionshead that
do not have on-site loading capabilities.
4.7.3.4 Landmark Townhomes Alley
The existing alley south of the Landmark Townhomes is utilized as a
delivery vehicle staging area, but this activity is strictly illegal. This alley is
the only dedicated fire access corridor into Lionshead from the west and is
not wide enough to accommodate service traffic without blocking the fire
lane. If the north day lot service center is constructed, it is recommended
that a new service corridor in this area not be constructed. However, in the
event that the north day lot site is not developed, any new service corridors
in this area must conform to the parameters outlined in section 4.7.1 and
must not compromise the fire and emergency vehicle access into the
Lionshead core.
4-32
4-33
4.8 Parking
Parking is a critical component in a mixed-use resort environment such as Lionshead, and any
efforts to enhance this component should adhere to the following goals and guidelines:
a. Parking must be sufficient to meet demand. Correctly assessing parking demand in an
environment such as Lionshead is difficult but extremely important. Overestimating
parking demand can be as damaging as underestimating demand due to the extreme expense
of parking space (especially if structured) in a real estate environment such as the Vail
Valley. Likewise, parking is a large consumer of ground and should be designed to occupy
as little real estate as possible. In tight margin developments such as mid-range hotels and
locals/employee housing, the expense of parking can be the deciding factor as to the
economic viability of the project. Due to these attributes of parking, it is important that true
demand, or desired demand, be distinguished from actual usage. For example, the “free
after three” program currently in place for the Town of Vail parking structures has
undoubtedly increased the usage of these structures during the evening hours (the Lionshead
structure filled in the evening for the first time in 1998). However, there has not been a
corresponding increase in sales tax revenue, which was the original intent of “free after
three”. (Note- concrete studies regarding the utilization of the “free after three” program
have not been conducted and it is strongly recommended that this occur if the program is to
continue). It is hypothesized that a significant portion of people utilizing the free parking
program are in fact employees or people that would have used transit or other means of
access if the parking were not as readily available. In other words, parking usage often will
rise to fill the available space, but the profile of the user may not be who the parking was
intended for. To be concise, the parking supply in Lionshead and the Town of Vail needs to
not only meet the demand, it needs to meet the desired demand and should be structured or
programmed in such as way to do so. Parking is important, but too expensive and land
consuming to be provided without solid reasoning.
b. Parking should relate to pedestrian circulation and desired points of access to the
pedestrian core. A primary goal of redevelopment in Lionshead is to increase the quality of
the pedestrian connections into the retail/ pedestrian core and through it to
the ski yard. Any new public parking must have a strong and convenient relationship to this
primary destination. However, parking should not use prime development sites and does
not have to be immediately adjacent.
c. Parking is only one part of an overall access strategy. Public parking is very important in
bringing guests to Lionshead, but structured parking is expensive. The cost of structured
parking today ranges from 20,000 to 30,000 dollars per space, so other means of access
should be carefully considered first. Possible alternatives include an enhanced transit
system, more convenient drop-off facilities, a reduction in required parking ratios for certain
uses (such as employee and locals housing), off-site and remote parking, and parking
disincentives that discourage driving.
d. Parking should be visually inconspicuous. Parking should be structured below ground
whenever possible. Surface parking areas should be heavily screened with landscaping,
berms, and walls. Expanses of asphalt should be interrupted with islands of landscaping or
replaced with pedestrian quality paving materials. Surface parking areas should be avoided
4-34
in or near the retail pedestrian core area. Although structured parking may be more
desirable visually, it must be properly designed so as not to detract from the guest’s arrival
experience.
e. Parking requirements should not constitute an unnecessary disincentive to redevelopment.
A thorough review of the current parking pay-in-lieu code and parking ratio requirements is
recommended. Given the above discussions it is important that parking requirements
accurately meet the true parking demand of new development and redevelopment. For
example, a stated goal of the master plan is to encourage, facilitate, and provide incentives
for the expansion of ground level retail in Lionshead. While this expanded retail will likely
represent some level of incremental increase to public parking demand in Lionshead, this
demand needs to be accurately understood so the parking pay-in-lieu fee does not make the
retail expansion economically unfeasible.
The following recommendations for parking deal with existing parking that may be displaced
by development, private residential/ lodging parking, public parking supply and demand, and
parking for locals/ employee housing.
4.8.1 Potential Displacement of Existing Parking
The ground rules for the Lionshead master plan mandate no net loss of parking as a
result of redevelopment. Properties potentially affected by this policy include:
4.8.1.1 North Day Lot
The north day lot (owned by Vail Associates) has approximately 105 parking
spaces, all utilized by Vail Associates employees. Parking on this site serves
mountain workers, Vail Associates office personnel, and employees visiting
from the company headquarters in Avon. Because much of the current Vail
Associates office space in Lionshead will be relocated when the site is
redeveloped, parking demand on the north day lot may also decrease. To
facilitate development of the site as a public transit center, it may be
desirable to relax the parking requirement if it can be demonstrated that
future demand will decrease.
4.8.1.2 West Day Lot
The west day lot is also owned by Vail Associates and is utilized primarily
by mountain based Vail Associates employees. This site offers the
possibility of a higher-return development opportunity that may make other
less profitable west end developments feasible, and its existing use for
parking is virtually certain to change. It is not anticipated that the employee
base utilizing this surface lot will decrease; therefore, all the current parking
(approximately 160 spaces) will have to be replaced.
4.8.1.3 Charter Bus Parking Lot
The charter bus parking area on the east end of the Lionshead parking
structure is the proposed location for a future Vail civic/community center.
The property is extremely valuable to the community, and its current
4-35
utilization as a parking lot is not its highest and best use. Alternate locations
for charter bus parking include the Ford Park parking lot and a down-valley
site. A drop-off point for the buses will still be necessary and is
recommended as a component of the proposed transit center on the north day
lot.
4.8.2 Residential Properties
As a policy, all residential properties should provide their own parking within their
property according to existing Town of Vail regulations and the parameters described
above.
4.8.3 Public Parking
Public parking in Lionshead today consists of the Lionshead parking structure, which
has a capacity of approximately 1200 vehicles.
4.8.3.1 Existing Parking Shortfall
The 1991 Vail Transportation Master Plan suggested a town-wide peak
period parking shortfall of 500 spaces. Overflow volumes are experienced
approximately 20-30 days per year.
4.8.3.2 Potential New Parking Demand
See appendix A, traffic impact study.
4.8.3.3 Potential New Parking Sites
To respond to the projected parking demand increase discussed in the traffic
study, it is strongly recommended that all town-wide parking opportunities
be examined or re-examined prior to any final planning or parking
construction. Specific public parking opportunities in Lionshead include:
a. Lionshead Parking Structure
The existing Lionshead parking structure is a logical location for expanded
public parking because it is already owned by the Town of Vail. Also, the
structure is conveniently located between the proposed civic center on the
east and the main portal to the Lionshead pedestrian mall on the west. No
other location offers visitors such ease of access.
A self-ventilating split deck structure, the garage has six half decks, each
holding approximately 200 vehicles (1,200 spaces in total). The addition of
one complete level would increase the structure by 400 spaces, two complete
new levels by 800 spaces.
Snow removal is an issue in the addition of new decks. The top deck of the
structure is cleared manually with front-end loaders. Additional decks will
make it impossible to continue this method, as the internal dimensions of the
structure will not accommodate front-end loaders. In addition, the
construction of a new delivery staging area on the west end of the structure
4-36
will remove the snow storage area presently used. Alternatives include
heating the upper deck, providing for an alternate snow removal access road
to the upper deck, and construction of a roof over the entire structure. Public
input during the master plan process has indicated the importance of the
eastward view, across the top of the parking structure, toward the Vail
Village as motorists travel east along the South Frontage Road and I-70.
Future expansion plans of the Lionshead parking structure should consider
the potential impacts expansion could have on this view plane. Also an issue
is the necessary structural reinforcement of the existing facility to support the
weight of additional decks.
b. West Lionshead
The construction of a new public parking facility at the west end of
Lionshead has been a planning consideration since the completion of the
Vail Transportation Master plan in 1991. This site is currently undeveloped
(except for the Vail Associates maintenance yard) and is large enough to
meet projected parking demand. It is well located in relation to the potential
new eastbound I-70 access ramps. The viability of a new public parking
facility in this location would be enhanced by bringing lift service to this
area. The construction of a new public parking facility would address the
existing deficiency of off-street parking on peak days and the shifting
demand of parking created by the introduction of a new ski lift in West
Lionshead. It is anticipated that the new public parking structure would
contain a approximately 400 public parking spaces, which would be in
excess of any parking requirements generated by proposed development.
The update of the Vail Transportation Plan should provide final direction on
the location and quantity of additional public parking spaces in the Town of
Vail. The location of additional public parking should consider where
parking is most optimal for both guests and employees, year round
utilization, mountain operations, and overall traffic circulation. Given the
location for this parking facility, it had been assumed that regular transit or
shuttle service would be necessary because of its distance from the retail core
area and the ski yard (greater than a 1200-foot walking radius). However,
the location of the parking structure would be proximate to the new lift and
as such the need for regular shuttle service would be minimized. However,
some provisions for bus stops and/or a transit facility should be considered
for the parking structure.
4.8.4 Parking for Employee Housing
The unit-to-parking space ratio for employee housing should be reduced to maximize
the housing opportunities in west Lionshead. During the master planning process, the
Vail Town Council toured several employee housing complexes in Keystone Resort that
averaged .25 cars per bed (one parking space per four-bed unit). Most of these
complexes at Keystone are removed from the core and depend on a bus transit system to
carry employees to and from work. Yet, Keystone property managers have not observed
a parking shortage. Likewise, at the Rivers Edge employee housing project in Avon, a
4-37
parking ratio of .75 cars per bed has been more than adequate and the parking lot is
underutilized.
4.9 Housing
Recent community surveys and grass-roots planning efforts such as Vail Tomorrow have
identified the lack of locals housing as the most critical issue facing the Vail community. Early
in the Lionshead master planning process, west Lionshead was identified as an opportunity area
to implement some of the community’s housing goals, particularly relating to employee
housing. These opportunities and associated issues are outlined below.
4.9.1 No Net Loss of Employee Housing
Ground rule number four of the master plan states that there shall be no net loss of
employee housing in Lionshead as redevelopment occurs.
4.9.2 Visual Issues
The financial realities of affordable housing often require cost reducing measures,
generally involving the quality of detailing, planning, and architectural design. Given
the strong desire to make these housing projects feasible, it is recommended that some
latitude be granted to affordable housing developers. However, it is also important that
financial realities not be used as an excuse to produce unsightly, poorly designed,
substandard products. Employee housing does not need to match the architectural
sophistication of a five star resort development, but it does need to be good quality
construction and design. Rivers Edge in Avon is a good example of an attractive yet
affordable employee housing project.
4.9.3 Policy Based Housing Opportunities
The first means of implementing housing goals in Lionshead is through policy based
requirements such as the employee generation ordinance currently being pursued by the
Vail Town Council. As required by a future ordinance, all development and
redevelopment projects, as a prerequisite to project approval, should provide housing for
employees generated and to the extent possible this housing should be located in the
Lionshead area.
4.9.4 Potential Housing Sites
Following are specific sites that have been identified as suitable for locals and employee
housing (see Map W).
4.9.4.1 South Face of the Lionshead Parking Structure
The south face of the Lionshead parking structure was identified by the
Lionshead master planning team, the public input “wish list” process, and
the Vail Tomorrow process as a potential location for housing. Depending
on building height, this location could support two to three levels of housing
located above a ground floor level of retail and commercial space.
Several planning issues are associated with this site. First, because the
structure will front the East Lionshead Circle pedestrian corridor, the
4-38
architectural quality and relationship to the street and pedestrian environment
will be very important. Strict standards of unit upkeep will have to be
enforced. Second, any housing units at this location will be required to park
in the Lionshead parking structure, but unit size and location should allow
the parking ratio to be lower than that of a typical one or two bedroom unit.
Third, it is recommended that the height of this potential development be
limited so that mountain views from the top deck of the parking structure are
not blocked. Lastly, the structural issues relating to an additional parking
deck should be coordinated with any south face development scenario.
4.9.4.2 Top Deck of the Lionshead Parking Structure
The upper deck of the Lionshead parking structure has also been identified as
a potential location for housing. Although the parking structure does offer a
large area, several critical planning considerations must be taken into
account.
a. Parking Issues
The most important future use of the Lionshead parking facility is expanded
public parking. No housing scenarios should be pursued before assuring that
public parking needs have been met. In addition, housing on the structure
must provide its own parking; there should be no net loss of existing or
future public parking on the structure.
b. Structural Issues
Engineering studies conducted during the master planning process indicate
that the parking structure can accommodate future expansion above the
existing upper deck, but not without structural reinforcement. Any housing
on top of the structure must take into
account the structural loading of the new development and the accompanying
cost implications.
c. Visual Issues
Because housing on top of the structure will be highly visible, it will have to
adhere to the Lionshead Architectural Design Guidelines (see chapter 8) and
provide for ongoing maintenance. Also, the view of the mountains across
the top of the parking structure is an important part of the arrival experience
for visitors and contributes significantly to the Lionshead image and
character. Any housing on the parking structure should endeavor not to
block this view completely.
4.9.4.3 West Lionshead
West Lionshead includes the Vail Associates Service Yard, Holy Cross site,
Vail Professional Building site, Cascade Crossings site, Glen Lyon Office
Building site, former gas station site and the Eagle River Water and
Sanitation site.
All redevelopment in West Lionshead will need to conform to the Town’s
housing policies and requirements. In order to create activity and vibrancy in
West Lionshead it is appropriate to include some dispersed employee
4-39
housing opportunities for permanent local residents in proposed
developments in the area consistent with these policies.
Perhaps the most promising locations to replace the Sunbird affordable
housing project and to conform to the Town’s housing policies and
requirements for new employee housing generation in Lionshead are the
North Day Lot, Vail Associates service yard, and Holy Cross site. However,
housing is not the only use these three properties will need to support.
4.9.4.4 Red Sandstone Parking Area
The parking lot and Town of Vail transit stop at the base of the Red
Sandstone Elementary school were identified as a potential site for employee
or locals housing because of its proximity to the elementary school, the I-70
pedestrian overpass and the transit stop. However, the access (vehicular and
pedestrian), safety and functional programming needs of the elementary
school must take priority in any potential housing development scenario.
4.9.4.5 Old Town Shops
The Old Town Shops, located just west of the Vail sanitation plant, were
identified as potential employee housing locations during the master
planning process. There are, however, other significant demands on this site,
including potential expansion of the sanitation plant and the need for a new
snowcat mountain access route from the Vail Associates service yard. In
addition, the presence of the sanitation plant on one side and the existing gas
station on the other reduces the desirability of this location for employee or
locals housing.
4.9.4.6 North Day Lot
The North Day lot is considered to be the preferred location for a significant
housing project in Lionshead to replace the Sunbird affordable housing
project and provide housing for new employee generation. Additionally, it
may be necessary to develop a higher revenue-generating product on a
portion of the Vail Associates service yard, Holy Cross, Vail Professional
Building, and Cascade Crossing sites in order to defray the cost of road and
infrastructure improvements.
In planning the site, the following issues need to be considered. While it is
important that buildings here be visually consistent with the overall character
of Lionshead, the desire to maximize the housing potential may make
appropriate the following deviations from standard development parameters:
a. Density
The site offers a unique opportunity to achieve significant density. It is
recommended that the standards for density (units per acre) be increased
at this location to allow for a greater number of employee housing units.
While it is important that buildings here be visually consistent with the
overall character of Lionshead, the desire to maximize the housing
4-40
potential may make appropriate the following deviations from standard
development parameters.
b. Building Height for Employee Housing
It may be appropriate to allow for a greater overall building height than is
otherwise allowed under the Lionshead Architectural Design Guidelines.
Any increase in building height will need to be reviewed on a case by
case basis by the Town of Vail, and any eventual building height will still
need to be visually appropriate for this location.
c. Parking
It may be appropriate to reduce the parking requirements for employee
housing at this location given the sites proximity to transportation
facilities, jobs, and pedestrian routes. In consideration for reducing
employee parking for the housing provided on this site, parking for other
employees of the owner provided on this site should be considered.
Excess parking may be used to satisfy the no net loss of parking policy or
for future parking requirements of other development on the property.
d. Site Coverage and Landscape Area and Setbacks
Consideration should also be given to increasing site coverage and
reducing setbacks and landscape area in order to maximize the amount of
employee housing on the site and/or due to impacts associated with the
development of a public transportation facility on the property. With any
deviation to development standards prescribed in the master plan and
zoning regulations, consideration of impacts should be afforded to the
neighboring residential uses to the North Day Lot. Any design with such
deviations will need to be sensitive to creating good designs with
mitigation measures such as heated sidewalks and well planned
landscape materials. Additionally due to impacts from the Town’s
dispersed transportation center on neighboring residential uses,
mitigation measures should be provided to buffer and screen residential
uses.
e. Encroachments on Town Land
The Town of Vail owns a small parcel of land on the north side of the
north day lot which accommodates the pedestrian bridge over the
interstate highway. This land was dedicated to the Town by Vail
Associates in 1976. In order to allow for more efficient layout and
development of employee housing on the site and/or the dispersed
transportation facility, the Town should give consideration to allowing
development of employee housing and/or transportation uses on this
parcel of land as part of the development of the north day lot.
4.10 Gateways, Landmarks, and Portals
The lack of spatial hierarchy or organizational clarity is a fundamental problem in the
Lionshead pedestrian and vehicular network today. This section discusses the need to create a
4-41
series of gateways, portals, landmarks and useful public spaces that will increase and enhance
the character and identity of the pedestrian environment.
4.10.1 Gateways and Portals
Gateways and portals are elements that signify important points of entry and transition
and serve to reinforce the identity and functionality of both. They are announcements of
direction and relative importance. Gateways can be created using building forms,
landscaping, paving patterns, or signage. Portals and gateways are discussed in the
architectural design guidelines (see chapter 8). The creation of gateways and portals is
encouraged as a basic component of redevelopment, especially in transition areas
between different domains, or public, semi-public, and private areas. A change in the
hierarchy of the surrounding environment should be announced and well delineated.
There are several critical locations where gateway and portals need to occur (see Map
R).
4.10.1.1 Vehicular Gateways
Because the majority of people coming to Lionshead arrive by vehicle, it is
important that the vehicular arrival points announce and help establish the
identity of Lionshead. The two primary vehicular gateways are the east and
west boundaries of the study area on South Frontage Road (see Map R).
Landscaping, signage, and the adjacent buildings should all communicate to
motorists that they have entered the Lionshead resort area. Secondary
vehicular gateways include all of the cross-streets that access Lionshead
from the frontage road. These intersections should have a consistent
landscape treatment and visible directional signage. A consistent signage
package announcing the lodging destinations on each street should be an
integral component of South Frontage Road improvements.
4.10.1.2 Pedestrian Portals/ Gateways
Four primary pedestrian portals are critical to establishing the character and
identity of Lionshead (see Map T): 1) the pedestrian entry on the west end of
the parking structure; 2) the top of the grade transition from the north day lot
into the retail mall; 3) the intersection of West Lionshead Circle and
Lionshead Place at the western end of the retail mall; and 4) the transition
between the ski yard and the retail mall.
4.10.2 Landmarks
A landmark is a significant architectural element that all the visitors to Lionshead can
identify and remember. Landmarks signify important points of entry, turning points and
critical intersections in the pedestrian network, as well as destinations and visual
reference points. The single landmark in Lionshead today is the Gondola clock tower,
which will be replaced with the Vail Associates core site redevelopment. Appropriate
locations for new landmarks in Lionshead are the east pedestrian portal, the central retail
mall adjacent to the main pedestrian plaza, and the west pedestrian portal adjacent to the
intersection of West Lionshead Circle and Lionshead Place. In addition, the potential
4-42
civic center complex at the east end of the parking structure should function as a
significant architectural landmark for the east end of Lionshead.
4.11 Public Art
Through the Art in Public Places board, the Town of Vail has long recognized the importance
of public art in pedestrian environments. Future development and redevelopment projects in
Lionshead, especially projects impacting the retail mall and primary pedestrian environments,
should seek to incorporate public art according to the Town of Vail Art in Public Places Master
Plan (not adopted as of the writing of this document). Pedestrian circulation systems, portals
and gateways, landmarks, pedestrian plazas and architecture all present opportunities to
incorporate public art.
4.12 Youth Recreation
Throughout the masterplan process there was public input regarding the need for both indoor
and outdoor non-skier related recreation opportunities for children and youth. Since the
removal of the playground south of Gore Creek in 1995, the only such activities include the
Vail Associates putt-putt golf course and the open play field of the ski yard. As the
redevelopment of Lionshead progresses the creation of a programmed children’s play area
should be a community priority. Programmatic components of such as play area could include
“tot-lot” play equipment, a volleyball court, swing sets, and creative play structures.
Landscaping, benches, and picnic tables should also be integrated into the design such a play
area. The location of such a play area will need to be readily accessible from the Lionshead
pedestrian mall area and the Gore Creek recreation path, and will require good southern solar
exposure. In addition to the play area described above, the potential of integrating children’s
play areas into the Lionshead pedestrian retail mall should be considered when improvements
to the mall are made. Good examples of such play areas can be found in the Aspen,
Breckenridge, and Boulder pedestrian retail districts.
4.13 Live Beds
The maintenance, preservation, and enhancement of the live bed base are critical to the future
success of Lionshead and as such, special emphasis should be placed on increasing the number
of live beds in Lionshead as the area undergoes redevelopment. The Lionshead area currently
contains a large percentage of the Town’s overall lodging bed base. The bed base in
Lionshead’s consists of a variety of residential and lodging products including hotels,
condominiums, timeshares and hybrids of all three. The vast majority of live beds in Lionshead
are not accommodation units in hotels, but instead, in dwelling units in residential
condominiums such as the Vail 21, Treetops, Antlers Lodge, Lion Square Lodge, Lifthouse
Lodge, Landmark Tower and Townhomes, Lionshead Arcade, and Montaneros, all of which
have some form of rental/property management program that encourages short term rental of
dwelling units when the owners are not in residence. It has been the experience in Lionshead
that condominium projects which include a voluntary rental management program have
occupancy rates which exceed the occupancy rate of hotel products, and therefore tend to
provide more live beds and produce more lodging tax revenues to the Town. Applications for
new development or redevelopment which maintain, preserve, and enhance the live bed base in
Lionshead have a significantly greater chance of approval in the development review process
than those which do not.
4-43
4.13.1 Live Bed Definition
Pursuant to Policy Objective 2.3.3, live beds (and warm beds) are defined as residential
or lodging rooms or units that are designed for occupancy by visitors, guests,
individuals, or families, on a short term rental basis. A live bed may include the
following residential products: accommodation units, fractional fee club units, lodge
dwelling units, timeshare units, attached accommodation units (i.e., lock-off units), and
dwelling units which are included in a voluntary rental management program and
available for short term rental.
4.13.2 Location of Live Beds
Live beds should be located in Lionshead pursuant to the Lionshead Mixed Use 1 and 2
zone districts. All properties within Lionshead, when developing or redeveloping and
providing new residential or lodging products, should provide live beds as defined
herein.
4.13.3 Hotel-types of Services and Amenities
To aid in the furtherance of Policy Objective 2.3.3 of the Plan, the creation of additional
live beds should include hotel-types of services and amenities. Such services and
amenities may include, but not be limited to, the operation of a front desk,
registration/reservation capabilities, recreational amenities, guest drop-off, on-site
management, etc. These types of services and amenities in multiple family residential
dwellings will increase the likelihood that the dwelling units will be made available for
short term occupancy and help to promote improved occupancy rates.
4.13.4 Review of New Development and Redevelopment Projects
The Planning and Environmental Commission shall consider the policies and direction
given by this Plan with respect to live beds when reviewing new development and
redevelopment projects in Lionshead. Applications for new development or
redevelopment shall maintain the live bed base in Lionshead. Applications for new
development and redevelopment which enhance the live bed base have a significantly
greater chance of approval in the development review process than those which do not.
A proposal’s adherence to the policies contained in the adopted master plan will be one
of the factors analyzed by staff, the Planning and Environmental Commission (PEC),
the Design Review Board (DRB), and the Town Council (as applicable) in determining
whether to approve or disapprove the specific proposal.
5-1
CHAPTER 5: DETAILED PLAN RECOMMENDATIONS
This section of the Lionshead Master plan examines individual parcels and groups of parcels within the
Lionshead study area, excluding the residential properties on the south side of Gore Creek. The intent
of this chapter – and the Master plan as a whole - is to identify important functional relationships and
visual objectives within the district and to propose a framework for the long-term redevelopment of
Lionshead. The document does not intend to limit or eliminate ideas relating to specific parcels; any
proposals consistent with this framework should be considered even if they are not anticipated in this
document. The parcels addressed here are organized generally from east to west, starting with the civic
hub on the eastern end of the parking structure.
5.1 Vail Civic Center
The proposed Vail civic center complex is comprised of the Vail public library, Dobson Ice
Arena, and the existing charter bus parking lot at the eastern end of the Lionshead public
parking structure (see figure 5-1). At this time, municipal priorities for the development
program on this site are uncertain, but potential alternatives are described below.
5.1.1 History of Vail Civic Center
The Vail Civic Center site was acquired in the mid 1970’s by the Town of Vail, after the
Town Council rejected a proposal to build a civic center at Ford Park. It was
determined that a civic center required a location adjacent to a major parking structure
with walking distance of both the Vail Village and Lionshead. Since the acquisition of
the property there have been several proposals considered and rejected for the site.
There have been three attempts to build a convention center on the charter bus lot site,
one including a performing arts center. All three proposals were rejected by the
electorate. To date, no proposal has met the grand vision for the completion of the Vail
Civic Center.
5.1.2 Potential Development Scenarios
Uses suggested during the master planning process include a performing arts center, a
conference facility, a community recreation and service center (potentially including the
town government offices), a second ice rink connected to Dobson Arena, and a high-
tech convention center. Community participants expressed a strong preference for a
locally relevant development serving the local community as well as destination visitors.
With a potential of 50,000 square feet per floor, this site could accommodate a variety
of uses, provided they are well designed and integrated. It will be the responsibility of
the Town of Vail Council to decide upon the development program for use of the civic
center site.
5.1.3 Functional Relationships
The general goal for this site is to create a single, cohesive civic center from three
disparate components (the library, the arena and the bus parking lot), using coordinated
architectural character and linked public spaces. The new concentration of civic uses
can help to connect Lionshead and Vail Village and will become the eastern anchor of
Lionshead, connected to the Lionshead pedestrian core by the parking structure and the
redeveloped East Lionshead Circle. Specific planning considerations are as follows:
5-2
5.1.3.1 Access
It will be important that the civic facilities complex be connected to all three
circulation networks in Lionshead: vehicular, pedestrian, and public transit.
a. Vehicular Access and Parking
The Lionshead parking structure will be the primary means of vehicular
access to this facility for those arriving by car. A drop-off point could also
be developed on the frontage road side of the facility (see figure 5-2), but
space is constrained here and better limited to special access needs. The
southeast corner of the parking structure should be converted into a drop-off
and arrival point for people walking to and from their cars. This will be the
front door for the majority of people accessing the complex and should be
designed to provide convenient vertical access to the interior of the facility
and the pedestrian plaza on its southern face. The new facility and Dobson
Ice Arena should be connected architecturally, allowing visitors who arrive
via the parking structure to have a safe, enclosed connection to Dobson (see
figure 5-3). This is particularly critical for parents of children attending
events at the arena. Although it is possible to create a vehicular drop-off
point at the western end of Dobson arena, this is not recommended because it
will conflict with service and transit traffic on East Lionshead Circle. If this
drop-off is required, it should provide access only for targeted uses.
b. Pedestrian Access
The primary point of pedestrian access to the new civic center complex
should be on the south side, at the terminus of East Lionshead Circle.
Because pedestrians walking from Vail Village and Lionshead will converge
at this point, the facility needs a well designed, highly visible front entry with
ample plaza space accessing both the new civic facility and Dobson Ice
Arena (see figure 5-3). This pedestrian plaza design should pursue
incorporating the grade transition down to the Vail Public Library, creating a
cohesive pedestrian plaza linking all elements of the Vail Civic Center
complex (the civic center, Dobson, library, and the parking structure).
A secondary access point should be created on the north side of the new
structure, allowing pedestrian access to and through the site from the Vail
International condominiums and the pedestrian walkway on the north side of
Dobson Ice Arena (see figure 5-3).
c. Transit Connections
Currently, the in-town shuttle stop is between Dobson Ice Arena and the Vail
public library for both east- and westbound buses. A transit stop is also
needed adjacent to the new main pedestrian entry on the west end of Dobson
(see figure 5-3), allowing transit riders to access both Dobson and the
proposed civic center complex from this point. This will allow greater
flexibility in the transit system and reduce the potential for conflict between
pedestrians, service vehicles and transit vehicles on the south side of
Dobson.
5-3
5-4
5-5
d. Emergency Access
A new emergency vehicle route (see figure 5-4) will be needed if the
extension of East Lionshead Circle into the Vail International condominiums
is closed. It is proposed that this route wrap around the southeast corner of
the civic complex to the north side of Dobson Ice Arena (requiring a
structural upgrade to the existing walkway). This access route must be
designed so that it is not blocked by delivery vehicle traffic on the eastern
end of the arena.
e. Vehicle Access to Vail International
If the East Lionshead Circle extension is closed, a new access point from
South Frontage Road will be required (delineated in figure 5-2).
f. Service and Delivery
Two service and delivery points are proposed for the proposed civic center
complex. The first is located on the southeastern end of Dobson Ice Arena.
The second will serve the new civic facility from South Frontage Road (see
figure 5-2). It is strongly recommended that no delivery points be
constructed that would introduce regular service and delivery traffic onto
East Lionshead Circle or West Meadow Drive. Service and delivery traffic
that will not be able to access the site from the South Frontage Road should
be distributed equally across East Lionshead Circle and West Meadow
Drive.
5.1.3.2 Relationship to East Lionshead Circle
The proposed new civic center complex should function as the eastern visual
terminus to East Lionshead Circle. The architecture connecting Dobson Ice
Arena to the civic center should be integrated into the potential development
on the south face of the parking structure (see section 5.2). The East
Lionshead Circle pedestrian environment should have a strong connection to
the pedestrian plaza in front of the civic center complex.
5.1.3.3 Relationship to Dobson Ice Arena
Perhaps the most critical functional relationship is the connection of the
proposed new structure to Dobson Ice Arena (see figure 5-3). Currently, the
main pedestrian entry to Dobson is the doorway on its south face, where
there are often conflicts with delivery vehicles and the transit buses during
times of peak activity. A common entry point on the western end of Dobson
can become the new front door to the arena, thus reducing the potential for
conflicts on the south side. It can also be designed to provide common
lobby, ticketing, and concession space for both structures.
There is an opportunity to make a below-grade connection from the common
entry to the ice level in Dobson. This could make possible a second sheet of
ice or large recreation space in the lowest level of the new civic center
structure. This would, however, require large structural spans and would be
very costly.
5-6
5.2 South Face of the Lionshead Parking Structure
The linear strip of land on the south face of the Lionshead parking structure (see figure 5-1)
should be considered for the development of retail and office space on the ground level and
housing for locals on the upper levels (see figure 6-6). The planning objectives of this potential
development are threefold. First, it would energize and visually upgrade East Lionshead Circle
by enhancing pedestrian activity on the street. Second, it creates the potential for a locally
accessible retail environment. The Town of Vail should consider retaining ownership of the
ground level retail/office space and making it available to local entrepreneurs and businesses,
much in the same way that deed restricted locals housing is provided in the Vail Commons.
Finally, this site presents an opportunity to locate locals/ employee housing conveniently
adjacent to the Lionshead pedestrian core.
Retail back doors and entrances to the residential units in the new development will be accessed
from the parking structure, and any private parking associated with these uses will be in the
parking structure. Some of the building’s service and delivery needs may handled interior to
the parking structure, but most will be accommodated in the facility proposed on the west end
of the parking structure. East Lionshead Circle would only be used in short-term overflow
situations. Because of the narrow depth and small square footage of the commercial space, it is
not anticipated that it will generate the need for larger delivery trucks.
Because the garage is a non-mechanical self-ventilating structure, any new vertical development
must be offset a minimum of ten feet from the face of the existing structure. The effect of
adjacent development on the ventilation of the parking structure must be thoroughly evaluated.
5.3 Lionshead Tourist Information Center
The Lionshead Tourist Information Center is currently located just west of the entry to the
Lionshead parking structure and is accessed directly off the frontage road. If the entrance to the
Lionshead parking structure is relocated as shown in figure 5-1 this existing facility will need to
be relocated. Potential locations for the center include the Future Vail Civic Center and the
parking structure.
5.4 Gore Creek Corridor
The master plan goals for the Gore Creek corridor are to protect and enhance its natural beauty
and environment, to connect it to the Lionshead core, and to make the Gore Creek recreation
path safer and more inviting as a passive recreation amenity. Specific recommendations for this
corridor are as follows
5.4.1 Creation of a Recreation Path ‘Bypass’ Around the Ski Yard
The existing Gore Creek recreation path is discontinuous and confusing. It should be
extended along the creek, under the skier bridge and behind the lift line mazes to form
an unbroken streamside trail around the ski yard (see figure 5-5). Close coordination
between the Town of Vail and Vail Associates lift operations will be needed for a safe
alignment in this area.
5-7
5-8
5.4.2 Picnic and Seating Areas along the Recreation Path
The existing picnic area on the recreation path behind the Lodge at Lionshead should be
significantly improved. Bicycle racks, new benches and picnic tables, and adequate
trash bins should be added. At least two other seating and picnic areas, consistent in
design and furnishings with improvements at the existing area, are also recommended.
Regular upkeep of the existing and proposed amenities will be required.
5.4.3 Safety Issues
The existing Gore Creek recreation path is a relatively safe environment, but conflicts
between pedestrians and cyclists will increase as the popularity of bicycling grows. A
clearly delineated bicycle lane wide enough for a bicycle with a pull-behind child carrier
is needed. The path should be wide enough for a cyclist to pass another bicycle without
endangering nearby pedestrians. The design of the path should eliminate blind curves
where cyclists riding in opposing directions might collide. The pool deck behind the
Antlers presents such a hazard, and all potential measures should be taken to remedy
that situation, including removal or modification of the pool.
5-9
5.4.4 Lowland Area South of Gore Creek
Improvements and restoration activities in this section of the Gore Creek corridor are
discussed in chapter four, section 4.3.2.
5.4.5 Revegetation and Landscaping West of the Ski Yard
Slope revegetation and landscaping are needed along the western portion of the Gore
Creek recreation path. This section, which traverses a fill bank above Gore Creek, may
never have the forested character of the section east of the ski yard, but it can be greatly
enhanced by planting more trees. The focus should be on the more barren north side,
with less intensive landscaping on the south bank framing views to the creek (see figure
6-4). The added landscaping should be as natural as possible and appropriate for a
5-10
riparian environment. The use of small understory plantings that would increase
maintenance requirements should be minimized.
5.5 East Lionshead Bus Drop-off Area
This area is an essential pedestrian connection between the Lionshead parking structure and the
Lionshead retail mall. The master plan recommends the removal of service and delivery
activities, skier drop-off, and shuttle vans from this area in order to make pedestrian crossing
safer. Other improvements include:
5.5.1 Pedestrian Connections
The pedestrian corridor between the parking structure and the Lionshead retail mall
should be direct and unobstructed (see figure 5-6). A small volume of vehicular and
transit traffic will continue to cross this area, but the space should be redesigned to
make it clear that these vehicles are subordinate to pedestrians. Its design should
suggest that cars are intruders in a pedestrian space rather than that pedestrians are
crossing a vehicular road (as is the case today). Techniques to accomplish this goal
include the elimination of grade separations at the pedestrian crossing, paving patterns
that differentiate the pedestrian crosswalk from the vehicular lanes, and bollards that
delineate vehicular crossing lanes (see figure 5-6). Landscaping may be appropriate in
this plaza, but it must not impede the flow of pedestrian traffic between the parking
structure and the core.
5.5.2 Transit Stop
The transit arrival and drop-off points should be re-designed to provide improved transit
functions and a better pedestrian experience. While pedestrian and bus conflicts will
always exist given the need for people to move between the parking garage and the east
Lionshead portal, significant improvements can be made to landscaping, sight-lines,
pavement surfaces, grades and the aesthetic quality of this area.
5.5.3 Potential Building Infill Site
At one time the Master Plan contemplated that when the skier drop-off and service and
delivery functions are removed from the east entry to Lionshead area that the transit stop
may be reduced in size yielding a site suitable for infill development. This infill
development would be associated with Vail 21 and/or Lionshead Center re-
developments on property that functions as road right-of-way and is owned by the Town
of Vail. Development of this area would potentially create a strong gateway into the
retail core and better definition of the pedestrian corridor that connects it to the parking
structure. During the 2009 Lionshead Transit Study there was discussion regarding the
idea of the entry into Lionshead being a “softer” more landscaped environment similar
in concept to Slifer Square. In addition, there is a need to maintain transit functions in
this area. For these reasons, coupled with the limited space available in this area the
“build to” lines depicted on Map S may not be feasible. Any necessary refinements to
“build to” lines should be considered during subsequent detailed design of the east entry
into Lionshead.
5.6 West Face of the Parking Structure
This area had previously been contemplated as being used for loading and delivery. However
5-11
as previously mentioned this is not feasible. This area should be preserved for snow storage
and access into the Lionshead Parking Structure.
5.7 Vail 21, Lionshead Arcade, Lifthouse Lodge, Lions Pride Cluster
This group of adjacent structures is critical to the ability of the Lionshead core to pull people
into its core (see figure 5-7). Because these buildings constitute a significant portion of the
existing retail frontage in Lionshead, they greatly influence the overall character and image of
Lionshead, especially for those who enter the core from the east. All possible measures and
incentives should be taken to upgrade these buildings. Some recommended possibilities are
described below.
5.7.1 Expansion of Ground Floor Retail Space
The ground floor retail space on the east face of the Vail 21 and the south and west faces
of the Lionshead Arcade should be expanded to meet the build-to lines shown on Map
S. This will focus and define the pedestrian street by changing its spatial proportions
and absorbing the existing grade changes that act as a barrier between the retail face and
pedestrian traffic flow. In addition, it will greatly enhance the visual quality retail
appeal of the first floor level and may help fund other architectural enhancements.
5.7.2 Architectural Improvements
The architectural design guidelines (Chapter 8) discuss several transition tools that can
be used to adapt an existing building to the new character and architectural quality
desired for Lionshead. Given their high visibility and the extent to which they influence
the quality of the pedestrian environment, these buildings should be a priority for
exterior renovation and enhancement.
5.7.3 Pedestrian Circulation Between Vail 21 and Lionshead Arcade
This courtyard space (see figure 5-7), often thought to be public, is actually private
property serving the Lionshead Arcade and Vail 21. Considered a “secondary
pedestrian mall” (see chapter six), it is appropriate that it be more intimate and quieter
than the primary retail mall. The entrance to the courtyard is secondary to the primary
pedestrian flow along the south face of the Lionshead Arcade (see figure 5-7). As
redevelopment occurs, snowmelting of the pavement should be considered because the
lack of winter sun causes ice and snow accumulations. During the summer, this space
will continue to function best as a semi-public outdoor courtyard for the existing
restaurant and adjacent retail businesses.
5.7.4 Pedestrian Access from Vantage Point Condominiums to the Retail Core
A pedestrian connection should be maintained from the Vantage Point condominiums to
the main retail mall (see figure 5-7). This connection exists today, but the outdoor stairs
and the steps on the east end of the Lions Pride building are not attractive and are
sometimes dangerous. When the site is redeveloped, this connection should be moved
west, adjacent to the east end of the Lifthouse Lodge.
5.7.5 Lions Pride Building and Parking Deck
The Lions Pride building and the parking deck across the alley are not in primary
locations in the retail core but, because they are in very questionable condition (both
5-12
visually and physically), their redevelopment and compliance with the Master plan
should be considered a priority. An opportunity exists to convert the existing alleyway
into a true arrival point for these properties and an enhanced pedestrian walkway. The
existing parking must be replaced, most likely underneath a new structure, and could be
accessed directly from East Lionshead Circle or from the alley.
5.7.6 Service and Delivery
The alley currently functions as a delivery staging area and for emergency vehicle
access. It is hoped that the service and delivery functions can be relocated to the new
facility proposed at the west end of the parking structure. If they must remain on-site,
any redevelopment in this area must dedicate adequate space to servicing so that
delivery trucks do not block the fire lane.
____
5-13
5-14
5-15
5.8 Lionshead Retail Core
The Lionshead retail core (see figure 5-8) is comprised of the Vail Associates core site, the
surrounding pedestrian mall environment, and the retail faces of adjacent buildings. This
central area is the heart and soul of Lionshead and constitutes the most critical area for public
and private improvements. The Vail Associates core site represents the most likely near-term
redevelopment project, but it is essential that the Town of Vail take all available steps to
encourage and facilitate other efforts to enhance and redevelop the retail core. Specific
recommendations are as follows:
5.8.1 Build-To Lines
A significant problem in the retail mall today is the excessive distance between
opposing retail faces, which causes pedestrians to interact with only one side of the
street. To remedy this, build-to lines are recommended (see Map S) to create a
continuous, well-defined retail experience in which all ground floor spaces directly
address the pedestrian street. Of special note, the corridor defined by the build-to lines
between the existing Landmark retail and Sunbird Lodge is centered on Tract C. In
other words, the build-to lines in this east-west corridor will impact both the Vail
Associates property and the Landmark Retail property equally.
5.8.2 Ground Level Retail Expansion Opportunities
Ground floor retail expansion should be encouraged on existing structures that do not
currently extend to their designated build-to lines and are not likely to be completely
redeveloped. The most significant places for ground floor retail expansion are the east
face of the Vail 21 building and the south and west faces of the Lionshead Arcade
building.
5.8.3 Pedestrian Connections Through the Core Site
There is a critical north-south pedestrian connection between the ski yard and the
proposed transportation and skier drop-off uses on the north day lot. This connection
will require at least one north-south penetration through the Vail Associates core site,
and there is an opportunity to create a second one, as shown in figure 5-9. The east-
west pedestrian corridor originating at the east Lionshead pedestrian portal should also
be extended into the Vail Associates core site, connecting with the north-south
corridors. These connections should be part of the “primary retail mall” (see site design
guidelines, chapter 6) to reinforce the village character of the core. It is not necessary
that flanking architectural forms be completely separated in order to define pedestrian
corridors. Instead, opportunities to create significant architectural portals are
encouraged to highlight the transition from one public space into another.
5.8.4 Hierarchy of Pedestrian Space
The Lionshead retail core is composed of a hierarchy of primary and secondary
pedestrian corridors and spaces (see site design guidelines, chapter 6), shown in figure
5-9. While both are important to the total retail environment, the primary should read as
the dominant pedestrian flow pattern. Transitions between these different domains
should be well defined.
5-16
5-17
5-18
5.8.5 Retail Space Allocation
A primary goal of the Lionshead Master plan is to increase both the amount and the
quality of retail space in the pedestrian core. The sunny south-facing sides of buildings
(for example, at the Lifthouse Lodge and the creek side of the VA core site) are ideal for
restaurants. The shadier north-facing sides are more appropriate for retail uses that do
not benefit as much from a direct relationship with the outdoors. Use of ground floor
commercial space for offices is not recommended on the primary pedestrian mall; these
businesses should be located instead on the second story or outside the main pedestrian
corridor.
5.8.6 Plazas and Nodes
Dynamic pedestrian plazas and nodes are encouraged at each significant intersection in
the retail core. Successful plazas are those that have good sun exposure, that are located
on primary pedestrian corridors, and that are properly proportioned to encourage
seating, eating, gathering and events. Successful nodes are concentrations of activities,
landmarks and spaces where people want to congregate. Focal elements such as
fountains, landscaping, and public art help to give each node a unique identify and serve
as visual reference points. A fundamental objective of the master plan is to introduce
these qualities in the Lionshead core.
The central Lionshead public plaza, for example (shown in figure 5-10), presents an
opportunity to create a vibrant center of activity surrounded by active retail and
restaurant spaces and animated with an ice rink. The development of a small infill
building at the north edge of the plaza is recommended to define the space and introduce
additional retail opportunities. The building could incorporate an underground service
and delivery corridor to the north day lot transportation center. A food and beverage
operation on a rooftop deck over this structure could provide a unique vantage point
marking the new north Lionshead pedestrian portal and opening views into the central
Lionshead plaza and up to the mountain.
Because the Lionshead pedestrian mall is also an emergency vehicle access corridor, its
proportions and the design of the elements within it must accommodate the turning
movements and clearance requirements of fire trucks and other large vehicles.
5.8.7 The Core Site as a Priority Location for a Resort Hotel
The Vail Associates core site has been identified as a priority location for a high-end
resort hotel. Although the hotel would be a private development, the Town of Vail
should take all reasonable measures to encourage and facilitate this goal. The benefits
of a hotel in the Lionshead core, discussed throughout this document, include a
significant increase in the Lionshead “live” bed base, an increase in the number of
visitors in the retail core, and a stronger identity as a resort destination.
5.8.8 Pedestrian/ Retail Connection to West Lionshead Circle
The most important missing link in the Lionshead retail mall is a direct connection
between the east end of the Montaneros condominiums and the intersection of West
Lionshead Circle and Lionshead Place. This connection would connect the Lionshead
mall to West Lionshead Circle and would remove the awkward grade transition at
5-19
Concert Hall Plaza. Figure 5-11 suggests that, at the least, a connection could occur
between the north side of the Montaneros and the south side of a redeveloped Concert
Hall Plaza. The optimum solution would entail the redevelopment of Montaneros,
enabling a direct connection with retail frontage on both sides (see figure 5-12).
5-20
5-21
5.9 North Day Lot
At the time the Lionshead Redevelopment Master Plan was adopted the North Day Lot was
identified as a potential location for a central transit facility. During subsequent study of the
site in 2008 and 2009 it was determined that the Town would not pursue locating a transit
center on this site. In lieu of a transit center the North Day Lot has been programmed to
provide affordable housing along with a skier drop-off parking lot.
5-22
5.10 Montaneros, Concert Hall Plaza, Landmark Tower and Townhomes
These three properties form the wall that separates the pedestrian retail mall from west
Lionshead lodges and residential properties. Although each property has particular issues and
redevelopment potential, they are discussed together because of their proximity and common
relationship to the pedestrian mall. The potential that these three properties could work
together in a joint redevelopment effort is limited because the Landmark Townhomes and
Montaneros are condominium associations. The conceptual master plan for this area (see figure
5-14) assumes that each property redevelops independently. However, the best planning
scenarios for these properties (and for the west pedestrian/ retail mall) involve joint efforts and
the possible realignment of existing property lines. If redevelopment pressures build for these
properties, the Town of Vail should take all reasonable measures to encourage and facilitate
cooperation among the owners.
5.10.1 Landmark Tower and Townhomes
Two important issues face this property: access and redevelopment of the Townhomes.
The Landmark Tower currently has an informal agreement with Vail Associates that
allows it to utilize the north day lot for guest arrivals and drop-offs. It is unlikely that
this use can continue in the same way after development of a transit center on the site.
Planning for development of the north day lot should explore all possibilities to
5-23
integrate a new front door for the Landmark into the new facility. There is also an
opportunity for the Landmark Tower to expand its lower level lobby over its existing
parking deck, possibly tying in with the shelter building proposed at the transit center.
Perhaps the best scenario for improving the Landmark’s access is in conjunction with
redevelopment of the Townhomes. This would make possible the creation of a drop-off
loop integrated into the west end of the Landmark or an access drive and drop-off loop
on the existing fire lane south of the structure. The latter would only be possible if a
new pedestrian corridor/fire lane is created into the pedestrian core area. A joint
redevelopment effort by the Townhomes, Concert Hall Plaza and Montaneros would
present the greatest range of opportunities to resolve the access issue.
There is little opportunity for expansion of the Townhomes because it is hemmed in by
property lines to the north and by the fire lane and property lines to the south. One
possibility is a structure oriented north-south over the west end of the North Day Lot.
However, there would be potential conflicts with the volume of traffic entering the north
day lot from this end. With cooperation from Concert Hall Plaza and Montaneros, the
property might be able to expand to the south.
5.10.2 Concert Hall Plaza/ Montaneros
Concert Hall Plaza was intended to be the western portal into the Lionshead pedestrian
core, but pedestrians can’t see where it leads and don’t use it. When this property is
redeveloped, a priority will be to create a connection as direct as possible between the
western terminus of the pedestrian core and the intersection of West Lionshead Circle
and Lionshead Place. The concept illustrated in figure 5-11 would require cooperation
with the Town of Vail to remove the existing bus drop-off, as well as Montaneros and
the Landmark Townhomes. (The scenario in figure 5-11 would require a small property
acquisition from the Landmark in the northeast corner of the redeveloped structure.)
The redeveloped structure could accommodate a vertical residential component as well.
This is the most feasible solution for a strong pedestrian connection, but the best
solution would entail a cooperative redevelopment effort with the Montaneros. The
Town of Vail should make all reasonable efforts to encourage and facilitate this
redevelopment. However, the need to maintain a bus stop and some level of short-term
parking and loading/delivery functions on Town-owned land adjacent to Concert Hall
Plaza will be an important consideration in the re-development of these properties.
5.11 Ski Yard
Improvements recommended for the Lionshead ski yard are as follows:
5.11.1 Relationship to the Lionshead Pedestrian Mall
There is a significant grade change between the ski yard and the retail mall. As
suggested in figure 5-15, a better grade transition could be designed at the north edge of
the ski yard to make it a more usable public space and to articulate a strong linkage
between the urban environment of the retail mall and the open environment of the ski
yard.
5-24
5.11.2 Skier Bridge
The existing skier bridge is a landmark but needs to be replaced. The new bridge should
be visually compatible with the desired character of Lionshead and wide enough to
separate skiers and pedestrians.
5.11.3 Connections
As depicted in figure 5-15, pedestrian path connections should be provided from the
north end of ski yard and the gondola terminal to the Gore Creek recreation path, the
skier bridge, and the southeast corner of the Lion Square Lodge (location of the KB
Ranch Restaurant).
5-25
5.11.4 Screening and Landscaping
Lion Square Lodge should be involved in planning enhancements in the ski yard.
Landscaping is desirable to screen the building at the west edge of the yard, but in the
central area would conflict with skier operations and the yard’s potential to function as a
village green for community gathering and summer recreation.
5.11.5 Potential Setback Encroachments by Adjacent Property Owners
Since the Ski Yard functions as an outdoor recreation and special events area, rather
than a traditional development site, encroachments within adjacent property owners'
prescribed setback areas adjacent to the Ski Yard may be considered.
5.12 Lion Square Lodge
The Lion Square Lodge, located at the end of Lionshead Place, occupies two parcels. The main
parcel (phases 1, 2, and 3) borders the ski yard and the Gore Creek recreation path. The north
parcel (phase 4) is located north of the Lionshead Place cul-de-sac. Several issues arise because
of this split configuration.
5.12.1 Traffic Concerns
The primary concern of the Lion Square Lodge property owners is the existing and
potential volume of traffic (both lodging vehicles and delivery vehicles) that accesses
the Vail Associates core site. The current access into the core site passes between Lion
Square’s main and north properties, resulting in an unsafe and poorly defined
connection between the buildings. When the Vail Associates core site is redeveloped,
the mitigation of lodging and service vehicle impacts on the Lion Square Lodge will be
essential. Service vehicles should not be allowed to
stage outside of the core site or to cause visual, audible, or air pollution impacts.
5.12.2 Pedestrian Connection between the Main Building and the North Building
Potential redevelopment must address the need for a clear pedestrian connection and
defined vehicular corridor between the main Lion Square Lodge property and the north
building on the other side of Lionshead Place (see figure 5-16).
5.12.3 Ski Yard Pedestrian Access
The pedestrian path around the north end of the Lion Square Lodge should be upgraded
to provide an attractive and safe pedestrian connection from Lionshead Place into the
ski yard. Because the path is close to the residential units in the northern end of the
Lion Square building, landscaping and other screening methods will be needed. It is not
recommended that this pedestrian access be emphasized, but only that it be of better
quality. The west Lionshead pedestrian portal is more important as the western point of
entry into the core area.
5.12.4 Potential Development and Redevelopment Scenarios
Lion Square Lodge is in need of major exterior renovations or redevelopment. Figure 5-
16 presents a scenario by which the Lodge could add significant density, enabling the
creation of a strong architectural edge to Lionshead Place, a direct connection between
the main and north Lodge properties, and a screened parking and arrival area. Another
5-26
redevelopment scenario (not illustrated) entails relocation of the existing core site access
road to a new dedicated access on the north side of Lion Square’s north building. This
would enable redevelopment to connect the primary Lion Square Lodge building with
its north property. Issues associated with this scenario include the proximity of this new
intersection to the adjacent West Lionshead Circle intersection and the potential for
noise and visual impacts on the south side of the Montaneros property.
5.12.5 Potential Setback Encroachments Adjacent to the Ski Yard
The east property boundary at the Lion Square Lodge is uniquely situated adjacent to the
Ski Yard, rather than another traditional development site. Since the Ski Yard functions
as an outdoor recreation and special events area, rather than a development site for
permanent buildings, there two properties relate differently than other properties in
Lionshead.
The existing Lion Square Lodge is deficient in regard to numerous building and fire
code issues such as accessibility and egress, and any redevelopment of these buildings
should remedy these deficiencies. Since the Lion Square Lodge abuts the Ski Yard,
rather than another traditional development site, an opportunity exists for redevelopment
of the Lion Square Lodge to occur in response to the existing site conditions rather than
in response to the prescribed setback areas.
Encroachments into the setback areas adjacent to the Ski Yard should be considered
when associated with a comprehensive redevelopment plan to improve the accessibility,
egress, life safety, or other building and fire code compliance upgrades for the existing
Lion Square Lodge. However, new structures associated with a demo/rebuild of the
Lion Square Lodge should not be constructed in a setback area.
The Lion Square Lodge owner(s) should acknowledge that any encroachment into the
setback area adjacent to the Ski Yard could have negative impacts to their residents and
guests (noise, reduced privacy, obstruction of view, etc.) due to the close proximity of
activities customary to the use and operation of the Ski Yard (recreational activities,
special events, snow making, maintenance, etc). Additionally, the Ski Yard owner(s)
should acknowledge that any encroachment into the setback area adjacent to the Ski
Yard may adversely affect existing below grade improvements and may reduce the
potential future development of the Ski Yard.
Should encroachments into the setback areas adjacent to the Ski Yard be considered, an
alternative means of meeting the purpose and intent of the setback requirements should
be provided. Any alternative to the prescribed setback requirement should ensure
adequate light, air and open space; adequate areas for drainage and utilities; adequate
separation of buildings and uses; etc. Special consideration should be made to ensure
that adequate landscaping and buffering is provided. Since encroachments into the
setback areas adjacent to the Ski Yard may have negative impacts; any alternative to the
prescribed setback requirement should be mutually agreeable to the Lion Square Lodge
owner(s), the Ski Yard owner(s), and the Town of Vail. Any adopted alternative to the
prescribed setback requirement should be memorialized in a legally binding agreement
between all three parties.
5-27
5-28
5.13 The Marriott
With approximately 320 rooms, the Marriott is the largest supply of hot beds in Lionshead. The
single largest structure in Lionshead, it is also very visible, especially from the west. It is
consequently a high priority renovation project, and all reasonable measures should be taken by
the Town of Vail to encourage and facilitate its enhancement. Specific issues regarding this
property are as follows:
5.13.1 Redevelopment or Development of the Parking Structure
The best opportunity for new development on the Marriott property is the existing
parking structure (figure 5-17). If this site is developed, attention should be given to the
relationship between the development, Gore Creek, the Gore Creek recreation path, and
the west day lot. Vertical development should step back from the recreation path, and
there should be a clear separation (most likely a landscape buffer) between the public
space of the recreation path and the private space of the residential units.
5.13.2 Infill Opportunities
There are several tennis courts on the south side of the Marriott. This area presents an
opportunity for low-rise infill development that eases the visual and physical transition
from the existing structure to the Gore Creek recreation path.
5.13.3 Opportunities for Facade Renovation
Exterior renovation of the Marriott is a community priority, but the size and dimensions
of the structure present a challenge, and it is unlikely that the architectural design
guidelines (see chapter 8) can be fully met. However, this should not discourage
exterior renovation, and the Town of Vail Design Review Board should insure that the
intent of the guidelines is met. (This is a basic premise of the architectural design
guidelines, relevant to all existing buildings in Lionshead.)
5.13.4 West Lionshead Circle in Front of the Marriott
Any future development or redevelopment of the Marriott property should include a
continuous secondary pedestrian walk on the south side of West Lionshead Circle. A
pavement snowmelt system is strongly recommended because of icing problems on the
walkway in winter.
5.13.5 Preservation of Existing Accommodation Units
The Marriott presently contains 276 short term accommodation units. In addition, the
Marriott also contains a restaurant, lounge, spa, and meeting space facilities incidental
to the operation of the hotel. Given the importance and need for short term
accommodations to the vitality and success of the community, any future redevelopment
of the site shall ensure the preservation of short term accommodation units on the site.
The preservation of short term accommodations should focus on maintaining the
number of existing hotel beds and the amount of gross residential square footage on the
site as well as requiring the preservation of 276 accommodation units. With this in
mind, the quality of the existing accommodation unit room could be upgraded and the
rooms could be reconfigured to create multi-room suites. In no instance, however,
should the amount of gross residential floor area devoted to accommodation units be
reduced. In fact, opportunities for increasing the number of accommodation units
5-29
beyond the existing 276 units already on-site should be evaluated during the
development review process. For example, the construction of “attached
accommodation units”, as defined in the Zoning Regulations, could significantly
increase the availability of short term rental opportunities within the building.
5-30
5.14 Antlers Lodge
Like the Marriott, the Antlers Lodge is a large and highly visible structure in need of exterior
renovation. It, too, should be considered a priority redevelopment project. Figure 5-18
illustrates a potential development scenario that involves partial screening of the existing tower
and an enhanced façade along Lionshead Place. Design considerations
described for the Marriott also apply to the Antlers; any addition or renovation should conform
to the architectural design guidelines in chapter 8. In addition, a heated sidewalk along the
north edge of the property, an on-site loading and delivery area, and a remedy for the bike path
problem caused by the pool should be part of any redevelopment.
5.15 Lionshead Inn, Lionshead Annex, Enzian Cluster
Redevelopment and/or enhancement of the buildings in this cluster at West Lionshead Circle
and South Frontage Road (see figure 5-19) is encouraged.
5.15.1 The Pedestrian Street
The existing structures are recessed from the street, elevated above it, and separated
from it by surface parking lots. To improve the pedestrian character of the
neighborhood, a better relationship with the street is desirable. The principal objective
for redevelopment in this area is to engage the surrounding pedestrian environment,
either by adding building elements toward the street or by lowering the finish grade at
the entries so that they are closer to the level of the street.
5.15.2 Access and Street Frontage
The existing accesses into these properties should be adjusted to align with the opposing
curb cuts on the east side of West Lionshead Circle. The street edge should be
strengthened for pedestrian use with landscaping, enhanced signage, and retaining walls
as described in the site design guidelines, chapter six. The Lionshead Inn secured a
permit in the past which is now expired to add another vehicular access point from the
South Frontage Road, and the property owner is encouraged to pursue the opportunity to
screen the surface parking lot on the north and regrade the lot to reduce the significant
cross-slope.
5.15.3 Building Height
Because it sits considerably above the frontage road, the Lionshead Inn is encouraged to
explore a ground level or lower floor infill solution if development scenarios are
pursued. Additional building height, if proposed, must conform to the design
guidelines.
5.15.4 Preservation of Existing Live Beds
The Lionshead Inn and Lionshead Annex presently contain 85 accommodation units.
Given the importance and need for live beds to the vitality and success of the
community, any future redevelopment of the sites shall ensure the preservation of short
term accommodation on the site. The preservation of live beds should focus on
maintaining the number of existing live beds and the amount of gross residential square
footage devoted to that use on the site. With this in mind, the quality of the existing live
bed base could be upgraded and the rooms could be reconfigured to create increased
lodging opportunities. In no instance, however, shall the amount of gross residential
5-31
floor area devoted to live beds be reduced. The construction of “attached
accommodation units”, “lodge dwelling units”, “timeshare units”, “fractional fee club
units”, and dwelling units in a voluntary rental program, as defined in the Zoning
Regulations, could significantly increase the availability of short term rental
opportunities within the building.
5-32
5-33
5.16 Vail Spa
The Vail Spa’s unique architectural style will be difficult to adapt to the new architectural
design guidelines for Lionshead, and no attempt to do so is recommended. However, the Vail
Spa has several developable areas on its property, notably its existing tennis courts. Any future
development or redevelopment of this property should comply with the intent of the master plan
and the design guidelines. If South Frontage Road is realigned, the length of West Lionshead
Circle around the western end of the property will increase, opening an opportunity for infill
development, possibly offices or other commercial use (see figure 5-20). In view of its close
proximity to the frontage road, the Vail Spa must be involved in all discussions concerning
future frontage road realignment or infill development.
5-34
5.17 Ever Vail
Ever Vail is a 12.6 acre site located in West Lionshead (see Figure 5-21). Ever Vail includes
the Vail Associates Service Yard, Holy Cross site, Vail Professional Building site, Cascade
Crossings site, Glen Lyon Office Building site, and the former gas station site. The subject
property is divided into two parcels within the Ever Vail Subdivision and should be zoned
Lionshead Mixed Use 2 District. Ever Vail should be redeveloped to enhance and improve the
guest and community experience and improve Vail Resorts’ ability to service and maintain
mountain facilities. Due to the large size of the development site, Ever Vail will likely be
redeveloped in phases over time. Ever Vail should be a residential/mixed use hub that includes
key components such as a ski lift (gondola), increased office space, new retail space, public
parking, realignment of the frontage road, relocated mountain operations and maintenance yard,
employee housing, a 100 plus room hotel, public transit facilities, a community recreation
facility and improvements for connectivity with the rest of Lionshead and Cascade Village for
pedestrians, bicycles and vehicles.
Figure 5-21: Conceptual Ever Vail Site Plan
5.17.1 South Frontage Road Realignment
The relocation of the South Frontage Road in the Ever Vail area has been a concept
embodied in this master plan since its adoption in 1998. Ever Vail includes the
relocation and realignment of the South Frontage Road consistent with the
recommended actions and policy objections found in sections 1.3.4 and 2.3.4. The
South Frontage Road realignment should be relocated as detailed in the initial road
relocation plans submitted to the Colorado Department of Transportation (CDOT) and
as shown in figure 5-21a. Prior to the Town of Vail submitting the final plans for the
relocation of the South Frontage Road to CDOT, the Town should reevaluate the design
5-35
to include a dedicated eastbound bike lane and a reduction in the width of the
pedestrian/bike path on the south side of the relocated South Frontage Road. The
relocated South Frontage Road includes a 2-lane roundabout at the eastern end of Ever
Vail. This roundabout connects the relocated frontage road with the new extension of
West Forest Road. Legal and physical access to the Eagle River Water and Sanitation
District (ERWSD) site shall be provided by the Ever Vail property owners through Ever
Vail to accommodate current uses and future development of the Eagle River Water and
Sanitation District (ERWSD) property. On the South Frontage Road west of Ever Vail,
a roundabout with a connection to the Simba Run underpass is anticipated and further
described in section 4.6.6. The grades of the relocated South Frontage Road should be
designed to accommodate the construction of the roundabout and Simba Run underpass
(see figure 5-21b).
The greatest benefit of the realignment of the South Frontage Road is that it results in
one contiguous development parcel and in doing so integrates the Maintenance
Yard/Holy Cross site with the West Day Lot (Ritz-Carlton Residences) by removal of
the barrier created by the existing South Frontage Road alignment. It also creates the
best pedestrian environment possible in creating an extension of the Lionshead Retail
area in that it provides the potential to establish a convenient and desirable pedestrian
connection to the rest of Lionshead.
Figure 5-21a: Conceptual Realignment of the South Frontage Road
5-36
Figure 5-21b: Conceptual Grading Plan for Frontage Road Realignment
5.17.2 Vehicular Access and Circulation
In keeping with Policy Objective 2.3.4, Improved Access and Circulation, of the Plan,
opportunities for public transportation and vehicular circulation improvements shall be
explored in conjunction with any future redevelopment of the South Frontage Road and
interior roads within the redevelopment of the West Lionshead sites. Possible
opportunities for improvements may include improved mass transit stops,
relocated/reduced/shared points of entry/exiting, restricted access points, acceleration/
deceleration lanes, roundabouts at major intersections, greater sight distances, dedicated
turning lanes, landscaped medians and skier drop-off.
It is essential that Ever Vail provide safe and efficient access points from the road
networks adjacent to the site. Legal and physical access to the ERWSD site shall be
provided by Ever Vail property owners through Ever Vail to accommodate current uses
and future development of the ERWSD property.
The design for the relocated South Frontage Road anticipates the construction of a
roundabout that connects the South Frontage Road to the North Frontage Road via the
Simba Run underpass. To accommodate this roundabout, the South Frontage Road will
need to include retaining walls to facilitate a drop in elevation as it moves west (see
5-37
figure 5-21b). The Simba Run underpass will cross beneath I-70 and provide an
additional connection between the north and south sides of Vail.
Ever Vail shall comply with the loading and delivery requirements of the Vail Town
Code. Loading and delivery within Ever Vail shall comply with Section 4.7, Loading
and Delivery, of this Master Plan. Service and delivery truck turning maneuvers shall
not negatively impact traffic flow on the South Frontage Road, West Forest Road or
Market Street. With a realignment of vehicular access points, attention should be given
to the location of service and parking areas.
5.17.3 Parking
Ever Vail shall be developed as a commercial core that includes mixed use
development, pedestrian streets and plazas, direct access to transit options, bicycle and
pedestrian connections and access to Vail Mountain. As a commercial core, Ever Vail
should be incorporated into the Town’s adopted commercial core parking areas, which
allow for reduced parking requirements due to proximity to mixed use development.
Ever Vail shall meet the parking requirements of the Vail Town Code. The appropriate
parking requirements for ski lifts and other potential land uses that do not have a
specified parking requirement will be determined by the Planning and Environmental
Commission.
Section 2.4: Ground Rules for the Master Planning Process, states that there shall be no
net loss of parking spaces now existing in Lionshead. Ever Vail must include parking
spaces to offset displaced existing parking from the former gas station site and
Maintenance Yard/ Holy Cross Site in accordance with section 4.8.1. These spaces are
in addition to parking required by the Vail Town Code and any public parking spaces
provided by Ever Vail.
Without including parking spaces required for the proposed gondola, as determined by
the Planning and Environmental Commission, if any, Ever Vail shall include an
additional 400 public parking spaces, as identified in section 4.1.5: West Lionshead –
Residential/Mixed Use Hub. These spaces will address long-term public parking needs,
including the Town's goal to eliminate parking from the South Frontage Road as further
detailed in Section 4.8.3.3b of this master plan. During development and phasing of
Ever Vail, there will be periods of time when surface parking lots and staging areas may
be necessary to meet skier parking and construction needs. Surface parking lots shall
not be maintained as a long-term solution to meeting parking demand. The construction
of a portion of the additional 400 parking spaces should be explored by Vail Resorts and
the Town of Vail, within Lionshead, in conjunction with the Ever Vail development.
Skier drop-off is an essential component of a successful ski portal. Skier drop-off at
Ever Vail improves the guest’s and local’s experience. The transit facility in Ever Vail
should accommodate 10 to 14 short-term or skier drop-off parking spaces. Short-term
parking is a key aspect to community commercial uses, allowing customers to quickly
and conveniently patronize establishments. Outside of skier drop-off and pick-up during
5-38
peak periods, these spaces could be utilized as short-term parking serving the
commercial uses in close proximity, such as the grocery store.
Skier drop-off spaces are also envisioned in the parking structure on the west side of
Ever Vail. Approximately 50 parking spaces should be available for short-term parking
and skier drop-off when not in use for children’s ski school activities, which
traditionally occur one day per week in the winter. These short-term parking spaces,
given their location approximately 500 feet from the gondola, would provide skier drop-
off capacity in the event the short-term spaces in the transit facility are displaced due to
expansion of bus activity.
5.17.4 Public Transportation
Public transportation is an essential element to successfully connect Ever Vail to other
portals, neighborhoods, and down valley communities. Ever Vail needs to provide
access for in-town bus service, outlying bus service, ECO Transit buses plus hotel and
lodge shuttles.
Transit facilities are essential to facilitate the use of public transit, reduce parking
demand and provide transit connections for employees living in Ever Vail. Adequate
transit provides an opportunity for employees, skiers, visitors and residents to connect
Ever Vail with other neighborhoods and communities. Ever Vail shall include a transit
facility located adjacent to the relocated South Frontage Road pursuant to section 1.3.5,
which recommends creating dispersed transit facilities in Lionshead. This facility shall
be designed to accommodate the Town’s outlying bus routes as well as regional bus
routes within a covered facility on the ground floor. It is anticipated that the transit
facility will accommodate a minimum of four bus bays. In the long-term and as
necessary, the facility may transition to up to 12 buses utilizing a pull off on the South
Frontage Road. The transit facilities are envisioned as a bus stop facility with very short
dwell times.
An area accommodating up to two in-town buses should be located on the eastern end of
Ever Vail (see figure 5-22). Ever Vail should also provide a hotel and lodge shuttle
drop-off area to accommodate visitors from other locations within Vail. The drop-off
area should be a surface location on the west side of Ever Vail. The bus stop and drop-
off area shall be enhanced with shelters, benches, landscaping and other similar
improvements.
5.17.5 Gondola and Vail Mountain Portal
Ever Vail shall include a gondola, which will transport visitors, guests, and residents to
Vail Mountain. A gondola will make Ever Vail a mountain portal and will enhance the
benefits of Ever Vail to guests, locals and employees. The gondola will be located
adjacent to Gore Creek and will generally travel to the base of the current Chair 26
where a new mid-station will be located. The gondola will replace Chair 26 and
generally terminate in the Eagle’s Nest area of Vail Mountain. The gondola route will
likely require easements and other approvals from the Town of Vail when the route
crosses Town-owned properties.
5-39
Figure 5-22: Conceptual Transit Facility and Bus Stops
Figure 5-22a: Conceptual Transit and Vehicular Circulation
5-40
Figure 5-22b: Conceptual Gondola and Mountain Portal
5.17.6 Pedestrian and Bike Access
As compared to a separate, free-standing portal, Ever Vail is considered a part of the
greater Lionshead area. In order for this area to be successful, it is important to have a
strong pedestrian connection with the rest of Lionshead. Streetscape improvements
including bike lanes or trails and sidewalks should be incorporated in any
redevelopment along West Lionshead Circle and the South Frontage Road to improve
the viability of mixed uses in Ever Vail. Improvements to street lighting, walking
surfaces, trails, seating areas and public art that facilitate safe and attractive pedestrian
and bike movement are strongly encouraged. Said improvements may necessitate the
need for access easements through the sites. In the redevelopment of Ever Vail,
pedestrian and bike connections shall be made to integrate with the rest of Lionshead
and Cascade Village.
Pedestrian and bicycle enhancements shall include a new bridge connecting the Gore
Creek Trail to Ever Vail, the redevelopment of the pedestrian bridge on the west side of
Ever Vail, path enhancements to the Gore Creek Trail connection into Cascade Village,
and a path connecting to the relocated South Frontage Road. All pedestrian path
improvements must meet Town of Vail recreation path standards and provide a safe and
attractive pedestrian and bike experience. The ability to traverse the site as a pedestrian
or on a bicycle from west to east without the need to utilize an escalator, stairs or
dismount should be considered in the design and evaluated in the context of all other
bicycle and pedestrian connections. -
Pedestrian connections between Ever Vail and West Lionshead Circle shall be improved
to provide safe and attractive pedestrian crossings. Improvements may include raised
crosswalks, change in paving material, safe harbors, medians, and signage. See figure
5-22c for the conceptual pedestrian and bicycle circulation plan.
5-41
Figure 5-22c: Conceptual Pedestrian and Bicycle Circulation
5.17.7 Public Spaces and Plazas
Within Ever Vail, pedestrian plazas and walkways are essential to create an extension of
Lionshead where pedestrianization has been a key element of success. Elements of
successful public spaces include portals, edge definers, public space definers, landmarks
and public art. These place-making elements improve pedestrian circulation and
provide aesthetically pleasing places to congregate. They further enhance the livability
of Ever Vail for employees, residents and guests. The creation of gateways and portals
is encouraged as a basic component of redevelopment, especially in transition areas
between different domains, or public, semi-public, and private areas. It is essential that
public spaces and plazas are not shaded by buildings at peak use times. Further sun
shade analysis will need to occur in order to ensure public spaces and plazas are not
shaded and unwelcoming to users. Outdoor dining decks are encouraged to bridge the
gap between public and private space and provide vibrancy to the adjacent streets,
walkways and plazas as further detailed in section 4.10 of this Plan. Chapter 8,
Architectural Design Guidelines, provides guidelines for these elements to ensure they
are successfully implemented.
Elements of the natural environment need to interact with public spaces in order to
connect the urban and natural environments. Within Ever Vail, the improvements to
Red Sandstone Creek, as further detailed in section 5.17.10, will provide public spaces
for recreation and congregation that connect Ever Vail with the natural environment, as
recommended by section 1.3.3.
5-42
Provisions should be made for public access to streets, paths and plazas through
easements or similar mechanisms to create a perceived public domain in Ever Vail.
Additional dedications and/or easements are necessary to facilitate the use of property
by the public.
Figure 5-22d: Conceptual Plan For Plazas, Public Spaces and Connections
5.17.8 Preservation of Existing Office and Retail Space
Section 4.1.5: West Lionshead- Residential/Mixed Use Hub requires an increase in
office space and no net loss of retail space in Ever Vail. Opportunities for increasing the
square footage of office and retail beyond the existing conditions in Ever Vail shall be
evaluated during the development review process. Currently, offices and businesses in
Cascade Crossing, Vail Professional Building and the Glen Lyon Office Building offer a
variety of local services and amenities, which is important to preserve with the
redevelopment of Ever Vail. During the winter months, the proposed gondola in Ever
Vail and the associated parking will generate significant pedestrian traffic and activity.
However, consideration shall be given to how Ever Vail can be an active and vibrant
place year-round.
One way this can be accomplished is the reinforcement of a well-crafted program of
specialty retailers, offices, and restaurants that attract both tourists and local residents.
Also, quality architecture and the creation of appealing outdoor spaces in and of itself
will encourage people to visit this area. An active program of public art, residential
5-43
units that are used for “artists in residence” or a culinary school are examples of uses
that could create a catalyst for activity. In conjunction with any application to develop a
new ski lift, a market study which analyzes the appropriate amount of office/retail
square footage shall be included in the redevelopment of Ever Vail. A fiscal and
economic analysis was completed in December 2010 and is further discussed in section
5.17.9. Depending on the length of phasing, this report may need to be updated.
There is approximately 30,000 sq. ft. of office space and 15,000 sq. ft. of retail space
within the Glen Lyon Office Building, Cascade Crossings, and Vail Professional
Building properties. This office space should be replaced within Ever Vail on the parcel
located east of Red Sandstone Creek to provide maximized connectivity of commercial
uses to the rest of Lionshead. In order to implement this policy, Ever Vail should
include at least 34,000 square feet of office space and 30,000 square feet of retail space.
5.17.9 Development Pattern, Program and Uses
In December of 2010, a Fiscal and Economic Analysis of Ever Vail was prepared by
Economic Planning Systems. The analysis found that Ever Vail will likely produce
positive fiscal and economic benefits to the Town. Ever Vail should reflect the
recommendations of this analysis, namely that retail and restaurant space should be
limited to approximately 55,000 to 65,000 square feet in order to create an economically
viable commercial project complementary to the existing core commercial areas in Vail.
Additional recommendations include the provision of hot beds, meeting space and a
grocery store in Ever Vail.
The land uses envisioned within Ever Vail are those allowed by the Lionshead Mixed
Use 2 zone district. Ever Vail will include multiple separate above-grade buildings
constructed above two below-grade structures with the bulk and mass conceptually
shown in figure 5-23 below.
Figure 5-23: Conceptual Bulk and Mass of Ever Vail
5-44
The overall development program for Ever Vail is envisioned to contain the following land uses:
Use Number Range of Square Feet
(gross)
Dwelling Units 350-450 500,000-800,000
Accommodation Units 100-120 90,000-100,000
Employee Housing Units 35-45 40,000-60,000
Office 3-12 establishments 30,000-40,000
Retail 5-10 establishments 30,000-35,000
Eating and Drinking Establishment 3-6 establishments 20,000-30,000
Spa 1-2 establishments 8,000-15,000
Skier Services / Recreation Facility 1-2 establishments 10,000-15,000
Ever Vail west of Red Sandstone Creek should be a residential neighborhood devoid of
extensive retail or restaurant uses. However, several non-residential uses should be
located on the west side, including, but not limited to, public parking, a space for
community recreational activities, a children’s ski program meeting area, and other
ancillary resort related uses. The concentration of residential land uses on the west side
of Ever Vail will serve as a population base for the commercial components within the
east side of Ever Vail and for other commercial core areas.
In furtherance of Policy Objectives 2.3.2 and 2.3.3, Ever Vail shall include a hotel and a
10,000-15,000 square foot grocery store. These uses were identified in the economic
and fiscal analysis as critical elements to the success of Ever Vail. A hotel brings life
and energy to Ever Vail and improves the Town’s inventory of "live" or "hot" beds,
producing increased revenue to the Town. A nightclub or other entertainment facility
would be a good addition to the east side of Ever Vail to provide a year-round use that
has largely disappeared with the redevelopment of other properties in Town.
Ever Vail provides an opportunity to relocate the Vail Resorts warehousing, office, and
vehicle/snowcat maintenance facilities currently located on the property to a below-
grade facility connecting to the snowcat access bridge and trail to Vail Mountain. An
alternative location for these facilities is on Vail Mountain instead of within Ever Vail.
A number of conditional land uses may be appropriate in Ever Vail, subject to the
approval of conditional use permits. These uses may include a ski lift (gondola), public
parking facilities, conference and meeting rooms, residential uses on the first floor,
recreational uses, and office uses. As identified in section 4.1.5, a ski lift is envisioned
as a catalyst for the redevelopment of this site and more specifically, for the
development of a structured public parking facility.
5.17.10 Relationship to Red Sandstone Creek and Gore Creek
Red Sandstone Creek and Gore Creek abut the Ever Vail project. The realignment of
the South Frontage Road provides increased opportunity to enhance these streams as
community resources. Portions of Red Sandstone Creek and Gore Creek shall be
enhanced with the preservation of wetland areas and enhancements to make these areas
5-45
community resources of Ever Vail and the Town (see figure 5-24). In conjunction with
the review of a specific plan for Red Sandstone and Gore Creeks Town reviewing
authorities should consider to what extent it is appropriate to locate improvements such
as walkways and bridges in these riparian corridors verses allowing the creeks to remain
in a more natural state. The project will preserve large trees and the relocate others
where practical (see figure 5-24a). While the natural riparian corridor of these streams
needs to remain protected and preserved, the physical and visual relationships and
references between adjacent development and the stream tract
should be strengthened. Improved public access and utilization of
Gore Creek and Red Sandstone Creek for fishing and other
recreational purposes is strongly encouraged to create a catalyst
for activity and enjoyment of the streams in furtherance of Policy
Objective 2.3.2 and as recommended by section 1.3.3.
Enhancements such as stream bank stabilization/ beautification,
natural stream drop structures, interactive low flow areas and
general improvements for wetlands and wildlife habitat are
strongly encouraged. Any modification or enhancement to the
creek corridor shall be subject to U.S. Army Corp of Engineers
and Town of Vail approval. Development impacts imposed upon
the creeks shall be mitigated. The stream health of Red
Sandstone Creek during and post-construction shall not be
degraded below pre-construction levels. The determination of
steam health shall be measured for the extents of the Ever Vail
project and not include impacts of development north of the
interstate. Indicators of stream health can include, but not be
limited to, aquatic life, suspended sediment, concentration of
various elements, etc.
Ever Vail shall include a public open space easement along Red
Sandstone Creek generally following the 100-year floodplain line,
as recommended by the Town’s Comprehensive Open Lands Plan
and in furtherance of Policy Objective 2.3.3: Vitality and
Amenities. This open space easement also implements the
recommended actions of section 1.3.3 by improving connections
with the natural environment and by creating green landscape
corridors that penetrate into the Lionshead environment.
Figure 5-24: Red Sandstone and Gore Creek Improvements
5-46
Figure 5-24a: Conceptual Tree Preservation and Relocation Plan
5.17.11 Employee Housing
Employee housing has been identified as critical need within the Town of Vail.
Employee housing provides an employee base within close proximity to jobs.
Employee housing within the Town provides environmental, social and economic
benefits including reduced traffic, increased transit use, improved livability and a
strengthened sense of community.
Section 4.9.4.3 West Lionshead identifies Ever Vail as an appropriate site to create
dispersed employee housing opportunities for permanent local residents. Ever Vail is an
appropriate site for employee housing due to its proximity to jobs, Vail Mountain,
transit and the commercial cores. Community commercial uses, such as the grocery
store, should be included in Ever Vail to accommodate the needs of employees living on
site.
Ever Vail shall meet the adopted Commercial Linkage and Inclusionary Zoning
regulations to mitigate the development impact of employee generation. The provision
of on-site employee housing must be coordinated with the Ever Vail construction
phasing plan.
5-47
5.17.12 Development Standards
5.17.12.1 Building Height
Buildings in Ever Vail shall comply with the height limits of the Lionshead
Mixed Use 2 District. Notwithstanding the height allowances of zoning,
buildings shall generally “step down” as they approach Gore Creek and the
western end of Ever Vail (see figures 5-25, 5-25a and 5-25b). Buildings along
Gore Creek and the western end of Ever Vail shall express no more than two to
three stories before “stepping back” to taller building mass. All buildings shall
be articulated to avoid large expanses of shear/unbroken wall planes, as per
section 8.4.2.3.
The pedestrian area connecting the transit facility on the north end of Ever Vail
to the gondola on the south end of Ever Vail shall be considered a Primary Retail
Pedestrian Frontage for the purpose of measuring building height and “step
backs” as described in section 8.4.2.3 of the design guidelines.
Figure 5-25: Conceptual Interpolated Grade Plan
5-48
Figure 5-25a: Maximum Average Height Plan
Figure 5-25b: Maximum Height Plan
5-49
5.17.12.2 Setbacks
Setbacks are necessary to provide a buffer between Ever Vail and adjacent
properties. Setbacks provide areas for landscaping, public art and other
improvements that help reduce the scale of buildings and further connect the
urban and natural environments. Along the South Frontage Road, the above-
grade setbacks should be significant enough to accommodate mature trees to
buffer Ever Vail from the South Frontage Road and I-70. Trees and other
landscaping must be integrated into the Ever Vail setbacks rather than only in
adjacent street right-of-ways in order to ensure landscaping remains should the
right-of-way be utilized for roads or utilities.
To facilitate subterranean parking structures, below-grade setbacks could
approach the Ever Vail property boundaries. Shoring may need to occur on
adjacent properties. However, footings and foundations, etc. should be located
within the Ever Vail property boundaries.
Because Ever Vail is one development site, zoning only dictates the setbacks
around the perimeter of Ever Vail and does not regulate the separation of
buildings internal to the site. Special attention should be paid to the sun shade
analysis to ensure that buildings have adequate separation and allow sunlight to
penetrate public outdoor spaces such as walkways and plazas. Figure 5-25c
depicts the spatial relationships between buildings, setbacks and landscaping.
Figure 5-25c: Conceputal Landcaping Plan
5-50
5.17.12.3 Landscaping
Landscaping serves many purposes, including the provision of shade, aesthetic
enhancement, storm water management and a connection to the natural
environment. Landscaped areas also provide snow storage, seating areas and
visual variation.
It is recognized that Ever Vail may include extensive below-grade building site
coverage. Landscaping installed over underground structures may be calculated
as landscape area when it is permanent and provides adequate soil depth to allow
vegetation maturity. However, landscaping over underground structures does
not contribute adequately to stormwater management and additional measures
will need to be taken to address this issue. Non-permanent landscaping such as
potted plants have proven to be ineffective in achieving the intent of the Town’s
landscaping requirements and are strongly discouraged.
Mature trees mitigate the visual impacts of buildings. Large trees should be
planted on the north end of Ever Vail to provide a buffer along the South
Frontage Road. It is understood that in order to relocate the South Frontage
Road and to develop Ever Vail, existing trees will need to be removed. Where
possible, existing trees should be relocated rather than removed.
Figure 5-25d: Conceptual Landscape Plan
5-51
5.17.12.4 Site Coverage
Redevelopment in Lionshead has commonly included below-grade structures to
facilitate subterranean parking, storage and loading and delivery. Often, the
footprint of these below-grade structures is larger than the buildings constructed
above. Ever Vail may include two below-grade parking structures that will
constitute the majority of the site coverage on the site. The anticipated Ever Vail
site coverage is further depicted in figure 5-25e.
Figure 5-25e: Conceptual Site Coverage
5.17.13 Architectural Improvements
The architectural design guidelines (Chapter 8) discuss several transition tools
that can be used to adapt an existing building to the new character and
architectural quality desired for Lionshead. Given the high visibility of the
buildings in Ever Vail and the extent to which they influence the quality of the
experience of passers-by, all future development of the sites should be closely
scrutinized for compliance with the applicable architectural design guidelines.
The architectural design guidelines identify the architectural qualities desired in
Lionshead. Ever Vail should have a unique architectural character that may be a
contemporary expression of alpine architecture. It should nevertheless
compliment the materials, forms and style of more traditional Vail architecture.
5-52
For properties that are east of Red Sandstone Creek, in West Lionshead, higher
densities and building heights may be appropriate, particularly to encourage the
development of employee housing. However, any development must meet the
overall character and visual intent of this master plan and be compatible with the
adjacent existing development of the Ritz-Carlton Residences and the Vail Spa.
5.17.14 Green Building
The Town has adopted an Environmental Strategic Plan that outlines goals,
objectives and policies to promote green building. Ever Vail shall incorporate
green building principles and techniques. Ever Vail should be designed,
constructed and operated to achieve green design principles. To accomplish
green building, it may be necessary to provide flexibility from Chapter 8:
Architectural Design Guidelines. For example, flat roof areas may be
incorporated more than typically permitted to allow space for solar energy
devices.
5.18 Old Town Shops
The old town shops site had been targeted for a variety of uses throughout the master planning
process, including employee housing, expansion of the Vail sanitation plant, and Vail
Associates mountain services. These uses were thought to be appropriate for the site, but it was
recognized they were all not compatible. In 2003 the Eagle River Water and Sanitation District
purchased the old town shops site. The site was redeveloped with a surface parking lot.
Additionally, in 2004 Vail Resorts constructed a bridge across the Gore Creek from this site to
provide possible future mountain operations access to Vail Mountain.
5.19 Evergreen Lodge at Vail
The Evergreen Lodge is located directly east of the Middle Creek Stream Tract and is bordered
to the north by the South Frontage Road, to the south by the Vail Valley Medical Center, and to
the east by the WestStar Bank office building. The lot area is 114,337 square feet or 2.625
acres. Physical improvements that currently exist on the site are a nine story stucco
hotel/condominium structure with an adjoining two-story hotel facilities wing, two below-grade
structured parking garages, and paved surface parking. The nine story structure has a
predominant east-west orientation along the southerly edge of the site while the facilities wing
has a north-south orientation along the western edge of the site. The eastern parking garage is
utilized by the Vail Valley Medical Center for employee parking and is accessed from the South
Frontage Road through a shared entry/exit with the WestStar Bank office building.
Opportunities for future improvements and upgrades include:
Creation of more underground parking;
Architectural enhancements consistent with the Lionshead Architectural Design
Guidelines;
Improved exterior lighting;
Coordinated vehicular access;
Improved streetscape and landscaping along the South Frontage Road;
Improved pedestrian circulation; and
Upgraded and expanded hotel accommodations and amenities
5-53
5.19.1 Pedestrian Access
Pedestrian access should be upgraded to provide a safe and attractive pedestrian
connection from the South Frontage Road, through the Evergreen Lodge development
site, to West Meadow Drive with a continuous pedestrian/bicycle path along the South
Frontage Road, as depicted on Map T herein. A gravel path connecting the South
Frontage Road to the paved pedestrian path located on the east side of the Dobson Ice
Arena presently exists along the south side of the property. This path, while functional,
receives little, if any, regular maintenance and includes a railroad tie set of stairs that is
unsafe and in disrepair. There are currently no pedestrian improvements located along
the South Frontage Road. Though no improvements exist, a fair number of pedestrians
use the southerly edge of the South Frontage Road when entering or exiting the site. In
order to improve pedestrian access and safety, it is recommended that future
redevelopment of the site includes the construction of a continuous pedestrian/bicycle
path along the South Frontage Road and that the existing gravel path along the southerly
edge of the site be improved and regularly maintained. Said improvements may
necessitate the need for pedestrian access easements through the site.
5.19.2 South Frontage Road Improvements and Vehicular Access
The site is currently accessed by vehicles off of the South Frontage Road from two, full
movement, two-way access points. The current location of these access points relative
to the existing access points for the WestStar Bank Building, Vail Valley Medical
Center parking structure, Town of Vail Municipal Buildings, and potential future access
points to the Vail Valley Medical Center and Vail International Building results in
undesirable traffic flow and turning movements creating traffic safety and capacity
concerns. In keeping with Policy Objective 2.3.4, Improved Access and Circulation, of
the Plan, opportunities for public transportation and vehicular circulation improvements
should be explored in conjunction with any future redevelopment of the site. Possible
opportunities for improvements may include, an improved mass transit stop,
relocated/reduced/shared points of entry/exiting, restricted access points, acceleration/
deceleration lanes, greater sight distances, dedicated turning lanes and landscaped
medians, and the evaluation and possible implementation of an intersection solution,
such as a roundabout.
5.19.3 Preservation of Existing Accommodation Units
The Evergreen Lodge presently contains 128 short term accommodation units. In
addition, The Evergreen Lodge also contains a restaurant, lounge, spa, and meeting
space facilities incidental to the operation of the Lodge. Given the importance and need
for short term accommodations to the vitality and success of the community, any future
redevelopment of the site shall ensure the preservation of short term accommodation
units on the site. The preservation of short term accommodations should focus on
maintaining the number of existing hotel beds and the amount of gross residential
square footage on the site as well as requiring the preservation of 128 accommodation
units. With this in mind, the quality of the existing accommodation unit room could be
upgraded and the rooms could be reconfigured to create multi-room suites. In no
instance, however, should the amount of gross residential floor area devoted to
accommodation units be reduced. In fact, opportunities for increasing the number of
accommodation units beyond the existing 128 units already on-site should be evaluated
during the development review process. For example, the construction of “attached
5-54
accommodation units”, as defined in the Zoning Regulations, could significantly
increase the availability of short term rental opportunities within the building.
5.19.4 Impacts on Middle Creek Stream Tract
The Middle Creek Stream Tract lies to the west of the Evergreen Lodge. The Tract is
owned by the Town of Vail. The tract is heavily vegetated with several substantial
deciduous trees and a significant lower layer of underbrush. Although the site borders
the Middle Creek Stream Tract, there is no significant amount of quality vegetation on
the site, and the parcel lies out of the 100-year flood plain. As currently configured,
opportunities exist to better recognize the benefits of creekside development. While the
natural riparian corridor of Middle Creek needs to remain protected and preserved, the
physical and visual relationships and references between adjacent development and the
stream tract should be strengthened. An opportunity exists to create a significant
connection between the Evergreen Lodge and Middle Creek. Any use of Middle Creek
for aesthetic or recreational purposes, however, should be subordinate to the
preservation of the natural riparian corridor and its inherent natural character. The
Middle Creek Stream Tract may provide an opportunity for the construction of a
recreational path connecting the South Frontage Road to the existing pedestrian paths at
the Dobson Ice Arena.
5.19.5 Relationship to the Vail Valley Medical Center and the proposed Vail Civic Center
Perhaps the most critical functional relationship is the need to coordinate any future
development on the Evergreen Lodge site with the Vail Valley Medical Center. For
example, every effort should be taken to ensure that future development on the
Evergreen Lodge site does not preclude the Vail Valley Medical Center from
reconfiguring the design of the medical center to eliminate vehicular access off of West
Meadow Drive and relocate the access to the South Frontage Road. Additional
opportunities may include, shared service and delivery facilities, grading and site
improvements, shared parking, pedestrian pathway connections, and land exchanges.
5.19.6 Service and Delivery
Service and delivery functions for the hotel are accommodated on grade from the
westerly entrance. Service and delivery for the Evergreen Lodge should occur
underground or be hidden from public view. Service and delivery truck turning
maneuvering should not negatively impact traffic flow on the South Frontage Road.
With a realignment of the vehicular access points, attention should be given to the
location of service and parking areas. An additional level of structured parking at the
current Frontage Road level would help to minimize the apparent height of the existing
or future structures, decrease the grade at existing access points, increase the amount of
landscaping on the surface of the structure, and hide service functions below grade.
5.19.7 Setbacks from the South Frontage Road
Special consideration should be given to the setback of buildings from the South
Frontage Road. Pursuant to the Lionshead Mixed Use -1 zone district setback
standards, a minimum 10-foot (10’) setback is allowed. Given the relationship of the
development site to the South Frontage Road, the need for adequate area for vehicular
traffic circulation, the importance of a landscape area to visually screen the massing of
the building, and the existence of a 30-foot wide utility easement along the southerly
5-55
edge of the South Frontage Road, the minimum required front setback for the Evergreen
Lodge development site shall be thirty feet (30’). This increased setback requirement
shall supersede the 10-foot setback requirement prescribed in Section 12-7H-10,
Setbacks, Vail Town Code.
5.19.8 Architectural Improvements
The architectural design guidelines (Chapter 8) discuss several transition tools that can
be used to adapt an existing building to the new character and architectural quality
desired for Lionshead. Given the high visibility of the buildings on this site and the
extent to which they influence the quality of the experience of passers-by, all future
development on the site should be closely scrutinized for compliance with the
applicable architectural design guidelines.
5.19.9 Public Transit Stop
A public transit stop is presently located east of the WestStar Bank Building, across the
street from the Town Municipal offices. Through the future redevelopment of the
Evergreen Lodge and the Vail Valley Medical Center, an opportunity exists to
potentially relocate the transit stop to a more optimal location.
5.20 Eagle River Water and Sanitation District (ERWSD)
While this parcel would certainly be a viable development site, the costs to relocate current uses at this
site, particularly the treatment facilities, are significant. For this reason it is assumed that the waste
water treatment facilities will remain in their existing location. ERWSD property is located within
West Lionshead adjacent to Ever Vail. Legal and physical access to the ERWSD site shall be provided
by the Ever Vail property owners through Ever Vail to accommodate current uses and future
development of the ERWSD property. Future redevelopment should consider the preservation of the
view from the Ever Vail gondola plaza east across the ERWSD site to the Gore Range.
CHAPTER 6: SITE DESIGN GUIDELINES
Chapters four and five identified important public spaces and pedestrian corridors that together define
the underlying structure of Lionshead and form essential connections between the district’s primary
destinations. This chapter on site design guidelines describes the detailed elements that lend character
and quality to the overall fabric of public spaces. The master plan envisions a hierarchy of pedestrian
spaces and, as outlined in this chapter, demands increasing attention to detailing in areas where public
use will be more intense. Any projects or situations that do not fall within the framework described
below shall conform to the existing Town of Vail regulations.
6.1 Primary Pedestrian Mall
The primary pedestrian mall is a heavily utilized pedestrian street or corridor characterized by
ground level retail frontage on both sides. In Lionshead today, the pedestrian/ retail core area
meets this definition. Areas within the primary mall (see Map P) shall conform to the
Architectural Design Guidelines regarding building setbacks and build-to lines on a primary
retail/ pedestrian street.
6.1.1 Spatial Proportions
The appropriate dimensions of pedestrian nodes, plazas and corridors will vary
depending upon the intended function and character of the space, the proportions of
buildings at the edge, and exposure to views and sun. On double-sided retail streets, it
is generally desirable that pedestrians are able to see storefronts on both sides of the
street.
6.1.2 Pedestrian Surfaces
Pavement in the primary pedestrian mall should be snowmelted. Consistency in paving
materials is recommended, but variations in paving patterns are encouraged to define
spaces, transitions, and predominant traffic flow patterns. Refer to the Vail Streetscape
Master Plan for recommended materials and design.
6.1.3 Site Furnishings
Site furnishings such as benches, seatwalls, trash receptacles and bicycle racks are
essential to increase the level of activity in the primary pedestrian mall. Seating areas
should be located where there are interesting view relationships with adjacent activities,
people passing by, or special scenery. Seating should be concentrated at the edges of
activity areas, slightly set back from the flow of pedestrian traffic. North facing walls
and consistently shady areas are generally less desirable than sunny places for seating,
although it is important to give people places to sit in the shade if they desire. The
design and appearance of site furnishings should be consistent throughout the primary
pedestrian environment.
6.1.4 Lighting
Site lighting is encouraged in the primary pedestrian environment to make evening use
safe and comfortable. Lighting must be shielded so as not to create a nuisance for upper
level residential units. Where possible, site lighting should be incorporated into the
adjacent architecture that defines the space. Variation in the light level to create pools
of light is encouraged. Accent lighting (such as bollards, uplights, and tree-mounted
6-1
lights) is encouraged at seating areas, grade transition areas, and other focal points. The
design of fixtures and the color of light they emit (lamp type) should be consistent
throughout the pedestrian environment. Fixtures should avoid cold or blue light;
warmer or yellow light, such as from incandescent lamps, is preferred. The standard
village fixture specified in the Streetscape Master Plan is recommended.
6.1.5 Signage
Creativity is encouraged in individual retail business signage. Ordinary stock or
prefabricated signage should be avoided in favor of custom designed and fabricated
artisan signage. Consistent directional and identity signage installed by the Town of
Vail is recommended at all intersections, portals and gateways in the retail environment
and at all pedestrian points of entry to the core. Pedestrian directional signage should be
attractive and understated, visually accessible and clear.
6.1.6 Landscaping
Because the primary pedestrian/ retail mall is a more urban environment, landscaping
will be less intensive than in more open pedestrian areas. Landscape areas should be
used to provide accent, shade, and spatial definition around activity areas, decks, and
the edges of plazas. Transparent landscape materials such as aspens and other
deciduous trees are preferred. Dense screening trees such as spruce should be used only
in accent situations; landscape screening should not be necessary in a cohesive, well
designed retail environment. Great care must be taken not to create barriers between the
pedestrian flow and the retail storefronts. Landscaping also can be used to create niches
and quite areas out of the main flow of pedestrian traffic, as well as to focus views and
provide focal points. To the extent possible, development and redevelopment projects
should endeavor to relocate existing trees on site that otherwise would be cut down.
6.1.7 Artwork
An objective of the community is to enhance the beauty of our environment by
incorporating quality visual art in highly accessible and visible places, both privately
and publicly owned, for the enjoyment of residents and guests. The master plan
encourages art installations as permanent elements integral to the design of exterior
spaces, architectural components, site furnishings, and paving. Artistic site furnishings
and accessories could include, but are not limited to, benches, railings, bike racks, ski
racks, signage, trash receptacles, lighting and utilities. Art is particularly effective in
activity areas, at entrances, at the intersections of pedestrian corridors, and where views
terminate. Art that is interesting and specific to the regional context of the valley is
encouraged. Interactive artwork that can be enjoyed by both children and adults, such
as found in the Boulder pedestrian retail mall, is highly encouraged. Artwork
accessible to the public must be constructed of durable materials and be easy to
maintain. The Design Review Board reviews artwork that is integral to structures or is
displayed on private property. The Art in Public Places Board reviews proposals for art
installations on public rights-of-way. Refer to the Vail Art in Public Places program
Policies and Guidelines and the Vail Art Master Plan for further information.
6-2
6.1.8 Diversification of Activity in the Public Right-of-Way
It is a fundamental goal of the master plan to intensify the level of activity in
Lionshead’s primary pedestrian mall area. Activities such as outdoor eating, childrens’
play, and special event merchandising are encouraged to diversify the opportunities for
recreation and enjoyment in the mall. Proposals by private businesses to use the public
right-of-way for these activities are reviewed by the Town’s Planning and
Environmental Commission and Design Review Board.
6.2 Secondary Pedestrian Mall
The secondary pedestrian mall area, like the primary, occurs adjacent to ground floor retail
frontage. Unlike the primary mall, however, these areas are not located where pedestrian flow
is most intense; they tend instead to be alcoves and smaller, more intimate spaces slightly
removed from the primary pedestrian environment.
6.2.1 Pedestrian Surfaces
Snowmelting is optional in secondary areas; the choice depends upon the anticipated
intensity of use and the area’s solar exposure. A higher degree of flexibility in the
choice of paving type, color and design is permitted to allow these more intimate areas
to develop their own unique character and sense of place. Creativity is encouraged, but
quality of materials is as essential here as it is in the primary mall.
6.2.2 Site Furnishings
Site furnishings such as benches, seatwalls, trash receptacles and bicycle racks are as
important in secondary areas as they are in the primary pedestrian mall. Furnishings can
be placed wherever warranted by exposure to views and sun and where they will not
obstruct pedestrian traffic or emergency access. North facing walls and consistently
shady areas should generally be avoided as seating areas. Greater flexibility in design
and appearance of site furnishings is permitted in secondary mall areas.
6.2.3 Lighting
The lighting of a secondary pedestrian mall area should conform to the same guidelines
that apply to the primary pedestrian mall.
6.2.4 Signage
The signage in a secondary pedestrian mall area should conform to the same guidelines
that apply to the primary pedestrian mall.
6.2.5 Landscaping
In the secondary pedestrian mall areas, there is a greater opportunity for landscaping
and for more intricate planting composition. Otherwise, the same guidelines outlined for
the primary mall area also apply in secondary areas.
6.3 Primary Pedestrian Walk
A primary pedestrian walk is a heavily utilized, linear pedestrian corridor, most often
associated with a street edge (see figure 6-2). Outside the pedestrian/ retail core, the overall
6-3
east-west pedestrian connection between Dobson Ice Arena and west Lionshead falls into this
category.
6.3.1 Pedestrian Surfaces
Under most conditions, snowmelting of pavements in these areas should not be
necessary. Consistent with the Town of Vail Streetscape Master Plan, paverstones are
preferred over poured concrete walks for durability and aesthetics.
6.3.2 Width
Primary pedestrian walks should be a minimum of eight feet wide, potentially wider at
street intersections and extremely high volume pedestrian areas.
6.3.3 Site Furnishings
Site furnishings such as benches, seatwalls, and trash receptacles are encouraged on an
intermittent basis along these corridors, concentrated primarily at intersections, in view
corridors, and other logical gathering or resting areas. Site furnishings should be placed
out of the flow of pedestrian traffic, creating comfortable but easily accessible
opportunities to sit and rest. Site furnishings should be consistent along primary
pedestrian walks.
6.3.4 Lighting
Lighting should comply with the parameters of the Vail Streetscape Master Plan.
6.3.5 Landscaping
Street trees and understory plantings are strongly encouraged along primary pedestrian
walks. The landscape treatment need not be homogeneous. A mix of deciduous and
evergreen trees is desirable, although deciduous trees are favored to protect views or
sun exposure. Ornamentals, perennials, and annual flowers are encouraged to provide a
wide variety of textures and seasonal color. Landscaping material should not interfere
with the pedestrian walk or snow storage requirements at mature growth.
6.4 Secondary Pedestrian Walk
Secondary pedestrian walks (see figure 6-3) are similar to primary pedestrian walks except that
they are not located on primary pedestrian corridors and thus carry a lower volume of
pedestrian traffic. The suggested minimum width for these secondary walks is six feet,
although wider walkways may be required where anticipated pedestrian traffic volumes are
greater. Poured concrete may be used as a paving material. All other design parameters that
apply to primary pedestrian walks also apply here.
6.5 Vehicular Pedestrian Retail Street
In addition to the Lionshead pedestrian malls and pedestrian walks there is the opportunity to
create linear pedestrian retail streets parallel and adjacent to vehicular streets. One such
example, as shown in figure 6-6, is the potential addition of retail to the face of the Lionshead
parking structure. Future development in west Lionshead may present the opportunity to add a
linear retail component along the pedestrian walks associated with vehicular streets. These
linear pedestrian/ retail environments should be characterized by wider walkways, increased
6-4
lighting, increased site furnishings, and a higher level of detail and visual activity. In addition
snowmelt systems may be required depending on the pedestrian environments solar exposure
and intensity of use. Where possible landscaping should serve to provide a separation between
the vehicular street and the flow of pedestrian traffic, most likely in the form of tree-grates or
at-grade planters. As within the pedestrian malls the mass of the building should step back
after the ground floor retail level, conforming to the architectural design guidelines (see chapter
8) for retail pedestrian streets.
6.6 Pedestrian Path
Pedestrian paths are located outside of the primary Lionshead pedestrian environment (see
figure 6-4). They include stand-alone circulation corridors, such as the Gore Creek recreation
path, that are most often built with asphalt surfaces. These pathways generally carry a lower
volume of traffic, but their width should reflect both anticipated volume and anticipated type of
traffic, as bicycles, rollerblades, and skateboards also utilize these pathways. Lighting,
signage, site furnishings and landscaping will be a function of a pathway’s intended use,
location, and traffic volume.
6.7 Signage
The Town of Vail should implement a consistent, comprehensive directional signage program.
Vehicular and pedestrian-scaled directional signage should be incorporated into the design of
all primary corridors.
6.8 Fences and Enclosures
6.8.1 Allowable Occurrences
As a general rule, fences, walls, and other screening devices are not desired in a higher
density, pedestrian oriented environment such as Lionshead. However, under limited
circumstances screening fences and walls will be allowed, subject to approval by the
Design Review Board.
a. Code requirements. Swimming pools and other potentially hazardous areas must be
fenced according to existing codes.
b. Service areas. Service docks and loading/ delivery areas should be visually screened
from surrounding uses.
c. Private courtyard areas. Subject to approval by the appropriate reviewing boards,
outdoor courtyards and other private gathering areas may warrant fencing or another
form of enclosure.
6.8.2 Dumpster Enclosure Criteria
All dumpster and outdoor trash storage areas should be completely screened and
enclosed, according to the following criteria:
a. Existing Code Requirements. Any existing code requirements regarding dumpster
and trash enclosures shall not be diminished by this section.
b. Extent of Enclosure. All dumpster and trash storage areas shall be completely
screened and enclosed, including latchable doors and a roof.
6-5
c. Materials. All dumpster and trash enclosures shall be constructed out of materials
matching or complementary to the adjacent architecture.
d. Design. All dumpster and trash enclosures shall be built to accommodate trash
removal requirements. Enclosures shall be solid and sturdy, designed to visually
blend with the surrounding architectural and site environment.
e. Landscape. To the extent possible, dumpster and trash enclosures should be
screened and visually softened through the use of landscaping.
6.8.3 Fence and Screen Wall Criteria
All fences and screen walls should be constructed according to the following criteria:
a. Existing Code Requirements. Any existing code requirements regarding fences and
screen walls shall not be diminished by this section.
b. Materials. Fences and screen walls shall be of high quality materials that match or
complement the adjacent architecture. T-111, paneling, chain link, and other non-
substantial materials shall not be used.
c. Design. Fences and screen walls should be well articulated, utilizing visually strong
posts, corners, and columns (where appropriate). Horizontal top and bottom railings
should be visually strong and heavier than the fence center materials. Screen walls
should look like extensions of the architecture. Fences should be unobtrusive, and
neutral and subdued in color.
d. Construction. Fences and screen walls shall be constructed to withstand all
expected wind and snow loads. Design and siting of fences and walls must take
snow removal and snow storage into consideration so as to minimize winter
damage.
e. Landscaping. Where appropriate, fences should be designed to include landscape
screening. Landscape material should be located on the outside of enclosed areas so
that the fence is screened from the adjacent public areas. The dimensions of
landscape beds shall be sufficient to provide adequate area for the dimensions of
landscape material. Long, unbroken, and barren stretches of fencing or walls are not
acceptable.
6.9 Compliance with Town of Vail Streetscape Master Plan
A goal of the Lionshead master plan is to improve the connections and relationships between
Lionshead and Vail Village. Towards that end, it is recommended that all site design issues not
dealt with in this chapter, including but not limited to site furnishings, site lighting, landscape
principles, paving types, and signage conform to the intent of the Town of Vail Streetscape
Master Plan. An exception is the opportunity to create a distinct character of site furnishings,
lighting, and other site design elements for the Lionshead pedestrian and retail core. Consistent
with section 6.1.7 above, artwork, the creative use of otherwise standard site elements
(benches, trash receptacles, phones, light standards, grate inlets, etc..) is encouraged to help
establish a strong, vibrant, and distinct character and sense of place for the Lionshead core area.
6-6
6-
7
6-
8
6-
9
6-
1
0
6-
1
1
6-
1
2
CHAPTER 7: DEVELOPMENT STANDARDS
The intent of this Chapter was to outline recommended development standards for zoning in the
Lionshead Redevelopment Master Plan study area. Since the inception of this plan, the
Lionshead Mixed Use 1 and 2 Districts have been established in the Zoning Regulations, which
outline development standards for these districts. Therefore, this Chapter remains for historical
reference purposes only.
This section outlines recommended development standards for private property in the Lionshead study area. In
some cases, implementation of these standards will require revision of applicable provisions in the Town of Vail
zoning regulations. Adoption of special provisions for redevelopment of properties that already violate existing
development standards should also be considered. It is critical to note that all of the following recommended
standards apply equally as future projects are reviewed for compliance. When one standard is more restrictive
than another, that is the standard that shall be the limiting factor. These standards do not represent
entitlements in any way. For example, if the GRFA ratio of a project cannot be met after the building height,
setback, and other architectural guideline standards have been applied, then that project is not entitled to the
maximum allowable GRFA. In this case, the quantitative and qualitative standards of the architectural design
guidelines would take precedence over the potential GRFA allocation.
7.1 Landscape Area
The master plan does not recommend modification of this standard for Lionshead. The Town’s current
standard, which applies to the majority of sites in Lionshead, requires that at least 20% of a parcel be
landscaped. This standard should be flexible for properties along build-to lines and in the pedestrian
retail core area so they may be able to decrease planted area and increase hardscape in order to create
the functional pedestrian corridors and spaces outlined in the master plan. This potential reduction of
landscape area is not a right and should require the approval of the Planning and Environmental
Commission.
7.2 Site Coverage
The master plan does not recommend changing this standard. The Town’s current standard, which
applies to the majority of sites in Lionshead, prohibits site coverage by structures in excess of 70% the
area of a site. This standard should be flexible for properties along build-to lines and in the pedestrian
retail core area so they may be able to increase site coverage as required to create the functional
pedestrian corridors and spaces outlined in the master plan. This potential increase in site coverage is
not a right and should require the approval of the Planning and Environmental Commission. Below
grade development is not counted as site coverage.
7.3 Setbacks
The master plan does not recommend changing this standard. The current setback requirement on the
majority of sites in Lionshead is 10 feet from the property line on all sides. This requirement shall be
waived in areas with designated build-to lines, and leeway should be considered in areas of significant
hardship that otherwise meet the intent of the master plan and do not negatively impact adjacent
properties.
7.4 Gross Residential Floor Area (GRFA)
An important component of the Lionshead Master Plan process was the analysis of GRFA’s
effectiveness as a tool for insuring the quality of architecture and the built environment within
Lionshead. In short, the masterplan team found that GRFA was not effective as a primary means of
providing for architectural quality. Based on this finding it is the conclusion of the master plan team
that GRFA should not be the primary means of regulating building size. To accomplish this, one of two
options must be pursued. First, GRFA could be eliminated. Secondly, the GRFA ratio could be
7-1
increased so that it functions as a safety valve to insure that buildings do not exceed the maximum
residential floorplate area that would otherwise be allowed according to the criteria of the architectural
design guidelines. If this second course of action is pursued, the following recommendations are made:
a. The ratio of Gross Residential Floor Area (GRFA) to lot area should be increased on all
properties within Lionshead, excluding the residential properties south of Gore Creek, so
that the site and architectural design guidelines, not GRFA, are the primary building size
and mass constraint.
b. The method of calculating GRFA should be greatly simplified and changed to include
common space so that basic floor plate area calculations will suffice.
7.5 Density (Dwelling Units Per Acre):
The allowable density of development in the study area should be increased to provide ample incentive
and create the financial mechanism for redevelopment of properties. Additional consideration must be
given to existing properties that currently exceed the density limitations. A model developed during the
master planning process showed that an increase of at least 33% over existing zoning or existing
dwelling units on a given site would be needed to make redevelopment an attractive option.
In order to encourage the development of live beds or warm beds in Lionshead, the master plan
recommends that accommodation units, hotel rooms and fractional ownership units not be counted in
the calculation of density. Further, because it is a community goal to increase the number of permanent
residents in Lionshead, employee housing units that are deed restricted for local employees should not
count toward density.
7.6 New Unit Definition
The master plan recommends that the zoning regulations be modified to include “lodge unit” as an
additional definition of a residential unit. This product is defined as a small condominium dwelling unit
with limited kitchen and floor area. (The floor area usually averages less than 650 sq. ft.) Units of this
small size are most likely to be in short-term rental pools, with occupancy rates similar to those for
hotel rooms. Because an increase in the short-term bed base in Lionshead is a key objective, the
planning team recommends that lodge units count as one-quarter of a normal dwelling unit (i.e. 4 lodge
units count as one dwelling unit). Further, it recommends that units of this size in existing properties be
treated as lodge units for the purpose of calculating density.
7.7 Building Height
This standard is addressed in the Architectural Design Guidelines (see chapter 8).
7-2
8-1
CHAPTER 8: ARCHITECTURAL DESIGN GUIDELINES
8.1 Vision Statement
The Lionshead neighborhood in Vail presents the opportunity to establish a dynamic and
exciting community within one of the premier resorts in the world. Lionshead’s mountain
location, proximity to the ski slopes, and ample residential base evokes the vision of a truly
special place, full of vitality and interest. This vision can be achieved through redevelopment
of the community by addressing site and architectural issues, and through consistent and
effective transitions from existing to new buildings.
The pedestrian experience of the public spaces within Lionshead is the most critical issue for
redevelopment. Many of the existing spaces are static and uninteresting, due to a prevailing
grid organization and lack of animation and architectural coherency within the spaces. One of
the most effective ways to intensify this experience is through careful design of the architecture
which defines the public spaces. Visually dynamic variation at the pedestrian level can help
avoid a monotonous streetscape, and judicious use of ornament, detail, artwork, and color can
reflect individuality and establish a variety of experience.
The architecture of Lionshead is envisioned as a unified composition of buildings and public
spaces based on the timeless design principles of form, scale, and order, made responsive to
their setting and environment. It is not envisioned as a strict dictation of a specific “style” or
“theme.” Many existing buildings within the community are built of monolithic concrete slabs
and lack any sense of order or personality. The new image for Lionshead should move towards
the future—using historical alpine references and Vail Village as antecedents. This design
framework will allow individual property owners freedom of expression within the
personalities of their buildings while establishing and maintaining an overall unifying character
and image for the entire community. In addition, it is paramount that the redevelopment effort
address specific design considerations generated by the location, climate, and surrounding
environment, such as addressing views, using indigenous building materials, and reflecting the
alpine heritage.
Designing in response to our regional heritage, adhering to a consistent architectural order, and
enhancing the public experience will enable Lionshead to define its own identity—making it a
distinct and special place not just within the context of Vail, but within kindred mountain
communities around the world.
8.2 Organization, Purpose and Scope
The organization of the Lionshead Architectural Design Guidelines is based upon describing
the “big picture” of the redevelopment effort first, and then studying the more detailed aspects.
Sections 8.1 and 8.2 begin with the “big picture” and offer the “vision” for Lionshead, and
provide explanatory information regarding organization, purpose, and scope. Section 8.3
contains special provisions for new and existing structures, including redevelopment priorities,
triggers, and transition tools. This Section addresses how flexibility in the application of the
Guidelines should be applied to development applications under consideration by the Town’s
Boards and Commissions. Section 8.4 contains the Guidelines themselves, but begins first with
the “big picture” of planning considerations which may overlap with the Lionshead Master
Plan. Prospective developers and/or designers should study this portion of Section 8.4
carefully, to see what design criteria must be met if their project occupies a special site relative
8-2
to building roles, pedestrian streets, or transition spaces. The latter portion of Section 8.4 deals
with the architectural principles of the Design Guidelines, starting first with overall issues such
as building form and massing, then moving into more detailed issues such as dimensional
criteria for architectural components, materials, and colors. Section 8.5 provides a “quick
glimpse” of the quantitative values outlined in the Guidelines.
The purpose of the Lionshead Architectural Design Guidelines (ADG) is to work in concert
with the Lionshead Master Plan to enhance the existing experience within the community,
improve the quality of life, focus direction for future growth, create visual harmony, and
improve property values for businesses and homeowners. This document constitutes a design
philosophy for the community, which when integrated with the Lionshead Master Plan, helps to
establish Lionshead as a coherent, dynamic village with a true “sense of place.” These
Guidelines are intended to direct the growth of the community through distinct levels of
perception, from views of the neighborhood from the mountain and the highway, to perceptions
within its pedestrian streets, to the detail level of artistry and ornamentation on the structures
themselves.
The scope of the Design Guidelines includes all criteria related to the architectural design of
new and redevelopment projects within Lionshead, along with site and planning criteria which
relate directly to architecture. Other site and planning criteria may be found in the Lionshead
Master Plan, and should be reviewed concurrently with these Guidelines. Structures which
have been reviewed and approved by regulatory agencies for Lionshead prior to the
endorsement date of this document may present special circumstances with respect to the
criteria cited within these Guidelines, and will be handled per Section 8.3.
8-3
8.3 New and Existing Structures
8.3.1 Special Provisions
While these Guidelines offer a roadmap for the redevelopment of Lionshead, they are
not intended to limit the efforts of developers and/or designers involved with new and
existing structures. It is understood that many of the buildings within the community or
may be unable to comply with some of the criteria described in the ADG. Many
existing buildings, for instance, may already exceed the height criteria identified. Some
existing roof pitches within the community may not meet the numerical values
described. And many of the existing pedestrian streets may fall well short of the “ideal”
proportions depicted. These and similar issues will be handled on a case-by-case basis,
with determination of compliance based upon whether the building meets the general
intent of these Guidelines and the tenets described herein.
Similar to existing structures, it is also understood that from time to time the Town may
determine that it is desirable to afford flexibility in strict application of the Guidelines
to new development projects. In these instances, the reviewing body shall rely upon the
stated review criteria for deviations to the Architectural Design Guidelines outlined in
sub-section 8.3.3.A contained herein.
Proposed renovations or additions which meet the general intent of the ADG will be
offered more latitude with respect to specific non-compliant items than those which
stray from the overall vision of Lionshead as described within—variances will be
granted from the detail of the Guidelines if the overall intent is met. In addition, any
meaningful efforts to enhance existing structures will be recognized as positive
progress, and strict compliance with the “letter” of these Guidelines is not meant to
discourage potential improvements.
8-4
8.3.2 Development Master Plans
Since many of the structures within Lionshead are pre-existing, Development Master
Plans are highly encouraged to define long-range goals for buildings within individual
parcels. These Plans should be presented to the Design Review Board (DRB) for
review when applying for initial building design approval, and should include
information such as:
• Overall architectural “vision” for all buildings within the site
• Design strategies for maintaining consistent architectural language between
renovations and new construction within the site
• Proposed phasing plans
8.3.3 Redevelopment Prioritization and “Triggers”
Consistent with Section 8.3.1 above, existing properties are encouraged to renovate and
rehabilitate, to the greatest extent possible, the exterior of their buildings according to
the parameters of the ADG. It is recognized, however, that a single, complete, and
comprehensive exterior renovation may not be economically possible for all existing
structures, and incremental improvements must be allowed. Having said this, the
following potential exterior improvements should be considered as priorities by both
private property owners and the Town of Vail. All reasonable efforts to encourage,
provide incentives, and facilitate these improvements should be made.
• Renewed and expanded retail frontage. For properties fronting the Lionshead
retail mall and retail pedestrian streets, the renovation and expansion of the
ground floor retail level is perhaps the most critical element in revitalizing the
Lionshead retail core.
• Roofs. As outlined in the ADG, the roofscape of Lionshead is a critical
component in “knitting” together the built environment and providing visual
cohesion to the urban fabric of Lionshead.
• Planning considerations. All buildings in Lionshead, both existing and new
development, should seek to fulfill the roles of landmarks, portals, turning
points, and other roles as outlined in the Master Plan.
• Form, massing and height criteria.
• Building surface treatment- walls, doors, windows, signage, etc.
• All other components of the architectural design guidelines.
A critical question regarding the renovation of existing structures is when compliance
with the architectural design guidelines is “triggered” or required. Regarding this, the
following guidelines should be considered:
• To the greatest extent possible, renovating properties should endeavor to make
significant and meaningful improvements to their properties as opposed to
small, insignificant improvements. This does not discount the importance of
any improvement to a properties exterior.
• Any single incremental improvement to one building element will not
necessarily trigger compliance on all remaining building elements. However,
any portion of the building being improved should do so according to the
parameters of the architectural design guidelines. For example, if a property
applies to resurface the walls of their building, this resurfacing should be done
8-5
according to the ADG, but will not in and of itself also require the replacement
of the roof, or another major modification, at the same time.
• Any proposal to add significant volume or mass to a property may trigger full
compliance to the Master Plan and Architectural Design Guidelines. Deviations
from this requirement shall require demonstration of compliance with the
procedures and review criteria outlined in Subsection 8.3.3.A herein.
8.3.3.A Review Criteria for Deviations to the Architectural Design Guidelines for New
Development
Similar to the implementation policies of the ADG prescribed for existing structures,
the Town has determined that there may be instances where flexibility in requiring strict
compliance with the Guidelines for new development maybe in the best interest of the
community and the furtherance of the goals and objectives stated in the Lionshead
Redevelopment Master Plan. That said, however, it is acknowledged that such
instances are rare and extraordinary, and shall be considered on a case-by-case basis.
To aid in determining when flexibility shall be afforded to new development from strict
compliance with the Guidelines, review criteria have been established. The degree of
design deviation flexibility afforded to a development project shall bear proportionately
to the extent of the improvements proposed. For example, a development application
that proposes the construction of a new structure which includes the demolition of an
existing structure or adds significant volume or mass to a property, shall more fully
comply with the prescribed Architectural Design Guidelines outlined in the master plan
than an application which proposes a renovation or addition to an existing building
The following criteria shall be used by the Town of Vail Planning & Environmental
Commission and Design Review Board to determine if deviations to the Guidelines
should be granted:
It shall be the burden of the applicant to demonstrate to the satisfaction of the Town of
Vail Planning & Environmental Commission following a recommendation from the
Design Review Board that:
• The request for design deviations are in compliance with the purposes of the
zone district; and
• The proposal which includes the design deviations is consistent with applicable
elements of the Lionshead Redevelopment Master Plan; and
• The proposal which includes the design deviations does not have a significant
negative effect on the character of the neighborhood; and
• The proposal substantially complies with other applicable elements of the Vail
comprehensive plan; and
• The design deviation meets or exceeds the intent of the specific design standards
as prescribed in Section 8.4; and,
• A public benefit is achieved as a result of the design deviation; and,
• The design deviation furthers the goals, objectives and purposes as stated in
Sections 2.3, 2.5 and 8.2 of the Lionshead Redevelopment Master Plan. (Res.
18, Series of 2004)
8-6
8.3.4 Transition Tools
Transition tools used to revitalize Lionshead are generally outlined in the specific
design criteria within these Guidelines, but are important enough to merit their own
subsections.
8.3.4.1 Build-to Lines
Build-to lines can be used to better define the existing public spaces, and to create new
ones. Delineation of these build-to lines is illustrated within the Master Plan. When
using these planning parameters to define public space, designers should give careful
consideration to the “ideal” pedestrian
street width-to-height relationships
illustrated in Section 8.4.1.3. Design
of new building edges within approved
build-to lines should be carefully
evaluated to make maximum use of the
new retail space, and how the added
building mass adds to the overall
pedestrian experience.
8.3.4.2 Roof Replacements
The replacement of flat roofs with
pitched roofs can greatly improve the
image of Lionshead, and roofing
projects for existing structures which
incorporate the criteria described
herein should be considered whenever
possible (see criteria for existing roof
compliance in Section 8.4.2.7).
Roofing projects which are part of
planned building maintenance
programs should be used as
opportunities to add life and interest to
buildings, through the addition of
pitched (or mansard) roofs which meet
the form, pitch, material, and color
criteria identified within these
Guidelines. These retrofitted roofs
will greatly enhance the image of the
individual structures, and will also act
to tie dissimilar structures together
within the community.
8.3.4.3 Door and Window Enhancements
Enhancements to doors and fenestration can also serve to add vitality and
interest to otherwise uninspiring buildings. Doors at primary entries and
retail frontages should be improved whenever possible, to encourage
8-7
pedestrian interest and add to the vitality of the streetscape. Modifications
to overall building fenestration and window detailing (at lintels, trim, jambs
and sills) can be used to articulate the notion of base, middle, and top on
buildings, and to introduce mountain-friendly windows to the community in
terms of energy efficiency and views.
8.3.4.4 Building Finishes
Simple improvements to building finishes, such as covering drab, monolithic
precast concrete panels with textured stucco, or applying stone veneer to tie
buildings to their sites, can act as successful transition tools, with relatively
minimal costs. New finishes add to the aesthetic appeal of buildings but can
also be used to provide tangible, value-added improvements to structures,
such as installing exterior insulation and finish systems (EIFS) to increase
thermal performance of buildings, or stone veneer to protect lower levels
from impact damage during snow removal.
8.3.4.5 Detail and Ornamentation
And finally, the addition of ornamentation and other detail appropriate to
Lionshead—used in conjunction with one or more of the previously
mentioned strategies—can greatly refine the quality of architecture
throughout the community. Well-crafted retail fronts will entice passers-by
into shops and other commercial areas, while careful detailing at eave lines
on new roofs will interlock roofs with building masses and tie new roofs to
the overall building language. Custom lintels over doors and windows will
also add visual interest, and detail on building finishes—such as articulated
bands on stucco or finely-crafted stone caps on stone veneer—will add to the
overall quality of structures within Lionshead.
8.4 Design Guidelines
8.4.1 Planning Considerations
8.4.1.1 Introduction
As noted earlier, most criteria governing site issues relative to Lionshead
redevelopment may be found in the Master Plan. However, some site issues
relate directly to the architecture of the community and are therefore
described within this section. Issues such as special “roles” buildings may
play within the community, comfortable proportions for pedestrian streets,
and the notion of domain are crucial concepts which rely heavily on the
architectural entities which define them, and are therefore described in detail
on the following pages.
8.4.1.2 Building “Roles”
Certain building sites within Lionshead occupy special locations within the
urban “fabric,” or “texture” of the community. To make best use of these
special sites and energize the pedestrian experience, buildings on the sites
will be required to meet the criteria that immediately follow, in addition to
the general criteria described throughout the rest of the document. The
8-8
locations of the special sites are identified within the Lionshead Master Plan.
This section outlines specific architectural requirements for buildings which
occupy these critical sites, based upon the types of buildings, or building
“roles” most appropriate to the sites, including portals, edge definers, space
definers, and landmarks.
Portals
Portals act as the “front doors” to communities or urban spaces and therefore
often present the first images to pedestrians. Buildings which are located on
key sites need to act as inviting and “friendly” portals to or within
Lionshead. Stand-alone structures can act as portals through appropriately-
scaled, large openings and significant mass, while multiple structures can
accomplish this through proper siting and relationship to one another.
Human scale can be achieved with portals by introducing horizontal
architectural components which relate to the surrounding context, such as
retail frontage heights and other critical eave heights. This can also be
achieved through careful design of detail
which is considerate of the human form; that
is, detail which relates to dimensions people
are most comfortable with, such as railing
heights, head heights, story heights, and similar
proportions. Portals within Lionshead can be
effective if they present enough mass to
enclose the spaces they are defining, with
enough open area to present the sense of entry
needed for a community of its size and
complexity. They may serve additional
functions as well, such as living areas, bridges,
or enclosed connectors, which can help to
further animate the portals and provide
additional income-generating space.
Edge Definers
Whereas portals act as the “front doors” to urban communities, edge-
defining buildings act as the “exterior walls” for communities. Where the
edges of Lionshead meet areas exterior to the community such as Vail
Village, the Gore Creek Corridor, and the highway, buildings must present
appropriately-scaled, well-defined edges to contain Lionshead or act as
distinct transition zones from one neighborhood to the next. The form,
massing, and height guidelines identified in Sections 8.4.2.2 and 8.4.2.3 will
direct much of the design of these edges, but additional considerations such
as building siting, scale, and architectural image should be taken into
account as well. Building siting should allow for openings to occur between
structures which make up the community edge, to encourage passers-by to
take inviting glimpses inside Lionshead. In addition, buildings along edges
8-9
should be scaled according to nearby
structures. Architectural language
should be used to offer a consistent
image of Lionshead from the
outside—proportions of buildings and
the ways in which they are detailed
need to reflect the overall image
found within the community, and
“loud,” self-promoting buildings
which reference only themselves
should be avoided.
Public Space Definers
To continue the analogy, structures
which define public space act as the
“interior walls” of Lionshead.
These buildings should address
public spaces with their primary
facades, and should not “turn their
backs” to the spaces. Buildings
which define public space should
have distinct wall planes, with
relatively minor plan and elevation
offsets. Building footprints which
are based upon rigid grid layouts
should be avoided; instead,
designers are encouraged to
develop more inviting, irregular
public spaces which offer surprises
to travelers as they proceed through
Lionshead. Definition of the
corners of public spaces is critical to contain
those spaces, and can be accomplished through
significant massing at the corners. In addition,
important heights such as tops of shopfronts and
prominent eave lines should be reinforced on
buildings which define public space, because
they encourage the eye to follow the “walls” of
the public space around its perimeter, thereby
strengthening the sense of encloseure.
Landmarks
A landmark provides a sense of orientation for
the community, and reinforces its “sense of
place” or image. As such, it must be visible
from key locations within the community, such
as portals and major public spaces, and must
offer an image consistent with Lionshead. As a
8-10
unique architectural element, a landmark should be designed to clearly stand
out from the rest of the community, while still presenting a consistent design
language. Care should be taken to provide a clear hierarchy between the
village landmark and other, secondary landmarks. Landmarks are most
successful when they serve special functions such as bell towers, clock
towers, monuments, or public art, rather than being self-serving.
Furthermore, they should be carefully scaled to the buildings adjacent to
them, as well as to the overall scale of the urban village.
8.4.1.3 Pedestrian Streets
Width-to-Height Relationships
Ratios of width to height at pedestrian streets and other outdoor spaces are
crucial to the success of those spaces. While ideas of comfortable, inviting
scale differ greatly between cultures and individuals, for the purposes of
these Guidelines, European mountain antecedents—integrated with our
Colorado resort location—have been used as the basis for determining
“comfort.” With this in mind, pedestrian streets shall be designed with
cross-sections exhibiting 1:1/2 to 1:1 ½ width-to-height ratios.
Approved cross-sections for pedestrian streets will be calculated using the
nearest walls which line the streets. Walls which are 16’ high or less (to the
eave) from ground level will not be considered as part of width and height
calculations. Walls greater than 16’ high (to the eave), however, interrupt
pedestrian site lines from street level, and offer a strong sense of enclosure
for pedestrians. Therefore, these walls will be included as part of street
width and height calculations. The sketches shown in this section illustrate
some examples of acceptable ratios, using both “short” and “tall” walls.
8-11
The intent of the width-to-height principles is to direct the development of
comfortable, human-scaled pedestrian streets. However, all other criteria
identified within the Lionshead Master Plan and the rest of this document,
such as build-to lines, form and massing criteria, and height restrictions, take
precedence over the ratios identified herein. Within these parameters,
exceptions to the listed ratios may be considered if the intent has been met.
Public and Private Domain
Proper understanding of the
notion of public and private
domain presents the opportunity
to introduce another level of
pedestrian movement through
Lionshead—one in which traffic
flows laterally across outdoor
spaces, rather than simply along
them. This lateral flow also
reinforces the concept of
weaving the sides of outdoor
spaces together, through
psychological, visual, and
physical ties.
Specific levels of domain can
range from public, semi-public, semi-private, to private. Designed properly,
the varying relationships between these levels can act to strengthen the ties
within a village, and add to the spatial interest—or quality level—of the
outdoor spaces. These additional “layers” of space along public ways add
excitement and vitality by presenting varying strategies of design and
detailing to pedestrians as they travel through the layers from public to
private space, or vice-versa. In addition, they provide comfortable transition
spaces from public to private,
rather than presenting an abrupt
experience from one domain to the
next. However, poor design of
domain and the ways in which the
different levels interact can lead to
psychological, visual, and physical
segregation of the levels, leading in
turn to empty and monotonous
public spaces rather than active and
interesting ones.
The aim of these Guidelines is to
reinforce the concept of
transparency between public and
semi-public, or street and shop.
Segregation of these levels of
8-12
domain shall be avoided whenever possible. To this end, colonnades,
arcades, porticos, and other covered ways along shopfronts shall be designed
to invite—rather than repel—pedestrian traffic. This may be accomplished
through thoughtful design of visual and artistic elements such as signage,
window displays, shopfront lighting, and the like, and physical elements
such as columns, planters, and artwork. As visual and physical barriers are
removed, psychological ones will follow suit. Design of street-edge
sidewalk cafes, patios, and colonnades are described in Section 8.4.1.4 of
this document.
8.4.1.4 Transition Spaces
General
For the purposes of these Guidelines, transition spaces are defined as the
architectural components which line pedestrian streets and other public
spaces. With this in mind, all structures which form transition spaces shall
be designed with the transparency and other characteristics described earlier
in this document, along with the dimensional criteria to follow. The intent is
to create a layer of frontage with interest and life, rather than the typical
homogeneous shopping center so common today. To this end, great latitude
is permitted for the design of transition spaces.
Outdoor Dining/ Sidewalk Cafes
Semi-public areas such as outdoor dining and sidewalk cafes offer the
opportunity to engage pedestrians with dining activities and serve to animate
the public spaces with the presence of people. As “outdoor rooms”
themselves, these types of spaces create a high level of transparency
between public and semi-public domains. Minor grade changes can actually
be very effective in these areas, and planter walls, guardrails, and the like
can act to define the
spaces and add another
level of detail to the
public ways. However,
the subtle awareness and
interaction of people from
the public spaces with
people inside the dining
areas or cafes is
important, and therefore
severe physical or visual
barriers should be
minimized whenever
possible.
8-13
Streetfront Patios, Courtyards, and Gardens
As semi-private spaces, patios, courtyards, and gardens which serve hotels,
residences, and other private uses must maintain the solitude for which they
were designed, while at the same time allowing for some interaction
between resident or hotel guest and the pedestrian traveler. In addition, as
components which contribute to the fabric of public spaces, patios,
courtyards, and gardens with street frontage must work in concert with the
street and add to its dynamic nature, through careful attention to scale,
materials, and detailing.
These semi-private amenities should be scaled small enough to avoid
competing with significant public spaces, to maintain the hierarchy of the
outdoor rooms, and make clear distinction between the public, semi-public,
and semi-private domains. Moreover, the materials which define the ground
plane (such as pavers or tiles), the walls of the space (such as stucco or
wood), and the ceiling of the space (such as wood trellises), must work in
harmony with the architectural language of the building itself, and with the
materials used along the street frontage. Details used to articulate these
areas can also contribute to the overall image of the public space and
reinforce to its “sense of place.”
Colonnades, Loggias, and Arcades
Architectural features such as colonnades or loggias—comprised of columns
supporting one edge of a roof and often called arcades—offer yet another
way to provide successful transitions from public space to semi-public
space. To maintain transparency, however, the components which make up
these features—such as columns, piers, and planter walls—should be
designed to allow unencumbered pedestrian movement around and through
them. A minimum clear space of 6’ shall be kept between building faces
and streetfront columns, piers, and planter walls. This clear space will
encourage two-way circulation along retail fronts, and foster comfortable
movement. In addition, the ratio of solid mass (expressed by the column or
pier width) to open area (expressed by the widths of the openings between
the columns or piers) should be designed so it does not act as a barrier which
prevents pedestrians from traveling along or through the colonnade.
Changes in ground plane between public spaces and colonnades, loggias,
and atria can also hinder freedom of pedestrian movement, and should
therefore be generally limited to 12” or less. The overall intent of this
section is to direct the careful design of architectural entities so they do not
act as barriers between public spaces and the buildings those spaces serve.
Within these principles, other factors such as elegant proportions,
appropriate scale, and accessibility must also be considered.
8.4.2 Architecture
8.4.2.1 Introduction
The architectural portion of these Guidelines is intended to provide a
unified, conceptual framework using historical alpine references. It is
imperative that the redevelopment effort address specific architectural
8-14
design considerations generated by the location, climate, and surrounding
environment—such as addressing views, using indigenous building
materials, and reflecting the alpine heritage. However, within this
framework, the architectural language of buildings within Lionshead should
strive to reinterpret its heritage and look to the future, instead of simply
mimicking the past.
8.4.2.2 Building Form and Massing
Building form and massing—as design determinants—are especially critical
to the success of Lionshead as an interesting, inviting resort. The forms of
buildings and the ways in which they are massed offer opportunities to
present a comfortable, pedestrian scale to the Lionshead traveler, and to
strengthen the continuity of the streetscape throughout. Other vital corridors
within Lionshead which are not along primary pedestrian/retail routes—such
as the Gore Creek Corridor—can also benefit from well-designed massing
which relates to the scale of those corridors. Form and massing act to marry
a building to its site, whether the site is part of a paved plaza or sits within
natural topography, and serve to “break down” the scale of the village fabric
when viewed from the ski hill.
The overall design strategy of building form and massing shall relate to the
horizontal organization found within Lionshead (such as shopfront heights,
important floor lines, and critical eave lines), and to the planning
considerations outlined in the Lionshead Master Plan (such as build-to lines,
sun pockets, and view corridors). The intent of this section is to guide the
creation of a village which is appropriately scaled through the use of
segmented forms and masses. The underlying fabric shall be constructed of
structures which rise out of the ground gradually, rather than being vertical
blocks set on the ground plane. At the pedestrian scale, the street level
should be dynamic and interesting, by varying forms and masses at the bases
of buildings. These building “skirts” should not be uniform one- or two-
story masses, but rather fragmented forms which offer interest and diversity.
8.4.2.3 Building Height
General
The following building height and massing criteria shall apply to the
Lionshead Master Plan study area, excluding all residential properties south
of Gore Creek.
Primary Retail Pedestrian Frontages
On any property edge fronting a retail pedestrian street or mall (see site
design guidelines for definition and locations), at least 50% of a building
face shall have a maximum 16’ initial eave height, at which point that face
must step back a minimum of 12’. The remaining percentage of building
face may have a maximum 36’ initial eave height, at which point the
building face shall step back a minimum of 12’. Eave height is defined as
the distance from finished grade to the initial primary eave of the structure.
Gable faces of buildings are also measured to their eaves, excluding the
8-15
actual wall area which comprises the gable. The intent of this
retail/pedestrian street requirement is to present a dynamic, fragmented
streetfront to outdoor spaces, rather than uniform blocks of building mass
(see Section 8.4.2.2).
Ski Yard and Open Space Frontages
This paragraph applies to the portion of any property not meeting the criteria
of the Primary Retail Pedestrian Frontages section above, and fronting on
the ski yard or the Gore Creek corridor. Due to the unique and highly
visible nature of these areas, building faces fronting them shall be limited to
maximum initial eave heights of 48’, at which point those faces shall step
back a minimum of 12’.
It is critical to note that the 48’ maximum initial eave height does not allow
for an unarticulated, flat building face from grade to 48’. The horizontal and
vertical maximum unbroken building face requirements, as well as all other
guidelines contained in this chapter and the Master Plan, shall apply.
Remaining Building Frontage
Building faces that do not meet the special site criteria of the sections above
may have a maximum initial eave height of 60’, at which point those faces
must step back a minimum of 12’. To the extent possible, all new and
redeveloped buildings in Lionshead should avoid “turning their backs” on
other buildings or important pedestrian corridors. However, it must be
acknowledged that very few buildings have prime frontage on all sides and
almost all buildings will have different programmatic requirements and
visual characteristics on their different faces. Toward that end, a building’s
greatest vertical mass and “back of house” functions should occur on the
frontage with the least volume of pedestrian traffic. In addition, components
of a building with the greatest vertical mass should be oriented north-south
to minimize the blockage of southern views and sunlight.
It is critical to note that the 60’ maximum initial eave height does not allow
for an unarticulated, flat building face from grade to 60’. The horizontal and
vertical maximum unbroken building face requirements, all other guidelines
8-16
contained in this chapter and the Master Plan, and DRB review and
approval, shall still apply.
Wall Surface Criteria
Notwithstanding the previous height and setback requirements, there shall be
no vertical wall face greater than 35’ on a building without a secondary
horizontal step in the building face (the horizontal step may be a cantilever
or a setback). This requirement is intended to prevent large, unbroken
planes in the middles of building faces, to further mitigate the visual impact
of building height, and to provide for higher quality and more interesting
articulation of structures. While many instances will necessitate a distance
of at least 24” for this movement, it shall be incumbent upon the developer
to demonstrate that the intent of this requirement has been met.
Absolute Maximum Heights
Absolute Maximum Height is defined as the vertical distance from existing,
finished or interpolated grade – whichever is more restrictive – to the ridge
of the nearest primary roof form to that grade. With this in mind, the
Average Maximum Height of any building shall not exceed 71 ft.
Notwithstanding the notion of Average Maximum Height, the Absolute
Maximum Height of any building shall not exceed 82.5 ft. Within any
building footprint, height shall be measured vertically from the ridgeline of
the primary roof form on a proposed or existing roof to the interpolated or
existing grade directly below said point on a proposed or existing roof to the
imaginary plane created by the interpolated grades (see Figure 8-15a-c)
Calculation of Average Maximum Height
The intent of implementing an Average Maximum Height for buildings is to
create movement and variety in the ridgelines and roof forms in Lionshead.
Toward that end, the Average Maximum Height of a building shall be
calculated based upon the linear footage of ridgeline along primary roof
forms. Any amount of primary roof form ridgeline that exceeds 71 ft. must
be offset by at least an equal amount of primary roof form ridgeline falling
below 71 ft., with the distance below 71 ft. equivalent to or greater than the
distance exceeding 71 ft. The average calculation shall be based on the
aggregate linear footage of primary roof forms across an entire structure, not
separate individual roof forms (see Figure 8-15c)
Average Maximum Height Calculation
Average
Maximum
Height = [Primary Ridge Length (A) X Average Height of Ridge (A)] +
[Primary Ridge Length (B) X Average Height of Ridge (B)]
+[Primary Ridge Length (C) X Average Height of Ridge (C)]
+[…]
------------------------------------------------------------------------------------
[Primary Ridge Length (A) + Primary Ridge Length (B) +
Primary Ridge Length (C) + (……)]
8-17
Additional Requirements/Exceptions
All buildings, regardless of permitted building heights and massing
principles, shall conform to all established Public View Corridors (see
Lionshead Redevelopment Master Plan). Special “landmark” building
elements, such as chimneys, towers, or other unique architectural forms, may
exceed the Absolute Maximum Height, subject to approval by the reviewing
board. This provision is intended to provide for architectural creativity and
quality of building form, and shall not be used as a means or circumventing
the intent of the building height limitations. In addition, regardless of final
building height, buildings shall avoid monotonous, unbroken ridge lines, and
shall provide visual interest through the use varied peak heights, roof forms,
gables, and other appropriate architectural techniques. (Res 8, Series of
2003)
Figure 8-15a – Building Perspectiv
8-18
Figure 8-15b – Roof Plan
8-19
Figure 8-15c – Schematic Building Sections
8-20
8.4.2.4 Exterior Walls
General
Exterior walls within Lionshead shall be designed with clear definition of
base, middle, and top. This organizing principle will weave the separate
pieces of the community into a consistent fabric. The tripartite strategy of
base, middle, and top will establish key datums, or special horizontal layers,
within the community which reinforce the form, massing and height
guidelines described earlier.
To this end, the three-part
definition of buildings shall
relate directly to organizing
principles such as existing
datums, architectural
elements such as storefront
colonnades and awnings
(where applicable), and
massing strategies such as
building setbacks and
maximum heights. This
strategy can relate to form
and massing principles
through the development of
street-level setbacks
defining the bases of
buildings where appropriate,
and minor setbacks relating to the middles and tops of buildings.
The bases of buildings should be visually
dynamic to heighten the pedestrian
experience. In addition, their interface
with the topography of the site is crucial,
as they act as the transition zones between
man-made structures and natural grade.
Visual dynamics at street level are most
effectively accomplished through the
introduction of secondary forms, materials,
colors and detailing.
8-21
However, the use of indigenous materials at
the primary elements (see following sections
for definitions) is critical in tying buildings to
their sites. Rhythm and order should be
introduced to guide the traveler through the
streetscape, and offer an enhanced sense of
movement through Lionshead. To reinforce
this intent, street-level walls shall not span
more than 30 feet horizontally without
significantly varying at least 2 of the
following 5 characteristics:
• Massing or Height
• Material, Fenestration, or Color
When massing or height are varied, buildings with street-level walls may
vary material, fenestration, or color to meet the 30-foot span requirement;
however, if massing or height are not varied within 30 feet, material,
fenestration, and color must be varied.
Existing buildings may disregard the 30’-maximum horizontal wall
guideline if their structural bays or other organizing elements exceed 30’,
provided that the distance over 30’ falls within reasonable limits. An
existing building with 36’ structural bays, for instance, is not required to
further divide those bays; however, an existing building with 48’ structural
bays may be required to divide those bays into 24’ sections, depending upon
the nature of the pedestrian street frontage.
The middles of buildings within Lionshead shall read as “quiet” masses
when compared to building bases and roofs, and should act as a unifying
8-22
background throughout the community. This should be done through the
use of simple materials, such as stucco, and more consistent, repetitive
fenestration and detailing (see Sections 8.4.2.5 and 8.4.2.9). Building
middles should not be designed as less important, banal elements, but rather
as elements which present interest and articulation through subtle
detailing—through fenestration, shutters, trim, and the like—instead of
massing. The tops of walls shall be designed to comfortably engage their
pitched roofs, without the abrupt changes in form and massing so commonly
found in structures with primarily flat roofs. Walls should also be used to
visually reduce roof heights, through the careful design of lowered plate
heights and integrated dormers, which help to merge wall planes with roof
forms and interlock building masses with roof masses.
The tops of buildings shall be capped with well-proportioned, pitched roofs,
acting as the uppermost unifying image within the architectural fabric of
Lionshead. Roofs viewed from pedestrian streets should nearly disappear
from view as travelers approach, due to their pitches relative to ground-level
sightlines. However, viewed from a distance, roof forms within Lionshead
should offer a consistent roofscape to the observer within the community or
on the mountain adjacent to it. Guidelines which direct the design of the
roofscape are described in Section 8.4.2.7.
Materials (General)
As mentioned earlier, building materials should be carefully selected to
recall the heritage of our alpine antecedents, yet look forward to the vision
of Lionshead as a modern resort community. The specific requirements and
limited palette of major building materials described herein are intended to
reinforce the visual harmony envisioned for the community and act as
additional unifying thread for the resort.
Materials used at primary building elements—defined as those which exceed
500 square feet (SF) in wall surface area—shall recall and relate to the
indigenous materials of the area and enhance the sense of our Colorado
mountain resort heritage. They are described below according to their most
appropriate locations within the tripartite order of individual structures.
Secondary building elements, or those which cover an area of 500 SF or less,
may be comprised of varying materials to add design flexibility, encourage
individual expression, and enhance visual interest. They are not specifically
listed within these Guidelines, but may include materials such as painted
steel, canvas and similar textiles, colored unit masonry, and the like. Within
this framework, creative use of materials is encouraged, but “patchwork”
designs of inconsistent material locations or patterns should be avoided. All
secondary building elements will be approved at the discretion of the
reviewing body.
8-23
Base Materials
Materials selected for the bases of buildings must balance the transparency
required at retail shopfronts with the strong, anchoring elements needed to
tie buildings to their sites. That is, they must successfully integrate the
notions of mass wall and frame wall. In addition, they should offer both
large- and small-scale texture at the ground plane, to add varying levels of
interest and heighten the pedestrian experience. With this in mind, building
bases shall be primarily constructed of individual pieces or unit materials
such as stone veneer. When using stone, veneers should be selected which
lend authenticity to mass walls—thin veneers or those which appear as mere
surface applique should be avoided. Battering may be used as an
additional—but optional—design tool to visually strengthen the bases of
structures. As mentioned earlier, secondary elements within building bases
may incorporate accent materials, but these materials should be carefully
selected to act in concert with the rest of the architecture. Shopfronts and
other special street-level amenities have the most latitude with respect to
material selection, but can be very successful if constructed of hand-crafted,
durable materials. These types of materials can hold up to the careful
scrutiny of the street-level observer, along with the physical abuse common
to public ways. Acceptable accent materials include—but are not limited
to—wood, wrought iron, forged or formed metals, and etched glass.
Middle Wall Materials
The middles of buildings shall be constructed of neutral field materials such
as true stucco, EIFS, or wood. These types of materials help to establish the
“quiet” or “background” vertical surfaces necessary at the major wall planes
which typically make up the bulk of structures. In addition, they offer an
interesting difference between the dynamic nature of building bases and the
more repetitive, subtle patterns of building walls above street level.
Materials such as stucco should be designed as an expression of mass, rather
than infill between structural members. Where building walls meet roofs,
materials which successfully integrate the tops of buildings to their middles,
such as wood in the form of brackets, rafter tails, and the like, are most
effective.
Approved materials for use on building roofs are described in Section
8.4.2.7 of these Guidelines.
Colors
Building colors for structures within Lionshead should be chosen to blend
structures with the mountain environment, while offering visual and
psychological warmth to observers. To this end, earth tones and other low-
intensity colors derived directly from the surrounding mountains should be
used on primary building elements, defined as those which cover more than
500 SF. Earth tones include hues such as off-whites, beiges, tans, and light
grays, introduced in shades slightly darker than their natural counterparts.
Colors inherent to the materials used, such as natural stones and naturally-
weathering woods, generally offer the hues and textures most desirable
8-24
within Lionshead, and such materials should not be painted. However,
integrally-colored concrete, stucco, and semi-transparent wood stains are
acceptable as well. In an effort to limit the palette of colors used on
buildings and avoid the “patchwork” effect, no more than three colors
should be used on primary building elements.
Secondary building elements (500 SF or less in area) may be clad in accent
colors to add visual interest to the overall streetscape. They should act as
highlighting elements at storefronts, primary entries, and signage, and are
most appropriate at lower levels to engage pedestrian interest. Upper levels,
in an effort to act as the more “quiet” fabric of Lionshead, should avoid
brighter colors and remain true to the earth tones listed above. When used,
accent colors should reflect the natural mountain environment of Lionshead,
with golds, oranges, reds, and shades of green, blue, and purple used most
often. Colors foreign to the mountain setting should be avoided.
Trim
Trim colors, generally used on elements to express structure, door and
window openings, significant floor lines, fascias, and the like, shall act in
concert with field and accent colors. This is most effectively accomplished
through the selection of deep or vibrant colors having the same or similar
hues, but using different shades or tints. At street level, accent colors may
be used on trim to express storefronts and reinforce the rhythm of the
streetscape.
8.4.2.5 Exterior Doors and Windows
General
In the tradition of mountain antecedents, openings for exterior doors and
windows in buildings within the Lionshead community shall be treated as
recessed elements in mass walls of stone, concrete, or stucco, rather than
flush surfaces on them. Within frame walls, they shall be expressed as infill
material between structural members, and
recessed from those members. This treatment
lends itself to the image of structures comprised
of significant mass or structure, instead of
curtain walls clad over lightweight frames.
Given this general approach, however, door and
window sizes, shapes, types, materials, and
colors should relate to the tripartite order
established through development of base,
middle, and top.
Exterior Door Sizes, Shapes, and Types
Door sizes should be appropriate to their
materials, with rustic, “heavy” doors generally
used in stone or concrete to accentuate mass, and
glazed, “light” doors used in field materials such
8-25
as stucco and wood siding, or at window wall assemblies (see commercial
front exceptions to follow in this Section). Entry doors located along retail
streets and other public ways offer the first true glimpse of buildings when
approached from those spaces, and should therefore be designed with hand-
crafted quality and attention to detail. These doors should be oversized
when possible, but in proportion to the frontage of which they are a part.
Entry doors for large retail centers or hotels should be significantly larger
than those found in smaller, more intimate shops. Other doors for structures,
regardless of location, should be designed as part of an obvious hierarchy,
with primary entry doors the largest, secondary entry doors somewhat
smaller, and private or egress-only doors smaller yet.
Shapes of doors should relate directly to their locations on the building, with
rectangular shapes being the most prevalent. Specially-shaped doors and
double doors are encouraged at primary entries along retail frontages, or as
custom portals for private residences, while the middles of buildings should
be characterized by more standard shapes. Special shapes should not be
overused or used in a random, ad-hoc fashion; shapes such as arched heads
or square, overhead doors should relate to the overall building architecture.
Exterior Door Materials and Colors
All exterior doors within Lionshead shall be constructed of high-quality,
durable materials such as wood, metal-clad wood, or metal; doors at primary
hotel, condominium, or retail entries may also include large areas of glass to
attract pedestrians. Glass doors should relate to building orientation, views,
or functions, with large areas of glass generally avoided in locations other
than those noted. Maintenance-free materials such as copper, baked
8-26
aluminum, and naturally-weathering woods are encouraged—painted metals
and woods should be avoided whenever possible. Copper cladding and
wrought iron doors may be left to patina naturally, while industrial metals
such as steel and aluminum should be baked or anodized with finish colors
to match building trim.
Commercial fronts and private entries offer the unique ability to introduce
hand-crafted, custom-built portals for businesses and private residences, and
must also have the ability to display shop wares. They are therefore
permitted more latitude with respect to materials, colors and amounts of
glazing. Aluminum storefronts may be used on commercial structures,
provided they are finished in factory finish. All-glass doors are permitted as
well, with no limits set on the amount of glass permitted at retail level.
Etched glass is encouraged to bring a level of detail to special storefronts.
Doors which are part of window wall assemblies may also have large glass
areas, to take full advantage of mountain views. All exterior door glazing
shall be non-reflective, to minimize off-site glare, particularly from the ski
mountain.
Exterior Door Hardware
Variations in designs and materials for exterior door hardware at primary
entries are encouraged to bring a level of fine detail and creative expression
to buildings within the community. Approved materials include brass,
copper, wrought iron, wood, and industrial metals such as aluminum or steel.
Industrial metals should be prefinished in colored or clear factory finish
systems to reduce maintenance problems. Door hardware in areas other than
primary entries should complement the
surrounding materials and details.
Window Sizes, Shapes and Types
As with exterior doors, window sizes should be
appropriate to their surrounding wall materials,
with narrow, relatively tall windows used in stone
or concrete, and larger, more expansive windows
used in field materials such as stucco and wood
siding, or in window wall assemblies.
Fenestration within field materials should be
designed with decorative trim and sills, or heavy
structural frames, so they do not appear as
“punch-outs” within those materials. Windows
located along retail streets and other public ways
offer locations in which to display goods to
pedestrians, and should therefore be designed with
particular care. Window walls should be designed
in proportion to their associated frontages, with
windows at large retail centers or hotels
significantly larger than those found in smaller,
more intimate shops. Other fenestration,
8-27
regardless of location, should be designed as part of an obvious hierarchy,
with lower-level, retail street openings the largest, and windows above
somewhat smaller.
Shapes of windows should also relate directly to their locations on the
building, with rectangular shapes being the most prevalent.
Fenestration located within the middles of buildings should be shaped and
organized into fairly regular patterns, to establish rhythm and continuity.
Specially-shaped windows are encouraged at walls along retail frontages, or
as custom openings in distinct areas of private residences. They are also
appropriate at dormers and other special roof elements. As with doors,
specially-shaped windows should relate to the overall building architecture.
And as a general rule, the variety of geometric shapes used should be limited
to 3 on any given building.
Acceptable window types include high-quality fixed, double-hung, awning,
and casement units. Sliding windows and multiple-opening units such as
jalousie are generally lesser-quality units not conducive to the mountain
environment and should be avoided. At retail levels, bay, box and bow
windows are encouraged to animate the pedestrian street and integrate public
and semi-public domains. All windows should strive to add visual interest
through careful design of mullions, muntins, and divided lites. The intent of
the Guidelines is to recall the regional heritage through the thoughtful design
of fenestration and how it relates in scale, proportion, and materials, to the
tripartite order of structures within the community.
Window Materials and Colors
Windows within Lionshead shall be
painted or stained wood, or clad in
maintenance-free metals such as
copper, or aluminum and steel with
baked finishes. Copper cladding may
be left to patina naturally, while baked
enamel colors for aluminum and steel
cladding should be similar to trim
colors, and in similar complementary
hues to wall colors or stained wood
colors. Factory finishes should be
selected to withstand the intense
ultraviolet radiation found at higher
elevations, and prolonged fade-resistant
warranties should be considered. In
addition, glazing shall be non-
reflective, to minimize off-site glare,
particularly from the ski mountain.
8-28
Decorative shutters are permitted within Lionshead only if they are designed
to operate or appear to operate. When used, they should be constructed of
wood and finished with durable stains or paints. Their design and placement
should be consistent and should not take on a random or haphazard
appearance. Design freedom is encouraged within these parameters, and
within the context of the other architectural elements found on the building,
including handrail designs, ornamental iron, and similar detailing.
8.4.2.6 Balconies, Guardrails, and Handrails
Location and Size
Balconies should be carefully located with respect to their orientation to the
sun, involvement with public spaces, and snow and watershed from
structures above and onto structures or passers-by below. They should be
sized as outdoor rooms, with ample space for outdoor furniture and other
amenities, or merely as small, private parapets used as “step-outs” to allow
fresh air into the adjacent room. False balconies and balconies which
straddle these two roles should be avoided, as they tend to lack the benefits
of either and are often left unused. Proper location and size will ensure that
balconies become animated spaces, rather than outdoor storage areas. As
animated spaces, their placement in public plazas and pedestrian streets—
straddling the semi-private and public domains—will infuse those spaces
with the vitality needed to draw visitors to Lionshead. Balconies which face
service alleys or are located within other socially “dead” spaces, or are
susceptible to water or snowshed are generally unsuccessful spaces and
should be avoided in Lionshead. The intent of this Section is to infuse
public spaces with the energy of occupied balconies, and encourage
designers to avoid the design of lifeless balconies which remain unoccupied
and therefore detract from public spaces.
8-29
Materials and Designs
Custom designs for balconies, guardrails, and handrails offer the opportunity
for truly creative expression within these Guidelines, and unique design
solutions are encouraged. Approved materials for primary elements such as
guardrails, handrails, posts, and support brackets include stucco-covered
walls (for guardrails only), naturally weather-resistant woods, wrought iron
and other decorative metals, and steel. Materials such as glass, plastic, pipe
rails, and metal panels are strongly discouraged. Secondary elements such
as pickets and ornamental detailing may use other materials not listed above
but will be reviewed on a case-by-case basis. Materials which meet the
intent of the Guidelines and work in harmony with the architectural language
of the building can lead to positive solutions, but all secondary building
materials will be approved at the discretion of the reviewing body.
Drainable balconies—or those which shed water off them via waterproof
membranes as opposed to letting water trickle through them—shall be
designed whenever other balconies, pedestrian streets, or other public ways
are exposed to water or snowshed from those balconies. Placement of the
drain systems should be carefully considered to avoid passers-by below.
Non-drainable balconies may be used in all other locations and should be
constructed of weather-resistant woods or ornamental metals.
Within these general parameters, balcony, guardrail, and handrail designs
should be patterned after a rational order of structure and detail. Primary
structural or decorative members should be in proportion to the balconies
they are supporting, which in turn should relate to the overall building scale.
An honest, straight-forward expression of structure should be sought
whenever possible, avoiding design faux pas such as stucco-covered beams
or grossly undersized brackets.
8.4.2.7 Roofs
General
In keeping with the spirit of the area’s mountain architecture, primary roofs
within Lionshead are to be predominantly gables and hips, with sheds or flat
roofs permitted at smaller, secondary roofs. Primary roofs are defined as
roofs which cover more than 500 SF of roof area, while secondary roofs are
those which cover 500 SF of roof area or less. Secondary roofs which occur
at logical breaks in building massing may exceed 500 SF if the general intent
of fragmented forms and visual harmony is met. Free-standing sheds and
butterfly roofs are not permitted. Mansard roofs are permitted on buildings
where pitched roofs would be impractical, if the mansards are of similar
form, pitch, material, color, and detail to other roofs within the community
(and identified within these Guidelines). If used, these types of roofs should
be considerate not only of views from the pedestrian street, but also those
from the ski mountain. To this end, areas of flat roof within the slopes of the
mansard shall be limited to the practical minimum, and the materials for the
flat roof shall be black or in a color to blend with the sloped roof. In
addition, rooftop equipment within the flat areas shall be painted to blend
8-30
with the roof material (see
“Miscellaneous Equipment”
Section to follow). The overall
image for Lionshead takes its cue
from the simple, fragmented,
gabled roof forms of European
alpine villages, where views of the
roofscapes from the mountains are
paramount.
All new construction shall comply
with the following roof criteria. Substantial expansions and renovations
shall also adhere to these Guidelines, along with the remaining portions of
the building which are not being expanded or renovated (see exceptions
above, in Sections 8.3.1, 8.3.4.2, and later in this Section). Roof framing
shall be expressed wherever possible, particularly through exposed ridge
beams, outriggers, rafter tails, and fascia boards.
Dimensional Guidelines
Roofs should be constructed with 30” minimum eave and rake overhangs,
with dimensions dependent upon overall building size. Secondary roofs may
have overhangs as small as 18”, but should work with the overall scale of the
roofscape. Ridge beams and outriggers should be of visually sturdy
members (6x or 8x material for wood, and equivalent sizes for other
materials), sized to support rafters and overhangs; decorative end cuts or
patterns are encouraged. Rafter tails shall also appear sturdy (2x or 3x
material for wood) and be exposed to express structure. Eave and rake
fascias shall be wide enough to screen end profiles at metal roofs, and to
offer a consistent image with respect to structural roof members.
Pitch
Roof pitches for primary roofs
shall be from 6:12 to 12:12,
inclusive. Pitch breaks are
permitted when they occur at
architecturally appropriate
locations such as plate lines,
changes in plane, etc. To add
variety to the Lionshead
roofscape, secondary sloped
roofs may have pitches
ranging from 4:12 to 12:12,
and flat roofs may have
limited use as secondary forms. Existing structures with especially large
footprints may deviate from the pitch requirements if they meet the overall
intent of the roof guidelines and are responsive to views from both the
pedestrian street and the ski mountain. Steep mansard roofs which exceed
the 12:12 maximum pitch criteria are not encouraged, but may be necessary
8-31
in certain instances when excessive building dimensions make the 12:12
pitch requirement impractical. These buildings will be handled on a case-
by-case basis, and evaluated on intent rather than quantitative criteria.
Materials and Colors
Primary roofs shall be covered with a limited palette of unit materials to
present a coherent image for Lionshead. Approved materials for primary
roofs include—but are not limited to—metal shingles, cementitious shingles,
concrete tiles, wood shakes or shingles, and high-quality asphalt shingles
which offer acceptable colors and depth. Metal shingles may be of copper
(16 oz/SF minimum weight), terne metal, or other materials with natural
patina. Secondary roofs may be covered with metal panels, in corrugated,
rolled, or standing seam profiles. Primary roofs shall be in neutral, earth-
tone colors, with brown or gray tones—bright colors or reflective materials
are not permitted. Roofs may incorporate blends to achieve desired colors—
on-site mock-ups are required when blends are proposed. At retail levels,
accent colors are permitted for secondary roofs to add vitality to the
streetscape. Changes in roof materials or colors shall take place in logical
locations, such as changes in pitch or changes in plane.
Dormers
Dormers are considered secondary roof elements, and as such are permitted
some latitude in terms of form, pitch and material. Dormers may be gables,
hips, or sheds, with pitch as identified previously for secondary roofs. When
designed as an extension of upper-level walls, they should be constructed in
the more traditional manner, above broken eaves on both sides of the
dormers, as opposed to continuous eaves up and over the dormers. Design
freedom is encouraged, and dormers with non-compliant forms or pitches
will be considered if the overall roofscape provides the image intended.
Snowguards, Gutters and
Downspouts
Snowguards or snowclips
shall be used wherever
significant amounts of snow
may accumulate over
occupied areas, such as
pedestrian streets, entries,
patios, decks, balconies, or
uncovered parking areas.
Pitched roofs which face
north are particularly
susceptible to snow and ice
accumulation, as are lower
roofs to the north of—and
therefore in the shadow of—
their higher neighbors. In these cases several rows of snowguards or many
snowclips may be necessary. Snow and ice accumulation on metal roofs—
8-32
which heat quickly during sunny winter days—is especially dangerous to
unsuspecting persons or equipment. Metal roofs which face south or are
located significantly higher than adjacent, lower roofs shall be equipped
with snowguards or snowclips to prevent injury to people or damage to
lower roofs.
Outdoor gathering areas which face south and are not completely covered
may be exposed to water drip from the roofs above them. These locations—
which may include heavily-used public spaces such as sun pockets or pocket
plazas—are ideal candidates for gutters and downspouts. Where roofs are in
constant shadow or have northern exposures, gutters and downspouts used in
conjunction with heat tape may work well. Gutters used below snowguards
should be designed to take the load of the accumulated snow and ice which
snowguards frequently release.
Approved materials for gutters and downspouts within Lionshead include
aluminum or steel with baked finish, and copper or lead-coated copper.
Gutter sections may be traditional or half-round. Snowguards shall be
constructed of painted plate steel vertical supports (painted black, or to
match roof or building trim color) with horizontal members made of
materials which recall the structure of the building, such as timbers, logs, or
tube steel . Large structures, where snowguards are not readily visible from
street level, may use the more utilitarian expanded metal or mesh dams,
welded to steel horizontal sections and vertical supports. All exposed steel
shall be painted.
Miscellaneous Equipment
All miscellaneous rooftop equipment, including roof vents, antennas and
satellite dishes, shall be painted to blend with the roofs to which they relate.
Major pieces of equipment on commercial buildings shall be strategically
located to conceal them from view, or hidden in cupolas or other
structures—exposed equipment is not permitted. All flashings shall be
copper or painted metal to match those found on exterior walls. The intent
of these provisions is to present a well-blended roofscape throughout the
community, as seen from the public spaces as well as from the mountain.
Skylights
Skylights are permitted within Lionshead if they are less than 3 feet higher
than the surrounding roof. Skylights must be included in maximum roof
height calculations, and shall be well-hidden from street level and the
mountain.
Solar energy devices
Solar energy device: A solar collector or similar device or a structural
design feature of a structure, such as a roof shingle with integrated
8-33
photovoltaic cells, which collects sunlight and converts the sun's radiant
energy into thermal, chemical, mechanical, or electrical energy
Solar energy devices should be installed on building roofs and facades and
oriented for energy production. Solar energy devices shall be designed and
placed in a manner compatible and architecturally integrated into the overall
design of the building. Solar energy devices should be installed to minimize
visual impact from street level.
Solar energy devices may be installed within the required setbacks on
existing structures if the structure is legally nonconforming or permitted to
encroach into the setback. Solar energy devices shall not be included in
calculation of building height. No portion of any solar energy device shall
project more than eight (8) feet from the roof plane or façade to which the
panel is attached. Solar energy devices shall not extend higher than the
existing adjacent ridgeline on roofs with pitches of 3:12 or greater. On
roofs with pitches less than 3:12, the Design Review Board shall make a
determination that the solar panels are installed to minimize excessive visual
impact. Solar energy devices shall not be installed within two (2) feet of a
roof ridge or roof eave. Solar energy device framing, brackets and
associated equipment shall be painted black or a color that matches adjacent
building surfaces at the discretion of the Design Review Board.
Figure 8-28a: Required Distances of Solar Energy Devices from Roof Edge
8-34
Figure 8-28b: Regulations Applied to a 8:12 Roof
Figure 8-28c: Regulations Applied to a 3:12 Roof
Figure 8-28d: Regulations applied to a Flat Roof
8.4.2.8 Fireplaces and Chimneys
Fireplace Requirements
Fireplaces shall be designed to meet all applicable Codes, including the
restriction on wood-burning units within Lionshead. Exposed flues and
vents for gas-operated fireplaces or other equipment such as furnaces should
Panels shall not exceed ridgeline
8-35
be hidden from primary views, and painted to blend with the nearest
building materials.
Chimney Sizes and Shapes
All flues 6” diameter or greater which penetrate roofs shall be designed with
chimneys. The sizes of chimneys should be in scale with the architecture of
the building—not small enough to be lost
in the massiveness of the structure, but not
large enough to overwhelm the structure.
Chimneys should be designed with
relatively slender proportions when viewed
from at least one profile, with height
greater than width, and in rectangular
shapes. Heights of gas-burning chimneys
or boiler flues shall be designed to
proportionally match their wood-burning
counterparts, to lend authenticity and
consistency to the overall roofscape.
Chimney Materials
Chimneys within Lionshead shall be covered in stone veneer (to match
building veneer) or stucco, to express the alpine heritage of the area. Wood
or metal-clad chimneys are permitted at small, residentially-scaled buildings
only.
Chimney Caps
Chimneys may terminate in decorative caps of stone, stucco, or metal.
Creative designs, such as arched openings within caps, barrel or pitched
metal roofs, and the like are encouraged to lend interest to the building
roofscape. Chimney caps should act as elegant crowns to nicely-
proportioned chimneys, and should not seem bulky or top-heavy. When flat
or pitched stone caps are used, they shall have a minimum thickness of 4”.
All chimney caps shall be designed to screen spark arrestors and other
utilitarian equipment as much as possible.
8.4.2.9 Detail
Detail should be introduced to the architecture of Lionshead to infuse
heritage, culture, and artistry to the Lionshead environment. Well-designed
ornamentation can serve to complement and perhaps intensify the other
architectural principles discussed in these Guidelines, but should be
designed to work in harmony with—and not against—the basic architecture.
The design of signage, brackets, lightposts, and the like should present a
hand-crafted quality, particularly at street level. Detail at the middles of
buildings should rely more upon pattern or carefully-designed repetition to
visually connect parts of a building together or separate buildings to one
another.
8-36
8.5 Summary Table of Quantitative Criteria
The following table offers a “quick glimpse” of the quantitative criteria established within
these Guidelines, by Section number. However, it is not designed to act in lieu of a thorough
review of this document. The values listed in the table should be evaluated in conjunction with
the actual Sections which they pertain to, particularly in light of the explanations of design
intent, clarifications, possible exceptions, and other notes not identified within.
S e c t D e s c r i p t i o n C r i t e r i a
8.4.1.3 Pedestrian Street Width-to-Height Relationships 1:1/2 to 1:1 ½
8.4.2.3 Bldg Eave Height at Retail/Pedestrian Streets 50% wall face @ 16’ max height
50% wall face @ 36’ maximum height
1 2 ’ m i n i m u m s t e p b a c k
8.4.2.3 Bldg Eave Height at Ski Yard/Gore Cr Corridor 48’ maximum eave height
1 2 ’ m i n i m u m s t e p b a c k
8.4.2.3 Bldg Eave Height at Remaining Areas 60’ maximum eave height
1 2 ’ m i n i m u m s t e p b a c k
8.4.2.3 Wall Surface Criteria 35’ maximum vertical face
H o r i z o n t a l s t e p r e q u i r e d
8.4.2.3 Maximum Ridge Heights 71’ average maximum height
82.5’ absolute maximum height
8.4.2.4 Exterior Horizontal Wall Spans 30’ maximum span at street level
8.4.2.4 Primary/Secondary Bldg Material Definitions Primary: exceed 500 SF area
Secondary: 500 SF area or less
8.4.2.4 Primary/Secondary Bldg Colors Primary: exceed 500 SF area
Secondary: 500 SF area or less
8.4.2.7 Primary/Secondary Roof Definitions Primary: exceed 500 SF roof area
Secondary: 500 SF roof area or less
Compliance Criteria for Existing Roofs Substantial expansion/renovation
8.4.2.7 Roof Dimensional Guidelines 30” min eave and rake overhangs
18” overhangs at secondary roofs
8.4.2.7 Roof Pitch Primary: 6:12 to 12:12
Secondary: 4:12 to 12:12 (or flat)
CHAPTER 9: IMPLEMENTATION
The intent of this chapter is to provide guidance to the Town of Vail as it seeks to implement the
recommendations of this master plan. The recommendations regarding priorities, phasing, and timing
are intended to be flexible, not binding, so that the community can adapt the plan to changing
conditions and priorities. The project priorities listed below are divided into public and private
improvements, although many projects will be implemented through joint public and private financing
efforts.
9.1 Project Prioritization
9.1.1 Public Improvements
The following list of major public improvements outlined in previous chapters suggests
priorities based on the relative importance of projects and the interrelationships among
them. (The plan acknowledges, however, that other variables also influence future
implementation decisions, including construction costs and funding availability. For
example, the construction of a Gore Creek recreation path bypass is not as critical to the
implementation of the master plan as the north day lot transportation center, but it might
be built sooner because of its lower cost and access to RETT funds.)
9.1.1.1 North Day Lot Transit Center
This component is essential to the implementation of the Lionshead Master
Plan because:
a. It is a prerequisite for other critical projects.
It will be impossible or very difficult to proceed with other essential
projects prior to the construction of the transit center, among them:
• The East Lionshead Pedestrian Portal. A critical component of the
pedestrian portal is the removal of the existing skier drop-off, service
and delivery, and local/ regional shuttle activity. The master plan
relocates all of these activities to the north day lot transit center. The
existing level of service and delivery traffic can be accommodated in
the proposed surface facility on the west end of the parking structure,
but this is a short term solution that does not provide for expanded
service and delivery needs.
• Concert Hall Plaza Redevelopment. The master plan recommends
the removal of the existing Concert Hall Plaza transit stop in order to
create a larger redevelopment parcel and to enhance the west
Lionshead pedestrian portal. Although this transit stop could be
eliminated today, it will likely be replaced in the north day lot transit
facility.
• Vail Community/ Civic Center. It will be difficult to remove the
charter buses from the future civic center site before a new pick-up
and drop-off point is created at the north day lot transit center.
• Retail Expansion. Retail expansion in the Lionshead pedestrian core
will necessitate the creation of new service and delivery facilities,
which the master plan recommends locating at the north day lot
transit center. In addition, a significant amount of current service
and delivery traffic on West Lionshead Circle that now occurs
9-1
illegally in the fire lane south of the Landmark Townhomes and in
the street would move to that facility.
b. It will energize a new corridor into Lionshead from the north.
One of the primary reasons for a transit center on the north day lot is to
create a major new point of entry into the pedestrian/ retail core. The
influx of additional pedestrian traffic generated by the transit center will
energize the western end of the core area and make retailers there more
successful.
c. Future transit implications
If any future technology transit system connects through the Lionshead
resort core in the future, the North Day Lot transportation center will
play an integral role in connecting to and providing for a central transit
stop in Lionshead.
9.1.1.2 The East Lionshead Pedestrian Portal
The East Lionshead pedestrian portal is the single most heavily utilized
point of entry into Lionshead and Vail as a whole (based upon skier numbers
accessing the mountain). The implementation of the master plan
recommendations for this portal will significantly affect the character and
visual perception of the study area.
9.1.1.3 The West Lionshead Pedestrian Portal
The West Lionshead pedestrian portal is critical to the functioning of the
retail core, but it is dependent on the redevelopment of at least one private
property (Concert Hall Plaza). It is strongly recommended that the Town of
Vail work with the owners of this property to facilitate its redevelopment.
9.1.1.4 Public Space Improvements in the Pedestrian/ Retail Core
Virtually equal in importance to the two portals into Lionshead is the quality
of the pedestrian/ retail mall itself. The recommendations made in the site
design guidelines for the primary pedestrian mall are critical to this
improvement. It is recommended that the adjacent property owners,
including but not limited to Vail Associates, participate in planning and
funding the implementation of these improvements as they redevelop or
expand their properties.
9.1.1.5 Sidewalk and Streetscape Improvements
Enhancements to Lionshead’s streets and pedestrian circulation patterns are
important both functionally and visually. Rather than undertaking the major
improvements by itself, the Town of Vail is advised to ask for the financial
participation of adjacent properties as they redevelop or expand.
9.1.1.6 Development on the South Face of the Parking Structure and East
Lionshead Circle Streetscape
This project includes two important elements: the creation of a
retail/commercial and housing component and the enhancement of the East
9-2
Lionshead Circle pedestrian corridor. Although these projects can stand
alone, or could occur prior to adjacent projects, they are closely related to
the East Lionshead pedestrian portal, the Vail Civic Center, the addition of
parking decks to the existing parking structure, and the streetscape
connection along West Meadow Drive to Vail Village. The Town of Vail’s
efforts to promote housing for locals causes these projects to take on a
higher priority.
9.1.1.7 South Frontage Road Realignment and Improvements
The improvement of South Frontage Road, including widening and
acceleration/deceleration lanes, will become more critical as existing
properties redevelop and add density. The timing of roadway improvements
depends not only on the pace of redevelopment but also on the ability to
finance the improvements. Decisions about realigning the road are
contingent on the development plans for the west day lot and the Vail
Associates service yard. It is likely that the improvements will happen in
significant phases. Imposition of impact fees on projects that add density or
traffic volume to Lionshead is one means to secure long-term funding. It is
important to note, however, certain improvements are needed now
(acceleration/deceleration lanes, signage), making it more difficult to charge
those expenses to future projects.
9.1.1.8 Parking
Current needs may justify expansion of 500 parking spaces town wide today,
but further study of future parking demand may be needed to verify this.
Additional decks on the existing structure or a new public structure in west
Lionshead may be necessary when the Vail Civic Center is constructed or
development occurs on the west day lot and the Vail Associates service yard.
In any case, the development of the west day lot will necessitate replacement
of this existing private parking with either structured parking or an adjacent
surface lot. If future parking studies demonstrate a need for significant
public parking in the west Lionshead area, a joint venture between Vail
Associates, the Town of Vail, and other potential development interests
should be considered.
9.1.1.9 Vail Civic Center
Additional parking must be built (in the existing Lionshead parking structure
or nearby) and the charter bus parking lot must be relocated before the Vail
Civic Center can be built. In addition, this project will be integrally tied to
development on the south face of the Lionshead parking structure and the
streetscape enhancements along East Lionshead Circle. This will be a huge
project and is likely to occur only after a longer period of planning and fund
raising; other, more critical elements of the master plan should not be made
contingent on its implementation.
9-3
9.1.1.10 West Lionshead Circle and Lionshead Place Realignment
The realignment of this intersection, while important, is not critical to the
implementation of the master plan; it could be done in conjunction with the
redevelopment of adjacent buildings. Redevelopment projects that are
linked to improvement of the intersection are the Vail Associates core site
redevelopment (due to the potential increase in traffic volume accessing the
core site via Lionshead Place) and Concert Hall Plaza. Concert Hall Plaza
redevelopment may not increase the volume of traffic on West Lionshead
Circle, but it will facilitate the creation of a stronger west Lionshead
pedestrian portal, of which this intersection is a critical component.
9.1.1.11 Gore Creek Corridor Improvements
Improvements in the Gore Creek corridor will greatly enhance the ability of
locals and guests to experience the creek but are not vital to the overall
functionality of Lionshead. However, these improvements are stand-alone
projects, not contingent on adjacent redevelopment, and thus may be
significantly easier to implement, both financially and logistically. Because
the creek is a significant benefit to Lionshead, the implementation of
improvements here should be diligently pursued but not allowed to delay
other, more critical plans.
9.1.2 Private Improvements
9.1.2.1 Individual Property Redevelopment and Exterior Renovations
The improvement of individual properties through redevelopment, site
enhancement, and exterior renovation is critical to the accomplishment of
master plan goals. The Town of Vail should create incentives, encourage,
and facilitate these important projects, using the master plan as a framework
to guide renewal and redevelopment projects. The specific
recommendations of the plan, including the architectural design guidelines,
are not intended to create a disincentive for redevelopment or exterior
renovations. If any provision of the plan proves over time to create a
disincentive for desired renewal or redevelopment, Town Council should
consider amending it
9.1.2.2 Core Site Hotel
A high end resort hotel in the core of Lionshead is a top priority for the
Town of Vail, which should provide incentives, encourage, and facilitate this
project. In conjunction with redevelopment of this site, the ski yard should
be improved, a new skier bridge constructed, and adjacent pedestrian
systems enhanced according to the guidelines set forth in the master plan.
9.1.2.3 Retail Expansion
The expansion of certain ground floor retail buildings, as outlined in the
master plan, is critical to the overall success of the retail/ pedestrian core
area. These projects should be expected to participate as well in the
enhancement of adjacent pedestrian systems according to the guidelines set
forth in the master plan. The Town of Vail should provide incentives,
encourage, and facilitate these projects.
9-4
9.1.2.4 Concert Hall Plaza/ West Lionshead Pedestrian Portal
The redevelopment of Concert Hall Plaza will be a private project, but it also
represents a critical public interest: the creation of the west Lionshead
pedestrian portal. All reasonable efforts should be made by the Town to
provide incentives, encourage, and facilitate this project.
9.1.2.5 West Lionshead Local/ Employee Housing
The development of a significant housing supply in west Lionshead should
be a component of any plans to tear down the Sunbird Lodge and redevelop
the Vail Associates core site. Housing is linked to the realignment of South
Frontage Road, the possible construction of a new west Lionshead parking
structure, and additional development on the west day lot and the Vail
Associates service yard. To the greatest extent possible, all of these projects
should be planned concurrently, and the sequence in which they are
implemented should not preclude other future projects. It should be
considered a priority by the Town of Vail to determine how much, if any,
public parking should occur in this area.
9.2 Mitigation of Construction Impacts
As Lionshead redevelops, especially in the pedestrian/ retail core, it is critical that all efforts be
made to minimize the impact on existing businesses and merchants. Toward that end the
following recommendations are made:
9.2.1 Phasing
Construction projects should be phased and scheduled so that no significant area of
Lionshead (such as the retail core) is isolated or completely shut down as a result of
construction. While it is recognized that short-term impacts will occur, storefronts and
critical pedestrian circulation patterns should not be blocked. Every effort should be
made to maintain pedestrian access during construction. If a complete shutdown of an
area is ever necessitated it should be scheduled for the fall or spring shoulder season to
minimize the impact on businesses.
9.2.2 Construction Mitigation
Construction impacts include, but are not limited to, noise, dust, equipment exhaust,
delivery traffic, and visual impacts. Construction projects that may impact public
pedestrian corridors or the pedestrian core must take all reasonable measures to mitigate
these impacts. Potential mitigation measures include the creative use of construction
fencing ( such as the “kidzone” construction barriers utilized in Beaver Creek and the
Vail Village), remote staging areas, and the careful timing of particularly disruptive or
noisy construction events.
9.2.3 Marketing
Special marketing efforts are recommended to help draw consumers into Lionshead
during construction periods.
9.2.4 Short-Term Relocation
The Town of Vail should work with developers to plan for the temporary relocation of
retail businesses that will be displaced by redevelopment. After the proposed
9-5
development on the south face of the parking structure is completed, ground floor
retail/office spaces in that building could satisfy this short term need.
9.3 Financing
The Town of Vail can use several financing tools to implement public improvement projects
and provide incentives for private development. The list that follows is not exhaustive, nor is it
clear which tool will prove to be the best means to implement the master plan. Potential legal
issues associated with the individual financial mechanisms are not addressed.
9.3.1 Private Development Incentives
9.3.1.1 Parking Pay-in-Lieu Relief
The parking regulations require a parking pay-in-lieu fee for parking that
cannot be provided on site. This fee, currently in excess of $17,000 per
required parking space, is a major obstacle to the redevelopment of buildings
in Lionshead. Reduction of the parking requirement, as well as the fee,
should be considered in the implementation of the master plan. This
proposal is particularly relevant to projects that can demonstrate a negligible
impact on parking generation.
9.3.1.2 Parking Requirement Reduction
The current parking regulations do not take into account the high volume of
pedestrian traffic and use of public transit that occur in Vail. The
regulations are derived from suburban models, not resort communities,
where parking supply is shared by multiple uses. By increasing the cost of
development, high parking requirements for individual uses in Lionshead
may be a disincentive for redevelopment.
9.3.1.3 Density Incentives
Increases in allowable density are recommended in the Lionshead study area
as an incentive for property owners to redevelop existing properties.
9.3.1.4 Tax Incentives
Tax reductions or tax rebates should be considered to aid in the
redevelopment of existing properties. They may help property owners
defray interest and other recurring costs associated with redevelopment. Tax
incentives must be balanced with the need to generate public revenue for
future public improvements.
9.3.2 Public Improvements
9.3.2.1 Tax Increment Financing (TIF)
Tax increment financing is one of the most effective tools available for
redevelopment of Lionshead. TIF allows the community to capture a portion
of tax revenues that normally go to the county and to utilize them locally
instead to implement public improvements. TIF does not raise taxes; it
reallocates the incremental property or sales tax revenues resulting from
improvements within the district and uses those revenues to repay bonds
issued to finance the improvements. While it is very difficult to forecast TIF
9-6
bonding capacity without knowing how many redevelopment projects will
occur, it is estimated that the Vail Associates core site alone (assuming an
approximate construction budget of $150,000,000) would generate
approximately $25,000,000 in bonding capacity.
9.3.2.2 Special Assessment District
A special assessment district could also be utilized to fund public
improvements in Lionshead. It is a somewhat less attractive option than tax
increment financing because it requires that a new taxing district be created.
Under the Tabor Amendment, this can only be done with an affirmative vote
of the community.
9.3.2.3 Application of Impact Fees
The construction of public improvements in Lionshead may also be funded
through assessments on redevelopment projects according to their estimated
impact on streets and public infrastructure. However, if considered, it needs
to be balanced with the incentives offered to encourage redevelopment. This
option should not become a disincentive to redevelopment.
9.3.2.4 Real Estate Transfer Tax (RETT)
The real estate transfer tax will continue to be a source of funding for public
recreation and open space in the Town of Vail and should be utilized to the
maximum extent possible for appropriate projects in Lionshead.
9.3.2.5 Municipal Bonds
Municipal bonds are an important option for funding public improvements
in Lionshead, although the issuance of bonds will likely require an
affirmative vote under the Tabor Amendment.
9.3.2.6 Grants
The Town of Vail and private entities should aggressively seek grants as a
source of funding public improvements.
9.4 Revenues and Costs
9.4.1 Revenues
The following is a summary of potential public revenues from taxes and development in
Lionshead.
9-7
9.4.1.1 Tax Revenue
A revenue impact model was developed for Lionshead by Stan Bernstein
and Associates, Inc. (submitted to the Town of Vail on June 24, 1998 and
attached, with notes, as appendix B). The revenue impact model is based on
the projected development model attached as appendix D. The revenue
projections shown in figure 9.1 assume a five-story average building height
and full build-out of the study area in accordance with the master plan. They
do not include potential revenues or costs associated with tax increment
financing.
Weighted towards fractional ownership
Revenues $3,358,587
% of Town 1998 budget 14.90%
Weighted towards whole ownership
Revenues $2,607,487
% of Town 1998 budget 11.60%
Weighted towards fractional ownership
Revenues $4,980,000
Weighted towards whole ownership
Revenues $3,526,500
Weighted towards fractional ownership
Revenues $2,999,848
Weighted towards whole ownership
Revenues $2,999,848
a. Incremental recurring revenues
b. Incremental non-recurring real estate transfer taxes
c. Incremental non-recurring construction permits
Figure 9-1- Tax based revenue
9.4.1.2 Revenue from Development
Three potential revenue-generating projects are located on Town of Vail
property in the Lionshead study area. Projected construction costs and
revenue from these projects are described below and summarized in figure
9.2.
a. South Face of the Parking Structure. No significant revenue for the
Town is assumed from the proposed upper-level housing component of
this project, although there may be enough to cover the cost of
construction. Estimated construction costs for the housing component are
outlined in section 9.5.2 below. Figure 9.2 shows the construction cost
of the retail component only and does not include any adjacent
streetscape enhancements.
b. Infill Development at the East Lionshead Pedestrian Portal. The
estimate in figure 9.2 assumes a three-story building on this site, the first
floor of which will be retail space and the upper two levels sold fee
simple as residential space.
9-8
c. Infill Development at the Central Pedestrian Plaza. The estimate in
figure 9.2 assumes a two-story building on this site. Only half of the
floor space is being allocated to revenue producing uses; the remainder
may be public space for restrooms and uses associated with activities in
the adjacent plaza.
Construction Total sq. ft. Cost per sq. ft. Total
12,600 $150.00 $1,890,000.00
Annual Retail Revenue Total sq. ft. Lease per sq. ft. Total
12,600 $30.00 $378,000.00
Construction Total sq. ft. Cost per sq. ft. Total
First floor retail 6,135 $150.00 $920,250.00
Second and third floor res.12,270 $250.00 $3,067,500.00
Total construction cost $3,987,750.00
Revenue Total sq. ft. Sales per sq. ft. Total
Annual retail revenue 6,135 $45.00 $276,075.00
Residential sales revenue 12,270 $500.00 $6,135,000.00
Approx. initial profit $2,147,250.00
Approx. recurring revenue $276,075.00
Construction Total sq. ft. Cost per sq. ft. Total
6,400 $150.00 $960,000.00
Annual Retail Revenue Total sq. ft. Lease per sq. ft. Total
6,400 $45.00 $288,000.00
Total construction costs $6,837,750.00
Total sales revenue $6,135,000.00
Total sales profit (loss)($702,750.00)
Total recurring lease revenue $942,075.00
South face of parking structure retail component
Central pedestrian plaza retail infill structure
Total development based revenues
Figure 9.2- Development based revenue
East Lionshead Pedestrian Portal infill building
9.4.2 Costs
Construction costs are outlined for the following potential projects. These costs are based upon
“order of magnitude” unit costs; a more detailed analysis would require a completed design
scenario. All costs are based on 1998 dollars and construction industry norms. In addition to
inflation, issues such as materials, labor, and transportation/ shipping costs may impact the
accuracy of these figures. Cost estimates are for conceptual planning purposes only and are not
a substitute for detailed cost analysis. Order of magnitude costs could vary as much as 15% in
either direction.
9-9
9.5 Next Steps
The following critical actions will set the stage for the implementation of the master plan
recommendations.
9.5.1 Joint Funding Agreements
The Town of Vail should enter into a joint funding agreement with Vail Associates and
other development interests to share the costs of public improvements necessary to
increase activity on Vail Mountain and in Lionshead. This action should be a high
priority after adoption of the master plan.
9.5.2 Rezoning
Zoning districts and land use regulations relevant to the Lionshead study area should be
updated and modified to reflect the recommendations contained in the master plan and
facilitate their implementation. The rezoning process should include the creation of
relevant impact fees that would require development to contribute toward the funding of
required public improvements associated with the development.
9.5.3 Downtown Development Authority
A downtown development authority (DDA) or another appropriate TIF bonding district
should be established for purposes of funding public improvements in both Lionshead
and the Vail Village. The establishment of such a district should be considered a top
priority by the Town of Vail and should not be delayed by the currently ongoing
Broomfield TIF litigation.
9.5.4 Parking Analysis
The Town of Vail should conduct an in-depth parking analysis in order to quantify
parking demand and understand what revisions, if any, should be made to the existing
parking code.
9.5.5 Employee Generation
In accordance with ongoing efforts to provide both locals and employee housing in the
Town of Vail, an employee generation ordinance is currently being pursued by the Vail
Town Council.
9-10
9-11
9-12
9-13
9-14
9-15
9-16
9-17
9-18
~ .----
n==".""n-D-Q,~:u==u --"
.
-0 [] []
Permitted Vail
Heights Intuoational
Zoning-HDMF
Flat top=45'
Sloj7ing t0p=48' Permitted
Heights:
Flat t0p=45'
Sloping top=48'
Existing
Height=59.8'
Varianee=(12)'
Elevation: 8220'
o 0
l'ermilted Landmark
Heights ToWii'ilOn1es
Zoning-CC2
Flat top=45'
Sloping top=48' Permitted
Heights:
Flat top=4S'
Sloping top=48'
Existing
Height=36'
Variance=12'
Lodge at Treetops Vail 21 Lion's Pride lJonshead
Lionahead Lionshead Zonmg-CC2 Zoning-eCZ Building Arcade
PhDe! &2 Phase 3 Zoning-eC2 Zoning-eCZ
Zoning-HDMF Zoning-HDMF Permitted Permitted
Heights: Heigbts: Permitted Permitted
Permitted Permitted Flat top=4S' Flat top=4S' Heights: Heights:
Heights: Heights: Sloping top=48' Sloj7ing t0p=4S' Flat t0p=4S' Flat top=4S'
Fla! t0p=4S' Flat top=4S' Sloping top=48' Sloping !op=48'
Sloping t0p=4S' Sloping top=48' E:<isting Existing
Height=74' Height=S8' Existing Existing
Existing Existing Variancc=(26') Variance={ 10') Height=32' Height=33'
Height=Sl' Height=40' Variance=l6' Variance-l 5'
Varianee-O') Variance=S' Elevation: 8199' Elevation: 8198'
Elevation: 8 I 79' Elevation: 817S'
Elevation: 8184' Elevation: 8178'
~
c--
0__8 D ~ 0
Sunbird Lodge Lion Square Landmark Con""rt HaIl Montaneros Lion Square
Zonmg-eC2 Lodge Tower Pia,.. Zoning-eC2 North Phase 4
Phases 1-3 Zoning-CC2 Zoning-eCZ Zoning-eCZ
Permitted Zoning-CC2 Permitted
Heights: Permitted Permitted Heights: Permitted
Flat top=4S' Permitted Heights: Heights: Flat top=4S' Heights:
Sloping top=4S' Heights: Plat top=4S' Flat t<JF4S' Sloping top=48' Flat lop=45'
Flat top=4S' Sloping top=48' Sloping top=48' Sloping top=48'
Existing Sloping top=4S' Existing
Height=SS' Existing Existing Height=43' Existing
Variance=(7') Existing Height=83' Height=27' Variance=5' Height=4I'
Height=49' Variance=(34') Variance=21I Variance=7'
Elevation: 8195' Variance=( I') Elevation: 8183'
Elevation: 8200' Elevation: 8240' Elevation: 8l77' Elev3lion: 8173'
Elevation: 8173'
D -..;;: -lr~:V~ l -l~'~;-~':-B:'~ D"'~ 0=
-- !
.
lJonhend Vanl2ge Point Liftholllie Westwind Gondola
Center Zoning-eC2 Condomlnlums Zoning-CC2 Building
Zoning-CC2 Zoning-eCZ Zoning-CC2
Permitted Permitted
Permitted Heights: Permitted Heights: Permitted
Heights: Flat t0p=4S' Heights: Flat top=4S' Heights:
Flat top=4S' Sloping top=4ll' Flat top=4S' Sloping top=48' Flat top=4S'
Sloping top=48' Sloping top=48' Sloping top=48'
Existing Existing
Existing Height-=72' Existing Height=56' Existing
Height=S3' Varianee=(24') Height=50' Variance=(8') Height=SO'
VariBnee=(S') Variance=(2') Variance=(2')
Elevatioo: 8233' Elevation: 8219'
Elevation: 8182' Elev3lion: 8190'
.----
,-, ' ''-'" .- ,,--.-
OItili. ~ -''-D;-_.=.-..:G ~ O
Vailglo Lodge Anders Lionsbead Inn Enzlan
ZOOing-eC2 Zoning-eCZ Zoning-eC2 Condominiums
Zonmg-eCZ Zoning-HDMF
Permitted Pennitted Permitted Permitted
Heights: Heights: Heights: Permitted Heights: Permitted
Flat top=4S' Flat top=4S' Flat top=4S' Heights: Flat top=4S' Heights:
Sloping top=48' Sloping top=48' Sloping top=48' Flattop=4S' Sloping top=48' Flat top=4S'
Sloping top=48' Sloping top=48'
Existing EJtisting Existing Existing
Height=48' Heigbt=74' Height=80' Existing Height=79' Existing
Variance=O' Variance=(26') Variance=(32') Height-=S4' Variance=(31') Hcight=S2'
Variance Variance=(4')
Elevation: 820S' Elevation: 8189' Elevation: 8244' Elevation: 8211'
Elevation: 8204' Elevation: 8202'
MAPM
EXISTING BUILDING HEIGHTS
L~~~~L~~E~D
MASTERPLAN
C~ES~GNWO~~s...HOPI
Elevation: 8177'
r-
-' ..~:-.
"O~--
Marriut Vail Spa
Zoning-SDD#? Condominiums
1200 FOOT WALKING DISTANCE