HomeMy WebLinkAboutB04-0033 REV transmittal� • � ! �
k, h. w e b b
TRANSMITTAL
To: Charlie Davis
ENCLOSED
NOTES:
From: KHWebb Architects
t
- , .
{�c t�� GT" ��'S{�dr� S � S
y}GC ��P�O
S �� Q�� �.��
� �''c� �.�
Date: 03.11.05
1�l,dr� s
ge; Permit Revisions Shannon Townhouse
(3) revised sets of Shannon Townhouse
►��-����
Charlie — I believe that we have addressed all of your revision comments regarding the
Shannon Townhouse in the Vail Mountain Lodge.
I. The coversheet has been amended to include the construction type and the fact that '�
we are using the 2003 IBL. �
2. The upper stairs leading to/from the upper deck on sheet A102 have a handrail on
both sides o( the stair, as do all of the stairs in the unit. �
3. Sheet A102 has been amended to note the fact that the exterior stairs are to be
snow melted, and will slope I/8" per foot to drain.
4. Smoke detectors are still not shown on the architectural sheets as they are shown �
on sheet E2.
5. Even though we are not altering the party walls that are already in place, we have �
provided a typical party wall condition detail where they are constructed of 5/8"
Type X gyp and studs. The concrete party wall condition has not been detailed
because there are no I hr fireproofing concerns with that type construction.
6. A complete interior door schedule has been provided on sheet A602. �"
1. Typical floor, wall, ceiling, and roof assemblies have been provided on Sheet A602 �
that illustrate a I hr fire resistive construction.
8. There are no through penetrations or membrane penetrations to note between the
Shannon's unit and the rest of Vail Mountain Lodge.
9. Sheet A105 has been amended to show that we are in compliance with IBC section
112.4.I. and a general note has been placed on the RCP so that there is no
confusion about the number of penetrations that can be made per IOOsq. ft. of
floor area.
10. See note 1.
953 SOUTH FRONTAGE ROAD WEST STE 216 YAIL tOLORA[H} 81b41
910.411.2990 974 417.�965 (rJ www.khwe�b.com
TOWN C
ti
f
Vail Building Safety and Inspection Services75 S. Frontage Rd. vail, Colorado 81657 970-479-2142
March 14, 2005
Vail Building Safety & Irispection Services
Plan Review Notes
Shannon Townhome located at the Vail Mountain Lodge, BP #B04-0033
Corrections are listed below. �
Sheet Item
I� Cover Provide a code analysis for this project. It is listed as a Type II-A building and shall be regulated
under the 2003 International Building Code.
Z. A 102 A handrail sha.11 be provided on both sides of exterior stairs. (Refer.lBC sec.1009.1.1)
3. A 102 Show how snow, ice and water will not accumulate on exterior stairs. (Refer. IBC sec. 1009.5.2)
4. A 102 Smoke detectors not shown. They are shown on sheet E2. Fire department approval is required.
S. A 102 Provide detail of all wall types proposed. Show compliance to IBC section 602.2 and Table 602.
(�, A 102/601 Door a not shown on door schedule. Opening protection is required here. Provide a complete door
schedule.
�. A 102/S2 Provide details of assemblies being used to obtain 1-hour fire-resistive- assemblies on all
structural frame elements. (Refer.lBC Table 601)
8 A102/105 Provide details of all through-penetration and membrane penetration fire-stopping methods.
(Refer. IBC sec. 712)
�• A105 Recessed can lights and other membrane penetrations exceed maximum allowed by IBC section,
712.4.1. Show how compliance to this section shall be obtained.
�o• S4 Provide detail of rooflceiling assembly. The roof/ceiling assembly shall be a 1-hour fire-resistive
assembly. (Refer. IBC Table 601)
The above referenced permit shall not be released until the above mentioned corrections are addressed.
Address all corrections to Charlie Davis