HomeMy WebLinkAboutB07-02957DR10 E
75 S. Frontage Rd.
Vail, Colorado 81657
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIG ((
Project #:
Building Permit #:
970- 479 -2149 (inspections)
OWN OF VAIL BUILDING PERMIT APPLICATION
Separate Permits are required for electrical, plumbing, mechanical, etc.!
CnNTRACT()R INFr1RMATWIN
Gen ral Contractor:
Town of Vail Reg. No.:
Contact Person and Phone #'s:
6'u i WvL11U_LJ]
/ /14
Email address: i2 „ ;<,
Fax
Contractor Signature: 1/"
COMPLETE VALUATIONS FOR BUILDING PERMIT /I nhnr R MatPrinkl
BUILDING: $
ELECTRICAL: $
OTHER: $
PLUMBING: $
MECHANICAL: $
TOTAL: $
For Parcel # Contact Eaale Countv Assessors Office at 970 - 328 -86dn nr visit www Paula_rnimfi1 rnm
Parcel #
Job Name: /YJGK�'a/!X
Job Address:
Legal Description Lot: % � Block: Filing: Subdivision:,+/,-/-/aie-
Owne
Addre s: a /' 94,,41z ik:;7 4 sy
Phone:
Architect/Desi ner:
Addre
Phone:
Engineer:
Address:
Phone:
Detailed description of work:
rlJiz� J1�7ct/�7/ f/�o 46,- Mo -arzt-
Work Class: New( Addition( ) Remodel ( ) Repair ( ) Demo ( ) Other ( )
Work Type: Interior Exterior ( ) Both ( )
Does an EHU exist at this location: Yes( ) No
Type of Bldg.: Single- family ( ) Two - family Multi- family ( ) Commercial ( ) Restaurant ( ) Other ( )
No. of Existing Dwelling Units in this building: 12
E70of Accommodation Units in this building:
NoFrype of Fireplaces Existing: Gas Appliances Gas Los Wood /Pellet Wood Burnin
No/Type of Fireplaces Proposed: Gas Appliances Gas Los Wood /Pellet Wood Burning NOT ALLOWED
Does a Fire Alarm Exist: Yes (.) No( J Does a Fire Sprinkler System Exist: Yes ( ) No
FOR OFFICE USE ONLY
Type of Construction: Date Received:
Occupancy Group Accepted By:
F: \cdev \FORMS \Permits \Building \building-permit.DOC Page 1 of 16
AUG s o 2007
TOW AIL
MWNOFVA(I '
BUILDING PERMIT APPLICATION CHECKLIST
SINGLE FAMILY /DUPLEX CHECKLIST
This checklist is to be used with any single family /duplex permit (new construction , addition, or remodel application.)
E Town of Vail Design Review Board approval must first be obtained (may not apply to interior remodels)
F Plan Check Fee must be paid at the time of application for projects over $100,000 valuation (see attached
schedule)
The following information must be shown on all 4 sets of plans:
Architectural Plans
E Site Plans. Provide all site plan information as required for the Design Review Application for your project.
Refer to the DRB application checklist for complete details.
❑ Construction staging plans. Provide construction staging and materials storage site plans.
._B-- Floor plans. Complete floor plans provided for each level. Complete dimensions, drawing scale noted, use of
each room shown on the plans. Location of mechanical equipment clearly shown
❑ Building Elevations N,W,S,E elevations. Show all proposed exterior finish materials, guardrails, windows,
doors, and finish grades.
❑ Window sizes and operation types. Specified on the floor plans or elevations.
❑ Stairways, guards, and handrails Show all stairway details with rise /run, handrail and guard details
❑ Roof plan. Show all roof covering materials (Class A covering required) and underlayment, roof pitch
❑ Building cross sections. Show roof, wall, floor construction assemblies and insulation R values. Show roof
and crawl space ventilation. Show ceiling heights in rooms and crawl spaces.
E Rescheck compliance certificate and inspection checklist (new construction and additions only).
Provide a complete signed compliance certificate and inspection checklist. Verify all exterior building is detailed
on the building plans as required on the Rescheck compliance report. (www.energycodes.gov)
❑ Fireplaces. All fireplace types shown on the floor plans. Specify gas log set, or gas appliance at each fireplace.
Structural Plans
❑ Soils Report. Include 2 copies of the soils report for your lot.
❑ All sheets of the structural plans stamped and signed by a Colorado State Licensed Engineer.
❑ Design specifications sheet. Roof live load, Deck live load, Floor live load, Wind Speed /Exposure, Soils report
number and soil bearing capacity referenced per the soils report.
❑ Foundation plan. Provide a complete foundation plan with all footing /foundation section details
❑ Framing plans. Provide complete framing plans for floors, decks, roofs. All beams, joists, rafters or trusses
clearly shown. Include framing construction details and connection schedules.
Other items
"-��Asbestos form completed. Asbestos test and report provided if any existing construction is proposed to be
disturbed. See Town of Vail asbestos testing requirement form.
❑ Plan check fees. Plan check fees must be paid with your application. The building permit and recreation fees
will be paid upon issuance of a building permit.
I have read and understand the requirements of this checklist. If any required information is missing from the
application, I ynderstand the application will not be accepted.
Applicant's Signature
Date
http: / /www.vaiIgov.com /docs /dI_ forms /buiIding_permit_4- 17- 2007.DOC Page 2 of 7 04/17/2007
MWOFVA1I '
ASBESTOS TESTING REQUIREMENTS
I
THE TOWN OF VAIL AND STATE OF COLORADO DEPARTMENT OF PUBLIC HEALTH REQUIRE ASBESTOS
TESTING ANY TIME WHEN MORE THAN 160 S.F. OF MATERIAL WILL BE DISTURBED OR REMOVED.
AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR BUILDING PERMIT
APPLICATION FOR ALL REMODEL, ADDITION OR OTHER PROJECTS INVOLVING ANY DEMOLITION OR
REMOVAL OF BUILDING MATERIALS THAT MAY CONTAIN ASBESTOS. BUILDINGS CONSTRUCTED AFTER
OCTOBER 12, 1988 THAT HAVE NO ASBESTOS CONTAINING MATERIALS ARE EXEMPT.
A COPY OF THE REPORT MUST BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION
• I have included the asbestos test and report with my building permit application
applicant signature
OR
date
• I certify my project will not disturb or remove more than 160 s.f. of building material. The construction
plans submitted with my application clearly indicate this information. (This will be verified during plan
review, and will delay your project if found to be inaccurate)
�G
applicant signature
OR
date
• The building was constructed after October 12, 1988. The date of construction was
applicant signature
date
original construction date
http: / /www.vaiIgov.com /docs /dl_ forms /buiIding_permit_4- 17- 2007.DOC Page 5 of 7 04/17/2007
A & D Asbestos Testing and Consulting
John R. Peterman
P.O. Box 1230 Clifton, CO. 81520 -1230
Cell 970 - 270 -3689 Home Phone 970 - 464 -5265
INSPECTION REPORT PREPARED FOR:
Nedbo Construction
=C0
P.O. Box 3419
jC.3
Vail, CO. 81658
0
970 - 845 -1001
3v
o
F -�
�
LOCATION:
0
The Residence
_0 Z 9S
4030 Big Horn Road
Vail, CO. 81657
REPORT PREPARED BY:
John R. Peterman
Inspector Manager
Certificate No. 6601
2
A & D Asbestos Testing and Consulting
John R. Peterman
Asbestos Testing, Project Design, and Consulting
INTRODUCTION:
On September 5th, 2007 an inspection/survey was conducted and 3
bulk samples were collected from the:
The Residence
4030 Big Horn Road
Vail, CO. 81657
The purpose of the inspection/survey was to locate and sample
suspected Asbestos containing materials that might be present in the area of
the Residence Unit that is planned for selective interior renovation.
The inspection was made, and the samples were collected by John R.
Peterman, an A.H.E.R.A. and State of Colorado Certified Asbestos
Inspector. Great care was taken during the inspection and sampling to be as
accurate as possible. It should be noted that minimal damage was done to
the existing building structures during the inspection so there is no
documentation for unseen conditions or stored items.
All samples were analyzed by DCM Science Lab in Wheatridge, CO.
This laboratory is deemed "Proficient" in the E.P.A.Quality Assurance (QA)
program for the determination of asbestos in bulk materials, and is
accredited by the American Hygiene Association (AHA).
SAMPLING PROTOCOL:
A random sampling scheme was used to sample the suspect materials that
were discovered. If during any future demolition or renovation work,
suspect material is discovered that hasn't been sampled and would be
disturbed, work should be halted until the material has been tested.
A & D Asbestos Testing and Consulting
John R. Peterman
Asbestos Testing, Project Design, and Consulting
The Residence
4030 Big Horn Road
Vail, CO. 81657
RENOVATION AREA DESCRIPTION:
The Residence at 4030 Big Horn Road is planned for selective interior
renovation. The interior walls are covered in sheetrock with a light texture,
and finished wood. The ceilings are covered in sheetrock like the walls, and
finished wood. The floors are covered with carpet, ceramic tiles, and
finished wood. The heating is provided by baseboard heating, and a
fireplace. No suspect materials were visible on the heating system.
CONCLUSIONS & RECOMMENDATIONS:
Laboratory analysis, of the bulk samples, indicates that no Asbestos was
detected in the bulk samples.
4
Date: September 5th, 2007
Location: The Residence, 3040 Big Horn Road, Vail, CO. 81657.
SAMPLE LOCATIONS
SAMPLE
NUMBER
AREA SAMPLE REMOVED FROM
DESCRIPTION
4030 - B
001
Front Room Wall
Composite Sheetrock w/Texture
4030 - B
002
Kitchen Ceiling
Composite Sheetrock w/Texture
4030 - B
003
Upstairs Bathroom Wall
Composite Sheetrock w/Texture
FRIABLE
NO
NO
NO
Date: September 5th, 2007
Location: The Residence, 3040 Big Horn Road, Vail, CO. 81657.
SAMPLE RESULTS:
SAMPLE NUMBER
4030 - B 001
4030 - B 002
4030 - B 003
DESCRIPTION
Composite Sheetrock w/Texture
Composite Sheetrock w/Texture
Composite Sheetrock w/Texture
KEY:
NAD - No Asbestos Detected
ASBESTOS TYPE
NAD 0.00
NAD 0.00
NAD 0.00
Date: September 5th, 2007
Location: The Residence, 3040 Big Horn Road, Vail, CO. 81657.
SUSPECT MATERIAL CONDITIONS
SAMPLE
NUMBER TYPE OF SUSPECT MATERIAL
OVERALL CONDITION
DAMAGED
%
TYPE OF DAMAGE
4030 - B
001 SUR
GOOD
NO
0.00
N/A
4030 - B
002 SUR
GOOD
NO
0.00
N/A
4030 - B
003 SUR
GOOD
NO
0.00
N/A
Key:
SUR - Surfacing
Date: September 5th, 2007
Location: The Residence, 3040 Big Horn Road, Vail, CO. 81657.
POTENTIAL FOR DISTURBANCE
Sample
Number
Accessibility
Potential
Influence
Potential
Located in Plenum
yes /no
contact
vibration
air erosion
yes /no
4030 - B
001
YES
HIGH
LOW
LOW
NO
4030 - B
002
YES
HIGH
LOW
LOW
NO
4030 - B
003
YES
HIGH
LOW
LOW
NO
DCM SCIENCE LABORATORY, INC.
12421 W. 49TH AVENUE, UNIT 06
WHEAT RIDGE, CO 80033 (303) 463 -8270
BULK ASBESTOS TEST REPORT
CLIENT:
PAGE 1 OF 2
A & D ASBESTOS TESTING & CONSULTING
ANALYSIS DATE:
653 36 1/4 ROAD
9 -6 -07
PALISADE, CO 81526
REPORTING DATE:
9 -6 -07
RECEIPT DATE:
9 -6 -07
CLIENT JOB NO.:
RESIDENCE
PROJECT TITLE:
DCMSL PROJECT:
4030 BIGHORN RD.
_ VAIL, CO
ADAT378
PERCENTAGE COMPOSITION
BY VISUAL ESTIMATE
DCMSL CLIENT
SAMPLE SAMPLE SAMPLE
NUMBER NUMBER DATE DESCRIPTION
PERCENT
ASBESTOS
TOTAL
TOTAL
OF SAMPLE
TYPE RANGE
ASBESTOS
% IN SAMPLE
OTHER FIBROUS
NON - FIBROUS
PERCENTAGE
- i RR 4030 -B -001
CONSTITUENTS
CONSTITUENTS
IDENTIFIED
9 -5 -07 A. WHITE AND ORANGE PAINT
MATERIALS
B. TAN FIBROUS
3.0%
C• WHITE DRYWALL MUD
5.0%
ND
0.0
D. WHITE DRYWALL,
10.0%
ND
100.0
100.0
100.0
82.0%
ND
0.0
0.0
100.0
2RR 4030 -B -002 9 -5 -07 A. WHITE PAINT
ND
ND
TR
100.0
100.0
100.0
100.0
B. WHITE DRYWALL MUD
3.0%
C. TAN FIBROUS
4.0%
4.0%
ND
0.0
D. WHITE DRYWALL
10.0%
0.0
100.0
100.0
83.0%
ND
100.0
100.0
100.0
-3RR 4030 -B -003 9 -5 -07 A. WHITE PAINT
ND
ND
TR
0.0
100.0
100.0
100.0
B• WHITE DRYWALL MUD
2.0%
ND
C. TAN AND GREEN FIBROUS
4.0%
ND
0'0
D. TAN DRYWALL
7.0%
0.0
100.0
100.0
87.0%
100.0
100
100.0
FOR CALCULATION PURPOSES, TRACE (TR) IS ASSUMED
ND
-__
ND
TR
0
100.0
100.0
100.0
TO BE 0.5 %.
(1) - INSEPARABLE LAYERS
ND -NONE DETECTED
DCM Science Laboratory, Inc.
12421 W. 49th Avenue, Unit #6
Wheat Ridge, CO 80033
DCM Project No.: ADAT 378
Client Job No.: 4030 BIGHORN ROAD
Bulk Sample Analysis
BULK SAMPLE ANALYSIS PROCEDURES:
Iq 19
Page , of
DCM Science Laboratory, Inc. analyzes bulk asbestos samples following procedures developed by the
McCrone Research Institute and in compliance with guidelines established by the Environmental Protection
Agency (EPA - 600 /R- 93/116, July, 1993).
Bulk samples are prepared for analysis using a 1 OX -80X stereo microscope in a hepa filter hood which provides
a contamination -free environment. The sample is then analyzed by polarized light microscopy (PLM) at 100X.
When the sample consists of more than one layer, each layer is prepared and analyzed separately. Fiber and
matrix materials are identified by the characterization of optical properties including color and pleochrorism,
form, cleavage, relief, birefringence, extinction, orientation, twinning, interference figure and other distinguishing
features. Dispersion staining is also used to further aid in mineral identification. All percentages of asbestos,
other fibers and non - fibrous constituents are calculated from the values obtained from the stereo and PLM
microscopes analysis. In -house and NIST standards as well as a chart prepared by R.D. Terry and G.V.
Chilinger for "The Journal of Sedimentary Petrology ", (Volume 24, pp. 229 -234, 1955) provide a guide for
estimating percentages. All samples are archived for six months unless other arrangements are made by the
client.
ACCREDITATION:
DCMSL is accredited by NVLAP (since April 1, 1989). Our NVLAP Lab Code is 101258 -0. DCMSL complies
with NVLAP requirements unless otherwise noted.
ENDORSEMENT:
The results of this analysis must not be used by the client to claim endorsement by NVLAP or any agency of the
U.S. Government.
This test report relates only to the items tested. This report may not be reproduced except in full, without the
written approval of the laboratory. The analysis was performed by:
John Silverman, Analyst
Ron Schott
Laboratory Director
NVLAP Lab Code 101258 -0
Ron Schott, Analyst
Date
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
TOWN OF VAIL, COLORADO Statement
*************************************************************
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Statement Number:
R070002119 Amount: $1,470.44 10/08/200709:28 AM
Payment Method:
Check Init: LT
Notation: Nedbo /
ck #32649
-----------------------------------------------------------------------------
Permit No:
B07 -0295 Type: ADD /ALT SFR BUILD PERMIT
Parcel No:
2101 - 122 - 1900 -9
Site Address:
4034 BIGHORN RD VAIL
Location:
4030 BIGHORN ROAD
Total Fees: $1,470.44
This Payment:
$1,470.44 Total ALL Pmts: $1,470.44
Balance: $0.00
*************************************************************
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code
--------------
Description Current Pmts
- - -
BP 00100003111100
- -- ------------------------ - - - - -- ------ - - - - --
BUILDING PERMIT FEES 888.75
PF 00100003112300
PLAN CHECK FEES 577.69
WC 00100003112800
-----------------------------------------------------------------------
WILL CALL INSPECTION FEE 4.00
- - - - --
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD /ALT SFR BUILD PERMIT Permit #: B07 -0295
Project # PRJ07 -0445
Job Address: 4034 BIGHORN RD VAIL Status ...: ISSUED
Location.....: 4030 BIGHORN ROAD Applied..: 08/30/2007
Parcel No...: 210112219009 Issued ...: 10/08/2007
Expires ...: 04/05/2008
OWNER MCKEEVER QPR TRUST
2552 E ALAMEDA 86
DENVER
CO 80209
APPLICANT NEDBO CONSTRUCTION
P.O. BOX 3419
VAIL
CO 81658
License: 251 -A
CONTRACTOR NEDBO CONSTRUCTION
P.O. BOX 3419
VAIL
CO 81658
License: 251 -A
Description:
NEW KITCHEN AND REMODEL BATH
Occupancy: R -3
Type Construction: V -B
09/14/2007
09/14/2007 Phone: 970 - 845 -1001
09/14/2007 Phone: 970 - 845 -1001
Valuation: $85,000.00 Revision Valuation: $0.00 Total Sq Ft Added: 0
************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY
Building - - - - ->
$888.75 Restuarant Plan Review - ->
$0.00 Total Calculated Fees - ->
$1,470.44
Plan Check ---- >
$577.69 Recreation Fee — ---------- —>
$0.00 Additional Fees ---------- >
$0.00
Investigation - ->
$0.00 TOTAL FEES --- ---------- >
$1,470.44 Total Permit Fee--- - - - - ->
$1,470.44
Will Call - - - ->
$4.00
Payments------------ - - - - ->
$1,470.44
BALANCE DUE ------- >
$0.00
s+ ss*+ s+++ ss++*+**++ s+ s*+***+*++*+*++++*+*+*+*****+* s*+**++** s***++******+***+** ss+*++****++*+***++* s++*+* s*+++*+ s +s + + + * *s *s *s * * + + + *s * + + * + + + * +s *+
Approvals:
Item: 05100 BUILDING DEPARTMENT
10/05/2007 cgunion Action: AP
Item: 05400 PLANNING DEPARTMENT
09/14/2007 JS Action: AP
+ + * * + * + *+ ssss++* ss**+ s******** s***+******+************ s+** s+*+*+ s+*+*++* s+*++*+++* s+ s********+** s**+*+******* s**** + * + * + * * * * + * + + + + +s *ss * + + + * + + + * ++
See the Conditions section of this Document for any that may apply.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ApVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM
4 PM. / /I _ d
SIGI<fATURE OF OWIrR OR CONTRACTOR FOR HIMSELF AND OWNER
CONDITIONS OF APPROVAL
Permit #: B07 -0295 as of 10 -08 -2007 Status: ISSUED
************************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Permit Type:
ADD /ALT SFR BUILD PERMIT
Applied: 08/30/2007
Applicant:
NEDBO CONSTRUCTION
Issued: 10/08/2007
970 - 845 -1001
To Expire: 04/05/2008
Job Address:
4034 BIGHORN RD VAIL
Location:
4030 BIGHORN ROAD
Parcel No:
210112219009
Description:
NEW KITCHEN AND REMODEL BATH
******************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Conditions********** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 16
(BLDG.): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION
R313 OF THE 2003 IRC.
OCT 11 2007 8:13AM HP LRSERJET 3200 P•2
KFIMCCNSULTANTS, INC.
P.O. Box 4572 970- 549 -93S I
Vail, Colorado 81 (35S FAX 945 -1 577
FIELD REPORT
TO:
DATE: 9/2012007
Carl @ Vedbo
ARRNE; 4:OOpm
DEPART; 4;30pm
WEATHER:
ATTEN PION:
JOB NUMBER: 0709 -15
PROJECT: 4030 Bighorn Remodel
PRESS NT AT SITE: Cad
STATUS OF COMPLETION: Some demolition
On September 20, 2007 I visited the above - referenced site to observe the kitchen wall to be removed. This is a loml
bearing wall that will be removed to enlarge the kitchen. l4
A new 13) -1 314 x 9 112 LVL beam shall be added spanning from the entry wall to the party wall at the upper floor level.% -
This near beam shall be supported with (6) -2x4's at the middle of this span. The beam shall also be supported with a O�
minimum of (2) -2xe's or (3) -2x4's at each end. Solid blocking shall be installed in the joist spaces below these stud C
Cm 3
packs, Mown to the foundation. O�
F-
Lim
Please :,all with any questions. L`
KRN[ C msultants Inc o
Structural Engineering & Design
APPROVED
At Community Development Department
,LOIN OF VXL Building Safety and Inspection S- -,rtes
IN
o;
TO
S1GNE,�: �6 � : � ®T
.Section
z 612-1 Intefil6 ftI�uilding Codelinternational Re
Cede Validity of permit. The issuance or granting of a per
®
C
not be construed to be a permit for, or an approval of, any v,:,. _.
a
any of the provisions of this code or of any other ordinance cf
Tim D. dennum, PE ':
01*0"�.�' ���?
jurisdiction. Permits presuming to give authority to violate cr co- :;J the
provisions of this code or other ordinances of the jurisdiction shall nct be
REIiIEI NED: `1�d4'�1 Eh
valid. The issuance of a permit based on construction documents and
_.�
other data shall not prevent the building official from requiring the
0 10 0-7
corrcoticn of errors in the construction documents and other data. The
building official is also authorized to prevent occupancy or use cf a
structure where in vion of this code or of any other ordinances of
this jurisdiction. + �-
1
PLANS EXAMINER. DATE:
04 -10 -2012 Inspection Request Reporting Page 4
9:38 am Vail, CO - City Of
Requested Inspect Date
Inspection Area
Site Address
A/P /D Information
Activity: 607 -0295 Type: A -BUILD
Const Type: Occupancy:
Owner: MCKEEVER QPR TRUST
Contractor: NEDBO CONSTRUCTION
Description: NEW KITC HEiT_AN_D1ZM0 DEL BATH
0 BLDG -Final
EDBO CONSTRUCTION
JMONDRAGON
Exp:
Thursday, April 12, 2012
CG
4034 BIGHORN RD VAIL
4030 BIGHORN ROAD
Sub Type: ADUP
Use: V -B
Inspection History
Item: 30 BLDG - Framing
10/23/07 Inspector: s
Comment: BACKBOX NE
Item: 50 BLDG - Insulation
Phone: 970 - 845 -1001
Status: ISSUED
Insp Area: CG
Requested Time: 11:00 AM
Phone: 970 - 845 -1001 -or- 970 -977-
0268 Rollie cell
Entered By: JMONDRAGON K
Action: AP APPROVED
EL IN SEPARATION WALL.
Item: 60 BLDG - Sheetrock Nail ** Approved **
10/26/07 Inspector: JRM
Comment:
Item: 70 BLDG -Misc.
Item: 533 PLAN -TEMP. C/O
Item: 535 DIA - 30 DAY REMINDER
Item: 536 DIA - SITE /LANDSCAPING
Item: 534 PLAN - FINAL C/O
Item: 90 BLDG -Final
Action: AP APPROVED
REPT131 Run Id: 14332