Loading...
HomeMy WebLinkAboutB07-02957DR10 E 75 S. Frontage Rd. Vail, Colorado 81657 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIG (( Project #: Building Permit #: 970- 479 -2149 (inspections) OWN OF VAIL BUILDING PERMIT APPLICATION Separate Permits are required for electrical, plumbing, mechanical, etc.! CnNTRACT()R INFr1RMATWIN Gen ral Contractor: Town of Vail Reg. No.: Contact Person and Phone #'s: 6'u i WvL11U_LJ] / /14 Email address: i2 „ ;<, Fax Contractor Signature: 1/" COMPLETE VALUATIONS FOR BUILDING PERMIT /I nhnr R MatPrinkl BUILDING: $ ELECTRICAL: $ OTHER: $ PLUMBING: $ MECHANICAL: $ TOTAL: $ For Parcel # Contact Eaale Countv Assessors Office at 970 - 328 -86dn nr visit www Paula_rnimfi1 rnm Parcel # Job Name: /YJGK�'a/!X Job Address: Legal Description Lot: % � Block: Filing: Subdivision:,+/,-/-/aie- Owne Addre s: a /' 94,,41z ik:;7 4 sy Phone: Architect/Desi ner: Addre Phone: Engineer: Address: Phone: Detailed description of work: rlJiz� J1�7ct/�7/ f/�o 46,- Mo -arzt- Work Class: New( Addition( ) Remodel ( ) Repair ( ) Demo ( ) Other ( ) Work Type: Interior Exterior ( ) Both ( ) Does an EHU exist at this location: Yes( ) No Type of Bldg.: Single- family ( ) Two - family Multi- family ( ) Commercial ( ) Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this building: 12 E70of Accommodation Units in this building: NoFrype of Fireplaces Existing: Gas Appliances Gas Los Wood /Pellet Wood Burnin No/Type of Fireplaces Proposed: Gas Appliances Gas Los Wood /Pellet Wood Burning NOT ALLOWED Does a Fire Alarm Exist: Yes (.) No( J Does a Fire Sprinkler System Exist: Yes ( ) No FOR OFFICE USE ONLY Type of Construction: Date Received: Occupancy Group Accepted By: F: \cdev \FORMS \Permits \Building \building-permit.DOC Page 1 of 16 AUG s o 2007 TOW AIL MWNOFVA(I ' BUILDING PERMIT APPLICATION CHECKLIST SINGLE FAMILY /DUPLEX CHECKLIST This checklist is to be used with any single family /duplex permit (new construction , addition, or remodel application.) E Town of Vail Design Review Board approval must first be obtained (may not apply to interior remodels) F Plan Check Fee must be paid at the time of application for projects over $100,000 valuation (see attached schedule) The following information must be shown on all 4 sets of plans: Architectural Plans E Site Plans. Provide all site plan information as required for the Design Review Application for your project. Refer to the DRB application checklist for complete details. ❑ Construction staging plans. Provide construction staging and materials storage site plans. ._B-- Floor plans. Complete floor plans provided for each level. Complete dimensions, drawing scale noted, use of each room shown on the plans. Location of mechanical equipment clearly shown ❑ Building Elevations N,W,S,E elevations. Show all proposed exterior finish materials, guardrails, windows, doors, and finish grades. ❑ Window sizes and operation types. Specified on the floor plans or elevations. ❑ Stairways, guards, and handrails Show all stairway details with rise /run, handrail and guard details ❑ Roof plan. Show all roof covering materials (Class A covering required) and underlayment, roof pitch ❑ Building cross sections. Show roof, wall, floor construction assemblies and insulation R values. Show roof and crawl space ventilation. Show ceiling heights in rooms and crawl spaces. E Rescheck compliance certificate and inspection checklist (new construction and additions only). Provide a complete signed compliance certificate and inspection checklist. Verify all exterior building is detailed on the building plans as required on the Rescheck compliance report. (www.energycodes.gov) ❑ Fireplaces. All fireplace types shown on the floor plans. Specify gas log set, or gas appliance at each fireplace. Structural Plans ❑ Soils Report. Include 2 copies of the soils report for your lot. ❑ All sheets of the structural plans stamped and signed by a Colorado State Licensed Engineer. ❑ Design specifications sheet. Roof live load, Deck live load, Floor live load, Wind Speed /Exposure, Soils report number and soil bearing capacity referenced per the soils report. ❑ Foundation plan. Provide a complete foundation plan with all footing /foundation section details ❑ Framing plans. Provide complete framing plans for floors, decks, roofs. All beams, joists, rafters or trusses clearly shown. Include framing construction details and connection schedules. Other items "-��Asbestos form completed. Asbestos test and report provided if any existing construction is proposed to be disturbed. See Town of Vail asbestos testing requirement form. ❑ Plan check fees. Plan check fees must be paid with your application. The building permit and recreation fees will be paid upon issuance of a building permit. I have read and understand the requirements of this checklist. If any required information is missing from the application, I ynderstand the application will not be accepted. Applicant's Signature Date http: / /www.vaiIgov.com /docs /dI_ forms /buiIding_permit_4- 17- 2007.DOC Page 2 of 7 04/17/2007 MWOFVA1I ' ASBESTOS TESTING REQUIREMENTS I THE TOWN OF VAIL AND STATE OF COLORADO DEPARTMENT OF PUBLIC HEALTH REQUIRE ASBESTOS TESTING ANY TIME WHEN MORE THAN 160 S.F. OF MATERIAL WILL BE DISTURBED OR REMOVED. AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION FOR ALL REMODEL, ADDITION OR OTHER PROJECTS INVOLVING ANY DEMOLITION OR REMOVAL OF BUILDING MATERIALS THAT MAY CONTAIN ASBESTOS. BUILDINGS CONSTRUCTED AFTER OCTOBER 12, 1988 THAT HAVE NO ASBESTOS CONTAINING MATERIALS ARE EXEMPT. A COPY OF THE REPORT MUST BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION • I have included the asbestos test and report with my building permit application applicant signature OR date • I certify my project will not disturb or remove more than 160 s.f. of building material. The construction plans submitted with my application clearly indicate this information. (This will be verified during plan review, and will delay your project if found to be inaccurate) �G applicant signature OR date • The building was constructed after October 12, 1988. The date of construction was applicant signature date original construction date http: / /www.vaiIgov.com /docs /dl_ forms /buiIding_permit_4- 17- 2007.DOC Page 5 of 7 04/17/2007 A & D Asbestos Testing and Consulting John R. Peterman P.O. Box 1230 Clifton, CO. 81520 -1230 Cell 970 - 270 -3689 Home Phone 970 - 464 -5265 INSPECTION REPORT PREPARED FOR: Nedbo Construction =C0 P.O. Box 3419 jC.3 Vail, CO. 81658 0 970 - 845 -1001 3v o F -� � LOCATION: 0 The Residence _0 Z 9S 4030 Big Horn Road Vail, CO. 81657 REPORT PREPARED BY: John R. Peterman Inspector Manager Certificate No. 6601 2 A & D Asbestos Testing and Consulting John R. Peterman Asbestos Testing, Project Design, and Consulting INTRODUCTION: On September 5th, 2007 an inspection/survey was conducted and 3 bulk samples were collected from the: The Residence 4030 Big Horn Road Vail, CO. 81657 The purpose of the inspection/survey was to locate and sample suspected Asbestos containing materials that might be present in the area of the Residence Unit that is planned for selective interior renovation. The inspection was made, and the samples were collected by John R. Peterman, an A.H.E.R.A. and State of Colorado Certified Asbestos Inspector. Great care was taken during the inspection and sampling to be as accurate as possible. It should be noted that minimal damage was done to the existing building structures during the inspection so there is no documentation for unseen conditions or stored items. All samples were analyzed by DCM Science Lab in Wheatridge, CO. This laboratory is deemed "Proficient" in the E.P.A.Quality Assurance (QA) program for the determination of asbestos in bulk materials, and is accredited by the American Hygiene Association (AHA). SAMPLING PROTOCOL: A random sampling scheme was used to sample the suspect materials that were discovered. If during any future demolition or renovation work, suspect material is discovered that hasn't been sampled and would be disturbed, work should be halted until the material has been tested. A & D Asbestos Testing and Consulting John R. Peterman Asbestos Testing, Project Design, and Consulting The Residence 4030 Big Horn Road Vail, CO. 81657 RENOVATION AREA DESCRIPTION: The Residence at 4030 Big Horn Road is planned for selective interior renovation. The interior walls are covered in sheetrock with a light texture, and finished wood. The ceilings are covered in sheetrock like the walls, and finished wood. The floors are covered with carpet, ceramic tiles, and finished wood. The heating is provided by baseboard heating, and a fireplace. No suspect materials were visible on the heating system. CONCLUSIONS & RECOMMENDATIONS: Laboratory analysis, of the bulk samples, indicates that no Asbestos was detected in the bulk samples. 4 Date: September 5th, 2007 Location: The Residence, 3040 Big Horn Road, Vail, CO. 81657. SAMPLE LOCATIONS SAMPLE NUMBER AREA SAMPLE REMOVED FROM DESCRIPTION 4030 - B 001 Front Room Wall Composite Sheetrock w/Texture 4030 - B 002 Kitchen Ceiling Composite Sheetrock w/Texture 4030 - B 003 Upstairs Bathroom Wall Composite Sheetrock w/Texture FRIABLE NO NO NO Date: September 5th, 2007 Location: The Residence, 3040 Big Horn Road, Vail, CO. 81657. SAMPLE RESULTS: SAMPLE NUMBER 4030 - B 001 4030 - B 002 4030 - B 003 DESCRIPTION Composite Sheetrock w/Texture Composite Sheetrock w/Texture Composite Sheetrock w/Texture KEY: NAD - No Asbestos Detected ASBESTOS TYPE NAD 0.00 NAD 0.00 NAD 0.00 Date: September 5th, 2007 Location: The Residence, 3040 Big Horn Road, Vail, CO. 81657. SUSPECT MATERIAL CONDITIONS SAMPLE NUMBER TYPE OF SUSPECT MATERIAL OVERALL CONDITION DAMAGED % TYPE OF DAMAGE 4030 - B 001 SUR GOOD NO 0.00 N/A 4030 - B 002 SUR GOOD NO 0.00 N/A 4030 - B 003 SUR GOOD NO 0.00 N/A Key: SUR - Surfacing Date: September 5th, 2007 Location: The Residence, 3040 Big Horn Road, Vail, CO. 81657. POTENTIAL FOR DISTURBANCE Sample Number Accessibility Potential Influence Potential Located in Plenum yes /no contact vibration air erosion yes /no 4030 - B 001 YES HIGH LOW LOW NO 4030 - B 002 YES HIGH LOW LOW NO 4030 - B 003 YES HIGH LOW LOW NO DCM SCIENCE LABORATORY, INC. 12421 W. 49TH AVENUE, UNIT 06 WHEAT RIDGE, CO 80033 (303) 463 -8270 BULK ASBESTOS TEST REPORT CLIENT: PAGE 1 OF 2 A & D ASBESTOS TESTING & CONSULTING ANALYSIS DATE: 653 36 1/4 ROAD 9 -6 -07 PALISADE, CO 81526 REPORTING DATE: 9 -6 -07 RECEIPT DATE: 9 -6 -07 CLIENT JOB NO.: RESIDENCE PROJECT TITLE: DCMSL PROJECT: 4030 BIGHORN RD. _ VAIL, CO ADAT378 PERCENTAGE COMPOSITION BY VISUAL ESTIMATE DCMSL CLIENT SAMPLE SAMPLE SAMPLE NUMBER NUMBER DATE DESCRIPTION PERCENT ASBESTOS TOTAL TOTAL OF SAMPLE TYPE RANGE ASBESTOS % IN SAMPLE OTHER FIBROUS NON - FIBROUS PERCENTAGE - i RR 4030 -B -001 CONSTITUENTS CONSTITUENTS IDENTIFIED 9 -5 -07 A. WHITE AND ORANGE PAINT MATERIALS B. TAN FIBROUS 3.0% C• WHITE DRYWALL MUD 5.0% ND 0.0 D. WHITE DRYWALL, 10.0% ND 100.0 100.0 100.0 82.0% ND 0.0 0.0 100.0 2RR 4030 -B -002 9 -5 -07 A. WHITE PAINT ND ND TR 100.0 100.0 100.0 100.0 B. WHITE DRYWALL MUD 3.0% C. TAN FIBROUS 4.0% 4.0% ND 0.0 D. WHITE DRYWALL 10.0% 0.0 100.0 100.0 83.0% ND 100.0 100.0 100.0 -3RR 4030 -B -003 9 -5 -07 A. WHITE PAINT ND ND TR 0.0 100.0 100.0 100.0 B• WHITE DRYWALL MUD 2.0% ND C. TAN AND GREEN FIBROUS 4.0% ND 0'0 D. TAN DRYWALL 7.0% 0.0 100.0 100.0 87.0% 100.0 100 100.0 FOR CALCULATION PURPOSES, TRACE (TR) IS ASSUMED ND -__ ND TR 0 100.0 100.0 100.0 TO BE 0.5 %. (1) - INSEPARABLE LAYERS ND -NONE DETECTED DCM Science Laboratory, Inc. 12421 W. 49th Avenue, Unit #6 Wheat Ridge, CO 80033 DCM Project No.: ADAT 378 Client Job No.: 4030 BIGHORN ROAD Bulk Sample Analysis BULK SAMPLE ANALYSIS PROCEDURES: Iq 19 Page , of DCM Science Laboratory, Inc. analyzes bulk asbestos samples following procedures developed by the McCrone Research Institute and in compliance with guidelines established by the Environmental Protection Agency (EPA - 600 /R- 93/116, July, 1993). Bulk samples are prepared for analysis using a 1 OX -80X stereo microscope in a hepa filter hood which provides a contamination -free environment. The sample is then analyzed by polarized light microscopy (PLM) at 100X. When the sample consists of more than one layer, each layer is prepared and analyzed separately. Fiber and matrix materials are identified by the characterization of optical properties including color and pleochrorism, form, cleavage, relief, birefringence, extinction, orientation, twinning, interference figure and other distinguishing features. Dispersion staining is also used to further aid in mineral identification. All percentages of asbestos, other fibers and non - fibrous constituents are calculated from the values obtained from the stereo and PLM microscopes analysis. In -house and NIST standards as well as a chart prepared by R.D. Terry and G.V. Chilinger for "The Journal of Sedimentary Petrology ", (Volume 24, pp. 229 -234, 1955) provide a guide for estimating percentages. All samples are archived for six months unless other arrangements are made by the client. ACCREDITATION: DCMSL is accredited by NVLAP (since April 1, 1989). Our NVLAP Lab Code is 101258 -0. DCMSL complies with NVLAP requirements unless otherwise noted. ENDORSEMENT: The results of this analysis must not be used by the client to claim endorsement by NVLAP or any agency of the U.S. Government. This test report relates only to the items tested. This report may not be reproduced except in full, without the written approval of the laboratory. The analysis was performed by: John Silverman, Analyst Ron Schott Laboratory Director NVLAP Lab Code 101258 -0 Ron Schott, Analyst Date ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statement ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statement Number: R070002119 Amount: $1,470.44 10/08/200709:28 AM Payment Method: Check Init: LT Notation: Nedbo / ck #32649 ----------------------------------------------------------------------------- Permit No: B07 -0295 Type: ADD /ALT SFR BUILD PERMIT Parcel No: 2101 - 122 - 1900 -9 Site Address: 4034 BIGHORN RD VAIL Location: 4030 BIGHORN ROAD Total Fees: $1,470.44 This Payment: $1,470.44 Total ALL Pmts: $1,470.44 Balance: $0.00 ************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ACCOUNT ITEM LIST: Account Code -------------- Description Current Pmts - - - BP 00100003111100 - -- ------------------------ - - - - -- ------ - - - - -- BUILDING PERMIT FEES 888.75 PF 00100003112300 PLAN CHECK FEES 577.69 WC 00100003112800 ----------------------------------------------------------------------- WILL CALL INSPECTION FEE 4.00 - - - - -- TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD /ALT SFR BUILD PERMIT Permit #: B07 -0295 Project # PRJ07 -0445 Job Address: 4034 BIGHORN RD VAIL Status ...: ISSUED Location.....: 4030 BIGHORN ROAD Applied..: 08/30/2007 Parcel No...: 210112219009 Issued ...: 10/08/2007 Expires ...: 04/05/2008 OWNER MCKEEVER QPR TRUST 2552 E ALAMEDA 86 DENVER CO 80209 APPLICANT NEDBO CONSTRUCTION P.O. BOX 3419 VAIL CO 81658 License: 251 -A CONTRACTOR NEDBO CONSTRUCTION P.O. BOX 3419 VAIL CO 81658 License: 251 -A Description: NEW KITCHEN AND REMODEL BATH Occupancy: R -3 Type Construction: V -B 09/14/2007 09/14/2007 Phone: 970 - 845 -1001 09/14/2007 Phone: 970 - 845 -1001 Valuation: $85,000.00 Revision Valuation: $0.00 Total Sq Ft Added: 0 ************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY Building - - - - -> $888.75 Restuarant Plan Review - -> $0.00 Total Calculated Fees - -> $1,470.44 Plan Check ---- > $577.69 Recreation Fee — ---------- —> $0.00 Additional Fees ---------- > $0.00 Investigation - -> $0.00 TOTAL FEES --- ---------- > $1,470.44 Total Permit Fee--- - - - - -> $1,470.44 Will Call - - - -> $4.00 Payments------------ - - - - -> $1,470.44 BALANCE DUE ------- > $0.00 s+ ss*+ s+++ ss++*+**++ s+ s*+***+*++*+*++++*+*+*+*****+* s*+**++** s***++******+***+** ss+*++****++*+***++* s++*+* s*+++*+ s +s + + + * *s *s *s * * + + + *s * + + * + + + * +s *+ Approvals: Item: 05100 BUILDING DEPARTMENT 10/05/2007 cgunion Action: AP Item: 05400 PLANNING DEPARTMENT 09/14/2007 JS Action: AP + + * * + * + *+ ssss++* ss**+ s******** s***+******+************ s+** s+*+*+ s+*+*++* s+*++*+++* s+ s********+** s**+*+******* s**** + * + * + * * * * + * + + + + +s *ss * + + + * + + + * ++ See the Conditions section of this Document for any that may apply. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ApVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM 4 PM. / /I _ d SIGI<fATURE OF OWIrR OR CONTRACTOR FOR HIMSELF AND OWNER CONDITIONS OF APPROVAL Permit #: B07 -0295 as of 10 -08 -2007 Status: ISSUED ************************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Type: ADD /ALT SFR BUILD PERMIT Applied: 08/30/2007 Applicant: NEDBO CONSTRUCTION Issued: 10/08/2007 970 - 845 -1001 To Expire: 04/05/2008 Job Address: 4034 BIGHORN RD VAIL Location: 4030 BIGHORN ROAD Parcel No: 210112219009 Description: NEW KITCHEN AND REMODEL BATH ******************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Conditions********** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 16 (BLDG.): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION R313 OF THE 2003 IRC. OCT 11 2007 8:13AM HP LRSERJET 3200 P•2 KFIMCCNSULTANTS, INC. P.O. Box 4572 970- 549 -93S I Vail, Colorado 81 (35S FAX 945 -1 577 FIELD REPORT TO: DATE: 9/2012007 Carl @ Vedbo ARRNE; 4:OOpm DEPART; 4;30pm WEATHER: ATTEN PION: JOB NUMBER: 0709 -15 PROJECT: 4030 Bighorn Remodel PRESS NT AT SITE: Cad STATUS OF COMPLETION: Some demolition On September 20, 2007 I visited the above - referenced site to observe the kitchen wall to be removed. This is a loml bearing wall that will be removed to enlarge the kitchen. l4 A new 13) -1 314 x 9 112 LVL beam shall be added spanning from the entry wall to the party wall at the upper floor level.% - This near beam shall be supported with (6) -2x4's at the middle of this span. The beam shall also be supported with a O� minimum of (2) -2xe's or (3) -2x4's at each end. Solid blocking shall be installed in the joist spaces below these stud C Cm 3 packs, Mown to the foundation. O� F- Lim Please :,all with any questions. L` KRN[ C msultants Inc o Structural Engineering & Design APPROVED At Community Development Department ,LOIN OF VXL Building Safety and Inspection S- -,rtes IN o; TO S1GNE,�: �6 � : � ®T .Section z 612-1 Intefil6 ftI�uilding Codelinternational Re Cede Validity of permit. The issuance or granting of a per ® C not be construed to be a permit for, or an approval of, any v,:,. _. a any of the provisions of this code or of any other ordinance cf Tim D. dennum, PE ': 01*0"�.�' ���? jurisdiction. Permits presuming to give authority to violate cr co- :;J the provisions of this code or other ordinances of the jurisdiction shall nct be REIiIEI NED: `1�d4'�1 Eh valid. The issuance of a permit based on construction documents and _.� other data shall not prevent the building official from requiring the 0 10 0-7 corrcoticn of errors in the construction documents and other data. The building official is also authorized to prevent occupancy or use cf a structure where in vion of this code or of any other ordinances of this jurisdiction. + �- 1 PLANS EXAMINER. DATE: 04 -10 -2012 Inspection Request Reporting Page 4 9:38 am Vail, CO - City Of Requested Inspect Date Inspection Area Site Address A/P /D Information Activity: 607 -0295 Type: A -BUILD Const Type: Occupancy: Owner: MCKEEVER QPR TRUST Contractor: NEDBO CONSTRUCTION Description: NEW KITC HEiT_AN_D1ZM0 DEL BATH 0 BLDG -Final EDBO CONSTRUCTION JMONDRAGON Exp: Thursday, April 12, 2012 CG 4034 BIGHORN RD VAIL 4030 BIGHORN ROAD Sub Type: ADUP Use: V -B Inspection History Item: 30 BLDG - Framing 10/23/07 Inspector: s Comment: BACKBOX NE Item: 50 BLDG - Insulation Phone: 970 - 845 -1001 Status: ISSUED Insp Area: CG Requested Time: 11:00 AM Phone: 970 - 845 -1001 -or- 970 -977- 0268 Rollie cell Entered By: JMONDRAGON K Action: AP APPROVED EL IN SEPARATION WALL. Item: 60 BLDG - Sheetrock Nail ** Approved ** 10/26/07 Inspector: JRM Comment: Item: 70 BLDG -Misc. Item: 533 PLAN -TEMP. C/O Item: 535 DIA - 30 DAY REMINDER Item: 536 DIA - SITE /LANDSCAPING Item: 534 PLAN - FINAL C/O Item: 90 BLDG -Final Action: AP APPROVED REPT131 Run Id: 14332