HomeMy WebLinkAboutDRB040442�� � � .
�� � s=�.
� - ��; `Y
� � '
Project Name: ]OHNSON RESIDENCE
Project Description:
Participants:
Design Review Board
ACTIO N FO RM
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
te1:970.479.2139 fax:970.479.2452
web: www.ci.vail.co.us
MINOR EXTERIOR ALTERATION
OWNER JOHNSON, SHERRY B.
12 HAMILTON TERRACE
LONDON NW8 9UG
ENGLAND
License:
APPLICANT NEDBO CONSTRUCTION
P.O. BOX 3419
VAIL, CO
81658
License:
Project Address: 1106 HORNSILVER CR VAIL
DRB Number: DRB040442
08/27/2004 Phone:
08/27/2004 Phone:970-845-1001
Location:
Legal Description: Lot: 9-A Block: Subdivision: HORNSILVER CIRCLE, LTD C
Parcel Number: 210109205012
Comments:
Motion By:
Second By:
Vote:
Conditions:
BOARD/STAFF ACTION
Action: STAFFAPR
Date of Approval: 09/16/2004
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond: 202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is diligently pursued toward completion.
Cond: CON0006685
The applicant shall trim the access panel the same as the adjacent windows and paint
the trim to match the building siding.
Cond: CON0006686
The applicant shall paint all existing, relocated, and new conduit, vent covers,
utitlity meters, etc. to match the building siding.
Planner: Bill Gibson DRB Fee Paid: $20.00
�
--� Questions? Call the Building Team at 479-2325
�
�,� �� \
�' � �G �a �r��� � ��
M � '�"��k { N �, �
° �F
TO���'�1' OF � t�IL �� Bui/dincr Permit Submitta/ Check/ist
Department of Community Development
Project Name: _
Project Address:
✓ This Check/ist must be coma/eted before a Bui/dina► Permit ava/ication is
accevted,
❑ All pages of application is complete
❑ Has DRB approval obtained (if required) Provide a copy of approval form
❑ Condominium Association letter of approval attached if project is a Multi-Family complex
❑ Complete site plan submitted
❑ Public Way Permit application included if applicable (refer to Public Works checklist)
❑ Staging plan included (refer to Public Works checklist) No dumaster parkinq or material stora4e
allowed on roadwavs and shoulders without written approval
❑ Asbestos test and results submitted if demolition is occurring
❑ Architect stamp and signature (All Commercial and Multi family)
❑ Full floor plans including building sections and elevations(5 sets of plans for Multi-Family and
Commercial Buildings)
❑ Window and door schedule
❑ Full structural plans, including design criteria (i.e.loads)
❑ Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
❑ Soils Report must be submitted prior to footing inspection
❑ Fire resistive assemblies specified and penetrations indicated
❑ Smoke detectors shown on plans
❑ Types and quantity of fireplaces shown
Applicant's Signature: �
Date of submi I•
�-�Z ��°
�
Received By: r`
\\Vail\data\cdev\FORMS\PERMITS\BLDGPERM.DOC
��
04/02/2003
�
1 V��
WHEN A��PUBLIC WAY PERMIT" IS REQUIRED
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A
"PUBLIC WAY PERMIT":
❑ Is this a new residence? YES NO�
❑ Does demolition work being performed require the use of the Right-of-Way, easements or
public property? YES N0�_
❑ Is any utility work needed? YES NO �
❑ Is the driveway being repaved? YES NO_��
❑ Is a different access needed to the site other than the existing driveway? YES NO�_
❑ Is any drainage work eing done that affects the Right-of-Way, easements, or public property?
YES N0�
❑ Is a"Revocable Right-of-Way Permit" required? YES NO_�
❑ Is the Right-of-Way, easements or public property to be used for staging, parking or fencing?
YES NO i�
If answer is N0, is a arking, staging or fencing plan required by Public Works?
YES NO�
If you answered YES to any of these questions, a"Public Way Permit" must be obtained.
"Public Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-2198. �
I HAVE READ AND ANSWERED ALL THE ABOVE QUESTIONS.
�"" _ / 0.�/_ � /'
/'� D ( a-�v.� i .2� � ii� �-
Co\ ractor Signature Company Name
Job or Project Name: f . ° � ���L ���� � �U��
Date Signed: � �'
F: /everyone/forms/bl dperm4
0
�
*****************+**************************************************+****+****+*************
TOWN OF VAIL, COLORADOCopy Reprinted on 02-15-2013 at 15:20:39 02/IS/2013
Statement
********************************************�***********�***********************************
Statement Number: R040006517 Amount: $20.00 08/27/200410:19 AM
Payment Method: Check Init: JS
Notation: #26656/NEDBO
CONST.
-----------------------------------------------------------------------------
Permit No: DRB040442 Type: DRB-Minor A1t,SFR/DUP
Parcel No: 2101-092-0501-2
Site Address: 1106 HORNSILVER CR VAIL
Location:
Total Fees: $20.00
This Payment: $20.00 Total ALL Pmts: $20.00
Balance: $0.00
***************************************************************************************+****
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
DR 00100003112200 DESIGN REVIEW FEES 20.00
-----------------------------------------------------------------------------
1 V�1'
PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
How it relates to Building Permits:
� Fill out the attached check list with the Building Permit Application.
If yes was answered to any of the questions then a'�Pubiic Way" permit is required. You
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
� Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
v A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November 1st and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
;- Sketch of work being performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
: Submit completed application to the Public Work's office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to perform.
r The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
� As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
:- NOTE: The above process is for work in a public way ONLY. Public Way
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
I have read and understand the above.
� ,� �/ /�
S(gnature Date Signed
F: /everyone/forms/bld perm5
0
i VFli►
DRAINAGE AND CULVERT INSPECTIONS ARE REQUIRED BY PUBLIC WORKS!
Please read and check off each of the items below:
o The Town of Vail Building Department has developed the foilowing procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
❑ The Town of Vail Public Works Department will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culverts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at 479-2198 to request an inspection from
the Public Works Department. Allow a minimum of 24 hour notice.
❑ Also, the Town of Vail Public Works Department will be approving all final drainage
and culvert instal�ation with resutting road patching as necessary. Such approval
must be obtained prior to any Final Certificate of Occupancv issuance.
—
Agreed to by: � i G�I ��i�/Uh �J���
Print Name
�------
Sign ure
Project Name: 1 ��.��r,���'i�7 ���G�`'
Date Signed: ��� a,�
F: /everyone/forms/bldperm6