Loading...
HomeMy WebLinkAboutDRB040442�� � � . �� � s=�. � - ��; `Y � � ' Project Name: ]OHNSON RESIDENCE Project Description: Participants: Design Review Board ACTIO N FO RM Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 te1:970.479.2139 fax:970.479.2452 web: www.ci.vail.co.us MINOR EXTERIOR ALTERATION OWNER JOHNSON, SHERRY B. 12 HAMILTON TERRACE LONDON NW8 9UG ENGLAND License: APPLICANT NEDBO CONSTRUCTION P.O. BOX 3419 VAIL, CO 81658 License: Project Address: 1106 HORNSILVER CR VAIL DRB Number: DRB040442 08/27/2004 Phone: 08/27/2004 Phone:970-845-1001 Location: Legal Description: Lot: 9-A Block: Subdivision: HORNSILVER CIRCLE, LTD C Parcel Number: 210109205012 Comments: Motion By: Second By: Vote: Conditions: BOARD/STAFF ACTION Action: STAFFAPR Date of Approval: 09/16/2004 Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 DRB approval shall not become valid for 20 days following the date of approval. Cond: 202 Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Cond: CON0006685 The applicant shall trim the access panel the same as the adjacent windows and paint the trim to match the building siding. Cond: CON0006686 The applicant shall paint all existing, relocated, and new conduit, vent covers, utitlity meters, etc. to match the building siding. Planner: Bill Gibson DRB Fee Paid: $20.00 � --� Questions? Call the Building Team at 479-2325 � �,� �� \ �' � �G �a �r��� � �� M � '�"��k { N �, � ° �F TO���'�1' OF � t�IL �� Bui/dincr Permit Submitta/ Check/ist Department of Community Development Project Name: _ Project Address: ✓ This Check/ist must be coma/eted before a Bui/dina► Permit ava/ication is accevted, ❑ All pages of application is complete ❑ Has DRB approval obtained (if required) Provide a copy of approval form ❑ Condominium Association letter of approval attached if project is a Multi-Family complex ❑ Complete site plan submitted ❑ Public Way Permit application included if applicable (refer to Public Works checklist) ❑ Staging plan included (refer to Public Works checklist) No dumaster parkinq or material stora4e allowed on roadwavs and shoulders without written approval ❑ Asbestos test and results submitted if demolition is occurring ❑ Architect stamp and signature (All Commercial and Multi family) ❑ Full floor plans including building sections and elevations(5 sets of plans for Multi-Family and Commercial Buildings) ❑ Window and door schedule ❑ Full structural plans, including design criteria (i.e.loads) ❑ Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) ❑ Soils Report must be submitted prior to footing inspection ❑ Fire resistive assemblies specified and penetrations indicated ❑ Smoke detectors shown on plans ❑ Types and quantity of fireplaces shown Applicant's Signature: � Date of submi I• �-�Z ��° � Received By: r` \\Vail\data\cdev\FORMS\PERMITS\BLDGPERM.DOC �� 04/02/2003 � 1 V�� WHEN A��PUBLIC WAY PERMIT" IS REQUIRED PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A "PUBLIC WAY PERMIT": ❑ Is this a new residence? YES NO� ❑ Does demolition work being performed require the use of the Right-of-Way, easements or public property? YES N0�_ ❑ Is any utility work needed? YES NO � ❑ Is the driveway being repaved? YES NO_�� ❑ Is a different access needed to the site other than the existing driveway? YES NO�_ ❑ Is any drainage work eing done that affects the Right-of-Way, easements, or public property? YES N0� ❑ Is a"Revocable Right-of-Way Permit" required? YES NO_� ❑ Is the Right-of-Way, easements or public property to be used for staging, parking or fencing? YES NO i� If answer is N0, is a arking, staging or fencing plan required by Public Works? YES NO� If you answered YES to any of these questions, a"Public Way Permit" must be obtained. "Public Way Permit" applications may be obtained at the Public Work's office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Works at 479-2198. � I HAVE READ AND ANSWERED ALL THE ABOVE QUESTIONS. �"" _ / 0.�/_ � /' /'� D ( a-�v.� i .2� � ii� �- Co\ ractor Signature Company Name Job or Project Name: f . ° � ���L ���� � �U�� Date Signed: � �' F: /everyone/forms/bl dperm4 0 � *****************+**************************************************+****+****+************* TOWN OF VAIL, COLORADOCopy Reprinted on 02-15-2013 at 15:20:39 02/IS/2013 Statement ********************************************�***********�*********************************** Statement Number: R040006517 Amount: $20.00 08/27/200410:19 AM Payment Method: Check Init: JS Notation: #26656/NEDBO CONST. ----------------------------------------------------------------------------- Permit No: DRB040442 Type: DRB-Minor A1t,SFR/DUP Parcel No: 2101-092-0501-2 Site Address: 1106 HORNSILVER CR VAIL Location: Total Fees: $20.00 This Payment: $20.00 Total ALL Pmts: $20.00 Balance: $0.00 ***************************************************************************************+**** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ DR 00100003112200 DESIGN REVIEW FEES 20.00 ----------------------------------------------------------------------------- 1 V�1' PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS How it relates to Building Permits: � Fill out the attached check list with the Building Permit Application. If yes was answered to any of the questions then a'�Pubiic Way" permit is required. You can pick up an application at either Community Development, located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. � Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective utilities prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. v A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This plan will expire on November 1st and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. ;- Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a site plan for the job. : Submit completed application to the Public Work's office for review. If required, locates will be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to perform. r The Public Work's Construction Inspector will review the application and approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released within 48 hours of being received, but please allow up to one (1) week to process. � As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit" with a "Building Permit". :- NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15th. A new Public Way Permit is required each year if work is not complete. Re-application each November 15th does not mean an automatic renewal. I have read and understand the above. � ,� �/ /� S(gnature Date Signed F: /everyone/forms/bld perm5 0 i VFli► DRAINAGE AND CULVERT INSPECTIONS ARE REQUIRED BY PUBLIC WORKS! Please read and check off each of the items below: o The Town of Vail Building Department has developed the foilowing procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. ❑ The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at 479-2198 to request an inspection from the Public Works Department. Allow a minimum of 24 hour notice. ❑ Also, the Town of Vail Public Works Department will be approving all final drainage and culvert instal�ation with resutting road patching as necessary. Such approval must be obtained prior to any Final Certificate of Occupancv issuance. — Agreed to by: � i G�I ��i�/Uh �J��� Print Name �------ Sign ure Project Name: 1 ��.��r,���'i�7 ���G�`' Date Signed: ��� a,� F: /everyone/forms/bldperm6