HomeMy WebLinkAboutB04-0344F DEpARrMENroF cor'ff\drnrrrytrsl,opMENrTOWNOFVAIL
75 S.FRONTAGEROAD
vArL, co 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TMES
ADD/ALTSFRBUILDPERMIT Permit #: 804-03,f4
Job Address: 1763 LIONS RIDGE LP VAIL
Location.....: 1495 LIONSRIDGELOOP
ParcelNo...: 210312202008
Project No , ?e o4 _ o3o>
OWNER RICKMAN, PATRICIA A. It/09/2004 Phone:
7936 DUBLIN CT
WICHITAKS 67205
License:
CONTRACTOR PAR CONSTRUCTION
1-495 LionsRidge LoopVail, Colorado
81557
L,icense: 331-L
APPI-,ICANT PAR CONSTRUCTION
1495 LionsRj-dge I-,oopVai1, Col-orado
dl-bf /License: 331-L
Ll./09/2004 Phone: (970t, 476-67L3
Lt/09/2004 Phone: (970) 476-61L3
Description:
EXTERIOR AND INTERIOR FULL REN.{ODEI,
Occupancy: R3 Single Family Residence
Type Construction: V B
Valuation: $500,000.00 Add Sq Fl 0
Fireplace lnformation: Resticted: Y # ofGas Appliances: 0 # ofGas Logs: 0 #of Wood Pellee 0
FEE SUMMARY
Building------> $3 , 2 3 3 . 7 5 R€stuarant Plan Review->
Plan check--> s2 , 101 . 94 DRB F€e--------->
S0.00 Toal Calculated Fees-> S5,338.69
s0.00 AddidonalFe€s-------->s0 .00
lnvestigation >$0. 00 Recr€ation Fe€----->50.00 Total peflnit FeF__> S5,339.G9
S0 . 00 Pallrrcats-_---> S5, 338. 69Will Call----> 53.00 Clean-rry Dqosit--------->
TOTAL FEES------> Ss,338.69 BAL/$ICE DUE----->s0.00
Status...: ISSIIED
Applied. . : ll/09/2004
Issued. .. : 12/0612004
Expires...: 06/04/2005
Approvals:
ftem: 05100 BUILDING DEPARTMB{T
12/03/2004 Jw Acti"on: AP
Iten: 05400 PLANNING DEPARTMEIIT
1-L/I2/2004 rtrtc AcEion: AP
It.em: 05500 FIRE DEPARTME!flIItem: 05500 PUBLTC WORKSII/23/2004 Is Action: AP
See page 2 of this Docurnent for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read Oi0pplirurioo, filled out in full the informationlequired" completed an acorrate plot plan,
and state that all the information as requircd is correct. I agrec to comply with the information and plot plan, to comply with all
Town ordinanccs and state laws, md to build this structure acrording to the towns zoning and subdivision codes, desip review
approved" Uniform Building Code and other ordinmces of the Tovm ryplicable thereto.
REQT ESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOLJRS IN ADVANCE BY TELEFgONE AT 479-?149 OR AT OUR OFFICE FROM 8:(X) AM - 4 PM.
SIGNATI,'RE OF OWNER OR CONTRACTOR FOR HMSELF AND OWNER
PAGE2
{.*,|i'}***'t**!t!t'|*,*'|.***'}***!t**,|t'}'|t*******!t*!t!t't'}!*tl**!*i{.!t**'t'}'}tt***'|t't'***|t:}!|t*+
CONDMONS OFAPPROVAL
Permit #: 804-0344 as of 12{6-2004 Status: ISSUED
**:t'|*:i'|t!*!t**tt***'t*,}*'t'**{t'}*+*'lt}*'t*****'}+++'}'}:|t{.{.*:t'|t***+t**+{.{.:|t'|t|'}**t***'}'}'i'*******+***
P€rmit Type: ADD/ALT SFR BUILD PERMIT Applied: ll/0912004
Applicanl PAR CONSTRUCTION Issued: 12/06/2004
(970) 476-6713 To Expire: 06/0412005
Job Address: 1763 LIONS RIDGE LP VAIL
Location: 1495 LIONSRIDGE LOOP
ParcelNo: 210312202008
Description:
EXTERIOR AND INTERIOR FULL REMODEL
'l'**'t'1,*{r*{.t**rt't,}******'*,***'*'***'}*,t+***'i'1.,1:**:t:********* COnditiOnS !*******,**********!i'}********,t:t*'}'i*+'}tt***:t:t*!t!t
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQLIIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 16
@LDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND
EVERY STORY AS PER SEC.3IO.9.I OF THE 1997IJBC.
++l'lr*laalaa'}*ta*llrala'3+f+aaaaaraf+taa*****tt**t*a+t**ar**aat*taaa*aaaa*a**aa**aafaaara*a++
TOWNOFVAIL, COLORADO Srar€meNr
'l*fta*llalal*lat*+***ftt*t**+tt*alaara++ffttf*ttatf+tat***trtt+f*a*+fa+*aaar**ra+*++****r***
Statenerrt Mrriber: RO4000722A Amount: $5,338.69 L2/06/200401 :01 pM
Palment ltlethod: Check Init : LTNoEation: PAR Constuction /ck 204
Permit No: 804-0344 Tlpe: ADD/ALT SFR BUIr.,D PERMITParcel No: 2t03L2202O08Site Address: 1?63 L,IONS RIDGE LP VAIIrLocation: 1495 LIONSRIDGE IJOOP Total Fee6: S5,338.69This Patment: $5,338.69 Total ALL Pnts: $5,338.69Balance: 50.00
ACCOUNT ITEM LIST:
Account Code Current Pflits
BP OO1OOOO31111OO BUIIJDING PERMIT FEES 3,233.75
PF 00100003112300 PLAN CHECK FEES 2, 101.94
wc 00100003112800 wrLL CALL rNspEcTroN FEE 3.00
Description
(o
WILL
t 633rf tl
APPLICATION NOT BE ACCEPTED IF INCOMPLETE OR
Project #:ot[ - O3(req6sa-s vfBuildiPermit #:
LICA
mecha
TOWTiOPVAIL
75 S. Frontage Rd.
Vail, Colorado 81657
CONTRACTOR INFORMATION
ECEffM
etc.!
N0t/ 092004
General Contractor:
Srue- crts\srcK{/acr,oN
own of Vail Reo. No.:
4)6 -67
COMPLETE VALU
Parcel # Contact
ATIONS FOR BUILDING PERMIT Labor & Materials
BUILDING: $ < {O, Do o-on ELECTRICAL: $ 50, aoo.od OTHER:$
PLUMBING:$ ?7_OOo-oo MECHANTCAL: g 7 0, 0O0.oa rorAL: $ {o0, ooa. o.,
For Assessors Office at 970-328-8640 or visit .com
farcel* ato3l f,ar.f nB
Job Name:Job Address:l4qE Aionsztxd AoOl
Legal Description Lot: 3- ll atocx: ll rilins, e.Subdivision: It OL6p.!Dct,g Rr,rsf.?
Owners Name:Address:Phone:
ArchitecVDesioner:V^/IDA dress:II|P EMIvEZ 9VtT€*)>(-e.EEE- 11, \,/t\Phone:4q4-SaD( )c
ff8S"€6.-*tvtr*!l ll4Ad$t---.o-r -p., -',.trrz a,*l P4?[fr'-t-tp
Detailed description of work:
Efr Aetou--t'--r-rs!:ei:.ror
./\volr c-g Ytt>o
FttLl,- l,an r>4 l,-.'
WorkClass: New() Addition( ) Remodel ( ) Repair( ) Demo( ) Other( )
WorkType: Interior( ) Exterior( ) Both Does an EHU exist at this location: Yes ( ) ttoV)L\
Type of Bldg.: Single-family{ Two-family ( ) Multi-family ( ) Commercial ( ) Restaurant ( ) Other ( )
No. of Existing Dwelling Units in this building: =Z No. of Accommodation Units in this building: O
No/Tvpe of Fireplaces Existinq: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq (l)
No/Tvpe of Fireplaces Proposed: Gas Appliances ( ) Gas loqs (l) Wood/Pellet (t)) Wood eulninq (NOT ALLOWED)
Does a Fire Alarm Exist: Yes ( ) tlo fi)Does a Fire Sprinkler System Exist: Yes ( ) No DQ
\\Vail\data\cdev\FORMS\PERM ITS\BLDGPERM.DOC
o
,,*ffi
Questions? Call the Building Team at 479-2325
Department of Community Development
Project Name:fl furnae^ fu n?s harrs (roe ehP
Project Address:t r/?S 4owfuesg bop /,f?; G/o 8/6s>
/ This Cheklist must be ampleted before a Euildina Permit aooliation is
acephd.
d All pages of applicaUon is complete
{ nas DRB approval obtained (if required) Provide a copy of approval form
o C.ondominium Association letter of approval attached if project is a MultFFamily complex
u/ Complete site plan submitted
o Public Way Permit application included if applicable (refer to Public Works checklist)
o Staging plan included (refer to Public Works checklist) No dumpster,parkino or material storaoe
allowed on roadwavs and shoulders without written aooroval
a/,.esUestos test and results submitted if demolition is occurringg/ Architect stamp and signature (All Commercial and Multi family)
{ Full floor plans including building sections and elevations(S sets of plans for Multi-Family and
Commercial Buildings)
/winoo* and door schedule
s Full structural plans, including design criteria (i.e.loads)
n Structunl Engineer stamp and signature on structural plans (All Commercial and MulU Family)
o Soils Report must be submitted prior to footlng inspection
d'firu resistive assemblies specified and penetrations indicated
{smqXedetectors shown on plans
vlyw and quanb'ty of fireplaces shown
ll
Applicanfs Signature:
Date of submittal:
\VailUata\cdev\FORMS\PERMITS\BLDGPERM.DOC
Received By:
04102n003
o
WHEN A'PUBLTC WAy PERMIT'IS REQUTRED
PLEASE REAB AND CHECK OFF EACH OF THE FOLLOWING QUESNONS REGARDING THE NEED FOR A
"PUBLIC WAY PERMIT":
B Is this a new residence? YES NO
a Does demolition work being performed require the use of the Right-of-Way, easements or
public propefi?
Is any utility work needed? YES NO
Is the driveway being repaved?
Is a different access needed to the site other than the existing driveway? YES_ NO
o Is any drainage work being done that affects the Right-of-Way, easements, or public property?
Is a "Revocable Right-of-Way Permit" required?YES NO
Is the Right-of-Way, easements or public property to be used for staging, parking or fencing?YES NO
If answer is NO, is a parking, staging or fencing plan required by Public Works?
YES_ NO_
If you answered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permif'applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Works at 479-2L98.
I HAVE READ AND ANSWERED ALLfiE ABOVE QUESNONS.
Job or Project Name:
Date Signed:
Company Name@ntractor Signature
F:/everyone/forms/bldpenM
APPLICATION
FOR TOWN OF VAIL
PUBLIC WAY PERMIT 19
o-- o
PW#: LJ U. LJ LJ LJ U
Parcer#:IM-If X-nn-XIr ffiBrds.Permit#,EnI'IfrI ru,nvffil
1.Job Name Street Address n n n-n (ttunknowncell
r_J L_J r_J | | 479-2139 ext.o
TOV Contractor's Licons€ Numb€r REOUIRED
Phone #ztpCity
A
Slart Dat€
Work is for (cirde one)
Other
Completion Date
Water Sewer Gas Electric Telephone
(Permit Expiration Dat6)
CATV Landscaping Temp. Site Access
Trench-width
(min.4')
Bond Amount $
ALL MATERIAL, EQUIPMENT, AND TRAFFIC
JOB IS STARTED.
7.Bubber out-riggers are required on
Asphalt surfaces underneath the
A signature below indicates a
signatures are obtained, permittee
necessary Town of Vail signatures.
BE ON THE JOBSITE BEFORE THE
working on asphalt.
at all times.
utlllty locatlons and approvals. Once all utility company
appllcation through the Public Works office to obtain the
up to one week to Process.
Depth
Totel sF $
Total LF $
Permit Fee Total Permit Fee $
Public Service Natural Gas Group (1-800-922-19871
Public Service Company (1
U.S. West (1-800-922-1987)
TCI Cablevision of the Rockies (1-800-922-1987)
Eagle River Water & Sanitation District (970-476-7480, eld. 1 14)
Holy Cross Electric Company (1-800-922-1987)
Town of Vail Electricians (970-479-2158)
Town ol Vail lrrigation (970-479-2158)
Town of Vall Public Works Constructlon Insp€ctor (970.479-2198)
9. THERE WILL BE NO TOTAL STREET CLOSUHESI A construction traffic control plan must be approved by the
Public Works Department prior to issuance of the permit.
10. All excavation must be done by hand within 18" of utilities - (Senate Bill 172)'
11. Permittee must contact Publlc Works D€partment et 479.2198 24 hours prior to commencino of work. Failure to notify
the Town wlll result in forfeiture of bond poney, Scheduled inspections which are not ready may result in the Town
charging the contractor a reinspection fee.
12. I certify that I have reacl all chapters of Title I - Public Ways and Property, of the Vail Municipal Code and all utility
company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required.
Contractor's Slgnature of Agreement Print namo clearly
ATTACH PLAN OF WORK, TNCLUDING CONSTRUCNON TRAFFIC CONTROL PLAN
Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT.
Date of Signaturg
White - Publlc Works
Yellow - Contractor
rvmtaF
PUBTIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
How it relates to Building Permits:
Fill out the attached check list with the Building Permit Application.
If yes was answered to any of the questions then a "Public Way" permit is required. You
can pick up an application at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November lst and will need to be resubmitted for consideration for
approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction,
Sketch of work being performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Work's office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to perform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Department will be notifled, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
NOTE: The above process is for work in a public way ONLY. Public Way
Permits are valid only until November 15th. A new Public Way Permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
I have read and understand the above.
Signature
F:/everyone/forms/bldperm5
//- /-01'
Date Signed
o
Mtl0F
DRATNAGE AND CULVERT TNSPECTIONS ARE REQUTRED By PUBLTC WORKS!
Please read and check offeach of the items below:
a The Town of Vail Building Department has developed the following procedures to
ensuie that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
The Town of Vail Public Works Department will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culvefts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at 479-2198 to request an inspection from
the Public Works Depaftment. Allow a minimum of 24 hour notice.
Also, the Town of Vail Public Works Depaftment will be approving all final drainage
and culveft installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Certificate of Occupancy issuance.
Agreed to by:
Print Name
Project Name:
Date Signed:
t\
Signature
F:/everyone/forms/bldperm6
/rLLA,4<
Please read and check off each of the items below.
(Copies of complete text are available upon request)
CODE 5.2-10: DEPOSITS ON PUBUC WAYS PROHIBITED
o Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any
other debris or material upon any street, sidewallg alley or public place, or any portion thereof,
o Notice; Abatement: The Director of Public Works may notiff and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice
by the Director of Public Works. In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified,
a Summons and Penalty: As an alternative to the notice for removal provided ih subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Coutt of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 1-4-1 ofthis code.
o Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 5 (1979).
CODES 7.3A-1 AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
n No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord.2(1968) 5 1)
o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and.presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as
amended, the officer shall reguire the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord, 2(1968) 6 3: Ord. 28(1981) 5 1)
I have read and will comply with the above code provisions:
Position or Relationship to Project:
Datesigned: //- /'Oq
F:/everyone/formVbldpemlT
VaiI 2004
Vail Village and Lionshead Village Construction Hours
Information Handout
Problem Statement
The Vail Village and Lionshead Village are invaluable assets to the community. Thousands of people
come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer.
The community and merchants rely upon our guest to generate revenue. Our summerArinter guests
expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the community and on our
guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village and
Lionshead Village Construction Hours Handout.
It would be irresponsible for the Town of Vail, the and the Merchants. to not
actively participate to minimize the impact of areas-
New for 2004-2006 will be the Vail Village
utility related improvements,
All Construction projects and/or Scott
Bluhm Town of Vail Streetscape
ude all
Givens
The following givens are intended to
in the Villages:
. The public's health, safety and
. Adequate pedestrian,
be maintained.
construction
be
vehicle,
and
Vail
The hours of Outside Gonstruction Activity shall be as follows:
- April 15-June 18 & SeptemberT - November 19,7 a.m. until 7 p.m., seven days aweek.
June 18 thru September 10, work must end by 4:00 p.m. on Fridays.
November 13 - April 15, 2005 work allowed within daylight hours only.
- Deliveries shall be restricted to the hours of 7 a.m. to 1 1:30 a.m. on Gore Creek Drive and 7 a.m.
to 8:30 a.m. on Bridge Street.
- Special Construction delivery permits must be requestecl in advance, from Public Works in
conjunction with Code Enforcement at Ch€ckpoint Charlie.
- No construction activity shall occur on Saturday or Sunday between June 19 and
September 5.
-3418 for