Loading...
HomeMy WebLinkAboutM03-0011TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MECHANICAL PERMIT Permit #: M03 -0011 Job Address: 75 S FRONTAGE RD WEST VAIL Status ...: FINAL Location.....: 75 S FRONTAGE ROAD Applied..: 02/07/2003 Parcel No...: 210108236004 Issued . .. 02/17/2003 Legal Description: Expires. .: 04/04/2006 Project No : OWNER TOWN OF VAIL C/O FINANCE DEPT 75 S FRONTAGE RD VAIL CO 81657 APPLICANT FALCON PLUMBING & HEATING 3187 MESA AVENUE, SUITE A GRAND JUNCTION CO 81504 CONTRACTOR FALCON PLUMBING & HEATING 3187 MESA AVENUE, SUITE A GRAND JUNCTION CO 81504 License: 175 —P 02/07/2003 02/07/2003 Phone: 970 - 434 -0556 02/07/2003 Desciption: INSTALL NEW BOILER @ COM DEVELOPMENT Valuation: $85,000.00 Fireplace Information: Restricted: Y # of Gas Appliances: 0 # of Gas Logs: 0 # of Wood Pellet: 0 FEE SUMMARY Mechanical - -> $1,700.00 Restuarant Plan Review —> $0.00 Total Calculated Fees - -> $2,128.00 Plan Check —> $425.00 TOTAL FEES------- - - - - -> $2, 128.00 Additional Fees--- - - - - -> $2,128.00) Investigation -> $0.00 Total Permit Fee -- ------- > $0.00 Will Call —> $3.00 Payments---- - - - - -- $0.00 BALANCE DUE --- - -> $0.00 Item: 05100 BUILDING DEPARTMENT 02/11/2003 cdavis Action: AP Item: 05600 FIRE DEPARTMENT CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 22 (BLDG 2003): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION 304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL. Cond: 23 (BLDG 2003) : BOILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND CHAPTER 10 OF THE 2003 IMC. Cond: 25 (BLDG 2003): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC. Cond: 29 (BLDG 2003): ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003 IMC AND CHAPTER 3 OF THE 2003 IFGC.. Cond: 31 (BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING. Cond: 32 (BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR TO AN INSPECTION REQUEST. Cond: 30 (BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER M03 -0011 : Entries for Item:390 - MECH -Final 09:27 02/19/2013 Action Comments By Date Unique_ Key CR 1.CAP ALL OPEN COPPER PIPE. GCD 07/29/2003 A000065 2.SUPPORT GASPIPE AT APPLIANCES. 123 3.PROVIDE BALANCE REPORT. 4.ROUGH AND FINAL ELECTRICAL INSPECTION READ. 5.PAINT EXTERIOR SHEET METAL TO MATCH BUILDING CR MET WITH STATE BOILER INSPECTOR GCD 12/29/2003 A000068 TODAY. 932 AN ASME LISTED EXPANSION TANK IS REQD DUE TO THE OPERATING PRESSURE OF THE T &PR VALVES. THE T &PR VALVES CAN BE CHANGED TO 30psi AND THE EXISTING TANK WOULD BE APPROVED. AP GCD 04/04/2006 A000088 557 Total Rows: 3 Page 1