Loading...
HomeMy WebLinkAboutM07-0286M07-0286: Entries for Item:390 W& D not hooked up for service. not tested. Not ready for final, not hooked up Total Rows: 4 vent J MER - MECH-Final Date Unique_ Ke D8/21/2008 A000116 848 08125/2008 A000116 979 10/20/2008 A000118 941 n�in7i9009 A000121 Page 1 15:40 02/19/2013 NOTE: TH/S PERMIT MUST BE POSTED ON JOBSITE AT ALL T/MES : 1DHTf OF YAQ. ' Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970-479-2139 f. 970.4792452 inspections. 970.479.2149 MECHANICAL PERMIT Permit #: M07-0286 AMF Job Address: 2339 CHAMONIX LN VAIL Location.....: 2339 CHAMONIX LANE Parcel No...: 210311401010 OWNER STEPHANOFF, ROBERT A. MICHA 10/17/2007 Phone: 390-4529 PO BOX 4573 VAIL CO 81658 APPLICANT PLUMBING SYSTEMS, INC. PO BOX 3879 AVON COLORADO 81620 License: 236-M CONTRACTOR PLUMBING SYSTEMS, INC PO BOX 3879 AVON COLORADO 81620 License: 236-M 10/17/2007 Phone:970-390-7763 10/17/2007 Phone: 970-390-7763 Desciption: INSTALL1 BOILER WITH RADIANT HEAT THROUGHOUT HOUSE Valuation: $45,000.00 Project #: Status . . . : ISSUED Applied . . : 10/17/2007 Issued . . : 01/06/2009 Expires . .: 10/20/2008 .,�.........,�...<.«..�...�..,�.,..,.......��*..�.....«...>........>.,».,..,«.......FEE SUMMARY«**...........��.��,*�...>..«...,..«..*«.....�.........,..,..�.......�.»�.«.......,... Mechanical Permit Fee---> $900.00 Will Call------------> $4.00 Total Calculated Fees---> $1,129.00 Plan Check-------------------> $225.00 Use Tax Fee------> $0.00 Additional Fees-----------> $0.00 Investigation-----------------> $0.00 TOTAL PERMIT FEE---> $1,129.00 Total Calculated Fees--> $1,129.00 Payments-----------------> $1,129.00 BALANCE DUE---------> $0.00 ...�....�..><..,..�......� ...............................t��.,........�.......*,....,,.«..,�............,....�.:..................»�.<........�,�..�.....,�..,....�....�.�........��.......��. APPROVALS Item: 05100 BUILDING DEPARTMENT 10/17/2007 cgunion Action: AP .��...��........�...<....*........+...,,�.�...�.,...,...........,�.,.*: .............�,�.:*:...�........,�..*,.,�.�......,��*.....».�.�.><.....,..�,.*�....�<....,.., ......**...............�..�t�.... CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 22 (BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION 304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL. Cond: 23 (BLDG.): BOIILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND CHAPTER 10 OF THE 2003 IMC. Cond: 25 (BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC. Cond: 29 (BLDG.): ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003 IMC AND CHAPTER 3 OF THE 2003 IFGC.. Cond: 31 (BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING. Cond: 32 (BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR TO AN INSPECTION REQUEST. Cond: 30 (BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6. .�,..�*.*��.....«.��*�+,*+,*....,.........�..**�*...�,�«.�.....��.......,......,....�...**.*...,.,.............��..«...,:.,..,��.�>,.<,�«..»<...,.�.............,....«.....�...,.�...�.�.��...<......... DECLARATIONS mechca n ical_permit_041908 I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0( AM - 4 PM. � �.---� Signatu�Q'�6wner or Contractor \ �-., �— Print Name mechcanical_permit_041908 � - G--�� ' Date **********+*********+*******************+*+******************�********+********************* TOWN OF VAIL, COLORADO Statement **++**************************************�***+********************************************* Statement Number: R090000010 Amount: $1,129.00 O1/06/200903:27 PM Payment Method: Check Init: DDG Notation: Plumbing Services Inc. 3908 ----------------------------------------------------------------------------- Permit No: M07-0286 Type: MECHANICAL PERMIT Parcel No: 2103-114-0101-0 Site Address: 2339 CHAMONIX LN VAIL Location: 2339 CHAMONIX LANE Total Fees: $1,129.00 This Payment: $1,129.00 Total ALL Pmts: $1,129.00 Balance: $0.00 ***********+*****************************�************************************++************ ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ MP 00100003111100 MECHANICAL PERMIT FEES 900.00 PF 00100003112300 PLAN CHECK FEES 225.00 WC 00100003112800 WILL CALL INSPECTION FEE 4.00 ----------------------------------------------------------------------------- _ _ __ APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNE �I�c � TOV Project #: � � ' V TJ.� Building Permit #: �' � �� — � � � � Mechanical Permit #: ��`��+tXAn ' 970-479-2149 (Inspections) 1fl�l, TOWN OF VAIL MECHANICAL PERMIT APPLICATION 75 S. Frontage Rd. Permit will not be accepted without the following: Vail, Colorado 81657 Provide Mechanical Room Layout drawn to scale to include: ❑ Mechanical Room Dimensions � ❑ Combustion Air Duct Size and Location �C.` ❑ Flue, Vent and Gas Line Size and Location � ❑ Heat Loss Calcs. � ❑ Equipment Cut/Spec Sheets E-Mail Address: Contractor Sign �, . r ,, 1"..� � i'� CO� MECHANICAL: $ �,L CONTRACTOR INFORMATION Town of Vail Reg. No.: Cpntact Person and Phone #'s: �, � � - /� � a, ; �, ��,� � ,- ; �i�»�� Fax#: PLETE VALUATION FOR MECHANICAL PERMIT (Labor & Materia > �`�%f7 Contact Ea /e Coun Assessors O�ce at 970 :328-8640 or visit www, ea le-coun , com fo� Parce/ # Parcel # )ob Name: � Job Address: � � j � � ,%� ' ��-v c : / ��'`, ��/ �� � � Legal Description Lot: Block: Filing: Subdivision: Owners Name: Address• Phone: � � ��f".;%� �,,L, r .�Y,. L- Engineer: Address: Phone: Detailed description o€ work: .�,, � j/--�-/� / ,��. �c -- ,�,� �� .� � �,4:,�-i �r2s-� c° � fi �- S� Work Class: New �X' Addition (�'� Alteration ( �,�Repair ( ) Other ( ) Boiler Location: Interior (�Exterior () Other () Does an EHU exist at this location: Yes () No () Type of Bldg: Single-family (� Duplex ( ) Multi-family ( ) Commercial ( ) Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this building: No. of Accommodation Units in this building: % No e of Fire Iaces.Existin : Gas A liances Gas Lo s Wood Pellet Wood Burnin No/Type of Fireplaces Proposed: Gas Appliances (�) Gas Logs � Wood/Pellet () Wood Burning (NOT ALLOWED) Is this a conversion from a wood burning fireplace to an EPA Phase II device? Yes () No (.� ************************FOR OFFICE USE ONLY***************************** F:\cdev\FORMS\PERMITS\Building\mechanical�ermit 1i-23-2005.DOC 11/23/2005 RADIANT HEAT LAYOUT TOTAL HEATED AREA 2,842 SQ. FT. a TOTAL BTU 107,134 PER HOUR REQ. ��Trusted Protestionals DERATED BTU 126,040 PER HOUR REQ. Supporting Your (3usincss TOTAL GPM 10.7134 TOTAL FT. HD. 6.88 TOTAL LOOPS 16 TOTAL FT. PIPE 3,250 BOILER TYPE CONDENCING JOB ELEVATION 8000FT STEPHANOFF RES ZONE 1 BEDROOM 3/ BATHROOM 3 AREA 186 SQ. FT. 2,983 BTU 0.30 GPM 0.8 HEAD 200 LINEAR FT. TUBING 12 CENTERS 1 LOOPS 200 LENGTH FLUID SUPPLY TEMP. 120 DEGREE ZONE 2 BEDROOM 4/ BATHROOM 4 AREA 253 SQ. FT. 3,997 BTU 0.40 GPM 1.65 HEAD 250 LINEAR FT. TUBING 12 CENTERS 1 LOOPS 250 LENGTH FLUID SUPPLY TEMP. 120 DEGREE ZONE3 GARAGE AREA 529 SQ. FT. 16,278 BTU 1.63 GPM 1.98 HEAD 600 LINEAR FT. TUBING 12 CENTERS 3 LOOPS 200 LENGTH FLUID SUPPLY TEMP. 120 DEGREE ZONE 4 FAMILY ROOM / ENTRY / HALL AREA 462 SQ. FT. 26,894 BTU 2.69 GPM 5.72 HEAD 600 LINEAR FT. TUBING 12 CENTERS 3 LOOPS 200 LENGTH FLUID SUPPLY TEMP. 120 DEGREE ZONE 5 MASTER BEDROOM MASTER BATHRROM AREA 380 SQ. FT. 19,654 BTU 1.97 GPM 6.88 HEAD 400 LINEAR FT. TUBING 12 CENTERS 2 LOOPS 200 LENGTH FLUID SUPPLY TEMP. 120 DEGREE ZONE 6 OFFICE / BEDROOM / BATHROOM AREA 336 SQ. FT. 10,112 BTU 1.01 GPM 1.98 HEAD 400 LINEAR FT. TUBING 12 CENTERS 2 LOOPS 200 LENGTH FLUID SUPPLY TEMP. 120 DEGREE ZONE 7 POWDER RM / HALL / KITCHEN / DINING RM / LIVING RM AREA 696 SQ. FT. 27,216 BTU 2.72 GPM 3.6 HEAD 800 LINEAR FT. TUBING 12 CENTERS 4 LOOPS 200 LENGTH FLUID SUPPLY TEMP. 120 DEGREE Prepared Nearest STEPHANOFF RES g; HVAC Supply Inc �;t ; VAIL 5-Feb-07 HeatLink � Heatloss Room Name Bedroom 3 Bathroom 3 Bedroom 4 Bathroom 4 GARAGE familylenUhall Master bed Master bath office/bed/bth Powder / hall KITCHEN Dining room Living room Room Number 1 2 3 4 5 6 7 8 9 10 11 12 13 Manifold Group Number #1 #1 #2 #2 #3 #4 #5 #5 #6 #7 #7 #7 #7 Thermostat FW/FH/HC FH FH FH FH FH FH FH FH FH FH FH FH FH -- - - - - -_ _ - -- -- -- - -_ Thermostat / Zone Number 1 1 2 2 3 4 5 5 6 7 7 7 7 Zone valve for Manifold (Y -Yes y Y Y Y Y Y Y Y Y Y Y Y Y Floor Hmsh u/Niviw� i rN C T C T N C C T T W W W W Exposed Wall Height 1 9.0 9.00 9.00 9.00 9.00 13.00 25.00 15.00 15.00 10.00 10.00 10.00 10.0 15.00 Exposed Wall (perimete ft 11.00 6.00 24.00 9.00 60.00 59.00 27.00 26.00 42.00 7.00 13 00 25.00 28.00 Room Length tt 11.00 5.00 11.00 11.00 23.00 11.00 14.00 12.00 12.00 10.00 13.00 9.00 15.00 Room Width fl 11.00 13.00 11.00 12.00 23.00 42.00 16.00 13.00 28.00 16.00 14.00 11.00 17.00 Gross Room Area sq fl Exposed Ceiling Area sq ft Exposed Floor Area sq ft Ceiling R-Value 30.0 30.0 30.0 30.0 30.0 30.0 3. 30.0 Wall R-Value 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 19.0 Cold Floor Type BF/SOG/OCS BF BF BF BF SOG BF Crawl Space R-Value 20.0 Cement Floor R-Value s.o 5.0 5.0 5.0 5.0 5.0 5.0 Perimeter R-Value (SOG 7,0 7A Buried Wall Height n Buried Wall R-Value sA Glass Type R-value �.sa t.54 i.5a Glass (fixed) sq n 254.00 143.00 Glass Type R-value 1.09 1.09 1.09 1.09 1.09 1.09 1.09 1.09 Glass (hinged) sq ft 18.00 18.00 60.00 40.00 23.00 51.00 42.00 Door Type R-value 1.40 Door Entry (metal/wood) Sq h Door Type R-value 1.11 1.11 1.11 1.11 1.11 Door (glass/overhead) sq ft 136.00 28.00 40.00 112.00 Skylight Type R-value �.09 Skylight (fixed) sq ft Infiltration Factor ACH 0.150 0.150 0.150 0.150 0.300 0.150 0.300 0.150 0.150 0.150 0.150 0.300 0.300 Commercial Air Chan e ACH No Radiant Heat Area sq ft Room Temp F 70 70 70 70 55 70 70 70 70 70 70 70 70 NetArea sqtt 121 65 121 132 529 462 224 156 336 160 182 99 255 HeatLoss BTU/Hr 2,426 557 3,008 989 16,278 26,894 11,999 7,655 10,112 1,241 3,447 5,994 16,534 upp y emp.: Water Temp. Drop: 20 F 10 - 20 normal Base on Pipe ize: 1/2 3/8, 1/2, 5/8, 3/4 idestream Filter: o Floor Heat?/Rad/Fan Coil V/N/R/FC Y Y Y Y Y Y Y Y Y Y Y Y Y Wet or Dry wC i wT i ws i t WC WC WC WC WC WC WC WC WC WC WC WC WC Dist. Manifold to Room ft Cement above pipe z.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Subfloor Thick�ess in 7/8 Max Floor Temp °F 85 °F 85 °F 85 °F 85 °F 85 °F 85 °F 85 °F 85 °F 85 °F 85 °F 85 °F 85 °F 85 °F Water Temp. Drop F 20 °F 20 °F 20 °F 20 °F 20 °F 20 °F 20 °F 20 °F 20 °F 20 °F 20 °F 20 °F 20 °F Pipe Type oxy/non oxy oxy oxy oxy oxy oxy oxy oxy oxy oxy oxy oxy oxy o�ry Pipe Size in 1/2 1/2 1/2 1/2 1/2 1/2 1/2 1/2 1/2 1/2 7/2 1/2 1/2 Pipe Spacing �n 12 in 6 in 12 in 6 in 12 in 12 in 12 in 6 in 6 in 6 in 6 in 6 in 6 in Max.Loop Length ft 295 295 295 295 295 295 295 295 295 295 295 295 295 Border Zone sq n Zone Pipe Spacing in Max. Loop Length ft Water Temp. Drop F Max Floor Temp STEPHANOFF RES PreB�red HVAC Supply inc va� 5-Feb-07 HeatLink� System Ana Room Name Bedroom 3 Bathroom 3 Bedroom 4 Bathroom 4 GARAGE family/enUhall Master bed Master bath office/bed/bth Powder / hall KITCHEN Dining room Living room Room Number 1 2 3 4 5 6 7 8 9 10 11 12 13 Do Floor Heat? (YtN) Y Y Y Y Y Y Y Y Y Y Y Y Y Type of heat emitting Floor heat Floor heat Floor heat Floor heat Floor heat Floor heat Floor heat Floor heat Floor heat Floor heat Floor heat Floor heat Floor heat WetorDry �wciwriws��� wC wC WC WC WC WC WC WC WC WC WC WC WC Cement above pipe in 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Floor Covering Carpet Tile Carpet Tile None Carpet Carpet Tile Tile Wood Wood Wood Wood Gross Area sqft 121 65 121 132 529 462 224 156 336 160 182 99 255 Net Area (excl. border) sq ft 121 65 121 132 529 462 224 156 336 160 182 99 255 Pipe Size PEX 1/2 1/2 1/2 1/2 1/2 1/2 1/2 1/2 1/2 112 1/2 1/2 1/2 Pipe SpaCing in 12 in 6 in 12 in 6 in 12 in 12 in 12 in 6 in 6 in 6 in 6 in 6 in 6 in Required output Btuh/sqn 21.4 Btu 9.2 Btu 26.6 Btu 8.0 Btu 32.9 Btu 62.3 Btu 57.3 Btu 52.5 Btu 32.2 Btu 8.3 Btu 20.3 Btu 64.8 Btu 69.3 Btu Actual output e�unisyn 21.4 Btu 9.2 Btu 26.1 Btu 8.0 Btu 32.9 Btu 26.1 Btu 26.1 Btu 30.5 Btu 30.5 Btu 8.3 Btu 20.3 Btu 30.5 Btu 30.5 Btu TOTAL Floor Heat Btuh 2,595 596 3,159 1,057 17,410 12,061 5,848 4,755 10,241 1,327 3,686 3,018 7,772 6, 531 � 3, 210 � 536 � � � 3,172 Border Zone Area sq n Heat Output awnisqn Zone floor temp F Flow Rate/loop gpm OP tota ft head Total Pipe in Zone tt Loops in Border Zone Manifold Group (Border) Room / Loop# Spacing in Ave. Border Loop Leng ft HeatLink� Setting Floor Temp F 80 °F 74 °F 82 °F 74 °F 70 °F 82 °F 82 °F 84 °F 84 °F 74 °F 79 °F 84 °F 84 °F Flow Rate/loop gpm 0.26 0.06 0.32 0.11 0.87 0.60 0.58 0.24 0.34 0.07 0.18 0.30 0.39 4 ( oop + ani o) ft head 0.5 0.0 0.7 0.2 8.2 3.8 3.5 0.5 1.4 0.1 0.4 1.0 1.9 Thermostat / Zone Number 1 1 2 2 3 4 5 5 6 7 7 7 7 Pipe t pe (oxy / non oxy) oxy oxy oxy oxy o�ry oxy oxy oxy wry oxy oxy oxy oxy Total Pipe in Room ft 121 ft 130 ft 121 ft 264 ft 529 ft 462 ft 224 ft 312 ft 672 ft 320 ft 364 ft 198 ft 510 ft Loops in Room 1 1 7 1 2 2 1 2 3 2 2 1 2 Manifold Group #1 #1 #2 #2 #3 #4 #5 #5 #6 #7 #7 #7 #7 Room / Loop# 1 2 3 4 5 6 7 8 9 10 11 12 13 Spacing in 12 in 6 in 12 in 6 in 12 in 12 in 12 in 6 in 6 in 6 in 6 in 6 in 6 in Average Loop Length n 121 ft 130 ft 121 ft 264 ft 264 ft 231 ft 224 ft 156 ft 224 ft 160 ft 182 ft 198 ft 255 ft HeatLinkO Setting 12 11 12 11 12 12 12 5 12 2 11 11 12 Design Temp.: -20 °F TOt81 CI�CUits: 27 Floor Heat (BTU/h): 73,526 Non-fioor neat areas: (�s i uihr� Ave. Water Temp.: 720 °F Total Pipe: 4,227 ft Shortages: sa,ss� Total Boiler Make-up: 111,913 (BTU/Hr) Total Flow USgal/min: 7.4 Total fc. head: 8.24 PEX Vol. 3s.s3gai ia7.d L Mech. Ventilation Residential: (BTU/Hr) . Dry system SQ. FT.: Wet Tyrap SQ. FT.: 2,842 Tracking on Subfloor SQ. FT.: Tracking on Styrofoam SQ. FT.: 111,913 Total BTU/hr