HomeMy WebLinkAbout!EXCERPT NOTESExcerpts Notes
Excerpts are designed to be stand-alone topics of the Transportation Master Plan
Update. Each excerpt contains the following from the entire plan:
Cover
Title page
Table of Contents
Executive Summary
Appendix A1: Peak Hour Traffic Volumes March 2000 and July 2000
Appendix A2: Vail Village Peak Hour Traffic Volumes, September 2000
The topics included as excerpts along with the applicable appendices include:
Vail Village Deliveries
In-Town Shuttle
Appendix B1: Technology Screening Process
Appendix B2: Examples of Remaining Technology Options
Outlying Bus System
Trail System Interface
Appendix C1: Portions of the Eagle County Trails Master Plan
Appendix C2:Trail Maps from Original Transportation Master Plan
LOS Analysis
Appendix D1: Intersection Level of Service
Appendix D2: Roundabout Level of Service
Appendix D3: Parking Structure Level of Service
Connecting Fixed Guideways
Appendix E: I-70 Capping and Fixed Guideway Mapping
Appendix G: FHWA Joint Development Study
Noise
Appendix F1: CDOT Noise Analysis and Abatement Guidelines
Appendix F2: Noise Contour Mapping
I-70 Capping
Appendix E: I-70 Capping and Fixed Guideway Mapping
Appendix G: FHWA Joint Development Study
Traffic Model
Appendix H1: Population and Employment Data
Appendix H2: Traffic Volume Data
Appendix H3: Model Calibration
Appendix H4: Growth Model
Appendix H5: Trip Reassignment Work Table
PEIS Issues