HomeMy WebLinkAboutE02-0054TO!\AI OF VAIL DEPARTMENT OF COMMUMTY DEVELOPMENT
75 S.FRONTAGEROAD
VAIL, CO 81557
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES
ELECTRICAL PERMIT Permit #: E02-0054
Job Address: 12 S FRONTAGE RD EAST VAIL Status . . . : ISSUED
Location.....: VAIL GATEWAY BLDG TINIT C-6 Applied . . : 05/06/2002
ParcelNo...: 210108264073 Issued. .: 05/06/2002
ProjectNo : PRSOZ -OO6t Expires. .: 11,/02/2002
oI^tNER MOUMTAIN OWNERS Lp 05 / 06 / 2OO2 phone :
C/O STEPHEN I,EWIS, STOLTZ MGMT
725 CONSHOHOCKEN STATE RD
BAI,A CYNIiIYD PA 19004
License:
coNrRAcToR D.p. ETJECTRTC 05/06/2002 phone: 970-926-4L40
P.O. BOX 711
EDWARDS, CO
Ii_63 2
License: l-l-9-E
APPLICAI{TT D.p. ELECTRTC 05/06/2002. phone t 970-9?6-4!4O
P.O. BOX ?l_1
EDWARDS, CO
8't 632
License: L19 -E
Desciption: TENANT FINISH OFFICE SPACE (C-6)
Valuation: $6,900.00
FEE SUMMARY
Electr{cal.-_-> 5128. OO Total Calculated Fees-> 5129 . oo
DRB Fee-__>
Investigaticm->
will call-..._>
$0.00
s0. oo
$3.00
Additional Fees->$0.00
Total perrnit Fee__> 9129-OO
Payments------> $129. OO
BALANCE DUE..-_->$0.00TOTALFEES--> gL2e. oo
Approvals:I€elm: 06000 EIJECTRICAI DEPARTMENf
05/06/2002 DF
Item: O5500 FIRE DEPARI!4ENI
Action: AP
CONDITIONSOF APPROVALCond:12
(BLDG.): FIEI-,D INSPECTIoNS ARE REQUIRED TO CHECK I'OR CODE COMPLIANCE.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the in-formation required, completed an
accurate PIot plan, and state that all the inJormation as required is correct. I agree to comply with the information and
plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoninS
and subdivision codes, design review approved, Unifomr Building Code and other ordinances of the Town applicable
theceto.
REqUE3'I5 FOR INSPECTION SHALL BE MADE TWENTY.FOURHOURSIN ADVANCE BY
PM.
SIGNAI'I.JRE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEI
AT 47*2til8 OR AT OUR OFFICE FROM 8:ffi AM - 5
o
o
o
tr
Overhead seruices are not allowed in the Town of Vail.
Underground services have to be in conduit (PVC) from the transformer to the electric meter, main disconnect
switch and to the first electrical distribution circuit breaker oanel.
The main disconnect switch shall be located next to the meter on the exterior wall of the structure easilv
accessible.
All underground conduits are required to be inspected before back-filling the trench,
In multi-family dwelling units, no electrical wiring or feeder cables shall pass from one unit to another. Common
walls and spaces are accepted.
NM Cable (Romex) is not allowed in commercial buildings or structures exceeding three (3) stories.
No use of aluminum wire smaller than size #8 will be permitted with the Town of Vail.
TOWN OF VAIL ELECTRICAL PERMIT GUIDELINES
All installations of enerior hot tubs or spa's require a DRB approval from planning. This application will
not be accepted without a copy of the DRB approval form aftached (if applicable).
If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over
30" above grade, you must also obtain a building permit.
if this permit is for installation of an exterior hot tub or spa on any existing deck or elevated ptatform,
a structural engineer must review the existing condition and verify that it will support the added
concentrated load. Please provide a copy of the structural engineers wet stamped letter or drawing
with this application.
if this is a remodel in a multi-family building with a homeowners association, a letter of permission
from the association is required.
o If this permit is for a commercial space,two (2) sets of stamped drawings are required.
If you have any questions regarding the above information or have additional questions,
please contact the Town of Vail Electrical Inspector at97O-479-2L47. The inspector can be
reached on Tuesday, Thursday and Friday mornings between the hours of 8am and gam. You
may also leave a voice mail and the inspector will call you back.
o
D
understand the above.
Signature Date Signed