HomeMy WebLinkAboutB13-0023 INSULATION INFO.pdfPage 1 of 2
Mr. Ed Turnbull
No Bull Remodeling
PO Box 757
Minturn, Co. 81645
VIA Email: nobullremodeling@gmail.com January 18, 2013
PROJECT: Booth Falls Townhomes #C-4
2875 Manns Ranch Rd.
Vail, Co.
SPECIFICATIONS:
R-11 1 ½” polyurethane spray foam to the block exterior walls lower level
R-30 unfaced fiberglass batts to the 10” framed exterior walls lower level
6 mil poly air/vapor barrier to the 10” framed exterior walls lower level
R-19 unfaced fiberglass batts to the mid floor
R-21 unfaced fiberglass batts to the rim joist
R-11 sound batts to 2x4 interior walls lower level
Foam all windows, doors and penetrations
TOTAL cost installed including labor and tax $2,450.00
OPTIONS:
1. R-23.8 3.5” polyurethane spray foam to the 2x4 exterior wall main level
ADD $1,975.00
Thank you for the opportunity to submit this proposal.
Kevin Wall
Estimating and Sales
Terms, Conditions and Proposal Accepted by: _________________________
Date: __________________________
PRICE SUBJECT TO CHANGE AFTER 30 DAYS
Page 2 of 2
Terms: Net 30- Please remit payment to P.O. Box 163669, Columbus OH 43216. Please reference invoice number when
paying. To the fullest extent permitted by law, you agree to pay all costs and expenses of collection, including reasonable
attorney’s fees and expenses.
All material will be as provided in the attached description. All work will be completed in a workmanlike fashion in
accordance with the standards of the industry. Any alteration or deviation from the above specifications involving extra
costs will be executed only upon written orders and will become an extra over charge and above the estimate(s). All
agreements are contingent upon strikes, accidents, acts of God or delays beyond our control. Owner to carry fire and
tornado insurance and other insurance that may be required by law. Our workers are covered by worker’s compensation
insurance to the extent required by law.
When sprayed polyurethane spray foam is being installed on a project, numerous precautions are required. No one or no
other trades should be in the building or home when the polyurethane is being sprayed and for minimum 24 hours in the
spray area after completion. Areas of work need to be 55 degrees in temperature 24 hours prior to and during application.
Areas of work should be well vented during and after the application for 24 hours. No open flames, torches or other hot
surfaces near the polyurethane foam during and after installation. All polyurethane spray foam must be covered with
applicable fire protection, including thermal or ignition barriers - please consult local authority having jurisdiction.
We do not warrant against and shall not be liable for any damage or injury, including but not limited to mold
accumulation, when due to any of the following causes: the failure of the builder or contractors (other than our Company)
to follow the instructions and specifications of the insulation manufacturer; faulty or improper installation or maintenance
of drywall or other wall covering; use of accessories or wall preparation materials that do not properly receive the
insulation; and compliance with applicable building codes or other government regulations relating to surface
preparation, wall coverings, required materials or mandatory procedures.
ANY WARRANTIES IMPLIED BY LAW, SUCH AS THE IMPLIED WARRANTIES OF MERCHANTABILITY
AND FITNESS FOR A PARTICULAR PURPOSE, ARE HEREBY EXPRESSLY DISCLAIMED. WE SHALL NOT
BE LIABLE FOR ANY CONSEQUENTIAL DAMAGES OR INCIDENTAL DAMAGES for breach of any warranty
associated with the insulation. Our liability shall in no event exceed the cost of the materials set forth herein. We cannot
and shall not be liable to you for the breach of any other express warranties, such as those given to you by other dealers,
contractors, applicators, distributors or manufactures. Your exclusively remedy with respect to defective materials
provided by us shall be repair or replacement, at our option, of the defective materials.
______________
Initial