Loading...
HomeMy WebLinkAboutB13-0037 scope of work/load calcs _ McNeill Property Management, Inc. 2077 N. Frontage RoQd Suite � Vail, CO 81657 Phone 970-479-6047 Fax 970-477-1147 dunC�mcneillinc.com "The Community Association Management Specialists" March6, 2013 Dea�r Mork Ryan, This letter is to acknowledge BoQrd npproval a�t Mountain Meadow unit 13 for interior remodel with the following conditions: • Construction shnll be in accordunce with the submitted atpplicattion. • Any potentiul penetration to roof inembrane for wiring / smoke detector instatl will be the responsibili�ty of the homeowner. • All Town of Vail requirements nre met. • No construction debr+s stored on-site nnd daily cleanup required. • Cal I management for inspection when pro ject is completed for f inal sign off. • The homeowner will be responsible for nll costs associated with the pro ject. • The builder and any sub-contrnctors agree that they have no financial or legal recourse against the HOA, for any reason what so ever. Sincerely, Dnn McNeill CMCA, AMS, Broker Mountain Meadow Managing Agent � 13-aO3� This is an Elec�rical Load report for the Vail Community Development Office for the remodel at 4682 Mountain Meadow Unit 13. I am the electrician working for K�B Construction. My company is Eagle Electric Inc. and my name is Michael Koenen. The property has multiple Duplexes. The remodel has its own meter. The meter has a 150 amp main breaker. The feeder to the panel is a 2/0 SER wire from the meter. T�ie only power requirements we are adding are 4 additional recessed tights which replace a surface light on the ceiling of the kitchen. The eacisting ceiling ftxture in the kitchen has 4, 40watt bulbs and we will repdace it with 4 recessed cans with SO watt halogen bulbs. In the kitchen we will add a new receptacle where we removed one receptacle from the wall. All the receptacles remain the same on two small appliance circuits. Two of the baseboard heaters will be replaced with hydronic baseboard heaters. They are more e�cient saves 400 watts. We will add two receptacles in the living room for TV. We will add a circuit for in floor heat upstairs. SDO watts. With the changes there should be an energy savings or a wash.. 2000 sq.*3VA per sq. ft. 6000VA 3000VA at 100% 3000VA 3000 VA at 35% 1O50VA General Lighting..... 4050VA Small appliance load 3000VA Laundry 1500VA Total Generallighting And small appliance 8550VA � J� KCB CONSTRUCTION INC P.O. Box 7371 Avon Co.81620 Mark Ryan 4682 Meadow Dr. #13 East Vail 1. Asbestos Test 2. Buiiding, Plumbing,Electrical, Mechanicaf Permits,Use tax,inspection fee 3. Engineer drawings 4. Garbage Disposal,and Dump Fees S. HOA Report 6. Covering,Masking,Construction Cleaning(no carpet) 7. Electrical 8. Plumbing (Rough and finish) 9. Carpet Remove and instal)new upstairs 10. Cabinets Materials Kitchen,3 baths,fireplace 11. Cabinets Install labor 12. Remove appliances and reinstall,install new microwave 13. Granite countertop,Kitchen,3 baths,fireplace, 14. Door and Trim Materials 15. Door and Trim Labor cut and hang doors,install trim,sand,and fitl 16. Install door and cabinet hardware 17. Stairs build wall caps and install skirt boards 18. Install new wood floor labor and material �wide plank 19. Tear out kitchen cabinets,rock on walls and ceiling,doars and trim 20. Crawlspace framing and support firepiace,kitchen, stair way wall 21. Reframe garage door header for new door 22. Vent microwave,reframe kitchen ceiling joists 23. Garage boiler frame,insulate,vent,rock,fire tape,hang door 24. Fire place tear out,frame and sheet as needed, 25. Fireplace install wire chase,supports,tv bracket,and tv 26. Gas fireplace labo�and materials to set fireplace with vent pipe 27. Sheetrock,tape,kitchen,entry 28. Texture walls and ceiling,light hand trowel texture no closets 29. Painting white ceilings,one color on ail walls,one color closets, Stain, lacquer 2 coats,all wood trim,doors,touch up windows,and seal 30. Pocket door framing and sheetrock 31. Window washing interior and exterior . 32. Shower door master bath 33. Master bath 34. Guest Bath 35. Powder Laundry Room 36. Kitchen Entry Floor 37. Fireplace Stone labor and materials 38. Electrical OPT#2 39. Remove sheetrodc install wundboard,insulation,3 walls Sheetrock 2 walis in master bed,denim insulation 40. Move access door to crawl space 41. Add 4 can lights to master bath ceiling 42. Instali tile backsplash in kitchen Master Bath Tear out interior walls,showe�wails a�d tub,vanity,toilet,flooring Install cement board on shower walis,curb and floor Buiid shower pan with drain and pan liner instail in floor heating and programmabie thermostat Install shower vatve and 5 new shut off valves for toilet and sinks Tile wafls,shower pan,curb,floor,with 1 corner shelf,and one row deco,grout and seal Sheetrock and tape as needed Install vanity,2 sinks,toilet,towel bars mirror and hooks Hook up water and waste lines Guest Bath Tear out shower walls,tub,vanity,toilet,and flooring Insiall existing tub,tub drain and new valve,2 shut off valves sink and toilet Instail cement board showe�walls and floor Tile floor,shower wails g�out and seal,with one row deco,and one corner sheif Sheetrock ta�as needed Install vanity,sink,toilet,towel bars,mirror,and hooks Hook up water and waste lines Powder Laundry Room Tear out floor,cabinet,toilet,sink Instail 2 new shut off for sink and toilet Tile floor grout and seal Sheetrock tape as needed includes wall and ceiling in laundry,to pull wires for electrical panel Install vanity,sink,toitet,towel bars,mirror,a�d hoaks Hook up water and waste lines Plumbing Kitchen install new shutoffs for sink,dishwasher tnstall new garbage disposal,hook up water and waste lines Move water and waste lines out of soffits into ceiling and walls Baths install new water shutoffs hook up water and waste lines to sinks,install valves Master Bath Remove tub and cap water and waste,move shower. Electricat Town of Vaii Ioad report and plans Provide 3 hydronic baseboard heaters upstairs and 4 thermostats in house tnstall receptacle and tv cable above fireplace. Wire new circuit from panel bath in floor heat Install carbon monoxide detectors,and 2 smoke detectors Install 2 under cabinet lights and 2 outlets at bar and desk top Move wires to outside walls in the kitchen to accommodate new walls,pillar in kitchen Remove fluorescent fixture and repiace with 4 recess can lights and move switcfi in kitchen Move 4 switches over to the outside wall in the kitchen. Move outlet in the wall that is torn out Install a new GFCI outlet on the end of the counter Run new circuit from panel to microwave abave range Move range outiet Outiet for dishwasher,and garbage disposal Replace light fixtures,Chandelier in the dining room,stairs,and 3 vanities Repiace electrical Panel OPTtON#2 Suppty 2(counter attack zenon)under cabinet lights in the kitchen on a switch for Mechanical Run 2 vent lines from boiler room to outside Run new chimney for gas fire piace Owner to supply Kitchen and bath sinks,faucets and shower valves,tub,toilets,microwave,refrigerator,dry bar refrigerato�,door and cabinet hardware, Tile,deco,bult�ose tile,baseboard tile, Mirrors,lights,bulbs,towel bars,hooks,toilet paper holders Light can trim covers,fire ptace insert,carpet Owner to choose Granite stone,shower bath glass,and hinge style,stone for fireplace