McNeill Property Management, Inc.
2077 N. Frontage RoQd Suite �
Vail, CO 81657
Phone 970-479-6047 Fax 970-477-1147
dunC�mcneillinc.com
"The Community Association Management Specialists"
March6, 2013
Dea�r Mork Ryan,
This letter is to acknowledge BoQrd npproval a�t Mountain Meadow
unit 13 for interior remodel with the following conditions:
• Construction shnll be in accordunce with the submitted
atpplicattion.
• Any potentiul penetration to roof inembrane for wiring /
smoke detector instatl will be the responsibili�ty of the
homeowner.
• All Town of Vail requirements nre met.
• No construction debr+s stored on-site nnd daily cleanup
required.
• Cal I management for inspection when pro ject is completed
for f inal sign off.
• The homeowner will be responsible for nll costs associated
with the pro ject.
• The builder and any sub-contrnctors agree that they have
no financial or legal recourse against the HOA, for any
reason what so ever.
Sincerely,
Dnn McNeill
CMCA, AMS, Broker
Mountain Meadow Managing Agent
�
13-aO3�
This is an Elec�rical Load report for the Vail Community
Development Office for the remodel at 4682 Mountain
Meadow Unit 13. I am the electrician working for K�B
Construction. My company is Eagle Electric Inc. and my
name is Michael Koenen.
The property has multiple Duplexes. The remodel has its own meter. The
meter has a 150 amp main breaker. The feeder to the panel is a 2/0 SER wire
from the meter.
T�ie only power requirements we are adding are 4 additional recessed
tights which replace a surface light on the ceiling of the kitchen. The
eacisting ceiling ftxture in the kitchen has 4, 40watt bulbs and we will repdace
it with 4 recessed cans with SO watt halogen bulbs.
In the kitchen we will add a new receptacle where we removed one
receptacle from the wall. All the receptacles remain the same on two small
appliance circuits.
Two of the baseboard heaters will be replaced with hydronic
baseboard heaters. They are more e�cient saves 400 watts.
We will add two receptacles in the living room for TV.
We will add a circuit for in floor heat upstairs. SDO watts.
With the changes there should be an energy savings or a wash..
2000 sq.*3VA per sq. ft. 6000VA
3000VA at 100% 3000VA
3000 VA at 35% 1O50VA
General Lighting..... 4050VA
Small appliance load 3000VA
Laundry 1500VA
Total Generallighting
And small appliance 8550VA
� J�
KCB CONSTRUCTION INC
P.O. Box 7371
Avon Co.81620
Mark Ryan
4682 Meadow Dr. #13
East Vail
1. Asbestos Test
2. Buiiding, Plumbing,Electrical, Mechanicaf Permits,Use tax,inspection fee
3. Engineer drawings
4. Garbage Disposal,and Dump Fees
S. HOA Report
6. Covering,Masking,Construction Cleaning(no carpet)
7. Electrical
8. Plumbing (Rough and finish)
9. Carpet Remove and instal)new upstairs
10. Cabinets Materials Kitchen,3 baths,fireplace
11. Cabinets Install labor
12. Remove appliances and reinstall,install new microwave
13. Granite countertop,Kitchen,3 baths,fireplace,
14. Door and Trim Materials
15. Door and Trim Labor cut and hang doors,install trim,sand,and fitl
16. Install door and cabinet hardware
17. Stairs build wall caps and install skirt boards
18. Install new wood floor labor and material �wide plank
19. Tear out kitchen cabinets,rock on walls and ceiling,doars and trim
20. Crawlspace framing and support firepiace,kitchen, stair way wall
21. Reframe garage door header for new door
22. Vent microwave,reframe kitchen ceiling joists
23. Garage boiler frame,insulate,vent,rock,fire tape,hang door
24. Fire place tear out,frame and sheet as needed,
25. Fireplace install wire chase,supports,tv bracket,and tv
26. Gas fireplace labo�and materials to set fireplace with vent pipe
27. Sheetrock,tape,kitchen,entry
28. Texture walls and ceiling,light hand trowel texture no closets
29. Painting white ceilings,one color on ail walls,one color closets,
Stain, lacquer 2 coats,all wood trim,doors,touch up windows,and seal
30. Pocket door framing and sheetrock
31. Window washing interior and exterior .
32. Shower door master bath
33. Master bath
34. Guest Bath
35. Powder Laundry Room
36. Kitchen Entry Floor
37. Fireplace Stone labor and materials
38. Electrical OPT#2
39. Remove sheetrodc install wundboard,insulation,3 walls
Sheetrock 2 walis in master bed,denim insulation
40. Move access door to crawl space
41. Add 4 can lights to master bath ceiling
42. Instali tile backsplash in kitchen
Master Bath
Tear out interior walls,showe�wails a�d tub,vanity,toilet,flooring
Install cement board on shower walis,curb and floor
Buiid shower pan with drain and pan liner
instail in floor heating and programmabie thermostat
Install shower vatve and 5 new shut off valves for toilet and sinks
Tile wafls,shower pan,curb,floor,with 1 corner shelf,and one row deco,grout and seal
Sheetrock and tape as needed
Install vanity,2 sinks,toilet,towel bars mirror and hooks
Hook up water and waste lines
Guest Bath
Tear out shower walls,tub,vanity,toilet,and flooring
Insiall existing tub,tub drain and new valve,2 shut off valves sink and toilet
Instail cement board showe�walls and floor
Tile floor,shower wails g�out and seal,with one row deco,and one corner sheif
Sheetrock ta�as needed
Install vanity,sink,toilet,towel bars,mirror,and hooks
Hook up water and waste lines
Powder Laundry Room
Tear out floor,cabinet,toilet,sink
Instail 2 new shut off for sink and toilet
Tile floor grout and seal
Sheetrock tape as needed includes wall and ceiling in laundry,to pull wires for electrical panel
Install vanity,sink,toitet,towel bars,mirror,a�d hoaks
Hook up water and waste lines
Plumbing
Kitchen install new shutoffs for sink,dishwasher
tnstall new garbage disposal,hook up water and waste lines
Move water and waste lines out of soffits into ceiling and walls
Baths install new water shutoffs hook up water and waste lines to sinks,install valves
Master Bath Remove tub and cap water and waste,move shower.
Electricat
Town of Vaii Ioad report and plans
Provide 3 hydronic baseboard heaters upstairs and 4 thermostats in house
tnstall receptacle and tv cable above fireplace.
Wire new circuit from panel bath in floor heat
Install carbon monoxide detectors,and 2 smoke detectors
Install 2 under cabinet lights and 2 outlets at bar and desk top
Move wires to outside walls in the kitchen to accommodate new walls,pillar in kitchen
Remove fluorescent fixture and repiace with 4 recess can lights and move switcfi in kitchen
Move 4 switches over to the outside wall in the kitchen.
Move outlet in the wall that is torn out
Install a new GFCI outlet on the end of the counter
Run new circuit from panel to microwave abave range
Move range outiet
Outiet for dishwasher,and garbage disposal
Replace light fixtures,Chandelier in the dining room,stairs,and 3 vanities
Repiace electrical Panel
OPTtON#2
Suppty 2(counter attack zenon)under cabinet lights in the kitchen on a switch for
Mechanical
Run 2 vent lines from boiler room to outside
Run new chimney for gas fire piace
Owner to supply
Kitchen and bath sinks,faucets and shower valves,tub,toilets,microwave,refrigerator,dry bar
refrigerato�,door and cabinet hardware,
Tile,deco,bult�ose tile,baseboard tile,
Mirrors,lights,bulbs,towel bars,hooks,toilet paper holders
Light can trim covers,fire ptace insert,carpet
Owner to choose
Granite stone,shower bath glass,and hinge style,stone for fireplace