CONSTRUCTION PROGRESS MEETING SCHEDULES
Next week's Vail Village construction progress meeting has been canceled. Vail Village
meetings will resume Oct. 28 through the start of the ski season. LionsHead construction
progress meetings have concluded. Please note the next iteration of this construction update
will be distributed on Oct. 31. For information on a specific project, use the contacts listed
below.
VAIL SEEKS COMMUNITY MEMBERS TO FILL B&FCA BOARD VACANCIES
The Town of Vail is seeking community members to fill three vacancies on its Building and Fire
Codes Appeals Board (B&FCA). Applications are due to the town by 5 p.m. Oct. 29. The Vail
Town Council will conduct interviews during its work session on Nov. 4, with appointments to
follow at its evening meeting. Send letters of interest and experience to: Vail Town Council, Attn.
Lorelei Donaldson, Town Clerk, 75 S. Frontage Rd., Vail, CO 81657. For more information and
a description of the board, visit www.vailqov.com.
VAIL VILLAGE
Notes from the construction progress meeting held Oct. 14, 2008.
(All scheduled activities are subject to change.)
PLEASE NOTE: The construction progress meeting scheduled for Oct. 21 has been
cancelled. The next meeting will take place Oct. 28.
Primary Contact
Leonard Sandoval, TOV Construction Area Coordinator
(970) 390-4677 or (970) 479-2198; Isandoval(a�vailqov.com
Public Project Updates
Seibert Circle
WET Design crews are working to program the fountain. Contact Todd Oppenheimer at (970)
390-4678 or (970) 479-2161.
West Meadow Drive Streetscape
Curb and gutter work is underway moving east to west. Utility work is nearing completion. Traffic
is reduced to one lane, west bound only between Vail Road and Vail Valley Medical Center
24/7. Pedestrian access is being maintained; cyclists are asked to dismount through the area.
Contact Chad Salli at (970) 479-2169.
Eaqle River Water& Sanitation District Work on Beaver Dam Road
Beaver Dam Circle is complete and the street is paved. Paving of from Beaver Dam Circle to
Forest Road is anticipated to occur next week. The entire project is targeting completion by the
end of October. Pedestrians are asked to avoid Beaver Dam Road. Contact John Cahill at (970)
477-5447 for more information.
Private Project Updates
Front Door
The first five chalet residences have received TCOs. Interior work on the remaining chalets will
continue into winter with completion scheduled for March 2009. Contact Jeff Haselhorst, Hyder
Construction at (303) 829-5741.
1
Solaris
A road closure on East Meadow Drive is underway to facilitate the final pre-cast work. Traffic
control will be in place. Buses will be rerouted to South Frontage Road. Contact Rob Robinson,
The Weitz Company, at (970) 668-4700 or (970) 406-0968.
FourSeasons
Paver sidewalk from Mayor's Park across the Four Seasons frontage on West Meadow Drive
will occur this fall. A lane closure on the South Frontage Road is anticipated to occur within the
next two weeks to allow for permanent power to be run to the site. Completion of the tenth floor
is underway. The smaller tower crane is anticipated to be removed in mid-November. Contact
Layton Construction, Mark Reed at (970) 401-1777 or Bob Hutchinson at (970) 401-0740.
Manor Vail
The remainder of the parking lot is scheduled to be paved by the beginning of November. Punch
list items are underway. Contact GE Johnson Construction, John Parr at (719) 330-3337 or
Austin Dodder at (970) 300-9035.
Mountain View
Landscaping will begin soon. Driveway entry and sidewalk repair are scheduled to occur yet this
fall. Contact Jeff Pugmire, R.A. Nelson, (970) 748-7645.
Rucksack
Exterior masonry and stucco is continuing. Contact Mark Hallenbeck, Highland Builders Corp.,
(719) 499-9248.
Bell Tower Buildinq
Ridge beam has been set and steel work is continuing, with steel anticipated to be complete by
Thursday. Roof framing will follow. Contact Kevin Fifield, Beck Building Company, (970) 949-
1800 or (970) 904-1283.
Announcements
• Work on the north side of Vail Village Inn Phase III is underway and includes realigning
the existing curb and gutter, installing a concrete pan in front of the garage access and
installing a heated paver walkway. Work is expected to be complete by the end of next
week. Pedestrian and vehicular access is being maintained; however, driveway access
will be narrowed to single lane at times for construction. Call 479-2235.
• On Monday (10/20) B&B will be asphalt paving sections of West Forest Rd between
South Frontage Rd and the ski way to repair snow cat damage. Single lane traffic will be
maintained at all times and traffic control will be in place.
Next Meeting
9 a.m. Tuesday, Oct. 28, Vail Transit conference room, Vail Transportation Center.
LIONSHEAD
Construction progress as of Oct. 17, 2008.
(All scheduled activities are subject to change.)
PLEASE NOTE: LionsHead Construction Meetings have concluded. Information on
projects in LionsHead will continue to be included in this update.
2
Private Project Updates
The Arrabelle at Vail Square
Primary Contact
Matt Lydens, Vail Resorts Development Company
(970) 331-7755; mlydens(c�vailresorts.com
Streetscape
• Pavers are complete in front of Montauk and Patagonia.
• Asphalt is complete on the west side of the Arrabelle and installation of pavers will
begin next week.
Core Site
• Punch work is continuing on all buildings and the plaza, which involves the use of
lifts.
• Drains and pavers are being raised or lowered on the plaza to remove puddles.
• Plaza fountain finishes are nearly complete.
• Gondola building stone work is complete.
• The temporary loading dock is being removed and the bike path has been restored
to its original configuration.
• Snowmelt is in and pavers will begin next week in ski yard.
Ritz-Carlton
Road closures of West LionsHead Circle are scheduled for Oct. 17, 20 and 21 to facilitate
concrete pours and material delivery, weather permitting. Traffic control will be in place. The
Marrriott bus stop will not be in service; the Concert Hall Plaza bus stop will be maintained.
Contact Cowboy Jorgensen, PCL Construction Services, Inc., (720) 244-5710.
Lion Square Lodqe North —Tower Residences
No updates. Contact Tony Faulhaber, J.L. Viele Construction, (970) 471-5467 or (970) 476-
3082.
Landmark Condominiums
Pre-cast work for underground parking garage is continuing. Installation of steel is underway.
Contact Howard Olson, The Alter Group, (847) 345-4104.
Announcements
• LionsHead construction meetings have concluded. Information on projects in LionsHead
will continue to be included in this update.
HELP US SPREAD THE WORD
Do you know of others who would be interested in receiving construction updates from the Town
of Vail? To sign up for this free service, visit www.vailqov.com/vail-mail. To receive this
information via fax, call the Town of Vail Community Information Office at 479-2118.
REMOVE YOURSELF FROM THE CONSTRUCTION UPDATE LIST
If you no longer wish to receive these updates, please call 479-2118 to remove yourself from
the fax list, or unsubscribe using the link at the bottom of this email.
3