HomeMy WebLinkAboutTOV.DRB.Utilities.approvalMar 1113 09:54a Beard & Assoc. 9704764918 p.1
PtE -�1� ��-��. �p,�R���L 7v ; s�'a�,1 +4y56�sn, cow
UTILITY APPROVAL & VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify
service availability and location for new construction and should be used in conjunction with preparing your utility plan and schedul-
ing installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval
and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you
are unable to obtain comments within that timeframe please contact The Town of Vail.
Subject Properly A dress: 1 275 Wrr5WJ har,0 CfR u Lot 46 Block Subdivision: &LEJ4/�YO
Primary Con Owner Representative: STAA) R e'41? Q Phone: 970} 390 " 2 7
Plans Dated:
Prima on ct/Owner Represq6tative Signature
Authorized Signature
Comments
Date
CENTURY TEL
970.468.6860(tel)
970.466.0672(fax)
Contacts: Samuel Tooley
Samuel tooley@owestcom
XCEL HIGH PRESSURE GAS
970.262.4076 (tiel)
970.468.1401 (fax)
Contact: Rich Sisnems
rich ard.sisnerosOxcelenergy.com
HOLY CROSS ENERGY
970.947.5471(t eo
970.945.4081 (fax)
Col I Jeff Vroom
jvroom0holycrosscom
IxCEL Energy
:970.262.4038 (fax)
970.262.4050 (be!)
Contacts: Louise Timson
louisg.drnson Oxceleneray.com
EAGLE RIVER WATER & SAN A—
TION DISTRICT
970.477.5435 (teI)
u�►C�o �, c� >v r a� i`Rv V tJ t-
970.477.5434 (fax)
�'� F
\7t)
Contact: Tug Tug Birk
t hirkOerwsd.ora
COMCAST CABLE -
970.930.4713 (W)
970.468.2672 (fax)
Contact: Michael Johnson
Michael ' hnson@cable.comcastoom
CDOT (Only in CDOT Right -of -way)
970.683.6284 (tel)
Contact: Dan Roussin
Danlel.roussin @dotstate.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right -of -way. Contact the
Public Works Departmdnt for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re- approval & re- verification if the submithed plans are altered in any way after the authorized signature date.