HomeMy WebLinkAboutB12-0319 Engineer's framing report.pdf i 'ter Vail, Colorado Denver, Colorado Frisco, Colorado 1 Monroe & Newell Engineers, Inc. March 20, 2013 i Sunder Inc. P O Box 1393 Edwards, CO 81632 jpsunder @vail.net Attn.: Mr. JP Sunderland Re: Zuckerman Duplex Structural Observation, Lot 3 Bighorn Subdivision, Vail, Eagle County, Colorado (M&N #8871) Gentlemen, Monroe & Newell Engineers Inc conducted a structural site visit on March 19, 2013. The purpose of our visit was to observe the installed framing of the building. The following items were noted: 1. Steel column base plates that bear on concrete walls or footings had not yet been grouted with non-shrink grout. The contractor shall install the grout per the manufacturer's specifications. 2. Steel beams in upper level floors had been leveled with steel shims in bearing locations on wood framing. The contractor shall install either shim plates across the complete bearing area or he shall install non-shrink grout between the steel beam and the wood bearing area to provide solid bearing. The same non-shrink grout as for steel bearing plates on concrete can be used or a two- component high strength epoxy can be installed. 3. In the west wall of the west unit entry hall blocking had not been installed between upper level floor joists. The contractor shall install this blocking. 4. The LVL members of two living room roof trusses had been posted at their south ends on the upper level floor. The trusses and posts shall be braced permanently by the steel railing at the edge of the upper level floor. www.monroe-newell.com 70 Benchmark Road • Suite 204 . Y.O. Box 1597 • Avon, Colorado 81620 (970) 949-7768 • FAX (970) 949-4054 • email: avon@monroe-newell.com 5. In the lower level of the west unit a large door is located in the north wall. The header beam for this door has to be reinforced as shown in the attached section SX1. A new 13.5 feet long MC9x25.4 steel channel has to be installed on the inside of the (3) —2x10 header as shown in this detail. 6. No other items were noted. Very truly yours, MONROE & NEWELL ENGINEERS, INC. REtj c:- Hannes Spaeh, P.E. 4 =' s Principal i s f Monroe&Newell Engineers,Inc.. 2 Zuckerman Duplex March 20,2013 JOB l� r,> LA P Monroe & Newell Engineers, Inc. SHEET NO. OF }} CALCULATED BY DATE 9 If CHECKED BY DATE I SCALE ...... ..... ..... ...... ... ........._...... ... ................. ........ .... ....... : . ... .......; .... . .. . . .... . :... ............. '.............: ........ .... ... . .... .... . :. .... . ... .. ......_.............. .... ............. . ....... ....._...... .. . . .. ........ .... F ..... . i i.............. ..... ..... ... gam ... ...... X- ( �a ... . .. , .. , _ ...... . . . A : :_. ...... .. .. ff ........ ..... I ........ . ..... ....... .........._. .......__. '1.. - . . . .:.... ..__.. ................ : .. .... ...... �. . f i PRODUCT 204-1(Single Sheets)2051(Padded) k