Loading...
HomeMy WebLinkAboutB12-0309 Structural Engineer Final Report.pdf T.Boyle Engineering,Inc. Date: 03/26/13 1650 Fallridge Road,Unit C2 Vail,Colorado 81657 Project: Vail Fire Station Location: Vail,Colorado Contractor: G. E. Johnson Owner: Town of Vail Weather: Cloudy,46 deg Present at Site: Allan Amason Tim Boyle Bill Pierce Pierce Architects 1650 Fallridge Road,Suite C1 Vail, Colorado 81657 Field Report The following items were observed: The purpose of this inspection was to make a final framing inspection of the building. At this time the interior framing has been covered up, but I have inspected and coordinated all of the interior framing during previous site visits, and I approve of this framing as constructed. I also made a final inspection of the framing for the upper level exterior balconies during this visit. These installations have been completed since my 2/28/13 site visit. I have determined that these balconies have been flamed according to the plans and specifications issued by this office. This completes the items covered during this inspection. Feel free to give me a call if you have any questions or comments regarding this re�O u Respectfully Submitte • 5 . T.B GI ,INC. • Timothy M.Boyle, •'••...••'4 President F�S�ONP�