HomeMy WebLinkAboutB12-0309 Structural Engineer Final Report.pdf T.Boyle Engineering,Inc. Date: 03/26/13
1650 Fallridge Road,Unit C2
Vail,Colorado 81657 Project: Vail Fire Station
Location: Vail,Colorado
Contractor: G. E. Johnson
Owner: Town of Vail
Weather: Cloudy,46 deg
Present at Site: Allan Amason
Tim Boyle
Bill Pierce
Pierce Architects
1650 Fallridge Road,Suite C1
Vail, Colorado 81657
Field Report
The following items were observed:
The purpose of this inspection was to make a final framing inspection of the building. At this time the interior
framing has been covered up, but I have inspected and coordinated all of the interior framing during previous site
visits, and I approve of this framing as constructed.
I also made a final inspection of the framing for the upper level exterior balconies during this visit. These
installations have been completed since my 2/28/13 site visit. I have determined that these balconies have been
flamed according to the plans and specifications issued by this office.
This completes the items covered during this inspection. Feel free to give me a call if you have any questions or
comments regarding this re�O u
Respectfully Submitte
• 5 .
T.B GI ,INC. •
Timothy M.Boyle, •'••...••'4
President F�S�ONP�