HomeMy WebLinkAboutB13-0033 B13-0034 CR1 Transmittal.pdf e 5 I g n s t u d I o po box 527 wo€ccd oo 81655 ph 970.470.1222 fax 970.926.9 078
millie@puredesign-studio.com
u r e
Transmittal:
David Rhoades, Development Review Coordinator April 5, 2013
Town of Vail Community Development
RE: 3080 Booth Falls Court, Dobyns Duplex
Enclosed: Plan Corrections: Revised Permit Drawings 4.4.13
Plan Corrections to Architectural:
1. Details to show compliance with Rescheck form submitted
a. Sheet A4.1, A5.1, A5.2, A5.3
2. Radon mitigation plan
a. Sheet A1.0
b. Notes Sheet A1.1, A1.2, A1.3, A1.4. A1.5
3. Make up air required
a. Sheet A1.1, A1.2, A1.3, A1.4
4. Egress, light and ventilation compliance unit B - bedroom #3
a. Sheet A1.1, A5.2
5. U value for Garage doors
a. Sheet A2.1, A5.3
6. Stone veneer on stone column base
a. Sheet A2.1, A2.2, A2.3
7. Windows match the approved DRB plans.
a. Sheet A2.3
8. Compliance with Rescheck - R 58
a. Sheet 4.1
9. Party wall assembly 1 hour barrier revision to framing and construction
sequencing.
a. Sheet 4.1
10. Compliance with Resheck / u value show compliance with egress, light and
ventilation requirements per 2012 IRC fall protection as required
a. Sheet A5.1, A5.2
11. 75% of all lighting is high efficacy
a. Sheet E2.0, E2.1, E2.2
Plan Corrections to Structural:
1. Party wall assembly 1 hour barrier revision to framing and construction
sequencing.
a. Sheet S8
Plan Corrections to MEP:
1. Sheet M1.1: 2012 code revision
Than a
Millie Akdn