Loading...
HomeMy WebLinkAboutB04-0316m Community Development Department 75 South Frontage Road Vail, Colorado USA 81657 CERTIFICATE OF OCCUPANCY This certificate is issued pursuant to the requirements of Title 10, Section 10 -1 -2, ADOPTED CODES of the Vail Town Code certifying that, at the time of issuance, this structure was found to be substantially in compliance with the various ordinances of the town regulating building construction or use for the following: Name and description of project One Willow Bridge Road Condominium Address of project: 1 Willow Bridge Road, Vail, Colorado Owner name and address: Vail Dover Associates LLC, 4148 N. Arcadia Drive, Phoenix, AZ 85018 IBC Edition: 2003 Occupancy Group(s): A2 /R2 /S2 Type(s) of Construction: IIA Permit Number(s): B04 -0316 Occupant Load: Sprinkler System Y/N Type: Yes 103 WO0P artin 14aeberle, Chief Building Official Date _ TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES NEW COMM BUILDING PERMIT Permit # B04-0316 � Job Address: 1 WILLOW BRIDGE RD VAIL Status . . . : FINAL Location.....: 1 Willow Bridge Rd Applied . . : 10/15/2004 Parcel No...: 210108284001 Issued . . . 12/06/2004 Legal Description: RESUB OF TRACTK-L Expires . .: 10/13/2008 OWNER VAIL DOVER ASSOCIATES LLC 09/10/2004 4148 N ARCADIA DR PHOENIX AZ 85018 APPLICANT WEITZ COMPANY, INC. (THE) 10/15/2004 Phone: 303-860-6600 4725 SOUTH MONACO STREET � DENVER, CO ' 80237 License: 131-A CONTRACTOR WEITZ COMPANY, INC. (THE) 10/15/2004 Phone: 303-860-6600 4725 SOUTH MONACO STREET � DENVER, CO 80237 License: 131-A Desciption: Town of Vail Adjusted Valuation: 1,201,607.00 ONE WILLOW BRIDGE Occupancy Type Factor Sq Feet Valuation Apartment Houses Zone 3 I-FR & II-FR 133. 11 53, 579 $7, 131, 900 . 69 Public Garages Zone 3 I-FR & II-FR 72 . 08 25, 268 $1, 821, 317 . 44 Stores Zone 3 I-FR & II-FR 122 . 06 11, 442 $1, 396, 610 . 52 Totals . . . 53, 579$21, 201, 607 . 00* Fireplace lnformation:Restricted:Y #of Gas Appliances: 0 #of Gas Logs: 0 #of Wood Pellet: 0 s*****+**r►�*�«*s***+r:**►*+tr+***�r**a*�**r****+»***a**t***�*s****�* FEE S UMMARY **r*�+*r�***e***�**a��*****«�+****+r*s�►*�*►**►+**+�r***�a*s Building------> 579,396.OS Restuarant Plan Review--> $0.00 Total Calculated Fees---> 215,359.10 Plan Check---> $79,396.05 Recreation Fee--------------> 553,579.00 Additional Fees-----------> S2,937.50 Investigation-> S0.00 TOTAL FEES-------------> 215,359.10 Total Permit Fee----------> 218,291.60 Will Call-----> $3.00 Payments-------------------> 218,291.60 BALANCE DUE---------> S0.00 *�*+�**+*s+s*s.+at+*.+*st+*+x�*sss**t*.***ts*ar***�.*s+****t*****►**+****+�***t.*+*****a*r**+***e*********s*:►**.*«*�*:*�***+ss**t.*►***«s�**.s■� Approvals: Item: 05100 BUILDING DEPARTMENT 12/06/2004 cdavis Action: COND Excavation and Shoring only, see condition: Ol/03/2005 Cdavis Action: COND Per Hougland and Associates Foundation plans approved No additional work allowed until future submittals and approvals obtained 02/16/2005 CDAVIS Action: PA Special Inspectors approved. This project � CTL Thompson to perform Special Inspections See File for people and qualifications 02/17/2005 Cdavis Action: PA VERBAL APPROVAL FOR FOUDANTION RELEASE FROI DEPARTMENT No issues affecting the foundation. »> Charlie Davis 02/16/2005 3 : 55: 33 PM »> Are any of the corrections affecting the foundation? If not, I will release the f� permit. Feel free to route the corrections to me and I will forward them to Art and the A: of Record »> Mike McGee 02/15/2005 6: 05: 90 PM »> I did the review but haven't typed the comments yet. I am OK with the foundation, but they still have a significant number of details � out. All they have for fire protection is "specs" . »> Charlie Davis 02/15/2005 1 : 53: 40 PM »> A request for information: I just got off the phone with Art Hougland (Plan Examiner) , he is about ready to : the revised foundation plan for the Willow Bridge project. Questions: Have you folks performed your review? Are there corrections that need to be addressed ? Can I release this (foundation) phase portion of the permit for construction? Let me know when you get a chance. Thanks Charlie 03/08/2005 cdavis Action: PA Foundation only approved per Hougland and Associates Approval date stamped 2/22/05 04/22/2005 Cdavis Action: AP FULL BUILDING PERMIT PHASE APPROVD FOR CON; 07/05/2005 cdavis Action: AP Revisions dated 6/7/05 approved 02/16/2006 cdavis Action: PA Exterior Wall Assemblies only 04/11/2006 cdavis Action: AP Full Building Permit approved per review a� approval of CIA See conditions listed Dated 4/12/06 06/16/2006 cdavis Action: PA Phased Occupancy plan date stamped by TOV � for partial parking garage use is approved pending field inspection and approvals gra� the Fire, Public Works and Building Departments 03/02/2007 cgunion Action: PA unit revisions to 206, 208, 308, 401, 403, 404 . and remainder of building approved by others . 05/10/2007 cdavis Action: PA CAtTWALK REVISION APPROVED. $110 . 00 OF ADD` PLA CHECK FEE ADDED FOR 2HR PLAN REVIEW 05/11/2007 cdavis Action: PA Pool Deck Second exit stairs Approved 5 hours of additional plan review fee due = $275 . 00 05/21/2007 CDAVIS Action: PA Temporary Egress Plan for Partial Occupanc: approval 10/15/2007 cdavis Action: AP Phased Occupancy submittal for whole-owned This approval is subject to field inspeciton to confirm complaince to all constru� codes 03/24/2008 CDAVIS Action: AP Additonal Sequencing methods for added smo. dampers located at the means of egress exit discharge approved and in file 04/03/2008 cdavis Action: AP Structural changes for garage door approve� Item: 05400 PLANNING DEPARTMENT 10/29/2004 George Action: AP 03/04/2005 George Action: PA Partial approval for foundation only. Furt] approvals from Planning required prior to the issuance of a "full" building permi� foundation ILC is required for review and approval to ensure that the foundation � footing do not encroach into the floodplain or over the property line. 04/22/2005 George Action: AP This approval is for the release of the fu: building permit. See conditions of approval under conditions screen. 08/17/2005 George Action: NO 08/17/2005 George Action: DN Revisions to the use of interior spaces as revisions to the mechanical/venting plan shall require the applicant to submit re• parking calculations and data and complete exterior elevations . 04/17/2006 Warren Action: COND The planning department has conditional ap� the complete building permit dated January 26, 2006. The changes included the additio� vents on the exterior for a new staff lounge in the garage of the structure, a ne� on the north elevation (did not affect GRFA) , railing changes on many of the decks, of several windows on stair 4, and changes to the first floor circulation (did not a: GRFA) . The conditional approval is due to the lack of a parking study to show that appro: 7 parking spaces can be eliiminated to add a staff lounge and kitchen storage in th� northeast corner of the garage. The conversion of the previous staff lounge to owners stora� also not approved until it is determined that there is available GRAF under the ratio requirements of the Public Accomodation District. A report detailing the ratio requirements of this project will need to be submitted and approved by staff prior to beginning construction of the owners storage closet. 05/02/2006 George Action: AP Parking calculations addressed by applican� pursuant to the conditional approval on 4/17/2006 05/22/2006 George Action: PA Partial Approval for TCO of parking garage bond required at this time. A completion bond shall be required prior to the issu� building TCO, if necessary. 10/12/2006 George Action: DN UNIT 401 Interior revisions dated 10/O1/06 401 denied. Additional square footage added with no GRFA available Storage space indicated on plans with approvals . Resubmit corrected plans . 10/12/2006 George Action: PA Unit 206 This is a partial approval for a : to the interior finish of Unit 206, dated October 10, 2006. 10/12/2006 George Action: PA Unit 208 This is a partial approval for re� to the interior of unit 208, dated October 10, 2006 10/12/2006 George Action: PA Unit 308 This is a partial approval for re� to the interior of Unit 208, dated October 10, 2006 03/05/2007 George Action: PA This is a partial approval to allow for in revisons for the tentant finsihs of Unit 206. No changes to teh exerior are permi- 03/05/2007 George Action: PA Unit 308 . This is a partial approval for r� to the interior tenant finish only. No exterior revisons are permitted by this appro� 03/05/2007 George Action: PA Unit 404 . This is a partial approval for i� revisions for the tenant finish only . No exterior changes are permitted by this � 03/05/2007 George Action: PA unit 208 . This is a partial approval for i� revisions only. No exterior revisions are permitted by this approval . 03/05/2007 George Action: PA Unit 401 . This is a partial approval for i� revisions to the the tenant finish only. No changes to the exterior are permitted approval 03/05/2007 George Action: PA Unity 403. This is a partial approval for : to the interior tenant finish. No changes to the exterior are permitted by this appr� 05/15/2007 George Action: PA This is a partial approval for the constru� a catwalk on the roof top per plans dated May 8, 2007 05/16/2007 George Action: PA This is a partial approval for the constru� a new egrees stair off the pool sun deck. The construction of the stair shall not b� in the 100-year flood plain 10/24/2007 George Action: PA This is a partial approval for the further � occupancy for the residentail units located within One Willow Bridge . Phased occu� approved per the plans received 10/08/07 and stamped approved on 10/24/07 . 04/07/2008 Warren Action: AP Plan revison for garge door structural cha� isolate door from building structure approved by Planning. Plans dated 2-29-08 . T] no exterior changes associated with this change that affect previous planning approv� Item: 05600 FIRE DEPARTMENT 11/16/2004 mcgee Action: AP Fire access must be provided per plan to T; throughout the project. Fire alarm and fire sprinkler plans are required under seperate cover. 04/01/2005 McGee Action: AP VFES recommends installation of standpipes Stairs 4 and 10 . If standpipes are not installed, graphic representation at Fire Command C� required per VFES specifications. If standpipes are not installed in Stairs 4 and 10, a subsequent review and inspe� insure adequate code required coverage is required, include funiture placement anc encumberances. 04/06/2005 mcgee Action: AP We have completed our review of the plans ; to date. The following comments, notes, and findings are as follows : 1 . Standpipes should be installed in Stairs 4 and 10 . 2 . Fire hose valves are required on the garage level . 3 . Fire sprinkler heads are required in the elevator pits . Isolation valves with � switches shall be installed at each elevator. 4 . The fire department connection should be parallel. Forty five degree "Y' s" req� foot clearance on each side. The FDC shall be 36 inches above finish grade to the of the cap. 5. Manual pull stations shall be installed at each level of each point of egress (stairwells) . 6. Smoke detectors in guest rooms should be located in the center of the room or � bed, in accordance with their listings, unless other circumstances and conditions such. 7 . Smoke detectors in elevator lobbies should be off-set from the centerline of t] elevator door but within 6 feet of the door. 8 . The exterior flow indicator shall be a minimum 110 candela horn/strobe (not be: 9. No sprinklers shall be installed at the top of the elevator shafts . 10 . A thermal detector shall be installed in the top of each elevator shaft. Upon activation, the thermal detector shall shut off power to the elevator via a shunt trip device 11 . Standby batteries shall be sufficient to operate the system for 24 hours unde: supervisory condition followed by a minimum of 10 minutes of continuous alarm conc 12 . Plans shall be stamped by the Engineer of Record. 06/27/2005 mcgee Action: AP revisions dated 6/6/05 04/11/2006 mcgee Action: AP Revisions 8/15/05 and 12/22/05 are approvec Bldg permit set) . The kitchen mechanical plan is not approved pending additional required informati� 06/16/2006 McGee Action: PA Phased Occupancy Plan dated 6/12/06 as amm� approved. 05/10/2007 mcgee Action: AP Rooftop catwalk approved per submittal 5/8, 05/17/2007 mcgee Action: AP Egress plan for initial limited TCO of conc approved per plans submitted by Hughes & Assoc. dated 05/14/07 . Item: 05500 PUBLIC WORKS 11/24/2004 TEK Action: AP Approve Excavation and shoring permit only Owner shall be responsible for any damage to utilities in the ROW due to temporar� shoring. 02/15/2005 CS Action: AP APPROVED FOR FOUNDATION PERMIT 03/17/2005 CS Action: AP 05/09/2007 tek Action: AP Secondary Egress off of Pool: Approved wit] condition that the Floodplain line is staked and a pre-inspection/walk thru and p� construction is completed with PW. 05/14/2007 tek Action: AP Catwalk on roof: No Public Works issues. 10/26/2007 tk Action: PA Partial TCO approved for wholly owned unit: the following conditions: 1 . Occupancy plan received 10/08/07 shall be adhered to. 2 . Low clearance areas in Loading dock area shall be signed with "Caution-Low Cle� X.X� " or similiar. 3 . Owner shall enter into a maintenance agreement for all snowmelted areas within Agreement shall be sent to owner from Town on 10/26/07 . Item: 05550 ENGINEERING CIVILS +.+**.�.***+.+.*�*+.*..*.�*�*.�#«*...*.*.*.*s.*.*:*.**�:.***.*.*.s�»*+******�«*..�*�.**�**.+.*+*.+*.*.:***....*,.�.*...«.+�.*■*..*«..+*...*****:. See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM-4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER PAGE 2 ******************************************************************************************************** CONDITIONS OF APPROVAL Permit# B04-0316 as of 04-12-2013 Status: FINAL ******************************************************************************************************** Permit Type: NEW COMM BUILDING PERMIT Applied: 10/15/2004 Applicant: WEITZ COMPANY, INC. (THE) Issued: 12/06/2004 303-860-6600 To Expire: 10/13/2008 Job Address: 1 WILLOW BRIDGE RD VAIL Location: 1 Willow Bridge Rd Parcel No: 210108284001 Description: ONE WILLOW BRIDGE Conditions: Cond: CON0006831 This permit approval is good for shoring and excavation only. Additional information and approvals are required prior to addtional work beyond excavation and shoring can occur. 12/06/04 Entry: O1/03/2005 By: cdavis Action: AP Cond: CON0006860 This permit is good for excavation shoring and foundation work only.Next phase of construction (core and shell) shall be submitted for review and no work allowed beyond foundation phase until approved. Entry: 07/05/2005 By: cdavis Action: AP Cond: CON0007060 Developer shall comply with the conditions#3,#4, and#6 outlined in the approved meeting minutes of the Planning and Environmental Commission, dated May 12, 2003, prior to the issuance of a Temporary Certificate of Occupancy. Conditions#1,#2 anf#5 have been addressed as of the issuance of this building permit. Entry: 03/09/2009 By: George Action: AP Cond: CON0007061 Developer shall submit a revised landscape(sheet A 1.0) indicating the installation of a minimum of 3 - 25 foot tall evergreen trees and 2 -20 foot tall evergreens,by no later than May 6, 2005, for review and approval. Entry: 03/09/2009 By: George Action: AP Cond: CON0007937 Condtions of approval4/12/06 The review of these documents was performed after the building was under construction. This review was for the tenant improvement or full building permit. Core and Shell permit had already been issued. Alterations from these plans may require documents to be submitted to the Town of Vail for additional review. Documents must be on site for all inspections. Administrative Modification is required to be submitted and reviewed by the Town of Vail prior to approval to move forward without a source of backup power for the elevator systems. Administrative Modification is required for the exterior wood siding that is currently installed on the exterior walls of the building above that permitted by Chapter 14 of the International Building Code. Accessibility review was done in accordance with the ICC/ANSI Al 17.1-2003. This document was granted approval if applied to the building throughout. Matt Royer spoke to Eric Ellis on 04/07/2006 and requested a detail for the enclosed space below Stair 5 on the first floor. There are 2 mechanical ducts that pass through the floor from below and are routed to the outside of the building through this enclosed space. The IBC prohibits these from passing through a rated stair enclosure. Eric will be providing a detail for separating this space from the rated enclosure. 3 doors on the first floor corridor are incorrectly labeled. All doors entering the corridor on the first floor shall be rated at least 20 minutes. Door numbers are 131, 1]5, and 135. These must have at least a 20 minute fire rating. Entry: 03/24/2008 By: CDAVIS Action: AP Cond: CON0007950 The applicant shall submit a corrected parking analysis for the project verifying that approximately 7 parking spaces can be eliminated to constructed a Staff lounge and kitchen storage. These changes to the garage level are not approved until the requested parking study is submitted and approved by staff. The parking analysis shall be submitted and approved prior to the start of any construction of the changes in the garage. Entry: 03/09/2009 By: George Action: AP Cond: CON0007951 The conversion of the previous staff lounge to owners storage is also not approved until it is determined that there is available GRFA under the ratio requirements of the Public Accomodation District. A report detailing the ratio requirements of GRFA for this project will need to be submitted and approved by staff prior to beginning construction of the owners storage closet. Entry: 03/09/2009 By: George Action: AP � B04-0316: Entries for Item:90 - BLDG-Final 15:15 04/12/2013 Action Comments By Date Unique_ Ke CR THIS WAS AN INSPECTION FOR UNIT 102 GCD 01/10/2007 A000097 FOR ADA TYPE A DWELLING 578 COMPLIANCE.ALL REFERENCES ARE ICCIANSI A117.A-1998 1.SINKS AND LAVITORIES REQD TO BE 6 1/2"DEEP MAX SEC 1002.12.4.3. 2.OPERABLE PARTS FOR OVEN REQD TO BE PER SEC 1002.12.6.2, REF 309, REF 308 FOR REACH RANGES 48"MAX. 3.APRON AT COOK TOP REQD TO BE 27" MIN PER SEC 306.3 4.WASHING MACHINE REQD TO BE 15" MIN PER SEC 611.4 5.BATHROOM DOOR REQD TO BE 32"CLR PER SEC 404.2.3. ACCESS TO BEDROOM REQD TO BE 32" CLR. CR ELEVATOR MACHINE ROOMS REQD TO GCD 04/12/2007 A030099 BE 2 HOUR RATED AND HAVE OPENING RPOTECTIVES PER IBC SEC 3006.4 UNIT CORRECTIONS 201 AND 301 REQ EGRESS WINDOW IN BED 2 20"MIN REQD.301 BATH 2 REQD TO HAVE 21" CLR AT WC. UNIT 102 TYPE A MAINTAIN 36"PATH OF TRAVEL THROUGHOUT UNIT. UNITS APPR 101,202,203,204,205,302,303,304,305. PI INSPECTION IN EXIT STAIR SHAFTS FOR GCD 04/13/2007 A000099 RISE/RUN, HAND AND GUARD RAILS, 74� EMERGENCY LIGHTING; STAIR 8, STAIR 9 INC EXIT DISCHARGE,AND STAIR 10. CR OPERATIONS OFFICE OK FOR FF&E NOT GCD 04/16/2007 A000099 OCCUPANCY ALLOWED. 78� STAIR 3,4,5 APPR.STAIR 1 PROVIDE RETURN FOR HANDRAIL. STAIR 2 HADRAIL EXTENSION REQD, STAIR RISE OVER 7"MAX 1st FLIGHT TOP. STAIR 6 PROVIDE HANDRAIL EXTENSION EXTERIOR STEPS OVER 7"MAX RISE BOTTOM. CR EXIT SIGN AT DOUBLE DOOR NO BACKUP GCD 04/17/2007 A000099 POWER. 811 DOOR HARDWARE IN SUN ROOM REQD TO COMPLY WITH 1008.1.8.3 THRU 1008.1.8.5 PI GARAGE APPROVED INCLUDING GCD 04/18/2007 A000099 EMPLOYEE LOUNGE. OWNERS 852 RESTROOM AND ELEVATOR EQUIPMENT ROOM ARE NOT APPROVED. PI STAIR 6 RISE CORRECTED AND APPR. GCD 04/19/2007 8990099 TERMINATE DOWN SPOUT IN PLANTER EXTERIOR APPR EXECPT NEW EXIT PLAN. PA UNIT 101 MEETS ICC ANSI FOR PATH OF GCD 05/03/2007 A000100 TRAVEL AND ACCESSIBILITY. 285 CORRECTIONS FOR STAIRS 1,2&6 APPR. PA UNITS 201 AND 301 EGRESS WINDOW GCD 05/16/2007 A0�0100 AND BATHROOM FIXTURE CLEARENCE CORRECTED AND APPROVED. SUNROOM DOOR HARDWARE APPR. DOWN SPOUT TERMAINATION APPR. Page 1 B04-0316: Entries for Item:90 - BLDG-Final 15:15 04/12/2013 PA UNITS 207,208,307,403 APPROVED GCD 10/26/2007 A000106 UNIT 306 GUARD ON DECK REQD TO BE $$� 42"MIN. ROMEO AND JULIETT BALCONY< 4"MAX PA CORRECTIONS MADE UNIT 306 APPR FOR GCD 10/29/2007 A000106 TCO 927 PA UNIT 402 APPROVED FOR TCO STILL GCD 11/20/2007 A000108 NEED TO REINSPECT PLUMBING IN 355 MASTER BATH PA UNIT 401 APPROVED FOR TCO MASTER GCD 02/26/2008 A000111 BATH REQS INSPECTION 436 AP ALL UNITS COMPLETE GCD 05/30/2008 A000114 123 Total Rows: 14 Page 2 *************************************++*******+**********+*+***************************++*** TOWN OF VAIL, COLORADOCopy Reprinted on 04-12-2013 at 15:14:59 04/12/2013 Statement **********************************************�******************************************�** Statement Number: R080000823 Amount: $438.00 05/29/200801: 18 PM Payment Method: Check Init: RLF Notation: 002648 VAIL DOVER ASSOCIATES, LLC ----------------------------------------------------------------------------- Permit No: B04-0316 Type: NEW COMM BUILDING PERMIT Parcel No: 2101-082-8400-1 2101-082-8400-2 2101-082-8400-3 2101-082-8400-5 2101-082-8400-6 2101-082-8400-7 2101-082-8400-9 2101-082-8401-0 2101-082-8401-1 2101-082-8401-2 2101-082-8401-3 2101-082-8401-4 2101-082-8401-5 2101-082-8401-6 2101-082-8401-7 2101-082-8401-8 2101-082-8401-9 2101-082-8402-0 2101-082-8402-1 2101-082-8402-2 2101-082-8402-3 2101-082-8402-7 Site Address: 1 WILLOW BRIDGE RD VAIL Location: 1 Willow Bridge Rd Total Fees: 218, 291. 60 This Payment: $438.00 Total ALL Pmts: 218, 291. 60 Balance: $0.00 ***********************************************************************************�******** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 219.00 PF 00100003112300 PLAN CHECK FEES 219.00 -----------------------------------------------------------------------------