Loading...
HomeMy WebLinkAboutB11-0492 InspectionsREQUIRED INSPECTIONS AND STATUS Inspection Sign Off with Comments: Item: 00120 ELEC-Rough 03/14/2012 By: sgremmer Action: AP Item: 00220 PLMB-Rough/D.W.V. 03/13/2012 By: gremmer Action: AP Item: 00230 PLMB-Rough/Water 03/13/2012 By: gremmer Action: AP Item: 00060 BLDG-Sheetrock Nail 03/26/2012 By: Martin Action: AP 05/04/2012 By: JRM Action: AP Comments: DRAFT STOP IN CHASE APPROVED Item: 00190 ELEC-Final 05/25/2012 By: sgremmer Action: DN Comments: 3 phase service needs to be completed it is part of the permit and scope of work all 125volt recpts. to be GFCI protected in kitchen area 12/11/2012 By: sgremmer Action: DN Comments: Panel schedule Breaker blanks 125 volt recpts. in front of ice cream cabinet to be GFCI protected 12/12/2012 By: sgremmer Action: AP Item: 00290 PLMB-Final 07/02/2012 By: sgremmer Action: AP Item: 00390 MECH-Final 12/17/2012 By: sgremmer Action: AP Item: 00090 BLDG-Final 12/17/2012 By: sgremmer Action: DN Comments: 1. door to remain unlocked while occupied 2. remove exit on sign on east door 12/20/2012 By: sgremmer Action: AP Comments: ok for C of O Item: 00228 FIRE - Final 12/20/2012 By: McGee Action: AP