No preview available
HomeMy WebLinkAboutB13-0126 07-29-2014 Inspection Request Reporting _ Page 6 4-33 pm Vail, CO-SityO Qpt - 6t� Requested Inspect Date: Wednesday July 30 2014 Site Address: 1635 GOLF'TER VAIL VAIL GOLFCOURSE TOWNHOMES UNIT H30 A/P/D Information Activity B13-0126 Type: COMBO Sub Type: AMF Status: ISSUED Const Type Occupancy: Use: R-2 Insp Area: Owner AZAD LLC Contractor: DGN INC. Phone: 970-904-0062 Description: BATHROOM REMODEL:NEW PLUMBING FIXTURES IN BATHROOMS,SWAP OF LOCATION OF TOILET AND SHOWER IN LOWER LEVEL BATH Requested Inspection(s) Item. 30'BLDG-Framing Requested Time: 09:30 AM Requestor DGMINC. Phone: 970-904-0062 Comments 904-0062 Assigned To SGREMMMER Entered By: JMONDRAGON K Action Time Exp: Item 90 BLDG-Final Requested Time: 11:00 AM Requestor DGN INC. Phone: 970-904-0062 Comments 904-006 Assigned To SGR r Time Ex p: Entered By: JMONDRAGON K g� r Item 390 MECH-Final Requested Time: 10:30 AM Requestor DGN INC. Phone: 970-904-0062 Comments 904-0062 Assigned To SGR Mcc Entered By: JMONDRAGON K Action ak 1 .e� Time Exp: Comment • J c p•- a exterior to be painted 4L1 Inspection History Item: 230 PLMB-Rough/Water **Approved** 08/20/13 Inspector: sgremmer Action: AP APPROVED Comment: tern 30 BLDG-Framing tern 50 BLDG-Insulation tern 60 BLDG-Sheetrock Nail tern 220 PLMB-Rough/D.W.V. tern 320 MECH-Exhaust Hoods tern 390 MECH-Final 05/27/14 Inspector: sgremmer Action: DN DENIED Comment: All black pipe at exterior to be painted Item: 290 PLMB-Final Approved** 05/27/14 Inspector: sgremmer Action: AP APPROVED Comment: Item: 90 BLDG-Final Item: 240 PLMB-Gas Piping **Approved** 09/26/13 Inspector: sgremmer Action: AP APPROVED Comment: 11/13/13 Inspector: mdenney Action: AP APPROVED Comment: REPT131 Run Id: 14792 NOTE: TH/S PERMIT MUST BE POSTED ON JOBS/TE AT ALL TIMES ,. �w�a�u�i • Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: B13-0126 Project #: PRJ13-0155 Job Address: 1635 GOLF TER VAIL Applied.....: 04/29/2013 Location......: VAIL GOLFCOURSE TOWNHOMES UNIT H30 Issued. . . : 05/08/2013 Parcel No....: 210109104030 OWNER AZAD LLC 04/29/2013 20 GROVE AVE LARCHMONT, NY 10538-4134 CONTRACTOR CROSSROADS REALTY 04/29/2013 Phone: 970-476-4300 AKA: DGN INC 1650 FALLRIDGE ROAD VAI L CO 81657 License: C000003121 Description: BATHROOM REMODEL: NEW PLUMBING FIXTURES IN BATHROOMS, SWAP OF LOCATION OF TOILET AND SHOWER IN LOWER LEVEL BATH Occupancy: Type Construction: Valuation: $25,000.00 ,.x................................�...........,,.�.....................�........., FEE SUMMARY .,........x,,...................................,,............................... Building Permit-----------> $391.25 Bldg Plan Check----------> $254.31 Use Tax Fee-----------------------> $300.00 Electrical Permit---------> $0.00 Elec Plan Check-----------> $0.00 Restuarant Plan Review--------> $0.00 Mechanical Permit------> $0.00 Mech Plan Check---------> $0.00 Additional Fees--------------------> $0.00 Plumbing Permit--------> $150.00 Plmb Plan Check---------> $37.50 Recreation Fee--------------------> $0.00 Investigation-----------------------> $0.00 Will Call------------------------------> $10.00 TOTAL PERMIT FEES--------------> $1,143.06 Payments-------------------------------> $1,143.06 BALANCE DUE------------------------> $0.00 ......................................................>......................,,...,,,�.,,........»............,,....�....,...,..............,..,..,.............«...,....,,...........,... DECLARATIONS I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM -4:00 PM. combination permit_012811 � r �I�V���I i . x....xx»x+.r..w....x..�....xxw••...+x•x...+xx...r...«.••.�...xx..x....w.....•x.wx........x.....r.x...••.+•.....+.+.••....,r.+v+•.r.....s..:..•...+.........xx..+.•.x•.•..+....:+...�.+.. CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF . Permit#: B13-0126 Address: 1635 GOLF TER VAIL Owner: AZAD LLC Location: VAIL GOLFCOURSE TOWNHOMES UNIT H30 ..�...........................x,,,...,.,...,.........,......,............................,.,..........,,,.....,.,..................,.,.,.......,,,.,,,x,.................,......,.... combination permit_012811 � � �V�!'t� U��ti�L • *„«*****«***************„*�*�****,,,,*****�*«***************.,,.******«.,**,.*,�*�******„*„*****************«,,,,*****,*�*****«*««*********«**„*,*«„*�****.,,** REQUIRED INSPECTIONS AND STATUSES Permit#: 613-0126 Address: 1635 GOLF TER VAIL Owner: AZAD LLC Location: VAIL GOLFCOURSE TOWNHOMES UNIT H30 **.*****�**,.,,.,*****.,*„«**«.,***„«**«*******..,***,.************.,.,*„********«,,,,w*,.***,.**„*,..*�**********,.**********«*************«******«**«*„**********« Item: 00230 PLMB-Rough/Water Item: 00030 BLDG-Framing Item: 00050 BLDG-Insulation Item: 00060 BLDG-Sheetrock Nail Item: 00220 PLMB-Rough/D.W.V. Item: 00290 PLMB-Final Item: 00090 BLDG-Final combination permit_012811 __ **************************************************************************************+***** TOWN OF VAIL, COLORADOCopy Reprinted on OS-08-2013 at 10:22:00 OS/08/2013 Statement *******************************+**+*****************+*************************************** Statement Number: R130000531 Amount: $885.00 05/08/201310:21 AM Payment Method:Credit Crd Init: CG Notation: mc 1 j nobrega ----------------------------------------------------------------------------- Permit No: B13-0126 Type: COMBINATION BLDG PERMIT Parcel No: 2101-091-0403-0 Site Address: 1635 GOLF TER VAIL Location: VAIL GOLFCOURSE TOWNHOMES UNIT H30 Total Fees: $1, 193. 06 This Payment: $885.00 Total ALL Pmts: $1, 143.06 Balance: $0.00 ****************************************************************�****+********************** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 391.25 PF 00100003112300 PLAN CHECK FEES 33.75 PP 00100003111100 PLUMBING PERMIT FEES 150.00 UT 11000003106000 USE TAX 40 300.00 WC 00100003112800 WILL CALL INSPECTION FEE 10.00 ----------------------------------------------------------------------------- **####***#####��#**4##**##*****########**##*#4##***##*##*#*�###i*##�M##***###*##*******##### TOWN OF VAIL, COLORADO Statement ***s****�**r****************r**+****�*�********.*r*�****�************:****�**********s**ss*s Statement Number: R130000434 Amount: $258.06 04/29/201312:30 PM Payment Method:Credit Crd Init: LC Notation: CREDIT CARD FROM LEONARD J NOBREGA, DGN INC. ----------------------------------------------------------------------------- Permit No: B13-0126 Type: COMBINATION BLDG PERMIT Parcel No: 2101-091-0403-0 Site Address: 1635 GOLF TER VAIL Location: VAIL GOLFCOURSE TOWNHOMES UNIT H30 Total Fees: $1, 143.06 This Payment: $258.06 Total ALL Pmts: $258.06 Balance: $885.00 *��*******�***+*�**r*****r**************s**�*:�*****�***r***��******��*********�************ ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ PF 00100003112300 PLAN CHECK FEES 258.06 ----------------------------------------------------------------------------- � � � � �/ � Department of Community Development D75 South Frontage Road TOWN Of VAIt' va�i, co s�ss7 APR 2 g 2013 Tel: 970�79-2128 www.vailgov.com Development Review Coordinator BUILDING PERMIT PLICATION (Separate applications are required for alarm 8�sprinkler) ProjectStreetAd ress: � ��_w ����AT__._.___._._.___`.__. Project#: Iv� � J�� � I�35 �o l � ��� (Number) (Street) , (Suite#) DRB#: Building/Complex Name: �t 1 �6'T ��� ldUu� Building Permit#: � J �v � 2� Contractor Information Lot#: Block# Subdivision: Business Name: ��^�� vV�s. � Pr ,r -�t Work Class: New� Addition� Alteration j Business Addr�ss: �o.J�`C� vc�, � V 0.1,�'� � i � Type of Building: ! �City C3�,�,1 State: U Zip: ; j Single-Family� Duplex�j Multi-Family� ' �Contact Name: � Commercial�j Other� ' ;Contact Phone: �2C� ''_1,�� "' (r��o� --- -- ---- �"�����SS�� �r Work Type: Interior�j Exterior Oj Both O ; I Contact E-Mail: �,1 � � ; � _.-.- ---_.____._.._ __--- _^__... ---_—� _ _.___---- -- -------- — � I hereby acknowledge that I have read this application,filled out Valuation of ': � Work Included Plans Included Work ! ; in full the information required,completed an accurate plot plan, ! and state that all the information as required is correct. I agree to Electrical Yes No )Yes )No ! comply with the information and plot plan,to comply with all Town ' ordinances and state laws, and to build this structure according to Mechanical �jYes �)No OjYes OjNo ' the town's zoning and subdivision codes, design review ap- I proved, Internationa uilding and Residential Codes and other Plumbing �es O)No �jYes �jNo � ordinances of the applicable thereto. ; Building Yes )No Yes )No Y,27G __ .._.. _ �,_ _ --._ _. _ _ __._ __._ _..__. .._.__..._--- -------- 'X -- 'Value of all work being performed: $ �i II- � Owne er's epresentative Signature(Required) (value based on IBC Section 109.3&IRC Sect�on 108.3� i � Electrical Square Footage i � —--- - — ------ !,Applicant Information ! Detailed Scope and Location of Work: 'Applicant Name: ����� C��1...� ; , 1�..�c��n�• 'P.�w� S �- ;Applicant Phone:���" �t�� � 'G.��.1(� � ; ��` Q�L>Uk��t VL�I ���U� !✓1 'Applicant E-Mail: �o ��:.�-1i1n. �, �� Qy _ '� :;;, a� -� ��� � SI,� ' Project Information �� � I d� Q �r^ � � ;owner Name: ,L fi-�� G }��� ' �}£�Y' �)� ;Parcel#: � 1_O �, ^ � �� "�� '" Uc�U ;(For Parcel#,contact Eagle County Assessors Office at(970-328-8640 or visit j www.eaglecounty.us/patie) z _____ � _ � _ " (use additional sheet if necessary) For Office Use Only Q 6 . Fee Paid: Cj�' Date Received: Received From: �t�J Cash Check# CC: Visa/MC Last 4 CC# t� exp date: Auth # �k�k3� 15-Maz-2012 �i�-o��� State of Colorado Asbestos Testing &Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmful asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact info listed below. When is asbestos testina reauired? �building proje�cts disturbing more than these threshold levels of building materials require asbestos testing: One-and Two-Family Dwellings: 32 square feet All Others (commercial spaces, hotel rooms, etc): 160 square feet Definition of a single-family dwelling: any dwelling unit that is used primarily for a single family, including multi-family/condominium units, and fractional fee units. Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1% require abatement by a State-certified abatement contractor. The air clearance letter or form must be submitted to the Town of Vail before the building permit will be issued. Project Checklist My project falls into the category checked below: � Will not disturb more than the threshold limits identified above. � Tested negative, or at 1% or below (1 copies of test results included) � Tested positive at more than 1%, requires abatement (1 copies of test results included) Tips&Facts: • Even recent construction projects may include asbestos-containing materials, so buildings of�age require testing. • The "1989 Ban" on asbestos-containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was set aside and did not take effect." - CDPHE Asbestos test results should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO3 81657. Town of Vail Contact: State of Colorado Contact: Fire Prevention Bureau Colorado Department of Public Health Vail Fire Department and Environment 75 S Frontage Rd Asbestos Compliance Assistance Group Fire_inspectors@vailgov.com 303-692-3158 970-479-2252 asbestos@state.co.us www.vailgov.com www.cdphe.state.co.us oi-.r�-i i � � � —� c �� . �'n�u �� Asbestos Inspection and Sampling Report 1580 Golf Terrace #30 Vail, Colorado 81657 Presented To: Mr.Jay Nobrega 1650 Fall Ridge Road Vail, CO 81657 celljay@crossroaddsvail.com (970) 476-4300 (970) 904-0062 Performed&Prepared By: Ms. Blake Bradley DS Consulting, Inc. PO Box 6864 Avon, CO 81620 (970) 281-2566 Project Details: Project Number: 7532 Conducted: April 16, 2013 . , TABLE OF CONTENTS PROJECT OVERVIEW 1.0 I�troduction 2.0 Scope of Work 3.0 Site Description 4.0 Certifications 5.0 Inspection,Sampling&Analytical Procedures 5.1 Inspection Procedures 5.2 Sampling Procedures 5.3 Analytical Procedures 6.0 Homogeneous Areas 6.1 Material Friability 6.2 Material Classifications 6.3 Material Conditions 6.4 Sample Quantities 7.0 Overview of Findings 8.0 Conclusion&Recommendations 9.0 Asbestos Abatement&Demolition Requirements 10.0 Major&Minor Asbestos Spill Response Actions 11.0 Disclaimer&Limitations APPENDIX A Inspector&Firm Asbestos Certificates APPENDIX B Analytical Data 2 PROJECT OVERVIEW 1.0 Introduction On April 16, 2013, Ms. Blake Bradley with DS Consulting, Inc. (DSC) conducted a limited asbestos inspection and collected asbestos bulk-samples of suspect asbestos-containing materials (ACM) within a portion of the single-family residence located at 1580 Golf Terrace #30 Vail, Colorado. The purpose of the limited inspection was to identify and sample potentially hazardous friable and non- friable ACM that may be impacted by subsequent renovation activities. 2.0 Scope of Work The scope of the limited inspection and bulk-sampling was limited to specific areas and materials of the residence defined by the contractor. These included the textured drywall in the main level bathroom and the master bathroom. The remaining areas and materials within the residence, garage or any out- building on the property were not included in the scope of the inspection. The limited asbestos inspection did not constitute a full building inspection and does not fulfill the asbestos inspection requirements for structures that are to be demolished. 3.0 Site Description The residence is a tri-level, single-family condo/residence with an attached garage. 4.0 Certifications The limited asbestos inspection and bulk-sampling was conducted by Ms. Blake Bradley with DSC. DSC is a Colorado Department of Public Health and Environment (CDPHE) certified Asbestos Consulting Firm, Registration No. 14912. Ms. Bradley is a CDPHE certified Building Inspector; having certification number 16862 (see Appendix A for certificates). 5.0 Inspection, Sampling& Analytical Procedures 5.1 Inspection Procedures The limited asbestos inspection was conducted by an Environmental Protection Agency (EPA) and CDPHE certified Building Inspector. The inspection procedures included identifying and sampling suspect ACM within the pre-defined areas, submitting samples to an accredited laboratory for analysis, classifying the materials and assessing their condition, and compiling a final report detailing the inspection and the analytical results of the bulk-samples. 5.2 Sampling Procedures Statistically random bulk-samples representative of the suspect ACM of each homogeneous area were collected according to the guidelines published as EPA Final Rule: Title II of the Toxic Substances Control Act (TSCA), 15 USC, Sections 2641 through 2654 and in compliance with 40 CFR, Part 763 and CDPHE Regulation Number 8, Part B -Asbestos (Reg. 8). DSC has collected the appropriate number of bulk-samples to meet all regulatory requirements for the classification and quantity of each homogeneous area. Some minor destructive sampling was conducted; however, walls, columns and perimeter pipe chases were not broken into in order to locate 3 and quantify suspect ACM. It should be noted that additional ACM might be located in these and other inaccessible areas. 5.3 Analytical Procedures All asbestos bulk-samples were analyzed by a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory via Polarized Light Microscopy (PLM) for asbestos content (see Appendix B for laboratory report). The percentage of asbestos within each individual bulk-sample can vary depending on sample location, homogeneity of the material, and the type of application. Any sample reporting a "TRACE" amount of asbestos must be considered positive for asbestos greater than 1% unless it is re-analyzed utilizing the point-count method and verified to be less than 1%. Materials containing less than 1%asbestos are not regulated by CDPHE Regulation 8, Part B -Asbestos. However, all demolition/abatement activities should be performed following the applicable Occupational Safety and Health Administration (OSHA) regulations. This would include,but not limited to,the appropriate asbestos training for the type of material being removed/disturbed as well as having a properly trained supervisor onsite, using wet removal methods, wearing adequate personal protective equipment (HEPA-filtered particulate respirators), medical surveillance of workers, personal-exposure air monitoring, area air monitoring in occupied buildings, etc. There may also be landfill disposal requirements for these materials, depending on the facility. DSC recommends that all demolition/renovation areas involving any amount of asbestos be subjected to visual inspections and a final clearance air testing by a CDPHE-certified Air Monitoring Specialist (AMS) after the work has been completed,but before any containments are dismantled and the area is reoccupied. 6.0 Homogeneous Areas A Homogeneous Area (HA) includes materials that are uniform in appearance, color, texture and date of application. The asbestos content of the bulk-samples collected within a homogeneous area can be applied to the entire homogenous area if they conform to the above characteristics and the regulated minimum sample quantities of each type of material are collected and analyzed. 6.1 Material Friability A material can either be friable or non friable. A friable material is one that, when dry, can be pulverized, or reduced to powder by hand pressure, a non-friable material cannot. A non-friable material may become friable if its condition had deteriorated or has been impacted by forces that have rendered it friable. 6.2 Material Classifications Sampled materials are divided into one of the following three categories: • Surfacing Material: sprayed or troweled onto structural building members • Thermal System Insulation (TSI): any type of pipe,boiler,tank, or duct insulation • Miscellaneous Material: all other materials not classified in the above two categories 4 6.3 Material Conditions Sampled materials are placed into one of the three following categories of conditions: • Good: none to very little visible damage or deterioration • Damaged: the surface is crumbling,blistered, water-stained,gouged,marred or otherwise abraded over less than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the damage is localized • Significantly Damaged: the surface is crumbling, blistered, water-stained, gouged, marred or otherwise abraded over greater than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the damage is localized 6.4 Sample Quantities DSC collected at least the minimum number of samples from each homogeneous area necessary to meet all regulatory requirements for the quantity of material to be disturbed. The quantities listed in this report are approximate and on-site verification of the exact quantity of each material is required. The following outlines the minimum sample quantities required per homogeneous area: � Surfacing Materials: up to 1,000 ft2 of material requires a minimum of three (3) samples; between 1,000 ft2 and 5,000 ft2 of material requires a minimum of five (5) samples; over 5,000 ft2 of material requires a minimum of seven (7) samples; one (1) sample of each patch • Thermal System Insulation (TSI): each homogeneous area requires a minimum of three (3) samples; at least one (1) sample must be collected from each patch; and collect enough samples sufficient to adequately assess the material and determine the asbestos content for TSI fittings such as pipe elbows or T's. • Miscellaneous Materials: collect enough samples sufficient to determine the asbestos content 7.0 Overview of Findings Asbestos was not reported within the drywall texture collected and analyzed. DSC collected a total of six (6) asbestos bulk-samples of two (2) homogeneous areas. Table 1 below describes the materials composing each homogeneous area as well as the locations of each bulk-sample collected. Also listed is the classification, condition, friability and estimated quantity of material to be removed and/or disturbed, as well as the asbestos content within each bulk-sample. Please see Appendix B:Analytical Data for the layer break-down of each bulk-sample. 5 TABLE 1 � `� ,�a d: €< ��i�, �i�t Mt�tt�r,f�l ��' � �s - � , � �'�. . ' : ��� �� . � �. ._ �r.,....�.. � . „ .��� , . - DWl-1 Gold Wallpaper on Smooth Main Level Bathroom,Behind SM G �200 ftz Friable Drywall Door 1 DWl-2 Gold Wallpaper on Smooth Main Level Bathroom,Behind SM G —200 ftz Friable ND Drywall Toilet DWi-3 Gold Wallpaper on Smooth Main Level Bathroom,Right SM G �200 ft2 Friable Drywall Of Shower DW2-1 Green Smooth Drywall Upper Level Master SM G �300 ftz Friable Bathroom,By Door To Toilet 2 DW2-2 Green Smooth Drywall Upper Level Master Bathroom SM G �300 ftz Friable ND Behind Toilet DW2-3 Green Smooth Drywall Upper Level Master SM G —300 tt2 Friable Bathroom,Behind Entry Door HA-Homogeneous Area G-Good CHRY-Chrysotile SM-Surfacing Material ND-None-detect D-Damaged ACT-Actinolite MM-Miscellaneous Material TR-Trace,<i%Visual Estimate SD-Significantly Damaged TS[-Thermal System Insulation 8.0 Conclusion & Recommendations Asbestos was not identified within the materials of the residence that were within the scope of the limited inspection and bulk-sampling performed on April 16, 2013; therefore, no professional abatement activities are required to remove or disturb the above-referenced sampled materials. 9.0 Asbestos Abatement& Demolition Requirements If ACM is to be removed or disturbed in a single-family residence, and the total quantity exceeds any of the regulatory trigger levels of 50 linear ft. on pipes, 32 ftz on other surfaces, or the volume equivalent of a 55-gallon drum, a CDPHE-certified General Abatement Contractor (GAC) is required to perform the work. The regulatory trigger levels within a commercial building are 260 linear ft. on pipes, 160 ft2 on other surfaces, or the volume equivalent of a 55-gallon drum. In addition, formal notification to CDPHE prior to the abatement of ACM as well as air monitoring, visual inspections, and final air clearances by a CDPHE-certified Asbestos AMS is required. DSC can provide the client or building owner with a proposal for project design, abatement oversight and air monitoring upon request. CDPHE regulations allow for the demolition of a building that contains non-friable asbestos-containing materials, such as caulking, mastic or resilient floor tiles. However, demolition must be completed without causing the non-friable ACM to be rendered friable. Burning a building with any ACM is prohibited. Operations such as sanding, cutting, crushing, grinding, pneumatic jacking, etc. of ACM are not permitted. Recycling of building materials such as concrete, metal, or wood that are bonded or contaminated with ACM, e.g. glue, caulking, or mastic is also prohibited. If any of the non-friable asbestos containing materials are to be recycled and rendered friable after demolition (i.e. crushing mastic-coated concrete),these materials must be abated of all ACM prior to shipping offsite for recycling. OSHA regulations regarding occupational exposure during demolition activities is still mandatory. OSHA 29 CFR 1926.1101 requires that workers performing construction-related activities be protected from asbestos fibers in excess of the permissible exposure limit of 0.1 f/cc of air. Contractors are must comply with applicable provisions of OSHA 29 CFR 1926.1101 during demolition and renovation activities. These OSHA provisions include, but are not limited to, PPE and respirators, personnel training, personal- exposure air monitoring, employee medical surveillance, wet removal methods, signage for regulated areas, etc. 10.0 Major & Minor Asbestos Spill Response Actions If ACM is significantly damaged and the total quantity exceeds the regulatory trigger levels, the area is deemed a "Major Asbestos Spill." The area is consequently subject to the requirements in Reg. 8, Section III.T.1. - Major Asbestos Spills, as outlined below. Additional asbestos air or dust sampling should also be conducted within the remaining areas not directly impacted by the Major Asbestos Spill to determine if asbestos-containing dust/debris has spread to adjacent areas. If asbestos fibers are found within any other areas or on building contents, they should be included in the scope of professional abatement and decontamination. The following response actions must be followed per Colorado Reg. 8 when a Major Asbestos Spill occurs: • Restrict access to the area and post warning signs to prevent entry to the area by persons other than those necessary to respond to the incident. • Shut off or temporarily modify the air handling system to prevent the distribution of asbestos fibers to other areas. � Immediately contact the Division by telephone, submit a notification in compliance with subsection III.E. (Notifications) and, if in an area of public access, apply for a permit in accordance with subsection III.G. (Permits). • Be exempted from the requirements to have a certified Supervisor on-site at all times, until such time as the immediate danger has passed. Any cleanup or asbestos abatement that must occur after the immediate danger has passed shall be supervised by a person certified by the Division. • Using certified Supervisors and certified Workers in accordance with section II. (Certification Requirements) of this Regulation, seal all openings between the contaminated and uncontaminated areas and establish none-detect air pressure within the contaminated area in accordance with paragraph III.J. (Air Cleaning and None-detect Pressure Requirements). This is to be accomplished using polyethylene sheeting to cover areas such as doorways, windows, elevator openings,corridor entrances,grills, drains,grates, diffusers and skylights. • HEPA vacuum or steam clean all carpets, drapes, upholstery, and other non-clothing fabrics in the contaminated area, or discard these materials. • Launder or discard contaminated clothing in accordance with subsection III.R. (Waste Handling). • HEPA vacuum or wet clean all surfaces in the contaminated area. • Discard all materials in accordance with subsection III.R. (Waste Handling). • Following completion of subparagraph III.T.1.a. through III.T.l.i. above, comply with air monitoring requirements as described in subsection III.P. (Clearing Abatement Projects); air samples shall be collected aggressively as described in 40 C.F.R. Part 763, Appendix A to Subpart E (EPA 1995), except that the air stream of the leaf blower shall not be directed at any friable ACM that remains in the area and • Comply with any other measures deemed necessary by the Division to protect public health. In the event of an asbestos spill involving less than or equal to the trigger levels, the building owner or contractor should take the following non-mandatory steps: • Restrict entry to the area and post warning signs to prevent entry to the area by persons other than those necessary to respond to the incident. • Shut off or temporarily modify the air handling system to prevent the distribution of fibers to other areas in the building. • Seal all openings between the contaminated and uncontaminated areas.This is to be accomplished by using polyethylene sheeting to cover all areas such as windows, doorways, elevator openings, corridor entrances, drains,grills,grates, diffusers and skylights. • HEPA vacuum or steam clean all carpets, draperies, upholstery and other non-clothing fabrics in the contaminated area, or discard all contaminated materials in accordance with subsection III.R. (Waste Handling). • Launder or discard contaminated clothing in accordance with subsection III.R. (Waste Handling). • HEPA vacuum or wet clean all non-fabric surfaces in the contaminated area. • Following completion of subparagraphs III.T.2.a. through III.T.2.f. of Regulation 8, conduct air monitoring as described in paragraph III.P.3 of Regulation 8. (Final Clearance Air Monitoring and Sample Analyses); air samples shall be collected aggressively as described in 40 C.F.R. Part 763, Appendix A to Subpart E (EPA 1995), except that the air stream of the leaf blower shall not be directed at any friable ACM that remains in the work area. 11.0 Disclaimer & Limitations The activities outlined in this report were conducted in a manner consistent with a level of care and expertise exercised by members of the environmental consulting and industrial hygiene profession. All 8 activities were performed in accordance with all applicable federal, state, and local regulations as well as generally accepted standards and professional practice. No warranty is either expressed or implied. DSC assumes no responsibility or liability for error in public information utilized, statements from sources other than DSC, or developments resulting from situations outside the scope of this project. The details provided within this report outline the inspection activities on the date(s) indicated and should not be relied upon to represent conditions at a later date, the limited number of bulk-samples collected, and the laboratory results of those bulk-samples. The laboratory results contained in this report apply specifically to the materials in which bulk-samples were collected. The results do not include or apply to any other materials within the structure that were not sampled, but may contain asbestos; including materials that may be hidden or inaccessible. Additional inspection and bulk- sampling activities would be required to determine if any other materials contain asbestos. This report has been prepared on behalf of and exclusively for use by the Client, with specific application to their project as discussed in the scope of work. The results of any surfacing material indicated in this report also includes any associated overspray of that material, e.g., under carpet, above suspended ceilings, etc. The information contained in this report is intended as supplementary material for abatement design and is not to be used as the scope of work for abatement activities, bidding or billing purposes. Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. DSC can provide a full scope of work for abatement upon request. DSC does not warrant the work of regulatory agencies, laboratories or other third parties supplying information which may have been used in the preparation of this report. 9 APPENDIX A INSPECTOR & FIRM ASBESTOS CERTIFICATES lo r � � {� � � STATE OF COLOR.ADO ,� � ASBESTOS � CERTIFICATION* � 7 co�n�n orr��m ma Env;room«a Air PoUudon Coaimtel Divieia► This catlfiea llmt � B�A��BI'�lUCy CsrtdinHo�TFo:1it62 met tAe requvemenb of 25-7-507.C.R.S.md Air Quality Control Commiaian Re�ulNion No.8.Pan 8.md i�heraby�ttified by the + sMe of Colasdo ia du followia6 discipliae: � BH�D=I6�pCCt01'* � : 7/S1/2�12 � M: 7/SIML7 / � �� d' ;� t •I..enra..,.....b.....,�...�.en.,Mi/�.�,,...�d....Rew,., � � � ow�4��rw�}/.��6/ir6 �, � 1 � . .: _- - - --,: � __ _ �. _. _ � � � � � ; , ___.-�•,_; , - - ��'�T�,-���A��-�' . F��<R . ��%.. �-���� �,{ ��� � : �� * � Y _ r _...�'+` xa `�' ..� _ s� Jc- . _ �_�- ��_'��s �J ��;��; � � _ ���: � � � =r,� ° - .� _ - x � �`.�::�--..� ,r.�� �- 7� , � x � ,� . �-� � ��� DS����ac. ' �� �- � - -�. .�._ 3 t�^ � 'y, 5 J �1l� 'R ��"�`�`��a�;z ;, � . _ 3.� k �.T+�: . #Y'�� f - s- g . , . ' #Y's �as�et t6e�eg�stratig��eqt�'tstu�u'`of�J1 7�'�t.§1 e�,�A� rtY Cvptrol . �wnm�sawn��jegalatiw��+ia�rt B � J�►��;v�A� �� aciiwhcs ab_�rsq e�"�n ,�te.�u�' # L',��,�3;i�}�bs titts f Colcrad�, :. a � _ ?Y - i ,� .,� � � �, � �:- ' tiz ' �� s°l' .. r:. � '�.�._ `� �'x'`� r"�� � Iasaed:- leouary 30 � �,,,,����" � �� �� ; �Explore�: Jtiaw�ty39,201#�.,;,` � �-_ �%'�." !WCt�apa�.rarM-� - a"`-�� �� .,� �_ �,,._. .: _ �Wc . .z�,,.- - - - �-x°.»-�r�.,,_�:� i 11 APPENDIX B ANALYTICAL DATA 12 780$imms Street Suite 104 A�o io ocy owaroay Crolden,CO.80401 ��s,�c',oRVOaw� so3 zsz.s�ae � Certificate of Analysis �.�rowowo�.�e� C6ent Name DS Consuhing �����s• Date Collected: 04/16/13 Sheet address 5366 Flatrock Ct. � Date Rcteived: 04/16/13 City,State Z� Morrison,CO 80465 Date Analyzed: 04/23/13 Attn: Blake Bradley TM.AP l�b Code 200860-o Date Reported: 04/23/13 Cllent Project N�roe: 1580 Golf Tea.#30,Vail,CO Project ID: 13004759 Job ID: Tes�Requesied: 3002,Aabestoa in Bulk Samples Method: Polarized Light Microscopy/Dispersion Staioing(PLM),Method for the Deteratinapon of Asbestos in Bulk Building Materials.EPA-60(1/R-93/I16,July 1993. xomo- Non-Asbestos Non-Fibrous Mafix Sample Idrntification Layer Physical Description of Sample/I.ayer geneous percentage °'Sbestos Delected Asbestos Percentage Fiber Material Material Client Leb S le Number (YM) Percenta e Percenta e Com sition 13004759-1A White Compound w/White Paint N 30% ND 100 C DW]-1 13004759-1B Brown/Gold Wallcovering N 30% ND SO 20 13004759-1C Tan/White Drywall N 40% ND 10 90 G 13004759-2A White Compound N 25% ND 100 C DWl-2 13004759-2B Red/Gold Wallcovering N 25% ND 80 20 13004759-2C Tan/White Drywall N 50% ND 10 90 G 13004759-3A White Compound w/White Paint N 50% ND 100 C DWl-3 13004759-3B Multicolored Wallcovering N 50% ND 80 20 13004759�A White Compound w/Green Paint N 25% ND ]00 C DW2-I 13004759-4B Tan/White Drywall N 75% ND 20 80 G A=Amosite Q=Quartz P=Perlire AC=Ac[inolite C=Carbonates B=Binder � `�/� �^ AN=Mthophyllite G=Gypsum D=Diaroms �� J � ) CHRY=Chrysotile M=Mica �,�i�.�u� CR=Crocidolite T=Tar � TR=Tremoli�e NTR=Non-Asbestiform TR c ar egrym on eyan Trace=Less Than 1% NAC=Non-Asbestiform AC I.aboratory Malyst /vbestos l.aboratory Supervisor N�None Detected Page 1 of 3 7M0 Simms Stree6 Suite I(W,Golden,CO,N0401,303.2323746 �so s�,�,�sh�� swm ioa A�o io oc�y ORA7�OR'Y Goldeq CO.80401 �Q.��A1� 30323?.3746 .�s Certi�cate of Analysis ��������^e� Clirnt Name DS Consulting ns� Date Coliecred: 04/16/l3 Sheet address 5366 Flatrcek Ct. ���� Date Received: 04/16/l3 City,Stah ZIP Morrison,CO 80465 Dare Analyzed: 04/23/13 Atb: Blake Bradley NVLAP[ab Code 200860-0 Date Reporled: 04/23/13 Clieet Prof ect Name: I SSO Golf Tea.#30 Vail,CO Project m: 13004759 Job m: Tea�Requesad: 3002,Asbestos in Bulk Samples Method: Polarized Light Microscopy/Dispersion Staining(PLM),Method for the Determinetion of Asbesros in Bulk Building Materials.EPA-600/R-93/1 l6,July 1993. Homo- Non-Asbestos Non-Fibrous Matrix Samplr ldentification physical Description of Sample/l.ayer geneous �y� Asbestos Detected Asbestos Percen[age Fiber Material Material Client Lab Sa le Number �y�� Perconwge Pnrcenta e Percenta e Co ition 13004759-SA White Tape N 20% ND 95 5 13004759-SB White Joint Compound N 20% ND 100 DW2-2 13004759-SC White Compound w/Green Paint N 20% ND 100 13004759-SD 7an/White Drywall N 40% ND 20 RO 13004759-6A White]oint Compound N 20% ND 100 C 13004759-6B WhiteTape N 20% ND 95 5 DW2-3 13004759-6C Tan/White Drywall N 20% ND 10 90 G 13004759-6D White Compound w/White Paint N 40% ND 100 C A=Amosite Q=Quartz P=Perlite AC=Actinolite C=Carbonates B=Binder � AN=Mthophyllitc G=Gypsum D=Diatoms CHRY=Chrysotile M=Mica `��� ��� CR=Crocidolite T=Tar TR=Trcmolitc NTR—Non-Asbcstiform TR ic a�r Wegya� on eyan Trace=Less Than 1% NAC=Non-Asbestiform AC Laboratory Malyst Asbesros Laboratory Supervisor ND=None Detected Page 2 of 3 7M0 Simms Street,Sui�e](M,Goldca CO,80401,3032323746 780 Simms Street Suite 104 �E�ROb� LAbORATOR7/ Golden,CO,80401 303.2323746 �'ir,e.s Certificate of Analysis www.aerobi .net DS Consulting ����^� Date Collected: 04/16/13 5366 Flatrock Ct. �� Date Received: 04/16/13 Morrison,CO 80465 V Date Analyzed: 04/23/13 Blake Bradley NVLAP Lab Code 200860-o Date Reported: 04/23/13 Client Project Name: 1580 Golf Terr.#30,Vail,CO Project ID: 13004759 Job ID: General Notes • ND indicates no asbestos was detected;the method detection limit is]%. ♦ Trace or"<1"indicates asbestos was identified in the sample,but the concentration is less than 1%. • All regulated asbestos minerals(i.e.chrysotile,amosite,crocidolite,anthophyllite,tremolite,and actinolite)were sought in every layer of each sample,but only those asbestos minerals detected are listed.Amosite is the common name for the asbestiform variety of the minerals cummingtonite and grunerite. Crocidolite is the common name used for the asbestiform variety of the mineral riebeckite. ♦ Tile,vinyl,foam,plastic,and fine powder samples may contain asbestos fibers of such small diameter(<0.25 microns in diameter)that these fibers cannot be detected by PLM. For such samples,more sensitive analytical methods(e.g.TEM,SEM,and XRD)are recommended if greater certainty about asbestos content is required. Semi-quantitative bulk TEM floor tile analysis is accepted under NESHAP regttlations. ♦ These results are submitted pursuant to Aerobiology Laboratory Associates,Inc.'s current terms and conditions of sale,including the company's standard warranry and limitation of liability provisions. No responsibility or liability is assumed for the manner in which the results are used or intetpreted. • Unless notified in writing to return the samples covered by this report,Aerobiology Laboratory Associates,Inc.will store the samples for a minimum period of thirty(30)days before discarding. A shipping and handling charge will be assessed for the retum of any samples. ♦ Aerobiology does not guarantee the results of tape lifrs,microvacs,wipe,and/or debris samples. Accurate analysis cannot be perfonned due to particle size,media used,and/or amount of material given. Analysis of these materials should be prefottned by a TEM. A result ofND does xoi indicate that the sa�nple area does not contain asbestos. It means the analyst could nat identify asbestos in the speciftc sample for the reasons listed above. Notes Reauired bv NVLAP ♦ This report must not be used by the client to claim product certification,approval,or endorsement by NVLAP,NIST,or any agency of the Federal Govemment. ♦ This test report relates only to the items tested or calibrated. ♦ This report is not valid unless it bears the name of a NVLAP-approved signatory. ♦ Any reproduction of this document must include the entire document in order for the report to be valid. Page 3 of 3 780 Simms Street, Suite 104,Golden,CO,80401,303.2323746