Loading...
HomeMy WebLinkAboutD13-0009 ASI 20.pdf 0 0 A Th"6 f 7 LOCAN SIMPSON DESIGN INC. Architect's Supplemental Instructions Project Architect's Supplemental Instruction NO: Ford Park Phase I Improvements 20 Owner Date of Issuance Town of Vail 3.19.2013 Todd Oppenheimer 530 South Frontage Road E Contract For Vail, CO 81657 General Construction From Contract Date Logan Simpson Design, Inc Kurt Friesen 123 North College Avenue, Suite 206 Project Number Fort Collins, CO 80524 125315 970.449.4100 To R.A. Nelson Mike Kowalski 51 Eagle Road#2 Avon, CO 81620 970.949.5152 Description: The scope of work for the demolition of the existing restroom building. Attachments: SOW provided by the TOV. Digitally signed by Kurt Friesen DN:cn=Kurt Friesen,o=Logan Issued by: Simpson Design,ou, email=kfriesen @logansimpson.c om,c=US Date:2013.03.28 19:35:48-06'00' (Signature) (Printed Name and Title) (Date) 123 North College Avenue, Suite 206 Fort Collins, CO 80524 Phone: (970) 449- 4100 Fax: (970) 449-4101 Ford Park Softball Fields Demolition of Existing Restroom Building March 18,2013 Scope of Work Construction vehicle access to the site will be by way of the concrete recreation path located between the Ford Park softball fields and the South Frontage Road. There will be no construction traffic allowed on the softball fields. The recreation path will remain open to the public and traffic control signage and flaggers will be required to protect public safety and facilitate turning movements on the South Frontage Road. A traffic control plan and Town of Vail Right-of-Way permit is required. Following the anticipated scope of work required: 1. Erect construction fencing to secure perimeter of working area. 2. Install Erosion Control devices. 3. Saw cut existing pavement(asphalt and concrete) a maximum of 8' outside the building roof line. 4. Remove a maximum of 843 sf asphalt pavement and 240 sf of concrete pavement and dispose of off site. 5. Disconnect existing electrical service to the panel entering building from the east and pull any wire circuits existing building to the first fixture or junction box encountered. 6. Demolish existing wood frame and concrete masonry unit building structure and dispose of off site. 7. Remove floor slab and entire building foundation and footer and dispose of off site. 8. Backfill excavation with 6" minus material and compact to 95%Standard Proctor Density. 9. Recut edge of pavement as needed to create a clean, straight line. 10. Prep subgrade with 4" class 6 road base and pour 3" concrete slab to match existing grades. Tool or saw cut construction joints at approximately 10' centers and broom finish. 11. Clean up and remove construction fencing and erosion control devices.