HomeMy WebLinkAboutB13-0016 REV1 CR1 APPLICATION AND SOILS REPORT f Department of Community Development
{ 75 South Frontage Road
TOWN OF lr�?I� _ Vail,CO 81657
TOWN
Tel: 970.479.2128
www-vailgov-com
Development Review Coordinator
TRANSMITTAL FORK]
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A two.hour minimum building review
fee of$110 will be charged upon reissuance of the permit.
-------------------------------------------------------------------—
ApplicationlPermit#(s) information applies
to: Attention: O Revisions
_ VQ/ / ---dz O Response to Correction Letter
(O _attached copy of correction letter
6 Deferred Submittal
- S 0�
(%Other S /S Jqc-.,79K�
Project Street Address:
(Number) (Street) (Suite#)
Building/Complex Name: Description of Transmittal/List of Changes, Items Atfached:
o, / 4qe�9 J' ,
Applicant Information IV
(architect,contractor,ownerlowner's rep) f�
Contact Name: ',G•`/•C 1 9�u• l�C/�
Address:_P,o _�B0 X 2 T 0
City State: C O zip: Z-
Contact Name: / �. / I/nl�k 1�(J J�� — (use additional sheet if necessary)
Contact Phone: Building Permits:
Revised ADDITIONAL Valuations(Labor&Materials)
Contact E-Mail:e-I H -fyA �Qi L C. S��•+ •z o~ i(DO NOT include original valuation)
I hereby acknowledge that I have read this application,filled out Building: $
in full the information required,completed an accurate plot plan,
and state that all the information as required is correct. I agree to Plumbing: $
comply with the information and plot plan,to comply with all Town
ordinances and state laws, and to build this structure according Electrical: $
to the town's zoning and subdivision codes, design review ap-
proved,International Building and Residential Codes and other Mechanical: $
ordinances of the Town applicable t e o.
Total: $o
Owner/Owner's Representative Signature(Required) - - ---------------------------------------------------------------------------------------------------------
Date Received:
[MAY For Office Use Only: O 013
Fee Paid:Received From: �Cash Check#CC: Visa/ MC Last 4 CC# ezp.date: WN OF VAIL
Authorization#
Hepworth-Pam-lak Geotechnical,Inc.
[—j 5020 COUnty Road I i4
ortech Glenwood Springs,C,lorado~1601
Phone:970-945-1985
HEPWORTH-PAWLAK GEOTECHNICAL Fax:970-945-8454
email:hp�e> hp�etrch.cum
April 24, 2013
Vail Custom Builders
Attn: Clinton Amundson
P. O. Box 2809
Vail, Colorado 81658
(Clintona,vailcustom.com)
Job No. 113 066A
Subject: Observation of Excavation, Proposed and Addition and Remodel, Milmo
Residence, Lot 51, Glen Lyon Subdivision, 1415 West Haven Drive, Vail,
Colorado
Dear Clinton:
As requested, a representative of Hepworth-Pawlak Geotechnical, Inc. observed the
excavation at the subject site on April 22, 2013 to evaluate the soils exposed for
foundation support. The findings of our observations and recommendations for the
foundation design are presented in this report. The services were performed in
accordance with our agreement for professional engineering services to Vail Custom
Builders, dated March 21, 2013.
The addition is planned to be attached to the east side of the residence and consist of a
lower(main floor) level enclosing an existing porch area as new living area. The new
foundation will support the main level addition and two stories of existing building above.
The new foundations will consist of three footing pads with a connecting grade beam
designed assuming an allowable soil bearing pressure of 2,000 psf. The ground floor will
be slab-on-grade. The existing residence is founded on shallow spread footings.
At the time of our site visit, the foundation excavation for the three footing pads had each
been cut in one level from about 4 to 4% feet below the adjacent ground surface. The
soils exposed in the bottom of the excavation consisted primarily of medium dense,
clayey sand with gravel and cobbles. There was some clayey sand with gravel fill at
subgrade in the southern pad excavation. The excavation subgrade areas had been
compacted. Results of swell-consolidation testing performed on a sample taken from the
site, shown on Figure 1, indicate the soils are moderately compressible under conditions
of loading and wetting with a low hydro-compression potential. The sample was at least
partly disturbed due to the rock content. The results of a gradation analysis performed on
Parker 30.3-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989
Vail Custom Builders
April 24, 2013
Page 2
a sample of the sand soils(minus 1 fz inch fraction) obtained from the site are presented
on Figure 2. No free water was encountered in the excavations and the soils were
generally moist.
Considering the conditions exposed in the excavations and the nature of the proposed
construction, spread footings placed on the undisturbed natural soil designed for an
allowable bearing pressure of 2,000 psf can be used for support of the proposed addition.
The existing fill at subgrade in the southern footing pad excavation appears limited in
area and depth and should be acceptable to bear the footing on. There could be some
differential movement with respect to the existing structure which should be considered in
the design. Removing the fill below the footing would provide a lower risk of settlement.
Footings should be a minimum width of 16 inches for continuous walls and 2 feet for
columns. Lopse and disturbed soils in footing areas should be removed and the bearing
level extended down to the undisturbed natural soils and the subgrade compacted. It
should be feasible to leave the existing fill in place the southern footing pad excavation
with the risk as discussed above. The bearing soils should be protected against frost and
concrete should not be placed on frozen soils. Exterior footings should be provided with
adequate soil cover above their bearing elevations for frost protection. Any continuous
foundation walls should be reinforced top and bottom to span local anomalies such as by
assuming an unsupported length of at least 12 feet. Structural fill placed within floor slab
areas can consist of the on-site granular soils, or suitable imported granular soils,
compacted to at least 95%of standard Proctor density(SPD) at a moisture content near
optimum. Backfill placed around the structure should be compacted to at least 90% SPD
(95%in pavement areas) and the surface graded to prevent ponding within at least 10 feet
of the building. Landscape that requires regular heavy irrigation, such as sod, and
sprinkler heads should not be located within 5 feet of the foundation.
The recommendations submitted in this letter are based on our observation of the soils
exposed within the foundation excavations and do not include subsurface exploration to
evaluate the subsurface conditions within the loaded depth of foundation influence. This
study is based on the assumption that soils beneath the footings have equal or better
support than those exposed. The risk of foundation movement may be greater than
indicated in this report because of possible variations in the subsurface conditions. In
order to reveal the nature and extent of variations in the subsurface conditions below the
excavations, drilling would be required. It is possible the data obtained by subsurface
exploration could change the recommendations contained in this letter. Our services do
Job No. 113 066A
G99tech
Vail Custom Builders
April 24, 2013
Page 3
not include determining the presence, prevention or possibility of mold or other biological
contaminants(MOBC) developing in the future. If the client is concerned about MOBC,
then a professional in this special field of practice should be consulted.
If you have any questions or need further assistance, please call our office.
Sincerely,
HEPWORTH—PA GEOTEVHNICAL, INC.
e,,e�fb31!
David A. Young, P.E. ,� a a 4M
2-216
attachments Figure 1, Swell-Consolidation Test Results
Figure 2, Gradation Test Results
Job No. 113 066A
r�
wetting
■n111Ri�i���N 11MM111Compression
1111
Sw
ELL-CONSOLIDATION TEST RESULTS
t�Illul��� ll�l■■�IIIIN
■�111111■;INNII�
�u�■anui■��i�
■�YN I�ii�ii��■■�n
I HYDROMETER ANAL SIEVE ANALYSIS
I
TIME READINGS U.S.STANDARD SERIES CLEAR SQUARE OPENINGS
24M 7HR
45MK 156811 GWK/WAN. 4ML 16814. I20D 0100 ON) 130 #18 08 14 3W 3W 112' 31 6 (r a,
0 100
10
90
Z
20 80
30 70
w:
0 40 6D
Z
<
co
Cr 50
50
Z z
0
w 0 LLI
cc
(r
w uj
CL 60 40 CL
70
so
80
2D
9D 10
�=j
100 =-r:r1EEE1 0
X1 Am Ms M .019 -OV M4 .150 300 AM 1.18 235 435 95125 19.0 375 762 1152 200
DIAMETER OF PARTICLES IN MILLIMETERS
CLAY TO SILT ANE SAM =F-= GMVEL T
COBBLES
MEDIUM COUSe RNE I COMM I
Gravel 26 % Sand 57 % Silt and Clay 17 %
Sample of: Clayey Sand with Gravel From: Bottom of Middle Footing Pad Excavation
113 066A 1HEPW(GOH gteqh INICAL GRADATION TEST RESULTS FIGURE 2
RTH�AWLAIC