Loading...
HomeMy WebLinkAboutDRB130155 APPLICATION.pdf RECEIVED Department of Community Development 0 Date:05/13/2 013 75 South Frontage Road TOWN OF VAIL` TOXIN OF VAIL g Vail,947 -2128 Y D. RHOADES Tel: 970479-2128 www.valigov.com Development Review Coordinator Application for Design Review New Construction General Information: This application is for all new construction. Applicable Vail Town Code sections can be found at www.vailgov.com under Vail Information — Town Code Online. All projects requiring design review must receive approval prior to submitting a building permit application. An application for Design Review cannot be accepted until all required information is received by the Community Development Department, as outlined in the submittal requirements. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design review approval expires one year from the date of approval, unless a building permit is issued and construction commences. Fee: $650 Single Family Duplex 01 Multi-Family Commercial 0096 Description of the Request: New construction of a previously approved(DRB07-0095)duplex residence Physical Address: 809 Potato Patch Drive Parcel Number: 2101-063-0101-8 (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) Property Owner: 809 Potato Patch Drive,LLC Mailing Address: 141 E.Meadow Dr.,Ste 211,Vail,CO 81657 Phone: 303-550-4551 Owner's Signature: Primary Contact/ Owner Representative: KH Webb Architects c/o Michael Current,Solaris Vail c/o Sharon Cohn Mailing Address: 710 W.Lionshead Circle,Ste.A,Vail,CO 81657 Phone: 970-477-2990 E-Mail: michael @khwebb.com,sharon@solarisvail.com Fax: 970-477-2965 For Office Use Only: Cash_ CC: Visa/MC Last 4 CC# Exp. Date: Auth# Check# 6363 Fee Paid: $650 . 00 Received From: K.H. WEBB ARCHITECT S Meeting Date: 0 6/05/2 013 DRB No.: Planner: Project No.: Zoning: Land Use: Location of the Proposal: Lot: 31 Block: 1 Subdivision: VAI—L-77717TU PATCH Property Information Property Address 809 Potato Patch Dr., Vail, CO 81657 Parcel# 2101-063-0101-8 Legal Description Lot 31, Blk 1, Potato Patch subdivision Development Site Area sq ft 120987 1 acres 10.482 1 buildable sq It 17278 Zone District/SDD# Two-Family Primary/Secondary Residential Hazard Zones Snow Avalanche High Severity Moderate Severity [J N/A Sections 12-21 &14-7 Debris Flow []High Flow Moderate Flow ❑ High Avalanche . N/A Rock fall ❑High Severity ❑Medium Severity ON/A Excessive Slopes [];->30% N/A Floodplain I ❑100 year floodplain Floodway "—'Wetlands 7`4/A Creeks,Streams LJGore Creek r on site ❑adjacent to site I±,,N/A Section 12-14-17 ❑Other tributary: Don site r-adjacent to site ' N/A Project Information Project Description New duplex residence Development Standards Allowed Existing Proposed Gross Residentlaf Floor Area Primary sq ft 7278 4294 (maximum) Chapter 12-15 Secondary sq ft 2861 EHU sq ft TOTAL sq ft 7155 250 Addition Interior Conversion Credits: Setbacks(minimum) Front ft 20 20 20 Section 14-104 Side ft 15 15 15 Side ft 15 15 15 Rear ft 30 30 30 Watercourse ft Site Coverage(maximum) see definition Section 12-2-2 4197 4184 Building Height(maximum) Sloping ft 33 33 33 see definition Section 12-2-2 Flat ft Landscaping Soltscape sq ft 13991 13991 13991 See definition Section 14-2-1 Section 14-10-8 Hardscape sq ft 675 675 675 TOTAL sq ft 14666 14666 14666 Driveway Max Curb-cuts 24 24 24 Sections 14-3-1 &14-3-2 Max Grade @ C% 5% 5% centerline J Min Width 23.5' 23.5' 23.5' Heated drive? j Yes M No [Yes [j No Snow Storage% 10 Parking #Enclosed Spaces Sections 12-10&14-5 #Unenclosed TOTAL Outdoor Lighting(maximum) #fixtures Section 14-10-7 21 19 PROPOSED MATERIALS Building Materials Type of Material Color Roof standing seam metal ebonized zinc Siding vertical board & batten light tan stain Other Wall Materials vertical standing seam metal Zinc Fascia RS cedar tan stain Soffits v-groove T&G clear stain Windows alum clad dark bronze Window Trim RS cedar tan stain Doors match windows Door Trim match windows Hand or Deck Rails steel dark bronze Flues obscured by steel mesh black Flashing sheet metal match windows Chimneys stone Trash Enclosures n/a n/a Greenhouses n/a n/a Retaining Walls stone and boulders Exterior Lighting metal dark bronze Other PROPOSED LANDSCAPING Botanical Name Common Name Quantity Size PROPOSED TREES Picea Pungens Colo Blue Spruce 10 8-12' AND SHRUBS Malus spp. "Radiant" Radiant Crabapple 1 3" cal. populus tremuloides quaking aspen 19 2-3" cal. amelanchier alnifolia serviceberry 3 5 gal. rosa woodsii wood's rose 16 5 gal. symphoricarpos albus Snowberry 15 5 gal. ribes alpinum alpine currant 5 5 gal. corpus stolinifera"baileyi" redtwig dogwood 1 7 gal. EXISTING TREES none TO BE REMOVED Minimum Requirements for Landscaping: Deciduous Trees—2" Caliper Coniferous Trees—6' in height Shrubs—5 Gal. Type Square Footage GROUND COVER native grass 13991 SOD SEED IRRIGATION TYPE OF EROSION CONTROL erosion control fence Please specify other landscape features(i.e. retaining walls, fences, swimming pools, etc.) stone veneer site retaining walls to match house stone. UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: Lot Block Subdivision: Primary Contact/Owner Representative: Phone: 303-550-4551 Plans Dated: Primary Contact/Owner Representative Signature Authorized Signature Comments Date CENTURY LINK 970.328.8288(tel) 970.328.8282(fax) Contacts: Barb Davis barb.davis aacenturylink.com XCEL HIGH PRESSURE GAS 970.406.1784(tel) 970.468.1401 (fax) Contact: Remington Baker remington.c.baker(abxcelenergy.com HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081 (fax) Contact:Jeff Vroom ivroom(a)holycross.com XCEL Energy 970.262.4039(tel) 970.262.4038(fax) Contacts: Pam McGuire Pamela.mcauire(abxcelenergv.corn EAGLE RIVER WATER&SANITATION DISTRICT 970.477.5449(tel) 970.845.7218(fax) Contact:Tug Birk tbirk cr.erwsd.ora COMCAST CABLE 970.930.4713(tel) 303.603.1004(fax) Contact: Michael Johnson Michael iohnsonCa.cable.comcast.com CDOT(Only in CDOT Right-of-way) 970.683.6284(tel) Contact: Dan Roussin Daniel.roussinla.dot.state.co.us NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date. 06/05/2007 13:15 9704797501 ENGLISH & ASSOCIATES PAGE 02/07 too UTILITY APPROVAL a VEFUMATION This form serves to vent'that the proposed ImprovameMs will not impact any egiiong or proposed uS'ty servks,and w"to verify samm wwrability and lowdon for new aomt uion and should be used in eonjUnctfon with preparing your utility plan and schedu0ng instapattons. A Site plan,Including graeling plerh,floor plan,and elevations,shall be submitted to the following utilities for approval and verification.PLEASE ALLOW UP TO 2 WEEF04 FOR APPROVAL OR COMMUM FROM THE UrILTly COMPANNS. if you are unabla to obtain comment;within that timetiamQ please con=The Town of Vail. pendopwtopAnl eLatAdidr*WZV rr06W& LptAddrew: subdivisions Lot#- ormod 8iqdftWM Carnmenla QWE9r 970.468.6860(tep 970.46&0672(Nx) roam 7s: Sam Toolw XCEL HIGH PRE"URE BAS 970,262.4078(tel) 970.46LIQI(W Cantarfr Rich Sawas HOLY CROSS ENERGY 970.W-94U(teI) 1=7c,grwc r'AC1L1T165 LOCATEfl 970.945.4081(f 0ontect Jetrvoom e A1.RA1C� PbTASb �P.�C1� �� )MR ENEKOY Q� �C49 970.262.4038(*) 970.262.4024(del) CaMOctw Kit Bogert SMILE FMR WATER& sAN1TAIMN 15MM ICT 970.676.7480(tat) 970:4.4089(W Contact Fred Hallee fhasrwed.om COMCASf CABLE 970.418.0248(tee 970.949-9198(ftO COMM* David R-- Bawd et�n��e.mmce�fn 1.If UOUN approval iL ver'Koadon form has tignetwes from each of the utM cam and n0 Comments are made dlredty on the form,or no action Is t3lm within 2 wader of the ijuWe receipt of tha form without eViaination the Town will presume that there are no problems and the devAlopment ran proceed. 2.If a toliity company has conrxms wim the propoifd co nr the uliW rew-WrItattve s MR nem dir®W on t+he hrb6ly veriflmtion form that mere is a problem Which nesds to be resolved. The 1=0�Gf the abbey detailed in end attached letter to me Town Of Vail, However,please kmep In mind that it is the respo^smnN the applicant to resolve idendfled problems. the Department a.These verifications do not rWwe the corttfdCODr of the respons�011y to obtain efa a Public a4in Gin a y public lght:ofr OFF of public Works at the Town of Vac. o casement wMn Me Town of Vall. 4 Developer is rap*-rl and agr@"to submit"revised drawings ro the hdilit 5 for raapp�&re•vertflcalfon 0 the submitted plans are altered In any way dtar the authonzei 9gnaaue date(ivhless otherwise sped5catN noted within the cummant area of this form). Date Devalgperle Sigr4=re F_ 7.410C Page 9 of 14 11173/2005 7 Abp 'nti MINI SSOU A10H WdEE;L LOOT til AVA 0G/05/2007 13:15 9704797501 ENGLISH & ASSOCIATES PAGE 03/07 SILVERTHORNE HP Fax:19704681401 May 15 2007 5:20 P.02 0 UTILITY APPROVAL&VERIFICATION =0170 This form serves to verify that the proposed improvements will not Impact any existing or proposed utility services,and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling Instatatlons. A site plan,including grading plan,floor plan,and elevations,shall be submitted to the following utilities for approval and verification.PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILTrY COMPANIES. If you are unable to obtain comments within that limeframe please contact The Town of Vail. Developer to Pmvide IotAddress lmlbrmaUon: Lot Address- VRlt:- 4710110 �" Subdivision:4 Lot#. Authorized Sianature Comments Date QWEST 970.468.6860(teo 970.468.0672(fax) Contacts: Sam Tooley sam uel.tooley0owestsom XCEL NIGH PRESSURE GAS /7 970.262.4076(tel) 970.468.1401(fax) MAY 15 1007 Contact: Ride Sisneros &LPaC'r -M richard.slsnerost1bxcelenergy.com HOLY CROSS ENERGY 970.947.5425(teq 970.945.4081(fax) Contact: Jeff Vroom Umomcholvcross.cord XCEL ENERGY 970.262-4038(fax) 970.262.4024(tel) contacts: K'rt Bogert Kath[yn.Booert@XCELENE&e.com EAGLE RIVER WATER& SANITATION DISTRICT 970.476.7480(tel) 970.476.4089(Fax) Contact: Fred Haslee fhaslee@erwsd.ora COMCAST CABLE 970.418.8248(teq 970.949.9138(fax) Contact; Davld Evans david eyaosOcable.eomtast com 1.If the utility approval&verification form has signatures from each of the utility companies,and no comments are made directly on the form,or no action Is taken within 2 weeks of the Utility's receipt of the forth without explatnation the Town will presume that there are no problems and the development can proceed. 2. if a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep In mind that it is the responsibility of the utility company and the applicant to resolve Identified problems. 3.These verifications do not relleve the contractor of the responslbllity bo obtain a Public Way Permit from the Department of Public Works at the Town of Vail.Utility 10 cations must be obtained before digging in any public right-of-way or easement within the Town of Vail. A building oerMilt Is not a Public_Way oermlt and must obtained senarztgly. 4.The Developer is required and agrees to submit any revised drawings to the utilities for re-approval&re-verification if the submitted plans are altered in any way after the authorized signature date(unless otherwise specifically noted within the comment area of this form). Developer's Signature Date F:\cdev\PORMS\Permits\Planning\DRB\drbsew_construction 1-25-2007.doc Page 9 of 14 11/73/2005 OG/05/2007 13:15 9704797501 ENGLISH & ASSOCIATES PAGE 04/07 FROM eewESV 51 LVERTHORM0 0704680672 CWED)MAV 78 3007 9:37/9T. P 2 no, UTILITY APPROVAL&VERIFICATION To iflV This form serves to verify that the proposed improvements will not impact any existing or proposed utility services,and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan,Including grading plan,floor plan,and elevations;shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Developer to Provide Lot Adds Information: Lot Address:L iTS 71 $ 2- LIB I subdivision: VA L 1 Lot; i '3 L_ Authorized Signature Commonts Date QWEST Qwerr(4,Af aVai&-� CARt6 970.468.6860(tel) A g -- TOWS � 970.468.0672(fax) LvTP'T'KA-r W!c ` e% .n Contacts: Sam Tooley - LQcAIM M samlaeLtoolev(o�gwest.com _, XCEL HIGH PRESSURE GAS 970.262.4076(tel) 970.468.1401(fax) Contact: Rich 51sneros richard sisneros6xcelanetav com HOLY CROSS ENERGY 970.947.5425(tel) 970.945.4081(Nx) Contact: Jeff Vroom iv roo m C81 h of vcross.com XCEL ENERGY 970.262.4038(fax) 970.262.4024 (tel) Contacts: Kit Bogert Kathryn•Bogert eC�XCEI_EPIP�CY_.cQm EAGLE RIVER WATER& SANITATION DISTRICT 970.476.7480(tel) 970.476.4089(fax) Contact: Fred Haslee fhasleernlerwsd.ore COMCAST CABLE 970.418.8248(tel) 970.949.9138(fax) Contact: David Evans david ev5ns6cable.com,gast-com NO L.If the utility approval&verification form has signatures from each of the utility companies,and no comments are made directly on the form,or no action Is taken within 2 weeks of the Utility's receipt of the form without explaination the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The Issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve Identified problems. 3.These verifications do not relieve the contractor of the responsibility to obtain a Public way Permit from the Department of Public Works at the Town of Vail.Utility locations_ ust be obtained before digginq in any publ'�c right-of--way or easement within the Town of Vail. A building PubriC Way RerTnit and mult be gbtained separately. 4.The Developer Is required and agrees to-submit any revised drawings to the utilities for re-approval&re-verification If the submitted plans are altered in any way after the authorized signature date(unless otherwise specifically noted within the comment area of this form). Developers Signature Date F:\cdev\FORMS\Pemuts\Planning\pRa\drb-new_construction_1-25-2007.doc Page 9 of 14 11/23/2005