HomeMy WebLinkAboutDRB130155 APPLICATION.pdf RECEIVED Department of Community Development
0 Date:05/13/2 013 75 South Frontage Road
TOWN OF VAIL` TOXIN OF VAIL g Vail,947 -2128
Y D. RHOADES Tel: 970479-2128
www.valigov.com
Development Review Coordinator
Application for Design Review
New Construction
General Information: This application is for all new construction. Applicable Vail Town Code sections can be
found at www.vailgov.com under Vail Information — Town Code Online. All projects requiring design review
must receive approval prior to submitting a building permit application. An application for Design Review
cannot be accepted until all required information is received by the Community Development Department, as
outlined in the submittal requirements. The project may also need to be reviewed by the Town Council and/or
the Planning and Environmental Commission. Design review approval expires one year from the date of
approval, unless a building permit is issued and construction commences.
Fee: $650
Single Family Duplex 01 Multi-Family Commercial
0096
Description of the Request: New construction of a previously approved(DRB07-0095)duplex residence
Physical Address: 809 Potato Patch Drive
Parcel Number: 2101-063-0101-8 (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.)
Property Owner: 809 Potato Patch Drive,LLC
Mailing Address: 141 E.Meadow Dr.,Ste 211,Vail,CO 81657
Phone: 303-550-4551
Owner's Signature:
Primary Contact/ Owner Representative: KH Webb Architects c/o Michael Current,Solaris Vail c/o Sharon Cohn
Mailing Address: 710 W.Lionshead Circle,Ste.A,Vail,CO 81657
Phone: 970-477-2990
E-Mail: michael @khwebb.com,sharon@solarisvail.com Fax: 970-477-2965
For Office Use Only:
Cash_ CC: Visa/MC Last 4 CC# Exp. Date: Auth# Check# 6363
Fee Paid: $650 . 00 Received From: K.H. WEBB ARCHITECT S
Meeting Date: 0 6/05/2 013 DRB No.:
Planner: Project No.:
Zoning: Land Use:
Location of the Proposal: Lot: 31 Block: 1 Subdivision: VAI—L-77717TU PATCH
Property Information
Property Address 809 Potato Patch Dr., Vail, CO 81657
Parcel# 2101-063-0101-8
Legal Description Lot 31, Blk 1, Potato Patch subdivision
Development Site Area sq ft 120987 1 acres 10.482 1 buildable sq It 17278
Zone District/SDD# Two-Family Primary/Secondary Residential
Hazard Zones Snow Avalanche High Severity Moderate Severity [J N/A
Sections 12-21 &14-7 Debris Flow []High Flow Moderate Flow ❑ High Avalanche . N/A
Rock fall ❑High Severity ❑Medium Severity ON/A
Excessive Slopes [];->30% N/A
Floodplain I ❑100 year floodplain Floodway "—'Wetlands 7`4/A
Creeks,Streams LJGore Creek r on site ❑adjacent to site I±,,N/A
Section 12-14-17 ❑Other tributary: Don site r-adjacent to site ' N/A
Project Information
Project Description New duplex residence
Development Standards Allowed Existing Proposed
Gross Residentlaf Floor Area Primary sq ft 7278 4294
(maximum)
Chapter 12-15 Secondary sq ft 2861
EHU sq ft
TOTAL sq ft 7155
250 Addition Interior Conversion
Credits:
Setbacks(minimum) Front ft 20 20 20
Section 14-104
Side ft 15 15 15
Side ft 15 15 15
Rear ft 30 30 30
Watercourse ft
Site Coverage(maximum)
see definition Section 12-2-2 4197 4184
Building Height(maximum) Sloping ft 33 33 33
see definition Section 12-2-2 Flat ft
Landscaping Soltscape sq ft 13991 13991 13991
See definition Section 14-2-1
Section 14-10-8 Hardscape sq ft 675 675 675
TOTAL sq ft 14666 14666 14666
Driveway Max Curb-cuts 24 24 24
Sections 14-3-1 &14-3-2
Max Grade @ C% 5% 5%
centerline J
Min Width 23.5' 23.5' 23.5'
Heated drive? j Yes M No [Yes [j No
Snow Storage% 10
Parking #Enclosed Spaces
Sections 12-10&14-5 #Unenclosed
TOTAL
Outdoor Lighting(maximum) #fixtures
Section 14-10-7 21 19
PROPOSED MATERIALS
Building Materials Type of Material Color
Roof standing seam metal ebonized zinc
Siding vertical board & batten light tan stain
Other Wall Materials vertical standing seam metal Zinc
Fascia RS cedar tan stain
Soffits v-groove T&G clear stain
Windows alum clad dark bronze
Window Trim RS cedar tan stain
Doors match windows
Door Trim match windows
Hand or Deck Rails steel dark bronze
Flues obscured by steel mesh black
Flashing sheet metal match windows
Chimneys stone
Trash Enclosures n/a n/a
Greenhouses n/a n/a
Retaining Walls stone and boulders
Exterior Lighting metal dark bronze
Other
PROPOSED LANDSCAPING
Botanical Name Common Name Quantity Size
PROPOSED
TREES Picea Pungens Colo Blue Spruce 10 8-12'
AND SHRUBS Malus spp. "Radiant" Radiant Crabapple 1 3" cal.
populus tremuloides quaking aspen 19 2-3" cal.
amelanchier alnifolia serviceberry 3 5 gal.
rosa woodsii wood's rose 16 5 gal.
symphoricarpos albus Snowberry 15 5 gal.
ribes alpinum alpine currant 5 5 gal.
corpus stolinifera"baileyi" redtwig dogwood 1 7 gal.
EXISTING TREES none
TO BE REMOVED
Minimum Requirements for Landscaping: Deciduous Trees—2" Caliper
Coniferous Trees—6' in height
Shrubs—5 Gal.
Type Square Footage
GROUND COVER native grass 13991
SOD
SEED
IRRIGATION
TYPE OF EROSION CONTROL erosion control fence
Please specify other landscape features(i.e. retaining walls, fences, swimming pools, etc.)
stone veneer site retaining walls to match house stone.
UTILITY APPROVAL&VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail.
Subject Property Address: Lot Block Subdivision:
Primary Contact/Owner Representative: Phone: 303-550-4551
Plans Dated:
Primary Contact/Owner Representative Signature
Authorized Signature Comments Date
CENTURY LINK
970.328.8288(tel)
970.328.8282(fax)
Contacts: Barb Davis
barb.davis aacenturylink.com
XCEL HIGH PRESSURE GAS
970.406.1784(tel)
970.468.1401 (fax)
Contact: Remington Baker
remington.c.baker(abxcelenergy.com
HOLY CROSS ENERGY
970.947.5425(tel)
970.945.4081 (fax)
Contact:Jeff Vroom
ivroom(a)holycross.com
XCEL Energy
970.262.4039(tel)
970.262.4038(fax)
Contacts: Pam McGuire
Pamela.mcauire(abxcelenergv.corn
EAGLE RIVER WATER&SANITATION
DISTRICT
970.477.5449(tel)
970.845.7218(fax)
Contact:Tug Birk
tbirk cr.erwsd.ora
COMCAST CABLE
970.930.4713(tel)
303.603.1004(fax)
Contact: Michael Johnson
Michael iohnsonCa.cable.comcast.com
CDOT(Only in CDOT Right-of-way)
970.683.6284(tel)
Contact: Dan Roussin
Daniel.roussinla.dot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date.
06/05/2007 13:15 9704797501 ENGLISH & ASSOCIATES PAGE 02/07
too UTILITY APPROVAL a VEFUMATION
This form serves to vent'that the proposed ImprovameMs will not impact any egiiong or proposed uS'ty servks,and
w"to verify samm wwrability and lowdon for new aomt uion and should be used in eonjUnctfon with preparing your
utility plan and schedu0ng instapattons. A Site plan,Including graeling plerh,floor plan,and elevations,shall be submitted
to the following utilities for approval and verification.PLEASE ALLOW UP TO 2 WEEF04 FOR APPROVAL OR
COMMUM FROM THE UrILTly COMPANNS. if you are unabla to obtain comment;within that timetiamQ please
con=The Town of Vail.
pendopwtopAnl eLatAdidr*WZV rr06W&
LptAddrew: subdivisions Lot#-
ormod 8iqdftWM Carnmenla
QWE9r
970.468.6860(tep
970.46&0672(Nx)
roam 7s: Sam Toolw
XCEL HIGH PRE"URE BAS
970,262.4078(tel)
970.46LIQI(W
Cantarfr Rich Sawas
HOLY CROSS ENERGY
970.W-94U(teI) 1=7c,grwc r'AC1L1T165 LOCATEfl
970.945.4081(f
0ontect Jetrvoom e A1.RA1C� PbTASb �P.�C1� ��
)MR ENEKOY
Q�
�C49
970.262.4038(*)
970.262.4024(del)
CaMOctw
Kit Bogert
SMILE FMR WATER&
sAN1TAIMN 15MM ICT
970.676.7480(tat)
970:4.4089(W
Contact Fred Hallee
fhasrwed.om
COMCASf CABLE
970.418.0248(tee
970.949-9198(ftO
COMM* David R--
Bawd et�n��e.mmce�fn
1.If UOUN approval iL ver'Koadon form has tignetwes from each of the utM cam and n0 Comments are made
dlredty on the form,or no action Is t3lm within 2 wader of the ijuWe receipt of tha form without eViaination the Town
will presume that there are no problems and the devAlopment ran proceed.
2.If a toliity company has conrxms wim the propoifd co nr the uliW rew-WrItattve s MR nem dir®W on t+he
hrb6ly veriflmtion form that mere is a problem Which nesds to be resolved. The 1=0�Gf the abbey detailed in end
attached letter to me Town Of Vail, However,please kmep In mind that it is the respo^smnN
the applicant to resolve idendfled problems. the Department
a.These verifications do not rWwe the corttfdCODr of the respons�011y to obtain efa a Public
a4in Gin a y public lght:ofr OFF
of public Works at the Town of Vac. o
casement wMn Me Town of Vall.
4 Developer is rap*-rl and agr@"to submit"revised drawings ro the hdilit 5 for raapp�&re•vertflcalfon 0
the submitted plans are altered In any way dtar the authonzei 9gnaaue date(ivhless otherwise sped5catN noted within
the cummant area of this form).
Date
Devalgperle Sigr4=re
F_ 7.410C Page 9 of 14 11173/2005
7 Abp 'nti MINI SSOU A10H WdEE;L LOOT til AVA
0G/05/2007 13:15 9704797501 ENGLISH & ASSOCIATES PAGE 03/07
SILVERTHORNE HP Fax:19704681401 May 15 2007 5:20 P.02
0 UTILITY APPROVAL&VERIFICATION
=0170
This form serves to verify that the proposed improvements will not Impact any existing or proposed utility services,and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling Instatatlons. A site plan,including grading plan,floor plan,and elevations,shall be submitted
to the following utilities for approval and verification.PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR
COMMENTS FROM THE UTILTrY COMPANIES. If you are unable to obtain comments within that limeframe please
contact The Town of Vail.
Developer to Pmvide IotAddress lmlbrmaUon:
Lot Address- VRlt:- 4710110 �" Subdivision:4 Lot#.
Authorized Sianature Comments Date
QWEST
970.468.6860(teo
970.468.0672(fax)
Contacts: Sam Tooley
sam uel.tooley0owestsom
XCEL NIGH PRESSURE GAS /7
970.262.4076(tel)
970.468.1401(fax) MAY 15 1007
Contact: Ride Sisneros &LPaC'r -M
richard.slsnerost1bxcelenergy.com
HOLY CROSS ENERGY
970.947.5425(teq
970.945.4081(fax)
Contact: Jeff Vroom
Umomcholvcross.cord
XCEL ENERGY
970.262-4038(fax)
970.262.4024(tel)
contacts:
K'rt Bogert
Kath[yn.Booert@XCELENE&e.com
EAGLE RIVER WATER&
SANITATION DISTRICT
970.476.7480(tel)
970.476.4089(Fax)
Contact: Fred Haslee
fhaslee@erwsd.ora
COMCAST CABLE
970.418.8248(teq
970.949.9138(fax)
Contact; Davld Evans
david eyaosOcable.eomtast com
1.If the utility approval&verification form has signatures from each of the utility companies,and no comments are made
directly on the form,or no action Is taken within 2 weeks of the Utility's receipt of the forth without explatnation the Town
will presume that there are no problems and the development can proceed.
2. if a utility company has concerns with the proposed construction, the utility representative shall note directly on the
utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an
attached letter to the Town of Vail. However, please keep In mind that it is the responsibility of the utility company and
the applicant to resolve Identified problems.
3.These verifications do not relleve the contractor of the responslbllity bo obtain a Public Way Permit from the Department
of Public Works at the Town of Vail.Utility 10 cations must be obtained before digging in any public right-of-way or
easement within the Town of Vail. A building oerMilt Is not a Public_Way oermlt and must obtained
senarztgly.
4.The Developer is required and agrees to submit any revised drawings to the utilities for re-approval&re-verification if
the submitted plans are altered in any way after the authorized signature date(unless otherwise specifically noted within
the comment area of this form).
Developer's Signature Date
F:\cdev\PORMS\Permits\Planning\DRB\drbsew_construction 1-25-2007.doc Page 9 of 14 11/73/2005
OG/05/2007 13:15 9704797501 ENGLISH & ASSOCIATES PAGE 04/07
FROM eewESV 51 LVERTHORM0 0704680672 CWED)MAV 78 3007 9:37/9T. P 2
no, UTILITY APPROVAL&VERIFICATION
To iflV
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services,and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan,Including grading plan,floor plan,and elevations;shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR
COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please
contact The Town of Vail.
Developer to Provide Lot Adds Information:
Lot Address:L iTS 71 $ 2- LIB I subdivision: VA L 1 Lot; i '3 L_
Authorized Signature Commonts Date
QWEST Qwerr(4,Af aVai&-� CARt6
970.468.6860(tel) A g -- TOWS �
970.468.0672(fax) LvTP'T'KA-r W!c ` e% .n
Contacts: Sam Tooley - LQcAIM M
samlaeLtoolev(o�gwest.com _,
XCEL HIGH PRESSURE GAS
970.262.4076(tel)
970.468.1401(fax)
Contact: Rich 51sneros
richard sisneros6xcelanetav com
HOLY CROSS ENERGY
970.947.5425(tel)
970.945.4081(Nx)
Contact: Jeff Vroom
iv roo m C81 h of vcross.com
XCEL ENERGY
970.262.4038(fax)
970.262.4024 (tel)
Contacts:
Kit Bogert
Kathryn•Bogert eC�XCEI_EPIP�CY_.cQm
EAGLE RIVER WATER&
SANITATION DISTRICT
970.476.7480(tel)
970.476.4089(fax)
Contact: Fred Haslee
fhasleernlerwsd.ore
COMCAST CABLE
970.418.8248(tel)
970.949.9138(fax)
Contact: David Evans
david ev5ns6cable.com,gast-com
NO
L.If the utility approval&verification form has signatures from each of the utility companies,and no comments are made
directly on the form,or no action Is taken within 2 weeks of the Utility's receipt of the form without explaination the Town
will presume that there are no problems and the development can proceed.
2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the
utility verification form that there is a problem which needs to be resolved. The Issue should then be detailed in an
attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and
the applicant to resolve Identified problems.
3.These verifications do not relieve the contractor of the responsibility to obtain a Public way Permit from the Department
of Public Works at the Town of Vail.Utility locations_ ust be obtained before digginq in any publ'�c right-of--way or
easement within the Town of Vail. A building PubriC Way RerTnit and mult be gbtained
separately.
4.The Developer Is required and agrees to-submit any revised drawings to the utilities for re-approval&re-verification If
the submitted plans are altered in any way after the authorized signature date(unless otherwise specifically noted within
the comment area of this form).
Developers Signature Date
F:\cdev\FORMS\Pemuts\Planning\pRa\drb-new_construction_1-25-2007.doc Page 9 of 14 11/23/2005