Loading...
HomeMy WebLinkAboutDRB130107 Plans ApprovedDRB130107 DOUGLAS MILLER DECHANT ARCHITECTS SHEPHERD RESOURCES INC / AIA POST OFFICE BOX 1624 AVON COLORADO 81620 T970 949 3302 F970 949 5 1 21 WWW.SRIARCHITECT. COM " ti 11 DATE ISSUE 6 -20 -12 DRB CONCEPTUAL 7 -23 -12 FINAL DRB 8 -24 -12 FINAL DRB REVISIONS 8 -29 -12 FINAL DRB REVISIONS 8 -31 -12 PERMIT 193 BEA\/ER DM ROAD 1 -2 -13 DRB CHANGES 2 -20 -13 DRB CHANGES 2 -7 -13 LOWER LEVEL WIN & DR CD 3 -13 -13 REVISED PERMIT 3 -13 -13 CONSTRUCTION DOCUMENTS DRBCHANG 5 -1 -13 DRB CHANGES 5 -15 -13 DRB CHANGES MAY159 2013 DRB CHANGES MAY 15, 2013 RECEIVED By David Rhoades at 9:36 am, Apr 22, 2013 PROJECT. 1107 MARSHALL RESIDENCE REMODEL 193 BEAVER DAM RD. BLOCK: 7, LOT: 38 VAIL VILLAGE FILING 1 VAIL, COLORADO COVER SH EET A0.0 FLOOR PLAN GENERAL NOTES 1. ALL INTERIOR WALLS ARE WALL TYPE W4A UNO. SEE PLANS FOR DIMENSIONS. 2. REFERENGE SITE PLAN FOR AGTUAL EXTERIOR PATI05 /STEPS 8 GRADE 3. ALL LIGHTER LINES ARE EXISTING, UNO. 4. ALL DARKER LINES OR SHADED WALL5 ARE NEW, UNO. 5. ALL WINDOW5 AND DOORS ARE NEW. 4 A3.1 .......... 4 5 DECK SETBACK LINE AND 10' UTILITY EASEMENT LINE 10' UTILITY EASEMENT LINE EDGE OF NEW DECK - - — 'ABOVE _ - 5 — — —6 p 3154 - 15 BUILDI AGK LINE — 4' - O" r NEW STONE N EXISTING = E11 r _ 5145- 5 1 = = A4.1 — — - FRAMING /STUCCO _ - - - - _ - I _ IER EQ = Q _ EXT. FACE N5E1 W2A EQ EQ 114 _ F STUD 5IM. cn B r 4" STONE N ' 4" STONE VENEER VENEER W/ NEW iy 9.25" -- THIS WALLS �� STONE VENEER THIS THIS WALL _ F. FACE - \ - //� - _ � � _OF STUD �- STONE - = WALL ONLY - / NEW PIER - 4'- O" EXIST EXT. FACE _ L OF BEAM 5 _ - - IM. -- / BEDROOM O A5E1 HOB TONE - _ F STUD W/ = ABOVE- O EQ 1' - 6" NEW STONE - _ _ _ BENGH #2 ON EXISTING SERVICE NEW STONE O FRAMING /STUCCO @ 12" PER ID BUILT -IN 114 UP - = PIERS_ _ = W3 - _ - - 04 - - - DOGS COUNTER - F5E6 - - - - SIM. AND GABS 0 W/ APPLIANGES— PER ID DOGS OOA 4'- 4 9/16" 4'- 3 5/8" _ RATH # # 5TA R r 2 MEGH EQ BEDROOM GHASE O 106 111 -l'- 2 5 /5" NEW WOOD FINISH 117 iv A4.0 _ # 1 F5E5 ON EXIST STAIR BUILT-IN a) - 104 COUNTER 106 � O 15T @ 10-311 NEW O 111 18T @ 10- 3/16" GRAM F5E6 AND GABS W4B HATGH, 12 5F MAX = BEDROO W/ APPLIANGES HOOD EXHAUST 5IM. _ #4 W4B PER ID DOGS 4^ _ $ 4^ z W36 pfui l I = - - _ - _ 100 2' - 4" 2 8 w 2. _ a.. 2' _ 4.. / 10O MEGH DUCT m m RE5 IN RE55IN - - (L #2 m I I STORAGE I REMOVE - WINE RACK A31 C _ _ 1 I 10"1 112 ry 5IM 110 N313 � � - o MEGH KITGHENETTE Q - - m - - 04 � UGTS - r D W46 - _ - A _ 114 ry A 115 - � o O 4 STONE VENEER — — - THI5 WALL Lu � I 108 F5E3 I I ry I L m 1 T - " 2 - 4 - 5/8" - � ry A4.0 II 103 ' I I r I ® W3B BEL W � Eo -5k: RECI 101 o 10 I 113 I ROOM I _ MIG O ABOVE i - � O 116 H �, W3B cv EQ W3E1 BATH #4 0 w NEW STONE LAUNDRY MEGH O ON EXISTING GL05ET 102 102 10q 113 <+j �t FRAMING 101 F5E3 A O FSES 4" NEW 5TONE OAS SMETERS r 8 /8" 102 I /— ON EXI5TING NEW STONE m 5 1l1l 3' - 3 1/2" FRAMING /STUCCO ON NEW ry d rr� W1E2 D4.16 FRAMING �t BENCH PER CURVED WALL 5'- 6 1/4" FURR -OUT WALL IF ID DOGS PER FURR -OUT WALL W1E1 REQ TO COVER ID DOGS W1E2 A5 REQD FOR NEW STONE STEEL PLATE MEGH DUCTS $ 5IM' ON EXISTING/A DED FURR -OUT 5IM. BEAM SEAT ABOVE. TO COVER WALL NOTIFY ARGHITECT WALL IF STEEL PLATE OF FINAL FINISHED REQ TO COVER NEW STONE BEAM SEAT WIDTH STEEL PLATE I ON EXISTING ABOVE OF TOILET ROOM BEAM SEAT ABOVE 2 WALL PRIOR TO GON5TRUCTION A4.1 OF FURRING. CENTER TOILET IN FINAL FINISHED WIDTH. I I I I I I I I I I I 3 A3.0 I I LOWER LEVEL FLOOR PLAN I 1 SCALE: 1/4" = 1' -0" 0 2' 4' 8' I 11 DOUGLAS MILLER DEC-ANT ARCHITECTS SHEPHERD RESOURCES INC / AIA POST OFFICE BOX 1624 AVON COLORADO 81620 T970 949 3302 F970 949 5 121 WWW.SRIARCHITECT. COM ti 11 DATE ISSUE 6 -20 -12 DRB CONCEPTUAL 7 -23 -12 FINAL DRB 8 -24 -12 FINAL DRB REVISIONS 8 -29 -12 FINAL DRB REVISIONS 8 -31 -12 PERMIT 11 -7 -12 PERMIT CORRECTIONS 1 -2 -13 DRB CHANGES 1 -21 -13 REVISED BUILDING PERMIT 2 -7 -13 LOWER LEVEL WIN & DR CD 3 -13 -13 REVISED PERMIT 3 -13 -13 CONSTRUCTION DOCUMENTS 5 -15 -13 DRB CHANGES 0 MAY 15, 2013 PRoJECr: 1107 MAASHALL RESIDENCE REMODEL 193 BEAVER DAM RD. BLOCK: 7 ,LOT: 38 VAIL VILLAGE FILING 1 VAIL, COLORADO LOWER LEVEL FLOOR PLAN PARTIAL A2.Oa FLOOR PLAN GENERAL NOTES 1. ALL INTERIOR WALL5 ARE WALL TYPE W4A UNO. SEE PLANS FOR DIMEN5ION5. 2. REFERENCE SITE PLAN FOR ACTUAL EXTERIOR PATIO5/5TEP5 $ GRADE 3. ALL LIGHTER LINES ARE EXI5TIN6, UNO. 4. ALL DARKER LINES OR SHADED WALLS ARE NEW, UNO. 5. ALL WINDOWS AND DOORS ARE NEW. I 10'UTILITY EASEMENT LINE 15' BUILDING SETBACK LINE I 6 T 8 9 32' - 0" I I I I I I I I I I I 1 LOWER LEVEL FLOOR PLAN SCALE: 1/4" = 1' -0" A/G CONDENSER 6X6 TIMBER COLUMN, TYP 0 2' 4' 8' 1 A3.0 N DOUGLAS MILLER DECHANT ARCHITECTS SHEPHERD RESOURCES INC / AIA POST OFFICE BOX 1624 AVON COLORADO 81620 T970 949 3302 F970 949 5 121 WWW.SRIARCHITECT. COM ea 11 DATE ISSUE 6 -20 -12 DRB CONCEPTUAL 7 -23 -12 FINAL DRB 8 -24 -12 FINAL DRB REVISIONS 8 -31 -12 PERMIT 11 -7 -12 PERMIT CORRECTIONS 1 -2 -13 DRB CHANGES 1 -21 -13 REVISED BUILDING PERMIT 2 -7 -13 LOWER LEVEL WIN & DR CD 3 -13 -13 REVISED PERMIT 3 -13 -13 CONSTRUCTION DOCUMENTS 5 -15 -13 DRB CHANGES DRB CHANGES MAY 15, 2013 i i IPRoJECr: 1107 MAIRSHALL I RESIDENCE � REMODEL I 193 BEAVER DAM RD. BLOCK: 7 ,LOT: 38 VAIL VILLAGE FILING 1 VAIL, COLORADO ILOWER LEVEL FLOOR PLAN PARTIAL /Q*Ob clqe C DOUGLAS MILLER DECHANT ARCHITECTS ISHEPHERD RESOURCES INC / AIA POST OFFICE BOX 1624 FLOOR PLAN GENERAL NOTES AVON COLORADO 81620 10' UTILITY EASEMENT LINE 1. ALL INTERIOR WALLS ARE NAL�PE�A 11p1G�. 5P�L,4td"t� FOR T970 949 3302 F970 949 5 12 1 �2. REFERENCE 5ITE PLAN FOR ACTUAL EXTERIOR FATIO5 /5TEP5 $ GRADE WWW . S R I A R C H I T E C T. C O M 3. ALL LIGHTER LINES ARE EXISTING, UNO. 4. ALL DARKER LINES OR SHADED WALLS ARE NEW, UNO. 5. ALL AINDOW5 AND DOORS ARE NEW. 15 BUILDING SETBACK LINE I _ — I I 6 7 S q 32' - O" I 14' -0" I I I I I I I I I I I I 1 1 I I I I I SEALED NOTE: I N W STONE W3E GAS FIREPLACE APPLIANCE MASTER 3 N EXISTING AMING 3 W3E DECK ELEVATION I zA� O MASTER TO BE RECONCILED �� cv W3E W3E1 A31 W3 O BEDROO WITH ACTUAL MASTER m 216 FINISHED ELEVATION PRIOR FLOOR I N UGTION p 11 1/2" I 11 1/2" 7 -23 -12 MASTER W/ CENTER OF 18' -0" I ROOF BELOW � 1 DRB CHANGES 1 -21 -13 2A A4.1 I 3 -13 -13 I 3 -13 -13 I 5 -15 -13 DRB CHANGES � GUARDRAIL �w ENTRY IQ I � u I W3E 2 ONE DECK, I A4.0 6 INSTALL BRIDGE O HEAT TUBING IN DECK I FOR FUTURE HEATING I NEW STONE � m ON NEW F4B OL 212 FRAMING O 4.2 21 FRIDGE 2' - 10 1/2" 5' - 6 1/2" 2166 ME � — — — — — — — \ I FRAMING /5T0000 I (E) OPENING SEALED NOTE: I N W STONE W3E GAS FIREPLACE APPLIANCE MASTER 3 N EXISTING AMING 3 W3E DECK ELEVATION I zA� O MASTER TO BE RECONCILED �� cv W3E W3E1 A31 W3 O BEDROO WITH ACTUAL MASTER m 216 FINISHED ELEVATION PRIOR FLOOR I N UGTION \ / I EXISTING LINEN G5 EGH DUCT , I \ / I TILE TO REMAIN `n as - - - - - - - \--/- - MA5/1-ER I 5' -0" 5' -0" (E) 5 H6PVER I W3E3 I OPENING 214 W3E NEW STONE ON EXISTING I WX FRAMING 4.3A W3E (E) I q OPENING I I zA2.3 I I I EO EO I A3'J2 I I MAIN LEVEL FLOOR PLAN SCALE: 1/4" = 1' -0" 1 2 3 4 5 I I I I I UPPER LEVEL FLOOR PLAN / SCALE: 1/4" = 1' -0" DATE ISSUE 6 -20 -12 DRB CONCEPTUAL 7 -23 -12 MASTER W/ CENTER OF OPENING – – – ROOF BELOW PERMIT 1 -2 -13 DRB CHANGES 1 -21 -13 2A 2 -20 -13 I TO BATHROOM 3 -13 -13 I 3 -13 -13 I 5 -15 -13 DRB CHANGES ENTRY W3E NEW STONE 10' - 8" 6 BRIDGE O IU /G DUGT5 m v OF CLOSET 2" FOR I ON NEW A MEGH DUCT w 212 w 21 FRIDGE � — — — — — — — FRAMING /5T0000 I (E) OPENING LINEN EQ EQ (D (1 )) I `t – 1 A' – GOUNTER – I �, MASTER 213 w � MASTER DRESSING I A4 0 TOILET MASTER _ 211 W/ GABINETS 1. I FLOOR / -WIND 215 UNDE � AND APPLIANCES 18 x 18" � DRAW R CLEAR REGISTER w PER ID DOCUMENTS F5E3 ALIGN Aso RE M E G H V W 65 CENTER I iv OF OPENING \ / I EXISTING LINEN G5 EGH DUCT , I \ / I TILE TO REMAIN `n as - - - - - - - \--/- - MA5/1-ER I 5' -0" 5' -0" (E) 5 H6PVER I W3E3 I OPENING 214 W3E NEW STONE ON EXISTING I WX FRAMING 4.3A W3E (E) I q OPENING I I zA2.3 I I I EO EO I A3'J2 I I MAIN LEVEL FLOOR PLAN SCALE: 1/4" = 1' -0" 1 2 3 4 5 I I I I I UPPER LEVEL FLOOR PLAN / SCALE: 1/4" = 1' -0" DATE ISSUE 6 -20 -12 DRB CONCEPTUAL 7 -23 -12 MASTER W/ CENTER OF OPENING – – – ROOF BELOW PERMIT 1 -2 -13 DRB CHANGES 1 -21 -13 REVISED BUILDING PERMIT 2 -20 -13 I TO BATHROOM 3 -13 -13 REVISED PERMIT 3 -13 -13 I 5 -15 -13 DRB CHANGES ENTRY W3E MEGH 216A w FURR -OUT INSIDE 10' - 8" DUGT5 m v OF CLOSET 2" FOR I A MEGH DUCT � — — — — — — — m (E) OPENING LINEN EQ EQ (D (1 )) I `t I �, MASTER 213 w � MASTER DRESSING I TOILET MASTER _ 211 213 F5E5 BATH � iv to I / -WIND 215 UNDE � 18 x 18" � DRAW R CLEAR \ / I EXISTING LINEN G5 EGH DUCT , I \ / I TILE TO REMAIN `n as - - - - - - - \--/- - MA5/1-ER I 5' -0" 5' -0" (E) 5 H6PVER I W3E3 I OPENING 214 W3E NEW STONE ON EXISTING I WX FRAMING 4.3A W3E (E) I q OPENING I I zA2.3 I I I EO EO I A3'J2 I I MAIN LEVEL FLOOR PLAN SCALE: 1/4" = 1' -0" 1 2 3 4 5 I I I I I UPPER LEVEL FLOOR PLAN / SCALE: 1/4" = 1' -0" DATE ISSUE 6 -20 -12 DRB CONCEPTUAL 7 -23 -12 FINAL DRB 8 -24 -12 FINAL DRB REVISIONS 8 -31 -12 PERMIT 1 -2 -13 DRB CHANGES 1 -21 -13 REVISED BUILDING PERMIT 2 -20 -13 DRB CHANGES 3 -13 -13 REVISED PERMIT 3 -13 -13 CONSTRUCTION DOCUMENTS 5 -15 -13 DRB CHANGES Ik �M�\ MAY 15, 2013 PRoJECr: 1107 MAASHALL RESIDENCE REMODEL 193 BEAVER DAM RD. BLOCK: 7 ,LOT: 38 VAIL VILLAGE FILING 1 VAIL, COLORADO MAIN LEVEL FLOOR PLAN PARTIAL & UPPER MAIN LEVEL PLAN A201 b P F: ELEVATION GENERAL NOTES 1. EXTERIOR WALL FINI5HE5 INDICATED ON ELEVATIONS - ALL WALL FINI5HE5 ARE NEW, UNO. A� 6" DRY 5TACK STONE VENEER (NEW OR REPLACE EXI5TIN5) WOOD HORIZONTAL NOT U5EO COPPER PANELS 2. COPPER PANEL SIZE /LAYOUT I5 A REPRESENTATION OF INTENT. ACTUAL PANELS 5HALL BE REVIEWED W / ARCHITECT PRIOR TO FABRICATION 3. 5TONE HATCH INDICATED ON EXTERIOR S UTH ELEVATION ( 3 I SCALE: 1/4" = V -0" WEST ELEVATION 2 SCALE: 1/4" = V -0" EAST ELEVATION 1 SCALE: 1/4" = V -0" 0 2' 4' 8' DOUGLAS MILLER DECHANT ARCHITECTS SHEPHERD RESOURCES INC / AIA POST OFFICE BOX 1624 AVON COLORADO 81620 T970 949 3302 F970 949 5 1 21 11 WWW.SRIARCHITECT. COM ti 11 DATE ISSUE 6 -20 -12 DRB CONCEPTUAL 7 -23 -12 FINAL DRB 8 -24 -12 FINAL DRB REVISIONS 8 -29 -12 FINAL DRB REVISIONS 8 -31 -12 PERMIT 1 -2 -13 DRB CHANGES 1 -21 -13 REVISED BUILDING PERMIT 2 -20 -13 DRB CHANGES 3 -13 -13 REVISED PERMIT 3 -13 -13 CONSTRUCTION DOCUMENTS 5 -1 -13 DRB CHANGES 5 -15 -13 DRB CHANGES • ' a •��, MAY 15, 2013 PROJECT: 1107 MAASHALL RESIDENCE REMODEL 193 BEAVER DAM RD. BLOCK: 7, LOT: 38 VAIL VILLAGE FILING 1 VAIL, COLORADO EXTERIOR ELEVATIONS A3*0 �J 1 A4.1 �mY 14' -O" 1 6 DRB CONCEPTUAL I I I 1. EXTERIOR WALL FINISHES INDICATED ON ELEVATIONS - I e��asw��� ALL WALL FINISHES ARE NEW, UNO. s.o�■aal� 8 -31 -12 A� 6" DRY STACK STONE VENEER (NEW OR REPLACE EXI5TING) �� DRB CHANGES WOOD HORIZONTAL REVISED BUILDING PERMIT _e - OI iT —1 ■�I D� COPPER PANELS CONSTRUCTION DOCUMENTS ts6 2. COPPER PANEL SIZE /LAYOUT 5 -15 -13 s� I��s1a>e - ■ °� REVIEWED W/ ARCHITECT PRIOR TO FABRICATION 3. STONE HATCH INDICATED ON EXTERIOR Imo— ■I ELEVATIONS REPRESENT LOCATION OF a•a!� tom® STONE VENEER ONLY AND SHOULD NOT BE 2 4 X11 3 REFERENCED FOR PATTERN, STYLE OR SIZE. A4.1 A4.1 ■1��>��� A4.1 4. ALL WINDOW5 AND DOORS ARE NEW. s� i 5. ALL GUTTERS AND DOWN 5POUT5 TO BE COPPER AND 4 3 2 I —1 REVIEWED BY ROOFING CONTRACTOR. ROOFING IMF_•1 d 11' -O" 1 - -�' 1 CHIMNEY 511,11- O" ■seo ■a ■I, —1 ■� o 1. �elr ■■w■i W■IEW � ��awlla WE me- a Imo— —1 ■� 1 ■m ®Ia�� s�fI1��1 �� = ■I� ■� ��r■� IA Imo— �mY 14' -O" 1 6 DRB CONCEPTUAL I I I 1. EXTERIOR WALL FINISHES INDICATED ON ELEVATIONS - I e��asw��� ALL WALL FINISHES ARE NEW, UNO. s.o�■aal� 8 -31 -12 A� 6" DRY STACK STONE VENEER (NEW OR REPLACE EXI5TING) �� DRB CHANGES WOOD HORIZONTAL REVISED BUILDING PERMIT Imo— OI iT —1 ■�I D� COPPER PANELS CONSTRUCTION DOCUMENTS ts6 OMa'E9i1M ■OME / V I �`f _ ��i /;f __:�� /'at igof __ ��;�r 'r /if __ wr s� ✓q ��f I __ q %of __.I�r rn it _ .�a r' /s o�aaa.as,■s•� =ate a ate, Iaaa�a� ■�a,� aaaaa�i■' ■ .�� CI— ■1m� MlllMI■ . q _ -- / 19A 19G 0 / l e i V �✓ Y 7 W' ■I— ■1�— �I■ � ��� o,® s ��6 ��■� —■� ■�i...'�� � sue, e�!e.`�e I Elm Elm MMlMM1 1103-1vid own NINE —. r ��as —� ®tee – — ■� e� ®�, v Mw.'� _�°_ A,�W.1a; tea; vim°•_ ©�� �� �� s'��e _ –�aC –�._ �e�7 -��' ' °O�/� _ ----v_ – _ – _ –t't!1 �' 9� ir9a■s a - �t� ;- ate_ - ° ..a01� �,G 1,,, �� o,��, 1� ©- ,1� 9, ..ate �,� �,I ..a,�- ISSUE ELEVATION GENERAL NOTES DRB CONCEPTUAL e■ 1. EXTERIOR WALL FINISHES INDICATED ON ELEVATIONS - ■�� e��asw��� ALL WALL FINISHES ARE NEW, UNO. s.o�■aal� 8 -31 -12 A� 6" DRY STACK STONE VENEER (NEW OR REPLACE EXI5TING) �� DRB CHANGES WOOD HORIZONTAL REVISED BUILDING PERMIT Imo— G� NOT USED —1 ■�I D� COPPER PANELS CONSTRUCTION DOCUMENTS ts6 2. COPPER PANEL SIZE /LAYOUT 5 -15 -13 ��� I5 A REPRESENTATION OF INTENT. ACTUAL PANELS SHALL BE ■ °� REVIEWED W/ ARCHITECT PRIOR TO FABRICATION 3. STONE HATCH INDICATED ON EXTERIOR Imo— ■I ELEVATIONS REPRESENT LOCATION OF a•a!� tom® STONE VENEER ONLY AND SHOULD NOT BE 2 4 X11 3 REFERENCED FOR PATTERN, STYLE OR SIZE. A4.1 A4.1 ■1��>��� A4.1 4. ALL WINDOW5 AND DOORS ARE NEW. i 5. ALL GUTTERS AND DOWN 5POUT5 TO BE COPPER AND 4 3 2 SHALL NOT BE PRE- PATINATED. GUTTER AND DOWN5POUT 1 LOCATIONS 4 LENGTHS ARE DIAGRAMMATIC 4 SHOULD BE —1 REVIEWED BY ROOFING CONTRACTOR. ROOFING IMF_•1 CONTRACTOR TO PROVIDE SHOP DRAWINGS. 11' -O" 1 - -�' 1 CHIMNEY 511,11- O" OMa'E9i1M ■OME / V I �`f _ ��i /;f __:�� /'at igof __ ��;�r 'r /if __ wr s� ✓q ��f I __ q %of __.I�r rn it _ .�a r' /s o�aaa.as,■s•� =ate a ate, Iaaa�a� ■�a,� aaaaa�i■' ■ .�� CI— ■1m� MlllMI■ . q _ -- / 19A 19G 0 / l e i V �✓ Y 7 W' ■I— ■1�— �I■ � ��� o,® s ��6 ��■� —■� ■�i...'�� � sue, e�!e.`�e I Elm Elm MMlMM1 1103-1vid own NINE —. r ��as —� ®tee – — ■� e� ®�, v Mw.'� _�°_ A,�W.1a; tea; vim°•_ ©�� �� �� s'��e _ –�aC –�._ �e�7 -��' ' °O�/� _ ----v_ – _ – _ –t't!1 �' 9� ir9a■s a - �t� ;- ate_ - ° ..a01� �,G 1,,, �� o,��, 1� ©- ,1� 9, ..ate �,� �,I ..a,�- 41- 1111 —� - - aces'.' ■aegis ■ oII1I■ s -. � +r . .■A� o ® s e ��:., �i ® vaai ���1�'+...®.7��� ® � -•Pis �� -�.fs �� �" — 'as��ssti as ■she mgr e�is�t�as■ �ia�■■��ssA— _ sal e v • - i a o _sue _ ^�� � ���;m_� =■�� - - ■ v as eo!- °�1m� —=e -aa _�_ � �s �� va� I I 1 � J t J s.z - - -s afis s �■a• .e. ''� ®� .- �■ � �® ��� � ®yam. ���_ m a� `ate esa�.° aon s �s as* i a>ess a+s - - 1�". s, a� s �^ ■mom - �'. s, 1 ie �, i.� as'.- - isa. s � � si tlas �aa�a �.tlas aas � a esaao•�e awe a�i i • !� d a i■o s o � •a � !� Mass— - �- �.^ � � .e�_BBan NINE MAIN LEVEL T O 5T /WD b1551- 2 5/8" _ --//MAIN LEVEL T O PLY 8154' - 11 1/8" LOWER LEVEL T O GYPG 5144'- 8 5/8" LOWER LEVEL T O PLY 5144'- 7 118" PARTIAL EAST ELEV @MASTER SCALE: 1/4" = V -0" (dd ISSUE ��■as,! DRB CONCEPTUAL e■ ■��ai� ■�� e��asw��� 8 -29 -12 s.o�■aal� 8 -31 -12 PERMIT �� DRB CHANGES 1 -21 -13 REVISED BUILDING PERMIT Imo— DRB CHANGES —1 ■�I 1 ■1�e1�vf�5 CONSTRUCTION DOCUMENTS ts6 ?�1��1'��v>� 5 -15 -13 ��� ■1� ■ °� ��� ���t Imo— ■I —1 a•a!� tom® - X11 X11 ■1��>��� i Imo— —1 mill IMF_•1 �— — 1 - -�' 1 0 E �i�■ ■seo ■a ■I, —1 ■� o 1. �elr ■■w■i W■IEW � ��awlla WE me- a Imo— —1 ■� 1 ■m ®Ia�� s�fI1��1 �� = ■I� ■� 41- 1111 —� - - aces'.' ■aegis ■ oII1I■ s -. � +r . .■A� o ® s e ��:., �i ® vaai ���1�'+...®.7��� ® � -•Pis �� -�.fs �� �" — 'as��ssti as ■she mgr e�is�t�as■ �ia�■■��ssA— _ sal e v • - i a o _sue _ ^�� � ���;m_� =■�� - - ■ v as eo!- °�1m� —=e -aa _�_ � �s �� va� I I 1 � J t J s.z - - -s afis s �■a• .e. ''� ®� .- �■ � �® ��� � ®yam. ���_ m a� `ate esa�.° aon s �s as* i a>ess a+s - - 1�". s, a� s �^ ■mom - �'. s, 1 ie �, i.� as'.- - isa. s � � si tlas �aa�a �.tlas aas � a esaao•�e awe a�i i • !� d a i■o s o � •a � !� Mass— - �- �.^ � � .e�_BBan NINE MAIN LEVEL T O 5T /WD b1551- 2 5/8" _ --//MAIN LEVEL T O PLY 8154' - 11 1/8" LOWER LEVEL T O GYPG 5144'- 8 5/8" LOWER LEVEL T O PLY 5144'- 7 118" PARTIAL EAST ELEV @MASTER SCALE: 1/4" = V -0" (dd MAIN LEVEL T O 5T /WD 5155- 2 5/8" MAIN LEVEL T O P 1 8154' - 11 1/8" LOWER LEVEL T O (5 PC 81441- 8 5/8" LOWER LEVEL T O PLY 8144' - 7 1/8" 1 19 PARTIAL WEST ELEV @MASTER BATH SCALE: 1/4" = 1' -0" 201 I I I I i ME d _ a ®� ■1111 _sie�� El I I � _ �3' — �f' — �9• — SID• i �as,� ISSUE ��■as,! DRB CONCEPTUAL e■ ■��ai� ■�� e��asw��� 8 -29 -12 s.o�■aal� 8 -31 -12 PERMIT �� DRB CHANGES 1 -21 -13 REVISED BUILDING PERMIT Imo— DRB CHANGES —1 ■�I 1 ■1�e1�vf�5 CONSTRUCTION DOCUMENTS 5 -1 -13 ?�1��1'��v>� 5 -15 -13 ��� ■1� ■ °� ��� Imo— —1 ■�I 1 ■I(I��� - X11 X11 ■1��>��� i Imo— —1 mill IMF_•1 �— — 1 - -�' 1 0 E �i�■ Imo— —1 ■� 1■II—I■.■■■a.e■ 1. �elr ■■w■i W■IEW � ��awlla WE me- a Imo— —1 ■� 1 ■m ®Ia�� s�fI1��1 �� = ■I� ■� ��r■� IA Imo— —1 ■� ! ■�I4a� i�.s�sls�e INS ism ■ ■I��a� a MAIN LEVEL T O 5T /WD 5155- 2 5/8" MAIN LEVEL T O P 1 8154' - 11 1/8" LOWER LEVEL T O (5 PC 81441- 8 5/8" LOWER LEVEL T O PLY 8144' - 7 1/8" 1 19 PARTIAL WEST ELEV @MASTER BATH SCALE: 1/4" = 1' -0" 201 I I I I i ME d _ a ®� ■1111 _sie�� El I I � _ �3' — �f' — �9• — SID• i �as,� ISSUE ��■as,! DRB CONCEPTUAL e■ ■��ai� ■�� e��asw��� 8 -29 -12 s.o�■aal� 8 -31 -12 PERMIT �� DRB CHANGES 1 -21 -13 REVISED BUILDING PERMIT Imo— DRB CHANGES —1 ■�I 1 ■1�e1�vf�5 CONSTRUCTION DOCUMENTS 5 -1 -13 ?�1��1'��v>� 5 -15 -13 ��� ■1� ■ °� ��� Imo— —1 ■�I 1 ■I(I��� - X11 X11 ■1��>��� Imo— —1 mill IMF_•1 �— — 1 - -�' 1 ■1� E �i�■ Imo— —1 ■� 1■II—I■.■■■a.e■ 1. �elr ■■w■i W■IEW � ��awlla WE me- a Imo— —1 ■� 1 ■m ®Ia�� s�fI1��1 �� = ■I� ■� ��r■� IA Imo— —1 ■� ! ■�I4a� i�.s�sls�e ism ■ ■I��a� ��11�11■ CAI Imo— —1■imi a■ III I wm ■I� A —°��' w � �� ISSUE ■�I 1 ■I��IiOAf■�: DRB CONCEPTUAL 1011��I�iOd� � ■ ■I� � ■�•ti�o �I 8 -29 -12 FINAL DRB REVISIONS 8 -31 -12 PERMIT 1 -2 -13 DRB CHANGES 1 -21 -13 REVISED BUILDING PERMIT 2 -20 -13 DRB CHANGES 3 -13 -13 REVISED PERMIT 3 -13 -13 CONSTRUCTION DOCUMENTS 5 -1 -13 DRB CHANGES 5 -15 -13 �� - ■ ■.fir loll aa, � WE me- MEMO�s ELM= PROPOSED FINISHED GRADE 0 2' 4' 8' 1 IN MINES c- PARTIAL EAST ELEV @ B SCALE: 1/4" = 1' -0" RIDGE DOUGLAS MILLER DECHANT ARCHITECTS SHEPHERD RESOURCES INC / AIA POST OFFICE BOX 1624 AVON COLORADO 81620 T970 949 3302 F970 949 5 121 WWW.SRIARCHITECT. COM ti 11 DATE ISSUE 6 -20 -12 DRB CONCEPTUAL 7 -23 -12 FINAL DRB 8 -24 -12 FINAL DRB REVISIONS 8 -29 -12 FINAL DRB REVISIONS 8 -31 -12 PERMIT 1 -2 -13 DRB CHANGES 1 -21 -13 REVISED BUILDING PERMIT 2 -20 -13 DRB CHANGES 3 -13 -13 REVISED PERMIT 3 -13 -13 CONSTRUCTION DOCUMENTS 5 -1 -13 DRB CHANGES 5 -15 -13 DRB CHANGES D�0 �MA, 0 20 MAY 15, 2013 PROJECT. 1107 MAASHALL RESIDENCE REMODEL - T O STONE 193 BEAVER DAM RD. 157' - O 5/8" . T O 5T /WD BLOCK: 7, LOT: 38 155-2 5/8" /EL T O PLY VAIL VILLAGE FILING 1 VAIL, COLORADO EXTERIOR ELEVATIONS :L T O GYPG 144'- 8 5/8" /EL T O PLY 3144'- 7 1/8" A3* I t1 ELEVATION GENERAL NOTES 1. EXTERIOR WALL FINI5HE5 INDICATED ON ELEVATIONS - ALL WALL FINISHES ARE NEW, UNO. 6" DRY STACK STONE VENEER (NEW OR REPLACE EXI571N(f;) WOOD HORIZONTAL NOT USED COPPER PANELS 2. COPPER PANEL SIZE /LAYOUT I5 A REPRESENTATION OF INTENT. ACTUAL PANELS SHALL BE REVIEAED Y41 ARCHITECT PRIOR TO FABRICATION 3. STONE HATCH INDICATED ON EXTERIOR ELEVATIONS REPRESENT LOCATION OF STONE VENEER ONLY AND SHOULD NOT BE REFERENCED FOR PATTERN, STYLE OR SIZE. 4. ALL WINDOWS AND DOORS ARE NEW. 5. ALL GUTTER5 AND DOWN SPOUTS TO BE COPPER AND SHALL NOT BE PRE- PATINATED. GUTTER AND DOWN5POUT LOCATIONS 8 LENGTH5 ARE DIAGRAMMATIC 8 SHOULD BE REVIEAED BY ROOFING CONTRACTOR. ROOFING CONTRACTOR TO PROVIDE SHOP DRAWINGS. PARTIAL SOUTH ELEV @MASTER SCALE: 1/4" = V -0" T O 5T /WD � 55' - 2 518" V 2 GARAGE ELEVATION SCALE: 1/4" = 1' -0" ROOF PLAN � 51(051- 8 5/5" V 'RY LEVEL T 0 STONE b15,71- 0 5/8" kIN LEVEL T O 5T /WD 5155- 2 518" MAIN LEVEL T O PLY 5154'- 11 1/8" WER LEVEL T O GYP0 a ' - /a" OWER LEVEL T O PLY 8144' - 7 1/8" PARTIAL WEST ELEV SCALE: 1/4" = 1' -0" DOUGLAS MILLER DECHANT ARCHITECTS SHEPHERD RESOURCES INC / AIA POST OFFICE BOX 1624 AVON COLORADO 81620 T970 949 3302 F970 949 5 1 21 11 WWW.SRIARCHITECT. COM ti 11 DATE ISSUE 7 -23 -12 FINAL DRB 8 -24 -12 FINAL DRB REVISIONS 8 -29 -12 FINAL DRB REVISIONS 8 -31 -12 PERMIT 1 -2 -13 DRB CHANGES 1 -21 -13 REVISED BUILDING PERMIT 3 -13 -13 REVISED PERMIT 3 -13 -13 CONSTRUCTION DOCUMENTS 5 -15 -13 DRB CHANGES b]*j FA\ MAY 15, 2013 PROJECT: 1107 MAASHALL RESIDENCE REMODEL 193 BEAVER DAM RD. BLOCK: 7, LOT: 38 VAIL VILLAGE FILING 1 VAIL, COLORADO EXTERIOR ELEVATIONS A3.2