Loading...
HomeMy WebLinkAboutB06-0070 final,P r06.- ooe, 04 -05 -2013 Inspection Request Reporting Page 2 4:05 pm Vail, CO - City Of Requested Inspect Date: Tuesday, April 09, 2013 Inspection Area: CG Site Address: 1673 MATTERHORN CR VAIL 1673 MATTERHORN CR A/P /D Information Activity: B06 -0070 Type: A -BUILD Sub Type: ADUP Status: ISSUED Const Type: Occupancy: Use: V -B Insp Area: CG Owner: KONDOS, DANIEL P. Contractor: BURKE HARINGTON CONSTRUCTION Phone: 376 -2256 Applicant: BURKE HARRINGTON CONSTRUCTION Description: BASEMENT ADDITION AND EXTERIOR ALTERATION Comment: ROUTED TO THE PLAN RACK E -2, BILL GIBSON AND FIRE - CGUNION Comment: corrections required. see plan review comments F: \cdev\ CHRIS \PERMIT.COMMENTS \B06 - 0070 \B06 - 0070.DOC - CGUNION Comment: OPEN HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION TO VERIFY ASSUMED BEARING CAPACITY PER IRC. RECEIVED REPORT 6/13/06 PRIOR TO POUR AND ON FILE - SHAHN. - SHAHN Comment: CORRECTED PLANS APPROVED 5/18/06. - CGUNION Comment: SEE RED LINE NOTES ON PARTY WALL DETAIL. PARTY WALL CONSTRUCTION AT LOT LINE SHALL COMPLY WITH IRC 302. - CGUNION Comment: REVISIONS SUBMITTED ADDRESSING COMMENTS ROUTED TO CHRIS GUNION, BILL GIBSON, FIRE ANn P1 1R1 i : vvnRKS _.1.q1 ITHPP Requested Inspection(s) T`AA&'e-� Item: 90 BLDG - final Requestor: BURKE HARRINGTON CONSTRUCTION Comments: follow up Assigned To: JMONDRAGON Action: Time Exp: Comment: Comment: pending planning final. Inspection History *A-4) 9 9, (3 Requested Time: 08:30 AM Phone: 970 - 376 -2256. Burke Entered By: JMONDRAGON K Item: 10 BLDG - FOOTING **Approved** 06/06/06 Inspector: shahn Action: DN DENIED Comment: denied for no soils report 06/13/06 Inspector: shahn Action: PI PARTIAL INSPECTION Comment: THICKENED SLAB APPROVED. PROVIDE MISSING #5 REBAR 1'8" TRANSVERSE PER DETAIL. REMOVE PAD FROM BOTTOM OF THICKENED PAD PRIOR TO POUR. 07/18/06 Inspector: shahn Action: AP APPROVED Comment: Inspected premanufactured footing /pier for deck. Sol test received and on file. ok to pour, GC to provide USA listed & approved data. Item: 20 BLDG - Foundation /Steel Item: 30 BLDG - Framing ** Approved ** 08/09/06 Inspector: shahn Action: COND APPROVED /CONDITIONS Comment: framing approved pending fireplace approval for both sides. Seal a exterior penetrations with sealant. Item: 50 BLDG - Insulation ** Approved ** 08/15/06 Inspector: shahn Action: COND APPROVED /CONDITIONS Comment: seal around exterior FP termination per manufacturers instructions. Secure the insulation above /around FP so it does not fall onto vent pipe. Replace packed fiberglass around window and doors with approved methods. Item: 60 BLDG - Sheetrock Nail ** Approved ** 06/23/06 Inspector: shahn Action: PI PARTIAL INSPECTION Comment: partial inspection of main and upper level party walls. Main floor: fill void at bottom plate above the lower main beam with rock wool. Drywall to extend from deck to deck and protect combustible material between the walls at top and bottom plates. 3ft fire rated exterior wall not inspected. Lower ground level party not inspected. 06/30/06 Inspector: JEC Action: AP APPROVED Comment: Party wall in basement. Inside rock installed as per detail 3 -A4.1 on print 08/09/06 Inspector: shahn Action: AP APPROVED Comment: approved exterior stucco. 08/21/06 Inspector: JRM Action: PA PARTIAL APPROVAL Comment: APPROVE WEST SIDE COMPLETE ONLY REPT131 Run Id: 14650