HomeMy WebLinkAboutB06-0070 final,P r06.- ooe,
04 -05 -2013 Inspection Request Reporting Page 2
4:05 pm Vail, CO - City Of
Requested Inspect Date: Tuesday, April 09, 2013
Inspection Area: CG
Site Address: 1673 MATTERHORN CR VAIL
1673 MATTERHORN CR
A/P /D Information
Activity: B06 -0070 Type: A -BUILD Sub Type: ADUP Status: ISSUED
Const Type: Occupancy: Use: V -B Insp Area: CG
Owner: KONDOS, DANIEL P.
Contractor: BURKE HARINGTON CONSTRUCTION Phone: 376 -2256
Applicant: BURKE HARRINGTON CONSTRUCTION
Description: BASEMENT ADDITION AND EXTERIOR ALTERATION
Comment: ROUTED TO THE PLAN RACK E -2, BILL GIBSON AND FIRE - CGUNION
Comment: corrections required. see plan review comments F: \cdev\ CHRIS \PERMIT.COMMENTS \B06 - 0070 \B06 -
0070.DOC - CGUNION
Comment: OPEN HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION TO VERIFY ASSUMED BEARING
CAPACITY PER IRC. RECEIVED REPORT 6/13/06 PRIOR TO POUR AND ON FILE - SHAHN. - SHAHN
Comment: CORRECTED PLANS APPROVED 5/18/06. - CGUNION
Comment: SEE RED LINE NOTES ON PARTY WALL DETAIL. PARTY WALL CONSTRUCTION AT LOT LINE SHALL
COMPLY WITH IRC 302. - CGUNION
Comment: REVISIONS SUBMITTED ADDRESSING COMMENTS ROUTED TO CHRIS GUNION, BILL GIBSON, FIRE
ANn P1 1R1 i : vvnRKS _.1.q1 ITHPP
Requested Inspection(s) T`AA&'e-� Item: 90 BLDG - final
Requestor: BURKE HARRINGTON CONSTRUCTION
Comments: follow up
Assigned To: JMONDRAGON
Action: Time Exp:
Comment:
Comment: pending planning final.
Inspection History
*A-4) 9 9, (3
Requested Time: 08:30 AM
Phone: 970 - 376 -2256. Burke
Entered By: JMONDRAGON K
Item: 10 BLDG - FOOTING **Approved**
06/06/06 Inspector: shahn Action: DN DENIED
Comment: denied for no soils report
06/13/06 Inspector: shahn Action: PI PARTIAL INSPECTION
Comment: THICKENED SLAB APPROVED.
PROVIDE MISSING #5 REBAR 1'8" TRANSVERSE PER DETAIL.
REMOVE PAD FROM BOTTOM OF THICKENED PAD PRIOR TO POUR.
07/18/06 Inspector: shahn Action: AP APPROVED
Comment: Inspected premanufactured footing /pier for deck.
Sol test received and on file.
ok to pour, GC to provide USA listed & approved data.
Item: 20 BLDG - Foundation /Steel
Item: 30 BLDG - Framing ** Approved **
08/09/06 Inspector: shahn Action: COND APPROVED /CONDITIONS
Comment: framing approved pending fireplace approval for both sides.
Seal a exterior penetrations with sealant.
Item: 50 BLDG - Insulation ** Approved **
08/15/06 Inspector: shahn Action: COND APPROVED /CONDITIONS
Comment: seal around exterior FP termination per manufacturers instructions.
Secure the insulation above /around FP so it does not fall onto vent pipe.
Replace packed fiberglass around window and doors with approved methods.
Item: 60 BLDG - Sheetrock Nail ** Approved **
06/23/06 Inspector: shahn Action: PI PARTIAL INSPECTION
Comment: partial inspection of main and upper level party walls.
Main floor: fill void at bottom plate above the lower main beam with rock wool.
Drywall to extend from deck to deck and protect combustible material between the walls at top
and bottom plates.
3ft fire rated exterior wall not inspected.
Lower ground level party not inspected.
06/30/06 Inspector: JEC Action: AP APPROVED
Comment: Party wall in basement. Inside rock installed as per detail 3 -A4.1 on print
08/09/06 Inspector: shahn Action: AP APPROVED
Comment: approved exterior stucco.
08/21/06 Inspector: JRM Action: PA PARTIAL APPROVAL
Comment: APPROVE WEST SIDE COMPLETE ONLY
REPT131 Run Id: 14650