Loading...
HomeMy WebLinkAboutDRB130147 PLANS APPROVEDDesign Review Staff Approval VA F L � By Joe Batcheller at 4:06 pm, May 24, 2013 N r C) N O c� k t 2 Vicinity map 1 1/2" = V -0" • • IDNI UP W- h -r UNIT 11 PROJECT INFORMATION Project description: The unit under this phase is adding 2 windows to the north elevation and 2 windows in a new window well on the east. A new Hot Tub slab and 2 ac condensing unit are proposed. Detailed description on sheet A3.2 Location: 950 Red Sandstone Raod Subdivision: Potato Patch Club Vail, Colorado 81657 Parcel Number 2101 - 063 -06 -011 Owner: RUBIN, YEVGENY & MARGARITA 21399 MARINA COVE CIR UNIT M18 AVENTURA, FL 33180 -4029 Contractor: GE Johnson Project coordinator Matt Lewis OAC Management Architect: Martin Manley Architect Jeffrey P Manley AIA PO Box 1587 Eagle, CO 81631 970.328.5151 jeff @martinmanleyarchitects.com Class of Work: Renovation Type of Construction: V -N Type of Occupancy: R2 (condominium) Sprinkler system: No Levels: 3 -story unit ,1 • d . (3) NEW DWARF LILAC' SHRUBS (5 GALLON) WINDOW WELL `''f+• `' �•• " r ` BELOW DN ou•.. ' • ". UNIT 11 �. ' (2) CONDENSING UNITS FOR AC , UNDER DECK ON PRECAST PAD ' NEW 4" CONCRETE ' ' SLAB ON 4" , GRANULAR FILL FOR . NEW HOT TUB.' ' .! .r j) Site Plan 1 if = 10' -0" M O M 4 O �o 0 W Z J a J E Q Cn z U N L- o a �E o W U 000 m Z O }• Z LL U� O U U O m L ■ W >, O F LO M �oim ■ Z V 00 oo E cn C' co d Q O x cB U) �--C rn m E o •N M O ry Q M O M 4 O �o 0 Z J a E Q Cn U) U N L- o a 0 Z Z O U N =k co O o 70 U U) �oim cn a ^Cz W d O Q W U) �--C C: o •N M O ry 7C3 .� O Ln 0) ry Nw O Z M O M 4 O M M r Z J a E Q Cn M 0 U N L- o a 0 Z O U N =k co U 70 U U) �oim ^Cz W d O Q W U) �--C C: o M O ry 7C3 .� O Ln 0) ry M O M 4 O M M r Z J a E Q Cn M 0 U N L- o a Design Review Staff Approval F By Joe Batcheller at 4:07 pm, May 24, 2013 N M O N O M "Z L 0 7 CV 60 0 6' -3" Cn N ADMIRAL STEEL 80 "x36" WINDOW WELL (SQUARE CASEMENT) 12'- `Kalm 12' -5" A3.2 4 6' -8" o 25'- 9 1/2" 3" 2' - 11 " 4" 2' -11 " 3" N lie-3 1/2" 1/4" 1/4" 6' -8" CONCRETE CUT WIDTH 11 6' -7" 11MI w 3' -10" 14 "x14" CUBBIES V F- N 9'- 10 3/4" N 12' -5" 0 CV 1 CEMENT STUCCO FINISH ON THERMAL AND AIR INFLITRATION BARRIER TO EXTEND FROM FINISH ABOVE TO BOTTOM OF WINDOW WELL. EXPOSED FOUNDATION WALLS ARE TO RECEIVE WATERPROOF MEMBRANE EXTENDING FROM FOOTING AND UP WALL AT LEAST 24" ABOVE PROPOSED FINISHED BOTTOM OF WINDOW WELL GRAVEL ELEVATION. AT THE WINDOWS, THE WALL SHEET WATERPROOFING IS TO EXTEND UP THE WALL AND UNDER THE WINDOW /OVER THE ROUGH SILL. WINDOW IS TO BE INSTALLED WITH 6" WATERPROOF WINDOW TAPE OVER ALL FLANGES. THE DRAINAGE PLANE OF THE THERMAL AND AIR INFILTRATION BARRIER ABOVE IS TO PROPERLY OVERLAP AT THE WINDOW HEAD CONDITION. OPEN HANGING- ROD WITH SHELF O I W/D � I W/D NEW SHOWER WITH GLASS DOOR 9'- 6 1/2" 6'- 0" 5' -0" N N BENCH c) "v M N COLORADO °° ROOM 3'- 113/4" 6' -9" 1 12' -2" 80 N i0 0 (2) CONDENSING UNITS FOR AC UNDER DECK ON PRECAST PAD n Lower Level 1/4" = 1' -0" W J �E o w o U O 0 F I U ILL ■�0 O a�� W I >, ■ 7- W I Lq ti c� ■ Z V N bo C LO M — -E L— Q o x m r 6' m E a Z O U N =k co U70 U) U tom c o c C) ca COQa> • — }, c� U, o ry C) ■ 1 /'1 VJ ry M � O M � �o 0 Z a J d J O W W z a o a N +� W 0 O o �W�// LL 0 z M � O M � M M r Z a J d J O W W z a o a N +� W 0 I kr TOWN OF VA Design Review Staff Approval By Joe Batcheller at 4:07 pm, May 24, 2013 2 Roof Level 00 N M O N O M NEW (DOUI WITH NOR7 j) Upper Level 1/411 = 1' -0" W J �E CY") o w o U O 0 F � U ■ 0 O a2) W >, F ■ 7- W ■ Z V N bo C co 7- -E L� Q CD m r 6' m E Q Z O U N U70 U) U tom oco c� U, O 70 C) •— L0 0) ry CN 0 00 w N � o 0 Z � M � T r Z Q O J a J W W J � a U � O � M � T r Z Q O J a J W W J � a U � O Design Review Staff Approval By Joe Batcheller at 4:07 pm, May 24, 2013 TOWN OF VAIL M N M 0 N O M 3 -7, 11.2.0- 3' 10" 3' - 10 ------------- � 11.1.D 11.1.G 11 71H- 00 N O j F � 07 3' -6" - 1 - ��_ - I a� 0❑U . 0 1 1 IIIIIII I _ =1 I I f I I I 1 I l =i =1 I1 I I 1 1= I - � I W � W � II III I I III =11 I 11L11L11L[11-111-111 2 SOUTH ELEVATION 1/411 = 1' -0" � U Lamer 1' Main r Lower a 3' -10" 11.1.A-------------- Ll 3' -10" 3' -10" - 11.13 11.1.0 3' -10" 3' -10" 11.1.E 11.1. ■ jil 1/4" = 1' -0" Upper Levell 17' -22 " ain Level Level 0"' ALL ELEVATIONS ARE SHOWN AS APPROVED BY THE HOA. THE PROPOSED LOCATION OF THE WINDOW WELL AND CONCRETE FOUNDATION WALL CUT ARE SHOWN ON THE EAST ELEVATION er Level 17' -2" iin Level � 8' -8" V er Level 0" 3 EAST ELEVATION 1/4"' = 1' -0" W J �E o w o U (3) F L U C) ■0 O a�� W � a >, ■ F 7- W ■ Z V N bo E Ix M 7- -E Q X m rn 0 E Q ca Z O co U N U70 U) U CIO oco a) - — �, a �°�Q c� U o ry � C) ■ — Ln 0) �o 0 O o (n a W 0 Z � M T r 0 Z o � � Q E W J W M o U � M T r 0 Z o � � Q E W J W M o U D 7 'I - ----- ------------------ - -- -- ti`- -��- -� --- - - - - -- - ---------- - - - - -- n REAR PERSPECTIVE Aid N Ln co 0 N C) Design Review Staff Approval TOWN � By Joe Batcheller at 4:07 pm, May 24, 2013 Upper Level 17' -2" Main Level 8' -8" Lower Level ill —Iii iil Iii —iii —iii— III -�I�I Ill III III= lll. 0" PROPOSED NORTH ELEVATION — 1/411 = 1' -0" 4 PROPOSED EAST ELEVATION 1 /4" = 1' -0" 1 Ir ill �� oil _7 r Levu 17' -2" Main Levu 8' -8„ _ J FRONT PERSPECTIVE NO o I "Aft ROJECT DESCRIPTION - EXTERIOR HOA AND DRB ITEMS THE PROJECT OF UNIT 11, POTATO PATCH CLUB, IS PROPOSING THESE ADDITIOANL ITEMS FOR SUBMITTAL AS 'CHANGES TO APPROVED PLANS'. 1 THE EAST ELEVATION IS PROPOSED TO HAVE A WINDOW WELL DUG OUT AND THE CONCRETE WALL CUT TO ACCEPT (2) NEW CASEMENT EGRESS WINDOWS. NEW WINDOWS BEING PROPOSED SHALL BE REFERED TO AS 11.0.E AND 11.0.F 2 THE NEW WINDOW WELL SHALL BE AN ADMIRAL STEEL 80 "06" WINDOW WELL. IT IS PROPOSED THAT 3 NEW DWARF LILAC SHRUBS (5 GALLON SIZE) SHALL BE PLANNED BETWEEN THE WINDOW WELL AND THE UNIT 12's EXISTING DECK. A GUTTER AND DOWNSPOUT IS TO BE ADDED AT THE ENTIRE EAST ELEVATION EAVE (ABOVE /TO PROTECT THE WINDOW WELL) 3 ANEW CONCRETE SLAB IS PROPOSED TO BE ADDED AGAINST THE EXISTING SITE WALL FOR ANEW HOT TUB. REFER TO SHEET A2.1, LOWER LEVEL PLAN FOR LOCATION. 4 (2) NEW CONDENSING UNITS FOR AIR CONDITIONING UNITS ON A PRECAST CONCRETE PAD ARE PROPOSED. THEY ARE PROPOSED TO BE LOCATED UNDER THE EXISTING SOUTH DECK. REFER TO SHEET A2.1, LOWER LEVEL PLAN I IN 001 (2) CONDENSING — UNIT FOR AC - - UNDER DECK ON PRECAST PAD Lower Level 0" III = 111 111 II II III III III III III„ III Upper Levell 17' -2"' RAILING NOT Lj SHOWN FOR CLARITY Main Level 8' -8m (2) CONDENSI I\ UNITS FOR A( UNDER DECK Level o„ �1 PROPOSED WEST ELEVATION U 1/4" = V -0" 0 . PROPOSED SOUTH ELEVATION 1/411 = 1' -0" Upper Level 17' - -2" 1 Main Level � 8' -8" Vd Lower Level 0" M O M 0 C/) Z O W � W N J J W °w 0 U) E 0 O a �E o L W w U o 0 C 0 F LL O U U O a� Cu ■ ■ W F 7- � Cu , W ■ Z I V Lq N ti c� bo E U < M — LO c � Q � X m m E O o /� ■ O OW W M O M 0 C/) Z O O � W N J W °w 0 U) E 0 O a L W 0 C 0 Z O U N co U U70 U) tom O o /� ■ O OW W �I (n a U) O W ■ C) L0 VJ W � o 6 Z M O M �„ � M C/) Z O O � W N J W °w 0 E 0 O a L W 0 C 0 Z O U N co U U70 U) tom c C) /� ■ O OW W �I C� U) O W ■ C) L0 VJ M O M �„ � M C/) Z O O � W N J W °w 0 E 0 O a L W O a C 0 o w