Loading...
HomeMy WebLinkAboutDRB130159 PW commentsTa s k N a m e Du r a t i o n Sta r t Fin i s h Sc h e m a t i c D r a w i n g s C o m p l e t e d 0 d a y s Mo n 4 / 1 5 / 1 3 Mo n 4 / 1 5 / 1 3 Sc h e m a t i c E s t i m a t e 10 d a y s Tu e 4 / 1 6 / 1 3 Mo n 4 / 2 9 / 1 3 Fir s t S p r a d d l e C r e e k D R B M e e t i n g 0 d a y s Mo n 3 / 1 8 / 1 3 Mo n 3 / 1 8 / 1 3 So i l s I n v e s t i g a t i o n a n d S o i l s R e p o r t 10 d a y s Mo n 4 / 1 / 1 3 Fri 4 / 1 2 / 1 3 DD P l a n D e v e l o p m e n t 23 d a y s Mo n 4 / 1 / 1 3 We d 5 / 1 / 1 3 Fin a l S p r a d d l e C r e e k D R B R e v i e w 0 d a y s Tu e 5 / 7 / 1 3 Tu e 5 / 7 / 1 3 DD E s t i m a t e 15 d a y s Th u 5 / 2 / 1 3 We d 5 / 2 2 / 1 3 TO V D R B I n i t i a l R e v i e w 15 d a y s Mo n 5 / 1 3 / 1 3 Fri 5 / 3 1 / 1 3 TO V D R B F i n a l R e v i e w 15 d a y s Tu e 5 / 1 4 / 1 3 Mo n 6 / 3 / 1 3 CD P l a n D e v e l o p m e n t 65 d a y s Mo n 5 / 6 / 1 3 Fr i 8 / 2 / 1 3 Su b m i t f o r B u i l d i n g P e r m i t 20 d a y s Th u 8 / 1 / 1 3 We d 8 / 2 8 / 1 3 GM P E s t i m a t e 20 d a y s Mo n 8 / 5 / 1 3 Fri 8 / 3 0 / 1 3 Sh o r i n g E n g i n e e r i n g 10 d a y s Th u 6 / 2 7 / 1 3 We d 7 / 1 0 / 1 3 Cle a r a n d G r u b f o r S h o r i n g 2 d a y s Mo n 7 / 8 / 1 3 Tu e 7 / 9 / 1 3 In s t a l l s o i l e r o s i o n c o n t r o l , t r e e a n d v e g . p r o t e c t io n 2 d a y s We d 7 / 1 0 / 1 3 Th u 7 / 1 1 / 1 3 Sta k e f o r S h o r i n g 1 d a y Fri 7 / 1 2 / 1 3 Fri 7 / 1 2 / 1 3 Sh o r i n g 25 d a y s Th u 7 / 1 1 / 1 3 We d 8 / 1 4 / 1 3 Sta k e f o r e x c a v a t i o n 1 d a y Th u 8 / 1 5 / 1 3 Th u 8 / 1 5 / 1 3 Ex c a v a t i o n 15 d a y s Fri 8 / 1 6 / 1 3 Th u 9 / 5 / 1 3 Sta k e F o u n d a t i o n 1 d a y Fr i 9 / 6 / 1 3 Fr i 9 / 6 / 1 3 Fo u n d a t i o n F o o t i n g 7 d a y s Mo n 9 / 9 / 1 3 Tu e 9 / 1 7 / 1 3 Fo u n d a t i o n W a l l s 25 d a y s We d 9 / 1 8 / 1 3 Tu e 1 0 / 2 2 / 1 3 Fo u n d a t i o n P e r i m e t e r D r a i n 2 d a y s We d 1 0 / 2 3 / 1 3 Th u 1 0 / 2 4 / 1 3 Fo u n d a t i o n W a t e r p r o o f i n g 2 d a y s Fri 1 0 / 2 5 / 1 3 Mo n 1 0 / 2 8 / 1 3 Ba c k f i l l F o u n d a t i o n 10 d a y s Tu e 1 0 / 2 9 / 1 3 Mo n 1 1 / 1 1 / 1 3 Lo w e r L e v e l S l a b P r e p 3 d a y s Tu e 1 0 / 2 9 / 1 3 Th u 1 0 / 3 1 / 1 3 Lo w e r L e v e l M E P R o u g h I n 10 d a y s Fri 1 1 / 1 / 1 3 Th u 1 1 / 1 4 / 1 3 Lo w e r L e v e l S l a b P o u r 2 d a y s Fri 1 1 / 1 5 / 1 3 Mo n 1 1 / 1 8 / 1 3 Ro u g h F r a m i n g 11 0 d a y s Tu e 1 1 / 1 9 / 1 3 Mo n 4 / 2 1 / 1 4 Ro o f D r y I n P h a s e d 15 d a y s Tu e 4 / 8 / 1 4 Mo n 4 / 2 8 / 1 4 ME P R o u g h I n 45 d a y s Tu e 4 / 8 / 1 4 Mo n 6 / 9 / 1 4 Win d o w I n s t a l l a t i o n 10 d a y s Tu e 4 / 2 2 / 1 4 Mo n 5 / 5 / 1 4 Ro o f i n g 20 d a y s Tu e 4 / 2 9 / 1 4 Mo n 5 / 2 6 / 1 4 Ex t e r i o r F i n i s h e s ( s i d i n g , s t o n e , e t c . ) 60 d a y s Tu e 5 / 6 / 1 4 Mo n 7 / 2 8 / 1 4 La n d s c a p i n g a n d F i n a l E r o s i o n C o n t r o l 45 d a y s Tu e 7 / 2 9 / 1 4 Mo n 9 / 2 9 / 1 4 Uti l i t y H o o k U p s 5 d a y s Tu e 6 / 3 / 1 4 Mo n 6 / 9 / 1 4 ME P I n s p e c t i o n s 3 d a y s Tu e 6 / 1 0 / 1 4 Th u 6 / 1 2 / 1 4 Fra m i n g I n s p e c t i o n 1 d a y Fri 6 / 1 3 / 1 4 Fri 6 / 1 3 / 1 4 In F l o o r H e a t I n s t a l l 6 d a y s Fri 6 / 1 3 / 1 4 Fri 6 / 2 0 / 1 4 Gy p c r e t e I n s t a l l 2 d a y s Mo n 6 / 2 3 / 1 4 Tu e 6 / 2 4 / 1 4 In s u l a t i o n 7 d a y s We d 6 / 2 5 / 1 4 Th u 7 / 3 / 1 4 Dr y w a l l H a n g & F i n i s h 20 d a y s Fr i 7 / 4 / 1 4 Th u 7 / 3 1 / 1 4 Pri m e r & F i r s t C o a t P a i n t i n g 10 d a y s Fr i 8 / 1 / 1 4 Th u 8 / 1 4 / 1 4 Wo o d F l o o r i n g I n s t a l l 7 d a y s Fri 8 / 1 5 / 1 4 Mo n 8 / 2 5 / 1 4 Wo o d C e i l i n g I n s t a l l 10 d a y s Tu e 8 / 2 6 / 1 4 Mo n 9 / 8 / 1 4 In t e r i o r D o o r & T r i m I n s t a l l 40 d a y s Fri 8 / 1 5 / 1 4 Th u 1 0 / 9 / 1 4 In t e r i o r T i m b e r I n s t a l l 25 d a y s Fri 8 / 1 5 / 1 4 Th u 9 / 1 8 / 1 4 Tile I n s t a l l 35 d a y s Fri 8 / 1 5 / 1 4 Th u 1 0 / 2 / 1 4 Ca b i n e t r y I n s t a l l 30 d a y s Fri 8 / 2 2 / 1 4 Th u 1 0 / 2 / 1 4 Co u n t e r t o p F a b & I n s t a l l 20 d a y s Fri 9 / 2 6 / 1 4 Th u 1 0 / 2 3 / 1 4 Ap p l i a n c e I n s t a l l 5 d a y s Fri 1 0 / 3 / 1 4 Th u 1 0 / 9 / 1 4 In t e r i o r S t o n e V e n e e r W o r k 25 d a y s Fri 9 / 1 9 / 1 4 Th u 1 0 / 2 3 / 1 4 Sh o w e r E n c l o s u r e F a b & I n s t a l l 10 d a y s Fri 1 0 / 3 / 1 4 Th u 1 0 / 1 6 / 1 4 Ba t h A c c e s s o r i e s I n s t a l l 5 d a y s Fri 1 0 / 1 7 / 1 4 Th u 1 0 / 2 3 / 1 4 Fin a l P a i n t a n d P l a s t e r 25 d a y s Fri 1 0 / 2 4 / 1 4 Th u 1 1 / 2 7 / 1 4 ME P T r i m 25 d a y s Fri 1 1 / 2 1 / 1 4 Th u 1 2 / 2 5 / 1 4 Wo o d F l o o r i n g F i n a l C o a t 3 d a y s Tu e 1 2 / 2 3 / 1 4 Th u 1 2 / 2 5 / 1 4 Ca r p e t 5 d a y s Fri 1 2 / 2 6 / 1 4 Th u 1 / 1 / 1 5 ME P F i n a l I n s p e c t i o n s & C O I n s p e c t i o n 5 d a y s Fri 1 2 / 2 6 / 1 4 Th u 1 / 1 / 1 5 Clo s e O u t 20 d a y s Fr i 1 / 2 / 1 5 Th u 1 / 2 9 / 1 5 0% Sc h e m a t i c D r a w i n g s C o m p l e t e d 10 0 % Sc h e m a t i c E s t i m a t e 0% Fir s t S p r a d d l e C r e e k D R B M e e t i n g 10 0 % So i l s I n v e s t i g a t i o n a n d S o i l s R e p o r t 0% DD P l a n D e v e l o p m e n t 0% Fin a l S p r a d d l e C r e e k D R B R e v i e w 0% DD E s t i m a t e 0% TO V D R B I n i t i a l R e v i e w 0% TO V D R B F i n a l R e v i e w 0% CD P l a n D e v e l o p m e n t 0% Su b m i t f o r B u i l d i n g P e r m i t 0% GM P E s t i m a t e 0% Sh o r i n g E n g i n e e r i n g 0% Cle a r a n d G r u b f o r S h o r i n g 0% In s t a l l s o i l e r o s i o n c o n t r o l , t r e e a n d v e g . p r o t e c t io n 0% Sta k e f o r S h o r i n g 0% Sh o r i n g 0% St a k e f o r e x c a v a t i o n 0% Ex c a v a t i o n 0% St a k e F o u n d a t i o n 0% Fo u n d a t i o n F o o t i n g 0% Fo u n d a t i o n W a l l s 0% Fo u n d a t i o n P e r i m e t e r D r a i n 0% Fo u n d a t i o n W a t e r p r o o f i n g 0% Ba c k f i l l F o u n d a t i o n 0% Lo w e r L e v e l S l a b P r e p 0% Lo w e r L e v e l M E P R o u g h I n 0% Lo w e r L e v e l S l a b P o u r 0% Ro u g h F r a m i n g 0% Ro o f D r y I n P h a s e d 0% MEP Rough In 0% Win d o w I n s t a l l a t i o n 0% Roofing 0% Exterior Finishes (siding, stone, etc.)0%Landscaping and Final Erosion Control 0%Utility Hook Ups 0%MEP Inspections 0%Framing Inspection 0%In Floor Heat Install 0%Gypcrete Install 0%Insulation 0%Drywall Hang & Finish 0%Primer & First Coat Painting 0%Wood Flooring Install 0%Wood Ceiling Install 0%Interior Door & Trim Install 0%Interior Timber Install 0%Tile Install 0%Cabinetry Install 0%Countertop Fab & Install 0%Appliance Install 0%Interior Stone Veneer Work 0%Shower Enclosure Fab & Install 0%Bath Accessories Install 0%Final Paint and Plaster 0%MEP Trim 0%Wood Flooring Final Coat 0%Carpet 0%MEP Final Inspections & CO Inspection 0%Close Out 3/3 3/1 0 3/1 7 3/2 4 3/3 1 4/7 4/1 4 4/2 1 4/2 8 5/5 5/1 2 5/1 9 5/2 6 6/2 6/9 6/1 6 6/2 3 6/3 0 7/7 7/1 4 7/2 1 7/ 2 8 8/ 4 8/1 1 8/1 8 8/2 5 9/1 9/8 9/1 5 9/2 2 9/2 9 10 / 6 0/1 0/2 0/ 2 11 / 3 1/1 1/1 1/2 12 / 1 12 / 8 2/1 2/2 2/2 1/ 5 1/1 2 1/1 9 1/2 6 2/2 2/9 2/1 6 2/2 3 3/2 3/9 3/ 1 6 3/2 3 3/3 0 4/6 4/1 3 4/2 0 4/2 7 5/4 5/115/185/256/16/86/156/226/297/67/137/207/278/38/108/178/248/319/79/149/219/2810/50/10/10/211/211/91/11/21/312/72/12/22/21/41/111/181/252/12/82/152/223/13/8 ar c h Ap r i l Ma y Ju n e Ju l y Au g u s t Se p t e m b e r Oc t o b e r No v e m b e r De c e m b e r Ja n u a r y Fe b r u a r y Ma r c h Ap r i l Ma y JuneJulyAugustSeptemberOctoberNovemberDecemberJanuaryFebruaryMarch Be c k B u i l d i n g C o m p a n y No e l l R e s i d e n c e C o n s t r u c t i o n S c h e d u l e 5/ 8 / 1 3 Post Office Box 7630 Telephone: (970) 949-0916 Avon, CO. 81620 Fax: (970) 949-1017 www.RMTarchitects.com E-mail: info@RMTarchitects.com Noell Residence Lot 6 , 1000 Spraddle Creek Road Vail, Colorado Project No. 12406 PROJECT MANUAL Issue-E Town of Vail DRB - Design Submittal May 13th, 2013 Lot 6 –Spraddle Creek Section 02785 Stone Pavers Schedule A. ST- 3 (Stone type #3) – Concrete Pavers – Exterior stone pavers – 4” thick, tumbled edge. Section 04852 Stone Masonry Veneer Schedule A. ST- 1 (stone type #1) – Colorado Moss Rock – Exterior and Interior Stone Veneer – 5” Thick. B. ST-2 (stone type #2) – Colorado Moss Rock – Interior and Exterior stone rubble caps – 4” thick, extend caps 2” past veneer below (slope caps for positive drainage) ( 8” thick cap at chimney per drawings). C. ST-4 (stone type #3) – Colorado Buff Sandstone – Exterior stone slab caps – 4” thick, snapped edge, extend caps 1 1/2” past stone veneer below. Section 05500 Metal Fabrication Schedule A. Custom fabricated wrought iron exterior railing system. Reference drawings. Section 06150 Wood Decking Schedule A. Exterior Raised Deck: 4x10 (nominal) douglas-fir solid exterior bridge decking. Provide 1/8” gap between boards. B. Exterior Eaves: 1x6 solid Western Red Cedar tongue-and-groove exterior eave decking unless otherwise indicated. Provide v-groove profile. C. Exterior Soffits with living space above: 1x6 solid douglas-fir tongue-and-groove exterior decking unless otherwise indicated. Provide v-groove profile. Section 06100 Rough Carpentry Schedule A. Exposed rafters and rafter tails – Western Red Cedar, Architectural Knotty Grade, rough sawn, size per drawings. Section 06200 Finish Carpentry Schedule A. Exterior 1. Fascia – Western Red Cedar, Architectural Knotty Grade, rough-sawn. 2. Eave and Rake Trim – Western Red Cedar, Architectural Knotty Grade, rough-sawn. 3. Exterior Window Trim – Western Red Cedar, Architectural Knotty Grade, rough-sawn. 4. Exterior Door Trim - Western Red Cedar, Architectural Knotty Grade, rough-sawn. 5. Corner Trim - Western Red Cedar, Architectural Knotty Grade, rough- sawn. 6. Belt Band, Base Trim, and Louver Trim - Western Red Cedar, Architectural Knotty Grade, rough-sawn. 7. Exterior Siding – Locations per drawings: a. Vertical Siding – 1x8 on 1x4 board-on-board, Western Red Cedar, Architectural Knotty Grade, S4S b. Horizontal Siding – 10” Bevel-Lap Siding, Western Red Cedar, Architectural Knotty Grade, Hand-hewn, S4S 8. Window Planter - Western Red Cedar, Architectural Knotty Grade, rough-sawn. Section 07115 Bituminous Dampproofing Schedule A. Foundation Walls: WP-1 (water proofing #1) TUFF-N-DRI Section 07130 Sheet Waterproofing Schedule A. Walls at Grade – WP-2 (water proofing #2) – Grace Ice and Water Shield 1. Install at all walls at grade. Utilize a 36-inch roll and overlap WP-1 by 12 inches, and seal. 2. Extend a minimum of 24” above grade B. Sloped roof surfaces – WP-2 – Grace Ice and Water Shield C. Roof/ Wall Intersections – WP-2 Grace Ice and Water Shield 1. Install at roof/wall intersections a minimum of 36 inches up vertical surface D. Sloped roof surfaces under metal roofing or flashing – WP-3 - Vycor Ultra E. Vertical and horizontal surfaces under exposed metal flashing – WP-3 – Vylor Ultra F. Entry Deck – WP-4 – W.R. Grace Bituthene System 3000 with protection board and drainage board Section 07212 Insulation Schedule A. Thermal Insulation 1. Floors – a. Thickness - 2. Exterior Walls – Thermal Resistance: R of 23 a. Thickness: 3. Roofs – Thermal Resistance: R of 50 a. Thickness – B. Acoustical Insulation 1. Interior Partion Walls a. Thickness: 5 1/2 inch and 3 ½ inch batts 2. Floor/ Ceiling Assemblies. a. Thickness: 5 ½ inch batts Section 07314 Composite Shingles and Shakes Manufacturers A. DaVinci Roofscapes, Inc. Model: Cedar Shake profile. a. Color: Tahoe Blend B. Substitutions: See Section 01600 – Product Requirements. Section 07611 Custom Sheet Metal Roofing Schedule A. Flat seam sheet copper metal roofing: as indicated on drawings. Section 07620 Sheet Metal Flashing and Trim Schedule A. Flashing and trim to include but not limited to the following: 1. Wall to roof curb flashing: where flashing is installed in combination with WP-2 or WP-3 at roof application, extend flashing vertical leg to min. 12”. Lap WP-2 over vertical leg to insure drainage. Extend over roofing water proofing min. 12”. 2. Flashing associated with Shingle Roofing, including Valley, Hip, Ridge, Eave, Gutter Edge, Gable Edge, Chimney: a. Fascia drip edge flashing: extend 2” in the plane of the roof over the first layer of water proofing. Extend down fascia 1 ½”, seal below exposed leading edge. 3. Roofing Penetration Flashings 4. Siding to stone cap flashing: Where flashing is installed at siding or stone veneer applications, extend flashing vertical leg to 18”. Lap weather resistant barrier over vertical leg to insure drainage. Extend exposed edge 1 ½” over stone and seal below leading edge. 5. Siding to trim band: Where flashing is installed at siding application with a trim band below, extend flashings vertical leg to 18”. Lap weather resistant barrier over vertical leg to insure drainage. Extend exposed edge 1 ½” down trim band and seal below leading edge. 6. Door and Window flashings: Install flashings at door and window heads and sills per manufacturer’s recommendations. a. At head extend flashing vertical leg to min. 12”. Lap weather resistant membrane over vertical leg. b. At sill key flashing into bottom of window frame, extend vertical leg to min. 6”. Lap vertical flashing leg over weather resistant membrane. Seal between window frame and window trim. 7. Coping, Cap, Parapet, Sill and Ledge Flashing 8. Flashing Associated with Shingle Roofing, including Valley, Hip, Ridge, Eave, Gutter Edge, Gable Edge, Chimney Section 08212 Stile and Rail Wood Doors Schedule – Refer to Detail 8.02 Door Schedule Section 08360 Overhead Doors Schedule – Refer to Detail 8.02 Door Schedule Section 08550 Wood Windows Manufacturers A. Jeld-Wen Windows: www.jeld-wen.com B. Custom wood casement windows C. Auralast pine, bronze finished aluminum cladding Schedule A. Refer to Detail 8.01 Exterior Window & Door Schedule Section 08800 Glazing Schedule A. Wood Windows: Glass Typ [IG], Tempered per safety glazing requirements above. B. Stile and Rail Wood Doors: 1. Exterior: Glass Type [IG], Tempered. C. Shower and Bath enclosures: 1. Glass Type [S] Section 09260 Gypsum Board Assemblies Schedule A. Provide 1-hour fire rated assemblies at the following areas 1. Garage walls and ceiling adjacent to living rooms 2. Flue chase shafts to the underside of the roof Section 10305 Manufactured Fireplaces Schedule UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Subject Property Address: ____________________________ Lot______ Block _____ Subdivision: ____________ Primary Contact / Owner Representative: ___________________________ Phone: _______________________ ______________________________________________________ Plans Dated: ________________________ Primary Contact/Owner Representative Signature NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date. Authorized Signature Comments Date CENTURYLINK 970.328.8288 (tel) 970.328.8282 (fax) Contacts: Barb Davis barb.davis@centurylink.com XCEL HIGH PRESSURE GAS 970.406.1309 (tel) 970.468.1401 (fax) Contact: Ron Bureta ronnie.j.bureta@xcelenergy.com HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.4081 (fax) Contact: Jeff Vroom jvroom@holycross.com 5/6/13 XCEL Energy 970.262.4039 (tel) 970.262.4038 (fax) Contacts: Pam McGuire pamela.mcquire@xcelenergy.com EAGLE RIVER WATER & SANITA- TION DISTRICT 970.477.5449 (tel) 970.845.7218 (fax) Contact: Tug Birk tbirk@erwsd.org COMCAST CABLE 970.930.4713 (tel) 303.603.1004 (fax) Contact: Michael Johnson Michael_johnson@cable.comcast.com CDOT (Only in CDOT Right-of-way) 970.683.6284 (tel) Contact: Dan Roussin Daniel.roussin@dot.state.co.us UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impaet any existing or proposed utlity services, and also to verify service availability and location for new construction and should be used In conjunction with preparing your utility plan and scheduling instalatons. A site plan, including grading plan, floor plan, and elevafons, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS PROM THE UTILITY COMPANIES. If you are unable to obtain comments within that tmeframe please contact The Town of Vail. Subject PropertyAddress:/JO(o’~ ~-~’V/4 ~l~lq P rima~ ~5 n[a~Re~ res e atatlve Signature CENTURY LINt( 970.328.8288 (tel) 970.328.8282 (fax) Contacts: Barb Davlsbarb.davis(O.ce ntu rylnk.com XCEL HIGH PRESSURE GAS 970.406.1784 (tel) 970.468.t,401 (fax) ;ontact: Remington Baker ernlngton.c.baker ~..xcele ner.qy.com HOLY CROSS ENERGY 970.9,17.5425 (ted 970.945.,4081 (fax)Contact: Jeff Vroom ivroom@holycross.com XCEL Energy 970.262.4039 (tel) 970.262.4038 (fax) Contacts: Pare McGulre pan’~ela.m cqeire@,xcelenerqy.com EAGLE RIVER WATER & SANITATION DISTRICT 970.477.5449 (tel) 970.845.7218 (fax) Contact: Tug Birk COMCAST CABLE 970.930.4713 (tel) 303.603.’i004 (fax) Contact: Michael Johnson M[ct~nson cable.c~i~casl.com CDOT (On!y in CDOT Right-of-way) 970.683.6284 (tel) Contact: Dan Roussin Da eieL roassin~.dot.state.co.es Lot ~ Block Phone: ~o"~,- ~’~ ~Ct I~ Plans Dated: Dat~e NOTES: 1, Utility locations n’~ust be obtained before digging, 2, A Revocable Right-of-Way Permit may be required for any Improvements within a street rlght-of-way. Contact the Public Works Department for verificatlor~ 970,479.2:[98. 3.It Is the responsibliW of the utility company and the applicant to resolve problems Identified above. 4. The Primary Contact/Owner Representative Is required to submit any revised drawings to the above agencies for re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date. UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify sewice availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMP_.,ANJF.~. If you_are unable tq oJ~tair’..4:oznments within that timeframe please contact The Town of Vail /P/I~ ---~.~./~/~J~)Z~: ~ SnbJect Prope,; A,Oress;b~V g~ ~,LoL ’~¢ Block Prim a ~o n [a~feWRe~ resent atlve Signature Authorized Skmature ~ ...... 0ENTURY LINK ~70.328.8288 (tel) ;)70.328.8282 (fax) 3ontacts: Barb Davis ba~b.davis(’&..centurylink.com XCEL HIGH PRESSURE GAS 970.406.1784 (tel) 970.468.1401 (fax) Contact: Remington Baker ~em[nqton,c.baker~xcelenergy.com HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.,4081 (fax) Contact: Jeff Vmom iwoon~@..holycross, com XCEL Eilergy 970.262.4039 (tel) 970.262.4038 (tax) Contacts: Parn McGuire )am ela.n’~cq uire(’~xcele n e rqy.com EAGLE RIVER WATER & SANITATION DISTRICT 970.471.5449 (tel) 970,845,7218 (fax) Contact: Tug Birk tbirk~e w,,,sd.orq COMCAST CABLE 970,930.,4713 (tel) 303.603.1004 (fax) Contacl; Michael Johnson Michael iohnson@cnble.comcast corn CDOT (Only in CDOT Right-of-way) 970.683.6284 (tel) Contact: Dan Roussln DanieLroussin@,dot.state.co,us ~OTES: 1. UtillLy locations musL be obtained before digging. 2. A Revocable RlghL-of-Way Permit may be required for any Improvements within a street right-of-way. Contact the Public Works Department for verlncatlon 970.479.2198. 3.It Is the responsibility of the utility company and the applicant to resolve problems Identified above, 4. The Primary Contact/Owner Representative Is required to submit any revised drawings to the above agencies for re-approval & re-verification If the submitted plans are altered in any way after the authorized signature date. .\