Loading...
HomeMy WebLinkAboutB12-0274 SOIL NAIL VERIFICATION TEST STAMPED LETTER INYeh and Associates, Inc. Consulting Engineers&Scientists August 31, 2012 Project No. 212-108 Mr. Shaun Brainard B&Y Drilling, Inc. P.O. Box 1878 Rifle, Colorado 81650 Subject: Review of Permanent Ground Nail Wall Testing, Weltner Residence, 1677 Buffehr Creek Road, Lott, Filing 1, Eleni Znermer Subdivision, Vail, Colorado Dear Mr. Brainard, A representative of Yeh and Associates conducted verification testing on August 29, 2012 on the permanent ground nail wall at the Weltner Residence, 1677 Buffehr Creek Road, Lot 1, Filing 1, Eleni Znermer Subdivision, Vail, Colorado. The wall was constructed by B&Y Drilling, Inc. We conducted one soil nail verification test on a sacrificial nail. The verification test was loaded to 2.0 times the design load (see attached). Test results indicated the test nail attained the required test loads. The test was conducted in general conformance with FHWA guidelines and the test results are attached. Based on our observations and test data, it appeared the permanent ground nail wall constructed by B&Y Drilling, Inc. was in general conformance with plans provided by Yeh and Associates, Inc., dated June 11, 2012. If you have questions or need additional information, please call us at 970-384-1500. YEH AND ASSOCIATES, INC. 'veee..eaaw� Richard D. Johnson, P.E. Project Manager a 3532 0 o' NA1-ECG 5700 East Evans Avenue, Denver, CO 80222, (303) 781-9590, Fax (303) 781-9583 1525 Blake Avenue, Glenwood Springs, CO 81601, (970) 384-1500, Fax (970) 384-1501 570 Turner Drive, Suite D, Durango, CO 81303, (970) 382-9590, Fax (970) 382-9583 Soil Nail Verification Testing Wall Designation: Weltner Residence Design Test Load: 13,572 Ibs Job Number: 212-108 Bond Length: 10 feet Testers: KA Free Length: 9 feet Date:August 29, 2012 Stress Length: 1 foot Load Hold Time Load Pressure Total Movement Residual Elastic Ibs (psi) inches inches inches AL(.10 DTL) until stable 4918 400 0.000 0.25DTL until stable 3393 276 - 0.50DTL until stable 6786 551 0.108 0.75DTL until stable 10179 825 0.146 1.00DTL until stable 13572 1100 0.182 1.25DTL until stable 16965 1375 0.225 1.50DTL 1 min 20358 1650 0.274 (Creep Test) 2 min 0.275 (Hold 10 3 min 0.277 min-minimum) 5 min 0.279 6 min 0.279 10 min 0.279 20 min 30 min 50 min 60 min 1.75DTL until stable 23751 1925 0.292 2.00DTL until stable 27144 2200 0.325 0.231 AL(.10 DTL) until stable 4918 400 0.094 Preliminary Acceptance: 0.005 Must be less than 0.04 inches- If necessary hold to 60 min (6 to 60 less than 0.08 inches) Comments: Ran test to 54,198 Ibs and held load. VERIFICATION TEST Weltner Residence Test Nail#1, Sacrificial at east end of wall Project No. 212-108 Bond Length= 10 feet Free Length= 9 feet 40 Hole Diam. = 4 inch 35 ------------------T------------------a------------------T------------------ ------------------+---------- ----- I Load Movement Bond 1 ' 30 ------------------ ------------------i------------------T------------------r---------------- ------------------ Ibs (in) (psi) i 4918 0.000 3.3 6786 0.108 4.5 25 ------------------r -----------------4------------------T-----------------F---- ----------- ------------------ 10179 0.146 6.8 = I 13572 0.182 9.0 Q -----------------T------------------1------------------T------- -----�r------------------T------------------ 16965 0.225 11.3 c 20 - � � � -- 20358 0.274 13.5 p 23751 0.292 15.8 15 ------------------T- -----------------;--------------- -T-----------------r------------------T------------------ 27144 0.325 18.0 i ; 36950 0.428 24.5 49270 0.528 32.7 1 i i 10 ------------------T----------------- ----------------- -----------------r------------------T------------------ 54198 0.577 35.9 ; ; T i i 5 ------------------T --------------;-------------------------------------- ------------------T------------------- Max. Load= 54198 lb Bond Area= 1508 in' Ultimate Bond = 35.9 psi 0 0.000 0.100 0.200 0.300 0.400 0.500 0.600 Total Movement(inches)