HomeMy WebLinkAboutB13-0174 permit C/'���--> .- I � ' `�-c.�
b
l
� ------����---
------- -- - - --
01-12-2015 Inspection Request Reporting Page 2
4_14_ m�_ _- -V�il_CO -�ii�Qf__— ---
Requested Inspect Date: Tuesda ,January 13 2015
Site Address: 600 VAI�VALLEY DF�VAIL
NORTHWOODS UNIT B313
A/P/D Information
Activity: B13-0174 Type: COMBO Sub Type: AMF Status: ISSUED
Const Type: Occupancy: Use: R-2 Insp Area:
Owner: SILVERFELF INC
Applicant: NEDBO CONSTRUCTION INC Phone: 970-845-1001
Contractor: NEDBO CONSTRUCTION INC Phone: 970-845-1001
Description: RENOVATION OF NORTHWOODS 6313.MAIN LEVEL:ADD EXTERIOR STONE DECK OVER EXISTING
SUN ROOM. EXISTING SUN ROOM TO BE REFRAMED WITH NEW WINDOWS AND EXTERIOR
FINISHES. NEW GLAZING FOR FOGGED WINDOW UNITS. UPPER LEVEL: RENOVATE MASTER SUITE
AND DECK-EXTERIOR WALL AT MASTER SUITE IS TO BE EXTENDED OUT ON EXISTING DECK AND
NEW GLASS SLIDING DOORS INSTALLED. DECK TO HAVE HOT TUB REMOVED AND NEW RAILINGS.
THREE NEW SKYLIGHTS W ILL BE ADDED.ALL EXTERIOR FINISHES ARE TO MATCH EXISTING
WINDOWS ANDRRAILIOODS�CPDA�TWG OF NT�RIOR F�IN SHES�INCLUDED AO�jDLWG, PAINTING,
Comment: E-SUBMITTAL.-DRHOADES
Comment: EMAILED CONTRACTOR-JMONDRAGON
Comment: Permit extended until spring 2014-SHANE
Reauested Inspection(s)
Item: 190 ELEC-Final Requested Time: 11:00 AM
Requestor: nathan Phone: 970-445-7442
Assigned To: Entered By: CGODFREY K
Action: Time Exp:
Item: 390 MECH-Final Requested Time: 10:30 AM
Requestor: nathan Phone: 970-445-7442
Assigned To: Entered By: CGODFREY K
Action: Time Exp:
Item: 90 BLDG-Final Requested Time: 04:00 PM
Requestor: natha Phone: 970-445-7442
Assigned To: J GON Entered By: CGODFREY K
Action: _ Time Exp:
.�--°°..,
It �542 PLAN-FINAL Requested Time: 08:15 AM
Req tor: nathan Phone: 970-445-7442
Assigned To: WCAMPBELL Entered By: CGODFREY K
ion: _ Time Exp:
r
Inspection Historv � �� /� ���
Item: 120 ELEC-Rough "Approved"
%�
06/17/13 Inspector: sgremmer Action: AP APPROVED
Comment:
10/21/13 Inspector: sgremmer Action: AP APPROVED
Comment:
10/21/13 Inspector: sgremmer Action: AP APPROVED
Comment:
10/27/14 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 200 MECH-Rough "Approved"
06/17/13 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 220 PLMB-Rough/D.W.V. "Approved*'
06/12/13 Inspector: sgremmer Action: AP APPROVED ,
Comment:
11/05/13 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 230 PLMB-Rough/Water *'Approved"
06/12/13 Inspector: sgremmer Action: AP APPROVED
Comment:
11/OS/13 Inspector: sgremmer Action: AP APPROVED
Comment:
REPT131 Run Id: 14898
THIJNDER MOUNTAIN TESTING
?974 Rontin Avenue, Grand Junction, Colorado 81504
;
Office (974) 256-.99+65 Cell (970) 210-7008 Fax (970) 314-7067
' AledboConstructian June 3.3()t� �
� • P.O.Box 3dt4 �
! VaiL Colarado 81658 I
�
� ATFN: Mr_Noward Bridgland Nem�ii �:R t;-017a ,
f
y
� RF: Northwaods Condaminiums
� Unit B-13
� 600 Vait Valley Drive
�
Vail.Colarado
f Dear Mr.Bridbiand,
�
� As requested,struetural stee)special inspection was conducted at the above referenced project per
� the IBC 2009 Edit'ton-Chapter 17:Structural Tests and Special Inspection and Town oF Vait rcquiremcnu.
� 1 arrived on site at I{:30 AM. i met with you on site to review project requirements and specifications.The
� stcef fabricatar and erecior for this project is Trinity Welding,liic in I.eadv°iUe.Colorad4� The uzlder
� ynalificatian test reports tor the welders on site wert revieHed and observrd to Fx acci:�tahle with prqject
� specificaiions.Copies�af test reports are on file with Mr.Jtremy Leibseit wiih Trinity�4'elding, Inc.
Visual welding inspectiun was conducted frram the 3'd Floor Framing Plan to the Roof 1=ramiti,
_ Plan leveis on the newly installed tube to column,column to t±eam&leciger angle fiilet welded cunnections
as required on Shcck 54:Details 3.3.�3,�.6&7 of appmvcti3 rngineering dra�vin��s pro�ided hv KRM
Cansultants,Ine.m Vail,Co:Job No. t?08-IS dated 4-t0-13.Inspection was conducted at�rid line D H
� & 13- Ib on all levels referenced.Fil1e[welds were obs�:rved to be acceptable with visual prohle;onf��
� stated in A WS Dl.1 requirertients.it shall be noted thar multiple column to beam and heam to beam
% connections were observed to be welded with appro�imately��Ib to'�'fillet welds in lieu ofhigh
� s[rength bolts as required on approved drawings referenced.LnGineenn��clarifica[ion;;hall he required in
� w^titing and reviewed b} Thunder Mountain Testin�,�rrac�r to acccpt:vice.
s
,;
� Continucd iospection shall he conducted at a later date_
� C
§ R e Ily Subml Rrviewed by; � �
a t _.Maxwe �L�� Michael Allan Berry. _E. ;� `� �p �i
' AWS CWI�910402p1 � 8t��� State ofColorado k3 :���j o�(3 i
� QCt fXQ,aE112Ut5 •
, ICC Certified�l18fi.i569-SI �.: O�e•�y����r���+
` Churtder Mountain Testin�, ff�fo�����QO
�
�
� ..
�
i
�
z .
z
�
�
�
�
�
'E
'
�
1
T
��:� ........ �
�
�
�
�
,�
�
�
KR IVI�CpNSULTANTS, �NC. FIELD REPORT
P.O.Bax 4572 • Val,Colprado 8�858 • 970-94g-g3gt
Project Northwoods B13 .Mb Nember 120&15
Engi»eer Kimberly McGhee Axrlve 1:00 p.m.
Dste 6/4/2U13 Depart 1:45 p.m. �
Present at Slte Kim,Howard ��°f Structural steei work 90%done
Com letion
Stractura/E/ements Observed �y�
1. Observed new steel beams and ftoor framing at new south deck at third floor. � S2
Beam comections were welded instead of bolted,are acceptaWe. Steel braces
below existing chase have been re-welded in place.Column base plates have not '
been grouted yet._
_ _...- — -- __ .. _____ _.
2..Observed new steel beams and floor traming at fourth floor master bath. � S3
3. Observed new steei transfer heam at fourth floor master bedroom. , S3
-- - -- . ,_.._. _..
4. Observed new exterior walt and roof overhang at fourth floor master bedroom. � S3
--- _.�— — - _.
5 Ews6ru,Lroof at master bedroom dedc has not been r�emoved yet 8iS4 �
__ ----- -- -- ___
6
_ __-- �..-- — ------- ,
7. ,
_ __ _ __ __ ----- .
8.
_ _ __ _--- --- _...__ __ _ __�
€'
�
�
�
�
�'
�';
Other than any deficiencies nated, are the structurai elements observed in general �
conformance with KRM Consultants, Inc. approved plans and specifications? Yes � No ❑ �
�'..
�'.
�-
Sli[iNED: ���j �E�/,�`r COPY TO: �
.h4y.,��.� F� �
�iCi':,,,'�`� �d GPSL Archilecls �
f
IGnberly R.McGhee,PE ��� �3+�99��� �'
REVIEWED: ` `''• �
a
�-r��f•„� • ��`� t:.
. �� �,��,
,� �
�
�
x
4'
S
i:
i'
G
f
,`t
4,
�
�:
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
,.
�w�o�yAU, .
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: B13-0174
Project #: PRJ13-0168
Job Address: 600 VAIL VALLEY DR VAIL Applied.....: 05/17/2013
Location......: NORTHWOODS UNIT 6313 Issued. . . : 06/10/2013
Parcel No....: 210108118013
OWNER SILVERFELF INC 05/17/2013
1 ER RETORNO DE SIERRA ITAMBE 101 COL
REAL DEL LAS LOMAS
MEXICO CITY
MEXICO 11920
APPLICANT NEDBO CONSTRUCTION INC 05/17/2013 Phone: 970-845-1001
PO BOX 3419
VAI L
CO 81658
License: C000003087
CONTRACTOR NEDBO CONSTRUCTION INC 05/17/2013 Phone: 970-845-1001
PO BOX 3419
VAI L
'� CO 81658
License: C000003087
Description:
RENOVATION OF NORTHWOODS 6313. MAIN LEVEL: ADD EXTERIOR
STONE DECK OVER EXISTING SUN ROOM. EXISTING SUN ROOM TO BE
REFRAMED WITH NEW WINDOWS AND EXTERIOR FINISHES. NEW
GLAZING FOR FOGGED WINDOW UNITS. UPPER LEVEL: RENOVATE
MASTER SUITE AND DECK-EXTERIOR WALL AT MASTER SUITE IS TO
BE EXTENDED OUT ON EXISTING DECK AND NEW GLASS SLIDING
DOORS INSTALLED. DECK TO HAVE HOT TUB REMOVED AND NEW
RAILINGS.THREE NEW SKYLIGHTS WILL BE ADDED.ALL EXTERIOR
FINISHES ARE TO MATCH EXISTING APPROVED NORTHWOODS CONDO
FINISHES, INCLUDING STONE, STUCCO, SIDING, PAINTING,
WINDOWS AND RAILINGS. UPDATING OF INTERIOR FINISHES
INCLUDED AS WELL.
Occupancy: R-2 Type Construction: Valuation: $460,000.00
.«.............................................,.,.._...,,.......,.,.,,......,x.., FEE SUMMARY ...................,.._.,.........,..__......_......._,,....,__.......,,.,......
Building Permit-----------> $3,009.75 Bldg Plan Check----------> $1,956.34 Use Tax Fee-----------------------> $9,000.00
Electrical Permit---------> $368.00 Elec Plan Check-----------> $239.20 Restuarant Plan Review--------> $0.00
Mechanical Permit------> $400.00 Mech Plan Check---------> $100.00 Additional Fees--------------------> $1,252.25
Plumbing Permit--------> $450.00 Plmb Plan Check---------> $112.50 Recreation Fee--------------------> $0.00
Investigation-----------------------> $0.00
Will Call------------------------------> $20.00
TOTAL PERMIT FEES--------------> $16,908.04
Payments-------°----------------------> $16,908.04
BALANCE DUE------------------------> $0.00
•iri.'kYextf f f+�A'*tf 1`f 4ir#'Ye1�f 44#YrYeYekf ir!#rtrtYf RR4flrthYew*#f fiYr+Yf#**RrttriFYeww#rtYetrttwtrrt44YewxiFfL#'Y(trtwR4ff YrRYf w4irfrtYe'ktlr4ilM'rtYrhYr'k'kxfffrt�k#YrY'�F�kx#R1`rtrtYl�Fwwf 44444+rt*#44fiwRY(t�M4#t#rth**i*##�k**}}fi#f**d***rtY***fi*f♦
DECLARATIONS
I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and
other ordinances of the Town applicable thereto.
combination permit_012811
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149
OR AT OUR OFFICE FROM 8:00 AM -4:00 PM.
�
combination permit_012811
�
�
i 11�I#i 1 �i �+i���Mii 1
........�.....x�...•.....+•...+.•:r.+..r...x.e..w:....••.�x.••:.,r.+......«e.x....e..+...•.•............+xx.x..••�..x...+r.+.x.....,r.x.....»w...s.+e•.......+..:+.•..x...•w...x.r..+..x.
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
�
Permit#: B13-0174 Address: 600 VAIL VALLEY DR VAIL
Owner: SILVERFELF INC Location:
NORTHWOODS UNIT 6313
•'kR+t4t�4�keYetrrt*f irirl(f f#Y'�kw**+F��f LYrf A/11`4f f f�kiFiFfr�*4i�i�kMfYrYf*telf�tfrY`+#Yeff fi(i(krtYrYrki!*f i`*Y`f iF#1`1�1�#rtYrRtr4fe'kYr�kitYri4frf f`Rf RR1(1�'kYrYrhIISRk1t�FYef rtYetef***rtf#k*/**M'YeYrRiRRiFYrk�krt�kt�1(k1�YeYefriFf##1(kY`f#}ff rtrtikY`f41`1`*YlY`R�f 4
combination permit_012811
�
�
!V�Tt� Ul 1�1]!L r
.,,,**�.,***.,**.**„*,,,,*****.,*,.******.,***********,.**********«**..*****�************„******«.,*****.,****************„*„**,.***,**********«****.,*,*.,.,***�***
REQUIRED INSPECTIONS AND STATUSES
�
Permit#: 613-0174 Address: 600 VAI�VALLEY DR VAIL
Owner: SILVERFELF INC Location:
NORTHWOODS UNIT 6313
.*****..***,,,,,..*************,,,,*«***«**,.********.***,,,,.***.***...***,.«******,.****«*.*�***********«„***�««„**«****,.*****,.**.,*«.,**«*****�**********�****
Item: 00120 ELEC-Rough
Item: 00200 MECH-Rough
Item: 00220 PLMB-Rough/D.W.V.
Item: 00230 PLMB-Rough/Water
Item: 00030 BLDG-Framing
Item: 00050 BLDG-Insulation
Item: 00060 BLDG-Sheetrock Nail
Item: 00542 PLAN-FINAL
Item: 00190 ELEC-Final
Item: 00290 PLMB-Final
Item: 00390 MECH-Final
Item: 00420 Special Inspect-final rept
Item: 00090 BLDG-Final
combination permit_012811
._ _ __. � - ol ��
��,� � �
01-14-2015 Inspection Request Reporting Page 3
4•14 nrt� VailrC� - Citv Of
Requested Inspect Date: Thursday January 15,2015
Site Address: 600 VAIL�IALLEY DR VAIL
NORTHWOODS UNIT B313
A/P/D Information
Activity: 613-0174 Type: COMBO Sub Type: AMF Status: ISSUED
Const Type: Occupancy: Use: R-2 Insp Area:
Owner: SILVERFELF INC
Applicant: NEDBO CONSTRUCTION INC Phone: 970-845-1001
Contractor: NEDBO CONSTRUCTION INC Phone: 970-845-1001
Description: RENOVATION OF NORTHWOODS B313.MAIN LEVEL:ADD EXTERIOR STONE DECK OVER EXISTING
SUN ROOM.EXISTING SUN ROOM TO BE REFRAMED WITH NEW WINDOWS AND EXTERIOR
FINISHES.NEW GLAZING FOR FOGGED W INDOW UNfTS.UPPER LEVEL:RENOVATE MASTER SUITE
AND DECK-EXTERIOR WALL AT MASTER SUITE IS TO BE EXTENDED OUT ON EXtSTING DECK AND
NEW GLASS SLIDING DOORS INSTALLED. DECK TO HAVE HOT TUB REMOVED AND NEW RAILINGS.
THREE NEW SKYLIGHTS W ILL BE ADDED.ALL EXTERIOR FINISHES ARE TO MATCH EXISTING
WINDOWS AND RAILINGS SUPDA�ING OF INT�RIOR F�IN SHES INC�UDED AO WEING,PAINTING,
Comment: E-SUBMITTAL.-DRHOADES
Comment: EMAILED CONTRACTOR-JMONDRAGON
Comment: Permd extended until spring 2014-SHANE
Reauested Inspection(s1 v��(/ I
Item: 542 PLAN-FINAL ���a� Requeste Phone: 08:00 AM
Requestor:
Comments: Nathan 970-445-7442 � Entered B CGODFREY K
Assigned To: WCAMPB LL Y�
A ion: Time Exp:
� �
C��`- �
` I �
Ins ection Histo
Item: 120 ELEC-Rough "Approved"
06/17/13 Inspector: sgremmer Action: AP APPROVED
Comment:
10/21/13 Inspector: sgremmer Action: AP APPROVED
Comment:
10/21/13 Inspector: sgremmer Action: AP APPROVED
Comment:
10/27/14 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 200 MECH-Rough "Approved"
06/17/13 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 220 PLMB-Rough/D.W.V. *'Approved"
06/12/13 Inspector: sgremmer Action: AP APPROVED
Comment:
11/05/13 Inspector: sgremmer Action: AP APPROVED
Comment:
ftem: 230 PLMB-Rough/W ater "Approved"
06/12/13 Inspector: sgremmer Action: AP APPROVED
Comment:
11/05/13 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 30 BLDG-Framing "'Approved"
06/17/13 Inspector: s�gremmer Action: COND APPROVED/CONDffIONS
Comment: Fire to sign off
_ 06/20/13 Inspector: sgremmer Action: AP APPROVED
Comment:,
Item: 50 BLDG-Insulation "Approved'*
06/24/13 Inspector: sgremmer Action: AP APPROVED
Comment:
ftem: 60 BLDG-Sheetrock Nail "Approved"
06/20/13 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: Interior drywalrfor fire seperation
06/24/13 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: upper unit
06/24/13 Inspector: Martin Action: PI PARTIAL INSPECTION
Comment: Soth room only
06/25/13 Inspector: sgremmer Action: AP APPROVED
Comment:
- ftem: 542 PLAN-FINAL
ftem: 190 ELEC-Final "Approved*'
01/14/15 Inspector: sgremmer Action: AP APPROVED
} REPT131 Run Id: 14899
.�