Loading...
HomeMy WebLinkAboutB13-0174 permit C/'���--> .- I � ' `�-c.� b l � ------����--- ------- -- - - -- 01-12-2015 Inspection Request Reporting Page 2 4_14_ m�_ _- -V�il_CO -�ii�Qf__— --- Requested Inspect Date: Tuesda ,January 13 2015 Site Address: 600 VAI�VALLEY DF�VAIL NORTHWOODS UNIT B313 A/P/D Information Activity: B13-0174 Type: COMBO Sub Type: AMF Status: ISSUED Const Type: Occupancy: Use: R-2 Insp Area: Owner: SILVERFELF INC Applicant: NEDBO CONSTRUCTION INC Phone: 970-845-1001 Contractor: NEDBO CONSTRUCTION INC Phone: 970-845-1001 Description: RENOVATION OF NORTHWOODS 6313.MAIN LEVEL:ADD EXTERIOR STONE DECK OVER EXISTING SUN ROOM. EXISTING SUN ROOM TO BE REFRAMED WITH NEW WINDOWS AND EXTERIOR FINISHES. NEW GLAZING FOR FOGGED WINDOW UNITS. UPPER LEVEL: RENOVATE MASTER SUITE AND DECK-EXTERIOR WALL AT MASTER SUITE IS TO BE EXTENDED OUT ON EXISTING DECK AND NEW GLASS SLIDING DOORS INSTALLED. DECK TO HAVE HOT TUB REMOVED AND NEW RAILINGS. THREE NEW SKYLIGHTS W ILL BE ADDED.ALL EXTERIOR FINISHES ARE TO MATCH EXISTING WINDOWS ANDRRAILIOODS�CPDA�TWG OF NT�RIOR F�IN SHES�INCLUDED AO�jDLWG, PAINTING, Comment: E-SUBMITTAL.-DRHOADES Comment: EMAILED CONTRACTOR-JMONDRAGON Comment: Permit extended until spring 2014-SHANE Reauested Inspection(s) Item: 190 ELEC-Final Requested Time: 11:00 AM Requestor: nathan Phone: 970-445-7442 Assigned To: Entered By: CGODFREY K Action: Time Exp: Item: 390 MECH-Final Requested Time: 10:30 AM Requestor: nathan Phone: 970-445-7442 Assigned To: Entered By: CGODFREY K Action: Time Exp: Item: 90 BLDG-Final Requested Time: 04:00 PM Requestor: natha Phone: 970-445-7442 Assigned To: J GON Entered By: CGODFREY K Action: _ Time Exp: .�--°°.., It �542 PLAN-FINAL Requested Time: 08:15 AM Req tor: nathan Phone: 970-445-7442 Assigned To: WCAMPBELL Entered By: CGODFREY K ion: _ Time Exp: r Inspection Historv � �� /� ��� Item: 120 ELEC-Rough "Approved" %� 06/17/13 Inspector: sgremmer Action: AP APPROVED Comment: 10/21/13 Inspector: sgremmer Action: AP APPROVED Comment: 10/21/13 Inspector: sgremmer Action: AP APPROVED Comment: 10/27/14 Inspector: sgremmer Action: AP APPROVED Comment: Item: 200 MECH-Rough "Approved" 06/17/13 Inspector: sgremmer Action: AP APPROVED Comment: Item: 220 PLMB-Rough/D.W.V. "Approved*' 06/12/13 Inspector: sgremmer Action: AP APPROVED , Comment: 11/05/13 Inspector: sgremmer Action: AP APPROVED Comment: Item: 230 PLMB-Rough/Water *'Approved" 06/12/13 Inspector: sgremmer Action: AP APPROVED Comment: 11/OS/13 Inspector: sgremmer Action: AP APPROVED Comment: REPT131 Run Id: 14898 THIJNDER MOUNTAIN TESTING ?974 Rontin Avenue, Grand Junction, Colorado 81504 ; Office (974) 256-.99+65 Cell (970) 210-7008 Fax (970) 314-7067 ' AledboConstructian June 3.3()t� � � • P.O.Box 3dt4 � ! VaiL Colarado 81658 I � � ATFN: Mr_Noward Bridgland Nem�ii �:R t;-017a , f y � RF: Northwaods Condaminiums � Unit B-13 � 600 Vait Valley Drive � Vail.Colarado f Dear Mr.Bridbiand, � � As requested,struetural stee)special inspection was conducted at the above referenced project per � the IBC 2009 Edit'ton-Chapter 17:Structural Tests and Special Inspection and Town oF Vait rcquiremcnu. � 1 arrived on site at I{:30 AM. i met with you on site to review project requirements and specifications.The � stcef fabricatar and erecior for this project is Trinity Welding,liic in I.eadv°iUe.Colorad4� The uzlder � ynalificatian test reports tor the welders on site wert revieHed and observrd to Fx acci:�tahle with prqject � specificaiions.Copies�af test reports are on file with Mr.Jtremy Leibseit wiih Trinity�4'elding, Inc. Visual welding inspectiun was conducted frram the 3'd Floor Framing Plan to the Roof 1=ramiti, _ Plan leveis on the newly installed tube to column,column to t±eam&leciger angle fiilet welded cunnections as required on Shcck 54:Details 3.3.�3,�.6&7 of appmvcti3 rngineering dra�vin��s pro�ided hv KRM Cansultants,Ine.m Vail,Co:Job No. t?08-IS dated 4-t0-13.Inspection was conducted at�rid line D H � & 13- Ib on all levels referenced.Fil1e[welds were obs�:rved to be acceptable with visual prohle;onf�� � stated in A WS Dl.1 requirertients.it shall be noted thar multiple column to beam and heam to beam % connections were observed to be welded with appro�imately��Ib to'�'fillet welds in lieu ofhigh � s[rength bolts as required on approved drawings referenced.LnGineenn��clarifica[ion;;hall he required in � w^titing and reviewed b} Thunder Mountain Testin�,�rrac�r to acccpt:vice. s ,; � Continucd iospection shall he conducted at a later date_ � C § R e Ily Subml Rrviewed by; � � a t _.Maxwe �L�� Michael Allan Berry. _E. ;� `� �p �i ' AWS CWI�910402p1 � 8t��� State ofColorado k3 :���j o�(3 i � QCt fXQ,aE112Ut5 • , ICC Certified�l18fi.i569-SI �.: O�e•�y����r���+ ` Churtder Mountain Testin�, ff�fo�����QO � � � .. � i � z . z � � � � � 'E ' � 1 T ��:� ........ � � � � � ,� � � KR IVI�CpNSULTANTS, �NC. FIELD REPORT P.O.Bax 4572 • Val,Colprado 8�858 • 970-94g-g3gt Project Northwoods B13 .Mb Nember 120&15 Engi»eer Kimberly McGhee Axrlve 1:00 p.m. Dste 6/4/2U13 Depart 1:45 p.m. � Present at Slte Kim,Howard ��°f Structural steei work 90%done Com letion Stractura/E/ements Observed �y� 1. Observed new steel beams and ftoor framing at new south deck at third floor. � S2 Beam comections were welded instead of bolted,are acceptaWe. Steel braces below existing chase have been re-welded in place.Column base plates have not ' been grouted yet._ _ _...- — -- __ .. _____ _. 2..Observed new steel beams and floor traming at fourth floor master bath. � S3 3. Observed new steei transfer heam at fourth floor master bedroom. , S3 -- - -- . ,_.._. _.. 4. Observed new exterior walt and roof overhang at fourth floor master bedroom. � S3 --- _.�— — - _. 5 Ews6ru,Lroof at master bedroom dedc has not been r�emoved yet 8iS4 � __ ----- -- -- ___ 6 _ __-- �..-- — ------- , 7. , _ __ _ __ __ ----- . 8. _ _ __ _--- --- _...__ __ _ __� €' � � � � �' �'; Other than any deficiencies nated, are the structurai elements observed in general � conformance with KRM Consultants, Inc. approved plans and specifications? Yes � No ❑ � �'.. �'. �- Sli[iNED: ���j �E�/,�`r COPY TO: � .h4y.,��.� F� � �iCi':,,,'�`� �d GPSL Archilecls � f IGnberly R.McGhee,PE ��� �3+�99��� �' REVIEWED: ` `''• � a �-r��f•„� • ��`� t:. . �� �,��, ,� � � � x 4' S i: i' G f ,`t 4, � �: NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ,. �w�o�yAU, . Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: B13-0174 Project #: PRJ13-0168 Job Address: 600 VAIL VALLEY DR VAIL Applied.....: 05/17/2013 Location......: NORTHWOODS UNIT 6313 Issued. . . : 06/10/2013 Parcel No....: 210108118013 OWNER SILVERFELF INC 05/17/2013 1 ER RETORNO DE SIERRA ITAMBE 101 COL REAL DEL LAS LOMAS MEXICO CITY MEXICO 11920 APPLICANT NEDBO CONSTRUCTION INC 05/17/2013 Phone: 970-845-1001 PO BOX 3419 VAI L CO 81658 License: C000003087 CONTRACTOR NEDBO CONSTRUCTION INC 05/17/2013 Phone: 970-845-1001 PO BOX 3419 VAI L '� CO 81658 License: C000003087 Description: RENOVATION OF NORTHWOODS 6313. MAIN LEVEL: ADD EXTERIOR STONE DECK OVER EXISTING SUN ROOM. EXISTING SUN ROOM TO BE REFRAMED WITH NEW WINDOWS AND EXTERIOR FINISHES. NEW GLAZING FOR FOGGED WINDOW UNITS. UPPER LEVEL: RENOVATE MASTER SUITE AND DECK-EXTERIOR WALL AT MASTER SUITE IS TO BE EXTENDED OUT ON EXISTING DECK AND NEW GLASS SLIDING DOORS INSTALLED. DECK TO HAVE HOT TUB REMOVED AND NEW RAILINGS.THREE NEW SKYLIGHTS WILL BE ADDED.ALL EXTERIOR FINISHES ARE TO MATCH EXISTING APPROVED NORTHWOODS CONDO FINISHES, INCLUDING STONE, STUCCO, SIDING, PAINTING, WINDOWS AND RAILINGS. UPDATING OF INTERIOR FINISHES INCLUDED AS WELL. Occupancy: R-2 Type Construction: Valuation: $460,000.00 .«.............................................,.,.._...,,.......,.,.,,......,x.., FEE SUMMARY ...................,.._.,.........,..__......_......._,,....,__.......,,.,...... Building Permit-----------> $3,009.75 Bldg Plan Check----------> $1,956.34 Use Tax Fee-----------------------> $9,000.00 Electrical Permit---------> $368.00 Elec Plan Check-----------> $239.20 Restuarant Plan Review--------> $0.00 Mechanical Permit------> $400.00 Mech Plan Check---------> $100.00 Additional Fees--------------------> $1,252.25 Plumbing Permit--------> $450.00 Plmb Plan Check---------> $112.50 Recreation Fee--------------------> $0.00 Investigation-----------------------> $0.00 Will Call------------------------------> $20.00 TOTAL PERMIT FEES--------------> $16,908.04 Payments-------°----------------------> $16,908.04 BALANCE DUE------------------------> $0.00 •iri.'kYextf f f+�A'*tf 1`f 4ir#'Ye1�f 44#YrYeYekf ir!#rtrtYf RR4flrthYew*#f fiYr+Yf#**RrttriFYeww#rtYetrttwtrrt44YewxiFfL#'Y(trtwR4ff YrRYf w4irfrtYe'ktlr4ilM'rtYrhYr'k'kxfffrt�k#YrY'�F�kx#R1`rtrtYl�Fwwf 44444+rt*#44fiwRY(t�M4#t#rth**i*##�k**}}fi#f**d***rtY***fi*f♦ DECLARATIONS I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. combination permit_012811 REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM -4:00 PM. � combination permit_012811 � � i 11�I#i 1 �i �+i���Mii 1 ........�.....x�...•.....+•...+.•:r.+..r...x.e..w:....••.�x.••:.,r.+......«e.x....e..+...•.•............+xx.x..••�..x...+r.+.x.....,r.x.....»w...s.+e•.......+..:+.•..x...•w...x.r..+..x. CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF � Permit#: B13-0174 Address: 600 VAIL VALLEY DR VAIL Owner: SILVERFELF INC Location: NORTHWOODS UNIT 6313 •'kR+t4t�4�keYetrrt*f irirl(f f#Y'�kw**+F��f LYrf A/11`4f f f�kiFiFfr�*4i�i�kMfYrYf*telf�tfrY`+#Yeff fi(i(krtYrYrki!*f i`*Y`f iF#1`1�1�#rtYrRtr4fe'kYr�kitYri4frf f`Rf RR1(1�'kYrYrhIISRk1t�FYef rtYetef***rtf#k*/**M'YeYrRiRRiFYrk�krt�kt�1(k1�YeYefriFf##1(kY`f#}ff rtrtikY`f41`1`*YlY`R�f 4 combination permit_012811 � � !V�Tt� Ul 1�1]!L r .,,,**�.,***.,**.**„*,,,,*****.,*,.******.,***********,.**********«**..*****�************„******«.,*****.,****************„*„**,.***,**********«****.,*,*.,.,***�*** REQUIRED INSPECTIONS AND STATUSES � Permit#: 613-0174 Address: 600 VAI�VALLEY DR VAIL Owner: SILVERFELF INC Location: NORTHWOODS UNIT 6313 .*****..***,,,,,..*************,,,,*«***«**,.********.***,,,,.***.***...***,.«******,.****«*.*�***********«„***�««„**«****,.*****,.**.,*«.,**«*****�**********�**** Item: 00120 ELEC-Rough Item: 00200 MECH-Rough Item: 00220 PLMB-Rough/D.W.V. Item: 00230 PLMB-Rough/Water Item: 00030 BLDG-Framing Item: 00050 BLDG-Insulation Item: 00060 BLDG-Sheetrock Nail Item: 00542 PLAN-FINAL Item: 00190 ELEC-Final Item: 00290 PLMB-Final Item: 00390 MECH-Final Item: 00420 Special Inspect-final rept Item: 00090 BLDG-Final combination permit_012811 ._ _ __. � - ol �� ��,� � � 01-14-2015 Inspection Request Reporting Page 3 4•14 nrt� VailrC� - Citv Of Requested Inspect Date: Thursday January 15,2015 Site Address: 600 VAIL�IALLEY DR VAIL NORTHWOODS UNIT B313 A/P/D Information Activity: 613-0174 Type: COMBO Sub Type: AMF Status: ISSUED Const Type: Occupancy: Use: R-2 Insp Area: Owner: SILVERFELF INC Applicant: NEDBO CONSTRUCTION INC Phone: 970-845-1001 Contractor: NEDBO CONSTRUCTION INC Phone: 970-845-1001 Description: RENOVATION OF NORTHWOODS B313.MAIN LEVEL:ADD EXTERIOR STONE DECK OVER EXISTING SUN ROOM.EXISTING SUN ROOM TO BE REFRAMED WITH NEW WINDOWS AND EXTERIOR FINISHES.NEW GLAZING FOR FOGGED W INDOW UNfTS.UPPER LEVEL:RENOVATE MASTER SUITE AND DECK-EXTERIOR WALL AT MASTER SUITE IS TO BE EXTENDED OUT ON EXtSTING DECK AND NEW GLASS SLIDING DOORS INSTALLED. DECK TO HAVE HOT TUB REMOVED AND NEW RAILINGS. THREE NEW SKYLIGHTS W ILL BE ADDED.ALL EXTERIOR FINISHES ARE TO MATCH EXISTING WINDOWS AND RAILINGS SUPDA�ING OF INT�RIOR F�IN SHES INC�UDED AO WEING,PAINTING, Comment: E-SUBMITTAL.-DRHOADES Comment: EMAILED CONTRACTOR-JMONDRAGON Comment: Permd extended until spring 2014-SHANE Reauested Inspection(s1 v��(/ I Item: 542 PLAN-FINAL ���a� Requeste Phone: 08:00 AM Requestor: Comments: Nathan 970-445-7442 � Entered B CGODFREY K Assigned To: WCAMPB LL Y� A ion: Time Exp: � � C��`- � ` I � Ins ection Histo Item: 120 ELEC-Rough "Approved" 06/17/13 Inspector: sgremmer Action: AP APPROVED Comment: 10/21/13 Inspector: sgremmer Action: AP APPROVED Comment: 10/21/13 Inspector: sgremmer Action: AP APPROVED Comment: 10/27/14 Inspector: sgremmer Action: AP APPROVED Comment: Item: 200 MECH-Rough "Approved" 06/17/13 Inspector: sgremmer Action: AP APPROVED Comment: Item: 220 PLMB-Rough/D.W.V. *'Approved" 06/12/13 Inspector: sgremmer Action: AP APPROVED Comment: 11/05/13 Inspector: sgremmer Action: AP APPROVED Comment: ftem: 230 PLMB-Rough/W ater "Approved" 06/12/13 Inspector: sgremmer Action: AP APPROVED Comment: 11/05/13 Inspector: sgremmer Action: AP APPROVED Comment: Item: 30 BLDG-Framing "'Approved" 06/17/13 Inspector: s�gremmer Action: COND APPROVED/CONDffIONS Comment: Fire to sign off _ 06/20/13 Inspector: sgremmer Action: AP APPROVED Comment:, Item: 50 BLDG-Insulation "Approved'* 06/24/13 Inspector: sgremmer Action: AP APPROVED Comment: ftem: 60 BLDG-Sheetrock Nail "Approved" 06/20/13 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: Interior drywalrfor fire seperation 06/24/13 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: upper unit 06/24/13 Inspector: Martin Action: PI PARTIAL INSPECTION Comment: Soth room only 06/25/13 Inspector: sgremmer Action: AP APPROVED Comment: - ftem: 542 PLAN-FINAL ftem: 190 ELEC-Final "Approved*' 01/14/15 Inspector: sgremmer Action: AP APPROVED } REPT131 Run Id: 14899 .�