HomeMy WebLinkAboutM06-0023 inspection .
M06-0023: Entries for Item:390 - MECH-Final 14:12 06/11/2013
Action Comments By Date Unique_
Ke
NR UNIT 11 GRD NOT INSTALLED, DUCT GCD 07/13/2006 A000091
BEING REPAIRED,SEAL DUCT IN 437
CRAWLSPACE, BOILER TERMINATIONS
NOT INSTALLED,VENTING NOT
CONNECTED.
UNIT 12 MECH ROOM NOT READY,
WATER IN CRAWLSPACE, NO ACCESS OT
CRAWLSPACE, BOILER TERMINATION
NOT INSTALLED.
INSPECTION STOPPED.
CR UNIT 12 1.T&P NOT TERMINATED. GCD 07/14/2006 A000091
2.HUMIDIFIER NOT PLUMBED TO DRAIN. 518
3.FCU IN MECH ROOM NOT CONNECTED.
OK FOR TCO
4.STEAMER NOT CONNECTED/WORKING.
UNIT 11
1.FANS IN UPSTAIRS WEST BATH NOT
WORKING.
BOTH UNITS MECH ROOMS NOT READY.
CR THIS BUILD STILL HAS CORRECTIONS. GCD 07/21/2006 A000091
BOTH UNITS HAVE LEAKS IN 778
CRAWLSPACE,CONNECT FANCOIL
UNITS, SNOWMELT REQS TEST.
UNIT 11 CONDENSATE NEUTRILIZER
HOSE KINKED.CHECK HUMIDIFIER
CONNECTION TO AIR HANDLER.
UNIT 12 CONSDENSATE PUMP
TERMINATE PLASTIC TUBE.
CR UNIT 11 LEAK AT SIDE ARM UNIONS. GCD 03/28/2007 A000099
UNIT 12 LEAK AT AHU AND HUMIDIFIER 275
AP FINAL UNITS 11,12 APPROVED JRM 06/05/2007 A000101
332
Total Rows: 5
Page 1