Loading...
HomeMy WebLinkAboutM06-0023 inspection . M06-0023: Entries for Item:390 - MECH-Final 14:12 06/11/2013 Action Comments By Date Unique_ Ke NR UNIT 11 GRD NOT INSTALLED, DUCT GCD 07/13/2006 A000091 BEING REPAIRED,SEAL DUCT IN 437 CRAWLSPACE, BOILER TERMINATIONS NOT INSTALLED,VENTING NOT CONNECTED. UNIT 12 MECH ROOM NOT READY, WATER IN CRAWLSPACE, NO ACCESS OT CRAWLSPACE, BOILER TERMINATION NOT INSTALLED. INSPECTION STOPPED. CR UNIT 12 1.T&P NOT TERMINATED. GCD 07/14/2006 A000091 2.HUMIDIFIER NOT PLUMBED TO DRAIN. 518 3.FCU IN MECH ROOM NOT CONNECTED. OK FOR TCO 4.STEAMER NOT CONNECTED/WORKING. UNIT 11 1.FANS IN UPSTAIRS WEST BATH NOT WORKING. BOTH UNITS MECH ROOMS NOT READY. CR THIS BUILD STILL HAS CORRECTIONS. GCD 07/21/2006 A000091 BOTH UNITS HAVE LEAKS IN 778 CRAWLSPACE,CONNECT FANCOIL UNITS, SNOWMELT REQS TEST. UNIT 11 CONDENSATE NEUTRILIZER HOSE KINKED.CHECK HUMIDIFIER CONNECTION TO AIR HANDLER. UNIT 12 CONSDENSATE PUMP TERMINATE PLASTIC TUBE. CR UNIT 11 LEAK AT SIDE ARM UNIONS. GCD 03/28/2007 A000099 UNIT 12 LEAK AT AHU AND HUMIDIFIER 275 AP FINAL UNITS 11,12 APPROVED JRM 06/05/2007 A000101 332 Total Rows: 5 Page 1