No preview available
HomeMy WebLinkAboutM05-0269 M06-0149 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-213 8 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MECHANICAL PERMIT Permit #: MOS-0269 Job Address: 825 FOREST RD VAIL Status . . . : FINAL Location.....: GORE CREEK PLACE BUILDING 6 Applied . . : 11/02/2005 Parcel No...: 210107207002 Issued . . . O1/12/2006 Legal Description: Expires . .: 12/19/2006 Project No : OWNER VAIL CORP 11/02/2005 PO BOX 7 VAIL, CO 81658 APPLICANT SNOOZ 'EASE HOME & HEARTH OUT 11/02/2005 Phone: (303) 722-6698 999 E. EVANS AVENUE DENVER COLORADO 80210 License: 331-M CONTRACTOR SNOOZ 'EASE HOME & HEARTH OUT 11/02/2005 Phone: (303) 722-6698 999 E. EVANS AVENUE DENVER COLORADO 80210 License: 331-M Desciption: GORE CREEK PLACE-INSTALLATION OF 2 NEW FIREPLACES BUILDING 6, UNITS 5 & 6 Valuation: $15,600.00 Fireplace Information:Restricted:Y #of Gas Appliances: 0 #of Gas Lo s: 0 �+***+*►+*****�*****r*r***s►e****a�***r****:t**»**+***�***��**»****** g #of Wood Pellet: 0 FEE S UMMARY �r**r*+*x�**s***r*****r********�r***�**a**a************r*s** Mechanical---> $320.00 Restuarant Plan Review--> S0.00 Total Calculated Fees---> $403.00 Plan Check---> $80.00 TOTAL FEES--------------> $903.00 Additional Fees-----------> � Investigation-> $0.00 Total Permit Fee----------> $0.00 Will Call-----> S3.00 $403.00 Payments-------------------> $9 0 3.0 0 BALANCE DUE---------> S0.00 �**.�*:�.+■*�*r+***.*****+�++�s*�#+�*+*+��***a«**#*�*+��:******�***�►«+*+»s*++***r+*►+*�s**�*.*r**+****.***�**s��*+***+***��*****�**�*+*+►�+��**�* Item: 05100 BUILDING DEPARTMENT 12/12/2005 cgunion Action: COND chimney shrouds must be constructed per fi: manufacturer' s requirements. Item: 05600 FIRE DEPARTMENT CONDITION OF APPROVAL Cond: 12 (BLDG. ) : FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 22 (BLDG 2003) : COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION 304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL. Cond: 23 (BLDG 2003) : BOILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND CHAPTER 10 OF THE 2003 IMC. Cond: 25 (BLDG 2003) : GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC. I Cond: 29 (BLDG 2003) : ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003 IMC AND CHAPTER 3 OF THE 2003 IFGC. . Cond: 31 (BLDG. ) : BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING. Cond: 32 (BLDG. ) : PERMIT, PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR TO AN INSPECTION REQUEST. Cond: 30 (BLDG. ) : BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004 . 6. .+.*+*.++,�*�*.*.�.....+.�**..�*�**.+�..:..**+:*...*».....+...***...+�..*..�«�..«*.*...**:.*�«+*****:�****......***+*.�***.....*►**��*«.«.......� DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR[NSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM-4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER M05-0269: Entries for Item:390 - MECH-Final 08:20 06/12/2013 Action Comments By Date Unique_ Ke AP FINAL GCD 12/19/2006 A000097 — — — 042 Total Rows: 1 ,, :. R Page 1 M05-0269: Entries for Item:390 - MECH-Final 08:20 06/12/2013 Action Comments By Date Unique_ AP FINAL Ke GCD 12/19/2006 A000097 —— 042 Total Rows: 1 Page 1 SET RECEIPT Copy Reprinted on 06-12-2013 at 08:19:57 06/12/2013 RECEIPT NUMBER: R060000031 SET ID: S000000066 SET NAME: Temp set of Type ACTIVITY TRANSACTION DATE: O1/12/2006 TOTAL PAYMENT: 3,224.00 TOTAL PAID FROM TRUST: .00 TOTAL PAID FROM CURRENCY: 3,224.00 SET TRANSACTIONS: Set Member Amount ---------- ------------ M05-0264 403. 00 M05-0265 403. 00 M05-0266 403.00 M05-0267 403.00 M05-0268 403.00 M05-0269 403. 00 M05-0270 403. 00 M05-0271 903. 00 TOTAL: 403.00 TRANSACTION LIST: Type Method Description Amount ------ --------------------------- ------------ Payment Check 053481 3, 229 . 00 TOTAL: 3,224.00 ACCOUNT ITEM LIST: ' Description Account Code Current Pmts ---------------- ---------------- ------------ MECHANICAL PERMIT FEES MP 0010000311110 2, 560. 00 PLAN CHECK FEES PF 0010000311230 640. 00 WILL CALL INSPECTION FEE WC 0010000311280 24 . 00 TOTAL: 3,224.00 RECEIPT ISSUED BY: DGOLDEN INITIALS: DDG ENTERED DATE: O1/12/2006 TIME: 11:20 AM TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MECHANICAL PERMIT Permit #: M06-0149 Job Address: 825 FOREST RD VAIL Status . . . : FINAL Location.....: GORE CREEK PLACE BUILDING 6 Applied . . : OS/22/2006 Parcel No...: 210107207002 Issued . . . OS/23/2006 Legal Description: Expires . .: 06/OS/2007 Project No : OWNER VAIL CORP 05/22/2006 PO BOX 7 VAIL, CO 81658 CONTRACTOR MID COUNTY PLUMBING & HEATIN 05/22/2006 Phone: 970-468-4924 P. 0. BOX 23186 SILVERTHORNE CO 80498 License: 225-M Desciption: NEW CONSTRUCTION-GORE CREEK PLACE BUILDING 6, i1NITS 5 & 6-INSTALL HEAT AND A/C Valuation: $102,753.00 Fireplace Information:Restricted: #of Gas Appliances: 0 #of Gas Logs: 0 #of Wood Pellet: 0 *�*�*�r*�*r**���*��+���*r***************s*r*x****t�**t�***►��*�s**** FEE SUMMARY ******************�**�***t**��t**+�t*�at*�**�***as**►+*t*►+* Mechanical---> $2,060.00 Restuarant Plan Review--> $0.00 Total Calculated Fees---> S2,578.00 Plan Check---> $515.00 TOTAL FEES--------------> $2,578.00 Additional Fees-----------> S0.00 Investigation-> $0.00 Total Permit Fee----------> S2,578.00 Will Call-----> $3.00 Payments-------------------> S2,5�8.00 BALANCE DUE---------> S 0.00 *+».r**•�*r**s�****►�*+��s�*���***�rr+»r+*++****ss**��**s+*+a**r►+t*****►*►*r**rr+*�*�*+**r+***s■s**a:***+**►*�+*+«�*�►«�***+***►+s++**�+r*r►***s+ Item: 05100 BUILDING DEPARTMENT 05/22/2006 JS Action: AP Item: 05600 FIRE DEPARTMENT � CONDITION OF APPROVAL Cond: 12 (BLDG. ) : FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 22 (BLDG 2003) : COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION 304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL. Cond: 23 (BLDG 2003) : BOILER INSTALLATION MUST CONFORM TO MANUFACTURER' S INSTRUCTIONS AND CHAPTER 10 OF THE 2003 IMC. Cond: 25 (BLDG 2003) : GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC. Cond: 29 (BLDG 2003) : ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003 IMC AND CHAPTER 3 OF THE 2003 IFGC. . '� Cond: 31 (BLDG. ) : BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING. Cond: 32 (BLDG. ) : PERMIT, PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR TO AN INSPECTION REQUEST. Cond: 30 - (BLDG. ) : BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004 . 6. *:***,*�.*:+.*.+,:*�.+*+�+..+,..►+*.+�.*+*...+.�.�►:.*.�►**.*.*.�.*..*,..*.►.,�,:**.*.+.*...*....*.►.,�*..�.+�+.**+..*.*..**►*+**�.�.*.....::...*... DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM-4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER M06-0149: Entries for Item:390 - MECH-Final 08:20 06/12/2013 Action Comments By Date Unique_ Ke CR UNIT 6 GCD 12/15/2006 A000096 1.WATER STORAGE TANK TERMINATE 921 T&P VALVE. REMOVE TIE WRAP FROM MC CABLE AND SUPPORT COPPER PIPES. 2.PROVIDE VACUUM BREAKER FOR HOSE BIB. 3.CHECK ALL TOILET EXHAUST. CR UNIT 5 GCD 12/18/2006 A000096 1.LEAK IN MECHANICAL ROOM 984 2.TERMINATE T&P VALVE. AP FINAL APPROVED FOR UNITS 5 AND 6 JRM 06/05/2007 A000101 336 Total Rows: 3 i Page 1 ************************+*+**+******************************************************+******* TOWN OF VAIL, COLORADOCopy Reprinted on 06-12-2013 at 08:20:34 06/12/2013 Statement ****+*++******************************************************�*****************+*********** Statement Number: Amount: $2, 578.00 06/05/200611:31 AM Payment Method: Cash Init: LT Notation: Mid- Count/Alpine Bank #256471 ----------------------------------------------------------------------------- Permit No: M06-0149 Type: MECHANICAL PERMIT � Parcel No: 2101-072-0700-2 2101-072-2200-3 2101-072-2200-5 2101-072-2200-6 2101-072-2200-7 2101-072-2200-8 Site Address: 825 FOREST RD VAIL Location: GORE CREEK PLACE B[JILDING 6 Total Fees: $2, 578.00 This Payment: $2, 578.00 Total ALL Pmts: $2, 578.00 Balance: $0.00 ****�************************************************************+************************** ACCOUNT 1TEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ MP 00100003111100 MECHANICAL PERMIT FEES 2, 060. 00 � PF 00100003112300 PLAN CHECK FEES 515.00 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 -----------------------------------------------------------------------------