Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutM05-0269 M06-0149 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-213 8
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MECHANICAL PERMIT Permit #: MOS-0269
Job Address: 825 FOREST RD VAIL Status . . . : FINAL
Location.....: GORE CREEK PLACE BUILDING 6 Applied . . : 11/02/2005
Parcel No...: 210107207002 Issued . . . O1/12/2006
Legal Description: Expires . .: 12/19/2006
Project No :
OWNER VAIL CORP 11/02/2005
PO BOX 7
VAIL, CO
81658
APPLICANT SNOOZ 'EASE HOME & HEARTH OUT 11/02/2005 Phone: (303) 722-6698
999 E. EVANS AVENUE
DENVER
COLORADO 80210
License: 331-M
CONTRACTOR SNOOZ 'EASE HOME & HEARTH OUT 11/02/2005 Phone: (303) 722-6698
999 E. EVANS AVENUE
DENVER
COLORADO 80210
License: 331-M
Desciption: GORE CREEK PLACE-INSTALLATION OF 2 NEW FIREPLACES BUILDING
6, UNITS 5 & 6
Valuation: $15,600.00
Fireplace Information:Restricted:Y #of Gas Appliances: 0 #of Gas Lo s: 0
�+***+*►+*****�*****r*r***s►e****a�***r****:t**»**+***�***��**»****** g #of Wood Pellet: 0
FEE S UMMARY �r**r*+*x�**s***r*****r********�r***�**a**a************r*s**
Mechanical---> $320.00 Restuarant Plan Review--> S0.00 Total Calculated Fees---> $403.00
Plan Check---> $80.00 TOTAL FEES--------------> $903.00 Additional Fees----------->
� Investigation-> $0.00 Total Permit Fee----------> $0.00
Will Call-----> S3.00 $403.00
Payments-------------------> $9 0 3.0 0
BALANCE DUE---------> S0.00
�**.�*:�.+■*�*r+***.*****+�++�s*�#+�*+*+��***a«**#*�*+��:******�***�►«+*+»s*++***r+*►+*�s**�*.*r**+****.***�**s��*+***+***��*****�**�*+*+►�+��**�*
Item: 05100 BUILDING DEPARTMENT
12/12/2005 cgunion Action: COND chimney shrouds must be constructed per fi:
manufacturer' s requirements.
Item: 05600 FIRE DEPARTMENT
CONDITION OF APPROVAL
Cond: 12
(BLDG. ) : FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 22
(BLDG 2003) : COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND
SECTION 304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL.
Cond: 23
(BLDG 2003) : BOILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS
AND CHAPTER 10 OF THE 2003 IMC.
Cond: 25
(BLDG 2003) : GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003
IFGC.
I
Cond: 29
(BLDG 2003) : ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE
2003 IMC AND CHAPTER 3 OF THE 2003 IFGC. .
Cond: 31
(BLDG. ) : BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS
LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING.
Cond: 32
(BLDG. ) : PERMIT, PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR
TO AN INSPECTION REQUEST.
Cond: 30
(BLDG. ) : BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED
MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004 . 6.
.+.*+*.++,�*�*.*.�.....+.�**..�*�**.+�..:..**+:*...*».....+...***...+�..*..�«�..«*.*...**:.*�«+*****:�****......***+*.�***.....*►**��*«.«.......�
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR[NSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM-4 PM.
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
M05-0269: Entries for Item:390 - MECH-Final 08:20 06/12/2013
Action Comments By Date Unique_
Ke
AP FINAL GCD 12/19/2006 A000097
— — — 042
Total Rows: 1
,, :.
R
Page 1
M05-0269: Entries for Item:390 - MECH-Final 08:20 06/12/2013
Action Comments By Date Unique_
AP FINAL Ke
GCD 12/19/2006 A000097
—— 042
Total Rows: 1
Page 1
SET RECEIPT
Copy Reprinted on 06-12-2013 at 08:19:57 06/12/2013
RECEIPT NUMBER: R060000031
SET ID: S000000066 SET NAME: Temp set of Type ACTIVITY
TRANSACTION DATE: O1/12/2006 TOTAL PAYMENT: 3,224.00
TOTAL PAID FROM TRUST: .00
TOTAL PAID FROM CURRENCY: 3,224.00
SET TRANSACTIONS:
Set Member Amount
---------- ------------
M05-0264 403. 00
M05-0265 403. 00
M05-0266 403.00
M05-0267 403.00
M05-0268 403.00
M05-0269 403. 00
M05-0270 403. 00
M05-0271 903. 00
TOTAL: 403.00
TRANSACTION LIST:
Type Method Description Amount
------ --------------------------- ------------
Payment Check 053481 3, 229 . 00
TOTAL: 3,224.00
ACCOUNT ITEM LIST:
' Description Account Code Current Pmts
---------------- ---------------- ------------
MECHANICAL PERMIT FEES MP 0010000311110 2, 560. 00
PLAN CHECK FEES PF 0010000311230 640. 00
WILL CALL INSPECTION FEE WC 0010000311280 24 . 00
TOTAL: 3,224.00
RECEIPT ISSUED BY: DGOLDEN INITIALS: DDG
ENTERED DATE: O1/12/2006 TIME: 11:20 AM
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MECHANICAL PERMIT Permit #: M06-0149
Job Address: 825 FOREST RD VAIL Status . . . : FINAL
Location.....: GORE CREEK PLACE BUILDING 6 Applied . . : OS/22/2006
Parcel No...: 210107207002 Issued . . . OS/23/2006
Legal Description: Expires . .: 06/OS/2007
Project No :
OWNER VAIL CORP 05/22/2006
PO BOX 7
VAIL, CO
81658
CONTRACTOR MID COUNTY PLUMBING & HEATIN 05/22/2006 Phone: 970-468-4924
P. 0. BOX 23186
SILVERTHORNE
CO 80498
License: 225-M
Desciption: NEW CONSTRUCTION-GORE CREEK PLACE BUILDING 6, i1NITS 5 &
6-INSTALL HEAT AND A/C
Valuation: $102,753.00
Fireplace Information:Restricted: #of Gas Appliances: 0 #of Gas Logs: 0 #of Wood Pellet: 0
*�*�*�r*�*r**���*��+���*r***************s*r*x****t�**t�***►��*�s**** FEE SUMMARY ******************�**�***t**��t**+�t*�at*�**�***as**►+*t*►+*
Mechanical---> $2,060.00 Restuarant Plan Review--> $0.00 Total Calculated Fees---> S2,578.00
Plan Check---> $515.00 TOTAL FEES--------------> $2,578.00 Additional Fees-----------> S0.00
Investigation-> $0.00 Total Permit Fee----------> S2,578.00
Will Call-----> $3.00 Payments-------------------> S2,5�8.00
BALANCE DUE---------> S 0.00
*+».r**•�*r**s�****►�*+��s�*���***�rr+»r+*++****ss**��**s+*+a**r►+t*****►*►*r**rr+*�*�*+**r+***s■s**a:***+**►*�+*+«�*�►«�***+***►+s++**�+r*r►***s+
Item: 05100 BUILDING DEPARTMENT
05/22/2006 JS Action: AP
Item: 05600 FIRE DEPARTMENT
� CONDITION OF APPROVAL
Cond: 12
(BLDG. ) : FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 22
(BLDG 2003) : COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND
SECTION 304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL.
Cond: 23
(BLDG 2003) : BOILER INSTALLATION MUST CONFORM TO MANUFACTURER' S INSTRUCTIONS
AND CHAPTER 10 OF THE 2003 IMC.
Cond: 25
(BLDG 2003) : GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003
IFGC.
Cond: 29
(BLDG 2003) : ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE
2003 IMC AND CHAPTER 3 OF THE 2003 IFGC. .
'� Cond: 31
(BLDG. ) : BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS
LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING.
Cond: 32
(BLDG. ) : PERMIT, PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR
TO AN INSPECTION REQUEST.
Cond: 30
- (BLDG. ) : BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED
MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004 . 6.
*:***,*�.*:+.*.+,:*�.+*+�+..+,..►+*.+�.*+*...+.�.�►:.*.�►**.*.*.�.*..*,..*.►.,�,:**.*.+.*...*....*.►.,�*..�.+�+.**+..*.*..**►*+**�.�.*.....::...*...
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM-4 PM.
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
M06-0149: Entries for Item:390 - MECH-Final 08:20 06/12/2013
Action Comments By Date Unique_
Ke
CR UNIT 6 GCD 12/15/2006 A000096
1.WATER STORAGE TANK TERMINATE 921
T&P VALVE. REMOVE TIE WRAP FROM MC
CABLE AND SUPPORT COPPER PIPES.
2.PROVIDE VACUUM BREAKER FOR HOSE
BIB.
3.CHECK ALL TOILET EXHAUST.
CR UNIT 5 GCD 12/18/2006 A000096
1.LEAK IN MECHANICAL ROOM 984
2.TERMINATE T&P VALVE.
AP FINAL APPROVED FOR UNITS 5 AND 6 JRM 06/05/2007 A000101
336
Total Rows: 3
i
Page 1
************************+*+**+******************************************************+*******
TOWN OF VAIL, COLORADOCopy Reprinted on 06-12-2013 at 08:20:34 06/12/2013
Statement
****+*++******************************************************�*****************+***********
Statement Number: Amount: $2, 578.00 06/05/200611:31 AM
Payment Method: Cash Init: LT
Notation: Mid-
Count/Alpine Bank #256471
-----------------------------------------------------------------------------
Permit No: M06-0149 Type: MECHANICAL PERMIT
� Parcel No: 2101-072-0700-2
2101-072-2200-3
2101-072-2200-5
2101-072-2200-6
2101-072-2200-7
2101-072-2200-8
Site Address: 825 FOREST RD VAIL
Location: GORE CREEK PLACE B[JILDING 6
Total Fees: $2, 578.00
This Payment: $2, 578.00 Total ALL Pmts: $2, 578.00
Balance: $0.00
****�************************************************************+**************************
ACCOUNT 1TEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
MP 00100003111100 MECHANICAL PERMIT FEES 2, 060. 00
� PF 00100003112300 PLAN CHECK FEES 515.00
WC 00100003112800 WILL CALL INSPECTION FEE 3.00
-----------------------------------------------------------------------------