Loading...
HomeMy WebLinkAboutB13-0092 CR1 plans APPROVEDREF. REF. De c k Be d r o o m # 1 (M a s t e r ) Be d r o o m # 2 Be d r o o m # 3 Ha l l w a y Li v i n g R o o m Ki t c h e n W/ D Ow n e r ' s C l o s e t s (l o c k a b l e ) Co m m o n L o b b y Ex i s t i n g F l o o r P l a n Sc a l e - 1 / 4 " = 1 ' Ex i s t i n g E n t r y Cl o s e t t o b e mo d i f i e d f o r a be n c h w i t h h o o k s fo r h a n g i n g a b o v e De c k Be d r o o m # 1 (M a s t e r ) Be d r o o m # 2 Be d r o o m # 3 Ha l l w a y Li v i n g R o o m Ki t c h e n W/ D Ow n e r ' s C l o s e t s (l o c k a b l e ) - Re m o v e d i v i d e r wa l l Common Lobby Sc a l e - 1 / 4 " = 1 ' Pr o p o s e d F l o o r P l a n A1Drawn By-WMK Date-4-9-13 6-3-13 Rev 1Gabilu Inc.- Lodge at Lionshead #5 Renovation St r u c t u r a l C o l u m n t o R e m a i n Kitchen to receive all new cabinets,counter tops and appliances. Soffit and shutters at island cabinet to be removed for more open feel Ex i s t i n g W / D t o R e m a i n Ex i s t i n g D e c k i n g i s t o b e r e f u r b i s h e d or r e p l a c e d w i t h C o m p o s i t e d e c k i n g Th i c k e n e d w a l l b e t w e e n ma s t e r a n d l i v i n g r o o m w i t h bu i l t i n s h e l v i n g a n d a r t n i c h e s is t o b e m o d i f i e d t o a l l o w f o r mo r e s p a c e i n m a s t e r be d r o o m a n d e x p a n d e d ma s t e r c l o s e t In s t a l l n e w dr y b a r ca b i n e t r y t o re p l a c e ex i s t i n g b u i l t in s h e l v i n g an d a r t n i c h e Be d r o o m s t o r e c e i v e n e w fi n i s h e s i n c l u d i n g n e w c a r p e t , ne w w a l l t e x t u r e a n d p a i n t . Bi - f o l d c l o s e t d o o r s t o b e re p l a c e d w i t h b i - p a s s s l i d i n g do o r s GENERAL NOTES-1- Verify Carbon Monoxide Detector installed 2- Asbestos Test- Result Negative 3- Verify All Elec/ Mech meets current code 4- At least 75% of new lighting to be high efficency 5- New Floor finishes throughout (tile/ carpet)6- Retexure drywall smooth throughout unit with new paint 7- Fire Sprinkler system is to be roughed in, without any sprinkler heads installed for future fire protection system for the building. Ba t h r o o m s - A l l b a t h t u b s wi l l b e r e m o v e d , a n d re p l a c e d w i t h s h o w e r o n l y . Ba t h r o o m s t o r e c e i v e a l l ne w v a n i t i e s , c o u n t e r t o p s , pl u m b i n g f i x t u r e s a n d n e w ti l e . ELECTRICAL NOTES- 6 new recessed light fixtures to be added, 3 at bedroom entries and 3 above shower locations (waterproof). All electrical devies to be replaced with new Wa t e r H e a t e r Wa t e r H e a t e r Replace 3 lower fixed window units with awning type windows with opening limiting devices Replace 2 existing window units consisting of three seperate window panes with new single pane fixed glass unitsWindow Replacement- Existing windows are to be replaced with new window units that are to match esiting style, color, etc. New window units are to have a U-value of 0.32Existing Fixed glass unit to remain